Skip to content
View in the app

A better way to browse. Learn more.

HarpGamer

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

DID - Five Year Extension on Paveway-II Missile Production

Featured Replies

GBU-12 Paveway II
GBU-12 Paveway II

Paveway II kits convert standard Mk 80 family free-fall bombs into laser-guided weapons. Each guidance kit consists of a computer control group (CCG) guidance system with a semi-active laser seeker and pneumatically-controlled guidance canards for the front-end of the bomb, plus an air foil group (AFG) on the back end that provides lift and stability. Once a target is designated, laser guidance is more accurate than GPS, but it can be foiled by obscurants like fog, sandstorms, etc.

At the beginning of August 2011, the US government issued a contract worth up to $475 million…

“Paveway” is actually a US government designation for laser-guided bombs, but the term has been the subject of global legal battles between Raytheon and Lockheed Martin, with Raytheon claiming it as a trademark, and Lockheed Martin claiming it as a generic term. A number of courts have ruled in favor of the generic argument.

Updates

May 11/16: Lockheed Martin Missiles and Fire Control and Raytheon Missile Systems have been awarded a combined not-to-exceed $649.7 million modification contract for Paveway II production. The modification provides a five year extension for Paveway II missile production with work completion expected for July 27, 2023. Foreign Military Sales (FMS) of the munition in 2015 included a $1.29 billion sale of muntions to Saudi Arabia, which included 1,000 GBU-12 Paveway II laser guided bombs.

Aug 1/11: Lockheed Martin Corp. in Archbold, PA (FA8213-11-D-0008), and Raytheon Missile Systems of Tucson, AZ (FA8213-11-D-0007) receive a $475 million contract for Paveway II laser-guided bomb computer control groups (seekers), and GBU-12 air foil groups (tail kits) for 500 pound bombs. Both elements are needed, in order to create a GBU-12 laser-guided bomb. The Ogden Air Logistics Center/GHGKA at Hill Air Force Base, UT manages the contract.

Discussions with Hill AFB confirm that this is a single 5-year firm-fixed-price, multiple-award contract. The 2 firms will compete for purchase orders, as the USAF issues them.



View the full article

Wow, the ability to autonomously land a helo on a frigate doing 25 kts in 15 mile/sec winds is far more than impressive (see typo in full article).

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.