Everything posted by HG S2 (Intel Bot)
-
NavHist - 2022 Knox Medal Presentation — Save the Date
The Commodore Dudley Knox Medal Presentation Luncheon at the Army Navy Country Club (Arlington, VA) on Thursday, 25 August 2022. We will be honoring historians Donald Bittner and Norman Friedman! Details to follow! The post 2022 Knox Medal Presentation — Save the Date first appeared on Naval Historical Foundation. View the full article
-
NavHist - Escape from Java: The Extraordinary World War II Story of the USS Marblehead
Reviewed by Jeff Schultz John J. Domagalski’s Escape from Java: The Extraordinary World War II Story of the USS Marblehead delves into the gut-wrenching experiences of an aging light cruiser caught up in the early Pacific War as part of the US Asiatic Fleet. Almost lost to enemy air attack and badly damaged during the Battle of the Flores Sea, the Marblehead’s crew fought desperately to keep their ship afloat which ultimately saved the day. Domagalski is a historian with multiple books and articles to his credit, often focusing on the Pacific War. The book consists of thirty-three chapters broken into several larger sections such as “War Clouds”, “Pacific in Flames,” “Fire from the Sky,” “Escape,” and “The Long Journey Home,” along with an epilogue, bibliography, endnotes and index. The text uses a large amount of eyewitness account excerpts woven into the narrative, supported with a photo section and a few helpful maps. This is one of the more seamless ship-based biography with the right amount of balance between the narrative and the many primary source pieces which flesh out the arcane elements coherently. Domagalski argues in this ship’s memoir that Captain Arthur Robinson’s resourceful crew made the difference, from the commanding officer down to the mess stewards, all of whom took part in the “herculean task” to save their ship. Everyone contributed in this all-encompassing team effort which permitted the ship to recover from the terrible beating it took from Imperial Japanese Navy “Betty” bombers on Wednesday, 4 February 1942, which nearly sank the vessel with two direct hits and a near miss which badly damaged the hull underwater. Several other ABDA cruisers were lost to enemy action in the East Indies campaign, including the USS Houston, HNLMS De Ruyter and HMS Exeter due to the Japanese control of the skies which makes this story all the more remarkable. Marblehead was part of the Omaha-class of postwar light (“scout”) cruisers launched in the 1920s with four smokestacks which gave them a distinctive appearance reminiscent of the smaller “four piper” destroyers of the Wickes and Clemson classes. Top-heavy, with a suboptimal armament layout, the Omaha’s did not prove successful against more modern Japanese designs they encountered. Poorly equipped to deal with modern air threats, the ship lacked a suitable anti-air capability which was only remedied in later refits which allowed the ship to take part as support vessel for August 1944’s Operation Dragoon. Domagaski follows the light cruiser from prewar to war’s end, along the way providing a brief glimpse of the US Asiatic Fleet which served mostly in China until forced to withdraw to the Philippines as war loomed. In this way the book is not only the Marblehead’s story but also that of the larger Asiatic Fleet which makes it more than merely a narrow look at one ship. Admiral Thomas Hart, the commander of the Asiatic Fleet at war’s beginning, plays an important part in the story, which Domagalski wisely interweaves with the Marblehead’s exploits, is a critical figure that like the light cruiser, was a product of the prewar Navy who had one last war to fight. Hart’s combat career ends after the East Indies debacle but he continued on in administrative roles much as the repaired light cruiser did in the South Atlantic, serving the larger Allied cause in a secondary theater. Domagalski spends considerable time discussing the damage control efforts. This part of the book in particular is a tribute to the brave crew, a number of whom were killed or wounded in the air attacks. While the two direct hits caused considerable damage, the underwater near miss caused a disproportionate amount of trouble for the crew much as the heavy rudder damage which initially prevented anything other than circles. It was not until much later that the rudder could be properly repaired, so local ingenuity reduced the problem along with using engines to help steer the ship in the correct direction as an expedient solution. Aside from considerable suffering, there were some bright spots in the journey, such as when Marblehead escaped potential destruction in the cramped port of Tjilatjap on Java’s south coast, then later escaped again from British-held Sri Lanka, leaving for South Africa before Admiral Nagumo’s carriers raided the area for considerable loss and finally the sheer fact that the ship held together as it sailed alone limping over a great distance on its way to Brooklyn Navy Yard. Among the vignettes featured is that of Dr. Corydon Wassel, USN who performed incredible feats which would be recounted by President Roosevelt in a “fireside chat” of 28 April 1942 later to the delight of a mass radio audience begging for heroes in the dark early days of the war. He took charge of ten US Navy wounded from USS Houston and Marblehead who had been offloaded as too badly wounded to continue a sea journey, but refused to abandon them; shepherding them using sheer force of will and luck via Dutch trains and ambulances plus a fortuitous British motorized column. Eventually they had a timely escape aboard the Dutch merchant ship Janssens from the endangered port of Tjilatjap and on to Australia after a harrowing encounter with strafing Japanese Zeroes, earning the Navy Cross for his brave actions. The Marblehead’s intrepid skipper Captain Robinson and several other sailors also earned the same prestigious decoration. Domagalski’s Escape from Java: The Extraordinary World War II Story of the USS Marblehead paints an engrossing tale of an obsolescent ship’s survival amid great odds set against the brutal early fighting of the Pacific War. This book will appeal to a wide audience not only as high wartime adventure but simply as a story of gritty perseverance when the odds are heavily against. A past contributor, Schultz teaches history at a community college in Pennsylvania. Escape from Java: The Extraordinary World War II Story of the USS Marblehead. By John J. Domagalski (Barnsley, UK: Pen and Sword Military, 2022). The post Escape from Java: The Extraordinary World War II Story of the USS Marblehead first appeared on Naval Historical Foundation. View the full article
-
CDR Salamander - Ukrainian Lessons as Old as Time: Logistics-Auxiliaries-Prizes
We opened Midrats last Sunday with a question to our guest Jimmy Drennan about what lessons he's taken so from from a maritime perspective during the Russo-Ukrainian War. This is a question I would like all of our navalists to think hard about. One constant we see throughout history is that small to medium wars will signal to you what you need to be ready for when the big war comes - and come it will. They always do. Well, yesterday another Midrats alumnus, Dr. James Kraska has a tightly written overview of some takeaways for him, and as always with Kraska's work ... his observations deserve close consideration. The setback for Russia was apparently tied to the oldest of military challenges—force sustainment during combat. The capture of Snake Island may help Ukraine to position anti-ship cruise missiles south of Odessa to weaken the Russian stranglehold on the port city. The Attack The resupply ship that never reached Russian forces on the island is believed to be the Russian naval tugboat Spasatel Vasily Bekh. The ship had a loaded displacement of 1670 tons. Part of the Black Sea Fleet, the Vasily Bekh was launched in 2016 and commissioned in 2017. The tugboat is designed to provide towing services for ships in distress, firefighting at sea and ashore, freshwater and electrical supply to other vessels, and to evacuate injured personnel. It carried a complement of 20 crewmembers with capacity for 36 more people and could carry tons of supplies. Coming after the sinking of the Black Sea flagship Moskva on April 14, the strike on the Vasily Bekh underscores the Russian Navy’s inability to establish sea control in the western area of the Black Sea. The Moskva was the largest Russian warship damaged by enemy fire since 1941, when the Luftwaffe damaged a Soviet battleship in Kronshtadt. The Russian withdrawal from Snake Island also demonstrates the importance of combat logistics. While Russia maintains internal lines of communication that can feed the Russian war machine inside Ukraine, the Russian element that occupied Snake Island had to be supplied from the sea, raising questions about the rules for targeting ships supporting the armed forces in war. If you want to know the sobering reality of war at sea - especially how we have done it in our entitled mindset of decades of dominance at sea, read close his legal outline of "Targeting Combat Logistics" next. I don't know about you, but it immediately makes me want to ask some very hard questions to people who I don't think are ready for them. Then I want you to play that out for the USA vs. China west of Wake. Heck, make it globe-wide. Later in his article, a few conversations I've had with Claude Berube and my co-host from Midrats came to mind - about Letters of Marque. Where does Ukraine's government stand on Letters of Marque ... because as this war drags on ... there are some interesting options for them ... and depending on how that plays out, for any - ahem - nation that may find itself at war at some time in the future with the People's Republic of China; Russia’s plans to leverage greater support from merchant ships also implicates the law of naval warfare. Russian-flagged merchant ships are liable to capture by Ukrainian naval forces, and they may be converted to use after adjudication of prize in a court of admiralty jurisdiction. The Russian merchant fleet has 1,155 ships and 7.7 million deadweight tons and could serve as an effective force multiplier for the Russian military services. China’s merchant fleet is among the top ten largest in the world, with 87 million deadweight tons and 4,881 ships. Decimated by uncompetitive costs of operation resulting from the Jones Act, the U.S. fleet is shockingly small and shrinking. The number of U.S. oceangoing commercial ships in the U.S. merchant fleet fell from 282 vessels to 182 ships since 2000. This means that while Russia and China can supplement their auxiliary naval forces with national-flagged merchant ships, the United States would find that option more challenging. This situation is ironic because unlike Russia and China, which enjoy internal lines of communication, U.S. requirements for force replenishment depend on a massive logistical flow to Asia and Europe. American forces operate forward, along the first island chain running from Japan to the Philippines, and on NATO’s eastern border in Europe. Sustainment of these forces likely would require merchant shipping. Like Russia, the United States may also resort to contracts with merchant carriers to provide force sustainment. These merchant ships would also be liable to capture by the enemy during armed conflict, and they may be attacked and destroyed if they resist capture. Yes, there are a lot of maritime lessons in this mostly land-centric war. The longer this goes - if you are willing to open your mind a bit - the more interesting the implications that may evolve for the US national strategy - or at least in the classified annexes. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=sWyHSR2ObAw:wRBrq_LFjxM:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=sWyHSR2ObAw:wRBrq_LFjxM:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=sWyHSR2ObAw:wRBrq_LFjxM:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=sWyHSR2ObAw:wRBrq_LFjxM:F7zBnMyn0Lo View the full article
-
DID - Boeing To Procure Super Hornet Armament Equipment | BIRD AMPS On UN Helicopters | Taiwan Demonstrated T-5
Americas L-3 Communications Vertex Aerospace won a $23.5 million modification, which extends services and adds hours for continued depot level maintenance, logistics, and sustaining engineering services in support of the C-12 Navy aircraft and the C-12 Marine Corps Reserve aircraft. The Beechcraft C-12 Huron is based on the Super King and 1900 series platforms and serves with the United States military as a utility transport among other roles. Work will take place in Louisiana, Japan, Bahrain, Cuba, North Carolina and Maryland. Estimated completion will be in January 2023. Boeing won an $18.7 million modification, which exercises options to procure the following aircraft armament equipment for F/A-18E/F production aircraft: SUU-79C/A wing pylons for 10 aircraft, SUU-80A/A low drag pylons for 4 aircraft, and ADU-773A/A adapters for 22 aircraft, as well as provide sustaining engineering. Work will take place in Arizona and Missouri. Estimated completion will be in August 2028. Middle East & Africa The Biden administration is reportedly discussing the possible lifting of its ban on US sales of offensive weapons to Saudi Arabia, but any final decision is expected to hinge on whether Riyadh makes progress toward ending the war in neighboring Yemen, according to four people familiar with the matter. BIRD Aerosystems has announced that the company has completed an installation of its AMPS-MV Airborne Missile Protection System, which includes the MACS sensor, on UN Air Operations Mi-17 helicopters. The AMPS-MV systems is to protect the UN Air Operations VIPs when flying in Africa. This follow-on order comes after several previous installations of Bird’s products on UN Air Operations aircraft in recent years. Europe F-15Es and F-35As from Royal Air Force Lakenheath are now in Souda Air Base, Greece for Exercise Poseidon’s Rage. The exercise will take place from July 11-22 and Hellenic Air Force’s 115 Combat Wing will be the exercise’s host. This exercise is the first concurrent deployment of F-15Es and F-35As from USAFE to the same forward operating location. It is also the first time the F-35A from Lakenheath is deployed to Souda. Asia-Pacific The Taiwanese Air Force has demonstrated its new T-5 Brave Eagle advanced jet trainer at Chihhang air base in Taitung. The aircraft is a product of the country’s push to prioritize indigenous development of advanced military equipment amid increasing pressure from China. Developed by the state-owned Aerospace Industrial Development Corporation, the T-5 Brave Eagle is suitable for air-to-air and air-to-ground combat training missions. Today’s Video WATCH: Taiwan bolsters defense as China increases military presence | DW News View the full article
-
CDR Salamander - Check Your Magazine Inventory Recently? missile>bomb>shell>bullet>blade>club>fist>teeth
Some warning will only be given so many times. We were warned a few months in to the 2003 invasion of Iraq. We were warned again five years later when we were trying to source what was needed to support the uplift in forces in Afghanistan while Iraq still had high demands. Our allies pretty much went Winchester in the 2011 operations against Libya. We can barely partially source small and medium sized conflicts ... we are not ready for a larger one. That is a simple fact that seems too painful for people to clearly look at. Like the US Navy excels in damage control by design and training, in theory the US military writ large excels in logistics. What good is the culture and practice if you lack the inventory to move, the production to create ... and even if you did, the strategic sealift and airlift to bring the weapons to the fight? In peace and in bushwars you can get by with shortages as you can always scrounge around to fill gaps (I have fun stories from AFG, but maybe later), but in a great conflict - there is no untapped resource. You either have it or you don't. At peace, "experts" will sell you comfortable theories about "short, decisive wars" and "72-hr war-winning CONOPS" that never pan out once the first ITL button is pressed. Over at FT, John Paul Rathbone and Steff Chavaz join the chorus trying to wake everyone up; In May, when Washington ordered 1,300 Stinger anti-air missiles to replace those sent to Ukraine, the chief executive of Raytheon, the defence company that makes them, replied: “It’s going to take us a little bit of time.” Paris, meanwhile, has sent 18 Caesar howitzers to Kyiv — a quarter of its total stock of the high-tech artillery — but it will take French company Nexter around 18 months to make new ones. The Ukraine war has exposed the skimpiness of western defence stockpiles — especially of unglamorous but crucial supplies such as artillery shells that have been the mainstay of fighting. Lack of production capacity, labour shortages and supply chain snafus — especially computer chips — mean long lead times to replenish them. The shortages, defence officials and analysts say, reveal the west’s complacency about potential threats since the end of the cold war, now shown up by the desire to shore up Ukraine with military support. Fetishes for high-tech weaponry and lean manufacturing have obscured the importance of maintaining stockpiles of basic kit, they add. ... “It’s like the first world war’s great shell crisis,” said Shea, recalling a 1915 scandal when massive artillery use in trench warfare depleted British stocks, a shortage that led to high troop casualties and the resignation of prime minister HH Asquith.Ponder this as well. The maritime domain has not been as tested as the land component the last few decades. As such, we can assume that our magazine inventory is even more "exquisitely" designed. In closed door sessions, I hope that Congress is demanding answers and hard numbers in this area ... and then will fund to fix them. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=51w8yi6JOiI:vHDPxSQthK8:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=51w8yi6JOiI:vHDPxSQthK8:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=51w8yi6JOiI:vHDPxSQthK8:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=51w8yi6JOiI:vHDPxSQthK8:F7zBnMyn0Lo View the full article
-
DID - B-2 Can Drop B61-12 | Turkey Launched TF-X Turbofan Competition | Norway Gets New Identification Friend-or-Foe Sensor Tech
Americas Sikorsky Aircraft won a $32.6 million order, which procures one CH-53K containerized flight training device based on low-rate initial production Lot 4 configuration in support of CH-53K phase II training system efforts. The CH-53K King Stallion is a new-build helicopter that will expand the fleet’s ability to move more material, more rapidly throughout the area of responsibility using proven and mature technologies. There are four System Development Test Article CH-53K with Marine Operational Test and Evaluation Squadron One (VMX-1). The squadron completed Initial Operational Test and Evaluation of the aircraft in 2022. There are 46 aircraft on contract, including four heavy lift helicopters for the government of Israel. Designed to lift nearly 14 tons (27,000 lbs/12,247 kg) at a mission radius of 110 nautical miles (203 km), in Navy high/hot environments, the CH-53K is capable of lifting almost triple the baseline CH-53E lift capability. Work will take place in Virginia, Connecticut and Florida. Estimated completion will be in December 2024. A B-2 stealth bomber recently tested dropping a production unit of the B61-12 Joint Test Assembly using the Radar Aided Targeting System (RATS). The capstone test was carried out at the Tonopah Test Range on June 14. The 72d Test and Evaluation Squadron also took the opportunity to test the RATS Application Tool. The software allows pilots in the cockpit to verify that the RATS is operating correctly prior to weapon release. Middle East & Africa Elbit Systems announced the launch of a new range of vision systems for military helicopters, integrating sensor array, an artificial intelligence (AI) powered mission computer, and a Helmet Mounted Display (HMD) system. The technology is designed to enable helicopter pilots to see through the body of the aircraft, offering real-time, clear, coloured wide field of view during day and night operations. According to Defense News, the Turkish government has officially launched a competition for the local development of a turbofan engine that will power the country’s national fighter jet in the making, the TF-X. Reportedly, two Turkish engine makers, Tusas Engine Industries and TRMotor, have replied to the RFP. Europe The Norwegian Defense Material Agency has awarded a $15.2 million contract to German firm Hensoldt for upgraded Identification Friend-or-Foe (IFF) technology. Under the contract, the company will deliver Monopulse Secondary Surveillance Radars and LTR400 DNG transponders to the Norwegian military. Asia-Pacific France and India have agreed to co-develop a new engine for the Indian Multi Role Helicopter (IMRH) project. The 13–16 tonne IMRH is being conceived as a replacement for Mil Mi-17 utility helicopters, which form the mainstay of the Indian military’s heavy-utility rotorcraft fleet. IMRH will be capable of carrying out a wide variety of missions, including transporting troops, conducting assault operations, air maintenance and anti-submarine warfare. South Korea will establish a strategic command by 2024 to oversee the country’s preemptive strike strategy and the assets to execute it, the Defense Ministry said. During a July 6 seminar led by President Yoon Suk Yeol, the ministry discussed key defense policies meant to counter the threat of North Korean nuclear missiles, including the Kill Chain strategy and well as more efficient efforts to develop defense capabilities. Today’s Video WATCH: Indian AMCA VS Turkish TF-X Fifth Generation Stealth Fighter View the full article
-
DID - USN Tapped For MQ-8C | US Sends HIMARS To Ukraine | Elbit Systems Awarded $80 Million Contract To Supply DIRCM To An Asian Country
Americas The US Navy’s MQ-8C has tested the Single System Multi-Mission Airborne Mine Detection (SMAMD) system for the first time. Testing took place at Eglin Air Force Base in May, according to Naval Air System Command. “The team successfully demonstrated that the prototype SMAMD System effectively operates as designed aboard the MQ-8C Fire Scout unmanned helicopter in relevant real world environments,” said Capt. Thomas Lansley, Fire Scout program director. “This cutting-edge technology could really enhance Fire Scout’s capability going forward.” Carrying out the tests in day and night, the team gathered data on drifting, tethered, and moored mines throughout beach zone to deep waters. The F-16 Block 30 employed by 7 US Air Force guard units and 2 reserve units are now capable of firing the AGM-158 Joint Air-to-Surface Standoff Missile (JASSM). This was made possible by a team from the Air National Guard and Air Force Reserve Command Test Center (AATC). Middle East & Africa The Qatar Emiri Naval Forces (QENF) received a landing ship and three landing craft in a ceremony held at Anadolu Shipyard’s Tuzla facility, the Qatari Ministry of Defense and the Turkish company announced. The vessels were identified as the 80 m landing ship tank (LST) Fuwairit (QL 80), the two 40 m landing craft mechanised (LCMs) Ishat (QL 40) and Broog (QL 41), and the 15.7 m landing craft vehicle and personnel (LCVP) Al-Aaliya (QL 15). Europe The United States is sending to Ukraine up to $400 million in additional military equipment and supplies, including four more medium-range rocket systems and ammunition, as the embattled nation tries to repel Russia’s advances in the Donbas region. Speaking to reporters on condition of anonymity on Friday, the official said the new US arms package would include four additional HIMARS and more ammunition, bringing the total number of these systems to 12. Ukraine purchased 2,900 RGW 90 Matador portable anti-tank weapons manufactured by the German company DND, a subsidiary of Israeli Rafael Systems, according to German media). The RGW 90 Matador (also called Panzerfaust 3 in the German army) is a man-portable anti-tank rocket launcher weapon developed between 1978 and 1985 and first entered into service with the German army in 1987. Asia-Pacific Israel’s Elbit Systems announced on July 5 that it has been awarded a contract to provide direct infrared countermeasures (DIRCM) and airborne electronic warfare (EW) systems worth up to US$80 million for a country in Asia-Pacific. It will supply its C-Music DIRCM systems, as well as Infrared-based Passive Airborne Warning Systems (IR-PAWS) for different types of aircraft. Today’s Video WATCH: U.S. Navy MQ-8C Fire Scout Takes Off and Flight View the full article
-
CDR Salamander - What to do With America's Maritime Disinterest, with Jimmy Drennan - on Midrats
Few navalists can look around them and feel content that their peers, government, and the American people understand - or for that matter seem to care - that our nation's wealth, health, and security is all based on the fact that we are a maritime and aerospace republic. Without excellence, mastery, and control of these two areas in the face of the challenge from China, all else is in danger. Inside and outside government, what needs to be done to create the conditions so we can provide for those generations who follow us the place and the world previous generations earned for us? Making a return to visit, our guest for the full hour this Sunday from 5-6pm Eastern to discuss this broad ranging topic will be Lieutenant Commander Jimmy Drennan, U.S. Navy, former president of the Center for International Maritime Security. Join us live if you can, but it not, you can get the show later by subscribing to the podcast. If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. You can find us on almost all your most popular podcast aggregators as well. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=peeszDoLogc:LSk3uawXG-E:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=peeszDoLogc:LSk3uawXG-E:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=peeszDoLogc:LSk3uawXG-E:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=peeszDoLogc:LSk3uawXG-E:F7zBnMyn0Lo View the full article
-
CDR Salamander - Fullbore Friday
It is a beautiful place today when you drive by it, but then you notice a curious red dragon facing a wood. The Welsh soldiers were just seven months out of training when they entered into combat at Mametz Wood. Many had never fired a round in combat, and used broomsticks rather than rifles at drill practice. In sharp contrast they faced the elite Lehr Regiment of Prussian Guards - highly-trained professional soldiers who were deeply entrenched in the dense woods. Their trenches were dug into chalk and thick wire stretched through the battleground, while the wood was heavily fortified with machine guns.As part of the Battle of the Somme was the Battle of Mametz Wood; Mametz Wood was the objective of the 38th (Welsh) Division during the First Battle of the Somme. The attack was made in a northerly direction over a ridge, focussing on the German positions in the wood, between 7 July and 12 July 1916 . On 7 July the men formed the first wave, intended to take the wood in a matter of hours.The British system was exceptionally hard on the homefront. Like the regiment my ancestors fought in during the American Civil War, the guy to the left and right of you was your neighbor, your brother, your cousin, your co-worker, your classmate, your friend. Lord Thomas of Gresford recently highlighted the role of the Division in the House of Lords, describing the loss of men in the battle as a "huge tragedy for the whole of Wales". He said 1,000 men from the Rhondda Regiment went in to battle that day, but only 135 men answered the roll call the following day. ... 3,993 killed or injured there.In the first day, over 400 men were killed just trying to get from that red dragon to the treeline. The poet Robert Graves fought in the battle and, having gone back into the wood once the battle was finally over, wrote: "It was full of dead Prussian Guards, big men, and dead Royal Welch Fusiliers and South Wales Borderers, little men. Not a single tree in the wood remained unbroken." Take some time to follow the links above and read up on this little snapshot of the sacrifice from WWI years before the USA threw its hat in the ring - especially this one about what a walk in the woods is like today. First posted July 2016. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qLRwkSgXElk:V6gB0KcJsVw:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qLRwkSgXElk:V6gB0KcJsVw:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qLRwkSgXElk:V6gB0KcJsVw:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qLRwkSgXElk:V6gB0KcJsVw:F7zBnMyn0Lo View the full article
-
CDR Salamander - Pluperfect's Programmatic Imperfection on the Future Perfect's Presentism
Today let's look not at tactical, operational, or even strategic challenges. No, let's instead look at the political, bureaucratic, and industrial structures that exist to enable everything else. There is a lot of money floating around the USA's defense budget and yet in the post-Cold War period no one feels we are making progress. On the naval surface side of the house, the promised future seems to underperform (LCS), be stillborn (DDG-1000), never arrive (CG(X)), or become limping testimony of institutional arrogance (FORD). On the land side, any attempt to move beyond Cold War era platforms fail to transition past prototype from self-propelled howitzers to amphibious assault craft. In the air, we cancelled F-22, overestimated F-35, and are to the point we are restarting the F-15 line in an echo of Navy's restarting DDG-51 last decade. Why? We did this to ourselves. In 1986 Goldwater-Nichols was signed along with the cult-of-the-Joint that followed and the now accretion-hobbled post-Cold War acquisition system that is more interested in process - and itself - than actually producing things that displace water, make shadows, and can engage an enemy. Our natsec nomenklatura on balance is motivated by something - incentivized by something - but providing usable kit serving to support national security needs of our nation is not it. Desert Storm in 1991 was won by the pre-Goldwater-Nichols military. Since then, we were defeated by a pre-modern culture in Afghanistan, Iraq is still a wreck in progress, and our enemies seem comfortable in calling our bluffs - some successfully, some not. We are not hopeless or completely unable - mass has use and we are in most areas still the big kid - but we are underperforming and allowing our comparative advantage to fade year after year in to parity - when we should be moving from strength to strength. It doesn't have to be like this - but we seem happy to allow it to be. The same institutions and mindsets that failed to see the obvious collapse in Kabul not even a year ago, failed to see Russia's advance in to Ukraine this winter. No one is accountable. Everyone thinks they did a good job. ...and yet, the national security apparatus at the dawn of the second half of 2022 wants you to believe that this time, in the face of China's rise, they will get it right. They use "pacing" to describe a threat that is gaining, passing, or lapping our own. They come up with their buzzwords and promises each POM cycle as if they have always gotten things right before - and as they had in the 30+-yrs they have owned our system - that they have all the time in the world to get their contracts, generate their white papers, pad their resumes, and prepare for their just reward. We should defer to them. We should acknowledge their authority. We should be thankful they are in power. Since the "do more with less" of the Perry years of the 1990s, through the Age of Transformation of the Rumsfeld era, to the distractions of petty domestic political games and reputation-covering of the last decade and a half, we find ourselves losing our status of the primary power in the Pacific to a nation all the Smartest People in the Room™told us was a peaceful rise, a way to get rich, ... a fair partner in the international system ... you know the drill. We accepted the promise of a future that was never delivered, are less secure than we were, and then the same people, processes, and organizations who got us here demand that we should quietly accept their continued leadership. Bullshit. The future is here, we were lied to, the nation's security is weaker than at any point since the 1980s, and the worst people have gotten rich in the process. In an ideal world, Congress would already have Goldwater-Nichols replaced with something more aligned with this century and not the last; our moribund, corrupt, and incompetent acquisitions system pulled up root and branch and replaced; the institutional ball-gag and intellectual lobotomy of Joint would be gone - but alas - we don't live in Salamanderland. We have what we have, and smart people are doing their best to bring attention to the crisis at our feet from a lack of Congressional action and Executive Branch imagination. The future is here and time is short. One of the best natsec minds out there, Mackenzie Eaglen, put out over the weekend a must read. If I could make her Empress I would, but instead all I can do is help spread the world. Head on over and read her article in Real Clear Defense in full. Here are the bits I hope people learn by heart; The U.S. military’s conventional deterrence and global leadership will also extinguish if time is continually wasted on uncertain wishes for an equally uncertain tomorrow. Unlike the financial state or strategic posturing of American military forces, there is one variable of which neither Congress nor the Executive has control—one that burns away irrespective of perception: time. Two generations of leadership consumed two generations of possible, incremental gains in capability and achieved nothing but broken promises and IOU's. Heck, "we" even had to trick the system and fool ourselves to get the Super Hornet in production by acting like this new airframe was just an update to an existing one. That was the exception. Never forget, there is a lot of money to be made on extending development times, prototyping things that can never be brought in to production, or allowing the good idea fairy to go on a drunken requirements rampage without adult supervision. There is also a lot of money in killing potential advances - like the X-47B - from going in to production to keep the high-margin developments in place without endangering paranoid communities until certain year-group leader's retirement dates arrive. Cynical? Sure. Based on fact? Yes. As the military enjoys the luxury of manufactured peace until 2027 based on optimistic assumptions, Pentagon leaders are simultaneously giving away permanent combat power and capability today as troops wait for the vaunted tomorrow to bear fruit. Defense planners are moving far too fast in giving away what cannot be clawed back and far too slow in estimating when Beijing might move forcibly against Taiwan. This is both an invitation for aggression and a recipe for failure. Why is our primary warship class in 2022 derived from a platform designed before Goldwater-Nichols/JCIDS/Joint grew deep roots? Did we learn nothing from the premature decommissioning off the OHP FFG and SPRUANCE DD for the promise of LCS and DDG-1000? Accepting a unilateral drawdown of trained manpower, capacity, training, and posture throughout the next decade will result in a self-inflicted stasis, in which our weapons and warfighters become more like antiques than armed forces—expensive yet impractical. The Pentagon and Congress have for three decades delayed modernization critical to the sustainment of credible U.S. combat power. Backs against the wall now, policymakers must not cede American military supremacy to a “dusty death,” but rather revise the pace of productivity by accepting that the armed force cannot survive on “buying time” to gain capability, but rather buying capability to gain time. No more Charlie-Brown and Lucy with the football. There is no time to "divest to invest" and we should have enough self-respect to stop deferring to people, institutions, and processes that have failed us for generations. As Jerry Hendrix mentions in his recent article over at National Review; the Chinese are serious in their plans while we are ... doing what exactly? China is willing to suffer pain to surpass the West and revenge its “century of humiliation.” We can expect that China’s new supercarrier will go to sea often to test its new capabilities and then begin putting its new aircraft and pilots to their paces. China already has two more Type 003 supercarriers under construction and is on pace to produce one every 18 months for the foreseeable future. We struggle to build a new carrier every four years. With its construction capacity, China will soon have the upper hand in sea control and power projection in the Pacific and Indian Oceans. In addition to the changes outlined above and in previous posts, let me remind you of other acts I have been asking for the last few years when "The Long Game" became the next away game; 1. No weapon system presently under production will be allowed to stop production until its replacement is under production itself. 2. Acknowledge we have lied to ourselves for decades actual magazine requirements in war (use "new" lessons from the Russo-Ukraine War for the tender to save face - whatever works) - and accelerate/restart production of everything from ASW weapons to strike weapons of all types. 3. Acknowledge that we do not have enough weapons - specifically anti-air and land attack - weapons on our warships. Every war proves this and recent experience tells us this. 4. If I take away your access to satellite VOX & DATA and you cannot navigate and fight, you are not a wartime asset and your funding sent somewhere useful. 5. Accelerate capacity for repair away from fleet concentration areas, preferably afloat. Maximize production of sealift and begin the process to replace the C-5M. 6. If your combat unit does not have organic, robust unmanned ISR under the command of your unit's commander, you are worthless in the war to come and you will have such a capability by FY25 or you will be disestablished. 7. Pass the Salamander Bill: no General of Flag Officer shall, for a period no less than 5-yrs from retirement date, receive compensation of any kind or anything of value from any publicly or privately held company that does business with the federal government, nor shall they serve in any non-paid positions with same. Yes, #7 is important. If you have not realized why in 2022, you are part of the problem. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=MzYafWuPQ7Q:0VPYywREnnM:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=MzYafWuPQ7Q:0VPYywREnnM:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=MzYafWuPQ7Q:0VPYywREnnM:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=MzYafWuPQ7Q:0VPYywREnnM:F7zBnMyn0Lo View the full article
-
DID - GD Tapped For Abrams Support | Algeria Unveiled T-62 | Royal Thai Navy Selects Israeli Hermes 900
Americas General Dynamics Land Systems won a maximum $145.5 million deal for multiple spare parts in the Abrams Main Battle Tank, Stryker Family of Vehicles, Light Armored Vehicle Family of Vehicles, Cougar, Buffalo and RG-31. This was a sole-source acquisition using justification 10 US Code 2304(c)(1), as stated in Federal Acquisition Regulation 6.302-1. The M1 Abrams entered service in 1980 and currently serves as the main battle tank of the United States Army and formerly the Marine Corps. Work will take place in Florida. Estimated completion date is July 29, 2029. Booz Allen Hamilton won a $15.5 million contract modification to exercise Option Year Four for analysis support services for III Marine Expeditionary Force and Marine Corps Installations Pacific (MCIPAC). Work will be performed in Okinawa, Japan, and is expected to be completed July 7, 2023. The MCIPAC Regional Contracting Office, Marine Corps Base Camp Butler, Okinawa, Japan, is the contracting activity. Middle East & Africa The Algerian People’s National Army (ANP) unveiled the T-62 tanks that it has converted into fire-support vehicles during the parade marking the 60th anniversary of the country’s independence on July 5. The parade included 10 of the conversions, which involved replacing the tank’s original turrets with the Russian-made Berezhok turret that has been used to upgrade many of the ANP’s BMP-1 infantry fighting vehicles. This involved fitting an additional armoured collar around the T-62’s turret ring to accommodate the smaller diameter of the Berezhok. Europe Ultra Electronics Ocean Systems won a $42 million deal supporting the production and delivery of Acoustic Device Countermeasure (ADC) MK 2 and ADC MK 2 training devices used on surface vessels and submarines. This contract has a five-year ordering period from fiscal years 2022 to 2027, and potential deliveries of Foreign Military Sales units and services in support of the United Kingdom and the Netherlands. Work will take place in Massachusetts, Virginia and North Carolina. Estimated completion will be in July 2027. Germany’s federal government approved the draft 2023 federal budget, as well as finance plan 2022?26 and the Bundeswehr special fund announced following Russia’s invasion of Ukraine. Military spending for the next four years reflects the benchmarks decided by the federal cabinet in March, having been revised upwards by only a few million euros. Core defence spending in 2023 will amount to $55.4 billion, a 0.6% nominal decrease from 2022 but a EUR2.76 billion increase compared with the estimate in the finance plan approved in June 2021. The core allocation to defence is set to remain flat in nominal terms until 2026. Asia-Pacific Royal Thai Navy spokesman Vice Adm Pokkrong Monthatphalin announced that the service has selected the Israeli Hermes 900 after closing an international bid. The contract is worth around $110 million and the contract is expected to be signed this month. According to the news report, vendors from China, Turkey and United States also bid in the competition. Today’s Video WATCH: Elbit Systems / HERMES 900 MCA DEMO View the full article
-
DID - Lockheed Tapped For F-35 Support | Qatar To Give Lebanon’s Armed Forces $60M | Finnish Border Guard Orders OPVs from Meyer Turku
Americas Lockheed Martin won a $22.6 million contract modification, which adds scope to procure 22 Electro-Optical Distributed Aperture System shipsets for Distributed Aperture System for Technology Refresh-3 developmental and operational testing, Block 4 testing, the Electromagnetic Environmental Effects aircraft, and a spare sensor set provision in support of F-35 Lightning II next generation capabilities. Work will take place in Texas. Estimated completion will be by July 2023. MH Systems won a $24.7 million deal for the purchase of aircraft painters manpower support. This contract provides for the augmentation of 402d Aircraft Maintenance Group organic forces for depot paint and de-paint operations for current and incoming workload for C-5, C-17, C-130, F-15, Global Hawk and JSTARS weapon systems. Work will take place in Georgia. Expected completion date is July 17, 2027. Middle East & Africa Qatar has given Lebanon’s cash-strapped armed forces $60 million, the foreign ministry in Doha announced. “The announcement comes within the framework of the State of Qatar’s firm commitment to support the Republic of Lebanon,” the ministry said in a statement. Lebanon defaulted on its debt in 2020, the local currency has lost around 90 percent of its value on the black market, and the UN now considers four in five Lebanese to be poor. Europe The Finnish Border Guard has awarded a contract to Meyer Turku for two new liquefied natural gas (LNG)-powered offshore patrol vessels (OPVs). The new vessels will be an improved variant of the OPV Turva, which was commissioned into FBG service in 2014 as the world’s first LNG coastguard ship. The contract will provide post-design services for armoured platforms including Bulldog, Warrior, Challenger 2, Challenger 3 when in service and other vehicles. According to a contract award notice, the Land Equipment Vehicle Support Team, part of the Ministry of Defence, intends to award a single-source contract for up to 5 years plus two option single years (total maximum contract duration including options is 7 years) to Rheinmetall BAE Systems (RBSL) for provision of Post Design Services (PDS) activity for current in-service armoured platforms. Asia-Pacific The Indian Army has issued a tender to local defense firms for 30,000 night sights for its US-made rifles. The sights will be installed on the country’s American SiG Sauer assault rifles to support soldiers patrolling its borders with China and Pakistan. The new device must reportedly have an adjustable illuminated Bullet Drop Compensator reticle pattern to enable target detection up to 600 meters. Today’s Video WATCH: C-5 Galaxy – the story of a flying whale View the full article
-
DID - NG Tapped For H-1 Avionics | France, Sweden, Germany To Develop Future Transport Aircraft | KF-21 Undergoes Ground Tests
Americas The Iowa Air National Guard has repainted an F-16A static display in a gold paint scheme. This scheme replicates the F-16C that was painted in gold back in 1996 to commemorate the 185th Fighter Wing’s 50th anniversary back then. The original F-16C #85-1565 is now a QF-16 and will eventually be destroyed during live-fire training exercise. Northrop Grumman won a $337.9 million deal, which provides researching alternatives, investigating and documenting new capabilities and anomalies related to H-1 avionics and weapons; and the development, integration, verification, validation, and testing of H-1 Integrated Avionics Systems, as well as identifies maintenance capabilities, upgrading and/or updating test equipment and other support equipment required to support the systems. Work will take place in California. Estimated completion will be in June 2027. Middle East & Africa The Israeli Air Force has wrapped up its investigations into an AS565 naval helicopter crash that killed both pilots on January 3. Investigators found that aluminum parts deep inside the helicopter’s engine had corroded and a turbine blade had broken off while leading to a fire. The manufacturer does the inspection of the components and this component is not part of routine checks stipulated by the helicopter’s manufacturer. Amentum Services won a $16.9 million modification for maintenance, supply and transportation logistics support services for Army Prepositioned Stocks-5. The Army Prepositioned Stock program is a cornerstone of the Army’s ability to rapidly project power and send a clear signal of U.S. commitment. Sets of equipment, such as all the tanks and wheeled vehicles of an armored brigade combat team, are strategically prepositioned in climate controlled facilities worldwide. Work will take place in Kuwait. Estimated completion date is January 2, 2023. Europe Jane’s reports that France, Germany, and Sweden have agreed development of a new fixed-wing medium-lift transport aircraft. The French Ministère des Armées reported the agreement, saying that the three countries launched the Future Mid-Size Tactical Cargo (FMTC) programme during the Armée de l’Air et de l’Espace (AAE)-hosted French Presidency of the Council of the European Union (PFUE) European Wings event. Asia-Pacific A KF-21 fighter prototype was spotted undergoing ground tests at Korea Aerospace Industries’ facility near Sacheon airport, South Korea. Located south of the country, Sacheon Airport (HIN) houses the headquarters of Korea Aerospace Industries, which develops and manufactures the upcoming 4.5 generation fighter jet. The 3rd Flying Training Wing of the Republic of Korea Air Force (ROKAF) is also based in the vicinity of the airport. Today’s Video WATCH: KF-21 Boramae undergoing ground test (higher quality) View the full article
-
NavHist - The Netherlands East Indies Campaign 1941-42: Japan’s Quest for Oil
Reviewed by Jeff Schultz Marc Lohnstein’s The Netherlands East Indies Campaign 1941-42: Japan’s Quest for Oil covers a typically unheeded early Pacific campaign, fought for the resource rich Dutch East Indies, which showcased a dysfunctional Allied coalition effort conducted under fraught circumstances exacerbated by prewar decisions but which fought desperately until overwhelmed. Lohnstein is a historian, assistant curator of the Royal Home for Retired Military Personnel and Bronbeek Museum in Arnhem, and a writer who focuses on Dutch colonial topics.This 96-page Osprey monograph is divided into several sections: “Origins of the Campaign,” “Chronology,” “Opposing Commanders,” “Opposing Forces,” “Opposing Plans,” “The Campaign,” and “Aftermath” along with a bibliography, and index; well-supported by many photos, detailed color maps, orders of battle, and a selection of color plates. Lohnstein argues the Imperial Japanese naturally looked for a replacement to fuel its truculent war machine once President Roosevelt ceased delivery of American oil. The Dutch East Indies arose as the clear answer, part of the grandly euphemistic “Southern Resource Area.” Risky, yet well-executed Japanese attacks followed, which the Allied nations failed to stop, making defeat inevitable as Imperial Japan reached the Australian periphery. Geography and colonialism played outsized roles in this particular campaign. The massive, scattered East Indies archipelago consisted of thousands of islands, which the Dutch already admitted they could not defend effectively in 1927. An enemy could choose where to strike and bypass troop concentrations in favor of easier pickings elsewhere. As such, even attempting to coherently defend the islands was dubious. Java, the central administrative and population nexus, was the key to the defense with both air and naval bases. Consider further that the manner in which the Royal Netherlands East Indies forces were raised was as a relatively small internal security force drawn from Europeans and friendly locals in charge of overseeing a much larger and potentially hostile population, similar to the German colonial Schutztruppe concept. External threats took second place to bureaucratic exigency in the Java defense scheme with predictably catastrophic results. The purpose of the Dutch colonial forces and often ad hoc nature of the other Allied forces sent to reinforce them speaks volumes as to the difficulties they faced against a well-trained, better supported, and aggressive foe. Lohnstein also addresses Allied difficulties which are not widely understood, what on paper seemed like a clear chance to unify the available combat power under the temporary ABDACOM (American British Dutch Australian Command) could never realize the potential due to lacking command, language, doctrinal, equipment woes and pervasive hubris. Tokyo was badly underestimated and dismissed by Allied planners instead of treated as a real threat. The British put more importance on Malaya and supposedly impregnable Singapore, much as the Dutch wanted to protect their possessions while the Americans and Australians tried to support their allies with often ill-equipped, battered or inexperienced forces. The Japanese accurately expected the Dutch colonial forces to fold under pressure, and Allied troop quality remained a worrisome factor as evidenced by events in Malaya, Singapore and the Philippines as the myth of an unstoppable enemy grew. By March 1942 the Dutch fought on with whatever Allied forces could not escape from Java until defeated. Lohnstein thankfully spends time discussing the equipment fielded by the belligerents, developing the key differences, such as Allied units often lacking support weapons, equipment, or spares. Sparse Allied armor was heavily outnumbered, not to mention Allied air units were outmatched, while the coordination between Japanese ground, air and naval units exceeded anything they faced. Leadership also favored the Japanese, who fielded aggressive commanders willing to improvise against Allied leaders who often struggled to control their units, maintain communications or otherwise react coherently to threats. The Japanese lack of sufficient naval vessels forced them to get creative and take chances, which worked in the early campaigns although remaining a challenge going forward, as Tokyo never had enough assets to meet the needs of a far-flung empire. The captured oil facilities never really produced as hoped due to a lack of tankers and predatory Allied submarines which denied the full benefit of their conquests. Lohnstein presents the Japanese forces as more varied than some might realize, with paratroopers playing an important role seizing critical facilities at Menado, Palembang and Timor. Additionally, the Imperial Japanese Army and Navy suffered from a bitter interservice rivalry throughout the war, regardless of their early successes. The Japanese doctrine of capturing airfields, then gaining air superiority over intended targets which led to successful amphibious landings is well profiled as a key to their early successes; not only due to their superior aircraft and pilots but the relative paucity the Allies could bring to bear with regard to lacking pilot skill level and air defenses plus obsolescent aircraft and ships. The Japanese also committed brutal atrocities during the campaign and later as the occupiers. The prevailing view of Europe as first priority, which led to the British assignment of the American-made Brewster B-339 fighters to the Far East, came to haunt London as the impressive warships of “Force Z”, HMS Repulse and Prince of Wales, were sunk in a stunning demonstration of modern airpower. Similarly, the outdated ABDA fleet collapsed under sustained aerial and surface attack, while nimble Mitsubishi A6M Zeroes bested the outclassed Allied fighters that rose to stop them. Among the ABDA naval assets were the remnants of the once proud U.S. Asiatic Fleet, which ceased to exist thereafter. Marc Lohnstein’s The Netherlands East Indies Campaign 1941-42: Japan’s Quest for Oil provides much-needed depth for an interesting, yet ill-fated early Allied coalition attempt that failed miserably to stop Imperial Japan but paved the way for later more successful coalition efforts as a valuable case study. It will appeal to Pacific War enthusiasts, leaders, veterans and anyone seeking a cautionary tale about lack of preparations for the next war, overconfidence, and valiant efforts against an inexorable tide. A past contributor, Schultz teaches history at a community college in Pennsylvania. The Netherlands East Indies Campaign 1941-42: Japan’s Quest for Oil. By Marc Lohnstein (Oxford: Osprey Publishing, 2021). The post The Netherlands East Indies Campaign 1941-42: Japan’s Quest for Oil first appeared on Naval Historical Foundation. View the full article
-
CDR Salamander - VADM Brown; Remembering the Johnston's Turn
There are many fine traditions in the naval service, especially in the Anglosphere. One of the best was summarized by Admiral Nelson, RN. When in doubt, attack. That bias for action in the face of a threat is an admirable trait, especially when contrasted with a more common human reaction – to freeze. As we have evolved as a species, other reactions developed past these Upper-Paleolithic instincts of Homo Sapiens. Indeed, in the modern evolution of Homo Bureaucraticus, scapegoating and blame-shifting, have sadly become more common through natural selection. In Ottomanesque bureaucracies, game recognizes game, and such responses are rewarded and passed along generation afte generation, eventually being a characteristic trait of a sub-species. Megan Eckstein kicks the work week off with a broad ranging, complicated, and important development in the story of the burning of the USS Bonhomme Richard (LHD-6), whose two-year anniversary will arrive at the end of next week. I see it as two interrelated stories; our Navy’s institutional failure of the fundamentals (Part I), and a gentleman’s response to an attack on his honor (Part II) We’ll do a “Part-I” and “Part-II” format. Before we dive in to Part-I, let’s review a few entering arguments which have anchored many conversations here over the last 18-yrs that apply here. 1. The Navy’s investigatory and legal system is no longer fit for purpose. It is hopelessly compromised by a culture infected with undue influence, sloth, and self-focus. 2. No one can trust a “Big Navy” investigation. The smart will lawyer-up early with outside counsel, keep meticulous records with secure backups, trust few, and suspect anyone who directly or indirectly will benefit from their downfall. It isn’t always about right and wrong, the longer it goes on it brings out the worst aspects of our adversarial legal system – it is about what can be blamed on whom not in the service of justice, but in service to the career goals of those conducting the investigation and prosecution. 3. We have too many Flag Officers with too few real Flag Officer responsibilities. As such, we have a warped culture where large numbers of ambitious people are underemployed and seek authority yet wish to avoid responsibility as demanded by our present system of incentives and disincentives. Part I: C2 Matters I hope Megan does not mind me pulling so much from her article, but especially for those who have served in staff positions, the core to this story if the C2 diagram (Figure 1) in para 6 of Enclosure (3) of OPNAVINST 3440.18 Dated 13 Nov 2018. To start out, no, I have no idea what the doctrinally correct definition of a “Bridge Line Command” is. I spent 9-yrs of my 21-yr Navy career as a staff officer on USA and NATO Staffs with untold hours working on C2 diagrams and relationships. I have never heard of that term, and a little googlefu cannot find in defined anywhere and only see it referenced directly or indirectly to 3440.18. If you can find anything better, please let us know in comments. Additionally, para 6 ends with the phrase “command bridge line” that is also a term I am not familiar with. I can only find one other Navy use of it in a NAVSEA document referring to communications. I will assume it is related to para. 3 of Encl.(3) but the list there is not fully congruent with the strange dashed box in Figure 1 of Encl.(3) … so, we’ll just put it to bad staff work. So, yeah … how this ever got approved is beyond me, but it is what we had … and bad staff work usually manifests itself with poor results in the field … and here we are. So, there is no definition of what the solid lines are in the diagram vs the dot-dash line … there are all sorts of inadequacies with the diagram itself and I’m not going to pick it apart anymore, but the important part is on the previous page in paras 1 and 2: 1. The chain of command is provided graphically in figure 1 of this enclosure. As the in-hull incident commander, the ship’s CO controls all damage control efforts on board the ship. The CO is assisted by a fire department senior fire chief or officer and naval supervising authority project superintendent (if applicable). 2. The area or unified area commander will remain in constant contact with the in-hull incident command. All requests for additional resources, special equipment, or technical expertise will be passed through the area commander. The area commander will man all bridge lines. This is rather clear, “…the ship’s CO controls all damage control efforts on board the ship.” So is, “All requests for additional resources, special equipment, or technical expertise will be passed through the area commander.” … and the Area Commander reports to the Primary Commander (Fleet Commander). So, I believe the “Area Commander” here would be CNRSW and the “Primary Commander” would be C3F. BTW, why does Commander Navy Region Southwest hardly get any mention here? Seriously, I have no idea. Now that we have this. Behold this mess; The initial response to the July 2020 fire that destroyed the multibillion-dollar amphibious assault ship Bonhomme Richard was uncoordinated and hampered by confusion as to which admiral should cobble together Navy and civilian firefighters, according to new information from the then-head of Naval Surface Forces. The discombobulation in those early hours meant sailors may have missed a small window to contain the fire in a storage area. One admiral who said he lacked authority to issue an order pleaded with the ship’s commanding officer to get back on the ship and fight the fire, when the CO and his crew were waiting on the pier. And when that admiral — now-retired Vice Adm. Rich Brown — found the situation so dire that he called on other another command to intervene, it refused, Brown said in an interview. ... Brown, as the type commander for surface ships, said he should have played a supporting role the morning the fire broke out. ... So Brown called ship commanding officer, Capt. Gregory Scott Thoroman, who said he and the crew had left the ship and were on the pier. The investigation into the fire noted the crew pulled out of the ship twice during the firefight that morning. Thoroman should have been coordinating with the base’s Federal Fire Department and the Southwest Regional Maintenance Center, collectively forming the incident command team, according to a 2018 Navy instruction laying out fire prevention and fire response responsibilities for ships in maintenance. ... With the Navy’s organization falling apart, he called the Expeditionary Strike Group 3 commander, Rear Adm. Phil Sobeck, around 11 a.m. “Phil, you can tell me to eff off, because I’m not in your chain of command, but you have to get down to that pier and provide leadership and guidance because they’re all sitting at the end of the pier watching the ship burn,” Brown said he told Sobeck. “And he goes, ‘Admiral, I’m getting in the car, I’m on my way.’” ... Brown directed his staff to contact U.S. 3rd Fleet around 12:30 p.m., but 3rd Fleet’s position was, “The ship’s in maintenance, it’s not our problem.” Who accepts responsibility? Who avoids it and why? As a friend mentioned earlier today to me, “Quite sure Kimmel did not say “not my job.”” After the staff-level call failed, Brown set up a call with 3rd Fleet Commander Vice Adm. Scott Conn, for the two three-stars to hash it out directly. “I said, hey, Phil’s down there, but we have to formally establish a new command structure. And he told me he wasn’t going to do it because the ship was in maintenance and it’s not his problem. And I said fine.” ... He then called the then-Pacific Fleet commander, Adm. John Aquilino. “I told him what I had done, what I was seeing: the C2 degrading on the pier, there’s no focus of effort, people are off doing their own things. And I told him that I had asked Scott to take command and he said no. And I said ... ‘Phil now works for me, and I’ve got it.’” “Absolutely, Rich, you got it, put the fire out,” the admiral replied, according to Brown. At the time we were all wondering what was going on. Chaos, that's what. A bias for action. This is one of our better traditions. In times of crisis, often those who should be responsible do not rise to the occasion, endangering not just themselves and their command, but everyone around them. It is not unheard of for this to be part of a cascading set of failures to act. Below the primary failure no one will do anything absent that direction as they either lack confidence or perspective to see the failure, and those above who should take charge don’t for similar reasons or just plain ignorance. What did VADM Brown do here as CNSF? No, he was not in the chain of command, but he was a leader who saw a failure to lead and he stepped up to try to get those who are responsible to act, and absent their actions, fill the gap as best he could as a supporting entity outside the chain of command. Did anything he did make things worse? Did they make them better? Was any other leader showing what we ask our leaders to show – a bias for action? What does our Navy reward? What does it punish? Part II: Honor Demands Let’s look a bit at how I framed Part-II at the start of the post, “a gentleman’s response to an attack on his honor.” It should go without saying, but as we live in a tender and reactive age, “gentlemen” can be seen as non-gender specific, but also very specific to men. Interpret that as you wish. Duty. As an officer in the United States Navy, who do you owe your duty to? There is both a simple and a complicated answer to that. Let’s start with the Oath; The Oath of Office (for officers): "I, _____ (SSAN), having been appointed an officer in the _____ (Military Branch) of the United States, as indicated above in the grade of _____ do solemnly swear (or affirm) that I will support and defend the Constitution of the United States against all enemies, foreign or domestic, that I will bear true faith and allegiance to the same; that I take this obligation freely, without any mental reservations or purpose of evasion; and that I will well and faithfully discharge the duties of the office upon which I am about to enter; So help me God." The Constitution first of all, that is pretty much a “Ref. A” answer. We have that document and rafts of judges up to SCOTUS to give us the “Ref. B.” Serious, yet complicated in its simplicity. That is the easy part. Then “the duties of the office.” There is that concept again, “duty.” In the military context, that definition is rather broad and open to interpretation, but I like the definition the State of Connecticut uses; …the performance of military service by a member of the armed forces of the state pursuant to competent state military orders, whether paid or unpaid for such military service, including training, performance of emergency response missions and traveling directly to or returning directly from the location of such military service. In practice, things get complicated from there. Loyalty is talked about a lot, yet abused more often. Are you loyal to people, or institutions? Yourself? Your family? “Ship, Shipmate, Self” is something we throw around a lot, and is a useful entering argument, but it is not a one-way relationship. As in all well-functioning systems, the relationship is interlocked and multi-relational. Most will find themselves in situations small and large where they find out that their assumptions about the systems they are a part of are no longer valid. The agreements, spoken and unspoken, that enabled decades of hard work and success, are broken. They are not working. Perhaps they never did. Then what does one do? Where one may have spent decades taking the burdens of an organization you love on to yourself personally, when doe that act of love become more of an acceptance of abuse? When does a man reach a point where the honor of love is replaced by the dishonor of accepted abuse? Part-II is about a man who found himself in a place many have found themselves in before. An organization he invested his life in, built his reputation on, and most likely loved – turned on him. He sees if not an upcoming assault on his honor, then at least an injustice, a bearing of false witness, and at a minimum an attempt to make flesh an untruth hewn from the body of his reputation. Some will advise a man to take such things as part of the job, to not make a fuss for … the sake of the institution. Some will counsel to appeal within the system, that regardless of its malperformance to date, one must trust the system regardless and work within it. There is another school of thought that forces an answer to a hard question; what do you owe to an institution if that institution breaks its bond with you? What honor is there to give the gift of trust to an untrustworthy organization? If one party breaks spoken and unspoken agreements, what rule under heaven obliges the other party to act as if the break never occurred? There is a time to accept that you are in a place you never desired to be. That even though you did all you could possibly do in the scope of your authority and responsibility, other entities are shaping your reality. They are stronger, larger, and on paper at least, more powerful. When they have you bracketed you can simply carry on as before in the knowledge that this is the fate you have been delt, or you can decide that fate is what she is, but there is a way to embrace it with a higher honor based on a higher ethic to embrace that fate on your own terms. Call flank-speed, full left rudder, and engage the attacking force head on. That, in a fashion, is how I read the strange Kafkaesque place Vice Admiral Rich Brown, USN (Ret.) finds himself in. Brown said he is sharing his story with Defense News now as he faces a secretarial letter of censure. He was named in the investigation as contributing to the loss of the ship, but was cleared by what’s known as a Consolidated Disposition Authority in December. He said he was not interviewed for the investigation into the fire. Capt. J.D. Dorsey, a spokesman for Secretary of the Navy Carlos Del Toro, told Defense News “the secretary is still in the process of reviewing the command investigation and has not yet made any final decisions on actions beyond what the CDA has imposed.” ... Brown didn’t dispute the Navy’s accounting of the rest of the five days of firefighting as laid out in the investigation, but said the investigation’s accounting of how the command and control fell apart during a crisis is incomplete and the investigation itself was “fatally defective” without interviewing him or including a full picture of what will be a key lesson learned. ... The retired three-star said one of the reasons he wanted to share his perspective about the fire is because the same command and control flaw played a role in the 2017 collisions of destroyers Fitzgerald and McCain and the 2020 fire on Bonhomme Richard. Brown led the McCain investigation and participated in the Fitzgerald investigation, and he said one of the recommendations he made at the time was to reinstate a Cold War-era command structure that had two chains of command: one for ships in maintenance and the basic phase, led by a one-star admiral focused on ensuring they built up their readiness, and one for ships in advanced training and deployments, led by a one-star focused on employing their warfighting capability. Brown said this setup could have prevented the Fitzgerald and McCain tragedies, and that he had urged the Navy to revamp the command and control setup in 2017. “I was told, ‘It’s not going to happen; there’s one chain of command.’ That’s what they all kept saying to me, there’s one chain of command, and that’s the operational chain of command, which the [type commanders] are not in.” ... Had the Navy made Brown’s recommended change in 2017, Bonhomme Richard would have been clearly under Brown’s control in 2020 and he could have taken more aggressive measures when the fire broke out. Brown said the Navy must learn from this disaster and make the proper reforms to prevent another ship from being destroyed — and the right lessons can’t be learned or the right reforms made if the Navy is working off an incomplete and inaccurate investigation. ... Brown said, despite the major role he played while the ship was on fire, he was never interviewed. Conn emailed him about a potential interview and to ask five specific questions related to the roles and functions of the type commander. Brown answered the questions, but said Conn never followed up to arrange a formal interview. Brown said he had no indication he would be named as contributing to the loss of the ship until the report came out. “I am convinced that there was undue command influence on that investigation at the end, because when you look at the findings of facts, in the findings of facts behind my name, they just don’t make any sense. And why won’t they talk to me?” he added. ... Pacific Fleet Commander Adm. Sam Paparo serves as the consolidated disposition authority for this incident and sent Brown a short letter in December stating that “I have determined your case warrants no action.” Brown said he thought the issue was resolved until his lawyer in early June warned him Navy Secretary Carlos Del Toro would be sending a letter of censure. “I just don’t know what facts changed in the last six months,” he said. ... Asked what he hoped would happen by talking to the media, Brown said the Navy has a pattern of punishing three-stars for political expediency without examining root causes and making reforms. Though he planned to let it go before, “now I don’t think I can, because I think the Navy is destined just to make the same mistakes again and again, especially the surface navy, because we don’t have the [command and control] right.” The more I think about this story, the more it becomes clear that VADM Brown is taking the only possible path honor, at least as I see it, demands. However, in defending his honor, he is creating a greater good to our Navy and the nation it serves. The Navy bureaucracy and Admiralty of the last few decades continues to fail its Navy and nation. There are exceptional individuals in both, but as a body the system of incentives and disincentives as they have developed are not just underperforming in selection in aggregate, they are damaging the institution, ill-serving its Sailors, and as a result providing an sub-optimal force to defend the maritime and aerospace requirements of the republic. The Bonnie Dick burned two years ago. In 53% of the time we took to fight WWII, Where are we? We have arrested a junior Sailor who still has not gone to trial. We still do not know what happened and if the Navy has taken pro-active steps to ensure it does not happen again. Justice delayed is justice denied. Bad investigations protect the guilty, hide the truth, and poison the future. Accountability thrown on the innocent reeks of the vilest institutional decadence. Bravo Zulu Vice Admiral Brown. Bravo Zulu. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ENXJgQ7ZVME:ND4lwgABZNw:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ENXJgQ7ZVME:ND4lwgABZNw:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ENXJgQ7ZVME:ND4lwgABZNw:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ENXJgQ7ZVME:ND4lwgABZNw:F7zBnMyn0Lo View the full article
-
DID - USAF Award Boeing $14.5M For KC-135 Services | Bayraktar Drone Fired Laser-Guided Missile | Slovakia To Purchase 152 CV90 MkIV
Americas The US Air Force contracted Boeing with $14.5 million for KC-135 engineering sustainment services. The contract modification provides for recurring engineering services for sustainment of the KC-135 aircraft for one option year. Work will take place in Oklahoma, Texas, Alabama and Florida. Estimated completion date is March 31, 2022. Tactical Air Support won a $265.3 million deal, which provides non-recurring engineering, inspection, modification, and block upgrade efforts for 16 F-5E and six F-5F Tiger II aircraft from a Swiss Confederation configuration to a Navy/Marine Corps N+/F+ configuration. Additionally, this contract procures eight block upgrade retrofits to existing fleet aircraft. Estimated completion will be in June 2027. Middle East & Africa Turkey’s landmark Bayraktar Akinci attack drone successfully fired a new laser-guided missile in a recent trial. During the test, the drone took off from Corlu airfield in northwestern Turkey and flew at an average altitude of 30,000 feet (9.1 kilometers). It struck a floating target laser-marked by another Bayraktar drone flying below cloud-level. Europe Slovakia will sign a government-to-government deal to purchase 152 CV90 MkIV tracked infantry fighting vehicles fitted with 35mm cannons by BAE Hägglunds, the country’s ministry of defense has announced. Bratislava plans to acquire the vehicles from Sweden in an “effort to build [a] heavy mechanized brigade, and reinforce its defense and support local industry,” Slovakia’s Defence Minister Jaroslav Na? said in a tweet. Asia-Pacific Lockheed Martin won a $192.4 million contract modification for technical engineering and management efforts for the Australia Surface Combatant program. The deal involves Foreign Military Sales to the government of Australia. Work will take place in New Jersey and Australia. India’s Autonomous Flying Wing Technology Demonstrator unmanned combat aerial vehicle (UCAV) has successfully flown for the first time. In a statement, the Press Information Bureau (PIB) said that the UCAV was flown by the Defense Research and Development Organisation (DRDO) from its Aeronautical Test Range (ATR) in Chitradurga, in the southern state of Karnataka, the same day. Today’s Video WATCH: F5E Tiger II Best of Aviation Documentary View the full article
-
DID - Airshow At Edwards Air Force Base | Greece To Buy F-35s | Lockheed Martin Tapped For Phased Array Tracking Radar to Intercept on Target Advanced Capability-3
Americas Federal Contracting won a $92.4 million deal for a B-21 Combined Mission Operations Planning Facility and Field Training Detachment Facility. Bids were solicited via the internet with three received. The B-21 is a new high-tech bomber slated to replace or complement the US Air Force’s aging fleet of B-52s, B-1s, and B-2 bombers, and represents the first new US bomber design in 30 years. As with its predecessors, it is designed to be long-range, highly survivable and capable of carrying a mix of conventional and nuclear ordnance and be a key part of the US nuclear triad. Work will take place in South Dakota. Estimated completion date is September 7, 2024. Edwards Air Force Base will hold its first airshow for the first time in 13 years on October 15 and 16. Besides the US Air Force, NASA Armstrong Flight Research Center will be participating as well. To commemorate the 75th anniversary of the first supersonic flight, jets from the USAF and NASA will compete to determine which will be first to go supersonic during the airshow. Middle East & Africa Israel’s Defense Attaché to Morocco, in addition to two IDF officers, participated as viewers in an international military exercise held in Morocco this past week. The “African Lion 2022” exercise, led by the US Africa Command (AFRICOM) and the Royal Moroccan Armed Forces (FAR), is the largest annual exercise held by both armies in Africa. Israel’s participation in the exercise is an additional step in strengthening the security relations between the two countries’ Defense Ministries and militaries. In addition, it constitutes a continuation of the FAR’s Counterterrorism Unit’s participation in the multinational exercise, which was held in Israel last year. Europe Oshkosh Defense won a $216.7 million contract modification to support fielding the Joint Light Tactical Vehicle Family of Vehicles for Foreign Military Sales. Bids were solicited via the internet with three received. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of November 30, 2023. Fiscal 2020 Air Force procurement, Air Force procurement Operation Inherent Resolve, Navy procurement, United States Marine Corps procurement and other procurement, Army funds; fiscal 2021 Air Force procurement Operation Inherent Resolve, Office of the Chief of Army Reserve, and operation and maintenance, Army funds; and fiscal 2022 Air Force procurement European Deterrence, Air Force procurement Operation Inherent Resolve, Navy procurement, United States Marine Corps procurement, Foreign Military Sales (Brazil, Lithuania and Montenegro), other procurement, Army, and research, development, test and evaluation, Army funds in the full amount were obligated at the time of the award. Greece has signed the Letter of Request (LoR) to buy the F-35 fighter, local media reports. The letter was sent by the Greek defense ministry to Washington on June 29. Athens hopes to buy 20 aircraft with options for another 20. Asia-Pacific Lockheed Martin was awarded a $307.1 million deal by the US Army for repair and recertification of Phased Array Tracking Radar to Intercept on Target Advanced Capability-3 missiles. Bids were solicited via the internet with one received. Work will be performed in Grand Prairie, Texas, with an estimated completion date of June 30, 2027. Fiscal 2022 Foreign Military Sales (Taiwan) funds in the amount of $150,400,000 were obligated at the time of the award. Today’s Video WATCH: New B-21 Raider: The Most Feared Bomber Ever Ready to Fly View the full article
-
DID - USAF New Bomber – B-21 – Gets a Base
B-52H, B-1B & B-2A (click to view full) The good news? 2006 saw a convergence of opinion within the USAF that a new long-range strike platform was needed. This is understandable given the B-52H Stratofortress fleet’s age (40-50 years), the B-1B Lancer’s internal power and electronics issues, both of these platforms’ low survivability against advanced air defense systems, and the B-2A Spirit stealth bomber’s very small numbers (21, of which 7-12 are generally operational). The unmanned J-UCAS program, meanwhile was seen as having inadequate range and payload (Boeing X-45C: 1,400 mile radius with 8 GBU-39 Small Diameter Bombs). The USAF decided that J-UCAS wasn’t a solution and pulled out, stalling American UCAV development until the Navy chose to go ahead with the carrier-based N-UCAS. The bad news? They seemed to have little idea of exactly what they wanted in their bomber. The FY 2010 budget killed those plans anyway, but in September 2010, pressure to field a new bomber began to rise again. By the time fiscal year 2015 budget planning was in motion, both DoD and the Air Force seemed committed to making the program one of the service’s top 3 priorities. Bad News, Good News FB-22: out (click to view full) BAD NEWS: Officials disagreed on what kind of aircraft or missile should be designed to meet the requirement. A single plane? A missile? A family of aircraft? Manned or unmanned? A fighter-bomber like the FB-22/FB-23 idea to fill the FB-111’s vacant shoes, or a full-reach heavy bomber? A traditional land-based platform, or should it be carrier capable? Something comparable to the $2 billion B-2s to take on the toughest strike missions – or more of a utility aircraft like some of the “arsenal aircraft” proposals, aimed at replacing the B-52s with a platform based on a passenger jet or C-17 that would be more economical to fly and maintain? And where do proposals to simply re-engine the B-52 fleet fit in? Until (unless) this was sorted out, R&D efforts could not succeed – and issues of future force structure remained open questions. An official Analysis of Alternatives was scheduled for Spring 2007, and the articles below chronicle developments in that process as it works its way forward. At this point, it appears certain that the new bomber will fly at subsonic speeds, and incorporate modern advances in stealth technology. Other elements are less clear. THE GOOD NEWS? Key technologies, from stealth to control of unmanned combat aircraft, have taken many steps forward since this discussion began. In September 2006, Inside Defense reported that the US Air Force was responding to ongoing Congressional pressure with a proposed $5 billion initial investment over the next few years. Their goal was to develop a next-generation long-range strike platform by 2018, with a fly-off before final platform selection. All of this work was effectively brought to a halt when US Secretary of Defense Robert M. Gates announced his FY 2010 budget recommendations, and effectively suspended the competition. Research may continue in some related technologies under ‘black’ (non-public) budgets, but Sec 124 of the Senate’s S.1390 FY 2010 defense budget was clear: “On May 7, 2009, President Barack Obama announced the termination of the next generation bomber aircraft program in the document of the Office of Management and Budget entitled ‘Terminations, Reductions, and Savings,’ stating that ‘there is no urgent need to begin an expensive development program for a new bomber’ and that ‘the future bomber fleet may not be affordable over the next six years’.” By 2010, however, pressure began to rise again to field a new bomber. The breakthrough came, ironically, during a January 2011 speech about $150 billion in spending and program reductions: “Finally, a major area of investment for the Air Force will be a new long-range, nuclear-capable penetrating bomber. This aircraft – which will have the option of being piloted remotely – will be designed and developed using proven technologies, an approach that should make it possible to deliver this capability on schedule and in quantity. It is important that we begin this project now to ensure that a new bomber can be ready before the current aging fleet goes out of service. The follow on bomber represents a key component of a joint portfolio of conventional deep-strike capabilities – an area that should be a high priority for future defense investment given the anti-access challenges our military faces.” Competing Teams Phantom Ray rollout (click to view larger) On the contractor side, the program seemed to be shaping clearly, the picture has become muddy again. On Jan 25/08, Boeing and Lockheed Martin announced that they would be cooperating on a bid of their own. Their team will perform studies and system development efforts “in pursuit of the anticipated U.S. Air Force Next Generation Bomber program.” Their collaborative research and development efforts will include will include work in advanced sensors, future electronic warfare solutions, better networked awareness of the broader battlefield, command and control issues for stealth platforms, and virtual warfare simulation and experimentation. By March 2010, however, the joint team members were each going their own way. Boeing’s X-45C Phantom Ray provides them with a very useful test platform that could become a base for a new unmanned bomber, and Lockheed Martin’s own work on “black program” UAVs gives them growing expertise as well. They eventually got back together in 2013, once requirements began to clarify. Northrop Grumman is another obvious contender, as the designer and manufacturer of the B-2A Spirit Stealth bomber. The firm has moved away from designing full-scale manned military aircraft in recent years, but there are persistent rumors of black (secret) program contracts related to the design of a next-generation bomber, and NGC’s leadership has indicated that black programs are a growing strategic focus for the company. Taken in tandem, it seems likely that Northrop Grumman is already working on a next-generation stealth bomber design. CFO James Palmer admitted as much during a financial conference in November 2013. Update July 4/22:Combined Mission Operations Planning Facility Federal Contracting won a $92.4 million deal for a B-21 Combined Mission Operations Planning Facility and Field Training Detachment Facility. Bids were solicited via the internet with three received. The B-21 is a new high-tech bomber slated to replace or complement the US Air Force’s aging fleet of B-52s, B-1s, and B-2 bombers, and represents the first new US bomber design in 30 years. As with its predecessors, it is designed to be long-range, highly survivable and capable of carrying a mix of conventional and nuclear ordnance and be a key part of the US nuclear triad. Work will take place in South Dakota. Estimated completion date is September 7, 2024. October 11/19: Squadron Reactivation The US Air Force reactivated the 420th Flight Test Squadron at Edwards Air Force Base for flight and ground testing of the next-generation bomber, the B-21 Raider. The squadron was organized under the 412th Test Wing at the base, and a ceremony marking the occasion was held on October 4, the Air Force announced on Wednesday. The first B-21 Raider bomber, the next-generation replacement for the B-1 and B-2 aircraft, is under development at Lockheed Martin facilities in nearby Palmdale, California. The B-21 is expected to enter service by 2025, and will replace the B-1 Lancer and B-2 Spirit over time. November 22/18: Base The US Air Force’s next-generation stealth bombers will be maintained at Tinker Air Base in Oklahoma and at Edwards Air Force Base in California. The B-21 Raider previously referred to as the Long-Range Strike Bomber, or LRS-B, is expected to be delivered in the mid-2020s. The air bases will be responsible to coordinate all maintenance and sustainment efforts of the new aircraft, which includes leading testing and evaluation efforts. This decision comes as the Northrop Grumman-made B-21 is expected to enter its critical design review milestone next month. The Air Force plans to buy a total of 100 Raiders as replacement to its fleet of B-2s and B-1Bs, which are expected to be retired by 2040. “From flight testing the X-15 to the F-117, Edwards AFB in the Mohave Desert has been at the forefront of keeping our Air Force on the cutting edge,” says Chief of Staff of the Air Force Gen David L. Goldfein. “Now, testing the B-21 Raider will begin another historic chapter in the base’s history.” May 17/17: The Pentagon’s inspector general has opened an investigation as to whether the USAF has imposed unnecessary additional secrecy on its B-21 bomber program. Last year, the Air Force rebuffed requests, including from Armed Services Committee Chairman John McCain, to reveal basic information such as the value of the development contract awarded to lead contractor Northrop Grumman or the amount of the fee set aside to encourage meeting program goals, citing their potential value to adversaries. Now, the DoD’s watchdog office will review and submit a report to Congress within the next six months aiming to ascertain whether there is the right mix of balanced program classification and transparency. March 9/17: Vice chief of the staff of the USAF Gen. Stephen Wilson has announced that the preliminary design review for the B-21 Raider has been completed. The progress on the new long-range bomber came as Wilson spoke to a House Armed Services Committee hearing on nuclear deterrence where he told lawmakers that he receives regular updates on the uber-classified program and is happy with its progression. Since the award of the B-21 contract to Northrop Grumman in October 2015, news has been scarce on the program’s development as the company and Air Force try to protect any information about the bomber’s design and development from leaking out into the press or to potential adversaries. October 27/16: While heavily redacted, the US Government Accountability Office (GAO) has published a 52-page ruling on Boeing’s protest of the B-21 competition won by Northrop Grumman. Quoting “significantly lower proposed prices” for initial production, the agency found Boeing would be hard-pressed to match Northrop’s bid to work on the $80 billion stealth-bomber program. Boeing has slammed the GAO’s analysis as flawed. September 21/16: The USAF’s new long-range strike bomber has officially been named the B-21 Raider. Air Force Secretary Deborah Lee James made the announcement on Monday in what is a tribute to the legacy of WW2’s Doolittle Raiders rather than a reference to the Indiana Jones movie “Raiders of the Lost Ark.” The Doolittle Raiders are known for their surprise attack against Japan during on April 18, 1942, which forced the Japanese to recall combat forces for home defense, and boosted morale among Americans and US allies abroad. September 4/15: Northrop Grumman and competitor coalition Lockheed Martin and Boeing submitted designs for the new long range bomber, with a decision expected in October. The first versions produced are expected to be manned craft, with unmanned craft coming a few years later. Designs are said to be more detailed at the stage than is typical. Additional Readings DID – Carrier UCAVs: The Return of UCAS. N-UCAS is a funded Northrop Grumman project. DID – Ride on the Ray: Boeing’s X-45 UCAVs DID – Funds to Boeing, NGC to Advance UAV Aerial Refueling. Bloomberg (Dec 6/13) – U.S. Bomber Planes at $81 Billion Seen 47% More Than Plan. USAF estimate is $55 billion for 100 planes. CSBA says $81 billion, incl. $20 billion R&D. Stimson Center says $68.2 billion. Bloomberg Government says $78.4 million. Wall St. Journal (Nov 3/13) – Pentagon Toils to Build a Bomber on a Budget [subscription req’d] Forbes (Oct 29/13) – Why A Boeing-Lockheed Martin Long Range Strike Bomber Team Will Be Hard To Beat. By Loren Thompson of the Lexington Institute. Lockheed Martin (Oct 25/13) – Boeing, Lockheed Martin Team for U.S. Air Force Bomber Program. Again. Boeing would be the prime contractor. James Hasik (July 10/13) – Is the USAF’s Next Bomber Program Way Too Ambitious? Aviation Week (June 30/11) – What We Are Allowed to Know About the Bomber. Short answer: not much. Optionally manned, stealthy, plans for 80-100. Joint Forces Quarterly (#60, Q1 2011) – Long Range Conventional Strike: A Joint Family of Systems [PDF]. Good article, penned by Northrop Grumman analysts; see also Aviation Week Ares coverage. Aviation Week Ares (March 18/11) – Where The 2018 Bomber Went Aviation Week Ares (Feb 18/11) – A Quick Look At The USAF’s New Bomber Requirements US Department of Defense (Jan 6/10) – Statement on Department Budget and Efficiencies. As Delivered by Secretary of Defense Robert M. Gates. Defense News (Sept 15/10) – P&W Pitches Engine For Long-Range Strike. Their PW9000, part of a new class of engines called “geared turbofans” that offer a wider variable thrust range, and much better fuel efficiency. NDIA’s National Defense magazine (Sept 15/10) – Air Force Under Pressure to Fund New Bomber. CSBA Report (Sept 14/10) – Sustaining America’s Strategic Advantage in Long-Range Strike [PDF] Defense News (Sept 13/10) – USAF Secretary: New Bomber Critical for the U.S.. But it would be built for conventional strike, and only certified for the nuclear mission later, if at all. Aviation Week (March 1/10) – A Lockheed/Boeing Breakup Over Bomber? There’s a $200 million request in the FY 2011 budget that lays the foundations for a bomber program revival, but Boeing Phantom Works’ President says cooperation with Lockheed Martin is “in stasis”. Aviation Week Ares (Dec 16/09) – New Bomber Claims New Missions. ISR, and possibly directed energy weapons? Government Executive (May 14/09) – Gates says next-generation bomber might fly without pilot Gvernment Executive (May 21/09) – Commander agrees with decision to delay new bomber. In light of upcoming START nuclear treaty negotiations with Moscow, expected to start in a few months. DID (April 6/09) – Gates Lays Out Key FY 2010 Budget Recommendations. The program is effectively canceled. “We will not pursue a development program for a follow-on Air Force bomber until we have a better understanding of the need, the requirement, and the technology.” Aviation Week Ares (Sept 10/08) – Northrop Grumman Boosts New Bomber Military.com (June 7/08) – Secret Plan for ‘Invisible Bombers’. The report claims that Northrop Grumman has received a secret development contract to develop a bomber-class aircraft with a radar signature 1/10th that of a mosquito. The Register (May 29/08) – SpaceShipOne firm to build Stealth Bomber 4.0? Also explains some of the evidence for the belief that this program has gone “black” (i.e. super-secret, no longer openly reported or discussed). DTI, via Military.com (April 28/08) – New AF Bomber May Also Fly Recon. Or at least, an unmanned version might. Note that there will be limitations: the USA’s B-2 stealth bomber, for instance, tends to confine itself to night missions against defended sites, because it has little ability to protect itself once it has been seen visually. Any unmanned bomber would have a similar issue. Defense Technology International, via Military.com (Dec 4/07) – New Bomber to Carry Nukes. A decision that could raise its cost by 50%, due to the required redundancy and EMP hardening. It also guarantees that the bomber will be a maned aircraft, not a UAV or UCAV. Government Executive magazine (Aug 15/07) – Air Force’s commitment to new bomber a matter of debate USAF, Air Force magazine (August 2007) – Great Expectations. “Air Combat Command recently conducted an analysis of alternatives for such an aircraft, and the Air Force has decided which capabilities it will seek in its next generation long-range strike system. The study evaluated “midterm” requirements, the state of technology, and the need to have a fully operational aircraft on the ramp in 2018. The results were, in some cases, quite surprising…” Government Executive magazine (June 13/07) – Air Force envisions stealthy long-range bomber for 2018. “The service, which hopes to fly the bomber by 2018, likely will use the F-22’s stealth and maneuverability capabilities when developing the new aircraft, Lt. Gen. Robert Elder, commander of the 8th Air Force at Barksdale Air Force Base, La., said during a breakfast with reporters… The service also plans to make the bomber a subsonic propulsion aircraft, said Elder…” The article adds that the USAF may be mandated by Congress to have 76 B-52s, but it’s only manning 56. Aviation Week (May 2/07) – Next Decade”s AF Bomber To Be Subsonic, Manned [sic] Air Force Association (February 2007) – Return of the Bomber: The Future of Long-Range Strike [PDF format, 642k]. In-depth report and analysis by Dr. Rebecca Grant of ISIS. USAF, Air Force magazine (October 2006) – The 2018 Bomber and Its Friends Inside Defense via Military.com (Sept 30/06) – New Bomber Program to Begin ‘Black’. Which means a classified program. “The ACC chief said programmatic details such as anticipated costs and initial capability milestones will be disclosed to the public. However, issues pertaining to the platform’s projected range, speed and payload will remain closely held secrets known only by a select number of service and Pentagon officials intimately involved with or charged with overseeing its development.” Inside Defense via Military.com (Sept 2/06) – Air Force has ‘Hard Time’ Developing Bomber Inside Defense via Military.com (Aug 25/06) – Big Down Payment for Future Bombers USAF (July 26/06) – Gen. Moseley: New long-range bomber on horizon for 2018 USAF, Air Force magazine (June 2006) – No Easy Answers on New Bomber Air & Space Power Journal (Summer 2005) – “Narrowing the global-strike gap with an airborne aircraft carrier” tag: 2018bomber View the full article
-
CDR Salamander - Fullbore Friday
Often we refer to WWII as being "....on the edge of living memory." We are reaching the point where we may need to start saying, "...just outside living memory." We reached an inflection point at the end of June; Medal of Honor Recipient and World War II Veteran Hershel “Woody” Williams, 98 has died on Wednesday. Williams was born on Oct. 2, 1923, and grew up in Quiet Dell in Marion County, West Virginia. Williams was the last living WWII Medal of Honor recipient. He joined the United States Marine Corps and served in the Battle of Iwo Jima with the 21st Marines, 3d Marine Division. Williams received the Medal of Honor on October 5, 1945, from President Harry S. Truman for his “actions, commitment to his fellow service members, and heroism,” the Woody Williams Foundation website says. Following his service in WWII, Williams worked to serve veterans and their families as a Veterans Service Representative for the Department of Veterans Affairs for 33 years. He also served as the Commandant for the Veterans Nursing Home in Barboursville, West Virginia for almost 10 years and has served on the Governor’s Military Advisory Board for West Virginia. Attention to citation: For conspicuous gallantry and intrepidity at the risk of his life above and beyond the call of duty as demolition sergeant serving with the 21st Marines, 3d Marine Division, in action against enemy Japanese forces on Iwo Jima, Volcano Islands, 23 February 1945. Quick to volunteer his services when our tanks were maneuvering vainly to open a lane for the infantry through the network of reinforced concrete pillboxes, buried mines, and black volcanic sands, Cpl. Williams daringly went forward alone to attempt the reduction of devastating machinegun fire from the unyielding positions. Covered only by 4 riflemen, he fought desperately for 4 hours under terrific enemy small-arms fire and repeatedly returned to his own lines to prepare demolition charges and obtain serviced flamethrowers, struggling back, frequently to the rear of hostile emplacements, to wipe out 1 position after another. On 1 occasion, he daringly mounted a pillbox to insert the nozzle of his flamethrower through the air vent, killing the occupants and silencing the gun; on another he grimly charged enemy riflemen who attempted to stop him with bayonets and destroyed them with a burst of flame from his weapon. His unyielding determination and extraordinary heroism in the face of ruthless enemy resistance were directly instrumental in neutralizing one of the most fanatically defended Japanese strong points encountered by his regiment and aided vitally in enabling his company to reach its objective. Cpl. Williams' aggressive fighting spirit and valiant devotion to duty throughout this fiercely contested action sustain and enhance the highest traditions of the U.S. Naval Service. A great Marine, an exemplary Shipmate, and a life well lived. Thank you Woody. We were all better for you. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=eLGbp0TRMvg:0jO9WmHRhqQ:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=eLGbp0TRMvg:0jO9WmHRhqQ:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=eLGbp0TRMvg:0jO9WmHRhqQ:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=eLGbp0TRMvg:0jO9WmHRhqQ:F7zBnMyn0Lo View the full article
-
CDR Salamander - The Netherlands is Game for the Black Sea Grain Escort Mission
The next questions is, who will throw their hat in the ring with them? From De Telegraph; The Netherlands has offered mine hunters to clear the way for grain ships from Ukraine. "If we can play a role, we are happy to do so," Defense Minister Kajsa Ollongren said at the NATO summit in Madrid. The Netherlands has offered Turkey, which mediates in the matter, help to clear the sea mines on the shipping routes. Then Russia and Ukraine will have to agree on a so-called maritime corridor, emphasizes Ollongren. Neighboring NATO member states such as Romania and Bulgaria are also in principle more eligible to supply minehunters, insiders say. The Koninklijke Marine has a half-dozen Tripartite Class minehunters and are very good in this warfare area. NATO operates combined mine hunting with member states on a regular basis. This could move fast if the diplomats can open the door. Of course, there is another way to make this happen ... but that brings more risk than I think most of NATO will be willing to take. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=cz1oJFigeZU:5kxzq0bLaYo:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=cz1oJFigeZU:5kxzq0bLaYo:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=cz1oJFigeZU:5kxzq0bLaYo:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=cz1oJFigeZU:5kxzq0bLaYo:F7zBnMyn0Lo View the full article
-
DID - Sikorsky Wins Black Hawk Overhaul Contract | Turkey’s Anadolu Started Sea Acceptance Tests | Saab Receives GlobalEye Order From Sweden
Americas Sikorsky won a $429.2 million deal from the US Army for maintenance and overhaul of UH-60 Black Hawk helicopters. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of June 28, 2027. Raytheon won a $57.9 million contract modification to exercise options and incrementally fund existing contract line items for fiscal 2022 Standard Missile-2 Block IIIC low rate initial production and spares. The SM-2 missile is a surface-to-air missile primarily intended for fleet area air defence and ship self-defense. Work will take place in Alabama and Arizona. Expected completion will be by December 2024. Middle East & Africa The Turkish Navy’s landing platform dock (LPD) Anadolu has started its official sea acceptance tests. Following the completion of its SATs, the future flagship of the Turkish Navy and the largest ship to be operated by the service is scheduled for commissioning in December 2022. Europe The Swedish government has inked a contract with Saab for two GlobalEye Airborne Early Warning and Control (AEW&C) aircraft. The contract is worth $714 million and Sweden has the option to purchase another two GlobalEye. The delivery of the aircraft is expected to be in 2027. The Swedish ambassador to Czech Republic Fredrik Jörgensen said in an interview with Seznam Správy that Czech can keep the Gripens that it leased from Sweden for free. The news comes as Czech is looking into buying 24 fighters as the lease for the Gripens will expire in 2027. According to the news report, the F-35 is the leading contender. Asia-Pacific India’s Polar Satellite Launch Vehicle (PSLV) has successfully sent three satellites from Singapore into space. The main satellite is the 365 kg DS-EO satellite which has an electro-optical digital imaging payload capable of 0.5 m resolution imaging capability. Today’s Video WATCH: Turkish First Amphibious Assault Ship TCG Anadolu has Begins Sea Tests View the full article
-
CDR Salamander - 1937, NATO, and the Need for Follow-Through
General Sir Patrick Sanders, GBR A, Chief of the General Staff (GBR), made a statement, in part, this week that at first I thought was a bit of an exaggeration; "This is our 1937 moment," the army chief said, referring to the crucial period leading up to World War Two. "We are not at war - but must act rapidly so that we aren't drawn into one through a failure to contain territorial expansion… I will do everything in my power to ensure that the British Army plays its part in averting war." The challenge means the army must modernise, embracing new technologies such as cyber warfare and long-range missiles, but also retain traditional soldiering skills. General Sanders said if a battle came "standoff air, maritime or cyber fires are unlikely to dominate on their own - land will still be the decisive to domain", adding that "you can't cyber your way across a river". Perhaps not. It tickled something that this former NATO staff officer and all around NATO fanboi tried to ignore as the Madrid Summit was going on. NATO is always frustrating and not all our allies are as “good” as others. Some nations are just institutionally prone to freeriding … but still, there is nothing better than NATO for nations who are trying to keep the experiment of liberal democratic government going. Even the least democratic nation in our club, Turkey, is still a place you can – within reason – not feel like you are living in some dystopian hell hole – though there are limitations there as opposed to living in say Denmark. It is clear that the Ukrainians’ brave stand in the face of Russian aggression finally opened the eyes of many in NATO that were previously closed that the post-Cold War fever dream has passed, that it is time to act as adults in an adult world. Not perfect, but an improved situation. Yes, Russia is a poor and corrupt country … but she is also resource rich and has a distinctly expansionist vision of her place in the world. On paper in GDP and population she does not seem like a threat to prosperous Western Europe and North America, but you can be as rich and prosperous as possible, but if you are supine and distracted, the smaller and poorer who is aggressive will defeat you every time. The events of the last year make the Madrid Summit one that must deliver more than group photographs. NATO must show her cards. This is one of those moments in time where you either turn in to the wind, or drift hopelessly. So far, with a few quibbles, there is room for optimism. Let’s look at a few bits from the pre-summit press conference with Secretary General Jens Stoltenberg on Monday, We will transform the NATO Response Force. And increase the number of our high readiness forces. To well over 300,000. NRF from 40,000 to 300,000. Hey, I know that gig and I feel the need to get to the CJ5 shop in Mons to go over the Combined Joint Statement of Requirements (CJSOR). Which troop contributing nations are filling which serials? Are we going to use the existing JFC’s as higher HQ or a new structure? This is my staff officer happy place. What a great time to be in Brussels, Mons, Brunssum, or Naples. If you love staff work – which I did – this is the kind of thing you just live for. (NB: don’t expect anything soon. NATO pretty much shuts down from 15 JUL to 15 SEP). Regulars here know my decades long hobby horse about NATO allies spending their fair share? Well … Nine Allies now reach – or exceed – the 2% target. Nineteen Allies have clear plans to reach it by 2024. And an additional five have concrete commitments to meet it thereafter. Two percent is increasingly considered a floor, not a ceiling. "... Back in 2014, when we agreed the Defence Investment Pledge, only three Allies met the guideline of spending 2% of GDP on defence. And defence spending was also declining across Europe and Canada." Say what you want about Trump, but he is the one that dusted this off and made it a priority. He and his natsec team were correct in this regard and should be given the appropriate credit. There are nations that geographically don’t quite “fit” NATO but otherwise would be right at home. We are smartly pulling them in tighter. I welcome that Australia, Japan, New Zealand, and the Republic of Korea will join us for the first time at our Summit. Absolutely critical to global security…not just North Atlantic. However … all is not perfect. I would not be doing my loyal readers proper justice if I did not point out one sad fact – there are still unserious people injecting their unserious neo-pagan religion in this very serious secular challenge; And on climate change, we will agree to cut greenhouse gas emissions for NATO as an organisation. NATO could disappear tomorrow – and the planet would not notice. What unserious Davosesque BS. Whoever insisted that be included should be publicly shamed. Having unserious FOD spot-welded on to serious occassions degrades everyone. It does not belong on the same page as this scene setter; ... remember that, for instance, in the current Strategic Concept, agreed at the Lisbon Summit in 2010 - and I attended that Summit as the Prime Minister of Norway - at that time, President Medvedev of Russia participated in the meeting and we agreed in the Strategic Concept, which is still the current Strategic Concept, and we will have a new one later this week, we said that Russia is a strategic partner. That will not be the case in the Strategic Concept we will agree in Madrid. I expect that Allies will state clearly that Russia poses a direct threat to our security, to our values, to the rules-based international order. That really set the tone for the conference. Today we got the official “Madrid Summit Declaration,” and it is good to note the significance of its location; 40-years after Spain joined NATO. What are the bold-faced items? We reaffirm our commitment to NATO’s Open Door Policy. Today, we have decided to invite Finland and Sweden to become members of NATO, and agreed to sign the Accession Protocols. In any accession to the Alliance, it is of vital importance that the legitimate security concerns of all Allies are properly addressed. We welcome the conclusion of the trilateral memorandum between Türkiye, Finland, and Sweden to that effect. The accession of Finland and Sweden will make them safer, NATO stronger, and the Euro-Atlantic area more secure. The security of Finland and Sweden is of direct importance to the Alliance, including during the accession process. No questions the largest takeaway. Swedish and Finn officers have been a regular sight through Partnership for Peace at NATO HQs for decades and at least their military has been ready to finalize their integration in to NATO. They were just waiting for the people and their elected representatives to realize the utility of this fact. They are turnkey members and will more than carry their weight. Great to officially have them in NATO. The second takeaway is something not spoken loudly in polite company but generally understood. Russia is the reason for NATO. We condemn Russia’s war of aggression against Ukraine in the strongest possible terms. It gravely undermines international security and stability. It is a blatant violation of international law. ... The Russian Federation is the most significant and direct threat to Allies’ security and to peace and stability in the Euro-Atlantic area. The invasion of Ukraine was simply the last straw. We warmly welcome President Zelenskyy’s participation in this Summit. We stand in full solidarity with the government and the people of Ukraine in the heroic defence of their country. We reiterate our unwavering support for Ukraine’s independence, sovereignty, and territorial integrity within its internationally recognised borders extending to its territorial waters. We fully support Ukraine’s inherent right to self-defence and to choose its own security arrangements. We welcome efforts of all Allies engaged in providing support to Ukraine. We will assist them adequately, recognising their specific situation. We are a long way from and many plays away from UKR joining NATO, but NATO is clearly as close to being a combatant in this war as one could be without having actual troops on the ground. The nearest parallel I can think of is the USA’s relationship to GBR from 39-41, and perhaps the Soviet Union to Vietnam during our war there. We will continue and further step up political and practical support to our close partner Ukraine as it continues to defend its sovereignty and territorial integrity against Russian aggression. Jointly with Ukraine, we have decided on a strengthened package of support. Every NATO meeting, like minded non-NATO nations should be invited and smart minds put to work to see how we can better integrate with these friends. We have met here in Madrid with many of NATO’s partners. We had valuable exchanges with the Heads of State and Government of Australia, Finland, Georgia, Japan, the Republic of Korea, New Zealand, Sweden, and Ukraine, as well as the President of the European Council and the President of the European Commission. We welcomed the engagements with the Foreign Ministers of Jordan and Mauritania, as well as the Defence Minister of Bosnia and Herzegovina. Sadly, once again – the unserious neo-pagan cohort had to jump in where they are not needed nor wanted, but Davos must have its bit of the spotlight; Climate change is a defining challenge of our time with a profound impact on Allied security. It is a threat multiplier. We have decided on a goal to significantly cut greenhouse gas emissions by the NATO political and military structures and facilities, while maintaining operational, military and cost effectiveness. We will integrate climate change considerations across all of NATO’s core tasks. So, there you have it. Sweden and Finland are in, and Russia is on report. Hopefully that means that I will have fewer opportunities to tap my sign over on twitter. If we are lucky, by mid-decade the new floor will be 2.5% of GDP and punitive measures like we’ve recommended through the years will be placed on member states not carrying their fair share of the load. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=mJXG3vuRhGg:c_aQX1bZqtw:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=mJXG3vuRhGg:c_aQX1bZqtw:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=mJXG3vuRhGg:c_aQX1bZqtw:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=mJXG3vuRhGg:c_aQX1bZqtw:F7zBnMyn0Lo View the full article
-
DID - Sikorsky Gets $2.3B For Black Hawk |Djibouti Revealed Bayraktar TB2 | MBDA Introduces JFS-M For HIMARS And M270
Americas Sikorsky Aircraft won a $2.3 billion deal for procurement of 120 H-60M Black Hawk helicopters and related support for fiscal years 2022-2026, including options for an additional 135 aircraft. Bids were solicited via the internet with one received. With more than 2,100 H-60 variants in the US Army’s inventory, the Black Hawk remains the workhorse and backbone of US Army aviation. As the US Army continues to develop its Futura Vertical Lift (FVL) programs – in which the company competes with its Raider X and SB-1 Defiant – they will continue to operate the H-60M for decades to come and alongside its future replacements. According to the US Department of Defense publication, the contract is multi-year and firm-fixed-price, and includes the aircraft and the logistics support ecosystem. Work will be performed in Stratford, Connecticut, with an estimated completion date of June 30, 2027. Lockheed Martin won a $13.3 million cost-plus-incentive-fee modification to previously awarded contract N00024-13-C-5116 for AEGIS Combat System Engineering Agent (CSEA) efforts. Work will take place in New Jersey. Expected completion will be by December 2022. The Naval Sea Systems Command, Washington, DC, is the contracting activity. Middle East & Africa Baykar, the Turkish manufacturer of the Bayraktar TB2, will donate additional unmanned combat aerial vehicles (UCAVs) to Ukraine, refusing to accept crowd-funded payment for the aircraft. Baykar announced the gifting of three UCAVs on June 27, saying that “The People’s Bayraktar” campaign to raise funding for the procurement should instead redirect the monies raised to “the struggling people of Ukraine”. Djibouti has revealed itself to be an operator of the Baykar Bayraktar TB2, parading the Turkish-built unmanned combat aerial vehicle (UCAV) at its independence day celebrations on June 27. Two Bayraktar UCAVs were showcased in a military parade to mark the 45th anniversary of independence for the east African country, with each being transported on the back of a flatbed truck. Europe At the recently concluded ILA Berlin Air Show, MBDA took the opportunity to unveil the Joint Fire Support Missile (JFS-M) that can be fitting inside the ammunition pods of the HIMARS or M270 Multiple Launch Rocket System (MLRS). The company decided that a cruise missile solution is more desirable than using ballistic missiles as the latter require larger boosters. Asia-Pacific According to Business World, the US has reoffered to co-develop the 110-kilonewton (kn) engine for India’s Advanced Medium Combat Aircraft (AMCA). An earlier US offer in 2019 to jointly develop the fighter engine was shelved after disagreements arose over technology sharing between the two countries. The US was reluctant to share “core or hot engine technology” with India, the outlet wrote. Today’s Video WATCH: Joint Fire Support Missile – Growth of capability for the artillery View the full article
-
CDR Salamander - The War Gods of the Copybook Headings Return
Industrial capacity feeds logistics. Logistics win wars. Logistics is math. Math is unforgiving to the complacent. If you are looking for early lessons of the Russo-Ukrainian War, there are two that need to be underlined today. Lesson 1: Don’t Fall for the Short War Fallacy: This is a known fallacy throughout human history, but every generation must be reminded of it, sometimes more than once. At peace, people will find reasons – either phycological or financial – to promote the promise of a short war either through their superior ideas or exquisite weapons. Good people desiring good things are easily seduced by this peace-time siren’s song. The Russians thought that the Ukrainians would fall in 3-5 days and planned for it. The United States and Western Europe thought that so much they tried to convince the Ukrainian government to retreat to Lviv or even Poland before the first Kalibr cruise missile received intent-to-launch. Before the war, the Ukrainians did not believe the Russians would actually do this – but the moment the first Russian boot stepped off a Mi-8 at Hostomel, they knew they were in for an existential fight … and here we are at the start of month-5 of the war. Action 1: have hard follow-on questions for anyone who is promising a short war or is selling a “Win in 72-hr Posture.” It briefs well, but it almost never works out. Everything has to be executed perfectly and your opponent have no agency. What is their “Plan-B” or will it be like Iraq 2003’s “Phase 4” or the Russian retreat from Kiev when reality hits. Lesson 2: The Hard Math of Shallow Magazines: You are short of everything because you didn’t believe the warnings of Lesson-1. We have all read volumes the last few months of all the friends of Ukraine scouring the deep recesses of forgotten magazines for former Soviet compatible ammunition that could be sent to Ukraine. Well, that which was not destroyed pre-war by the Russian clandestine services. Because the answer was too painful for peacetime leaders to ponder, no one wanted to do the math of what a real war would mean. That is the subject of today’s post. Action 2: Tell the Cult of Efficiency to Get Bent; You Have a War to Prepare For. Alex Vershinin over at the Royal United Services Institute has a must read article I’m going to pull some quotes on supporting Lesson-2 titled, The Return of Industrial Warfare. The rate of ammunition and equipment consumption in Ukraine can only be sustained by a large-scale industrial base. This reality should be a concrete warning to Western countries, who have scaled down military industrial capacity and sacrificed scale and effectiveness for efficiency. This strategy relies on flawed assumptions about the future of war, and has been influenced by both the bureaucratic culture in Western governments and the legacy of low-intensity conflicts. ... The winner in a prolonged war between two near-peer powers is still based on which side has the strongest industrial base. From small arms to nuclear submarine repair, our industrial base is exquisitely designed and Tiffany-tough. Any unexpected shock can almost make the whole system grind to a stop. Though the roots go deeper, this is a direct byproduct of the 1990s “Send all senior defense leaders to a 2-week MBA school” mentality and its second order effects. The Cult of Efficiency’s green eye-shade priorities took the place of the bookshelf full of history’s example. It didn’t take the Russo-Ukrainian War to expose this. We saw this in 2011’s operations against Libya and the war in Iraq. ...there is an assumption about overall ammunition consumption rates. The US government has always lowballed this number. From the Vietnam era to today, small arms plants have shrunk from five to just one. This was glaring at the height of the Iraq war, when US started to run low on small arms ammunition, causing the US government to buy British and Israeli ammunition during the initial stage of the war. At one point, the US had to dip into Vietnam and even Second World War-era ammo stockpiles of .50 calibre ammunition to feed the war effort. This was largely the result of incorrect assumptions about how effective US troops would be. Indeed, the Government Accountability Office estimated that it took 250,000 rounds to kill one insurgent. Luckily for the US, its gun culture ensured that small arms ammunition industry has a civilian component in the US. This is not the case with other types of ammunition, as shown earlier with Javelin and Stinger missiles. Without access to government methodology, it is impossible to understand why US government estimates were off, but there is a risk that the same errors were made with other types of munitions. As I alluded to above, there are some important influencers in the natsec arena who are in love with the “72-hr War.” Their premise is that if we design our force around convincing the Chinese – and ourselves – that in the first 72-hrs we have the capacity to destroy any ability of the enemy to proceed towards their objectives then they won’t start the war. If they do, well, we have what our wargames tell us we need to win in 72-hrs. I’m sorry, but your modeling and wargames are just that – models and games. You tell any competent designer what outcome you want, and they/we can tweak the assumptions and variables such that we can give you that result. I am very sure all the Russian models and wargames showed them conducting a victory parade in Kiev before March … but how did that work out for them? If you don’t win quick – there are no mulligans in war. Let’s quote me again; “Industrial capacity feeds logistics. Logistics win wars. Logistics is math. Math is unforgiving to the complacent." ...390 daily missions fired by tube artillery...With four guns per battery and four rounds per gun, the tube artillery fires about 6,240 rounds per day. We can estimate an additional 15% wastage for rounds that were set on the ground but abandoned when the battery moved in a hurry, rounds destroyed by Ukrainian strikes on ammunition dumps, or rounds fired but not reported to higher command levels. This number comes up to 7,176 artillery rounds a day. It should be noted that the Russian Ministry of Defense only reports fire missions by forces of the Russian Federation. These do not include formations from the Donetsk and Luhansk separatist republics, which are treated as different countries. The numbers are not perfect, but even if they are off by 50%, it still does not change the overall logistics challenge. Presently, the US is decreasing its artillery ammunition stockpiles. In 2020, artillery ammunition purchases decreased by 36% to $425 million. In 2022, the plan is to reduce expenditure on 155mm artillery rounds to $174 million. This is equivalent to 75,357 M795 basic ‘dumb’ rounds for regular artillery, 1,400 XM1113 rounds for the M777, and 1,046 XM1113 rounds for Extended Round Artillery Cannons. Finally, there are $75 million dedicated for Excalibur precision-guided munitions that costs $176K per round, thus totaling 426 rounds. In short, US annual artillery production would at best only last for 10 days to two weeks of combat in Ukraine. If the initial estimate of Russian shells fired is over by 50%, it would only extend the artillery supplied for three weeks. ... The expenditure of cruise missiles and theatre ballistic missiles is just as massive. The Russians have fired between 1,100 and 2,100 missiles. The US currently purchases 110 PRISM, 500 JASSM and 60 Tomahawk cruise missiles annually, meaning that in three months of combat, Russia has burned through four times the US annual missile production. The Russian rate of production can only be estimated. Russia started missile production in 2015 in limited initial runs, and even in 2016 the production runs were estimated at 47 missiles. This means that it had only five to six years of full-scale production. ...(a)crucial assumption is that industry can be turned on and off at will. This mode of thinking was imported from the business sector and has spread through US government culture. In the civilian sector, customers can increase or decrease their orders. The producer may be hurt by a drop in orders but rarely is that drop catastrophic because usually there are multiple consumers and losses can be spread among consumers. Unfortunately, this does not work for military purchases. There is only one customer in the US for artillery shells – the military. Once the orders drop off, the manufacturer must close production lines to cut costs to stay in business. Small businesses may close entirely. Now is the time for Congress to force The Pentagon to stop with foolish ideas. Demand to see the full inventory for everything from 5.56mm to 48-inch torpedoes and run the long war. Not 72-hrs, but 72-weeks. Heck, take an extra day and make it 72-months. Look at our single points of failure. From magazines and airfields west of Wake to production facilities in CONUS – expect at war that through direct action or sabotage, we will lose some of these facilities/capabilities. The Chinese have seen this in the build-up and execution of the war by the Russians against Ukraine. They will go after these non-resilient targets that even without prompting can go up in a – pun intended – flash. There is even a term of art for it; Unplanned Explosions at Munitions Sites (UEMS). We need to start acting on this now. There are more lessons to come, but we don’t have to wait for them all to come in – we don’t have time to. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=NLk62J1HT-w:truU4dmLOZI:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=NLk62J1HT-w:truU4dmLOZI:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=NLk62J1HT-w:truU4dmLOZI:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=NLk62J1HT-w:truU4dmLOZI:F7zBnMyn0Lo View the full article
-
DID - BAE Systems Tapped For ICBM | UK Swattles Mosquito Project | Asian Air Force Ordered Scorpius-SP
Americas BAE Systems Technology Solutions & Services won a $12 billion deal for Integration Support Contract (ISC) 2.0. The main function of ISC 2.0 is to support the government as the lead systems integrator and augment government resources for Intercontinental Ballistic Missile (ICBM) weapon system systems engineering and integration and professional services. According to solicitation documents, the Integration Support Contract 2.0 covers support for Minuteman III and the next-generation ground-based strategic deterrent missile or any future ICBM weapon system developed throughout the duration of the contract. Work will take place at Hill Air Force Base, Utah, and is expected to be completed by December 24, 2040. Five RQ-4 Block 30 unmanned air vehicles assigned to the 319th Reconnaissance Wing at Grand Forks Air Force Base have been transferred to Northrop Grumman for the Sky Range program. The US Air Force says a total of 20 Global Hawks are to be transferred and four Block 20 aircraft were transferred last year. Middle East & Africa Lockheed Martin won a $22.1 million contract modification to procure modernized day sensor assembly kits and spares for Apache helicopters. The Apache is a twin-engined army attack helicopter developed by McDonnell Douglas (now Boeing). It entered service with the US Army in 1984 and has been exported to Egypt, Greece, Israel, the Netherlands, Japan, Saudi Arabia, United Arab Emirates and the UK. Work will take place in Orlando, Florida, with an estimated completion date of November 30, 2024. Fiscal 2010 Foreign Military Sales (Egypt) funds; and fiscal 2021 and 2022 aircraft procurement, Army funds in the amount of $22,112,989 were obligated at the time of the award. Europe The United Kingdom has cancelled its Mosquito ‘loyal wingman’, deciding instead on a “change of direction” for the Lightweight Affordable Novel Combat Aircraft (LANCA) programme from which it was being developed. Announced by the Ministry of Defense on June 24, the decision by the Royal Air Force (RAF) Rapid Capabilities Office (RCO) not to take the Mosquito beyond its current design phase was decided on the basis that the desired additive capabilities can be better achieved by other means. Asia-Pacific A senior military officer from Japan has revealed that the Philippines and Tokyo could soon explore space and surveillance as the countries’ next areas of defense cooperation. The plan comes in response to China’s increasing military activities in the Indo-Pacific region. During his recent visit to Manila, Japan Air Self-Defense Force chief of staff Shunji Izutsu said that the sea and skies are no longer safe for either nation. IAI says that an Asian Air Force has ordered the ELTA ELL-8222SB Scorpius-SP jammer pod. Scorpius-SP is based on AESA technology with multi-beam operation – the ability to simultaneously detect and suppress multiple threats in different directions around the aircraft. It utilizes Digital Radio Frequency Memory (DRFM) and a range of sophisticated ECM techniques, providing protection against all types of Air-to-Air (A/A) and Surface-to-Air (S/A) threats in a dense radar-guided weapons environment. Today’s Video WATCH: This is the $220 Million US Air Force RQ-4 Global Hawk Spy Plane View the full article