Skip to content
View in the app

A better way to browse. Learn more.

HarpGamer

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

HG S2 (Intel Bot)

Members
  • Joined

  • Last visited

    Never

Everything posted by HG S2 (Intel Bot)

  1. UCAS-D/ N-UCAS concept (click to view full) The idea of UAVs with full stealth and combat capabilities has come a long way, quickly. Air forces around the world are pursuing R&D programs, but in the USA, progress is being led by the US Navy. Their interest is well-founded. A May 2007 non-partisan report discussed the lengthening reach of ship-killers. Meanwhile, the US Navy’s carrier fleet sees its strike range shrinking to 1950s distances, and prepares for a future with fewer carrier air wings than operational carriers. Could UCAV/UCAS vehicles with longer ranges, and indefinite flight time limits via aerial refueling, solve these problems? Some people in the Navy seem to think that they might. Hence UCAS-D/ N-UCAS, which received a major push in the FY 2010 defense review. Now, Northrop Grumman is improving its X-47 UCAS-D under contract, even as emerging privately-developed options expand the Navy’s future choices as it works on its new RFP. N-UCAS: Programs & Potential X-47B concept (click to view full) In early 2006 the future of DARPA’s J-UCAS program seemed uncertain. It aimed to create Unmanned Combat Aerial Vehicles (UCAV) for the USAF and Navy that could approach the capabilities of an F-117 stealth fighter. Boeing’s X-45C was set to face off against Northrop Grumman’s X-47B Pegasus, the program had demonstrated successful tests that included dropping bombs, and aerial refueling tests were envisioned. J-UCAS was eventually canceled when the services failed to take it up, but the technologies have survived, and the US Navy remained interested. Like the F-117, a UCAV’s self-defense would involve remaining undetected. While UCAVs can theoretically be built to execute maneuvers no human pilot could handle, the pilot’s awareness of surrounding events would be quite limited. The X-47B isn’t being designed to do what the type inherently does poorly, but to do what the type does inherently well: be stealthier than manned aircraft, and fly reliably on station for days using aerial refueling support. If Northrop Grumman or emerging competitors can overcome their technical and operational challenges, and if UCAV reliability lets them match the 2-3 day long mission profiles of Northrop Grumman’s RQ-4 Global Hawks, the US Navy would receive the equivalent of a carrier-borne F-117 stealth fighter, with improved stealth and no pilot fatigue limits. That would open up entirely new possibilities for American carriers. If aerial refueling support is present behind the front lines, an N-UCAS wing could easily sally forth to hit targets thousands miles from their host carrier, while pilots inside the ship fly in shifts. The X-47s would fly a much shorter distance back to aerial tankers as needed, and only return to the steaming carrier several days later, or when their weapons had been used up. As a concrete example, in an emergency a carrier could launch UCAVs as it left Gibraltar at the gate of the Mediterranean, then fly them to the Persian Gulf and keep them on patrol using USAF aerial refueling tankers, all the while steaming to catch up. As the carrier got closer to the Arabian Sea off of Oman, the UCAVs would get more and more loiter time over their target area, and the “chainsaw” would get shorter and shorter. First Step: UCAS-D / X-47B Concept no more (click to view full) N-UCAS (Naval Unmanned Combat Air System) is the US Navy’s broader umbrella initiative to define/develop/produce a fleet of unmanned, carrier based strike and surveillance aircraft. The UCAS-D demonstration program is a subset of that initiative. If the demonstrations go well, the Navy may progress to an Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) program. In July 2007, Northrop Grumman’s X-47B Pegasus beat Boeing’s X-45C to win the UCAS-D development contract. Northrop Grumman’s Aug 3/07 release describes their mission as: “The UCAS-D effort will mature critical technologies, reduce unmanned air system carrier integration risks and provide information necessary to support a potential follow-on acquisition milestone.” Translation: show us that this can work, and demonstrate carrier-based launches and recoveries of a tailless, autonomous, “LO-relevant” aircraft. “Low Observable relevant” means that its outer shape must reflect stealth requirements, but without any of the operational stealth coatings and other expensive measures. That makes sense, since UCAS-D is only about aerodynamics and control. Eventually, follow on programs like UCLASS will have to test stealth as well, but UCAS-D will be about the basics. UCAS-D has 2 big technical challenges. One is safe, reliable flight and landings in carrier-controlled airspace, for a stealth aircraft that may not always be visible on radar. Testing appears to be working, and combined manned/ unmanned evolutions have begun. The other big challenge is successful and safe aerial refueling. Next Step: UCLASS Phantom Ray Northrop Grumman’s UCAS-D team hopes that by completing the UCAS-D funded demonstration phase, they’ll be able to offer an inherently conservative service a proven UCAV option, with a more complete set of advanced capabilities than privately-developed or late-moving competitors. The USA’s Naval Aviation Master Plan currently includes provisions for a Navy UCAS (N-UCAS) around 2025. If UCAS-D work goes very well, and the US Navy follows through on its shift toward an X-47B-class UCAV that can be used for limited missions, pressure will build for much earlier deployment. There are already indications of pressure along those lines, and the UCLASS RFI sets a goal of fielding a limited capability UCAV on board American carriers by 2018 or so. Barring continued and substantial pressure from above, however, the level of cultural shift required by the naval aviation community is likely to slow down any deployment of advanced UCAVs on board ships. That is already happening to UCLASS, which has seen its strike role shrink while the Navy publicly talks about making surveillance its main mission. That would be less threatening to future manned aircraft programs, but it may not be the best use of UCAV technology, and the Navy is already finding itself at odds with Congress on this score. A priority on surveillance also shrinks the need for stealth, which would give General Atomics’ conventional airframe design a big advantage over its 3 tailless flying wing competitors. Predator C click for video If and when the US Navy proceeds with a full Unmanned Combat Air Vehicle deployment program, the X-47 will have competitors. The 3 additional recipients of initial UCLASS study contracts include: General Atomics. They were the first competitor out of the gate, expanding their jet-powered Predator C “Avenger” research program to include a carrier-capable “Sea Avenger” as well. Boeing. Boeing already makes F/A-18 Super Hornet naval fighters, and their privately-developed X-45 Phantom Ray UCAV stems from the same DARPA J-UCAS program that produced the X-47B UCAS-D. Northrop Grumman designed their X-47B for carrier operations from the outset, but Boeing developed their X-45C without those compromises, so carrier operations will require added work. Lockheed UCLASS click for video Lockheed Martin. This concept comes out of their famed Skunk Works facility, which produced planes like the F-117 Nighthawk stealth fighter. Their work also builds on internal efforts like Polecat UAV, and classified programs like the RQ-170 UAV. They also seem to be making a push to leverage their strength in back-end command and control systems as a selling point, while partnering with control system specialist DreamHammer. UCAS-D: Program & Team The first X-47B Pegasus UCAS-D (AV-1) was scheduled to fly in December 2009, but that was pushed back to Q1 of CY 2010, and finally ended up taking place in February 2011. It conducted series of detailed flight envelope and land-based carrier integration and qualification events at Edwards AFB, CA, then returned to NAS Patuxent River, MD to begin land-based carrier landing trials. AV-2, which is equipped with full refueling systems, was expected to make its first flight in November 2010, and begin testing autonomous aerial refueling (AAR). Early 2011 saw the AV-2 airframe pass static and dynamic load tests, but AV-2’s flights were delayed until AV-1 finishes its own tests, in late 2011, and didn’t take off until November 2011. It began carrier-related testing in 2012, and launched for the 1st time in May 2013. Full launch and landing circuits, and aerial refueling tests, are still on the horizon. Its first landing was initially set for late 2011, but the firm now talks about some time in 2013. Once autonomous aerial refueling demonstrations begin, the Navy intends to achieve both probe & drogue (USN style) and boom/receptacle (USAF style) refuelings. Northrop Grumman’s facility in Palmdale, CA is the final assembly site for the X-47B, and the industrial team also includes: UCAS-D: Northrop Grumman’s X-47B X-47B 3-view (click to view full) UCAVs currently have no real situational awareness of the airspace around them, which makes them sitting ducks for any attack that doesn’t use radar guidance, and isn’t picked up by their radar warning receivers. Even an alerted UCAV currently has few options but to try and change course. That may work against ground threats, but mobile aerial opponents will simply follow and kill them. Their best defense is not to be found. Their best option if found is to make it hard to keep a radar track on them, or to vector in enemy aircraft. This may be why high-end strike UCAVs like the Boeing X-45 Phantom Ray, European nEUROn, British Taranis, and Russian MiG SKAT all use the maximum stealth configuration of tailless subsonic blended wing bodies with shielded air intakes, and attenuated exhausts. The X-47B’s modified flying wing design and top-mounted air intake reflect this orientation. By removing the pilot and opting for sub-sonic speeds, Northrop Grumman is able to field a design that looks like a more advanced version of its B-2 bomber. Instead of a straight flying wing like Boeing’s competing X-45C, however, their engineers opted for a cranked wing that improves landing characteristics on carrier decks, and makes it easy to use carrier-borne aircrafts’ classic “folding wing” design for improved storage in tight spaces. This UCAV may be a short plane, but it’s not a small one. The X-47B’s 62.1 foot wingspan rivals the Navy’s old F-14s, and is wider than a Navy F/A-18 Hornet or even a larger Super Hornet. Because of its foreshortened length, however, its storage “spot factor” relative to an F/A-18C Hornet (“1.0”) is just 0.87. Target and strike (click to view full) Pratt & Whitney Canada JT15D-5C turbofan engine powered previous X-47 models, but the UCAS-D will adopt Pratt & Whitney’s F100-PW-220U, a modified variant of the engine that powers American F-16 and F-15 fighters. Subsonic requirements and carrier-based employment changed the engine’s imperatives: it will produce less thrust than its F100 counterparts (just 16,000 pounds), in exchange for efficiency improvements and better protection against the corrosive salt-water environment. Efficiency matters to this platform. Unrefueled X-47B range is expected to be between 1,500 – 2,100 nautical miles, with a maximum payload of 4,500 pounds. The standard payload is expected to be a pair of 2,000 pound JDAMs, but the weapon bay’s ultimate size and shape will determine its ability to carry other options like strike missiles, JSOW glide bombs, a pair of 4-bomb racks for the GPS-guided Small Diameter Bomb, the forthcoming Joint Air-Ground Missile, etc. Sensors are currently to be determined, as they aren’t really the point of UCAS-D. Any Navy strike platform is expected to have an advanced SAR radar with Ground Moving Target Indicator (SAR/GMTI), conformal electro-optic day/night cameras, and ESM (Electronic Support Measures) equipment that helps it pinpoint and trace back incoming electromagnetic signals. Given the X-47B’s design’s inherent strengths of stealth and long endurance, additional modules or payloads for tasks like signals collection must surely be expected. Naval UCAVs: Contracts and Key Events See also “Boeing to Advance UAV Aerial Refueling” for background and updates regarding unmanned aerial refueling test programs in the US military – which now include UCAS-D/ N-UCAS. Unless otherwise indicated, The Naval Air Systems Command Patuxent River, MD manages these contracts. FY 2016 – Today November 3/20: Environmental Assessment The US Navy prepared a draft environmental assessment for home-basing of the MQ-25A Stingray carrier-based unmanned air system at Naval Base Ventura County in Point Mugu, California. The Stingray is an aerial refueling drone. It will serve as a tanker capable of refueling aircraft in flight. The Stingray will also be capable of conducting intelligence, surveillance, and reconnaissance operations. The drone first flew on September 19, 2019. Boeing is developing the MQ-25. According to the company, will „provide the needed robust refueling capability thereby extending the combat range of deployed Boeing F/A-18 Super Hornet, Boeing EA-18G Growler, and Lockheed Martin F-35C fighters“. According to the draft released by the USN, the Stingray will fly approximately 960 flights annually at Point Mugu. The home basing will bring 730 personnel and their family members to the base. A new hangar will be constructed northeast of the base with two taxiways to link to the existing Taxiway B. July 4/19: MD-5A Frequentis Defense won an $8.5 million firm-fixed-price contract for the MD-5A Unmanned Carrier Aviation Mission Control System, which will support the MQ-25 Stingray drone. The deal provides non-recurring engineering and logistics for the design, development, test, manufacture and repair of the system. The integrated computer system will transport voice communications from carrier-based air vehicle operators to local audio switches, local radio terminals and remote radio terminals. The MQ-25 is the Defense Department’s first aircraft carrier-based unmanned air vehicle. Frequentis will perform work in Columbia, Maryland, and is expected to be finished by March 2021. June 18/19: Vehicle Management Boeing decided on BAE Systems to supply vehicle management systems for its MQ-25 unmanned aerial aircraft. BAE Systems said in a press release on Monday, that its „Vehicle Management Control System will control all flight surfaces and perform overall vehicle management duties for the MQ-25 unmanned aerial vehicle“. Boeing is developing the MQ-25 Stingray unmanned tanker for the US Navy. It is the Navy’s first operational carrier-based unmanned aircraft and will provide a necessary refueling capability. The USN wants MQ-25 to have initial operational capability by 2026. A MQ-25A prototype, known as a T-1 or Stingray, is expected to take its first test flight later this year. The drones will be based on the Boeing F/A-18 Super Hornets, Boeing EA-18G Growlers and Lockheed Martin F-35C fighters. December 21/18: Stingray development Boeing is receiving additional funding to continue research on the MQ-25 Stingray. The contract modification is valued at $90.4 million and is expected to be completed in August 2024. Under the contract, Boeing will perform a number of studies and analysis related to the engineering, manufacturing and development phase of the MQ-25 Stingray. The Stingray will be the Navy’s next ‘Group 5’ aircraft. With its implementation the US Navy seeks to close the gap with between UAS and manned aircraft by adding a system that is designed from the outset to operate within meters or less of large manned aircraft. The UAV will have the capacity to carry 15,000 pounds of fuel and will be used to refuel the F/A-18 Super Hornet, EA-18G Growler, and F-35C fighter jets, extending their range and time in the air significantly. Work will be performed at Boeing’s factory in St. Louis, Missouri. April 18/18: GA unveils deck handling controls Images and video posted by General Atomics have shown a demonstration of the aircraft carrier deck-handling controls for its MQ-25 Stingray unmanned tanker bid by using a pair of motion-sensing director wands and an Avenger unmanned aerial vehicle as a stand-in for its yet-to-be-built prototype. According to the firm, the specially designed director wands are the same size, shape and weight as those used on aircraft carrier decks to direct manned aircraft, such as the F/A-18 Super Hornet. According to Flight Global, General Atomics’ wands use proprietary gesture recognition algorithms to identify standard hand movements, as designated by Naval Air Training and Operating Procedures, and then translates and sends those commands to the MQ-25 air vehicle. They allow directors to fully control aircraft taxi operations on deck using the wand, including lowering and raising the launch bar, spreading and folding the wings, and raising the arresting hook. Rival MQ-25 bidders Lockheed Martin and Boeing have yet to reveal their respective deck handling control tech. April 11/18 Lockheed drops its industry team Lockheed Martin has unveiled its industry team that, if selected by the US Navy, would develop the MQ-25 Stingray unmanned aerial tanker, company execs released Monday. Suppliers of equipment intended to be used include General Electric’s F404 turbofan engine—used on the F/A-18 Super Hornet—United Technologies—who supply the landing gear found on the F-35C—while Triumph Aerostructures will manufacture the internal structure of the drone. While Lockheed seems to be relying on equipment used on legacy airframes, it may have taken the most risk in its design, putting out a tanker drone concept that doesn’t look much like its competitors. When the Navy rejigged its requirements from a drone that could take on the ISR and strike missions to that of just an unmanned mission tanker, Lockheed threw out is previous design while competitors such as General Atomics and Boeing heavily reused theirs. Furthermore, since Northrop’s retirement from the competition last year, Lockheed is also the only competitor offering a flying wing aircraft as both General Atomics and Boeing have notably put forward wing-body-tail aircraft. The Navy plans to pick an MQ-25 vendor this summer, and will award a contract for the four engineering and manufacturing development aircraft, with an option for three more test assets. March 12/18: Boeing talks to Aviation Week In an exclusive interview with Aviation Week, Boeing Phantom Works’ MQ-25 Stingray team has spilled some beans on the firm’s effort for the US Navy’s unmanned aerial tanker and its plans to win the contract. Dubbed the T-1 by the firm, the aircraft had been rolled out as early as 2014 but had been kept out of view until December 2017’s teaser reveal on Twitter. The mission tanker contract for which Boeing, Lockheed Martin and General Atomics are all competing for is a fixed-priced award for the development and construction of the first four aircraft. The Navy hopes to purchase up to 72 operational models for carrier deployment and achieve initial operational capability, expected by 2026. February 15/18: GA’s Industry Partners—Navy talks FY2019 funding The US Navy has pushed initial operational capability (IOC) of the MQ-25 Stingray unmanned aerial tanker into 2026, rather than the rapid acquisition initially planned for 2020. Service officials told a Fiscal Year 2019 budget briefing on Monday that they plan to spend $719 million on research and development for the MQ-25A and now anticipates purchasing the first four aircraft in 2023. Meanwhile, Boeing has been listed by General Atomics Aeronautical System (GA-ASI) as part of its industry team of suppliers entering the Stingray program. The announcement comes after Boeing’s Phantom Works unit revealed before Christmas, its own fully assembled MQ-25 ground test vehicle at its St Louis facility, and the firm maintained that acting as both a prime bidder and a member of the General Atomics team “is good for our customer and reflects our focus on doing what’s necessary to compete, win and grow.” Other suppliers listed by GA-ASI include: Pratt & Whitney for its engines; UTC to design and build the landing gear; L3 Technologies for communications; BAE Systems for software capabilities, mission planning, and cybersecurity; Rockwell Collins for advanced navigation technologies, a new generation of the TruNet ARC-210 networked communications airborne radio and a comprehensive simulation framework; and GKN Aerospace’s Fokker for landing gear technologies. January 9/18: Boeing Prototype—FAA Registration The Federal Aviation Administration (FAA) has awarded Boeing’s MQ-25 Stingray demonstrator a US aircraft registration, the firm has told Flight Global. The unmanned carrier-based mission tanker prototype, dubbed T1, was unveiled by Boeing on Twitter onDecember 16, and received the registration number, N234MQ, from the FAA on December 26. However, several details usually included, such as the model of the turbofan engine that powers the aircraft, were omitted from the registration. The deadline for bids to the MQ-25 Stingray program were due on January 3, with General Atomics and Lockheed Martin joining Boeing in the competition. While Boeing have been dripping information on their prototype, Lockheed Martin has released only a fragment of its MQ-25 concept aircraft, showing only part of the underside of a wing and a refueling pod. December 21/17: Prototype Unveiling After a week of teasing its release, Boeing’s Phantom Works unit revealed Tuesday its prototype that will be entered into the US Navy’s MQ-25 Stingray unmanned aerial tanker program. A photograph of the aircraft facing the camera released by the firm shows that Boeing have incorporated a wing-body-tail design, diverting from the original flying wing design it considered putting forward to the precursor of the MQ-25 program—when the Navy prioritized strike and ISR capabilities over mission-tanking for its first carrier-based drone. Engine runs will be conducted before the end of the year, with deck handling demonstrations to follow in the new year. During the demo, prototype operators will taxi the aircraft via remote control and move it within the confines of the deck, as well as validating that the aircraft will engage the launch bar of a catapult. Boeing said first flight will take place when the engineering and manufacturing development contract is awarded. October 30/17: Northrop Grumman has pulled out of the US Navy’s MQ-25 Stingray unmanned refueler competition. Despite being the company who developed the test platform that proved a UAV could take off and land from an aircraft carrier, CEO Wes Bush cited the Navy’s requirements in the request for proposal issued earlier this month as the reason for the firm’s forfeiture from the race, noting “if you can’t really execute on it and deliver on it to your customer and your shareholders, then you’ve done the wrong thing.” That leaves Boeing, Lockheed Martin and General Atomics still in the race. October 12/17: US Naval Air Systems Command has released the final request for proposals (RFP) to industry for the unmanned MQ-25 Stingray unmanned aerial tanker. Lockheed Martin, Boeing, Northrop Grumman and General Atomics were all issued the RFP to compete for the air segment of what will be the Navy’s first operational carrier-based unmanned aerial vehicle ahead of an anticipated contract award by September of next year. Basic requirements will have the Stingray deliver about 15,000 pounds of fuel 500 nautical miles from the carrier, with a mission of alleviating the strain on the existing F/A-18E/F Super Hornets that are burning through flight hours while serving as a refueling tanker for other aircraft attempting to land on an aircraft carrier. September 04/17: The US Navy has said that the inclusion of the MQ-25 Stingray unmanned tanker on its aircraft carriers will extend the range of its carrier-borne fighters by 300 to 400 nautical miles. It is expected to be able to carry 15,000 pounds of fuel at 500 nautical miles from the carrier to the air wing’s strike fighters and capable of refueling between four and six aircraft at range. Navy brass expect the first MQ-25 to be flying mission tanking operations as early at 2019. July 24/17: A new draft request for proposals released by the US Navy has revealed that the service’s plans for the MQ-25 Stingray will be primarily that of a mission tanker. The draft, published on July 19, made no mention on the unmanned platform’s intelligence, surveillance and reconnaissance (ISR) capabilities, instead outlining the two key performance parameters (KPP) required for the aircraft’s airframes as having both carrier suitability and mission tanker capacity. As a result, the four competitors – Northrop Grumman, Lockheed Martin, Boeing and General Atomics – will only have to prove that their aircraft can take-off and land back on a carrier and do mission tanking. June 15/17: US Navy aircraft carriers, the USS Dwight D. Eisenhower (CVN 69) and USS George H.W. Bush (CVN 77), will be the first vessels to carry the MQ-25A Stingray, the service’s upcoming unmanned aerial refueling tanker. Both carriers will receive upgrades to include the control stations and data links needed to control the tanker, and while no date for the upgrades have been set, it is believed that Chief of Naval Operations Adm. John Richardson intends to accelerate the deployment of the Stingray and get it on carrier decks as early as 2019. News of the first carriers set for the MQ-25A introduction comes as the Navy decided to reprogram $26.7 million for control systems and data link installation the MQ-25A will need to operate from an aircraft carrier, taking that money from the USS George Washington (CVN-73) during its four-year midlife refueling and complex overhaul (RCOH) in the Fiscal Year 2017 budget. May 31/17: The US Naval Air Systems (NAVAIR) Command will soon issue a solicitation for engineering, manufacturing and development (EMD) to Boeing, General Atomics, Lockheed Martin and Northrop Grumman. NAVAIR also intends to release a solicitation to those companies for an accompanying contract for studies and analysis supporting the MQ-25 Stingray EMD program. The concepts coming out of the EMD phase are expected to take a stark departure from the preliminary designs, which industry created to support the navy’s original requirement for a stealthy, carrier-launched surveillance and strike aircraft (UCLASS). Such changes include dropping the initial requirement for strike capabilities but will retain surveillance capabilities with the inclusion of a 19-23in-diameter forward looking infrared sensor turret. March 23/17: The US Navy’s MQ-25A Stingray unmanned aerial tanker is likely to have a wing-body-tail design after Lockheed Martin’s Skunk Work division found that a flying wing design is not the best aerodynamic shape for the service’s latest requirements. While the Navy had initially intended a surveillance and possible strike capability for the aircraft, the current requirements suggest a strong emphasis on a tanking role and less on ISR. As a result, competing firms Lockheed Martin, Northrop Grumman, General Atomics and Boeing are likely to redesign their bids for the competition. October 24/16: Four companies have been awarded contracts by the US Navy to conduct risk reduction work on their designs for the MQ-25 Stingray. Boeing, General Atomics Aeronautical Systems and Lockheed Martin received contracts for $43 million each while Northrop Grumman received $35.8 million. The risk reduction work will see the companies alter previous designs of the MQ-25 as an unmanned strike bomber to fit its new role as an aerial tanker under the carrier-based air refueling system (CBARS) program. September 27/16: Contracts worth $43 million each have been doled out to Lockheed Martin and Boeing in order “to conduct risk reduction activities in support of the MQ-25 unmanned carrier aviation air system.” Both companies are expected to complete their work on the UAV by October 2017. Now known as the Stingray program, the UAV integrates the first operational, carrier-based, catapult-launched drone and will provide long-endurance ISR and organic refueling capabilities for the carrier air wing. August 22/16: Contractors aiming to secure deals in relation to the Navy’s MQ-25A program have been given vague hints at what the service is expecting. Hopefuls looking to secure a slice of the action have been told they need to get that “sweet spot” between supporting mission tanking and intelligence, surveillance and reconnaissance (ISR) missions. Born out of the scrapped Carrier-Based Aerial Refueling System (CBARS) program, the MQ-25 Stingray looks to include higher endurance for ISR capabilities in addition to just refueling. A lot of food for thought for those looking to get involved, but at least the initial “stealth tanker” concept has been shelved, for now. July 19/16: While speculation over its name has been floated for some time, the US Navy’s first carrier unmanned aerial vehicle has been officially named. Known as the Carrier Based Aerial Refueling System (CBARS) program, the service’s Material Command has now designated the aircraft MQ-25A with the name “Stingray.” Initially conceived as a low observable lethal, and deep penetrating strike platform, the MQ-25A will now focus on refueling with some ISR capabilities and followed up with later weapons installation. May 4/16: The US Navy is expected to release a risk-reduction request for proposals (RFP) for its MQ-25 Stingray program this summer. This will help set out the timeline in which the service can realistically expect the tanker system to be deployed on-board its carrier fleet. It is expected that this will be followed by an engineering, manufacturing and design RFP in early FY2017. Boeing, General Atomics Aeronautical Systems, Lockheed Martin, and Northrop Grumman all have designs they were going to pitch for UCLASS, and are expected to modify them for the Stingray’s new role. March 30/16: The US Government Accountability Office (GAO) has published its annual report on the the Navy’s Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) program, as authorized by the National Defense Authorization Act for Fiscal Year 2014. By analyzing the DOD budget for FY 2017 and speaking to program officials, the GAO found that the U.S. Navy has begun to develop modifications to existing shipboard systems to support the UCLASS’ latest iteration – Carrier Based Aerial Refueling System (CBARS). As with the UCLASS program, CBARS will include an air system segment, an aircraft carrier segment, and a control system and connectivity segment. March 16/16: The US Navy has announced plans to “descope” the stealth requirement from the development carrier-based aerial system (CBARS). This will allow the tanker to be capable of firing missiles and dropping munitions. Dubbed the MQ-25 Stingray, the descoping marks yet another alteration to the program which had initially started out as the Unmanned Carrier Launched Airborne Surveillance and Strike (UCLASS) program before a drastic U-turn took it away from ISR activities to that of refueling role. However, according to Vice Adm Joseph Mulloy, deputy chief of naval operations for integration of capabilities and resources, the addition of greater weapons capabilities will not see the Stingray spying, with destroying targets and refueling remaining its main mission. March 7/16: The decision to convert the Unmanned Carrier Launched Airborne Surveillance and Strike (UCLASS) program to an aerial refueling tanker under the Carrier Based Aerial Refueling System (CBARS) may require a new competition. Michael Novak, the Deputy Director of the Unmanned Maritime Systems Office under the office of the Chief of Naval Operations said that higher ups in the Pentagon were considering the change to allow all four companies that participated in the earlier UCLASS competition to be able to refine their proposals and “hit the mark for the CBARS.” The decision rests with the Office of the Secretary of Defense (OSD) on what the next step for the tanker will be. February 2/16: Initial plans to have the US Navy’s latest unmanned jet weaponized seems less likely, as plans seem to have shifted towards a tanker role. The long deferred Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) program was recently provided enthusiastically with $350 million by Congress. However, this was given on the understanding that the jet would be developed for full integration into carrier air wing operations – including strike operations – and possess the range, payload, and survivability attributes as necessary to complement such integration. No mention had been made about the need for unmanned aerial tanking capability. Instead the jet could be developed under the little known Carrier-Based Aerial-Refueling System (CBARS) aimed at producing an unmanned carrier-based aerial tanker, able to refuel other planes low on gas without risking a pilot. Strike capabilities would feature in a future variant of the aircraft. October 1/15: Both House and Senate armed forces committees have agreed to fund the development of UCLASS unmanned aircraft in the draft FY2016 NDAA bill, in addition to more Tomahawk cruise missiles, F-35B Joint Strike Fighters for the Marines and F/A-18E/F Super Hornets for the Navy. The draft bill also includes for the provision of a fourth MQ-4C Triton UAV. FY 2015 April 20/15: The X-47B UCAV currently being developed by Northrop Grumman, has conducted successful aerial refueling from a KC-707, the first time the demonstrator has completed this difficult test set. Additionally, the US Office of Naval Research recently successfully tested the ability of UAVs to “swarm”, sharing information in flight with some autonomy, as part of its LOCUST program. Feb 4/15: FY 2016 budge shelves UCLASS until 2023. Even (theoretically) busting through sequestration, the 2016 Administration budget for the Navy opts to push UCLASS off to 2023. The new schedule has an RFP released in FY 2016, with an award in Q2 2017 and first flight milestone in Q3 2020. Initial capability wouldn’t arrive until 2023. Where UCLASS was to originally get $669 million in FY 2016, the final document allowed it only $135 million. FY 2014 X-47B UCAS-D (click to view full) Sept 10/14: UCLASS. The UCLASS team has integrated the latest iteration of Common Control System (CCS) software, which is the 1st to use the latest Navy Interoperability Profile (NIOP). This iteration forms the baseline for all future UCLASS control software, and Cmdr. Wade Harris is the Control System and Connectivity (CS&C) lead. They’re currently testing this software with an air vehicle simulator based on the MQ-4C Triton. Ron La France is the UCLASS integration lead, and system-level testing of the control station and connectivity segment, carrier segment, and air system segment in the lab is next. That’s hard enough. Meanwhile, the program team is working with 72 programs of record, 22 program offices, 6 program executive offices and 3 systems commands. No wonder this stuff is slow and expensive; in fairness, a carrier deck can’t afford screwups, and there are a lot of moving parts to consider. Sources: US Navy NAVAIR, “Navy integrates ‘common’ software into next-generation unmanned carrier-based system”. Aug 29/14: UCLASS. So much for that Sept 10/14 DAB meeting. US Navy Cmdr. Thurraya S. Kent now says that: “Defense officials will be including [Unmanned Carrier Launched Airborne Surveillance and Strike (UCLASS)] in its ISR portfolio review to be conducted in conjunction with the normal budget review process this fall… Determination regarding the release of the UCLASS RFP will be made based on the results of this review.” It appears that the Navy itself is divided between its initial view of UCLASS as an ISR asset with secondary aerial tanker and low-threat light strike capabilities, vs. a stealthy and refuelable high-threat strike platform that’s designed to radically extend the carrier’s offensive reach. Sources: USNI, “UCLASS RFP Delayed Again Following Pentagon Meeting”. Aug 27/14: Testing. X-47B testing aboard USS Theodore Roosevelt [CVN 71] draws to a close. The UCAV flew with manned aircraft for the first time (q.v. Aug 17/14), continued flying and landing tests, performed a night time shipboard flight deck handling evaluation to see how the sailors dealt with that, and collected flying quality and recovery wind condition data to evaluate how the aircraft responds to wake turbulence during approach and landing. Sources: US Navy NAVAIR, “X-47B achieves new set of firsts aboard USS Theodore Roosevelt”. Aug 19/14: UCLASS. USNI reports that US NAVAIR is about to release their UCLASS RFP at long last, with a final signoff expected on Sept 10/14 by the Defense Acquisition Board. The specifications are still secret this time, so it’s hard to have an intelligent public discussion beyond the public data of 14 hours ISR endurance, 1,000 pound payload, or 2,000 mile strike mission with 500 pounds payload. It is interesting that many American sorties over Iraq these days are surveillance missions, though using Navy fighters for that is a fiscally stupid thing to do. Sources: USNI, “NAVAIR ‘On the Precipice’ of Releasing UCLASS RFP, Pentagon Review Set For Sept. 10” | USNI, “Navy: Most Carrier Sorties Over Iraq Are Surveillance Missions”. X-47B & F/A-18F Aug 17/14: UCAS-D & F/A-18F. The Navy continues taking next steps, operating an X-47B alongside manned F/A-18C and F/A-18F fighters from the same carrier at the same time: “The first series of manned/unmanned operations began this morning when the ship launched an F/A-18 and an X-47B. After an eight-minute flight, the X-47B executed an arrested landing, folded its wings and taxied out of the landing area. The deck-based operator used newly developed deck handling control to manually move the aircraft out of the way of other aircraft, allowing the F/A-18 to touch down close behind the X-47B’s recovery.” This seems easy, but “de-confliction” is really dangerous. Sources: US Navy, “USS Theodore Roosevelt Conducts Combined Manned, Unmanned Operations” | Foxtrot Alpha, “Video Of X-47B & F/A-18 Carrier Ops Shows The Future Of Naval Aviation” | Washington Times, “Navy’s X-47B drone completes ‘key’ carrier tests alongside F/A-18 Hornet”. July 31/14: UCLASS. USNI reports that the shift in UCLASS requirements wasn’t budget-driven, it was politically driven based on a program that doesn’t exist yet: “In particular, the change in UCLASS from a deep strike stealthy penetrator into the current lightly armed intelligence, surveillance and reconnaissance (ISR) focused aircraft was – in large part – to preserve a manned version of the F/A-XX replacement for the Boeing F/A-18E/F Super Hornet, several Navy, Pentagon and industry sources confirmed to USNI News.” It wouldn’t be the first time something like this has happened. The usual outcome is the elimination of a useful capability now, without really protecting the future program. Another trap could snap shut if the Washington Business Journal turns out to be correct, and the Navy decides to keep the specifications poorly defined, in order to give themselves more flexibility. What that usually gives you, is more cost. Sources: USNI, “UCLASS Requirements Shifted To Preserve Navy’s Next Generation Fighter” | The Guardian, “Carrier-based drone offers way forward for US navy – subject to squabbling” | Washington Business Journal, “Could UCLASS end up as the Pentagon’s next runaway program?”. June 26/14: N-UCAS Phase II. Northrop Grumman Systems Corp. in San Diego, CA receives a $63.1 million to a previously awarded cost-plus-fixed-fee contract modification for Phase II of N-UCAS post-demonstration activities. $45.9 million is committed immediately, using US Navy FY 2013 and 2014 RDT&E budgets. Phase II activities will include continued flights, test bed and flight test support at both shore-based locations and associated carrier detachments, continued development of Fleet Concepts of Operations, X-47B maintenance support, lab and test bed operational support and continued flight test opportunities. Work will be performed in San Diego, CA (70%) and Patuxent River, MD (30%), and is expected to be complete in March 2015. US Naval Air Systems Command, Patuxent River, MD, is the contracting activity (N00019-07-C-0055). N-UCAS Phase II May 6/14: Politics. House Armed Services Committee (HASC) chair Buck McKeon [R-CA] is proposing to add $450 million to fund 5 EA-18Gs and their equipment in the FY 2015 budget, instead of the 22 on the unfunded priorities list. The committee’s proposed changes would also preserve all F-35 funding, while cutting the Navy’s unmanned UCLASS R&D budget in half to $200 million. Sources: Flightglobal, “House bill promotes EA-18G and U-2S, but hits UCLASS” | Reuters, “Boeing, backers to fight for funding for 22 Boeing jets”. May 4/14: RFP leak? Shawn Brimley of the center-left Center for a New American Security discusses the recent classified UCLASS RFP. Something must have leaked: “But last month the Navy instead reportedly issued classified requirements for UCLASS to deliver intelligence, surveillance and reconnaissance. Instead of creating a drone that can carry missiles or other strike power into enemy airspace, defense contractors have been told to submit proposals for an aircraft designed to fly around the aircraft carrier for 12 to 14 hours delivering persistent surveillance over uncontested airspace, with a light strike capability to eliminate targets of opportunity.” Within the known set of contenders, this RFP would give General Atomics a significant advantage, but it would also remove most of the UCAV’s ability to operate in contested environments. Stealth at a level required for contested environments isn’t a bolt-on, it’s a fundamental design choice that affects most other choices. There’s a set of trade-offs between various capabilities and reasonable cost (q.v. Feb 13 – April 2/14), but one can legitimately wonder why the job description Brimley describes requires a new program of any kind. The MQ-4C Triton and RQ-4B Block 40 Global Hawks will already perform that reconnaissance role, and if light strike is also required, the MQ-9 Reaper could just be navalized. Sources: Defense One, “Congress’s Chance to Fix Aircraft Carrier Drones”. April 30/14: Politics. The House Subcommittee On Seapower And Projection Forces discusses H.R. 4435, the FY 2015 National Defense Authorization Bill. Title II addresses UCLASS directly, and prohibits UCLASS contracts until the Pentagon has produced a review of the report that examines the carrier wing’s capabilities against surveillance-strike complexes by 2025-2035, including both manned and unmanned components. That actually misses one of a UCAV’s biggest benefits, which is the strike range they offer with aerial refueling. The report may not change much, but the committee does say that: “The committee believes that current UCLASS Air System Segment requirements will not address the emerging anti-access/area-denial (A2/AD) challenges to U.S. power projection that originally motivated creation of the Navy Unmanned Combat Air System (N-UCAS) program during the 2006 Quadrennial Defense Review (QDR), and which were reaffirmed in both the 2010 QDR and 2012 Defense Strategic Guidance. In particular, the disproportionate emphasis in the requirements on unrefueled endurance to enable continuous intelligence, surveillance, and reconnaissance (ISR) support to the Carrier Strike Group (CSG), a capability need presumably satisfied by the planned acquisition of 68 MQ-4C Tritons…. appears unsupportive of the 2012 Defense Strategic Guidance for the United States to “maintain its ability to project power in areas in which our access and freedom to operate are challenged.” ….Finally, the committee is concerned with multiple aspects of the proposed UCLASS acquisition strategy, including: insufficient time and funding for contractors to mature their designs in support of a full-scope Preliminary Design Review, due in part to late-developing and still-evolving air system performance requirements; the additional risk to the program associated with the Navy’s decision to abandon the precision landing system developed and successfully tested during the UCAS-D effort; and the potential risk associated with NAVAIR developing the UCLASS Mission Control System internally.” April 17/14: RFP. Secretary of the Navy Ray Mabus signed-off on the draft RFP during an April 16/14 briefing, and the US Navy Navy released a draft UCLASS RFP direct to their existing contractors: Boeing, General Atomics, Lockheed Martin & Northrop Grumman. It’s classified, as expected, and the final RFP is due late this year. Sources: USNI, “Navy Issues Restricted UCLASS Draft Request for Proposal”. UCLASS RFP April 10/14: UCAS-D Testing. The X-47B conducts its 1st night flight. Sources: US NAVAIR, “Photo Release: X-47B completes night flights”. April 10/14: UCLASS GA. General Atomics’ modified Sea Avenger UAV appears to have grown larger since initial designs were released, with an internal bay and 4 wing hardpoints, including an option for buddy refueling tanks. The key question for the company will be the UCLASS stealth requirements. If they’re focused on ISR and strike missions in defended airspace, requiring good stealth scores in the C, X, and Ku bands, the Sea Avenger probably can’t compete. If the requirements focus on missions in relatively unthreatened airspace, inherent efficiencies in the Sea Avenger’s design sharply improve its chances. Sources: USNI, “General Atomics Shows Off Company’s UCLASS Option”. April 9/14: UCAS-D Recognition. The X-47B program is awarded the aerospace industry’s annual Robert Collier trophy for 2013. Sources: US NAVAIR, “Navy’s X-47B program receives aviation honor”. April 8/14: UCLASS. Speaking at the Sea, Air and Space 2014 expo, NAVAIR PEO unmanned aviation and strike weapons Adm. Mat Winter says that the US Navy expects to release a classified UCLASS draft RFP before the end of April. Sources: USNI, “Classified UCLASS Draft Request for Proposal Due at End of April”. Feb 13 – April 2/14: UCLASS. Nailing down the UCLASS requirements has been the Navy’s biggest headache throughout, and even at this late date, competing visions are still problematic enough to delay the RFP. One is reminded of legendary Skunk Works chief Kelly Johnson: “Starve before doing business with the damned Navy. They don’t know what the hell they want and will drive you up a wall before they break either your heart or a more exposed part of your anatomy.” The core design issues are straightforward. One, more payload = more size = more cost. Two, different UCAV sizes force a choice of specific marinized jet engines, which will have specific fuel consumptions. If gal/nmi isn’t good enough, that means more fuel, which means more payload, and see #1. Engine choice also affects stealth and size directly, since efficient high-bypass turbofans have large diameters, and you have to design around that. Finally, stealth itself costs money, and creates airframe designs that are difficult to change later. The Navy’s requirements (q.v. June 26/13) effectively impose a $75 million per UCAV cost cap, but “we want it all” letters from House ASC Seapower subcommittee chair Randy Forbes are likely to force costs to $100+ million if its recommendations are adopted. In-air refueling capability is critical for any UCAV, but adding maximum stealth and payload to the request is what breaks the deal. This may be one of those cases where a limited program with a less expensive platform is what’s really called for, in order to allow the Navy to figure out how they can best use the technology first. Sources: Scribd, Rep. Randy Forbes UCLASS Letter || USNI, “Cost Will Drive UCLASS Designs” | “Requirements Debate Continues to Delay UCLASS RFP”. April 1/14: UCLASS. The Navy has been discussing the potential use of UCLASS as an aerial tanker platform for some time now. They aren’t talking about forward use during strikes. Rather, they’re focused on orbits around the carrier that can top off planes in the landing circle. The Navy currently uses F/A-18E/F Super Hornets for that job, configured with buddy refueling tanks. Those missions eat up fully 20% of the fighters’ missions, consuming limited airframe flight hours for an expensive asset. All because the Navy foolishly retired its S-3 Vikings when they still had more remaining airframe life than a new Super Hornet. The coming COD carrier cargo aircraft competition may provide a different solution to this problem, via an upgraded C-3 Viking or the V-22’s roll-on refueling pallet. That’s good, because there probably won’t be enough UCLASS drones to do this job and perform their own missions. Sources: USNI, “UCLASS Could Be Used as Tanker for Carrier Air Wing”. March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. They peg the UCLASS program at $3.7 billion, and express concern about using a “technology development” program as a procurement program, which would bypass formal systems development requirements and move directly into production in 2020. A development contract is expected in FY 2014, but: “UCLASS is critically dependent on the development and fielding of the Joint Precision Approach and Landing System (JPALS), a global positioning system that guides aircraft onto an aircraft carrier. Navy officials expect UCLASS to hold a preliminary design review – including the air vehicle, carrier, and control segments – in May 2014 based on JPALS test progress. However, the Navy still considers JPALS one of its top risks for UCLASS.” March 4-11/14: FY15 Budget. The US military slowly files its budget documents, detailing planned spending from FY 2014 – 2019. The future UCLASS program is slated to consume $2.937 billion through FY 2019, all of which will be R&D money due to the program’s structure. Feb 13/14: UCLASS Air-to-Air? The Navy is thinking broadly about UCLASS, which is good as long as it doesn’t screw up the specifications. Director of air warfare Rear Adm. Mike Manazir talks about the potential to use the UCLASS’ payload bay as a missile magazine. It wouldn’t have independent targeting capability, but datalinks with fighters like the missile-limited F-35C would allow remote firing, with guidance provided thereafter by manned fighters. It’s the right kind of thinking, but unlikely to see much use for 3 reasons. One is that the UCLASS will be subsonic, with very limited ability to avoid enemy fighters. That’s a nice way of saying that they’d be expensive sitting ducks if enemy aircraft can get a firing solution on them, even as the number of missiles on board makes them a priority target. Another potential issue is that asking internal launchers to handle a wider variety of weapons (q.v. Nov 21/13) generally drives up costs, and may compromise optimal weapon configurations for the strike role. On a less likely but more catastrophic level, one hopes there’s no software exploit that might allow others to issue those kinds of firing commands. Sources: USNI, “Navy’s UCLASS Could Be Air to Air Fighter”. Feb 4/14: UCLASS. The FY 2014 defense budget bill added some new demands on the UCLASS program, but they won’t stop the Navy from running it as a technology demonstration project that goes straight into operational production. Programmatic updates, and annual GAO review of the program, are normal. What will change is the number of UAVs bought during the TD Phase, which is capped at 6 instead of the planned 24. The Navy says that they can handle Milestone B approval with 6, which was never really in doubt. What does change is the ability to field what’s effectively an operational capability straight out of the TD phase. Sources: USNI, “Navy: Congressional Oversight Will Not Slow UCLASS Program”. Nov 21/13: UCLASS. The UCLASS weapons debate isn’t solved yet, though the Navy seems to be leaning strongly toward a primary surveillance and targeting role, since that would be a new addition to the carrier air wing. UCLASS/UCAS-D requirements officer Cmdr. Pete Yelle says that: “Weapons requirements will be defined in the final proposals. It is up to the vendors to come back with proposals and leverage what is available”…. The UCLASS will be able to work operations over land and water using EO/IR, or electro-optical/infrared sensors, FMV or full-motion video and eventually a fifth-generation AESA radar, Yelle said.” Full Motion Video is part of most EO/IR systems these days. As for the AESA radar, that can mean a wide array of solutions, and a significant range of expense. The question is how far one wants to go. Just surface scans? Surface scans plus periscope detection capabilities, to partially replace the retired S-3 Viking’s role? Or a full fighter radar for air and ground surveillance, with specialized capabilities added as software? Each choice leads to different cost ranges, and potential commonalities or divergences with other fleet assets. On the weapons front, some capability for persistent surveillance and strike seems like an obvious addition. What’s available includes Paveway laser-guidance, JDAM and Small Diameter Bomb GPS, and DAMTC dual-mode laser/GPS bombs. Depending on a given UAV’s internal mechanics, compact anti-ship missiles and even AIM-9X air defense weapons could also become an option, but that tends to add complexity and cost to the system. Sources: Defense Tech, “Navy Plans to Arm UCLASS with JDAMs”. Nov 10/13: Flying again. The X-47B is back at sea, flying from the decks of the USS Theodore Roosevelt [CVN 71]. US Navy, “X-47B Operates Aboard Theodore Roosevelt”: “The aircraft performed precise touch and go maneuvers on the ship to generate data that characterizes the environment in close proximity of the carrier flight deck. In addition, the aircraft took part in flight deck handling drills, completed arrested landings and catapult launches. Mission operators monitored the aircraft’s autonomous flight from a portable command and control unit from Theodore Roosevelt’s flight deck during each of its 45-minute flights.” FY 2013 In-depth carrier ops testing; UCAS-D deck handling, catapult launch, and arrested landing tests; Despite cuts, UCLASS plans are still on. History made click for video Aug 28 – Sept 6/13: AAR. A Calspan Learjet has been modified with a non-functioning aerial refueling probe, and X-47B UCAV hardware and software for navigation, command and control, and vision processing. Its challenge? To fly behind an Omega K-707 tanker, and demonstrate its ability to hold correct positions and operate with the installed systems. Testing went well. The next step will using the kind of digital messaging and navigation processes that were demonstrated by the UCAV’s recent carrier landings, with Rockwell Collins TTNT datalink, and Precision Relative GPS (PGPS) algorithms. The final goal? A complete autonomous rendezvous, approach, plug, and safe separation. No fuel will be transferred to the Learjet, which isn’t equipped to receive it anyway, but the ability to fly that kind of evolution is enough challenge all by itself. People in the military overuse the phrase “game changer,” but a technology that could allow continuous 72+ hour missions and trans-ocean control from a carrier would indeed justify that description. Sources: US NAVAIR, “Navy autonomous aerial refueling tests underway”. Aug 14/13: UCLASS. US Naval Air Systems Command in Patuxent River, MD offers each of the UCLASS study participants another $15 million firm-fixed-price contract for their preliminary design review assessment work. Each firm has $4.75 million committed to it immediately, and work is extended until June 2014. Too bad the core requirements are still in flux. The winners include: Northrop Grumman Systems Corp. in El Segundo, CA (N00019-13-C-0140). Lockheed Martin Corp. in Palmdale, CA (N00019-13-C-0141). Boeing in St. Louis, MO (N00019-13-C-0142). General Atomics Aeronautical Systems, Inc. in Poway, CA (N00019-13-C-0143). Aug 12/13: UCLASS. Aviation Week reports that the US Navy is having a hard time with the specifications for their UCLASS program RFP, which will be delayed into September 2013. The biggest question is how much stealth the drone requires. Despite recent manufacturing advances, like the radar-absorbing materials baked right into the F-35’s composite skin, more stealth tends to make planes more expensive to buy and to maintain, while dropping their endurance and payload. On the other hand, current drones would have a very short life expectancy against advanced air defense systems, which creates a gap outside of the military’s unknown “black” programs. Aviation Week reports that Northrop Grumman and Lockheed Martin are emphasizing stealth, while General Atomics and Boeing are willing to raise the radar cross-section somewhat in exchange for payload and endurance. General Atomics’ Sea Avenger, with its winged body and tail, does seem to fit this description. On the other hand, Boeing’s X-45 Phantom Ray is a tailless flying wing design, just like its NGC and Lockheed competitors. If Boeing is really prioritizing range and payload, it means they’re changing their base platform. Aviation Week: “Uclass: How Much LO is Enough?” Aug 7/13: UCAS-D: Keep flying. It seems that the X-47Bs aren’t done flying yet. Instead of mothballing them as planned, the US Navy wants to keep them flying into 2015, and deploy to carriers 3 more times. Up to 3 more carriers will be fitted with compatible equipment, and Congress may get its wish to have the aerial refueling tests restored and completed by October 2014. The most important test will involve full integration with a 70-plane carrier air wing for several weeks, which would create a different level of comfort within the Navy for unmanned aircraft. Despite past weapon drops under the J-UCAS program, The Us Navy doesn’t expect to conduct any of those with the X-47 UCAS-D. NAVAIR’s Capt. Jaime Engdahl repeated that refusal a couple of times a week later, at the AUVSI conference. Continued flying will also give Northrop Grumman additional opportunities to work on its UCLASS design, and ensure that the Navy gets comfortable with its evolution. David Axe correctly points out that the last situation similar to this one involve Lockheed Martin’s X-35 design, which was chosen to become the F-35. DoD Buzz: “Navy: X-47B Drone Won’t Be a Killer” | USNI News: “NAVAIR: X-47B to Fly Again” | War Is Boring: “Navy’s Big Surprise: Carrier Drone to Make a Comeback”. July 10/13: X-47B “Salty Dog 502” leaves NAS Pax River, MD and flies to USS George H.W. Bush [CVN 77], off the coast of Virginia. The UCAV successfully lands on the aircraft carrier and traps the #3 wire, marking a huge milestone in naval aviation. It then takes off from the carrier and lands again. On the 3rd approach, the drone reported that one of its 3 navigational computers failed. Rear Adm. Mat Winter decides that they had done enough for 1 day, and orders the drone back to Wallops Island, VA to land. Even with that minor glitch, the Secretary of the Navy had an appropriate quote when he said that: “It isn’t very often you get a glimpse of the future. Today, those of us aboard USS George H.W. Bush got that chance…” Actually, glimpses of the future are common. What he meant to say was that glimpses of a future that promises big changes in naval warfare are rare. This event is indeed in that class – closer to Billy Mitchell’s sinking of the Ostfriesland than it is to the 1st carrier jet launch. The Navy still needs to demonstrate UCAS aerial refueling in order to complete an airpower revolution, but this is a very big step forward. US Navy | Northrop Grumman | Wind River | Defense Tech | DoD Live. Carrier landing at sea! July 2/13: UCLASS. Lockheed Martin touts a recent UCLASS demonstration at NAVAIR, but their focus is on back-end and Common Control systems, rather than the UCAV itself. Lockheed Martin: “Using an open architecture framework integrated with DreamHammer’s Ballista [DID: link added] drone control software and Navy compliant software protocols, a single operator managed multiple UAS platforms [including Lockheed Martin’s UCLASS concept] simultaneously. The team also used the new Navy Cloud capability to demonstrate control of the ISR sensors and fully integrate the data into one complete mission picture. The team then used this picture to rapidly re-task and re-route the UAS assets. In addition to using DreamHammer’s Ballista drone control software in this UCLASS demonstration, Lockheed Martin is teamed with DreamHammer Government Solutions in pursuit of the upcoming Navy Common Control System contract.” June 28/13: JPALS/N-UCAS. Engility Corp. in Mount Laurel, NJ receives a $12.5 million cost-plus-fixed-fee contract, exercising an option for engineering services in support of the Joint Precision Approach and Landing Systems (JPALS) and the Navy Unmanned Combat Aerial Systems programs. JPALS is a ground or ship-based system that adds extra precision to GPS, and is used to help land aircraft. It’s a critical enabler for naval UAVs like UCAS-D, UCLASS, etc. $4 million in FY 2013 RDT&E funds are committed immediately. Services to be provided include requirements definition and analysis; prototyping; test and evaluation; technical assistance; system analysis; engineering; software development, integration and maintenance; test data acquisition; reduction and analysis; technical logistic support; configuration management; training support; and program and project management. Work will be performed in St. Inigoes, MD (95%); Providence, RI (3%); and Chicago, IL (2%); and is expected to be complete by in January 2014 (N00421-12-C-0048). June 26/13: UCLASS. “The Navy has outlined the specifications for the Unmanned Carrier Launched Surveillance and Strike (UCLASS) in a requirements document obtained by USNI News.” the key numbers are: Carrier and JALN-M network compatible, with take-off and landing in Sea State 3 (4′ waves) minimum, and SS7 (29′ waves) maximum. Able to conduct a strike mission at 2,000 nmi. Able to conduct 2 surveillance orbits at 600 nmi radius around the carrier, or 1 at 1,200 nmi radius. 3,000 pound payload, including day/night optical surveillance comparable to an MQ-9, plus a surface scanning radar including GMTI moving object tracking. At least 1,000 pounds of that payload can be existing carrier weapons. Enough stealth for surveillance missions in lightly contested areas. Those requirements will be difficult to meet already. Now add a number of added requirement being floated at present, and ongoing disputes about how much stealth etc. is necessary. Sources: USNI, “UCLASS By the Numbers”. May 17/13: Touch and Go. The X-47B UCAS-D follows its catapult launch with a touch-and-go landing on USS George W. Bush [CVN 77], which tests its ability to fly precision approaches to a moving target. A touch-and-go doesn’t trap the wire, but throttles the engine to full and takes off again. Carrier-based planes have to be able to do that if they miss the wire and pull a “bolter,” which is a guaranteed way to get harassed by your fellow pilots. Not sure what you do to a UAV. Perhaps the Navy can offer a rotating pool of drone software programmers, available for friendly abuse via secure video conference. US NAVAIR | US Navy. Carrier launch click for video May 14/13: Carrier launch. An X-47B UCAS-D is maneuvered into position on deck, and launched from USS George W. Bush [CVN 77]. The US Navy, Northrop Grumman et. al. hail it as a revolutionary milestone. We’ll grant that launching amidst the busy, complicated, and dangerous goings-on of a carrier deck is unlike any land-based challenge. It’s a difficult task for humans, and a difficult task for computers to do with human help. Having said that, this isn’t the complete circuit. It’s the next logical step after on-ship deck tests (vid. Nov. 26/12) and land-based catapult launch (vid. Nov 29/12). We’ve said before that they won’t have a revolution on their hands until they can do the complete circuit: maneuver, launch, fly a circuit, and land. The next revolution after that will involve aerial refueling. When they do these things, we’ll join the chorus. US NAVAIR | Northrop Grumman. May 6/13: Trap. The X-47B UCAS-D demonstrator successfully traps the wire as it lands at NAS Patuxent River, MD’s shore-based catapult and arresting gear complex. Northrop Grumman. April 12/13: Support. FBO.gov: “This synopsis provides notice of the Government’s intent to solicit a proposal on a sole source basis from Sierra Nevada Corporation, 444 Salomon Circle, Sparks, NV for work providing support in troubleshooting, problem resolution, and anomaly investigation associated with the Precision Global Positioning System (PGPS) as part of the existing Unmanned Combat Air System-Demonstration (UCAS-D) Program. This request for proposal will be issued in accordance with the terms and conditions of Basic Ordering Agreement (BOA) N00421-10-G-0001. This acquisition is being pursued on a sole source basis under the statutory authority 10 U.S.C. 2304(c)(1), as implemented by Federal Acquisition Regulation Part 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements.” April 7/13: UCLASS. Lockheed Martin finally unveils their Skunk Works’ UCLASS design, which combines elements of their RQ-170 Sentinel stealth reconnaissance UAV with technologies from the F-35C for carrier operations, weapons use, etc. Overall, the design looks quite a bit like Boeing’s X-45C Phantom Ray. LMCO UCLASS Page | YouTube video. March 26/13: UCLASS. NAVAIR indicates through a presolicitation that it plans to go ahead with follow-on Preliminary Design contracts to all 4 UCLASS study contract vendors (Boeing, General Atomics, Lockheed Martin, Northrop Grumman – vid. June 23/11), and continue the Unmanned Carrier Launched Airborne Surveillance and Strike program. The contracts are expected by the summer of 2013, supporting up to 2 years of work on the UAVs, datalinks for communications and control, and the carrier operations segment. They’re expected to carry each design to the Preliminary Design Review by Q3 2014, and support post-PDR design maturation and follow-on engineering. The next step after that will be the selection of 1 winner, and UCLASS initial operational capability within 3-6 years. FBO | Defense Update. Dec 21/12: Aerial Refueling. Northrop Grumman Systems Corp. in San Diego, CA receives a $9.7 million cost-plus-incentive-fee contract modification for Autonomous Aerial Refueling (AAR) demonstration activities in support of the N-UCAS program. Services will include completion of Delta Critical Design Review (DCDR), surrogate testing with manned aircraft, preparation for the X-47B demonstration, travel, and support technical data for the AAR demonstration activities. Work will be performed in Manhattan Beach, CA (70%) and Patuxent River, MD (30%), and is expected to be complete in December 2013. All contract funds are committed immediately (N00019-07-C-0055). Nov 29/12: Testing. An X-47B is launched using a land-based naval steam catapult, at NAS Patuxent River, MD. The releases are full of words like “historic,” but DID just doesn’t see it. Lots of UAVs have been launched by non-steam catapults, steam catapult technology isn’t new, and this isn’t a launch from an actual ship. It’s just a test to verify that the X-47B’s landing gear, body structure, and software, which were designed from the outset to handle the rigors of a steam catapult launch, can indeed do so. A milestone, yes, but a minor one. When an X-47B is launched from an actual ship, and recovered aboard, that will be historic. Ditto for successful aerial refueling. US NAVAIR | Northrop Grumman. X-47B deck tests click for video Nov 26/12: Testing. An X-47B air vehicle arrives by barge from Naval Air Station Patuxent River, MD, and is craned aboard the USS Harry S. Truman [CVN 75] for deck handling tests aboard the ship. One suspects that civil airspace certification for high-end drones can’t happen soon enough for NAVAIR and the US military. US NAVAIR. Nov 15/12: Testing. Northrop Grumman announces that its UCAS-D team has successfully completed initial onshore trials of the Control Display Unit (CDU), a new wireless, handheld controller used for carrier-deck maneuvering. Tests were basic: control engine thrust; roll forward, brake and stop; nose wheel steering; and maneuver the aircraft efficiently into a catapult or out of the landing area following a mock carrier landing. On-ship deck trials are next. Nov 6/12: NASIF Testing. US NAVAIR discusses testing at the “N-UCAS Aviation/Ship Integration Facility.” If NASIF didn’t exist, the Navy would have to use an aircraft carrier for this sort of testing, and it can’t afford that. Hence the NASIF building, stocked with Primary Flight Control (PriFly), Landing Signals Officer (LSO), Carrier Air Traffic Control Center (CATCC) and Mission Control Element (MCE) equipment. The UCAS-D program uses the facility for system integration of new equipment, and UAV/manned surrogate demonstration events. Events like final Human Systems Integration (HSI) modeling and simulation testing for sailors from USS Carl Vinson and USS Abraham Lincoln. Instead of using the current method of controlling multiple aircraft with radar displays and voice radio, the event tested their ability to send and receive digital instructions to and from aircraft, in addition to using voice instructions. This capability is absolutely required for UAV, but it will also help manned fighters, whose 60-second landing spread includes a final 20 seconds of enforced controller silence. If the controllers can communicate with everyone else by text while a pilot lands, that’s a big step forward. The controller teams showed they could handle it over about 20 test scenarios, which progressed from relaying UAV commands to a UAV mission operator for entry, to direct communication with the simulated UAV and more automated systems. FY 2012 Aerial refueling expands to include both boom and drogue; How can it be a UFO, if it’s on a truck? X-47B, Edwards AFB (click to view full) Aug 20/12: UCLASS. NAVAIR awards a small $440,315 firm-fixed-price delivery order to Rockwell Collins, for Phase II of the ARC-210 UCLASS feasibility study with JPALS. ARC-210 radios are used to communicate with UAVs over UHF, and their software may need fine-tuning to work with UCLASS for all of the Navy’s requirements (N00019-08-G-0016-0076). Contract: FBO.gov. Aug 13/12: UCLASS. Naval Air Systems Command releases a Request for Information to evaluate the Draft Mission Effectiveness Analysis (MEA) Tool developed by the UCLASS Program Office. In practice this is a spreadsheet fed with warfare analysis models, where the user can input UAV parameters for comparative assessment (N00019-12-P7-ZD235). The RFP should come in the fall with a down-select to a single design in 2016 aiming for IOC in 2020. The spreadsheet is classified SECRET/NOFORN. FBO.gov | Flight International. Early July 2012: Testing. Members from the UCAS-D carrier integration team engage in extensive software testing aboard USS Harry S. Truman [CVN 75], talking to fleet air-traffic controllers and air-department personnel about the usability of the new software, and lessons learned. Land-based X-47B tests will continue at Patuxent River, MD, and the goal is a carrier landing in about a year. US NAVAIR. June 14/12: UFO-G. US NAVAIR indirectly confirms that the wrapped object spotted on a truck in Kansas was UCAS-D AV-2 (vid. June 6/12 entry), being trucked across the country from Edwards AFB, CA to NAS Patuxent River, MD for the next phase of flight tests. Easier than getting the civil flight waivers, I guess. June 8/12: JPALS. L-3 Service, Inc. in Mount Laurel, NJ receives a $12.5 million cost-plus-fixed-fee contract for engineering services in support of the precision GPS Joint Precision Approach and Landing System, and the Navy’s UCAS-D program. The 2 are highly connected, of course, since UCAVs will need to depend on precision GPS, in order to land on carriers (vid. the July 2/11 test). JPALS will also help manned fighters. Services to be provided include requirements definition and analysis, prototyping, test and evaluation, technical assistance, system analysis, engineering, software work, test data acquisition, reduction and analysis, technical logistic support, configuration management, training support, and program and project management. Work will be performed in St. Inigoes, MD (95%); Providence, RI (3%); and Chicago, IL (2%). Work is expected to be complete in October 2012. This contract was not competitively procured, pursuant to the FAR 6.302-1, by the US Naval Air Warfare Center Aircraft Division in Patuxent River, MD (N00421-12-C-0048). June 6/12: UFO-G. From the Augusta (KS) Gazette: “This morning several Butler County Sheriff officers and KDOT personnel escorted a flatbed trailer entering Augusta from the south on US Highway 77 and headed east out of town on US Highway 54. Traffic was backed up coming in and going out of town. At first glance the strange-shaped cargo cloaked in industrial-strength shrink wrap appeared to be a saucer, but an unidentified KDOT worker advised it was an X-47B Combat Drone coming from Texas and en route to an unknown destination.” Operating unmanned jets in US civil air space is a bit of a problem, which may help to explain the decision to ship it by road. Kansas is a rather roundabout route from Texas to Patuxent River, MD, but it is more of a straight line from California. Jan 21/12: Testing. NAVAIR/AFRL’s AAR program completes a series of ground and flight tests that began in November 2011, using a Calspan Learjet surrogate with X-47B hardware and software, and a Omega Air Refueling K-707 aerial tanker. The tests included simulated flight demonstrations of both boom/receptacle (USAF) and probe-and-drogue (Navy & European) aerial refueling techniques, but no fuel was actually transferred, and Calspan’s Learjet wasn’t equipped for that anyway. The tests were all about correct positioning and coordination, beginning at a position 1 nautical mile from the K-707, and allowing autonomous guidance to move the Learjet into the 3 air-air refueling positions: observation, contact, and re-form. Navy UCAS program manager Capt. Jaime Engdahl says that the next big step will involve using the actual X-47B. The team plans to conduct 2 more surrogate test periods before a planned refueling demonstration with the X-47B in 2014. NAVAIR | Northrop Grumman. Nov 22/11: AV-2 flies. The fully-equipped UCAS-D demonstrator #AV-2 takes off for the 1st time at Edwards AFB, CA. That’s about a year late, but AV-1’s issues had to be ironed out first. With 2 flying UCAVs, the program is expected to move AV-2 to NAS Patuxent River, MD by the end of 2011, and begin testing carrier landing technologies in 2012. That will include GPS-guided precision approaches to the carrier, arrested landings and “roll-out” catapult launches at land-based test facilities; and flight testing of new precision navigation computers and guidance/ navigation/ control software recently installed on both aircraft. The new suite of hardware and software is designed to let the X-47B land safely on a moving aircraft carrier deck. AV-1 will continue testing at Edwards AFB, with a focus on finding its flight limits. Northrop Grumman. Nov 7/11: Aerial refueling. Inside the Navy reports [subscription] that the US Navy will be expanding the X-47B’s planned aerial refueling capability, to autonomously refuel while in flight with both USAF Air Force and USN aerial tankers. The USAF uses KC-135s and KC-10s, but many of the KC-135s need to place an attachment on the refueling boom, in order to refuel probe-carrying aircraft. The US Navy has KC-130 Hercules aerial tankers, and its F/A-18E/F Super Hornets can become “buddy refuelers” with special wing tanks. FY 2011 1st UCAS-D flight; 1st carrier landing using a surrogate plane; UCLASS study contracts. “Look ma, no hands!” (click to view full) July 18/11: Northrop Grumman Systems in San Diego, CA receives a $25 million cost-plus-incentive-fee contract modification for UCAS-D autonomous aerial refueling technology maturation and demonstration activities. They’ll provide “air systems, air vehicle segment, and mission management segment requirements definition; integration planning and verification planning; and definition of certification requirements and approach.” Work will be performed in San Diego, CA, and is expected to be complete in December 2012. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-07-C-0055). July 2/11: Testing. A contractor/government team lands an F/A-18D test aircraft from Navy squadron VX-23 on the USS Eisenhower in the western Atlantic Ocean, using hardware and software developed for the X-47B UCAS-D. This Hornet had a pilot on board as a safety precaution, but the system landed the plane. A King Air 300 twin-prop plane from Air-Tec, Inc. was also used as a surrogate to test mission management, command and control, communications, air traffic control and navigation, without executing an actual landing. Participating organizations included USN PEO Carriers, NAVSEA PMA-268, and the crew of the USS Dwight D. Eisenhower; plus industry partners Northrop Grumman, Rockwell Collins, Honeywell, L-3 Communications, SAIC, ARINC and Sierra Nevada Corporation. It’s a big step forward for the UCAS-D program, and came after a series of interim steps detailed in the accompanying releases. It could also change the way Navy pilots land manned aircraft. Right now, carrier landings are very manual, and visual. All air traffic control instructions are by voice, and even a good portion of navigation data has to be read out over the air, while visual signals cement the final approach. Supporting a UAV, and possibly retrofitted manned fighters, in future operations, required some important ship modifications. Eisenhower’s Landing Signal Officer (LSO) equipment was altered to communicate directly with the VX-23 F/A-18D through a digital network, and so were the ship’s primary flight control (“tower”) and Carrier Air Traffic Control Center (CATCC). The UAS operator’s equipment, installed in one of the carrier’s ready rooms, was the other key network node. Precision Global Positioning System (PGPS) capabilities with sub-1 meter accuracy were then added into the ship and the aircraft, to provide constant position awareness. US NAVSEA | Northrop Grumman. Unmanned carrier landing! June 23/11: UCLASS US NAVAIR awards a set of UCLASS study contracts to 4 vendors. Boeing publicly touted its own 8-month, $480,000 study contract, which includes developing of a concept of operations, an analysis of alternatives, and an investigation of notional solutions for various components of the Navy’s UCLASS program, which could be fielded for ISR and strike operations by 2018. Boeing’s option would include the X-45C Phantom Ray UCAV, but similar contracts for about $500,000 each were issued to Northrop Grumman (X-47B/ UCAS-D), General Atomics (Sea Avenger, also new EMALS/AAG carrier launch/recovery systems), and Lockheed Martin (unknown, has previously discussed the possibility of an unmanned F-35). The UCLASS system will consist of an air segment (the UCAV), a connectivity and control segment, a launch and recovery segment, and a systems support segment. FBO.gov announcement | Boeing. See also March 28/11, March 19/10 entries. UCLASS Studies May 16/11: Northrop Grumman announces that it has picked up awards from the USAF Flight Test Center at Edwards AFB, CA, including Flight Test Team of the Quarter (above candidates like the F-35) for its X-47B/UCAS-D aircraft. April 25/11: Sub-contractors. ARINC Engineering Services, LLC in Annapolis, MD receives a $9.7 million cost-plus-fixed-fee contract for technical and engineering services in support of the Joint Precision Approach and Landing Systems (JPALS) and Navy Unmanned Combat Aerial Systems (N-UCAS) programs. The 2 are related, as JPALS precision GPS-driven approach is a natural fit with the landing needs of a carrier-borne UCAV. Work will be performed in Lexington Park, MD (80%), and St. Inigoes, MD (20%), and is expected to be complete in October 2011. This contract was not competitively procured by the US Naval Air Warfare Center Aircraft Division in Patuxent River, MD (N00421-11-C-0034). March 28/11: UCLASS. US NAVAIR issues a Broad Agency Announcement regarding UCLASS, in solicitation #N00019-11-R-0031: “The Naval Air Systems Command seeks proposals which conceptually demonstrate that a UCLASS system can provide a persistent Carrier Vessel-Nuclear (CVN) based Intelligence, Surveillance, and Reconnaissance (ISR) and strike capability supporting carrier air wing operations in the 2018 timeframe. In order to identify and explore available trade space… The program anticipates leveraging existing, deployed Department of Defense (DoD) systems to launch, recover, and control the air vehicle, transfer data in support of time critical strike operations, and conduct persistence ISR operations. The ongoing Unmanned Combat Air System-Demonstration program will inform UCLASS development and provide technology risk reduction for Unmanned Aircraft (UA) integration into carrier environments.” March 14/11: Testing. A US Navy/Northrop Grumman Corporation test team issues a report stating that 5 weeks of dynamic load testing on X-47B air vehicle 2 (AV-2) demonstrated its ability to handle the stresses, strains and dynamic loads associated with carrier catapult launches and arrested landings, and air-to-air refueling. AV-2 is the X-47B airframe that will be equipped for air-to-air refueling tests. The tests themselves finished on Jan 24/11, a week ahead of schedule. NGC AV-2 manager says they included 8 design conditions, including a 3-G symmetrical pull up, a 2.4G rolling pullout, and turbulence during aerial refueling; and 5 conditions expected to occur on the ground, including takeoff and landing tests involving the nose gear and tail hook. To conduct the tests, engineers bonded pads to 200 points on the airframe surface, and then pushed and pulled on those pads using hydraulic jacks to simulate various static and dynamic load conditions. Northrop Grumman. March 1-4/11: Testing. The X-47B UCAS-D makes its 2nd and 3rd of 49 planned flights at Edwards AFB, CA. Testers are working to expand the flight test envelope in terms of air speeds, altitudes and operating weights, while testing key systems. Major concerns at this point include its flight control system’s ability to handle unpredictable crosswinds and turbulence at all speeds, the accuracy of its flush-mounted air data testing instruments, and engine performance. NGC. Feb 15/11: UCLASS. General Atomics Aeronautical Systems, Inc. announces success in wind-tunnel tests of its Sea Avenger model, intended to validate its new wing’s low-speed handling characteristics. a key wind tunnel test on a model of its jet-powered Sea Avenger Predator C variant. The new wing is also designed to increase aircraft dash speeds, which is an interesting engineering combination. GA-ASI President Frank W. Pace touts the 90-hour, 8-day test at the San Diego Air & Space Technology Center, as a classic example of his firm’ push to invest in early development, ahead of customer requirements for a UCLASS type system. The firm’s past history with the MQ-1 Predator and MQ-9 Reaper backs up his boast. Feb 7/11: Sub-contractors. Lockheed Martin touts their own involvement in the X-47B program, which mostly revolves around low observable (stealth) design and aspects of aerodynamic edges, inlet lip and control surfaces, and an all new arresting hook system. Al Romig is the current VP of Advanced Development Programs for Lockheed Martin Aeronautics, and the firm completed delivery of its UCAS-D hardware in December 2009. Lockheed Martin will continue to support further UCAS-D flight testing, as well as carrier flight operations. UCAS-D 1st flight (click to view full) Feb 4/11: First UCAS-D flight. The flight took off at 14:09 PST (GMT -0800) at Edwards AFB, and lasted 29 minutes, flying between 180 – 240 kt and climbing to 5,000 feet with landing gear down at all times, while executing racetrack patterns. It provided test data to verify and validate system software for guidance and navigation, and aerodynamic control of the tailless design. The flight follows airframe proof load tests, propulsion system accelerated mission tests, software maturity and reliability simulations, full system taxi tests, and numerous other system test activities that happen before any 1st flight. Eugene Fly had made the first landing on a stationary ship on Jan 18/1911, but a 100th anniversary flight for X-47B #AV-1 wasn’t possible. Some of items that delayed this flight from original expectations in late 2009 included propulsion acoustic and engine-start sequencing issues, an asymmetric braking issue uncovered during taxi tests, and a last-minute maintenance issue with an auxiliary power generation system. Testing continues. Aircraft AV-1 will remain at Edwards AFB for flight envelope expansion before transitioning to Naval Air Station Patuxent River, MD, later in 2011, where they will validate its readiness to begin testing in the maritime and carrier environment. Meanwhile, the refueling-ready AV-2 has completed its design limit load tests up to 130% with no test anomalies, showing that it’s able to withstand g-loads encountered during aerial refueling. It won’t begin its own tests until AV-1’s initial tests are done, which is currently planned for late 2011. The program is currently preparing the X-47B for carrier trials in 2013. US Navy | NGC release | Bullet points, images & video | Aviation Week. 1st flight Feb 2/11: USAF opportunity? Defense news quotes Col. James Gear, director of the USAF’s Remotely Piloted Aircraft Task Force, on the future of its UAV fleet. Despite a big commitment to the MQ-1 Predator, the MQ-9 Reaper caused a major mid-stream shift in plans. Col. Gear cites some existing issues with the MQ-9, which could leave it open to a similar shift. The Reaper does not fare well in icing conditions, and is also not considered survivable against anti-aircraft systems. The issue of jam and snoop-proof data links, and trace-back and verification of signal origins, has also been a live question during the MQ-1 and MQ-9’s tenure. The “MQ-X” that replaces it will have to do better on all 3 counts, and the USAF also wants it to be easily upgradeable via switch-out modules. The Colonel believes the resulting UAV will end up being common with the US Navy’s carrier-based UCLASS requirement, as the 2 services are cooperating closely. That could give Northrop Grumman’s funded X-47B N-UCAS an edge over Boeing’s privately developed X-45 Phantom Ray. It could also offer a boost to General Atomics’ Predator C/ Sea Avenger. FY 2010 UCAS-D testing; UCLASS RFI and Navy plans; Does GA’s Predator C have a customer? Manned and…not (click to view full) July 19/10: UCLASS. General Atomics Aeronautical Systems, Inc. touts its jet-powered Predator C Avenger UAS as “ready for deployment” under programs like the British RAF’s SCAVENGER, or as the MQ-X successor to the USAF’s MQ-9 Reapers. The Avenger family’s avionics are based upon the Predator B/MQ-9 Reaper, and the plane features both radar and optical sensor options, plus a variety of internal weapons loads up to 2,000 pound Joint Direct Attack Munitions (JDAM). Ready for deployment” is stretching things a bit. The Predator C series first flew in April 2009, “tail one” is currently averaging 2-3 flights a week, and flight tests were recently transferred from GA-ASI’s Gray Butte Flight Operations Facility in Palmdale, CA, to Naval Air Station (NAS) China Lake, CA. GA-ASI Aircraft Systems Group President Frank Pace does describe some results as “exceeding our expectations,” including excellent agreement between advance engineering and flight tests, and fuel burn rates up to 10% better than predicted models. The UAV reportedly uses a Pratt & Whitney Canada PW545B engine, which also powers the Cessna Citation XLS business jet. May 3/10: UCLASS. General Atomics announces that it has submitted its “Sea Avenger” as a potential candidate for UCLASS airborne surveillance and strike requirement. Their UCAV is based on their jet-powered, 44-foot long and 66-foot wingspan “Predator C Avenger,” which can fly at 400 knots for up to 20 hours, and operate up to 50,000 feet. Design changes include a highly fuel-efficient engine and inlet design, a Lynx SAR ground-looking radar, retractable electro-optical/infrared (EO/IR) sensors and a 3,000 pound capacity internal weapons bay, and folding wings. The structure can accommodate carrier suitable landing gear, tail hook, drag devices, and other provisions for carrier operations. Developed on company funds for near-term military use, the base Predator C Avenger is continuing through its planned test program, with a 2nd aircraft currently under development and expected to be complete by the end of 2010. General Atomics. March 19/10: UCLASS RFI. The US Navy issues a Request for Information for a (UCLASS). The RFI indicates that the Navy is looking to move ahead with full unmanned combat aircraft earlier than its original plans. “The Navy is interested in information on carrier based, low observable (LO) Unmanned Air Systems (UAS) concepts optimized for Irregular and Hybrid Warfare scenarios, capable of integrating with manned platforms as part of the Carrier Air Wing (CVW) by the end of 2018 to support limited operations in contested scenarios. The UAS should enhance situational awareness and shorten the time it takes to find, fix, track, target, engage, and assess time sensitive targets. This RFI is intended to determine the existence of sources that can provide a limited inventory of systems capable of being operated by fleet Sailors and performing the above mentioned Navy UAS mission.” The UCLASS concept involves 4-6 UAVs that could perform both intelligence/ surveillance/ reconnaissance (ISR) and strike missions in contested airspace, that are able to fly for 11-14 hours without refuelling. Industry reportedly expected the navy to release a UCLASS RFP in early 2011, and interested parties beyond Northrop Grumman include General Atomics (Sea Avenger), and reportedly Boeing (X-45 Phantom Ray) as well. See: FedBizOpps RFI | Flight International | Jane’s. March 17/10: Leadership. Janis Pamiljans, previously vice president and program manager of Northrop’s KC-30 aerial refueling tanker bid for the USAF, takes over from Scott Winship as vice president of N-UCAS related efforts. Pamiljans also has worked as a program manager on the F/A-18 and F-35 strike fighter programs. Aviation Week points out that this is just one of several corporate moves, which seem to be aimed at freeing people up to participate in “black” (classified) programs, and develop a next-generation stealth aircraft for reconnaissance and long-range strike. Aviation Week | Defense News. March 2/10: Leadership. Capt. Jeff Penfield takes over the Navy’s X-47B program office, replacing Capt. Martin Deppe. Source. Feb 18/10: Predator C. Don Bolling, a Lockheed Martin senior business development manager, hints that General Atomics’ Predator C has a customer, and isn’t just a privately funded effort. He tells a media source that General Atomics Aeronautical Systems is interested in “Global Hawk-like” payloads for high altitude surveillance on its jet-powered Predator-C Avenger UAV, putting efforts to install the F-35 fighter’s Sniper pod-derived electro-optical targeting system (EOTS) on hold. The shift was reportedly at the request of a customer, which made the report news because the Predator C wasn’t known to have a customer. The USAF already flies Global Hawks, and export approvals for the EOTS and Predator C would be an involved process. The most likely guess as to the customer would be the CIA, which does operate UAVs of its own, or US Special Operations Command. Flight International. Feb 13/10: Testing. The US Navy announces that N-UCAS team members are underway with USS Abraham Lincoln [CVN 72] to test the integration of existing ship systems with new systems that will support the X-47B in carrier-controlled airspace. The team is testing X-47B software integration by using a King Air turbo prop “surrogate” aircraft taking off and landing from shore, but approaching the carrier and performing the various procedures associated with systems like Prifly, CATCC, LSO, etc. The digital messages from shipboard controllers receive “wilco” (ACK) responses to verify receipt. Additional developmental testing later this year, will involve testing the software integration using an F/A-18 surrogate aircraft, to more closely emulate the X-47B’s flight. Feb 4/10: Navy plans. Defense News reports that the N-UCAS program is slated to receive a $2 billion boost over the next 5 years, and seems set to follow the RQ-4 Global Hawk procurement model, rather than remaining a demonstration aircraft. The RQ-4 Global Hawk was an advanced development program that was moved to the front lines after the 9/11 attacks, and became a fully operational platform. The 2010 Quadrennial Defense Review featured a tilt away from technology demonstrator status, and toward an X-47 UCAV that can perform surveillance and/or strike roles. That would let the Navy field operational UCAVs much sooner, and allow them to field a capability that could be similar but superior to the USAF’s current RQ-170 Sentinel/”Beast of Kandahar” stealth UAV. Those exact capabilities remain a matter for discussion, however, as Navy Undersecretary and UCAV advocate Bob Work points out: “There is a lively debate over whether or not the N-UCAS demonstrator should result in a penetrating, ISR strike bird, or be more of a strike fighter… That debate has not quite been resolved. Having this extra $2 billion added to the budget is going to help us resolve that debate.” Jan 26/10: Aerial refueling. Northrop Grumman Integrated Systems Sector in San Diego, CA received an $11 million not-to-exceed modification to a previously awarded cost-plus-incentive-fee contract for autonomous aerial refueling technology maturation and demonstration activities in support of the Navy UCAS-D. Work will be performed in El Segundo, CA (60%) and Rancho Bernardo, CA (40%), and is expected to be complete in November 2010 (N00019-07-C-0055). Jan 17/10: Testing. First low-speed taxi test of an X-47 N-UCAS. Source. Dec 22/10: Delay. Trouble with engine start sequencing and propulsion acoustics will now reportedly delay the X-47B’s December 2009 flight to sometime in the first 3 months of 2010. Gannett’s Navy Times | Defense Update. Nov 25/09: Aviation Week reports that the X-47 UCAS-D system demonstrator is experiencing “propulsion acoustic and engine-start sequencing” issues, which will require additional testing and push its 1st flight to 2010. The US Navy reportedly says UCAS-D is still on track for sea trials in 2012, but Northrop Grumman has placed a “moratorium” on press interviews for UCAS-D – never a good sign. Nov 2/09: Navy plans. The Brookings Institute’s 21st Century Defense Initiative hosts Chief of Naval Operations Admiral Gary Roughead, who discusses the U.S. Navy’s use of new technologies, and its development and integration of unmanned systems. Excerpts: “I would say that where we can make some significant breakthroughs us just in the organizing principles and in the way that we approach the unmanned systems. The idea of being able to disembark or embark long-range unmanned air systems for example changes the nature in which we can run flight decks, changes the nature of the carrier air wing configurations as we move into the future. …I would also say that I am often struck that as we talk about unmanned systems we’ve really become enamored with the vehicle itself and there has been very, very little discussion and arguably little work on something that makes it all work together and that’s the network and the architecture of the network, how the information will be moved, what are the redundancies that you would have in place, and what are the common protocols that are going to be required as we move into the future.” See WIRED Danger Room | Brookings Institute and full transcript [PDF] Oct 6/09: Sub-contractors. GE Aviation announces that it has delivered the first fully-dressed X-47B UCAS-D landing gear to Northrop Grumman Corporation. “Fully-dressed” landing gear is designed to meet or exceed all U.S. Navy carrier landing requirements for a fully loaded UCAS-D aircraft. GE Aviation says that its combined systems make it the largest non-partner equipment supplier to the X-47B, but the landing gear effort had partners of its own: “Due to the demanding mission profiles required for this advanced carrier platform, the landing gear system incorporates the latest technology advancements in steering control from Parker Hannifin as well as anti-skid braking systems from Goodrich Corporation.” FY 2008 – 2009 Aerial refueling will be part of the program; Load testing. UCAS-D load testing (click to view full) Aug 11/09: Updates. AUVSI 2009 event reports indicate progress on several fronts from the UCAS-D program. Flight International reports that an F/A-18D Hornet test plane with be modified to carry X-47B avionics and software, then used as a test bed to develop a fully integrated aircraft/carrier auto-landing system. The Navy is hoping to perform manned but “hands-off” approaches and landings on an aircraft carrier within 2 years, though that aspect remains to be decided. Meanwhile, Shephard reports that number of USAF personnel will begin arriving at NAS Patuxent River as observers to PMA-268, the Navy UCAS Program Office. The planned air-air refueling demonstration was apparently the catalyst for USAF interest, and the second test aircraft (AV-2) is being built with full internal refueling systems on board. July 29/09: Load testing. Northrop Grumman announces a successful series of static and dynamic proof load tests, designed to ensure that the UCAV will be able to stand up to aircraft carrier launches, recoveries, and other associated stresses. For these torture tests, over 200 electro-hydraulic assemblies were attached to the major components of the X-47B, whereupon pressure was applied to simulate desired conditions. The 2-month effort included progressive structural, functional proof and calibration tests to verify the integrity of all flight control surfaces, major structural load paths, main landing gear structure, and the tailhook assembly. The 2nd aircraft is currently being assembled, and will begin proof load tests later in 2009. UCAS-D aircraft will also undergo parallel engine integration and taxi tests through fall 2009, in preparation for first flight and aircraft carrier trials. Northrop Grumman Aerospace Systems VP and UCAS-D program manager, Scott Winship, cited that unforgiving environment, then promised that: “The X-47B was built for these conditions, and as the results of the rigorous proof test show, the design of the aircraft is structurally sound for all aspects of carrier operations.” Jan 12/09: Aerial refueling. Jane’s confirms that the X-47 UCAS-D program will begin aerial refueling tests performed in 2010, using surrogate aircraft. Dec 9/08: Aerial refueling. Aviation Week quotes UCAS program manager Scott Winship, as part of a report that that Northrop Grumman will modify the second X-47B UCAS-D to allow autonomous aerial refueling (AAR) using both U.S. Navy probe-and-drogue and U.S. Air Force boom-and-receptacle methods. The U.S. Navy has announced plans to award the company a sole-source contract to support the demonstration of AAR capability by 2013, under UCAS-D’s parallel technology-maturation phase. Boeing is currently leading a team including X-47B partners Northrop Grumman and Lockheed Martin for the 4-year second phase of a parallel Air Force Research Laboratory program. Winship says the X-47B could be used to provide a “graduation exercise” for the AAR effort. Nov 19/08: Aerial Refueling. Boeing in St Louis, MO received a $49 million cost plus fixed fee contract as the automated aerial refueling Phase II integrator. At this point, $1.2 million has been obligated. The Air Force Research Laboratory at Wright-Patterson AFB, OH manages this contract (FA8650-09-C-3902). Read “$49M for Boeing to Advance UAV Aerial Refueling” for an explanation of the importance to the UCAS-D and similar programs. July 14/08: Sub-contractors. Pratt & Whitney announces a $54 million contract from Northrop Grumman to develop and integrate the X-47 UCAS-D’s engine and exhaust system. The Pratt & Whitney F100-PW-220U engine will power the UCAS-D, providing up to 16,000 pounds of thrust while operating in a maritime environment, including carrier deck operations. FY 2005 – 2007 UCAS-D award; Carrier simulation exercise. Just another day at the office… (click to view full) August 1/07: UCAS-D. Northrop Grumman Integrated Systems – Western Region in San Diego, CA received a $635.9 million cost-plus-incentive-fee contract for the Unmanned Combat Air System CV Demonstration Program (UCAS-D). Work will be performed in Rancho Bernardo, CA (38%); El Segundo, CA (29%); Palmdale, CA (13%); East Hartford, CT (7%); Jupiter, FL (2%); Nashville, TN (2%); Hazelwood, MO (1%), and various locations within the United States (8%), and is expected to be complete in September 2013. The purpose of the UCAS-D is to demonstrate critical CV suitability technologies for a stealthy air vehicle in a relevant environment [DID: i.e naval/ aircraft carriers]. Expected deliverables include trade studies, analyses, software, reports and flight test data. This contract was competitively procured through a request for proposals; 2 firms were solicited [DID: that would be Boeing and NGC] and 2 offers were received (N00019-07-C-0055). See also Northrop Grumman’s Aug 3/07 release. UCAS-D contract. Sept 28/05: As part of DARPA’s J-UCAS program, Northrop Grumman Corporation’s X-47B conducted a successful simulated exercise at the Naval Air Warfare Center Weapons Division in China Lake, CA. It demonstrated the simultaneous control of 4 of its X-47B unmanned aerial vehicles (UAVs) during U.S. Navy aircraft carrier operations. See Dec 9/05 NGC release. Using a surrogate aircraft which represented one X-47B, 3 additional simulated X-47B aircraft were successfully controlled during several flights using advanced mission-management software and air traffic control procedures currently used by Navy aircraft carriers. The air traffic controller provided standard commands to a single mission operator, who in turn ensured all four aircraft safely operated within the simulated carrier’s airspace. The controller had to demonstrate the ability to guide all 4 aircraft through approach, wave-off and traffic pattern procedures, while accomplishing proper spacing and air traffic de-confliction. The mission operator had to be able to monitor the entire process to ensure proper command response, and advise the controller on aircraft response or performance limitations. This was one of many tests undertaken as part of J-UCAS. It is reproduced here for its ongoing relevance to the UCAS-D program. Additional UCAV Readings UCAS-D/ N-UCAS Air Force Technology – X-47 Pegasus Naval Unmanned Combat Air Vehicle (UCAV-N), USA. Northrop Grumman – X-47B UCAS. Northrop Grumman Review Online (2007) – The United States Navy’s Unmanned Combat Air System Demonstration (UCAS-D) Program. Rockwell Collins, via SLDINFO – Tactical Targeting Network Technology and Connectivity [PDF]. TTNT’s very low latency, join on the fly networking is important for UCAV safety-of-flight, especially around carrier decks. DID – Game-Changer: USA Developing UAV Aerial Refueling. Automated Aerial Refueling is the key to unlocking the UCAV’s full potential. Center for Strategic & Budgetary Assessments (June 18/08) – Range, Persistence, Stealth, and Networking: The Case for a Carrier-Based Unmanned Combat Air System [PDF]. News & Views USNI (Aug 21/14) – Essay: The Legal and Moral Problems of Autonomous Strike Aircraft. Technically, the UCLASS is not autonomous, its human operator has to trigger the attack. The question is whether that’s ultimately feasible in an anti-access, high-jamming environment. Washington Business Journal (Aug 19/14) – Could UCLASS end up as the Pentagon’s next runaway program? Breaking Defense (Aug 5/14) – Crunch Time For UCLASS: USD Kendall, Rep. Forbes, & The Requirements Fight. James Hasik (Dec 3/13) – Manning the Unmanned: Cultural Experimentation for the Coming Drone Fleet. James Hasik (Aug 15/13) – Range and payload: further thoughts on the US Navy’s approach to the UCLASS program. James Hasik (Aug 13/13) – Just how ambitious should be the requirements for the US Navy’s new drone?. NDIA National Defense (July 2013) – Fight Begins Over Navy’s Armed Drone Program . WIRED Danger Room (April 11/11) – Navy Wants Its Drone to Land on a Carrier With a Mouse Click. Military.com (Aug 14/07) – Will Drones Work on Carriers? Describes the process of launching and landing UCAVs on a carrier. You may be surprised to learn how much of this is already automated in America’s manned fighters. Center for Strategic & Budgetary Assessments (CSBA) Backgrounder (May 10/07) – The Unmanned Combat Air System Carrier Demonstration Program: A New Dawn For Naval Aviation? [PDF]. AFA Air Force Magazine (November 2005) – Will We Have an Unmanned Armada. AFA Air Force Magazine (June 2005) – Toward an Unmanned Bomber. UCAV Programs DID FOCUS Article – nEUROn UCAV Project Rolling Down the Runway (updated). nEUROn is a 6-nation European project that aims to create a UCAV with capabilities that resemble J-UCAS, but do not currently include carrier operations. It has moved into Phase 2. Air Force Technology – Taranis Unmanned Combat Air Vehicle (UCAV) Demonstrator, United Kingdom. Not tackling carrier operations at this point. DARPA – J-UCAS program. J-UCAS died shortly after being transferred to the Air Force and Navy. Air Force Technology – X-45 J-UCAV Joint Unmanned Combat Air System, USA. The X-47B’s competitor for the UCAS-D follow-on program, and fellow J-UCAS participant. DID – Ride on the Ray: Boeing’s X-45 UCAVs. Boeing has restarted it with corporate funding. AIN (May 17/13) – China’s ‘Sharp Sword’ UCAV is Spotted Taxiing . Northrop Grumman Analysis Center, presentation to the 3rd Joint-Industry Forum (Feb 16/05) – Joint Unmanned Combat Air System and US Military Transformation shows [PDF]. View the full article
  2. Saar 5: INS Hanit (click to view full) The 1,227t/ 1,350 ton Sa’ar 5 Eilat Class corvettes were built by Northrop Grumman in the 1990s for about $260 million each. It’s a decent performer in a number of roles, from air defense to anti-submarine work, to coastal patrol and special forces support. In 2006, the Israelis went looking for a next-generation vessel with better high-end capabilities. Six years later, Israel had nothing to show for its search. In the meantime, massive natural gas deposits have been discovered within Israel’s coastal waters, adding considerable urgency to their search. The USA is Israel’s logical supplier, but given Israel’s size and cost requirements, the only American option was the Littoral Combat Ship. Israel pursued that option for several years, conducting studies and trying to get a better sense of feasibility and costs. Their approach would have been very different from the American Freedom Class LCS, removing the swappable “mission modules” and replacing them with a fixed and fully capable set of air defense, anti-ship, and anti-submarine weapons. In the end, however, the project was deemed to be unaffordable. Instead, Israel began negotiating with Germany, and reports now include discussions involving both South Korea, and a local shipyard. Ship Systems: What is Israel Looking For? The Strategic Situation Offshore energy (click to view full) Israel’s discovery of massive offshore gas reserves in the Tamar and Leviathan fields has the potential to change Israel diplomatic weight, as well as its economy and energy status. Work is already underway in cooperation with Cyprus, and Greece has shifted from hostile to cooperative over the last decade, but Turkey is making hostile noises, and Syrian hostility is assured. Potential irregular threats to Israeli drilling installations include UAVs, which have already overflown existing rigs on their way into Israeli airspace, or boat operations with divers or depth charges. Rig owners are working with the IDF to counter the irregular threat, via armed teams on each platform and radars networked to Israel’s coastal defenses. They may need to take further steps with RWS emplacements and missiles, given rules that require enemies to close within 1/2 mile before defenders can open fire. The higher end is more problematic, and isn’t much discussed, but it exists. Hezbollah has already proven its ability to use long-range surface-launched naval missiles, and drilling platforms are ideal targets if they can be reached. Full state-level threats leave Israel open to the threat of supersonic Russian SS-N-26s in Syria’s possession, and add enemy submarines to this picture. Turkey’s purchase of 6 U214s, Iran’s Kilo Class boats, and a possible Egyptian purchase of 2 U209s fitted with modern systems, are changing the local balance. Turkish saber-rattling and Syrian hostility mean that enemy fighters must also be considered, and the rigs will be placed some distance from Israeli quick-reaction fighter launches. It’s a complex, multi-dimensional problem, and the solution will have to be multi-layered. Defensive systems and sensors on board the rigs themselves, and naval flotillas of smaller ships that offer presence while providing point defense and surface attack punch, are already in place. Heron UAVs are already operating in maritime patrol mode, which offers Israel a persistent aerial surveillance option, but doesn’t help much with response capability at present. Israel could benefit greatly from maritime patrol aircraft with good on-station time, and offensive capabilities that allow them to intervene. Their aged Westwind 1124N Sea Scan business jets don’t fit that bill. Meanwhile, their naval flotillas need a boost, and acknowledging higher-end threats becomes very consequential if it means that Israel needs high-end wide-area air defense and anti-submarine capabilities on station. Israel’s Requirements LCS-I components (click to view full) Whatever that solution may be, Israel’s experience with the LCS concept shows where their needs are leading them. From Israel’s point of view, the keys to their original interest in an LCS-I design were threefold. Flexibility. The 1st key is an open architecture combat system. Israel produces a lot of its own electronics, and the ability to easily integrate their own products into current and future configurations was seen as a huge plus. Lockheed Martin’s VP of Israel Operations, Joshua Shani, meant it when he said that that “participation by the Israeli defense industry will be the cornerstone of [LCS-I’s] success.” The same will be true of any other ship type that Israel adopts. Wider View. The 2nd key is better sensors. LCS-I negotiations focused on Lockheed Martin’s SPY-1F S-band radar, which also equips Norway’s Fridjhof Nansen Class AEGIS frigates. Discussions surrounding other ships have focused instead on IAI Elta’s locally-developed EL/M-2248 MF-STAR “Adir” S-band active array radar, which has been exported to India for use on their Kolkata Class destroyers, and is being installed as a Sa’ar 5 upgrade. AESA radars are much easier to resize for smaller ships, and IAI ELta’s designs scale all the way down to the EL/M-2258 ALPHA (Advanced Lightweight Phased Array) radar, which is being installed on Israel’s 500t class Sa’ar 4.5 Fast Attack Craft. AN LCS-I would also have offered far superior underwater sensors. The ability to embark larger helicopters, including the MH-60 Seahawk family or similar naval helicopters, would dramatically boosting Israel’s anti-submarine capabilities. A modern bow sonar, which is present in other ship designs, would add a lot all by itself, especially if the ship’s combat system could integrate that data with towed and/or variable-depth sonars. SM-2 (top), SM-3 Weapon Improvements. The 3rd key involves a wider weapon fit, especially when it comes to air defense. Adopting the MK41 Vertical Launch System would give Israel inherent flexibility over time to integrate new missiles of all types, in order to handle Israel’s combat scenarios, and address changes in threats and operational requirements. LCS-I’s high-end armament would have included torpedo tubes, mounts for Harpoon or Gabriel anti-ship missiles, and the contents of the ship’s 16 strike-length vertical launch cells. Those cells would offer Israel the flexibility to include anti-air missiles like the new Israeli Barak-8, the entire range of Raytheon’s Standard family air and missile defense interceptors, compatible anti-ship and precision strike missiles like Lockheed Martin’s LRASM, or even current anti-submarine missiles like VL-ASROC. Local options like IAI’s ANAM/ Gabriel 5 and IMI’s Delilah-SL will also be of interest to the Israelis. In Israel’s case, a strike-length MK41 VLS system could take on strategic significance. Raytheon’s SM-3 (area defense), SM-2 Block IV, and SM-6 missiles (point defense) can be used to defend against ballistic missile attacks, if paired with a suitable radar. The AN/SPY-1F has never received the signal processor upgrades given to larger and more powerful SPY-1D radars for ballistic missile defense, nor has it ever been tested in that role. Alternatively, the ship could be networked with long-range ground radars like Israel’s “Green Pine.” In either scenario, the SM-3’s range and Israel’s tiny size would allow just 1 ship on station to cover most of Israel. A situation where 2 ships out of 4 are on station at any given time is very plausible, and could provide overlapping point defense ABM coverage. Either option would supplement Israel’s medium range Arrow and short range Patriot PAC-2 GEM systems on land. At present, this is an option rather than a focus, but even the potential for such a vital national mission is a first for the Israeli Navy. Onboard vehicles add to an Israeli frigates’ punch in a different way. New ships will be expected to embark a flexible USV/UUV mix, with the ability to store and launch Rigid Hull Inflatable Boats (RHIB), mine or sub-hunting hunting UUVs, or surface USVs. Israel’s leading-edge capabilities in USVs would make that capability an immediate and long-term force multiplier. Israel’s core problem is that a high-end, full featured frigate is going to cost them $600+ million. They want the capabilities, but don’t have the money to buy 3-4 ships at that price. In response, they can choose to scale back their desires, or they can find some way to make a deal. What Are You Shipping: Vessels & Systems Current State: Israel’s Sa’ar 5 Corvettes Sa’ar 5 corvettes click for video Some have called the 1,227 tonne Eilat Class a better base model for the USA to adopt, as it seeks an affordable Littoral Combat Ship or flotilla asset. The ships were built by Litton-Ingalls Shipbuilding Corporation of Pascagoula, MS (now HII), based on Israeli designs. All 3 ships of class were launched from 1993 – 1994. Air Defense. Sa’ar 5 corvettes have moderate anti-air capabilities, thanks to IAI Elta ELM-2218S and ELM-2221 GM STGR radars. Twin 32-cell launchers hold short-range Barak-1 surface-air missiles, and the ship has a Mk15 Phalanx 20mm CIWS gun for last-ditch defense. As of 2013, the ships are preparing to swap their Barak-1 systems for the larger Barak-8 missile, whose 70+ km reach will give the Israeli Navy its first area air defense capability. ASW. Bow-mounted and towed sonars, plus 6x 324mm torpedo tubes for Mark 46 torpedoes, give these corvettes moderate anti-submarine capability. This was quite adequate until the early 2010s. As Turkey has become progressively more hostile, and unstable neighbors like Egypt buy modern submarines, there is some concern that the Eilat Class’ anti-submarine capabilities may not be enough. Surface Warfare. Surface warfare is addressed well. Harpoon or Gabriel anti-ship missiles can be used against larger ships or land targets, while the Mk15 Phalanx 20mm gun and Typhoon remotely-operated 7.62-30mm gun/missile systems deal with guerrilla craft. The corvette is also capable of launching small special forces boats, or robotic USVs like RAFAEL’s Protector series. A 76mm Oto Melara naval gun option could be installed in place of the Phalanx. It would offer slightly less air defense capability, in exchange for a longer reach and more punch against fast boats. That upgrade would be compatible with long-range Vulcano ammunition for naval fire support, but Israel has chosen the Phalanx for now. The Eilat Class’ helicopter hangar can accommodate AS565 Dauphin/Panther, Kaman SH-2F or Sikorsky S-76N helicopters. Israel’s navy flies the AS565, but they haven’t armed them with substantial naval weapons. Future Option: Lockheed Martin’s LCS-I LCS-I missions (click to view full) The Israelis have a long-standing relationship with Lockheed Martin, and a 2,500-3,000t LCS design with the USA’s swappable mission modules could significantly improve Israel’s ability to conduct anti-submarine warfare and mine neutralization missions. Unfortunately, the pitifully weak armament of the USA’s LCS ships is inadequate for the Israelis, who need their ships to be able to engage other naval vessels, and to provide their own air defense. Worse, the American design lacks the flexibility to add meaningful weapons in future. As a result, the Israelis took a different approach, eliminating the ship’s swappable mission modules in favor of a much more heavily-armed vessel. Initial studies were conducted in conjunction with Lockheed Martin, leading to an RFP and even an official $1.9 billion DSCA request for Lockheed Martin’s LCS-I design. That would have made Israel the first LCS export customer. Construction of the LCS-I ships would have occurred at Marinette Marine and Bollinger Shipyards in the United States and American construction allows Israel to buy the ships with American military aid dollars, rather than using its hard-currency budget. Gary Feldman, Lockheed’s business development director international LCS sales, said that detail design could have begun in 2009, with construction starting in 2010. In the end, however, expected per-ship costs of $700 million or so led the Israelis to back away and look for another solution. Future Option: HII’s Sa’ar 5B Northrop Grumman has proposed an enlarged “Sa’ar 5B” corvette with more advanced systems, and Israel has made that task easier by developing their own advanced ship radars and improved missiles. Indeed, the Israelis are implementing a de facto Sa’ar 5B by upgrading existing Eilat Class ships with fixed-plate MF-STAR “Adir” AESA radars, new medium range Barak-8 missiles, and better anti-ship/ land strike missiles. Northrop Grumman (now HII) has hinted that Sa’ar 5B ships could be built for less than $450 million, using American aid dollars, but Israel initially rejected that option as well. Discussions are rumored to have resumed, but nailing down a firm price will require money up front for extensive design studies. That left Israel looking beyond the USA for their base ship, even as the equipment they wanted in those ships remained fairly constant. Future Option: Germany, Overall? MEKO CSL (click to view larger) In February 2009, Israel switched its interest to ThyssenKrupp Marine Systsems’ MEKO family, which comes in sizes ranging from A100 corvettes to full-size A200 frigates. MEKOs are customized to their destination country, so a German K130 Braunschweig Class is very different than Malaysia’s Kedah Class, even though both begin with the A100 base. As part of that customization, the radar would have been IAI’s Elta’s EL/M-2248 MF-STAR, and many of the other technologies requested for the LCS-I would have applied as well. Reports are split between a buy of 4 A100 base corvettes to put more ships on station, vs. a purchase of 2 high-end frigates that would be able to focus on advanced anti-submarine and wide-area anti-air warfare. There was even some talk of making Israel the launch customer for the MEKO CSL, which would have given Israel some of the modularity found in the USA’s LCS class. The Meko CSL is only slightly smaller than the American LCS Freedom Class, at 108m/ 354 ft. long, with a beam of 21 meters and full-load displacement of 2,750 tonnes. Propulsion is by a combined diesel-and-gas (CODAG) water-jet system that cruises at 15 knots and reaches 40. Cruising speed range at would be about is 3,500 nautical miles, with 21 days endurance. The MEKO CSL variant adds improved stealth shapes and measures refined on Sweden’s Visby Class corvettes, and has several modular sections for faster swap-outs. An Israeli MEKO CSL would contain a lot of local content, including IAI Elta’s MF-STAR, the new Barak-8 medium range air defense missile, and Israeli electronic countermeasures systems, among others. The CSL also has a rear mission bay, and could serve as a hub for Israel’s advanced UAVs and robotic naval USV/UUVs. German negotiations stalled after Germany agreed to provide subsidies for more Dolphin Class submarines, but not for frigates. 2013 Reports indicate that negotiations have resumed. Asian Quality: The South Korean Option FFX launch (click to view larger) South Korea (ROK) is a global leader in shipbuilding, and their successful naval shipbuilding programs include cruiser-size KDX-III AEGIS destroyers as well as smaller ships like their FFX and FFX II light frigates. The FFX Block II in particular appears to be an advanced small combatant that meets Israel’s size and capability requirements. The 2,500t+ ships will offer electrical power to spare, high-end long range radar capabilities, a 127mm/ 5″ gun with guided shell options and future long-range fire capabilities, a 16-cell vertical launch system, and the ability to embark full-size anti-submarine helicopters. The South Koreans might be able to produce new frigates at the price and quality level Israel needs, and they’ve become significant buyers of Israeli defense technologies in recent years. Israel wants to keep that relationship going, but KAI’s recent loss of a $1 billion deal for new IAF jet trainers has put a dent in things. South Korea remains interested in other Israeli technologies, including its Iron Dome rocket defense system. A deal that offset ROK defense purchases with Israeli buys of South Korean FFX Block II ships might make everyone happy, and get the Israeli political support required to move the project ahead. Negotiations are reportedly underway. Final Option: Don’t Go Big – Go Home Saar 5 Eilat Class (click to view larger) Israel’s final option is less ambitious in terms of performance, but more ambitious industrially. It involves a deal with the privatized Israel Shipyards. In exchange for government investment to modernize and expand the shipyard, they would design and build an larger, improved version of existing corvettes. The Sa’ar 5.5 option would be designed to give Israel a locally-built offering that was both exportable and upgradeable, without requiring outside help or approval. Recent MF-STAR/ Barak-8 upgrades are laying the groundwork for a tested option. The question is whether all of the money required for shipyard modernization, ship design, fabrication in a shipyard stretching its capabilities, and platform testing would make the final product as expensive as higher-end options, while offering comparatively less capability. That could also make the vessels unexportable on price grounds, creating a lose-lose-lose scenario. Contracts & Key Events 2015 – 2018 Barak-8 (click to view full) November 3/20: 72 At Euronaval Online, which is the digital edition of Euronaval 2020, International naval defense and maritime security industry exhibition, Israel Shipyards presented the SAAR S-72, the new generation of the famous SAAR class Fast Attack Mini Corvettes, Israel Defense reported. The SAAR-72 is a multi-mission vessel using a modular design, in Corvette configuration, she can be used to conduct naval warfare missions. In OPV (Offshore Patrol Vessel), she can be armed with lighter weaponry. It is a stealth multi-purpose corvette derived from the Saar 4.5 missile boats fully designed by Israeli Shipyards. The ship has a length of 72 meters and a displacement of 800 tons. She has an endurance of 21 days with a crew of 50 people including officers and sailors. It can also accommodate 20 passengers or commandos. November 20/19: Replacement Israel Shipyards will design the Israeli Navy’s new Reshef Class to replace its aging Saar 4.5 vessels. The class will be based on the S-72, which it described as a “proven design”, even though none have been ordered as yet, and would be able to “successfully withstand the new and evolving threats and challenges” facing the Israeli Navy. The vessels will be used to protect Israel’s exclusive economic zone, including oil and gas facilities. The news follows a November 6 announcement in which the Israeli Ministry of Defense said it had ordered a floating dock from Israel Shipyards as part of a $25.8 million agreement that also covers the design and construction of future naval vessels that were not identified. October 1/19: Sa’ar 72 Israel Shipyards received orders for its OPV 45, and is in discussions towards the first sale of a Sa’ar S-72 vessel, Jane’s reports. The OPV 45 is Israel Shipyards’ newest patrol craft. The Sa’ar S-72 is 71.8 m long, has a 3,200 n mile range, an 800 tonne displacement, and a 30 kt top speed. Noam Latsav, managing director at Israel Shipyards, said that contract talks are ongoing with one country, and one Sa’ar S-72 has begun construction in the meantime. The OPV 45 is driven by fixed-pitch propellers and the power plants depend on the customer’s needs. It can mount stabilized naval gun systems of up to 30 mm in the primary position, and 12.7 mm machine guns. August 19/19: ALPHA Radar Jane’s reports that images have shown at least one Israeli Navy Saar-5 corvette has the new IAI-Elta ELM-2258 Advanced Lightweight Phased Array or ALPHA radar. The radar system is based on unique full digital AESA technology by ELTA Systems Ltd., a Group and Subsidiary of IAI (IAI/ELTA) and is an integral part of the combat systems installed on the missile ships. ALPHA is a rotating AESA radar, capable of producing a large number of simultaneous beams for maritime and aerial targets, and to provide a high quality situation picture in the most extreme marine environment. The radar can perform several tasks at the same time, such as: detection and classification of naval targets, tracking of a large number of targets, and integration into guided missile systems for defense and attack. Israeli Naval sources told Jane’s in 2017 that the Saar 5 corvettes Hanit and Eilat would receive the radar as part of an upgrade that would also see the integration of the new Barak 8 surface-to-air missile. February 28/19: ELM-2248-Star Radars ELTA Systems, a subsidiary of Israel Aerospace Industries (IAI) won a contract with the Israeli Navy to supply four ELM-2248-Star radars for its four new Sa’ar-6 corvettes. The ELM-2248 MF-STAR Multi-Function Digital Radars are based on Active Electronically Scanned Array (AESA) technology. The Sa’ar-6 class corvettes are four German-made warships ordered for the Israeli Navy in 2015. They are tasked to protect Israel’s economic zone and secure its critical naval infrastructure, such as natural gas rigs against missiles, rockets and enemy aircraft. The MF-STAR is to be installed on the ship’s mast. It comprises four conformal phased array S-Band antennas providing 360 degrees coverage. The Israeli Navy expects the German-built corvettes to enter service by 2022. August 16/18: Protector of Israeli interests Israel will send its ‘Sons of Sa’ar’ to protect its Mediterranean gas fields and its exclusive economic zone. The Israeli Navy is set to receive four next-generation Sa’ar 6 corvettes between 2019 and 2024. The 300-feet-long warships, which are currently being built in Kiel, Germany, will be packed to the gills with highly sensitive detection equipment — to monitor both the surrounding sea and airspace — as well as offensive weapons and defensive missile interceptors. The ships will be equipped with the ‘Naval Dome’, essentially a navalized version of the Iron Dome, with the Barak-8 missile at its core. The Barak-8, and aims to deliver up to 42 mile of range, thanks to a dual-pulse solid rocket motor whose second “pulse” fires as the missile approaches its target. This ensures that the missile isn’t just coasting in the final stages, giving it more than one chance at a fast, maneuvering target. The missile’s most important feature may be its active seeker. Instead of forcing its ship or land-based radar to “paint”/illuminate its target at all times, the Barak 8 can be left alone once it is close to its target. This is an excellent approach for dealing with saturation attacks using older ship radars, which can track many targets but illuminate just a few. The Barak-8 was developed by IAI in collaboration with Israel’s DDR&D, India’s DRDO (Defense Research and Development Organization), the navies of both countries, Rafael Advanced Defense Systems Ltd., IAI’s ELTA Group and local industries in India. January 19/18: Upgrades—Testing Israel’s Navy announced that it has successfully tested a new chaff defense system for its Sa’ar 4.5-class missile boats and it is expected that the system will be declared operational in the coming weeks. First to receive the upgrade was the INS Sufa, with testing conducted two months ago off the coast of Haifa. The system includes an algorithm that identifies and classifies any kind of projectile making its way towards the Israeli missile ship, and then programs a unique diversion plan: firing chaff rockets from the front deck and create a “wall” over the water of hundreds of metal wires, which mislead the enemy missile into “thinking” this was the Israeli ship. This helps divert the enemy missile, only a minute or two before it was to hit the Israeli ship. April 3/17: The Israeli Navy is altering the design of the Sa’ar-6 corvette in order to fit additional Iron Dome interceptors onboard the vessels. By adding a second launcher, each corvette will be able to carry as many as forty Tamir interceptor missiles, allowing vessels to engage an increasing number of disruptive, possibly deadly and inexpensive shore-launched rockets launched by groups such as Lebanon’s Hezbollah. Four Sa’ar-6 ships are currently on order with Germany’s ThyssenKrupp Marine Systems (TKMS); however, the sale is source of a scandal in Israel and are part of an investigation into potential conflicts of interest among those close to Israeli Prime Minister Benjamin Netanyahu. November 10/16: Israeli navy officials are evaluating fixed-wing extremely short take-off and landing (ESTOL) UAV ideas to eventually deploy on their four new Saar 6 corvettes and existing SAAR 5 missile vessels. The ESTOL UAV will be based on propulsive lift technology that will enable it to take off from a very small platform on the navy ship. A decision will be made on the platform in 2017. May 12/15: The Israeli Ministry of Defense announced Monday that it has signed a contract for four Sa’ar-class corvettes, manufactured by Germany’s TKMS. Discussions between the two countries over the supply of Littoral Combat Ships to protect Israel’s offshore gas reserves have been in the works since 2009, with the Germans agreeing to a discount in October last year, with the German government further subsidizing the deal, funding approximately a quarter of the contract’s value. The $480 million deal will see TKMS buying $181 million-worth of Israeli-manufactured equipment as offsets. Whilst the Israeli MoD did not announce the precise type of corvette the Israeli Navy will receive, it is likely to be the Blohm Voss-class 130 corvette, with modification to Israeli specifications. 2014 Israel’s offshore strategic situation; Significant Sa’ar 5 improvements underway; Negotiations with Germany. Oct 19/14: Germany. Ha’aretz reports that Germany has agreed to a discount, and seems set to secure the Israeli contract for its next-generation ships: “A crisis between Israel and Germany over missile boats required to protect Israel’s offshore gas fields has ended after Berlin agreed to slash [EUR] 300 million (about $382 million) off the cost, officials on both sides said. They are expected to initial an agreement for the boats within weeks.” Time will tell which boats Israel orders. If they still want 4 ships, a sum of just over $900 million with subsidies included could get them MEKO derivatives along the lines of Germany’s own 1,840t K130 Braunschweig Class corvettes, but with Israeli technology. If they’re only ordering 2 ships, possibilities expand to include base options like the 2,750t MEKO CSL, or a MEKO A200 derivative that compares to Turkey’s own 3,350t Barbaros Class. Sources: Ha’aretz, “Missile boat crisis ends as Germany gives Israel $382 million discount”. Sept 28/14: RFP & timelines. State Comptroller Judge (ret.) Joseph Shapira published an audit report in March 2014 that said Israel’s gas facilities in the Mediterranean were only partially protected, but constituted a prime target for attacks by terrorist organizations. That has ratcheted urgency a bit higher, but Israel may have to wait for some time before its ships sail out: “The Ministry has been preparing for a number of years an international tender for the procurement of ship to operate in Israel’s marine economic area, and has done in-depth staff work in the matter. The government decided to procure the ships only in November 2013, and provided a special budget for them. Procurement was suspended in order to provide enough time for negotiations for a deal with a foreign country. Last July, following the prolonging of these processes, the Defense Ministry decided to issue an international tender for procurement of the ships. The tender is currently taking place; the envelopes will be opened next December, and a preliminary answer will be given. The tender will be completed by the end of 2015.” Add time for integration of Israeli components, construction, outfitting, testing, and training, and operational acceptance before 2018 would be quite a feat. Globes reports that the contract’s scope involves NIS 2 billion (about $550 million) for 4 ships. That won’t get them very much. Sources: Globes, “Israel Navy to wait years for gas rig defense ships”. May 15/14: Germany. Ha’aretz reports that the proposed deal discussed in December 2013 (q.v. Dec 8/13) appears to have fallen through for now: “The German government has decided not to give Israel a massive subsidy for the purchase of German missile boats, due to the breakdown in Israeli-Palestinian peace talks, both Israeli and German officials said on Thursday.” Sources: Ha’aretz, “Germany nixes gunboat subsidy to Israel, citing breakdown of peace talks”. May 13/14: Sa’ar 5+. Israeli improvements to their existing ships are underway. This matters, because deploying the systems within the Israeli Navy makes Israel much more likely to demand them as part of any future frigate. Fielding a tested upgrade to the Eilat Class also provides added weight to options like the Sa’ar 5B or Sa’ar 5.5, by creating a proven starting point. A “senior naval source” tells The Jerusalem Post that Israel is upgrading the anti-ship and strike missiles on board its ships, in order to give their Navy medium-range precision strike capability against land targets. They weren’t specific, but IAI has developed an “Advanced Naval Attack Missile” as a successor to existing naval Gabriel missiles. The other likely option is IMI’s “Delilah-SL”; it’s a ship-launched version of the Air Force’s go-to missile for strikes against targets that are heavily defended, or require a high level of human judgement via its “man in the loop” feature. The article adds that a Sa’ar 5 Eilat Class corvette has already been outfitted with IAI Elta’s MF-STAR S-Band AESA radar and Barak-8 air defense missiles. Adding better strike weapons to that array changes effectively creates a proven “Sa’ar 5B/ 5.5” option. Sources: The Jerusalem Post, “The Israel Navy is quietly enhancing its capabilities for precision, long-range missiles”. Jan 18/14: Israel Defence reports that Israel is scaling down its naval platform ambitions. They’re reportedly back to a platform around 1,300t, which is about the same size as their Sa’ar 5s, rather than a 2,000t+ platform. They’ll still insist on its ability to carry MF-STAR and the Barak-8, but success won’t entirely solve their problems: “Originally, the IDF Navy should have initiated the procurement of the new missile frigates in the context of the previous multi-year plan, and funds had been allocated for this purpose as part of that plan, but owing to the cancellation of the LCS option, the process never materialized…. intention of the IDF is to finance the procurement of the new vessels by a dedicated budget allocated by the government outside the framework of the normal defense budget, in order to secure the offshore gas drilling rigs. The procurement plan notwithstanding, the total number of missile frigates in the IDF Navy is expected to decrease during the next five-year period, owing to the obsolescence of the present vessels, some of which are to be decommissioned.” Sources: Israel Defence, “The Next Missile Frigate of the IDF Navy”. Jan 8/14: Strategic. Paul Alster & David Andrew Weinberg discuss the difficulties Israel faces in defending its offshore gas resources, and take a critical look at the exploitable reserves and revenue projections. They say flatly that: “IDF officials concede that they do not have the resources as of now to properly secure the infrastructure at sea.” They list threats that include UAVs, which have already overflown existing rigs on their way into Israeli airspace; suicide operations with divers, boats or depth charges; and surface-to-surface missiles like the C-802s that have already been used by Hezbollah. Rig owners are working with the IDF to counter the irregular threat, via armed teams on each platform and radars networked to Israel’s coastal defenses. They may need to take further steps with RWS emplacements and missiles, given rules that require enemies to close within 1/2 mile before defenders can open fire. Higher end threats are even more problematic, and aren’t much discussed here, but they exist. It’s a complex, multi-dimensional problem, and the solution will have to be multi-layered. One apparent error: the authors refer to “two state-of-the-art German-built MEKO class F221 frigates” as Israel’s choice. The F221 is FGS Hessen, a Sachsen Class advanced air warfare destroyer. First off, it isn’t part of the MEKO family, but a separate and more advanced class built in the context of trilateral cooperation between the Netherlands, Germany and Spain. They are top-end multi-role “frigates,” whose size and growth capacity for ballistic missile defense would make them destroyers if Europeans weren’t so averse to the term. It’s a very capable ship, but an unlikely choice. One ship of that class, with modifications, would eat most of Israel’s reported EUR 1 billion budget for 2. Sources: Forbes, “The Daunting Challenge Of Defending Israel’s Multi-Billion Dollar Gas Fields”. 2012 – 2013 Sa’ar 5 & Panther (click to view full) Dec 16/13: Strategic. Information Dissemination runs an analysis of Israel’s apparent interest in 2 high-end ships, which is a departure from their traditional focus on larger numbers of smaller vessels. The best that can be said for Jacob Stoil’s analysis is that it’s incomplete. He’s correct to say that this is a departure, and that presence matters, but he never looks at the regional changes underway, and the strategic imperatives created by new enemy capabilities and new Israeli needs. Then there are quotes like this one, which assume premises that turn out not to be true: “Israel clearly does not intend to use naval power to support land operations or develop independent strategic operations from the sea in a serious way. All of their naval procurement and training decisions over the last more than twenty years have made that impossible.” Sources: Information Dissemination, “Of Destroyers and Doctrine: An Evaluation of Israel’s Decision to Invest in Larger Hulls”. Dec 8/13: Germany. The newspaper Ha’aretz reports that Israel’s Defense Ministry is expected to ask the Finance Ministry for a ILS 3 billion budget increase (about $855 million/ EUR 624 million) to purchase 4 “missile boats” as a special buy outside the defense budget, for protection of Israel’s huge offshore natural gas fields. At the same time, the German Bild newspaper is reporting a different deal: 2 ships for EUR 1 billion. The Ha’aretz report does add that Israel continues to negotiate with American and South Korean suppliers, leaving the Navy’s plans characteristically unclear. What is clear is that there’s a big difference between the implications in the Israeli and German reports. EUR 156 million per ship will struggle to buy a ship like the K130 corvette, a surface warfare patrol ship with limited anti-aircraft capabilities, and no anti-submarine capabilities. They could form interesting flotilla dyads with the proposed Multi-role Super-Dvora, but submarine threats are rising in the Mediterranean. At EUR 500 million per ship, on the other hand, Israel would be looking at high-end MEKO Class frigates will a full range of capabilities, which would become the most advanced ships in their navy. The price would be more limited coverage, with just half the number of ships bought for slightly more money. Sources: Die Presse, “Israel konnte deutsche Kriegsschiffe kaufen” | Ha’aretz, “Defense Ministry seeking $853m to buy German missile boats” | AFP, “”Bild”: Deutschland verkauft Israel zwei raketenbestuckte Zerstorer” | N24, “Israel will Raketenschiffe aus Deutschland” (repeats Ha’aretz figures). Aug 10/12: South Korea. Israel Defense reports that South Korea is interested in Israel’s Iron Dome rocket defense system, and is negotiating for possible offsetting deals involving frigates for Israel. April 1/12: South Korea? Israel Defense reports that South Korea is offering to build new surface vessels for the Israeli Navy via Hyundai shipyards. South Korean representatives have reportedly visited Israel and met with the Ministry of Defense, and are said to be continuing discussions. The magazine reports that the offered ships had a displacement of just 1,300 tons, the same size as current Sa’ar 5 Eilat Class corvettes, and significantly smaller than South Korea’s new 2,300t FFX Incheon Class frigates. It didn’t say whether that displacement was measured at full load, after Israel radars, weapons, etc. had all been installed. Israel hasn’t set aside a budget for such vessels in its current plans, but ongoing discoveries of huge offshore oil and gas are changing its assessment of its security needs. Meanwhile, Israel Shipyards has reportedly proposed an alternative in which government re-investment would help them add hundreds of employees, invest in a new manufacturing layout, and build 2,100 ton “Saar 5.5” light frigates. They would then become an exporter, with the ability to field upgraded versions for Israel later on. The MoD has approached the Treasury about this plan, but it’s reportedly stuck, even as negotiations have stalled with the USA for a Freedom Class LCS derivative, and with Germany for a MEKO frigate derivative. 2009 – 2011 LCS too expensive; Talks center around German MEKO designs, incl. MEKO CSL; Israel may not have the budget to buy the ships it wants – but huge resource finds mean they may have to. MEKO 200TN (click to view full) November 2010: Leviathan. Israel’s giant “Leviathan” offshore natural gas field is discovered. The gas field is located roughly 130 km/ 81 miles west of Haifa, in 1,500 m/ 4,900 ft. of water. Estimated reserves are a stunning 500+ billion cubic meters, or more than 18 trillion cubic feet. Israel’s navy just became much more important. Giant offshore gas find July 25/10: MEKO. Hopes of German government subsidies to finance Israel’s MEKO buy appear to be fading, amidst the country’s tightening climate of austerity. From The Jerusalem Post: “The [Israeli] Defense Ministry statement came amid reports that Chancellor Angela Merkel’s government had decided to turn down an Israeli request for financial assistance in purchasing the Dolphin-class submarine and new [MEKO frigates]. In another rare statement, the German government, which rarely talks about defense sales, also denied it was holding talks with Israel on subsidizing new naval vessels… Israel had hoped to receive additional subsidies for two Meko-class ships it was interested in purchasing.” May 18/10: MEKO CSL? Aviation Week reports that Israel may become the launch customer for ThyssenKrupp’s new MEKO CSL. If true, the American Littoral Combat Ship’s price may end up spawning an international export competitor. The Meko CSL is only slightly smaller than the American LCS Freedom Class, at 108m/ 354 ft. long, with a beam of 21 meters and full-load displacement of 2,750 tonnes. Propulsion is by a combined diesel-and-gas (CODAG) water-jet system that cruises at 15 knots and reaches 40. Cruising speed range at would be about is 3,500 nautical miles, with 21 days endurance. The MEKO CSL variant adds improved stealth shapes and measures refined on Sweden’s Visby Class corvettes, and has several modular sections for faster swap-outs. An Israeli MEKO CSL would also contain a lot of local content, including IAI Elta’s MF-STAR active-array radar, the new Barak-8 medium range air defense missile, and Israeli electronic countermeasures systems, among others. The CSL does have a rear mission bay, and one of its roles would likely be as a hub for Israel’s advanced set of robotic UAVs and naval USV/UUVs. Jan 18/10: MEKO. Defense News reports that Germany and Israel are in talks concerning a $1.45 billion naval deal that would add 1 Dolphin Class submarine, and 2 MEKO-derived frigates as the beginning of Israel’s next-generation frigate program. Current reports do not see a January 2010 agreement as likely, and Defense News claims that Israel is asking Germany to pay for 33% of the cost as a German industrial stimulus program, just as it did with Israel’s previous 2-sub order. The MEKO ships would be Israel’s alternative to a very modified version of Lockheed Martin’s Littoral Combat Ship design, which Israel rejected due to its expected $700+ million cost. Even so, American components in the total naval package could reach up to $200 million. This is important because Israel can use US military aid dollars to buy them, instead of hard currency. Nov 25/09: German MEKOs? Reuters reports on negotiations between TKMS and Israel to buy up to 8 next-generation MEKO ships. “Built at ThyssenKrupp’s (TKAG.DE) Blohm+Voss shipyards in Hamburg, the Meko costs around $300 million but Israel wants the German government to underwrite the sale. An official involved in the talks said Israel sought a discount of 20 to 30 percent. That would help the Meko outprice the Littoral Combat Ship (LCS)… An Israeli official said despite the fact that U.S. defence grants would significantly defray the estimated $460 to $600 million cost of the LCS, the Meko topped the wish list. “We want to close a deal by the end of the year. Now it comes down to financing issues with the Germans,” he said.” Previous reports placed the LCS-I cost closer to $650-700 million. As was the case with the LCS-I, Israel is looking to incorporate a range of Israeli technologies and weapons into the frigates. Oct 15/09: TKMS + UAE. Blohm + Voss parent firm, ThyssenKrupp Marine Systems, sells an 80% share of all Blohm + Voss groups to the United Arab Emirates’ firm Abu Dhabi MAR, and makes future naval construction a 50/50 joint venture. It remains to be seen whether this will affect Israeli negotiations to use Blohm + Voss’ MEKO designs as the base for its future frigate. June 29-July 6/09: USA Out. Multiple sources report that Israel is abandoning the LCS-I design, owing to its high costs. Israeli estimates reportedly put the price of an LCS-I at over $600 million, a reasonable figure given the $650-700 million cost of the first 2 American ships, and LCS-I’s extensive Israeli equipment upgrades. Arutz Sheva: “As much as we sought commonality with the U.S. Navy, it became much, much more expensive than planned,” a naval source said. “At the end of the day, we had no choice but to face that fact that, for us, it was unaffordable.” Surprisingly, Israel also turned down a 2,300 ton Sa’ar 5.5/5B option from original Eilat class builder Northrop Grumman, owing to expected costs of about $450 million. Instead, Israel is reportedly looking at expanding cooperation with ThyssenKrupp Marine Systems (TKMS), whose HDW subsidiary builds Israel’s Dolphin subs. The idea is to build an advanced, stretched version of Blohm + Voss’ 2,200 ton MEKO A-100 corvette. The ship would add Mk 41 VLS cells, IAI’s Elta’s EL/M-2248 MF-STAR “Adir” active array radar, and other Israeli equipment. The Israelis reportedly believe they would be able to field such a capable ship for around $300 million, and that they can build it locally as a joint military/economic stimulus project. One source told Arutz Sheva (INN) that “We believe a strong case can be made for making this into a national project that fosters self sufficiency and provides all the economic benefits that come with creating a military shipbuilding industry.” TKMS would be the main design partner, IAI looks set to step into the role of overall systems integrator, and the likely shipbuilder would be Israel Shipyards in Haifa. Israel Shipyards have mostly focused on much smaller fast attack boats, but were also responsible for local integration of the Sa’ar 5 corvettes. This version of Israel’s next-generation ship project will face 2 main challenges. One is a technical/ engineering challenge. The other is financial. As one source told the Jerusalem Post: “The challenge will be to make a relatively small ship large enough to carry everything we need, including the radar system.” Given that the systems Israel wants usually equip 4,000+ ton ships, that challenge should not be minimized. TKMS’ Meko 200, in service with the Turkish and South African navies, does offer a 3,850 ton option, and the Israeli Navy is reportedly preparing to issue a design contract to IAI and TKMS subsidiary Blohm+Voss, in order to sort out their technical options. The financial challenge will be equally formidable. Both LCS-I and a Sa’ar 5.5 design could be purchased with American military aid dollars, which must be spent in America. Those agreements have provisions that allow up to 26% of that aid to be spent in Israel, but those funds are already committed to projects like an extended-range Barak anti-aircraft missile, IAI Elta’s MF-STAR active array radar, and other priority projects. There are 2 possible workarounds for this, and they are not mutually exclusive. One involves financing from other ministries beyond defense, as an industrial project that would provide employment, expand Israeli shipbuilding capabilities, and might even create an exportable platform if the right agreement is struck with TKMS. The second workaround involves using American aid dollars to cover some elements, like steel, American production of the Meko’s MTU1168 diesel engine by General Dynamics, etc., in order to reduce the hard currency price. That would help the project get approved, but it comes with a cost of its own – it would force the Israelis to labor under America’s cumbersome ITAR export approval laws whenever they or TKMS wished to sell the design abroad. If those conundrums cannot be resolved at an acceptable cost, a 3rd option may exist. Defense News adds that Israel might have driven down the Sa’ar 5.5’s price by $100 million if it had paid for a contract design/detail design process, and that option may return depending on how efforts with ThyssenKrupp Marine Systems progress: “When Northrop Grumman makes a fixed-price offer, it’s the result of an organized and serious process that allows the company to honor all of its commitments,” a company representative said. “Without conducting a contract design – which eliminates most of the uncertainties that drive up price – NG couldn’t offer the unit costs we all believed we could have delivered to the Israel Navy.” Sources: Arutz Sheva | Jerusalem Post | Defense News | Jane’s. LCS-I out; No NGC Sa’ar 5B either Feb 12/09: Industrial. The director of naval procurement at the Israeli Ministry of Defence’s purchasing mission in New York informs U.S. parties that a change in plans toward a different class of locally-built ships may be in the cards: “In the event this option turns out to be more suitable both in terms of our operational and budgetary requirements, the [multimission ships] will be built in Israel.” Source: Defense News June 2009 report. Feb 1/09: LCS-I. The Jerusalem Post reports that OC Navy Adm. Elazar Marom has dispatched a number of officers to the United States to sail on Lockheed Martin’s Freedom [LCS 1] and test its capabilities. The report adds: “In addition to reviewing the LCS – whose price has soared over the past year and now reportedly reaches $500 million – the navy is also considering downgrading its procurement plans and purchasing more Sa’ar 5-class missile ships… “There are a number of possibilities and they are under review,” one source said. “There are other possibilities such as more Sa’ar 5s, an upgraded Sa’ar 5 that would be called Sa’ar 5.5, or to wait for the LCS’s price to go down.” January 2009: Tamar. Noble Energy announces that exploratory drilling has found an offshore gas field about 80 km west of Haifa, in 1,700m / 5,600 ft. of water. The field is called Tamar. Eventual estimates for the area are a bit of a shock to the traditionally resource-poor Israelis: 200 billion cubic meters / 7.1 trillion cubic feet of natural gas. Giant offshore gas find 2006 – 2008 From studies to a formal LCS-I request. (click to view full) July 15/08: LCS-I. The US Defense Security Cooperation Agency announced [PDF] Israel’s official request for up to 4 Littoral Combat Ships (LCS-I variant), including the hull, and all mechanical and electrical functions. The ships will also include design and integration services, hardware and software, spare and repair parts, test and tool sets, personnel training and equipment, publications, U.S. Government and contractor engineering and logistics personnel services, and other related elements of logistics support. The estimated cost is $1.9 billion. Each ship will be equipped with: 2 MK-41 Vertical Launch Systems, with 8 launch cells for each system. This would allow the ship to hold and fire up to 16 SM-2/3 air defense missiles, or up to 64 RIM-162 Evolved Sea Sparrow Missiles. 1 Enhanced Harpoon Launching System with missile launchers. Harpoon is an anti-ship missile, but the latest versions can also be used to hit land targets. 1 Phalanx Close-In-Weapon System, Block 1A. This is surprising, as Block 1B adds important capabilities against the small boats that remain a concern for Israel. Israel is likely to bolt on other gun systems like RAFAEL’s Typhoon in order to cover that threat, but Israeli systems do not need to be specified in the DSCA announcement. 2 MK-32 triple-launcher Surface Vessel Torpedo Tubes, which handle lightweight torpedoes and launch them from on deck using pressurized air. Communications and Sensors, including Link 16. The same COMBATSS-21 Combat system used in American LCS designs. The smaller AN/SPY-1F (V) AEGIS radar, which is also used on Norway’s Nansen Class frigates. SPY-1F radars lack ballistic missile defense capabilities, but could be networked with other radars like Israel’s “Green Pine.” A MK-99 Fire Control System; or the Ship Self-Defense System (SSDS) now being installed on American Carriers, LHA/LHD ships, San Antonio Class LPDs, etc. The principal contractors will be: Lockheed Martin Maritime Systems and Sensors in Moorestown, NJ and Eagan, MN (LCS-I, SPY-1F radar, COMBATSS-21, Mk-41) General Dynamics Armament Systems in Burlington, VT (AEGIS illuminator, 20mm gun for Phalanx) Raytheon Company, Equipment Division in Andover, MA and Integrated Defense Systems in Waltham, MA (Phalanx, SSDS) The DSCA announcement says that the Israeli Navy will have no difficulty integrating these ships into its Naval forces, adding that this proposed sale will not require the assignment of any U.S. Government or contractor representatives to the Israel. LCS-I DSCA request Feb 6/08: LCS-I. The Jerusalem Post: “Looking to upgrade its sea-based capabilities, the Israel Navy has submitted a Request for Proposal (RFP) to the United States Navy for a new missile ship currently under development by Lockheed Martin Corp. The Defense Ministry said that the navy expects to receive a reply by April.” The report added a final caveat, but it doesn’t mean as much as it seems when set against a detailed ship design study, and accompanying industrial arrangements for an extensive array of Israeli equipment on board. That prior work and set of partnerships creates a strong pull toward the Team Lockheed design – one that will not be lightly broken: “While the navy has filed the RFP, defense officials said it was still not certain whether Israel would purchase the LCS from Lockheed Martin. As part of its multi-year plan finalized in September, the IDF decided to purchase two new ships, but did not state from which company.” September 2007: LCS-I. NAVSEA asks Lockheed Martin to conduct a 9-month, $2.5 million study of combat system integration for an Israeli LCS-I configuration. Systems that must be compatible with the combat system reportedly include Lockheed’s AEGIS SPY-1F radar and the Israeli Elta EL/M-2248 Adir radar, RAFAEL’s Typhoon remotely-operated gun/missile systems, Raytheon’s Standard SM-2 surface-to-air missile, and Israel Aerospace Industries’ Barak 1 and 8 anti-air missile systems. A Nov 12/07 Lockheed Martin release adds that: “During the nine-month combat system configuration phase, Lockheed Martin will examine the combat system performance of LCS-I using two different radar options: the advanced radar under development by Israeli Aircraft Industries (IAI) and Lockheed Martin’s SPY-1F radar. The team will examine the performance of these two radar options using the COMBATSS-21 combat management system integrated with the Israeli Navy Command and Control (IC2) system and develop the technical architecture, high level specifications and estimated costs to integrate COMBATSS-21 with IC2 and multiple Israeli and U.S. sensor and weapon systems including the MK 41 Vertical Launch System (VLS)… Lockheed Martin is currently partnered with Rafael Armament Systems, Elbit Systems and Ness on LCS-I.” Combat system study April 10/06: LCS-I. Lockheed Martin announces a $5.2 million NAVSEA study studied Team Lockheed’s LCS hull, mechanical, and engineering systems’ ability to accommodate the systems and weapons the Israelis want, while avoiding the need for major redesign of the USA’s basic configuration. The final answer was that it could, with some obvious modifications to accommodate better radars and vertical launch systems for missiles. Freedom Class LCS study Additional Readings & Sources Background: Israeli Sa’ar Vessels Israeli Weapons – Eilat Class Saar 5 multi-mission corvettes. Built by what is now Huntington Ingalls in the USA. Currently being refitted with the MF-STAR AESA radar, Barak-8 medium-range air defense missiles, and improved anti-ship/ land strike missiles. Naval Technology – Eilat Class Sa’ar 5 Multi-Mission Corvettes, Israel. Israeli Shipyards – SAAR Class Fast-Attack Vessel. The Sa’ar 4 and 4.5, which max. out at 500t, plus an abbreviated description of the the 800t SAAR S-72. They didn’t build the Sa’ar 5s, but are an option to build a “Sa’ar 5.5” design if Israel goes that route. Defense Update – Israel Shipyards Introduces the SAAR 72 Mini-Corvette Design. The 800t design sits somewhere between the existing Sa’ar 4.5 and Sa’ar 5 corvettes. From May 16/13. Israeli Weapons – Sa’ar 4.5. Currently being refitted with improved IAI ELM-2258 APLHA radars. Background: Other Ships DID – The USA’s New Littoral Combat Ships (LCS). ThyssenKrupp Marine Systems – Blohm+Voss Class 130 Corvette. Based on the MEKO 100, displacement 1,840t. Mostly surface warfare & point air defense. They carry 2 small heli-UAVs in a small hangar on board, and can accommodate medium helicopters on the deck. Naval Technology – K130 Braunschweig Class Corvette, Germany. Germany’s 5th and final ship entered service in March 2013. ThyssenKrupp Marine Systems – Blohm+Voss MEKO® A-200 Class Frigate. Naval Technology – MEKO A Class Combat Ship Family, Germany. ThyssenKrupp Marine Systems – Blohm+Voss Class MEKO® CSL Light Frigate. Modular design with a payload bay. DID – Korea’s New Coastal Frigates: the FFX Incheon Class. About 2,300t full displacement. Hyundai and Daewoo can go much bigger, of course, all the way up to their 4,800t KDX-II and 10,000+ tonne KDX-III destroyers that serve with the ROKN. They’ll also be working on an FFX Batch II class that’s expected to be larger, with an upgraded radar and Mk.41 VLS cells. Background: Ship Systems IAI Elta – ELM-2248 MF-STAR : MULTI-FUNCTION Surveillance and Threat Alert Radar. Has up to 4 fixed active array S-band tiles, with multiple digital beamforming capability. Each tile containing 16 Gallium Arsenide transmit/receive modules. A typical 3×3 m array weighs approximately 1,500 kg, and total weight below decks is about 900 kg for onboard equipment in 2 processing and 4 power supply cabinets. Liquid cooling is used. Defense Update – EL/M-2248 MF-STAR Naval Multi-Mission Radar. also known as “Adir,” and being fitted to Sa’ar 5 corvettes as part of a current upgrade. IAI – ELM-2258 ALPHA: Advanced Lightweight Phased Array Naval Radar. Significantly smaller than MF-STAR, uses a single rotating face. An upgrade for Sa’ar 4.5 FACs. Wikipedia – Gabriel (missile). Israel currently fields the Mk.IV (200 km range), and they’ve exported successive versions around the world. IAI – Advanced Naval Attack Missile. Effectively, the Gabriel Mk.V, but different enough to merit its own designation. IMI – Delilah-SL. The EO-guided Delilah is the IAF’s go-to missile for attacks against heavily defended targets, or targets that demand a high level of human judgement via a “man in the loop” feature. This ship-launched variant offers a 250 km range. IAI – Barak-1 Ship Point Defense System. DID – India & Israel’s Barak-8 SAM Development Project(s). Barak-8 is already being retrofitted to the Sa’ar 5 Eilat Class, along with an MF-STAR radar. News and Views Forbes (Jan 8/14) – The Daunting Challenge Of Defending Israel’s Multi-Billion Dollar Gas Fields. Information Dissemination (Dec 16/13) – Of Destroyers and Doctrine: An Evaluation of Israel’s Decision to Invest in Larger Hulls. Defense Update (Oct 14/12) – Israel Navy to Modernize Hetz Class Missile Boats with a New Radar. The Sa’ar 4.5 will get the EL/M-2258 ALPHA S-Band, electronically-steered, software-defined radar. It uses a number of MF-STAR technologies, but is adapted for small ships. Ha’aretz (July 9/12) – Israel Navy demands NIS 3 billion for protection of gas rigs. Defense Update (January 2010) – Israel Turns to Germany for Naval Stealth Ships. Israel switches gears. Report is focused on the MEKO, incl. the MEKO CSL. Defense News (Oct 22/07) – Lockheed Moves Forward With USN’s LCS. Jane’s Defence Weekly (Oct 11/07) – Reports that “[The Lockheed Martin LCS-I] design appears to be the most suitable for our needs,” a senior IN source told Jane’s…” View the full article
  3. Successor Class (click to view full) “We are committed to working towards a safer world in which there is no requirement for nuclear weapons… However, the continuing risk from the proliferation of nuclear weapons, and the certainty that a number of other countries will retain substantial nuclear arsenals, mean that our minimum nuclear deterrent capability, currently represented by Trident, is likely to remain a necessary element of our security.” — UK SDSR, 1998 Britain has a big decision to make: do they remain a nuclear weapons power, or not? In an age of collapsing public finances and an uncertain long-term economic future, the money needed to design new nuclear missile submarines is a huge cost commitment that could crowd out other needs. Then again, in an age of collapsing non-proliferation frameworks, clear hostility from ideologies that want nuclear weapons, and allies who are less capable and dependable, the downside of renouncing nuclear weapons is a huge risk commitment. Pick one, or the other. There is no free lunch. This article covers that momentous decision for Britain, and the contracts and debates associated with it. Contracts & Key Events HMS Vanguard (click to view full) Britain’s government took the first big steps in 2006-2007, a joint US-UK “Common Missile Compatment” (CMC) project was launched in 2008, and initial gate approval for Britain’s “Successor” project followed in 2011. Other contracts have followed, covering design, infrastructure, and even the new kind of nuclear reactor the submarines are expected to use. What hasn’t quite followed yet, is full approval to launch the build program. Note that the CMC sub-program, which is financed by the USA and UK, is covered in its own article. FY 2015 – 2020 RUSI November 3/20: AWE According to news reports, the UK Government will take back control of the Atomic Weapons Establishment (AWE) following a written ministerial statement by the Secretary of State for Defense Ben Wallace. The AWE designs, manufactures and supports the UK’s nuclear weapons. For two decades, it has been under privatized management. It is currently run by Lockheed Martin, Serco and Jacob’s Engineering, with Lockheed holding a majority stake in the management consortium. The establishment, based at Aldermaston in southern England, is at the core of British activities toward developing, producing and disassembling nuclear warheads for the Royal Navy’s fleet of Trident missile-armed submarines. Back in February 2020, the Ministry of Defense started the development of a new nuclear warhead to allow the Navy to field an effective deterrent for deployment on the new fleet of Dreadnought Class submarines due to start replacing the existing boats early in the next decade. June 12/20: Development General Dynamics Mission Systems won a $104.2 million deal for fiscal 2020-2023 Columbia (US01) and Dreadnought ballistic missile submarine class development, production and installation requirement. The Columbia Class program is meant to design and build 12 new ballistic missile submarines to replace the Navy’s current force of 14 aging Ohio Class boats. Dreadnought Class nuclear-armed ballistic missile submarines are being constructed by BAE Systems at its Barrow-in-Furness shipyard in Cumbria, UK, for the UK Royal Navy.The Dreadnought class will replace the Vanguard class submarines from 2028 onwards and will host the United Kingdom’s nuclear deterrent. Work will take place in Massachusetts, the UK, Rhode Island and Connecticut. Work is expected to be complete by November 2024. March 4/20: Sonar Suite And Above-Water-Sensor Systems Thales UK has been awarded contracts worth around $422.8 million to develop the sonar suite and above-water sensor systems for the new Royal Navy Dreadnought Class nuclear-powered ballistic missile submarines (SSBNs). Previously known as Successor, the Dreadnought submarine program is planned to replace the RN’s four existing Vanguard Class SSBNs – one for one, from the early 2030s – to maintain a posture of continuous at-sea deterrence. Manufacture work on the first two 17,200-tonne displacement boats is under way at the BAE Systems Maritime – Submarines’ Barrow-in-Furness shipyard facility in Cumbria. September 24/19: Logistics Engineering And Integration Support BAE System Technology Solution and Services won a $19.9 million modification to provide logistics engineering and integration support of the US Ohio Class and UK Vanguard Class Strategic Weapon System (SWS) platforms, including support of future concepts. The Vanguard class is a class of nuclear-powered ballistic missile submarines (SSBNs) in service with the UK Royal Navy. The Ohio class of nuclear-powered subs is the sole class of SSBNs currently in service with the USN. Work will take place within the US and estimated complete date is September 30, 2020. UK funds in the amount of $3,652,728, are being obligated on this award. August 26/19 HMS Valiant General Dynamics won a $64.8 million cost-plus-incentive-fee contract in support of the UK’s second hull of Dreadnought Class ballistic missile submarines, nuclear, recently named as HMS Valiant, and the UK Software Facility. The Dreadnought Class of submarines are set to gradually replace the four Vanguard Class boats from the early 2030s. Construction on HMS Dreadnought, the lead ship in the class, started in October 2016. The submersibles are 152.9m (501ft) long, displace 17,200 tonnes and will be armed with Trident II D5 missiles. The ships will be fitted with a new lighting system which can imitate night and day, making it easier for crew to get used to normal life after three months submerged. The HMS Valiant is the second Royal Navy Dreadnought Class submarine. Under the new contract, work will take place in Pittsfield, Massachusetts and estimated completion date is August 22, 2025. April 23/19: Missile Tubes General Dynamics won a $269.3 million contract modification from the US Navy in support of the UK Dreadnought fleet and the US Navy’s Columbia Class fleet ballistic missile submarine (SSBN). The modification includes the manufacturing of 42 missile tubes as well as missile tube outfitting material. The Dreadnought Class submarines, the future replacement for the Vanguard Class, will like their predecessors carry the Trident II D-5 missiles. The upcoming Columbia Class of nuclear submarines will replace the UGM-133 Trident II-armed Ohio Class. Work will take place in Rhode Island and Pennsylvania and is expected to be finished by May 2028. February 27/19: Maintenance Britain awarded Rolls-Royce a $307 million contract to maintain nuclear submarines. Until 2022, Rolls Royce will provide support and advice for systems on board the fleet of Trafalgar, Vanguard and Astute class submarines. The new deal, known as the Nuclear Propulsion Lifetime Management (NPLM) contract, forms part of a wider suite of contracts with Rolls-Royce to provide naval reactor plant design, support, advice and components to the submarine build program and provide enabling services such as infrastructure and IT. The British Defense Ministry also revealed the name of the third Dreadnought submarine, which will be called the HMS Warspite. The name Warspite goes back to 1595 and was the last “great ship” to be built during the reign of Queen Elizabeth I. The newest submarine is expected to see service in the early 2030s, and will be the eighth Royal Navy ship to carry the name Warspite. October 4/16: BAE Systems will commence work on the UK’s newest nuclear submarines following the release of nearly $1.7 billion in funds. The announcement was made by the Minister of Defence on Saturday after approval was given by MPs earlier this year. Known colloquially as the Trident system, the first of the Vanguard-class submarines will enter service in the early 2030s. March 10/16: Britain’s Ministry of Defense has confirmed that it is to invest £642 million (US $908 million) in preparation for the production of its new fleet of Trident missile-armed nuclear submarines. The funding had initially been set out in the government’s 2015 strategic defense and security review (SDSR), and will be spent on upgrading production facilities at BAE Systems’ Barrow-in-Furness nuclear submarine yard, essential long lead items for the submarines, and the nuclear propulsion program being led by Rolls-Royce. In total, the Successor submarine program is estimated to cost around $44 billion, with a contingency fund of $13 billion set aside for any emergencies that arise. December 15/15: The UK government may nationalize the nuclear submarine arm of Rolls-Royce as concerns grow that the company may be subject to a takeover bid by a foreign company. The news comes as Rolls-Royce has reported its fifth profit warning in 20 months as the company struggles to come to grips with its finances. While it’s not usually the Conservative Party’s style to nationalize, the company is integral to the development of the powering of the Trident nuclear deterrent system. Other alternatives may see a partial or full merger with BAE Systems, although this has already been mooted. Either way, David Cameron will be impatient to keep the firm within British control to protect UK interests and the security of the Trident program. FY 2014 Aug 21/14: Industrial. BAE is starting to demolish certain disused buildings at their Barrow-in-Furness site, as the 1st major stage in a large-scale 8-year industrial program. An old foundry and boiler shop are the first to go, and construction will eventually include: Refurbishment of the site’s main fabrication facility, together with its existing plant and machinery; An extension to the Devonshire Dock Hall construction facility to include a new state-of-the-art manufacturing and installation facility; An intent to build a 28,000 m2 off-site facility to store submarine parts and materials within the local area, for easier and faster access. Sources: BAE Systems, “Demolition Begins To Transform Submarine Building”. Feb 2/14: Politics. The buzz in Westminister is that Labour Party MPs are beginning to back away from their leader Ed Miliband’s support for the Successor Class. The erosion is serious enough that Conservative Party Defence Secretary Philip Hammond has told his junior ministers to lobby the shipbuilding unions and have them firm up Labour Party support. The Liberal Democrats are openly against the project, but the Labour Party doesn’t want to head into the next election on a pledge to abandon Britain’s deterrent. Neither does the Conservative Party, despite reservations in some of its own quarters. Labour’s Miliband voiced his public displeasure over the perceived interference in his party’s affairs, but he has no way to block discussions with the shipbuilding unions. Sources: The Guardian, “Lobby ship unions over Trident, Philip Hammond tells ministers”. Jan 31/14: RUSI Report. RUSI releases a report that looks at how a smaller or less active SSBN force would affect Britain’s deterrent, compared to the current arrangement of Continuous At-Sea Deterrence (CASD) that ensures at least 1 submarine ready at all times. A number of proposals are in play politically: “At lower readiness, the ‘preserved deterrence’ posture presented in the TAR and the ‘contingency’ posture proposed elsewhere by the Liberal Democrat Party would have no nuclear platforms deployed on a day-to-day basis, and would only have the ability to reconstitute a force over a limited period of time (in the case of ‘preserved deterrence’, a matter of years).19 At medium levels of readiness, the ‘sustained’ or ‘responsive’ postures presented in the TAR would have nuclear-armed submarines patrolling on a day-to-day basis, interrupted by voluntary periods of inactivity of varying length (the former permitting fewer and shorter interruptions than the latter). At higher levels of readiness, the ‘focused’ posture would maintain back-to-back patrols, interrupted only for periods of technical or personnel recuperation.” RUSI’s conclusion is that the lowest-readiness option, and proposals that would cut the submarine force to just 2 boats, are problematic because of the breadth of gaps and/or lag time they create. Medium levels of readiness, or a fleet of 3 boats, might work, but it means the UK has to change from deterrence as an undefined concept and invisible non-factor in crisis escalation. Instead, the need to activate the deterrent would require a very clear doctrine of deterrence and escalation that would play a significant role in future crises. This state of affairs also adds opportunities for British politicians to bungle things beforehand by ignoring vital signals, or create big problems during a crisis by managing their suddenly-public moves badly. Based on the historical record, RUSI is more complacent about future governments’ handling of such things than they ought to be. Britain will also have to worry about rushed moves causing a submarine-related accident, and about the morale and readiness rot that afflicts personnel who see themselves as a sideline. RUSI uses the USA’s ICBM missile force as a negative example. Sources: RUSI, “A Disturbance in the Force: Debating Continuous At-Sea Deterrence” (see Additional Readings). Key report 2013 Long-term nuclear infrastructure deal; Political turbulence in Scotland, Labour Party, and even the Conservative Party; Small long-lead buys begin. Vanguard Class SSBN (click to view full) Dec 16/13: Procurement begins. GBP 79 million is a drop in the ocean for this program, but the UK MoD has begun the process of ordering known early-build items items like structural fittings, electrical equipment, castings and forgings, etc. The GBP 79 million in contracts are actually a set of 2, both awarded to BAE Systems Maritime – Submarines. The Ministry of Defence also releases the 1st conceptual graphics of the Successor Class design, based on work done to date. At this stage, they don’t show much and shouldn’t be expected to. Sources: UK MoD, “News story: New investment in Successor submarines” | Royal Navy, “£79m investment in next generation nuclear submarines” | BAE, “First Successor procurement contracts awarded”. Dec 15/13: Doubts. Former defense minister James Arbuthnot [Cons. – North East Hampshire], who chairs Parliament’s Defence Select Committee, tells the Guardian that he’s concerned about the UK armed forces, and is less sure that maintaining Britain’s nuclear deterrent is a good idea. He isn’t suddenly becoming a pacifist. Rather: “Nuclear deterrence is essentially aimed at states, because it doesn’t work against terrorists. And you can only aim a nuclear weapon at a rational regime, and at rational states that are not already deterred by the US nuclear deterrent. So there is actually only a small set of targets. “With the defence budget shrinking, you have to wonder whether [replacing Trident] is an appropriate use of very scarce defence sources. You have to wonder whether nuclear deterrence is still as effective a concept as it used to be in the cold war…. [If Russia wanted to attack, they] would organise for a terrorist group to put a nuclear weapon on a container ship and sail it into Tilbury docks, with the signature of Pakistan on the nuclear device. And what would the UK do? Launch a missile at Islamabad? We could not be sure against what we are retaliating. Nuclear deterrence does not provide the certainty that it seemed to in the past. It’s not an insurance policy, it is a potential booby trap.” On the other hand, can Britain assume that the US nuclear deterrent will remain reliable over the next 50 years? The last half decade has greatly frayed their relationship, and the USA faces significant financial challenges of its own. Arbuthnot says he would still vote in favor of renewing Trident, but the extent and content of his reservations suggest that a “Syria moment” over nuclear weapons remains a possibility in Parliament. Sources: The Guardian, “Tory ex-defence minister voices doubts over need for Trident replacement”. Oct 6/13: Not good. The Independent newspaper reports that a 90-minute breakdown of all reactor coolant supply at Devonport dockyard’s Tidal X-Berths in Plymouth, UK nearly led to a major nuclear incident. Based on a heavily redacted report from the Ministry of Defence’s Site Event Report Committee (SERC), both the electrical power for coolant supply to docked nuclear submarines, and the diesel back-up generators, failed at the dockyard on July 29/12. That failure followed a similar failure involving HMS Talent in 2009, and a partial failure involving HMS Trafalgar in 2011. The newspaper adds that an internal Babcock investigation blamed the incident on the central nuclear switchboard, but added a note of concern about “inability to learn from previous incidents and to implement the recommendations from previous event reports.” This will not help existing uneasiness over the next generation of nuclear submarines, and “Nuclear scare at Navy submarine base after ‘unbelievable’ failures” adds that: “Its own “stress test” on Devonport safety, launched after the Fukushima disaster, said that in the event of the failure of both power supplies, heat levels in reactors could be controlled by emergency portable water pumps, and added that such a failure had occurred a “number of times” previously.” Dockyard failure Oct 3/13: SSE. Babcock announces an unspecified contract from BAE Systems for the System Design phase of a new model of Submerged Signal Ejector (SSE Mk.12). It follows Babcock’s October 2012 system definition contract for the Successor Class’ WHLS (tactical weapons handling and launch) and SSE, thanks to a recent and successful concept review. An SSE’s self-contained launch tubes sit in the submarine’s external under-casing, and are used for more than just communications beacons. Decoy devices, bathythermograph sensors, flares, and escape signals are all options for the SSE, hence Babcock’s description of it as a “first level system.” Babcock has extensive experience in SSE design and has been heavily involved in designing and making all UK SSE systems. Sources: Babcock International release, Oct 3/13. March 19/13: Politics. With an SNP-sponsored debate on Trident set to take place in the Scottish Parliament this week, a Labour Party that depends on its advantage in Scotland needs to be clear on its policy. British media are reporting that the Labour Party is looking to backtrack slightly, and propose replacing the 4 Vanguard Class submarines with just 3 successors. Labour Shadow Defence Secretary Jim Murphy continues to support the idea of a Trident replacement, saying that: “North Korea is trying to develop nuclear weapons, as is Iran. If they do, then Saudi Arabia and Turkey may do the same. The UK shouldn’t just give up our nuclear deterrent by ourselves…. The precise shape of the future deterrent will be based on capability and cost.” See: UK BBC | Daily Record | The Guardian | The Telegraph | left-wing New Statesman magazine. March 7/13: Scotland. With a 2014 referendum looming that could deprive the UK of its nuclear submarine base in Scotland, Britain’s House of Commons Scottish Affairs Committee weighs in. Bottom line? The SNP seems to have taken a leaf from their counterparts in Quebec, Canada, and decided to be extremely vague regarding their plans in a potentially controversial area. After all, 6,700 work at Falsane and Coulport now, which is expected to rise to 8,100 after they house all of Britain’s Astute and Trafalgar Class boats and other facilities. Parliament will be pressing the issue hard and publicly: “Unfortunately, the Scottish Government has gone on evasive manoeuvres over the issue of what they will really do in the event of Separation. Their response dodges the central question, which is what they really mean by their stated policy of the ‘speediest safe transition’ of Trident from Scotland. As we said in our report, in reality, Trident can be deactivated within a matter of days and the warheads removed from Scotland within twenty four months. In the process, the UK would lose the ability to operate its nuclear deterrent. Alternatively, it would take approximately 25 years for new facilities to be created elsewhere in the UK. We believe the Scottish Government must be honest and open about their intentions. Tomorrow we will be taking evidence from the Convener and Shop Stewards at the Coulport and Faslane. They represent the workers who will bear the brunt of job loss…” Really? 25 years? If so, the whole issue of the Successor Class could become moot very quickly. Which would be fine with the SNP, who want to eliminate the Trident program if Scotland does vote to stay in the UK. Expect to hear more of this sort of to-and-fro, what with another 5,000 jobs on the line in shipbuilding, 15,000 in the UK government 4 Army infantry battalions, 2 Royal Marine Commando units and 5 squadrons of Tornado and Typhoon fighter aircraft in Scotland. UK HoC | SNP | Aviation Week | The Scotsman. Feb 13/13: Reactors. The UK MoD signs a 10-year, GBP 800 million (then about $1.2 billion) contract with Rolls Royce, financing the Submarines Enterprise Performance Programme (SEPP) envisioned in the 2010 SDSR. The goal is to consolidate costs under one contract with consistent incentives, and improve operational efficiency in the infrastructure that delivers and supports the UK’s naval nuclear propulsion systems. They’re hoping for a GBP 200 million saving over this 10 years. Time will tell. SEPP isn’t technically part of any one program. Contracts for products and services to deliver and support the submarine programs themselves will continue in parallel. Royal Navy | Rolls Royce. Jan 25/13: Electrical. HMS Vengeance’s GBP 350 million Long Overhaul Period and Refuel (LOP(R)) will feature a switch that’s likely to be a precursor for Britain’s next-generation SSBNs. Vengeance is replacing the maintenance-heavy rotating machinery of motor generators (MGs) with fixed solid-state Main Static Converters (MSCs), as a key component of the boat’s electrical system. The new MSCs are derived from the system developed for Britain’s Astute Class SSNs, but adapted for the higher power requirements of an SSBN. They also had to be smaller, due to space limitations in the Vanguards. Finally, they had to successfully integrate into the Vanguard submarines’ existing electrical, control, and coolant systems. Installations have now begun, and a modified version is almost certain to to be part of Britain’s Successor Class. Its designers are likely to be watching the MSCs’ performance in the Vanguards closely. Babcock, via ASD. 2012 Design contracts; Reactors. click for video Dec 18/12: The British Ministry of Defense submits its 2012 report to Parliament [PDF] on the future nuclear deterrent, noting the ramp up in public and private resources via an Integrated Programme Management Team (IPMT). A whole boat System Definition Review is scheduled to take place in 2013. With respect to the big items: “Of the [GBP] 3Bn we plan to spend in the Assessment Phase, the expenditure to the end of Financial Year 2011/2012 has totalled [GBP] 315M. This is some [GBP] 30M lower than expected at the time of the Initial Gate approval, principally as a result of slower than expected manpower build-up in our Industrial partners… still expects to deliver the Assessment Phase within the approved cost of [GBP] 3Bn… Current forecast costs, including planned SEPP efficiency measures, indicate that we remain within the 2006 White Paper estimates of [GBP] 11-14Bn (at 2006/7 prices) for the Successor platform costs (assuming a four boat fleet). The 2006 White Paper also recognised that investment of [GBP] 4-6Bn (at 2006/7 prices) would be required for supporting infrastructure and a replacement warhead ([GBP] 2-3 Bn for each element). As set out in the 2011 report, the MOD plans to spend some [GBP] 8M between 2011 and 2013 assessing the requirement for additional infrastructure investment. The 2011 report also noted that a decision on whether to refurbish or replace the existing warhead design could be deferred until the next Parliament, as the current warhead design is now planned to continue in service until the 2030s.” Oct 29/12: Design contracts. The UK commits GBP 350 million to design their next-generation SSBN submarine, which will incorporate CMC. The work will be divided GPB 315 million to BAE Systems, who already has over 1,000 people working on this program, and a further GBP 38 million to Babcock. This award is part of the GBP 3 billion design phase (vid. May 18/11 entry). The current Vanguard Class submarines are scheduled for replacement from 2028, and Britain is busy moving its entire submarine force to Falsane in Scotland, which will grow to 8,000 jobs by 2017. Deputy Prime Minister Nick Clegg, who leads Britain’s Liberal Democrat party, angrily denounced the way the move was presented by the government. The government presented it as another step toward renewing the submarine deterrent, but Clegg sees that as ‘jumping the gun.’ His party has set up a review that’s looking at options like shorter-range cruise missiles launched from the torpedo tubes of existing Astute Class fast attack submarines, or to air-launched nuclear missiles. UK MoD | BAE Systems | UK’s Daily Mail. June 18/12: Reactors. Britain’s Ministry of Defense signs a GBP 1.1 billion contract with Rolls Royce for submarine nuclear reactor cores, (GBP 600 million) and industrial investment in the Raynesway plant that manufactures them (GBP 500 million). The contracts will secure 300 jobs at Rolls-Royce. The nuclear reactor cores will be used to power the 7th and final SSN Astute Class fast attack submarine, and the 1st of the Royal Navy’s next generation of SSBN nuclear deterrent submarines, currently known as the Successor Class. Rolls Royce is the sole Technical Authority for the UK Nuclear Steam Raising Plant, whose reactors have powered British nuclear-powered submarines for the past 50 years. The GBP 500 million infrastructure contract aims extend the operating life of the Rayneway plant in Derby, UK, by more than 40 years. Rolls-Royce will continue to maintain and operate its existing reactor core manufacturing facility, while undertaking a parallel phased rebuild and modernization of buildings on site. UK MoD | Rolls Royce | The Telegraph. May 22/12: Design contracts. The UK MoD issues a series of design phase (vid. May 18/11 entry) contracts for its next-generation “Successor” Class SSBNs, while re-iterating that a decision on the final design and build contracts won’t be made until 2016. The design work has to be done, or it would be impossible to make an informed decision about costs. BAE Systems Maritime – Submarines receives the main design contract, worth GBP 328 million. Babcock receives a GBP 15 million contract to focus on designing parts of the in-service support program. Rolls Royce receives over GBP 4 million to integrate a new reactor design into the submarine. The reactors themselves will be separate design/ build contracts. May 15/12: 5 bn for AWE. The UK MoD announces a multi-billion pound agreement with the AWE Management Limited (AWEML) joint venture, which manages Britain’s Atomic Weapons Establishment. The AWEML joint venture includes Jacobs Engineering, Serco and Lockheed Martin, and they signed the current 25-year management contract in 2000. Scientists at the AWE’s Berkshire sites are involved from the initial concept and design of British nuclear warheads, through manufacture and support, to their decommissioning and disposal. Under the agreement, the ministry will invest GBP 1 billion a year over the next 5 years in skills and facilities at the company’s Aldermaston and Burghfield sites in Berkshire, where more than 4,500 staff are based. Around 40% cent of this money will be invested in essential capital projects, including production and research facilities. The remainder will be spent on operating and maintaining the AWE. 2010 – 2011 Initial Gate. SDSR. UK Trident launch (click to view full) May 19/11: Initial Gate. The British government approves the initial Successor Class assessment phase, known as Initial Gate. This allows a design phase to begin that could be worth up to GBP 3 billion. The new submarine class will retain the current Trident II D5 missiles, and introduce a PWR3-based passive cooling nuclear reactor design for the Royal Navy. The cost for 4 boats is estimated to be GBP 15-20 billion at 2006/7 prices, but the final decision to build 3 or 4 submarines will be taken in 2016. UK House of Commons, “Statement on the Nuclear Deterrent.” | UK MoD. Design Phase approved March 23/11: New reactor? Britain is reportedly shifting toward the passive-cooling PWR3 nuclear reactor design for its future SSBN nuclear missile submarines. The PWR2 design used in its SSBN Vanguard Class, as well as the SSN Trafalgar, and new SSN Astute Class fast attack boats, reportedly shares unwelcome features with the Fukushima reactors, in that they entirely on back-up power supplies to provide emergency cooling in the event of an accident. In contrast the PWR3, which is widely used in modern US nuclear submarines, uses “passive” cooling. That makes it less reliant on back-up power, and offers additional methods of injecting coolant into a reactor. www.guardian.co.uk/uk/2011/mar/23/navy-submarines-nuclear-reactors Oct 18/10: SDSR Britain’s new government releases its 2010 Strategic Defense and Strategy Review [PDF]. With respect to its future SSBNs, the government intends to move forward, but: “Under the 1958 UK-US Agreement for Cooperation on the Uses of Atomic Energy for Mutual Defence Purposes (the ‘Mutual Defence Agreement’) we have agreed on the future of the Trident D5 delivery system and determined that a replacement warhead is not required until at least the late 2030s. Decisions on replacing the warhead will not therefore be required in this Parliament. This will defer £500 million of spending from the next 10 years. We have also reached agreement with the US over the size of the missile tubes in the new submarines; this has enabled us to reduce the cost of the submarine missile compartment by up to [GBP] 250 million. As a result of our value for money review, we will reduce the number of operational launch tubes on the submarines from 12 to [8], and the number of warheads from 48 to 40, in line with our commitment vigorously to pursue multilateral global disarmament. This will help reduce costs by [GBP] 750 million over the period of the spending review, and by [GBP] 3.2 billion over the next ten years. ‘Initial Gate’ – a decision to move ahead with early stages of the work involved – will be approved and the next phase of the project will start by the end of this year. ‘Main Gate’ – the decision to start building the submarines – is required around 2016.” There is tension in the governing coalition between Conservative party members, who want to maintain the deterrent, and the Liberal-Democrat party members, who do not. SDSR 2006 -2009 Concept designs. Integrated project team. Vanguard cutaway (click to view larger) March 19/09: Report. Edward Leigh MP, Chairman of the Committee of Public Accounts, makes a statement as the committee publishes “The United Kingdom’s future nuclear deterrent capability” : “The Department’s timetable for completing the design and build process for the replacement submarines is extremely tight. It has 17 years to do it, even though the Department itself accepts that such a process usually cannot be completed in under 18. The MOD’s track record in delivering major defence projects on time is not exemplary. The MOD must make absolutely fundamental decisions about the design of the new submarines by September of this year. These include the main design features; whether to develop a new type of nuclear reactor requiring substantial research and development; and, crucially, the design and size of the missile compartment.” Oct 26/07: Concepts. BAE presents 2 SSBN concept designs at DSEi 2007, labelled Concept 35 and Advanced Hull Form (AHF). Concept 35 is an evolution of the SSBN Vanguard Class and SSN Astute Class. The Advanced Hull Form uses a broad y-shaped stern with twin propulsor shrouds, which reportedly houses much of the boat’s machinery outside of the pressure hull. See Beedall for pictures. Oct 18/07: IPT opened. BAE Systems announces that Rear Admiral Paul Thomas CB, FREng chairman of the defence nuclear safety committee, has officially opened the Future Submarines (FSM) Integrated Project Team office at Barrow-in-Furness. “This element of the Future Submarines IPT will be based on the BAE Systems Submarine Solutions site and will be manned by a collaboration of up to 128 personnel made up from the Ministry of Defence, BAE Systems, Rolls Royce and Babcock Marine. Working with the FSM IPT office in the MoD’s Abbey Wood offices, the team will, over the next two years, develop a concept design for the submarine component of the future deterrent programme.” March 4/07: Vote. Britain’s Labour government wins a 409 – 161 vote to build a new SSBN successor the Vanguard Class. 95 Labour Party MPs vote “no,” but the motion passes with the support of most Labour Party MPs and Britain’s Conservative Party. Britain’s Liberal Democratic Party, Green Party, and Scottish National Party are all opposed as matters of party policy. BBC | The Guardian | The Telegraph. Commons vote Dec 4/06: Britain’s government releases “The Future of the United Kingdom’s Nuclear Deterrent” [PDF] white paper, and decides to maintain the UK’s nuclear deterrent. That will mean building a class of 3 or 4 SSBNs, to replace the current fleet of 4 Vanguards. White Paper Additional Readings UK SSBNs BAE – Successor. Navy Matters – Future Submarines. DID – CMC Program to Define Future SSBN Launchers for UK, USA. DID – Trident II D5 Missile: Keeping Up with Changing Times. DID (March 27/12) – GBP 350M for Final Refit of UK’s Vanguard Nuclear Missile Subs. Final? Other refits may be needed in future, in order to keep the Vanguards in service until the new submarines arrive. These will be the last British nuclear submarines to require a Long Overhaul Period and Refuel (LOP-R) during their service lives. The New PWR2 Mk.2 reactor in refitted Vanguard and current Astute submarines, and the PWR3 reactors in the new submarines, will last for the submarine’s entire lifetime. Official Reports UK Ministry of Defence (Dec 18/12) – The United Kingdom’s Future Nuclear Deterrent: 2012 Update to Parliament [PDF]. UK Parliament (May 19/11) – Statement on the nuclear deterrent. UK Committee on Public Accounts (March 19/10) – The United Kingdom’s future nuclear deterrent capability. UK Defence Committee (May 24/07) – The Future of the UK’s Strategic Nuclear Deterrent: the White Paper: Government Response to the Committee’s Ninth Report of Session 2006-07. UK Defence Committee (Dec 19/06) – Fourth Report of Session 2006-07, The future of the UK’s strategic nuclear deterrent: the manufacturing and skills base, HC 59. UK MoD (2006) – The Future of the United Kingdom’s Nuclear Deterrent: Defence White Paper 2006 [PDF]. News & Views RUSI (January 2014) – A Disturbance in the Force: Debating Continuous At-Sea Deterrence [PDF]. See also their release, complete with YouTube video. Naval Technology (July 30/13) – Deep impact: inside the UK’s new Successor-Class nuclear submarine. RUSI, on TouTube (July 16/13) – Danny Alexander on the Trident Alternative Review [59:14]. LabourList beta (Jan 29/13) – Will Trident split the Labour Party in half?. RUSI (July 29/10) – Like for like renewal of Trident will come at expense of conventional forces. View the full article
  4. More evidence that we need a new "elite" and our defense and diplomacy nomenklatura is worm-ridden with people better suited for anything else. Few thing are more cost effective and strategically additive than our military attaché cadre. If anything, it should be expanded and being one made a top-shelf career enhancer than its status today. When done and funded correctly, attachés can be instrumental in helping build partnerships and relationships throughout the world that can pay orders of magnitude greater returns down the road. We have a huge military and as a former manpower guy, I see this for exactly what it is - screwed up priorities and myopic leadership. The Pentagon has quietly begun withdrawing top military officers from U.S. embassies in Africa and downgrading other such posts world-wide, a move officials say is necessary to shift resources to counter China and Russia on the geopolitical stage and meet congressional caps on the number of generals and admirals in the U.S. military. The position of defense attaché, the senior U.S. military representative in American diplomatic posts, is being downgraded in rank in eight key allied countries—including the U.K. ... What a bullsh1t excuse. I've held for a long time that at the Department of State and The Pentagon, we have too few leaders that have anything but a JPME-thin understanding of demographics and economics. As a result, we have a choppy and spotty record seeing larger trends that should inform our national strategy. Instead of setting a sound framework to prepare for what is clearly coming, we spasmodically run blindly through a field of rakes and wonder why our nose keep getting bloodied and teeth chipped. Building partnerships in Africa and having our best eyes and ears there are the best ways to "counter China and Russia" on the continent. Our GOFO bloat is not from our embassies. In most of our allied countries (NB: those outside Africa), you have to be a General or Flag Officer in order to have any kind of diplomatic heft or to build the relationships you need at that level. Anyone who has served in such a capacity or for someone who has can tell you this, but it appears those people are not driving this clown car. Give me the charter and a team of 4-6 that I get to choose, all the UIC manning documents I'll request, and I'll find the manpower funding in a weekend to make sure we have what we need to keep and expand this unalloyed positive asset. Better yet, the larger DOD won't even notice what I took away to do it. A lot of unnecessarily stupid things have been done the last decade or so to hobble the future - you can add this own-goal to the list. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=46x4dcMeFjA:359JOOSgoe0:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=46x4dcMeFjA:359JOOSgoe0:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=46x4dcMeFjA:359JOOSgoe0:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=46x4dcMeFjA:359JOOSgoe0:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/46x4dcMeFjAView the full article
  5. Americas Lockheed Martin won a $73.9 million modification, which exercises an option to provide continued F-35 development lab infrastructure activities as well as recurring administration, maintenance and preparation of the F-35 laboratories to test developed configurations across the F-35 platform. The F-35 Lightning II joint strike fighter (JSF) is a stealthy, supersonic multirole fighter. Work will take place in Texas and is expected to be finished by October 2021. The US Air Force awarded Raytheon a $192 million deal or Advanced Medium Range Air-to-Air Missile (AMRAAM) field team and lab support. This contract provides support for the AMRAAM system development test activities to include laboratory management, field-team test support, testing and analysis. The AIM-120 advanced medium-range air-to-air missile (AMRAAM) is a new generation all-weather, missile manufactured by Raytheon. MRAAM incorporates active radar seeker with mid-course inertial navigation making it less dependent on aircraft’s fire control radar. That capability enables simultaneous AMRAAM launching against different targets. Work will take place in Arizona, Texas, Missouri, Washington, California and Florida. Estimated completion date is September 30, 2030. Middle East & Africa Israeli news site Globes says that “several Gulf States” have expressed interest in buying defensive equipment from Rafael. These countries are keen to buy missile defense systems to defend their oil installations from missile attacks. They are also looking at the Trophy active protection system for armored vehicles. These contacts are taking place against the background of the involvement of the UAE and Saudi Arabia in the civil war in Yemen on the side of the government, against the Houthi rebels, who are supported by Iran, says „Globes“. Forces of the Gulf states are fighting in this conflict in the air, on land, and by sea, and the Israeli systems could be very useful. Europe Russia’s Aerospace Force successfully tested the 53T6M anti-ballistic missile interceptor at the Sary-Shagan proving ground in Kazakhstan, Tass reports. The new interceptor missile of the ABM system reliably confirmed its stated characteristics. “The combat team of the Aerospace Force’s air and anti-ballistic missile defense troops successfully conducted the next test-launch of a new missile of the Russian anti-ballistic missile (ABM) defense system at the Sary-Shagan proving ground (the Republic of Kazakhstan),” the Russian defense ministry said in a statement. Last time, Russia’s Defense Ministry reported about the test-launch of a new interceptor missile from the Sary-Shagan proving ground on July 2, 2019. Asia-Pacific The Defense Security Cooperation Agency announced that the US State Department recently approved the potential sale to Australia of more than $46 million worth of Javelin anti-tank guided missiles. The complete package includes two hundred Javelin FGM-148E missiles with US Government technical assistance and other related elements of logistics and program support. According to a notice released on October 30, the proposed sale will support the foreign policy and national security objectives of the United States. Australia is one of our most important allies in the Western Pacific. A new warship being considered as a replacement for Japan’s Aegis Ashore proposal will be the largest guide missile destroyer for the Japan Self-Defense Force if the project goes ahead. The new warship will be based on the Maya Class but its displacement will be increased to 9,000-tons and the dimensions will be longer. This is to create a better living environment for the crew. Today’s Video Watch: UNITED STATES WILL DEPLOY COAST GUARD SHIPS IN THE WESTERN PACIFIC TO TAKE ON CHINESE MILITIA ! View the full article
  6. I find it interesting what parts of our history people like to bring up ... and why. Often what is even more interesting is what they don't bring up ... and why. One American hero you hadn't heard too much the last half year or so is Sergeant William Carney, United States Army. In March 1863, Carney joined the Union Army and was attached to Company C, 54th Massachusetts Colored Infantry Regiment, the first official black unit recruited for the Union in the north. Forty other black men served with him, including two of famed abolitionist Frederick Douglass' sons. Within a few months, Carney's training would be put to the ultimate test during the unit's first major combat mission in Charleston, South Carolina. On July 18, 1863, the soldiers of Carney's regiment led the charge on Fort Wagner. During the battle, the unit's color guard was shot. Carney, who was just a few feet away, saw the dying man stumble, and he scrambled to catch the falling flag. Despite suffering several serious gunshot wounds himself, Carney kept the symbol of the Union held high as he crawled up the hill to the walls of Fort Wagner, urging his fellow troops to follow him. He planted the flag in the sand at the base of the fort and held it upright until his near-lifeless body was rescued. Even then, though, he didn't give it up. Many witnesses said Carney refused to give the flag to his rescuers, holding onto it tighter until, with assistance, he made it to the Union's temporary barracks. Carney lost a lot of blood and nearly lost his life, but not once did he allow the flag to touch the ground. His heroics inspired other soldiers that day and were crucial to the North securing victory at Fort Wagner. Carney was promoted to the rank of sergeant for his actions. For his bravery, Carney was awarded the Medal of Honor on May 23, 1900. He was 23. What was his reference point? Carney was born into slavery in Norfolk, Virginia, in 1840. His family was eventually granted freedom and moved to Massachusetts Carney died at the Boston City Hospital on December 9, 1908, of complications from an elevator accident at the Massachusetts State House, where he worked for the Department of State. His body lay in repose for one day at the undertaking rooms of Walden Banks, 142 Lenox Street, at the wish of his wife and daughter. He was buried in the family plot at Oak Grove Cemetery in New Bedford, Massachusetts. Engraved on his tombstone is an image of the Medal of Honor. I wonder what Sgt. Carney would think of 2020 America and how some treat our flag today - and why. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qzLkIw-F_BQ:HrSyggcypwI:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qzLkIw-F_BQ:HrSyggcypwI:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qzLkIw-F_BQ:HrSyggcypwI:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=qzLkIw-F_BQ:HrSyggcypwI:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/qzLkIw-F_BQView the full article
  7. Americas DRS Systems won a $10.5 million contract modification for an engineering change to the Energy Magazine Prototype design for the DDG51 Class destroyer program. This award is for an engineering change proposal of the Energy Storage Module that will provide capability to supply power to a directed energy load and includes design, build and testing for a total of two prototype units. The Arleigh Burke (DDG 51) Class guided missile destroyers provide a wide range of warfighting capabilities in multi-threat air, surface and subsurface environments. Arleigh Burke class destroyers are equipped with the Navy’s Aegis Weapon System, the world’s foremost integrated naval weapon system. When integrated with the Aegis Combat System, the Cooperative Engagement Capability (CEC) will permit groups of ships and aircraft to link their radars to provide a composite picture of the battle space, effectively increasing the theater space. The capability is designed to provide the Navy with a 21st century fighting edge. Work under the current modification will take place in Wisconsin and is expected to be finished by June 2022. Lockheed Martin won a 9.8 million order, which provides non-recurring engineering for the production of target designator sets and electro-optical in support of AH-1Z Light Attack helicopters for Foreign Military Sales customers. Contracting activity is the Naval Air Systems Command. The US Marine Corps just recently completed its transition from the AH-1W Sea Cobra attack helicopter to the AH-1Z Viper. The Viper includes new propulsion, fire control, and sensor improvements. The Viper also comes with a fully integrated glass cockpit, third-generation fire control system, new transmission, upgraded landing gear, and improved weapons-carrying capabilities. Work under the order will take place in Florida and estimated completion will be by November 2022. Middle East & Africa According to „Israel Defense“, Israel’s MCTECH completed the process of supplying dozens of MC-60P explosive device jammers to a military customer in Southeast Africa last month. MCTECH specializes in the design, development and manufacturing of high-end radio frequency jammers. Reportedly, the MC-60P, developed and manufactured by MCTECH Laboratories, is a modular and portable system that can be quickly deployed or operated while in motion. Its function is to protect troops, explosive ordnance disposal operators and other security forces from radio-controlled improvised explosive devices, or to disrupt enemy transmissions on the battlefield. Europe According to Tass, Russian Deputy Prime Minister suggested to South Korean Deputy Prime Minister that Moscow could repay its state debt to South Korea by delivering helicopters to the country. Yury Trutnev held a video conference call with Hong Nam-ki. Trutnev’s press service said in a statement that both sides discussed the repayment using helicopters. Earlier, the South Korean Ministry of Land, Infrastructure and Transport validated the certificate of Mi-171A2, a Russian-made civilian helicopter, effectively authorizing its use in the country. New reports from Greece say that the United States has agreed to sell 20 F-35A fighters to Greece, six of them will be jets that were originally ordered by Turkey but not delivered. Greek newspaper “Estia“ said the order was discussed during Secretary of State Mike Pompeo’s visit to the country earlier this month. Asia-Pacific According to Northrop Grumman, the company commenced assembly of the first of up to seven MQ-4C Triton high-altitude, long-endurance (HALE) unmanned aerial vehicles (UAVs) for Australia. The milestone saw the first jig-load for a Triton intelligence, surveillance and reconnaissance (ISR) UAV for the Royal Australian Air Force (RAAF) take place at Northrop Grumman’s Moss Point facility in Mississippi. Final assembly and flight testing will follow at the company’s Palmdale facility and at Edwards Air Force Base in California, ahead of delivery to Australia in 2023. Today’s Video Watch: TAIWAN PROVES IT IS NO PUSH OVER & CAN HOLD ITS OWN – AMERICAN F 16 vs RUSSIAN SUKHOI SU 30 ! View the full article
  8. Americas The US Army received the first Infantry Squad Vehicle made by General Motors Defense. The vehicle, which the Army received at GM Proving Grounds, was the result of the first major contract GM Defense, a wholly-owned subsidiary of GM, has won since its formation since 2017. GM Defense delivered the vehicle just 120 days after winning the $214.3 million deal to produce it in June. “One hundred and twenty days from contract award to delivery is a significant milestone, and I am very proud of the team for this accomplishment,” said David Albritton, president of GM Defense in a statement. “We’re leveraging General Motors’ engineering prowess and immense manufacturing capabilities to bring transformative solutions to the military vehicle market.” The Infantry Squad Vehicle is based on the 2020 Chevrolet Colorado ZR2 truck, and it uses 90% commercial components, but is designed to carry a nine-soldier infantry squad quickly across a battlefield. The Pentagon delayed plans to move the F-35 program to full-rate production because simulation testing that’s needed before that can even begin has been delayed until next year. The testing phase was originally scheduled for 2017 but had been delayed to December of this year. Now it’s being moved back again because technical preparations aren’t complete, and both testing and the production decision have been pushed to 2021, according to Jessica Maxwell, spokeswoman for Defense Department acquisition chief Ellen Lord. While it’s not clear, why the test schedule has been delayed again, but in April Lockheed said it expected lower sales and slower deliveries for several of its programs this year due to disruptions caused by the current global pandemic, with the F-35 program being particularly hard hit. Middle East & Africa A batch of MiG-29Ms that Algeria ordered in 2018 have been delivered in pieces to the country and they are assembled and ready for flight. These aircraft are now at Oran. This first batch was delivered in a disassembled state. It is unknown how many aircraft are involved in this batch and if the aircraft were delivered as air freight or by boat. The new aircraft are being prepared for their first flights at an air base in the vicinity of Oran. The deal for the new single seat MiG-29M and dual seat MiG-29M2 was signed during the MAKS-2019 International Aviation and Space Salon in Moscow (Russia). The new M-model will replace the older MiG-29S and MiG-29UB in use at Bou Sfer air base. The number of aircraft in this contract is reported to be fourteen aircraft. The new Algerian Air Force MiG-29M/M2 is the same version as the Egypt Air Force MiG-29Ms. Washington agreed to consider allowing the UAE to buy stealth F-35 fighter jets in a side deal to its normalization agreement with Israel. Israel will not oppose US sales of “specific weapons systems” to the United Arab Emirates (UAE), Israeli Prime Minister Benjamin Netanyahu and Defense Minister Benny Gantz said, in an apparent reference to the high-tech F-35 warplanes sought by Abu Dhabi. Under a principle of preserving Israel’s “qualitative military edge”, the United States consults with it on proposed sales of advanced arms to other countries in the region. Europe According to the British Royal Navy, Royal Marines have completed two weeks of rigorous training in the skills needed to protect the UK’s nuclear deterrent. The Royal Marines of 43 Commando Fleet Protection Group are held at very high-readiness year round, guarding the nuclear deterrent carried onboard the Vanguard-class submarines based at Faslane Naval Base in Scotland. The commandos battled in a range of complex environments and challenging scenarios that ensure they are ready to safeguard the nuclear deterrent whatever the situation. Asia-Pacific A Royal Australian Navy (RAN) Canberra-class amphibious assault ship has embarked a Republic of Singapore Air Force (RSAF) CH-47 heavy-lift helicopter on its flight deck for the first time, marking a new level of interoperability between the two armed forces. The aircraft underwent deck landing qualification on HMAS Adelaide (L 01), the RAN’s second Canberra-class vessel, as part of Exercise ‘Sea Wader 2020’, which took place off the coast of Queensland, Australia. “The ability to operate our largest amphibious vessels with Singapore’s CH-47 Chinook helicopters means we can work together to mobilize and move personnel or supplies at sea, and enhance our combined joint capability”, said Linda Reynolds, Australia’s Minister for Defense, in a statement. Today’s Video Watch: BECA: THE DEAL THAT WILL MAKE INDIAN MISSILES MORE LETHAL HAS BEEN SIGNED | CHINA ON CROSSHAIR ! View the full article
  9. CH-47Fs take off (click to view full) DII FOCUS articles offer in-depth, updated looks at significant military programs of record; this FOCUS Article covers the CH-47F/MH-47G Chinook helicopter programs, in the USA and abroad. These helicopters’ distinctive “flying banana” twin-rotor design stems from the brilliant work of aviation pioneer Frank Piasecki. It gives Chinooks the ability to adjust their positioning very precisely, while carrying a large airframe whose load capacity has made it the world’s most popular heavy-lift helicopter. The USA expects to be operating Chinooks in their heavy-lift role past 2030. The CH-47F looks similar to earlier models, but offers a wide range of improvements in almost every aspect of design and performance. While the related HH-47’s $10-15 billion CSAR-X program win was terminated, delivery orders continue for CH-47Fs and for MH-47G Special Forces configuration helicopters. International orders or formal requests have also come in from Australia, Britain, Canada, Italy, the Netherlands, Turkey, and the UAE, with India and other countries expected to follow. The New Chinooks: CH-47F, MH-47G, HH-47 CH-47F Family: Initial Improvements CH-47D Chinooks (click to view full) These new aircraft are part of the U.S. Army Cargo Helicopter Modernization Program, but they are based on a long-serving basic design. The CH-47F Chinook and MH-47G Special Ops version are the latest variants in a family of helicopters that first saw service in 1962 during the Vietnam War. New “F/G” models feature numerous upgrades over CH-47Ds (produced 1982-1994), including more powerful engines, reduced vibration, upgraded avionics and self-defense systems, and manufacturing advances designed to improve both mission performance and long term costs. Engines & Fuel: The new CH-47F has 4,868 shaft horsepower (SHP) from each of its twin T55-GA-714A engines, improving fuel efficiency and enhancing lift performance by approximately 3,900 pounds. The new engines will enable the CH-47F to reach speeds in excess of 175 mph and transport up to 21,016 pounds. As a point of comparison, the original CH-47A’s T55-L7 engines generated 2,650 SHP each, and the CH-47D’s T55-L-712 turboshaft engines produced 3,750 SHP. This improved power will also pay dividends in high-altitude or hot environments, as all aircraft suffer performance penalties in such “hot and high” conditions. The new Robertson Aviation Extended Range Fuel System of internal auxiliary fuel tanks gives the CH-47F a mission radius greater than 400 miles. Other airframe modifications improve the helicopter’s strategic deployability, reducing the time required for aircraft tear down and build-up by about 60% when deploying them via a C-5 Galaxy or C-17 Globemaster III heavy transport aircraft. CAAS in MH-47: edited (click to view full) Cockpit & Avionics: The new digital cockpit design improves interoperability via the US Army’s Common Aviation Architecture System cockpit, simplifying pilot training and workload. CAAS creates a package that offers Digital Advanced Flight Control System (DAFCS) , displays and avionics. That’s enhanced with moving maps, forward-looking infrared (FLIR) and multimode radar pictures for nap-of-earth and low-level flight operations in any visibility or weather, and an advanced data transfer system to store preflight and mission data. Because this is built on the CAAS foundation, expansion, modernization, and even cross-upgrades developed for other helicopters are all thinkable. Survivability: New survivability features include a Common Missile Warning installation, and Improved Countermeasure Dispenser Systems. The US Army’s ATIRCM contract was intended to round that out with a next-generation defensive system for active laser decoying of enemy guided missiles, and is employed on CH-47s, but turned out to be too heavy to install on the Army’s smaller helicopters. It was limited to CH-47 installations, and terminated. If the Army’s new CIRCM program to field lighter devices reaches fruition, it will eventually become a common system for all Army machines, and replace ATIRCM via retrofits. Manufacturing Advances CH-47F: mid-conversion (click to view full) The remanufacture process has become more extensive than the original plans, and now involves wholesale replacement of key sections. The incoming helicopter has its propulsion systems removed and sent for overhaul/replacement, and the cockpit is cut off. What’s left is the aft fuselage and cabin, which is blast stripped to bare metal, inspected, and then has appropriate sections repaired or replaced. True manufacturing splices allow full modularity with large airframe sections, which can be mixed and matched if inspection reveals a need to replace other elements. Throughout this process, Boeing has pushed to reduce manufacturing costs and improve production efficiency by outsourcing significant sub-sections to firms like L-3 Crestview (new cabins), using lean manufacturing processes on the factory floor, and using related techniques like employee involvement teams. The new airframe itself is built utilizing advanced manufacturing techniques where large single-piece components replace built-up sheet metal structures and aluminum honeycomb formers. Boeing spokespeople have cited 35% reductions in parts and fastener totals. Doing it this way is expected to reduce operating and support costs while improving the structural integrity of the aircraft, extending the overall useful life of each Chinook. Further structural enhancements in key locations, and advanced corrosion protection via special paints, should also improve durability and lead to longer service life. 2011 British orders have taken another step beyond, to CH-47F models with “machined monolithic” frames. CH-47F Phase II and new-build MH-47G helicopters followed suit. Variants MH-47G, Jackal Stone 2010 (click to view full) MH-47G. These Chinooks are optimized for Special Forces operations. The most obvious difference is the big aerial refueling tube at the front. Less obvious modifications include extra fuel in enlarged side fuel tanks, additional sensors for surveillance, “aircraft survivability equipment,” dual embedded Global Positioning Systems, a redundant navigator for improved accuracy and reliability, and various advanced datalinks that allow the display of Near Real Time Intelligence Data (NRTID). Almost all MH-47Gs are rebuilt from existing helicopters, but a recent contract is producing 8 new-build birds. HH-47 CASR. This modified MH-47G successfully lifted off as the $4-10 billion CSAR-X combat search and rescue competition’s winning entry in November 2006. That model still exists, and some of its features have been incorporated at the request of other CH-47F customers like Canada and the Netherlands, but the CSAR-X program was canceled in 2009 after a series of successful GAO protests by the losing contractors. The USAF wound up buying much smaller CRH-60M Pave Hawks instead. Planned MYP-II improvements CH-47F maintenance (click to view full) Cargo & Lift: Initial CH-47Fs don’t offer much beyond the new engines and improved construction, but Phase II/ MYP-II helicopters will have some additions that will be retrofitted back into the rest of the fleet. The first cargo advance is called COOLS (Cargo On/Off Loading System), and consists of floor panels that flip over, to reveal loading rollers. COOLS panels are expected to begin deploying in February 2013, and their presence will have the side effect of improving floor protection against small arms fire. Chinook modernization manager Lt. Col. Joe Hoecherl explained its importance: “Right now we have a system that is not on the aircraft. We have to bring it on. What happens now when you are flying is you take off and, if you have a change of mission, you have to go pick up pallets. You can’t push pallets on this floor as it is now. With COOLS, the rolls are going to be built into the floor, so if you have a change of mission you just flip the floor up [and roll the pallets onboard].” The other advances in this area won’t begin with MYP-II buys, but will be introduced into the production line later, and then added as a retrofit. A new set of composite Advanced Chinook Rotor Blades (ACRB) are projected to able to add another 1,800-pounds of lift capability, thanks to their design. The blades have already gone through some wind-tunnel testing, and are slated for fielding in 2016. Boeing is also working on an update to the CH-47F’s Improved Vibration Control system, which will be lighter and will have obsolete electronic components replaced. Maintenance: A number of Boeing’s manufacturing advances are aimed at reducing maintenance, but more can be done. The CHPE (Cargo Platform Health Environment) program of embedded diagnostic and prognostic sensors began installation validation in May 2012, and is slated for MYP-II/ Phase II CH-47Fs. These kinds of HUMS (Health and Usage Monitoring Systems) offer make basic maintenance like rotor track and balance easier, and make diagnosing wider helicopter problems and fleet trends much easier. That saves a lot of money on maintenance, and improves availability in service. The USA’s Acquisition Plan CH-47 Assembly Line (click to view full) The US Army’s original plan was revised upward a few times from the original 452, and went as high as 533 helicopters in 2012, before coming back to the same place it began in April 2013. The FY 2014 budget would leave the US military with 451 machines, made up of 382 CH-47Fs and 69 MH-47Gs. Under the current plan, the Army is modernizing 206 CH-47D Chinooks to the new F-model configuration, while also buying 176 new-build CH-47F Chinooks. New build and refurbished CH-47s are being bought side by side, in order to keep more operational helicopters out of the factory lines and on the front lines. In the wake of operational success in Afghanistan, U.S. Army Special Operations Command (SOCOM) moved to increase its MH-47G Chinook inventory to 69 machines, adding 8 new helicopters to its 61 remanufactured machines. The CH-47F was expected to enter service in July 2007, and did receive a US Army go-ahead for full-rate production and fielding that month; it was certified as combat ready with the 101st Airborne in August 2007. Under a multi-year contract awarded in August 2008, Boeing received 28 orders in 2009, and then began a graduated delivery rate ramp-up through successive years. Boeing submitted a proposal for a CH-47F MYP-II buy to begin in 2013, and that contract was finally signed in May 2013. Note that Foreign Military Sales are available as options under these contracts, if the countries involved want to take advantage of that. The USAF’s CSAR-X program could have added another 141 HH-47 helicopters, but it was canceled following competitive protests. That saga is detailed in its own article set. CSAR-X was eventually canceled, though the USAF is still looking for a combat search and rescue option via its “CRH” solicitation. Global Contracts and Key Events CH-47F & CH-47D (click to view full) Customer Orders: US Army (532 planned), US SOCOM (61 planned), Australia (7), Britain (14), Canada (15), Italy (16), the Netherlands (6/9), Turkey (6+/14), United Arab Emirates (6+/16). Unless otherwise noted, key program events and related awards noted below are assumed to be US orders from Army Aviation and Missile Command in Redstone Arsenal, AL; issued to The Boeing Co. in Ridley Park, PA. Note that contracts to Boeing are not all-inclusive, by any means. As an example, they include installation of Honeywell’s engines, but not the engines themselves, which are “Government Furnished Equipment” (GFE) bought under a separate contract. In a related vein, the purchase contract is usually accompanied by advance materials and “long lead items” contracts earlier. The actual price of a combat-ready CH-47F will be very different. FY 2016 – 2020 Canadian CH-147 (click to view full) October 29/20: Australia And Singapore A Royal Australian Navy (RAN) Canberra-class amphibious assault ship has embarked a Republic of Singapore Air Force (RSAF) CH-47 heavy-lift helicopter on its flight deck for the first time, marking a new level of interoperability between the two armed forces. The aircraft underwent deck landing qualification on HMAS Adelaide (L 01), the RAN’s second Canberra-class vessel, as part of Exercise ‘Sea Wader 2020’, which took place off the coast of Queensland, Australia. “The ability to operate our largest amphibious vessels with Singapore’s CH-47 Chinook helicopters means we can work together to mobilize and move personnel or supplies at sea, and enhance our combined joint capability”, said Linda Reynolds, Australia’s Minister for Defense, in a statement. October 2/20: Forward And Aft Boeing won a $32.4 million deal for logistics support for H-47 forward and aft blades and associated containers. The CH-47D Chinook helicopter transports troops, artillery, supplies and equipment to the battlefield with other applications ranging from medical evacuation, aircraft recovery, parachute drop, search and rescue to disaster relief, firefighting and heavy construction. Estimated completion date is September 30, 2021. September 8/20: Overhaul And Repair Triumph Engine Control Systems won a $7.9 million deal for the overhaul and repair of fuel engine controls for the CH-47 Chinook. Bids were solicited via the internet with one received. The CH-47D Chinook helicopter transports troops, artillery, supplies and equipment to the battlefield with other applications ranging from medical evacuation, aircraft recovery, parachute drop, search and rescue to disaster relief, firefighting and heavy construction. Work will take place in West Hartford, Connecticut with an estimated completion date of July 31, 2021. September 3/20: First Block II For Secial Ops Boeing delivered the first MH-47G Block II Chinook helicopters to Army Special Operations Command, the company announced. Under the current iteration of the contract, Boeing will build a total of 24 aircraft for a total potential value of $602.2 million. The company had signed a $265 million deal in July to to build upgraded Chinook aircraft for SOCOM. The Block II version of the Chinook includes newly designed rotorblades, changes to the drive system and improvements like non-segmented fuel cells. August 21/20: Indonesia Indonesia’s National Board for Disaster Management (BNPB) has leased a CH-47D helicopter from Billings Flying Service of the United States for forest fire fighting and COVID-19 relief operations. The large rotorcraft is on a one month trial and will assist in the distribution of test kits to remote regions. It arrived in Sumatra on August 18 and is already painted in BNPB colors. The board says it will also lease a Black Hawk helicopter for similar duties. May /20: Britain British Chinook helicopters have now completed 2000 hours of flying in support of the French military counter insurgency operation in Mali, West Africa. Chinooks began operating in Mali with the French military during July 2018 and since then have moved over one-thousand tonnes of freight and over twelve-thousand passengers. The Chinook helicopters bring a unique logistical capability to the operation, allowing French ground forces to operate more effectively across the region. Currently the helicopters are being flown by aircrew drain from 18(B) Squadron. April 27/20: FMSO To UAE The US State Department has approved a possible Foreign Military Sales Order (FMSO) II to provide funds for blanket order requisitions to the United Arab Emirates (UAE). The Defense Security Cooperation Agency (DSCA) delivered the required certification notifying Congress of this possible sale on April 23. The Government of the United Arab Emirates had earlier requested a Foreign Military Sales Order (FMSO) II to provide funds for blanket order requisitions under a Cooperative Logistics Supply Support Agreement for common spares/repair parts to support the UAE’ fleet of AH-64 Apache, UH-60 Black Hawk, and CH-47 Chinook helicopters, additional support; and other related elements of logistics and program support. The estimated cost is $150 million. The proposed sale will allow the UAE Joint Aviation Command to continue to purchase needed spare/repair parts to maintain its fleet of AH-64 Apache attack helicopters, UH-60 Black Hawk utility helicopters, and CH-47 Chinook heavy-lift helicopters as part of the Cooperative Logistics Supply Support Agreement program. April 6/20: Netherlands Boeing delivered the first of14 new-build CH-47F Chinook heavy-lift helicopters to be built to the latest US Army standard to the Netherlands, the manufacturer announced on April 3. The helicopter, which is the first to be built for the Royal Netherlands Air Force (RNLAF) with the advanced digital cockpit, was formally handed over at Boeing’s production facility in Philadelphia, Pennsylvania. As noted by Boeing, delivery of the remaining aircraft is expected to continue into 2021. The Netherlands currently fields 11 CH-47D helicopters that it first received in 1995 and six early-standard CH-47F helicopters that began arriving in 2012. Boeing is also to temporarily suspend production activities at its Philadelphia, Pennsylvania, facilities – the location of the CH-47’s final assembly line – for two weeks after the end of the working day on April 3, due to measures adopted during the coronavirus pandemic. February 28/20: France The French military has indicated that it intends to lease some CH-47s before it acquires a heavy lift helicopter from 2025. Combat experience in Central Africa has exposed the need for a heavy lift rotorcraft to support French special forces. It currently relies on three British CH-47s in Mali. France is one of a handful of European countries that do not operate heavy lift helicopters, instead relying on types like the NHIndustries NH90, the Airbus H225M Caracal and Super Puma for troop lift and battlefield support operations. But France’s recent experience in Central Africa has prompted the need for a logistics heavy lifter. January 27/20: Afghanistan The Pentagon’s semiannual report “Enhancing Security and Stability in Afghanistan” revealed that Washington plans to provide CH-47 helicopters to Afghanistan’s Special Mission Wing. The report says the Pentagon has approved the plan and the Wing’s Mi-17s will be replaced by the Chinook by 2023. It states that “The United States continued to provide the ANDSF the necessary equipment and training to improve their capacity during this reporting period and focused advisory efforts at the “point of need” with reliable security partners to increase their effectiveness.” “DoD continued to provide additional combat aircraft to the Afghan Air Force and plans to provide CH-47 Chinook helicopters to the Special Mission Wing to support its counter-terrorism operations and replace its Russian-made Mi-17 helicopters,” the report also said. The NATO-led Train, Advise, Assist Mission officials had earlier said that the alliance would step up efforts to triple the size of the Afghan Air Force by 2023. November 11/19: UAE The US Defense Security Cooperation Agency has notified Congress on the potential Foreign Military Sale to the United Arab Emirates of 10 CH-47F helicopters. The estimate cost for the package is $830.3 million. This request represents the 10th Foreign Military Sales request from the UAE since the start of fiscal 2017, for a total approximate worth of $10.5 billion. It is also the first Foreign Military Financing request cleared by the DSCA since the Trump administration declared a regional emergency in order to get several weapons packages pushed through Congress despite opposition on Capitol Hill, leading to bipartisan criticism of the move. The UAE bought its first lot of CH-47Fs, 16 aircraft for estimated total of $2 billion, in 2009. October 24/19: UAE And UK Interest US Army Secretary Ryan McCarthy has disclosed that United Arab Emirates as well as the UK are seeking to buy CH-47s from Boeing. The UAE will be getting 10 while 14 are to be sold to Britain. A formal letter of acceptance could be offered to the UK next spring. “I believe we will be in the position here very shortly to take the next step for notification to Congress of a proposed sale of 10 additional Chinooks to the UAE, with the UK likely to buy an additional 14“, Bloomberg Quint cited McCarthy. “I’m personally involved with those efforts.” The Boeing CH-47 Chinook is an American twin-engined, tandem rotor, heavy-lift helicopter developed by rotorcraft company Vertol and by Boeing Vertol. August 29/19: Overhaul The US Army awarded Triumph Engine Control Systems a $7.5 million firm-fixed contract in support of the CH-47 Chinook helicopter. The deal is for the overhaul of a minimum of the fuel control main for the chopper. The CH-47D Chinook helicopter transports troops, artillery, supplies and equipment to the battlefield. Other applications include medical evacuation, aircraft recovery, parachute drop, search-and-rescue, disaster relief, firefighting and heavy construction. 163 CH-47Ds took part in Operations Desert Shield and Desert Storm. The CH-47F design features alterations to the airframe structure to reduce the effects of vibration, as well as other structural enhancements to the cockpit, cabin, aft section, pylon and ramp. Estimated completion date is August 26, 2024. July 17/19: France France wants to purchase an undisclosed number of CH-47 Chinooks for its Air Force. The French Military currently operates Airbus Helicopters H225M Caracals and NH Industries NH90 Caiman rotorcraft. The country’s deployment to Mali has been augmented by three Royal Air Force Chinooks. Flight Global reports that parts of the French military have long been keen on acquiring a heavy-lift capability. During the late 2000s Paris was engaged in a joint effort with Germany under the Future Transport Helicopter program. The CH-47 Chinook is a twin-engined, tandem rotor, heavy-lift helicopter. July 11/19: New Chinooks in India India received two new heavy-lift Chinook helicopters. The Indian Air Force bought 15 Chinook and 22 AH-64E Apache helicopters from the US’s defense company Boeing. The IAF had placed the order in 2015. The first four helicopters arrived in February. The induction of the two new CH-47F (I) Chinook helicopters took place on Monday. The Chinook has unsurpassed ability to deliver heavy payloads to high altitudes, and is eminently suitable for operations in the high Himalayas. According to Boeing, the aircraft has been battle-tested in diverse, extreme conditions throughout the world, and has proven capability to operate in the wide range of conditions that typify the Indian subcontinent. June 14/19: Seven new MH47-Gs The US Special Operations Command awarded Boeing a $194.2 million delivery order modification. The deal procures six renew-build and one new-build MH-47G rotary wing aircraft. The MH-47G is the special operations variant of Boeing’s CH-47 Chinook multi-role, heavy-lift helicopter used by the US Army Special Operations Aviation Command. The aircraft is able to support heavy-lift missions such as troop, weapons, vehicles and other equipment transportation, as well as civil and humanitarian relief missions. It can conduct long-range missions at a low level and in adverse weather conditions during the day and at night. The CH-47F/MH- 47G modernization programs, which includes a mix of remanufactured and new aircraft, will help the aircraft remain in the Army fleet at least through the 2030s. The current modification will sustain US Special Operations Forces (SOF) heavy assault, rotary wing aircraft and mitigate the impact of the MH-47G aircraft availability in light of increased SOF operational demands. March 27/19: Induction India inducted four CH47 Chinooks heavy-lift helos into the Indian Air Force. The Chinook choppers will be used for various military purposes including deploying of troops and machinery at high-altitude locations along the India-Pakistan border. With this, India will join a long list of 19 countries including the US, UK, Japan, and South Korea that deploys the twin-engined, heavy-lift helicopters. India bought 15 Chinooks at a prize of $1.5 billion. The whole fleet is expected to be inducted by March next year. The CH-47 Chinooks are multi-mission heavy-lift transport helicopters. They will be used to transport troops, artillery, supplies, equipment on the battlefield, ammunition and even barrier materials. They can also be used as disaster relief, search and recovery operations, medical evacuation, fire-fighting and civil development. February 12/19: Arrival in India After India officially received four Ch-47 Chinooks from the US, the helicopters arrived in the country and were offloaded at the Mundra port of Gujarat. The CH-47 is a twin-engined, tandem rotor, heavy-lift helo that will provide the Indian Armed Forces (IAF) with unmatched strategic airlift capability across the spectrum of combat and humanitarian missions. The IAF currently has 15 Chinook helicopters on order. The arrival of the helicopters happened ahead of schedule, which proves Boeing’s commitment to delivering on its promise of modernizing the Indian Defense Forces. February 5/19: US Special Ops order The US Special Operations Command contracted Boeing with a $39 million contract modification to finalize four new-build MH-47G rotary wing aircraft in order of satisfying an urgent need to sustain US Special Ops Forces heavy assault, rotary wing aircraft in light of increased operation demands. The MH-47G Chinook Special Operations helicopter is a variant of the CH-47 Chinook multi-role, heavy-lift helicopter. The first MH-47G helicopter was delivered to the US Army Special Operations Aviation Command in 2014. It is utilized in transportation of troops, ammunition, vehicles, equipment, fuel and supplies, and civil and humanitarian relief missions. The helo’s airframe houses a rear ramp for loading and unloading of troops, supplies and vehicles. The aircraft can seat 5 crew, including two pilots and three crew-chiefs or aerial gunners. Boeing received a $26.9 million indefinite-delivery/indefinite-quantity contract for the production of Block 2 MH-47G aircraft in July. It received a further $43million contract in November for four new Chinooks. Work will be performed in Pennsylvania. January 7/19: Boeing updates Boeing is going to upgrade Spain’s fleet of CH-47D Chinook helicopters to the F-model configuration. The CH-47F is an advanced multi-mission helicopter for international defense forces. It includes a fully integrated, digital cockpit management system, Common Aviation Architecture Cockpit and advanced cargo-handling capabilities that complement the aircraft’s mission performance. The CH-47F is primarily used by the US Army and its allied nations to transport troops and large loads. It is capable of operating at speeds faster than 175 miles per hour and over long-range flights. The deal with Spain falls under a $181.3 million contract, which Boeing secured with the uS Defense Department back in July. The contract calls for the US military’s purchase of up to 156 Multi-Year II Block I CH-47F Chinook helicopters. November 5/18: SOCOM orders The US Special Operations Command is ordering additional helicopters from Boeing. The awarded contract modification is priced at $42.8 million and provides for four new build MH-47G Chinooks. The MH-47G is a new version of the helicopter platform that first flew in 1962 and has been configured to perform long-range day and night missions, in inclement weather at low levels. The Chinooks feature enhanced digital avionics and flight control systems, as well as a sturdier monolithic airframe increasing survivability. According to the DoD press release, SOCOM needs those additional rotorcraft to satisfy an urgent need for heavy assault helicopters. Work will be performed at Boeing’s factory in Ridley Park. October 22/18: UK FMS The UK is requesting the purchase of sixteen H-47 Chinooks from Boeing. The potential Foreign Military Sales contract is priced at $3.5 billion and would include the delivery of the helicopters equipped with GPS, missile warning systems, radio-frequency countermeasures, multi-mode radars, electro-optical sensor systems and other equipment. The extended range Chinooks will be armed with M-134D-T mini­ guns and M240H machine guns. The CH-47F Chinook is the latest variant of the combat proven platform. Renewals include a new Robertson Aviation Extended Range Fuel System of internal auxiliary fuel tanks that gives the helicopter a mission radius greater than 400 miles. The Royal Air Force’s current operational Chinook fleet comprises Mk 4 and Mk 6 aircraft, fitted with digital glass cockpits. The UK’s Chinook Sustainment Programme aims to build on the platform’s success, recapitalising existing airframes and extending the capability out to 2040. October 19/18: IAF team trains in US A team of the Indian Air Force (IAF) is currently training to operate the country’s future CH-47F helicopters. The team is made up of four pilots and four flight engineers who started their training in Delaware on Monday. The CH-47F Chinook is the latest variant in a family of helicopters that first saw service in 1962 during the Vietnam War. The upgraded version includes more powerful engines, reduced vibration, upgraded avionics and self-defense systems, and manufacturing advances designed to improve both mission performance and long term costs. The IAF plans to introduce the Chinooks to its fleet in the near future. India purchased 15 CH-47F Chinook and 22 AH-64E Apache attack helicopters under a 2014 deal valued at $3.1 billion. July 23/18: Order – Order The US Army is continuing to boost its heavy-lift capabilities. Boeing is being awarded with a firm-fixed-price contract valued at $181.2 million. The deal provides for the procurement of up to 156 Block I configured CH-47F Chinook helicopters. The CH-47F builds the backbone of the US Army Cargo Helicopter Modernization Program, it’s the latest variant of the helicopter platform that was introduced in 1962. The CH-47F has 4,868 shaft horsepower from each of its engines, increasing fuel efficiency and enhancing lift performance by approximately 3,900 pounds. The new engines will enable the CH-47F to reach speeds in excess of 175 mph and transport up to 21,016 pounds. Work locations and funding will be determined with each order, with an estimated completion expected by December 2022. July 17/18: SOF Boeing is being tapped to further support the SOCOMs MH-47G Block II renewal program. The cost-plus-fixed-fee type contract has a value of $17.8 million and provides for the procurement of long lead components and parts in support of the helicopter. The MH-47G Chinook is the Special Operations variant of the combat-proven family of helicopters that first saw service in 1962 during the Vietnam War. The awarded contract is required to satisfy an urgent need to sustain Special Operations Forces heavy assault, rotary wing aircraft to ensure that the aircraft are available for operations in light of increased SOF operations demands. The majority of the work will be performed in Ridley Park, Pennsylvania. July 13/18: New Order The US Army is tapping Boeing to increase its transport capability. The awarded contract modification is valued at $131.1 million and provides for the procurement of four MH-47G Block II aircraft. The MH-47G Chinook is a variant of the world’s most popular heavy-lift helicopter, that has been optimized for Special Forces Operations. The most obvious difference of this helicopter variant is its big aerial refueling tube at the front. Less obvious modifications include additional sensors for surveillance, “aircraft survivability equipment,” dual embedded Global Positioning Systems, a redundant navigator for improved accuracy and reliability, and various advanced datalinks that allow the display of Near Real Time Intelligence Data (NRTID). The USA expects to be operating Chinooks in their heavy-lift role past 2030. Work will be performed in Ridley Park, Pennsylvania, with an estimated completion date of June 29, 2020. May 28/18: Saudi order The Kingdom of Saudi Arabia is set to receive eight CH-47F transport helicopters from Boeing. The contract modification is valued at over $25.7 million. The contract is funded through of the Fiscal 2017 foreign military sales fund. The CH-47F Chinook’s load capacity has made it the world’s most popular heavy-lift helicopter. The USA expects to be operating Chinooks in their heavy-lift role past 2030. The CH-47F looks similar to earlier models but offers a wide range of improvements in almost every aspect of design and performance. The CH-47F Chinook and MH-47G Special Ops version are the latest variants in a family of helicopters that first saw service in 1962 during the Vietnam War. New “F/G” models feature numerous upgrades over the old CH-47Ds, including more powerful engines, reduced vibration, upgraded avionics and self-defense systems, and manufacturing advances designed to improve both mission performance and long-term costs. Work will be performed in Ridley Township, Pennsylvania, with an estimated completion date of July 2021. April 26/18: German heavy-lift industry team announced A week after Lockheed Martin announced its industrial team that will enter into Germany’s upcoming heavy-lift helicopter competition, Boeing has come out with its list of German collaborators who would help maintain a potential sale of CH-47F Chinooks. Speaking at the Berlin ILA air show, Michael Hostetter, director, Vertical Lift Programs in Germany said that if selected, the local companies will offer maintenance and training to the German military. The German companies —or German units of foreign companies —that Boeing has partnered with are AERO-Bildungs GmbH, Aircraft Philipp, CAE Elektronik GmbH, COTESA, Diehl Defence, Honeywell, Liebherr-Aerospace, Reiser Simulation and Training GmbH, Rockwell Collins, and Rolls-Royce. “The customer has made it very clear that they are looking for low-risk off the shelf solution,” Hostetter said, adding Boeing was able to produce a Chinook every five days at its production site in Philadelphia. He said Boeing could offer either the Foxtrot model or an extended range version, with both offering the air-to-air refueling requirement that Germany is likely to seek. April 6/18: FMS-Spain The US State Department has cleared the sale of 17 CH-47F Chinook helicopters to the Spanish military. Valued at $1.3 billion, the foreign military sale comes with a host of associated parts and mission equipment including the AN/AAR-57A(V)8 Common Missile Warning System (CMWS). According to the Defense Security Cooperation Agency (DSCA), “The proposed sale of the CH-47F aircraft will improve Spain’s heavy lift capability,” adding that “Spain will use this enhanced capability to strengthen its homeland defense and deter regional threats. Spain will have no difficulty absorbing these aircraft into its armed forces.” March 7/18: Potential FMS Boeing’s CH-47 Chinook may have secured a scalp against rival Sikorsky’s CH-53K King Stallion after the Israeli army indicated it would prefer the Chinook to be selected for Israel’s new heavy-lift competition. According to Flight Global, while the helicopters will be operated by the air force, the helicopters are frequently used to transport ground troops thus giving the service’s opinion some weight in the matter. The winner will replace older versions of Sikorsky’s CH-53 Yasur helicopters from the the late 2020s. August 25/17: Boeing has been awarded a $222.5 million contract modification for the production and delivery of eight CH-47F Chinook helicopters to the Royal Saudi Land Forces. Production of the new builds will be conducted at Ridley Township, Penn., with an estimated completion time of July 31, 2021. Last year, the US State Department approved the sale of 48 CH-47F Chinooks and associated equipment to Saudi Arabia in a deal worth an estimated $3.5 billion. The Royal Saudi Land Forces of the Kingdom of Saudi Arabia deploy a variety of US-made helicopters, including UH-60 Black Hawk medium-lift transport aircraft, AH-64 Apache gunships and the CH-47, among others. July 31/17: Boeing has won a $276.6 million US Army contract for engineering work and manufacturing development for the CH-47F Chinook Block II program. The program will see Boeing upgrade existing CH-47F and special operations MH-47G Chinooks, totaling 542 airframes, including new composite rotor blades for better performance, drivetrain upgrades, and a strengthened airframe. Work will be conducted in Ridley Park, Penn., and is scheduled for completion by July 27, 2020. July 17/17: The US Special Operations Command has awarded Boeing a $27 million contract to conduct preparatory work on the production of Block 2 MH-47G Chinook special operations helicopters. Under the terms of the agreement, the work will include incorporating new and existing stockpiles of government and contractor components to upgrade CH-47 airframes to the MH-47G variant, with the airframes being modified under the auspices of the Technology Applications Program Office. The variant also includes upgraded digital avionics and flight control systems, a monolithic airframe instead of assembled sheet metal for greater strength and modifications for easier transportation by cargo aircraft. It features other changes to make it better suited for air assault operations and can be refueled in mid-air for greater range. November 18/16: Greece has taken delivery of three second-hand CH-47SD heavy-lift helicopters. The transfer of the ex-National Guard Chinooks was completed on November 11. Seven more are expected by the end of 2017 as part of a $120 million deal with the US. October 11/16: Honeywell is working on improving the T55 turboshaft engine found on the CH-47 Chinook helicopter. Aimed at increasing its power efficiency by 25%, work has begun on developing a new improved compressor that would increase the T55’s engine power – from 4,700shp (3,500kW) to 6,000shp – and reduce fuel usage by 8%. The research coincides with Boeing’s Block 2 upgrade on the helicopter, which aims to increase its lost pay-load capability. June 13/16: Boeing plans to test its new Chinook rotor blades this October. If successful, the heavy-lift helicopter will gain an extra 2,000lb for its maximum take-off weight. Using honeycomb composite rotor blades, good news from Boeing could see it form part of the CH-47 Block II upgrades the Army is pursuing, and be open to funding previously denied by the Department of Defense (DoD). March 17/16: The US Army has awarded an $896 million contract to Boeing to refurbish 27 CH-47F Chinook military airlift helicopters and to buy an additional 12 units. The CH-27F upgrade of the troop transport aircraft was completed in 2006. The modification to the contract increases the funds initially going to Boeing for the work by $30 million. Completion of the upgrades and delivery of the new units is expected by December 20, 2020. January 19/16: The upgrade program of the Chinook CH-47F looks to be shortly approved after a successful meeting at the Army Systems Acquisition Review Council. All that is required for the project to be green lit, is a signed decision memorandum that will allow the service to release a request for proposals for its “Block II” upgrade program. While little is known of the exact upgrades that will be part of the program, it is believed that changes will be made to the electrical system, transmission and rotor system, as well as increasing the helicopter payload by 4,000 pounds to 54,000. October 14/15: The Army will likely release a Request for Proposals for the CH-47 Chinook Block 2 program early next year; however the enhancements required by the Army have yet to be finalized. Janes reports that one of the possible technologies set for inclusion in the Block 2 package is the Advanced Chinook Rotor Blade (ACRB), thought capable of adding an additional 1,800lb of lift capacity, with the Army having already invested $17.9 million in March 2013 to develop the technology. FY 2015 September 10/15: Flightglobal reports that the Netherlands plans to procure 14 CH-47F Chinook helicopters, upgrade its six existing F model aircraft, and retire ten older D models. The new F models will not be in the CH-47F (NL) configuration as per previous orders, owing to budgetary constraints, but will instead be modified US Army CH-47F designs, acquired through the Foreign Military Sales program and scheduled for delivery in 2019. The $1 billion project will eventually see the Dutch operate 20 upgraded CH-47F helicopters, which will boast new VHF radios, self-protection equipment and fast-rope insertion/extraction systems, among other upgrades. August 10/15: The Army wants to restart production of the Boeing MH-47G Chinook special mission helicopter in a new Block II design. With eight Block I variants scheduled for delivery by the end of 2015, the specific upgrades incorporated into the Block II version have not been disclosed. The first MH-47G Block I was delivered in October 2014, with the pace of SOCOM operations driving the requirement for new build helicopters. The new Block II variants will reportedly replace some or all of SOCOM’s 61 Block I MH-47Gs. May 6/15: The first pair of F-model CH-47 helicopters have entered service with the Australian Army, with five more scheduled for delivery by August. The seven helicopters were ordered in 2010 contract along with training simulators and spares for $470 million. The Aussie F models are US-configured, in comparison to other international customers such as the UK and Canada which ordered modified versions. Oct 15/14: Brazil. Boeing spokesman Scott Day says that “We have had some early discussions about the Chinook with the Brazilian Army,” but said the potential order is “not a large one.” Brazil’s military doesn’t have any helicopters as large as the CH-47F. The closest they get is AS532 Super Puma medium helicopters and their more modern iteration, the EC725 Cougar. A small number of CH-47s would be very useful for hauling heavier cargo loads into remote areas without an airstrip, and especially for recovery of other helicopters. Sources: WKZO, “Exclusive: Boeing eyes possible Chinook helicopter sale to Brazil”. FY 2014 – 2015 CH-47Fs (click to view full) March 25/15: The Netherlands looks set to receive 17 CH-47F helicopters in a $1.05 billion Foreign Military Sale from the US. The new aircraft will replace the Netherlands’s existing fleet of CH-47D variants and will complement a previous sale of CH-47Fs in 2006. Sept 29/14: new MH-47G. Boeing delivers the first new-build MH-47G to US Army Army Special Operations Aviation Command a full month ahead of schedule, as part of an 8-helicopter, $300 million program that will last through 2015. Production improvements on the new-build models include more robust, improved monolithic machined-frames that were pioneered for the British Chinook Mk.6 (q.v. Aug 22/11), a digital flight control system, and improved air transportability. Sources: Boeing, “Boeing Delivers First New-Build MH-47G Special Operations Chinook”. Sept 26/14: Support. A 5+ year, $499.1 million cost-plus-fixed-fee contract for American H-47 helicopter support services, encompassing engineering, logistics, data analysis, technical data reproduction, supportability, and management requirements for pre-through post-production, sustainment, and fleet support of all H-47 variants. Delivery order 0001 is exercised immediately, and the rest will be allocated as needed, with work location and funding determined for each order. The support contract runs until Dec 31/19. Bids were solicited via the internet, with 1 received (W58RGZ-14-D-0075). 5-year H-47 support contract Sept 15/14: Upgrades. Boeing in Ridley Park, PA receives a $27.7 million cost-plus-fixed-fee contract modification to develop, test, and bench qualify a modified electrical system for the CH-47. Fiscal 2014 other funds in the amount of $27,700,422 were obligated at the time of the award. Work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30, 2017. Army Contracting Command, Redstone Arsenal, AL manages the contract (W58RGZ-04-G-0023, 0308). Aug 29/14: India. The new BJP government’s Defence Acquisition Council (DAC) makes a number of key moves, beginning with cancellation of the 197-helicopter Light Utility Helicopter competition. At the same time, however, DAC effectively cleared the purchase of 15 CH-47F Chinook and 22 AH-64E Apache attack helicopters, by approving Boeing’s industrial offset proposals. Sources: Defense News, “India Cancels $1 Billion Light Helicopter Tender” | Financial Express, “Make in India kicks off with defence deals” | Indian Express, “Centre scraps light utility helicopter tender, opens it to Indian players” | NDTV, “Modi Government Drops Rs 6000-Crore Foreign Chopper Plan, Wants ‘Made in India'”. July 31/14: Engines. Honeywell Aerospace International, Phoenix, Arizona, was awarded a $121.9 million initial foreign military sales contract order, on behalf of Turkey, Australia, the United Arab Emirates and Morocco. Note that Morocco isn’t a CH-47F customer, but their request for 3 CH-47Ds included the uprated 714A engines. It’s the 1st order under a new contract covering up to 440 total T55-GA-714A engines and 365 T55-GA-714A engine fielding kits. All funds for this order are committed immediately, but the wider contract will have a total potential value well north of $121 million. Work will be performed until Dec 31/18 in Phoenix, AZ. US Army Contracting Command in Redstone Arsenal, AL (W58RGZ-14-C-0021, PO 0001). July 29/14: 1st Phase II. Boeing delivers the first CH-47F Phase II to the U.S. Army, 1 month ahead of schedule, in a ceremony at the production facility in Ridley Township, PA. Sources: Boeing, “Boeing Delivers First U.S. Army Multiyear II Configured Chinook”. 1st CH-47F Phase II July 22/14: COOLS. A $65.4 million firm-fixed-price contract for 204 Cargo On/Off Loading System (COOLS) A-Kits; 204 COOLS B-Kits; and 22 COOLS Ballistic Protection System (BPS) Kits. All funds are committed immediately, using FY 2013 US Army budgets. Work will be performed in Ridley Park, PA, with an estimated completion date of Nov 29/19. COOLS (Cargo On/Off Loading System) consists of floor panels that flip over to reveal loading rollers. Before the CH-47F Phase II was introduced, the loading rollers had to be installed independently. That made loading and unloading supply pallets much more difficult and tedious. In contrast, metal COOLS floors can be flipped in place in minutes, while providing extra ballistic protection as a bonus (W58RGZ-14-C-0063). May 22/14: +1 CH-47F. Boeing in Ridley Park, PA receives a $25.9 million contract modification under the multi-year contract, exercising an option for 1 CH-47F Chinook helicopter. All funds are committed immediately, using FY 2014 US Army budgets. Note that this isn’t the full purchase price of a CH-47F, which also has Government Furnished Equipment aboard that is bought under other contracts. Work will be performed in Ridley Park, PA with an estimated completion date of Dec 31/20 (W58RGZ-13-C-0002, PO 0009). April 17/14: Support. A $43.3 million contract modification for new equipment and equipment training to Army units receiving the CH-47F. All funds are committed immediately, using Army FY 2014 budgets. Work will run until Feb 29/16, at continental United States and overseas locations (W58RGZ-13-C-0114, PO 0003). April 9/14: An $8.9 million modification to the MYP-II contract, covering overruns for Production Lot 12 and advance buys for Lot 13. All funds are committed from FY 2011, 2012 and 2014 budgets. Estimated completion date is Dec 31/20. Work will be performed in Ridley Park, PA (W58RGZ-13-C-0002, PO 0008). April 3/14: Phase II. A $19 million contract modification to integrate improved drive train development, as part of the CH-47F Phase II Aircraft Component Improvement Program. All funds are committed immediately, from FY 2014 RDT&E budgets. Estimated completion date is May 29/15 (W58RGZ-04-G-0023, 0307). March 18/14: Phase II. Boeing in Ridley Park, PA receives a $15.8 million cost-plus-fixed-fee to develop and test a CH-47F Phase II Lightweight Fuel System as part of the Airframe Component Improvement Program. Work will be performed at Ridley Park, PA until March 15/17. Bids were solicited via the Web, with 1 bid received (W58RGZ-04-G-0023). strong>Dec 26/13: +28 CH-47F. Boeing in Ridley, Park, PPA receives a $617.7 million order for FY 2014 production, under the current multi-year contract (q.v. June 11-17/13): 22 remanufactured CH-47Fs, 6 new CH-47Fs, and long lead funding for remanufacturing 13 CH-47F helicopters in FY 2015. Note that the FY 2015 budget projections called for 30 remanufactured helicopters. All funds are committed immediately, using FY 2014 other procurement funds. Work will be performed at Ridley Park, PA, and the estimated completion date for the contract is listed as Dec 31/20 (W58RGZ-14-C-0003, PO 004). Jan 28/14: DOT&E Testing Report. The Pentagon releases the FY 2013 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The MH-47 gets some good news, thanks to a better armoring system: “The Army Aviation Applied Technology Directorate (AATD), contracting with The Protective Group, completed work on this project during FY13. They developed a non?permanent armor to fit under the floor of the MH-47 helicopter cabin. The goal was to maintain the same minimum level of ballistic protection as the fielded armor, with better durability and less installed weight. Locating the armor under the cabin floor panels greatly reduces the wear and increases its lifespan. The designers also developed an installation and removal system that is lightweight, requires minimal aircraft modification and manpower, and does not interfere with maintenance requirements, mission equipment, or cargo loading systems. The project demonstrated armor panel installation and removal in minutes and achieved a 34 percent reduction in weight over the currently fielded ballistic protection system.” FY 2013 FY 2013-2017 multi-year deal; +1 MH-47G; Late Dutch deliveries finally begin; Preferred bidder in India; Prospects in Libya?; DVE system for MH-47Gs to help see in tough conditions. CH-47F got moves (click to view full) Sept 27/13: Libya order? The Libya Herald reports that the country is looking to buy transport helicopters, in order to reach remote communities and vastly improve border control. IHS Jane’s and Boeing both report that the Chinook is a serious contender. Despite Libya’s past as an anti-American state and Soviet client, they have a long history with the CH-47 thanks to license-built sales from Italy’s AgustaWestland. Most of their 20 Chinooks were destroyed in the civil war, with just 1 reportedly flying. The Chinook can expect competition from options like Eurocopter’s EC725, and the most interesting question might be whether the CH-47F deal with AgustaWestland includes Libya within the June 2008 agreement’s export zone, and under what terms. The other big question is the size of Libya’s desired order. Senior Boeing manager Steve Barlage said in August that the desired order was more of a full replacement: 6 CH-47Ds and 16 CH-47Fs. Recent accounts, however, involve just 6 CH-47Ds, which could be taken from American or Canadian stocks and sold through Boeing. Libya has vast potential oil riches, but the country is in somewhat poor shape, and oil production has plunged sharply to under 100,000 barrels per day in the wake of strikes and disorder at key terminals. At the same time, US government financing to backstop arms deals is limited. There are ways to square that circle, including an export order from AgustaWestland that leverages Italian export credits, but it’s all up to Libya. Sources: Libya Herald, “Military considers $700 million Chinook helicopter deal” | Defense News, “US Firms Eye Late Entry Into Libyan Defense Market” | SKy News Australia, “Libya oil production slumps over strike”. Sept 27/13: +7 MH-47G. A $78.2 million firm-fixed-price contract finalizes an order for 7 new-build MH-47G helicopters, which is the total for that type under the recent multi-year contract (q.v. June 11-17/13). Even as bare airframes, this amount seems a bit low (q.v. Dec 11/12). The final cost of each ready-to operate MH-47G is, of course, considerably higher. Work will be performed in Ridley Park, PA. One bid was solicited and 1 bid received (W58RGZ-04-G-0023, 0275503). Sept 27/13: MH-47 DVE. The Technical Applications Contracting Office in Fort Eustis, VA issues 3 contracts to develop and field “the degraded visual environments (DVE) system.” DVE will “integrate information from [MH-47E/G and MH-60K/L/M helicopter] sensors,” in order to help aircrews perm their missions through rain, fog, sand brownouts, etc. Dust-driven brownouts are an especially prevalent killer in many operating theaters, and the advanced sensors already on board US SOCOM’s helicopters offer an interesting option for cutting through the clutter. See also: US Army, “Army acquiring ‘brown-out’ assistance for helos” for additional context regarding this area in general. This area is being pursued by a number of US military programs, and by a number of private companies. The 60-month SOCOM DVE contracts were awarded from 5 offers received in response to the FBO.gov solicitation, and they will run until Aug 31/17. Winners include: Rockwell Collins in Cedar Rapids, IA wins a maximum $22.4 million indefinite-delivery/ indefinite-quantity, cost reimbursement contract, with $1.3 million in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0008). Sierra Nevada Corp. in Sparks, NV receives a maximum $22.6 million indefinite-delivery/ indefinite-quantity, cost-plus-fixed-fee DVE contract, with $624,013 in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0010). Boeing in Philadelphia, PA wins a maximum $23 million indefinite-delivery/ indefinite-quantity, cost-plus-fixed-fee DVE contract, with $2.1 million in FY 2013 research, development, test and evaluation funds committed immediately for task order 0001 (H92241-13-D-0011). July 18/13: Support. A maximum $39.6 million cost-plus-fixed-fee contract for helicopter support and personnel training services, aimed at units receiving the CH-47F. FY 2013 procurement funds are being used, and 1 bid was solicited, with 1 bid received (W58RGZ-13-C-0114). June 24/13: Italy. The Italian Army’s 1st ICH-47F Chinook performs its 15-minute maiden flight at AgustaWestland’s Vergiate plant in Italy. Under the joint agreement, AW makes the drive systems, handles system integration for Italy’s unique requirements, and performs final assembly. They also have the same kind of wider export permission in their region that they enjoyed with the CH-47C. Italy ordered up to 20 ICH-47Fs (16 + 4 options – q.v. May 13/09), to replace the 1st Regiment’s 40 CH-47Cs that entered service in 1973. Delivery of this 1st helicopter is scheduled for early 2014, with final deliveries in 2017. AgustaWestland | Read “Italy Buying CH-47F Helicopters” for more. June 11-17/13: MYP. A $3.414 billion firm-fixed-price, multi-year contract for remanufactured and new-build CH-47F cargo helicopters, with $1.317 billion of FY 2011-2013 funds committed immediately. Boeing announces it as a contract for 177 helicopters from FY 2013 – 2017, which could rise to 215. If it does rise that high, the Pentagon announces the contract maximum as $4.984 billion. Boeing is touting up to $800 million of savings vs. single-year buys, plus a $130 million investment they’ve already made to modernize the Chinook factory in Pennsylvania. The Pentagon adds that a portion of the initial contract involves foreign military sales for Turkey and the UAE. The USA’s FY 2013 budget submission involved just 155 helicopters and $373 million in savings, for a total of $3.363 billion. That indicates another 22 helicopters in this base order, but Turkey and the UAE together have just 16 helicopters left in their DSCA requests (8 each), so the numbers don’t add immediately. As of this date, there were 241 CH-47Fs in the Army and National Guard, with 15 units operating them and a 16th being equipped. CH-47F units have logged more than 86,000 combat hours in Afghanistan, maintaining an operational readiness rate of over 80%, compared to equally new technology like the V-22 tilt-rotor whose readiness rate is 70% or less. Boeing cites a final Army target of 464 CH-47Fs, including 24 to replace helicopters that have been lost, but that’s at variance with FY 2014 Pentagon budget documents (W58RGZ-13-C-0002). Boeing. Multi-Year Contract: 177 – 215 helicopters April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage. The FY 2013 program plan was 533 helicopters: 237 New Build + 226 remanufactured. The FY 2014 program plan cuts that by 20 remanufactured helicopters (to 207) and 61 new-build helicopters (to 176), but the interesting thing about the cuts is that they mostly take place after 2017. The reason is the multi-year buy proposal, which runs from FY 2013 – 2017. There is a cut of $527 million in the FY 2017 budget projection, and if you look closely, it’s mostly from the total removal of new-build funding that year. The exact impact of these cuts on the entire program’s cost isn’t clear yet, and will have to await a Pentagon Selected Acquisitions Report (SAR). March 21/13: Improved rotor. A $17.9 million cost-plus-fixed-fee contract modification for Advanced Chinook Rotor Blade (ACRB) design and engineering services. This blade is slated to be added part-way through CH-47F Block II production, with fielding in 2016. If it performs to spec, it will add another 1,800-pounds of lift capability, and could be retrofitted to the rest of the fleet. See also Aug 4/12 entry. Work will be performed in Ridley Park, PA with an estimated completion date of March 18/17 (W58RGZ-04-G-0023). Dec 11/12: +1 MH-47G. A $34.2 million cost-plus-fixed-fee contract to buy 1 MH-47G special operations variant Chinook helicopter. There’s a fair bit of separate equipment that also goes into these, so our standard warning about prices is magnified in this case. Work will be performed in Ridley Park, PA, with an estimated completion date of Oct 31/15. One bid was solicited, with 1 bid received (W58RGZ-04-G-0023). Dec 5/12: India. The Indian government officially announces that Boeing’s CH-47F is its preferred bidder. In India, an “L1” bidder is the one that offers the lowest cost, after all adjustments have been made to the proposal. Depending on the competition, price adjustments could be made as a result of industrial benefits plans, maintenance figures, etc.: “In the proposal initiated by Indian Air Force (IAF) for procurement of 15 Heavy Lift Helicopters, M/s Boeing with Chinook Helicopter has emerged as the L1 Vendor. The cost of the Contract would depend upon outcome of the Contract negotiation with the L1 Vendor, which has not yet concluded. The Field Evaluation Trials for these Helicopters conducted by the Indian Air Force have found them to be compliant with all the stated Air Staff Qualitative Requirements (ASQRs). Divulging further details in this regard may not be in the interest of National security.” Nov 28/12: Canada. Canada’s DND provides an update re: its 15-helicopter “CH-147” project. They say that the project is currently on-budget for its C$ 2.3 billion procurement phase, and on schedule. The add that Boeing is also on track to meet its target of $1.25 billion in industrial offset commitments. The RCAF currently has 2 CH-47Fs flying, and will continue to fly test missions in 2013. The first CH-147 is scheduled to arrive on schedule at a new CFB Petawawa, ON facility in June 2013. Helicopters will be delivered at a rate of approximately one aircraft per month, with all aircraft being delivered over a 12-month period, reaching Initial Operational Capability in 2014, as planned. Canada DND. Nov 19/12: Sub-contractors. Canadian landing gear specialist Heroux-Devtek Inc. in Longeuil, PQ receives a multi-year contract from Boeing to manufacture the landing gear for all US Army CH-47F helicopters bought under MYP-II. Deliveries are scheduled to begin in the first half of 2014 and run into 2019. Current MYP-II contract expectations will involve 155 helicopters, but this sub-contract also includes options for up to 150 additional landing gear sets to 2019. America isn’t likely to order another 150 CH-47Fs, but foreign buyers might, and MYP-II lets them benefit from the same bulk-order prices negotiated by the US government. Heroux-Devtek is already an incumbent landing gear supplier for the CH-47F, thanks to the Sept 24/09 MoU that let them bid to supply all H-47F aircraft delivered to customers outside the United States. In September 2012, they received a license to fabricate replacement parts, and to carry out repair and overhaul services, for the landing gear of all Chinook variants. This agreement completes the trifecta. Heroux-Devtek release [PDF]. Oct 28/12: India. The Ministry of Defence has reportedly designated Boeing’s bid to supply 15 CH-47Fs as the “L-1” (lowest adjusted bid) in Russia’s heavy-lift helicopter competition. If a contract is finalized, the CH-47F will have beaten Russia’s larger and more powerful Mi-26T2, which already serves in India’s armed forces. Both types have proven themselves in Afghanistan, and commercial Mi-26 helicopters have been hired to airlift crashed CH-47Ds back to base. One key difference? The CH-47F may have just half of the Mi-26’s takeoff weight, but it can be transported in India’s new fleet of C-17A Globemaster heavy-lift jets. That will give an Indian CH-47F fleet a much greater deployment reach. Times of India. Oct 8/12: Netherlands. The Dutch Armed Forces receives their first 2 CH-47F-NLs, growing their CH-47 fleet to 13 (11 Ds, 2 Fs). The delivery is significantly later than the original date of 2009. For training purposes, the Luchtmachthanden has stationed 3 training CH-47Ds in Fort Hood, TX. They’ve also set up local training at the School of the Air-Ground Cooperation in Schaarsbergen, including a 10m fixed drop to practice ropedowns. Dutch MvD [in Dutch]. Oct 5/12: Support. Boeing announces a 5-year, $185 million Performance-Based Logistics (PBL) contract to manage production, overhaul and distribution of the Army’s supply of Chinook helicopter rotor blades. This includes older CH-47D models, as well as the CH-47F. Boeing now has performance-based support contracts within the AH-64 Apache, V-22 Osprey, and international CH-47 programs. They add that: “Boeing has been collaborating with U.S. Army Aviation and Missile Life Cycle Management Command for several years on ways to improve the tooling used to produce and repair Chinook rotor blades. The company also has increased the efficiency and capacity of its Chinook supply chain through the use of improved asset management and forecasting tools, an enhanced supplier network and a public-private partnership with the Corpus Christi Army Depot.” Oct 5/12: HUMS. An $8.6 million cost-plus-fixed-fee contract for CH-47F cargo-platform health environment (CPHE) field demonstration kits. Boeing confirms that these embedded HUMS (Health and Usage Monitoring Systems) will track wear and performance for specific mechanical components and areas. The contract supports initial CPHE fielding, and this aircraft monitoring system is part of the Multi Year II suite of improvements to the CH-47F. The initial fielding contract, however, is issued under an older agreement. Work will be performed in Philadelphia, PA, with an estimated completion date of Sept 28/13. One bid was solicited, with 1 bid received (W58RGZ-04-G-0023). Oct 4/12: IVCS. A $17.1 million cost-plus-fixed-fee contract to qualify Improved Vibration Control Systems for use on the CH-47. Boeing says that IVCS replaces the existing system, reducing weight and issues with part obsolescence. It is not part of the Multi Year II suite of improvements to the CH-47F. Work will be performed in Ridley Park, PA with an estimated completion date of Sept 28/15. One bid was solicited, with 1 bid received (W58RGZ-04-G-0023). Oct 2/12: COOLS. A $13 million cost-plus-fixed-fee contract for “cargo on/off loading systems.” Boeing confirms that this contract is for the new Cargo On/Off Loading System (COOLS), which provides a convertible roller/ flat floor surface for the CH-47F, and incidentally improves bullet protection in the floor. COOLS will be installed in all MYP-II Chinooks, and will be retrofitted into all existing F-model Chinooks. Work will be performed in Ridley Park, PA with an estimated completion date of Jan 31/14. One bid was solicited, with one bid received (W58RGZ-04-G-0023). FY 2012 FY 2012 buys; FY 2013-17 plans; 2nd multi-year US deal for improved CH-47Fs?; Australian & UAE contracts; Survivability. CH-47F, FOB Bastion (click to view full) Sept 25/12: Support. A $12.1 million cost-plus-fixed-fee contract for CH-47F maintenance. Work will be performed in Ridley Park, PA with an estimated completion date of Sept 11/15. One bid was solicited, with 1 bid received (W58RGZ-04-G-0023). Aug 16/12: 50th Anniversary. Boeing marks the 50th anniversary of delivering the first H-47 Chinook military helicopter, making it Boeing’s longest continuously running production program. The company has delivered more than 1,200 Chinooks to 18 operators around the world, and more than 800 still in operation today. The production line near Philadelphia is about to see the end of a $130 million renovation that will help Boeing increase Chinook production rates without breaking the bank. Boeing says that they are scheduled to deliver nearly 60 Chinooks this year. They have a proposal for a multi-year American buy, and a backlog of foreign orders. Aug 14/12: Australia/ UAE. An $81.1 million firm-fixed-price contract modification of an existing contract for “CH-47F aircraft in support of foreign military sales.” Boeing explains to DID that this converts the existing Bridge Contract for CH-47F Foreign Military Sales (vid. Jan 5/12), formally converting the (now 14) helicopters from a Multi Year I to a Multi Year II configuration with the added floor loading systems, etc. It also establishes firm delivery dates for Australia and the United Arab Emirates. The total contract value is now $451.1 million. Work will be performed in Ridley Park, PA, with an estimated completion date of June 15/15. The bid was solicited through the Internet, with 1 bid received (W58RGZ-12-C-0010). Australia & UAE Aug 14/12: Improved Rotor. A $37.2 million cost-plus-fixed-fee contract for engineering services in support of the Advanced Chinook’s rotor blade tooling. Advanced Chinook incorporates a number of modifications to the base CH-47F, and the new rotor blade design is one of the most important ones. Work will be performed in Ridley Park, PA, with an estimated completion date of Nov 30/15. The bid was solicited through the Internet, with 1 bid received (W58RGZ-04-G-0023). Aug 7/12: AVMS. Boeing announces that it will embark on Phase II of its Adaptive Vehicle Management System (AVMS), an advanced flight control system that’s designed to improve maneuverability and performance. It achieves these goals by adapting the flight controls to the aircraft’s flight condition, environment and even computed pilot intent. The $18 million U.S. Army contract is a joint development project between Boeing and the Army Aviation Applied Technology Directorate (AATD) and will encompass more than 100 hours of flight test time. In Phase II, the team will fly the AVMS system on the modified Boeing H-6 helicopter used in Phase I, as well as on the larger Boeing AH-64 Apache attack helicopter and CH-47 Chinook heavy-lift helicopter. May 16/12: MH-47G. Rolls Royce Corp. in Indianapolis, IN receives a $17 million firm-fixed-price and cost-no-fee contract for MH-47G helicopter infrared exhaust suppressors, including systems components, initial fielding spares and spare parts. Work location will be determined with each task order, until May 10/17. One bid was solicited, with 1 bid received by U.S. Army Contracting Command in Fort Eustis, VA (W91215-12-D-0001). April 9/12: A $26.9 million firm-fixed-price contract for “services in support of the Chinook cargo helicopter advance procurement, long lead items.” Work will be performed in Philadelphia, PA, with an estimated completion date of Dec 31/13. One bid was solicited, with one bid received (W58RGZ-04-G-0023). April 4/12: US Army Plans. US Army CH-47 F-model project manager Lt. Col. Brad Killen states that the Army plans to have a “pure” fleet of 440 F-model Chinooks by 2018, thanks to a combination of CH-47F buys and upgrades. So far, the Army has accepted 169 CH-47Fs, and its long history of upgrades still includes the first CH-47A ever delivered. About 50 years later, it’s serving in Afghanistan, as a CH-47D. Lt. Col. Killen has a colleague, thanks to the Army’s recent move to install a Lt. Col. Joe Hoecherl as the special program manager for CH-47F modernization. Key initiatives includes the new composite rotor blade, slated for flight testing in summer 2015; the COOLS Cargo On/Off Loading System of flippable rotors, which will begin fielding in February 2013; and the CHPE Cargo Platform Health Environment of embedded diagnostic and prognostic sensors, which begins installation validation in May 2012. US Army. Feb 13/12: FY 2013 budget. The US Army request is $1,462.3 million for 44 CH-47Fs. $1,159.4 million will fund 19 new-build and 19 remanufactured/Service Life Extension Program helicopters, while another $231.3 million buys 6 Overseas Contingency CH-47Fs to replace combat losses. The accompanying document says that: “Protection of the CH-47 is a major part of the Army’s continued focus on aviation and maintaining an effective Aviation Modernization program, specifically modernization of the Army Rotary Wing fleet. The Department requests funding for procurement of 25 new F-model aircraft while remanufacturing 19 more. Also, funding will be used for further improvements and upgrades, including a loading system to enable rapid reconfiguration from cargo to passenger missions. Funding in FY 2013 is $1.2 billion and totals $5.7 billion from FY 2013 – FY 2017.” Feb 13/12: +32 CH-47F. A $676 million firm-fixed-price contract modification to buy 32 CH-47F new build helicopter airframes, plus installation of GFE equipment like engines, etc. Work will be performed in Ridley Park, PA, with an estimated completion date of Dec 31/15. One bid was solicited, with 1 bid received (W58RGZ-08-C-0098). Feb 13/12: A $21.9 million cost-plus-fixed-fee contract, covering initial production fielding support for each new equipment training site equipped with the CH-47 cargo helicopter. Work will be performed in Ridley Park, PA, with an estimated completion date of April 30/13. One bid was solicited, with 1 bid received (W58RGZ-11-C-0093). Feb 13/12: Cargo upgrade. A $13.3 million cost-plus-fixed-fee contract modification to manufacture and test 5 Cargo On-and-Off Loading System prototypes. As noted above, this is a proposed modification to the existing CH-47F. Work will be performed in Ridley Park, PA, with an estimated completion date of Feb 28/14. One bid was solicited, with 1 bid received (W58RGZ-04-G-0023). Jan 17/12: DOT&E on Survivability. The Pentagon releases the FY2011 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The CH-47 is cited as a system performing well on all measures, but there were some interesting notes about survivability: “Rotorcraft Sponson RPG Vulnerability. This project is demonstrating methods of suppressing fires resulting from RPG impacts to sponson fuel tanks [DID: those bulges on the lower sides] – with emphasis on occupant survivability. For several U.S. rotorcraft, fuel tanks are contained in sponsons that are adjacent to the main cabin. Current data indicates that the U.S. aircraft are being shot with RPGs and sponsons should be protected. …Combat Incident Emerging Threat Investigation. This project is addressing a recent combat incident in Afghanistan that raised concerns about a potential new threat to helicopters. In this incident, a CH-47 helicopter was damaged in a manner uncharacteristic of any previous incident. JCAT requested JLF Air support by providing threat-target characterization data for their incident investigation. Results from two shots completed against a surrogate airframe were provided to JCAT. The initial results from these tests allowed JCAT to understand the engagement conditions and subsequent damage with confidence, increasing the value of information provided to operational commanders.” Jan 5/12: Australia & UAE. A $370 million firm-fixed-price contract to “provide for the services in support of the bridge requirement for new CH-47 F model aircraft to support foreign military sales.” The English translation, based on responses to our inquiries, is that Australia and the UAE are buying 13 CH-47Fs (7 of 7 Australia, 6 of 16 UAE) under the US Army’s contract, in order to benefit from its volume pricing. The 14th helicopter will be bought by the US Army. As always, this is buying base airframes, plus integration of GFE. Even so, CH-47F customers like Britain and Canada, who ordered heavily customized versions, can’t take advantage of this approach. Neither can Italy, who will produce the machines in-country under an agreement between Boeing and AgustaWestland. Work will be performed in Ridley Park, PA, with an estimated completion date of June 30/16. One bid was solicited, with 1 bid received by the US Army Contracting Command at Redstone Arsenal, AL, on behalf of its Foreign Military Sale clients (W58RGZ-12-C-0010). See also Dec 3/09 entry, “Australia Ordering CH-47F Chinooks“, and Boeing’s release. CH-47Fs: 7 Australia, 6 UAE, & 1 USA Jan 5/12: A $218.7 million firm-fixed-price contract. Clarifications revealed that the FY 2012 order will produce the last 12 refurbished CH-47F (converted from CH-47D) airframes under the current multi-year contract, as well as installation of equipment like engines etc. that are bought by the government under separate contracts. Boeing submitted an offer for a follow-on multi-year CH-47F contract in November 2011 (vid. Nov 4/11, Oct 12/11), and expects that if their offer is accepted, it would happen around January 2013. Note that final contract dates are not the same as final delivery dates, so the 1st multi-year program will still be building machines during any follow-on contract’s initial couple of years. Work will be performed in Ridley Park, PA, with an estimated completion date of Dec 31/15. One bid was solicited, with 1 bid received (W58RGZ-08-C-0098). Nov 4/11: MYP-II offer. Boeing has tabled its 2nd multi-year buy offer to the US government, for another 155 CH-47F family helicopters, as the end comes into view for its first $4.3 billion, multi-year contract for 191 helicopters. Boeing CH-47Fs currently equip 8 U.S. Army units, and 6 of those units have completed deployments in Iraq and Afghanistan. The Army is in the process of training and equipping the 9th unit. Boeing. Oct 12/11: MYP-II = CH-47F+. Boeing is preparing its next multi-year buy offer to the US government for 155 more CH-47 family helicopters, which would end the program of record. Procurement wouldn’t start until 2013, and the new machines would include a number of changes including flip-over cargo rollers on the floor. They’re also developing a new rotor blade to give the helicopter about 2,000 more pounds of lift, without hurting forward flight performance. The new rotor is headed for a Critical Design Review in January 2012, but probably won’t deliver in time to begin the next buy. Defense News. FY 2011 FY 2011 buys; British & Turkish buys; Dutch 1st flight; New sensor turrets; Canada’s Auditor-General is very critical. CH-47F, Ft. Campbell (click to view full) Sept 14/11: A $6.75 million firm-fixed-price contract modification “to support the CH-47F Chinook helicopter renew aircraft.” Work will be performed in Ridley Park, PA, with an estimated completion date of Dec 31/15. One bid was solicited, with one bid received (W58RGZ-08-C-0098). Aug 22/11: UK contract. The UK MoD signs a GBP 1 billion ($1.64 billion) contract with Boeing for 14 new “CH-47 Mk6” Chinook helicopters, plus associated support for the first 5 years. Boeing confirmed that these are new-build helicopters, which use the same T55-GA-714A engines that are installed on the F model, and being retrofitted to existing RAF Chinooks. The CH-47F is also known for its use of large, single-piece components, and the UK advisory touts a “new, machined monolithic airframe.” That appears to be a CH-47F base, but extensive changes and additions include UK-specific avionics, communication and navigation equipment; forward-looking infrared surveillance turrets; a rescue hoist; and defensive systems against guided missiles. Canada made similar changes to the “CH-147s” it bought. The RAF will receive the 1st Mk6 aircraft for initial trials and testing in 2013, to enter service in May 2014. By early 2015, 3 CH-47 Mk6 helicopters are slated to be ready for operational deployment, and delivery of all 14 helicopters is expected to finish by the end of 2015. The RAF intends to have all 14 operational by early 2017, bringing their total Chinook fleet to 60 (barring further losses). UK MoD | Boeing. Britain: 14 “CH-47 Mk6” Aug 14/11: Turkey. As expected, Turkey’s DSCA request (vid. Dec 8/09, June 6/11) shrunk by 66% and turned into an initial order for 6 CH-47Fs, with 5 going to the Army, and 1 to their Special Forces Command. An unnamed procurement official was reported as saying the contract was signed last month for about $400 million. Delivery is scheduled to take place between 2013 – 2014. The country didn’t have heavy-lift helicopters yet, so this is a notable step forward for them. Hürriyet Daily News. Turkey: 6 CH-47F Aug 11/11: MH-47G. An $8.4 million firm-fixed-price contract to buy Digital Automatic Flight Control Systems for the Special Operations MH-47G. They’re actually manufactured by BAE. Work will be performed in Philadelphia, PA, with an estimated completion date of Dec 1/13. One bid was solicited, with one bid received by the US Army Aviation and Missile Command, Contracting Center in Fort Eustis, VA (W91215-11-D-0001). Aug 4/11: MH-47G. Raytheon in McKinney, TX receives a $21 million indefinite-delivery/ indefinite-quantity contract for 8-15 AN/ZSQ-2v1 Assault and 0-5 AN/ZSQ-2v2 Attack Electro-Optical Sensor Systems. The FBO solicitation specified only MH-47Gs, but the DefenseLINK release referred to US SOCOM’s MH-47G Chinook and MH-60M Black Hawk helicopters at Fort Campbell, KY. Work will be performed primarily in McKinney, TX and is expected to be completed by Aug 2/13. A $15.6 million Delivery order 0001 was issued on Aug 2/11. This is a sole-source contract under the authority of FAR 6.302-1 (H92241-11-D-0006). See also FBO.gov. The ZSQ-2 electro-optical turrets share a number of sub-systems in common with similar Raytheon products that equip aircraft like the MQ-9 Reaper, MH-60R Seahawk, etc., as Raytheon seeks to take things one step further with a Common Sensor Payload design for the US Army. The ZSQ-2s have begun receiving upgrades with 3rd generation FLIR night vision systems. June 29/11: +8 CH-47F. A $174.1 million firm-fixed-price contract, covering the 4th year (FY 2011) of the current CH-47F multiyear contract, and exercising the Production Lot IX option for 8 new-build CH-47Fs. Work will be performed in Ridley Park, PA, with an estimated completion date of Dec 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). June 6/11: Turkey. Turkey’s DSCA request (vid. Dec 3/09) may be close to a contract, but for fewer helicopters. Hurriyet Daily News quotes an unnamed “senior procurement official,” who says that a $300 million deal for 6 of the 14 notified CH-47Fs is close to finalization, with deliveries to begin in 2013. The official added that “After the helicopters begin to arrive, we plan to make some modifications on them according to suit our specific needs.” Contract negotiations among the SSM, the U.S. government and Boeing were launched in 2010. The deal is reportedly for 6 Army helicopters because of financial constraints, leaving the remaining 8 as a future option. May 10/11: Training. A $23.7 million firm-fixed-price contract covers initial production fielding support for each new equipment training site equipped with the CH-47F. Boeing describes it a bit differently, as Initial Production Fielding Support modifications on 49 CH-47F Chinook helicopters at Boeing’s Millville, NJ Modification Center, which opened in 2010. After the Chinooks are delivered from the production line in Philadelphia to the Army, they are flown to Millville, where Boeing structural and electrical employees make specialized avionics and airframe modifications to support new Army requirements. The contract will also support 2 New Equipment Training teams, who help train US Army Chinook units in the USA and abroad on the upgrades. The US Army lists the estimated completion date as April 30/13, while Boeing says that the current contract period extends the current work of modifying Chinook aircraft at the Boeing Millville facility from May 2011 through April 2012. Both could be right; DoD announcements may not include option periods, and may cover only part of the contract’s total possible funds (W58RGZ-11-C-0093). See also Boeing release. March 30/11: +25 CH-47F. A $528.1 million firm-fixed-price contract for 25 nCH-47F Chinooks, as the FY 2011 new-build order. Work will be performed in Ridley Park, PA, with an estimated completion date of Dec 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). March 3/11: ECM. Boeing receives a $13.6 million firm-fixed-price contract for CH-47F infrared suppressor systems modification B-kits. The idea is make the helicopter’s hot engine exhaust gasses less of a clear target for heat-seeking missiles. Work will be performed in Ridley Park, PA, with an estimated completion date of May 31/13. One bid was solicited with one bid received (W58RGZ-04-G-0023). Feb 16/11: Engines. Honeywell Aerospace in Phoenix, AZ received a $43.7 million firm-fixed-price contract for 50 T55-GA-714A engines and 30 T55-GA-714A engine fielding kits. Work will be performed in Phoenix, AZ, with an estimated completion date of Dec 31/13. One bid was solicited with one bid received (W58RGZ-04-C-0061). Dec 28/10: +11 CH-47F. A $242 million firm-fixed-price contract for 11 CH-47F Chinook helicopters, as the FY 2011 remanufactured order. Work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). Dec 28/10: Support. A $10 million cost-plus-fixed-fee contract for training, equipping, sustaining, and other support and services for the CH-47F Chinook program. Work will be performed in Ridley Park, PA, with an estimated completion date of April 30/11. One bid was solicited with one bid was received (W58RGZ-04-G-0023). Dec 8/10: Dutch 1st flight. 1st flight of the Royal Netherlands Air Force (RNLAF) CH-47F (NL) Chinook heavy-lift helicopter. The new version is scheduled to complete its flight test program in August 2011, after approximately 100 flight hours. There are 2 aircraft in flight test as of January 2011, of the order for 6. The CH-47F-NLs will join an existing fleet of 11 CH-47Ds, as the Dutch become the 1st international customer to field an F model variant. The new Dutch Chinooks are equipped with self-protection systems, engine air particle separators, a forward-looking infrared system, and fast rope positions, which will be used to support Special Forces operations. Boeing | DID’s full CH-47F (NL) coverage. Dec 3/10: A $50.7 million firm-fixed-price contract commits funding for CH-47F production Lot 10 long lead time items. Work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). Nov 3/10: Improvements. Boeing continues to work on CH-47F/MH-47G improvements. They include a redesigned rotor blade, improved engine controls for the “fat tank” MH-47Gs, and an integrated cargo roller system for the CH-47Fs. These features could be part of a new configuration set that will be finalized in June 2011. Deliveries would start in 2014, under what Boeing hopes will be a new multi-year contract. The new blade was derived from the canceled RAH-66 Comanche scout/attack helicopter, and has a swept dihedral-anhedral blade tip, using 3 airfoil sections instead of 2. It’s designed to add 2,000 pounds of lift, without hindering forward-flight performance. Wind tunnel testing is done, and the next step is making full-size blades for dynamic and fatigue testing, followed by 2014 flight tests. Aviation Week. Oct 28/10: Canadian criticism. Canada’s Office of the Auditor General (OAG) releases their 2010 Fall report. Canada’s CH-147 program rates a very negative verdict. Most important, they contend that the procurement process itself was unfair, and that DND kept senior decision makers in the dark about major changes to the project and its costs. Read “On The Verge: Canada’s $4B+ Program for Medium-Heavy Transport Helicopters” for the full details, including links to background materials. Oct 13/10: +2 CH-47F. A $43.5 million firm-fixed-price contract, exercising the option for 2 CH-47F new Chinook cargo helicopters. The order is technically placed on Sept 30/10, the last day of FY 2010. Work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). Oct 13/10: Support. A $12 million cost-plus-fixed-fee contract, covering 57,700 hours of CH-47F engineering services support, to include integration of engineering change proposals, product improvement, and other modifications to the CH-47F cargo helicopter. Work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30/12. U.S. Army Contracting Command, CCAM-CH-A in Redstone Arsenal, AL (W58RGZ-04-G-0023). FY 2010 FY 2010 buys; Requests & plans from Australia, Britain, Turkey, UAE; 100th CH-47F delivered. MH-47G, 2010 exercise (click to view full) Aug 6/10: Support. A $5.7 million cost-plus-fixed-fee delivery order modification for 27,310 hours of engineering services support of “CH-47F unique items identification candidates, non-recurring engineering.” Work is to be performed in Ridley Park, PA, with an estimated completion date of Jan 31/12. One bid was solicited with one bid relieved (W58RGZ-04-G-0023). DID asked about this, and the Army eventually explained that Boeing will be evaluating parts to determine where and how to permanently mark items over $5,000, or serially tracked items, with machine readable code per the Pentagon’s Item Unique Identification (IUID) mandate. July 30/10: The 10th Mountain Division becomes the 6th US Army unit to field the CH-47F. It’s 10th Combat Aviation Brigade’s 3rd General Support Aviation Battalion has equipped its B Company at Fort Drum, NY, which will begin advanced mission training including simulated assault, troop-transport and cargo-movement exercises, and high mountain operations. Boeing. July 22/10: #100. The 100th CH-47F rolls out of the Boeing facility near Philadelphia, PA, during a ceremony commemorating the milestone and the Army’s acceptance of the helicopter. More than 2,500 Boeing employees gathered inside the flight deck hangar to join in the commemoration. US Army | Boeing. 100th CH-47F April 16/10: Support. A pair of cost-plus-fixed-fee contracts for engineering services, worth a combined $38.2 million for 183,993 hours. Work is to be performed in Ridley Park, PA, with an estimated completion date of Dec 31/11. In both cases, just 1 bid was solicited, with 1 bid received (W58RGZ-04-G-0023). The first contract exercises a $30.2 million option for 145,480 hours, while the second exercises an $8 million option for 38,513 hours. Feb 25/10: Australia. The Australian Government gives second pass approval to “Project AIR 9000 Phase 5C” for 7 CH-47Fs, at a budget of AUD $755 million. This approves the plan’s details, but is not itself a contract. Australia expects to field the first 2 helicopters in 2014, with all 7 expected by 2017. The ministerial statement makes it clear that the 7 CH-47Fs would replace 5th Aviation Regiment, C squadron’s existing 6 CH-47Ds, would also be based in Townsville, and would be expected to serve until 2040. Per the recommendations of past commissions like Australia’s famous Kinnaird Review, Senator Faulkner said the new aircraft will be procured and maintained in the same broad configuration as the United States Army CH-47Fs. Australia also promised to consider joining the USA’s Chinook Product Improvement Program as a way to keep those configurations aligned, “when information on this program is of second pass quality.” Having said all that, however, “The new Australian Chinooks will also receive some additional ADF-specific equipment to meet certain operational and safety requirements.” CH-47F taking off click to play video Dec 16/09: FY 2009. A $704.4 million firm-fixed-price contract for 21 new build aircraft and 14 remanufactured CH-47s. This is the 3rd year of a multi-year contract for CH-47Fs, and work will be performed in Ridley Park, PA, with an estimated completion date of Sept 30/13. One bid was solicited with one bid received (W58RGZ-08-C-0098). Dec 15/09: UK plans. Gordon Brown’s Labour Party government and the British Ministry of Defence announce plans to buy 10 new CH-47 Chinook helicopters for delivery in 2012-2013, with the intent to buy another 12 Chinooks later. The Chinooks will replace the planned Future Medium Helicopter competition to field a successor for Britain’s 34 AS330 Puma HC1s, and 46 H-3 Sea Kings. This is not a formal contract yet, and it is likely but not certain that the new helicopters will be CH-47Fs with British adaptations. Dec 8/09: Turkey request. The US Defense Security Cooperation Agency announces Turkey’s official request for up to 14 CH-47F Chinook Helicopters, as well as 32 T55-GA-714A Turbine engines (28 fitted + 4 spares), 28 AN/ARC-201E Single Channel Ground and Airborne Radio Systems (SINCGARS), 14 AN/APR-39A(V)1 Radar Signal Detecting Sets, and the required special tools and test equipment, spare and repair parts, publications and technical documentation, site survey, personnel training and training equipment, ferry services, and U.S. Government and contractor support services. A DSCA request is not a sale; if the sale is not blocked in Congress by Dec 22/09, and a contract is concluded later, the estimated cost of the complete package could be up to $1.2 billion. The prime contractor will be the Boeing Company in Ridley Park, PA. There are no known offset agreements proposed in connection with this potential sale, and even though these will be Turkey’s first heavy-lift helicopters, this proposed sale will not require the assignment of any additional U.S. Government or contractor representatives to Turkey. DSCA announcement [PDF] | Defense News with Turkish reaction. DSCA request: Turkey (14 CH-47F) Dec 3/09: UAE request. The US Defense Security Cooperation Agency announces the United Arab Emirates official request to buy CH-47Fs and associated systems. The estimated cost is $2 billion, the prime contractor will be Boeing Integrated Defense Systems in St. Louis, MO, and the DSCA release [PDF] adds an interesting note: “The proposed sale will provide the United Arab Emirates the capability to transport equipment and troops in the region, as well as to support U.S. and NATO airlift requirements in Afghanistan.”[emphasis DID’s] Though it is not discussed much, the UAE does have troops in Afghanistan, serving as part of ISAF. Implementation of this proposed sale will require the assignment of 4 contractor representatives in the UAE for a period of 1 year, with an option for 2 additional years. During helicopter delivery, 1 additional U.S. government and 4 contractor representatives will be required for 1 week for quality assurance. Specific items requested include: 16 CH-47F Chinook helicopters 38 T55-GA-714A Turbine engines (32 quipped, 6 spares) 20 AN/APX-118 Identification Friend or Foe Transponders 20 AN/ARC-220 (RT-1749) Single Channel Ground and Airborne Radio Systems (SINCGARS) with Electronic counter-countermeasures 40 AN/ARC-231 (RT-1808A) Receiver / Transmitters 18 AN/APR-39A(V)1 Radar Signal Detecting Sets with Mission Data Sets Plus flight and radar signal simulators, support equipment, spare and repair parts, publications and technical documentation, site survey, construction and facilities, and U.S. Government and contractor support. Note that a DSCA request is not a contract, which must be signed after the 30-day Congressional blocking period has expired. The UAE also has some additional challenges these days, owing to $60 billion dollar debt default issues in Dubai. The UAE’s central government in Abu Dhabi is limiting its willingness to guarantee that debt, however. DSCA request: UAE (16 CH-47F) Dec 3/09: Support. Boeing in Ridley Park, PA receives a $21 million cost-plus-fixed-fee contract for interim contract support Phase II. Work is to be performed in Ridley Park, PA, with an estimated completion date of Dec 31/10. One bid was solicited with one bid received by U.S. Army Contracting Command’s Aviation & Missile Command in Redstone Arsenal, AL (W58RGZ-04-G-0023). Nov 9/09: UK. Defense News reports that Britain is planning to cancel its Future Medium Helicopter competition, and order Boeing Chinooks instead. The proposed move is part of a Ministry of Defence helicopter strategy called “Vision 2020,” which still requires approval by government ministers. Oct 28/09: Dutch. Luchtvaartnieuws reports [dead link, in Dutch] that the 6 initial Dutch CH-47Fs will be delayed to the end of 2010, due in part to software issues. They were originally scheduled to arrive by early 2010. The practical consequence? If the Dutch decide not to stay in Afghanistan past 2011, their CH-47Fs may not be deployed there. Oct 19/09: Sub-contractors. VT Group US, a unit of UK-based VT Group, announces a 5-year, $29.1 million contract to provide logistics analyses and support for the Army’s fleet of CH-47D/F Chinook cargo helicopters. Under the terms of the contract, VT Group’s Technical Services Division will provide CH-47D/F logistics fleet management, sustainment, CH-47F product manager, foreign military sales, and sustainment support related to all CH-47 cargo helicopters in the Army’s fleet. This includes logistic support to be performed for the CH-47D/F programs, subsystems, product improvements, and the Army’s modernization plan for the CH-47s. FY 2009 FY 2009 orders; Italian buy; Australian request. Sept 24/09: Sub-contractors. Canadian landing gear specialist Heroux-Devtek Inc. in Longeuil, PQ signs a 4-year Memorandum of Understanding with Boeing. It makes them eligible to provide landing gear for all H-47F aircraft scheduled to be delivered to export customers over the firm’s FY 2012-2016 period. Héroux-Devtek may also be considered for an intellectual property license to service variants in the worldwide fleet of over 1,000 Chinook helicopters, and the firm is especially interested in that aftermarket services opportunity. This MOU follows the Canadian government’s Aug 10/09 announcement to order 15 new “CH-147” Medium to Heavy Lift Helicopters, and supports Boeing’s Industrial & Regional Benefits commitment for the MHLH program. Heroux-Devtek release [PDF]. Sept 17/09: Turkey. Turkey is moving closer to a CH-47F contract, and its SSM procurement agency has reportedly added 4 Combat Search & Rescue (CSAR)/ Special Operations versions to its desired buy, raising the total to 14. Flight International reports that a letter of request has now been issued, and a contract signature is expected by mid-2010 via the USA’s Foreign Military Sales mechanism. Sept 14/09: +6 MH-47G. A $17.8 million firm-fixed-price contract involving 6 MH-47G Recap, Lot 7 Recap Aircraft. Work is to be performed in Ridley Park, PA with an estimated completion date of May 30/10 (W58RGZ-04-G-0023). As the price might suggest, this is not the full remanufacturing cost. Boeing representatives confirmed that it will be used to refurbish rotor blades, transmissions, and other re-used parts as part of the overall remanufacturing process. Aug 3/09: +5 CH-47F. A $108.8 million firm-fixed-price contract for CH-47F multiyear contract option for 5 new-build CH-47s, as part of FY 2009/ Production lot 7. Work is to be performed in Ridley Park, PA, with an estimated completion date of Sept 30/13. One bid solicited with one bid received (W58RGZ-08-C-0098). July 1/09: Australia. Shephard Group reports that Australia may not place a contract order for new CH-47Fs until 2012, and doesn’t expect to field them before 2016-2018. In the interim, Australia hopes to issue maintenance support tenders for its 6 existing CH-47Ds. The original acquisition plan, approved by the Liberal Party government, would have bought 3 new-build CH-47Fs, and remanufactured existing CH-47Ds to CH-47F configuration. The new Defence Capability Plan, issued this day, revises the timeline. May 13/09: Italian order. Italy’s ARMAEREO procurement agency signs a EUR 900 million ($1.23 billion equivalent) contract to buy 16 CH-47F heavy-lift helicopters for the Italian Army, with an option for 4 more. Read “Italy Buying CH-47F Helicopters” for more details, and updates. Italy: 16 CH-47Fs April 23/09: Australia request. The USA’s Defense Security Cooperation Agency announces [PDF] Australia’s official request to buy 7 CH-47F Chinook helicopters with 14 T55-GA-714A Turbine engines, 7 Dillon Aero M134D 7.62mm Miniguns, 16 AN/ARC-201D Single Channel Ground and Airborne Radios (SINCGARS), 7 Force XXI Battle Command Brigade and Below Blue Force Trackers (FBCB2/BFT), 2 spare T-55-GA-714A Turbine engines, plus mission equipment, communication and navigation equipment, ground support equipment, spare and repair parts, special tools and test equipment, technical data and publications, personnel training and training equipment, and support. The estimated cost is $560 million, but a DSCA request is not a contract. See “Australia Ordering CH-47F Chinooks” for further details and updates. DSCA request: Australia (7 CH-47F) April 23/09: +7 CH-47F. A $142 million firm-fixed-price contract for 7 new-build CH-47Fs in FY 2009, adding helicopters to the existing multi-year contract (see Aug 27/08) under production Lot 7 (see Dec 24/08). Work is to be performed in Ridley Park, PA with an estimated completion date of Sept 30/13. One bid was solicited and one bid received. Note that the 5-year contract includes options for up to 24 additional helicopters over its lifetime, in addition to agreed yearly production figures. This order brings Lot 7 production to 38 helicopters: 23 new-build CH-47Fs, and 15 remanufactured CH-47Fs (W58RGZ-08-C-0098). April 13/09: Boeing announces that a 4th U.S. Army unit has fielded the CH-47F Chinook: Company B of the 82nd Airborne Division’s 82nd Combat Aviation Brigade, 3rd General Support Aviation Battalion at Fort Bragg, N.C. Feb 26/09: Delivery. Boeing announces delivery of the first CH-47F Chinook manufactured under the 5-year U.S. Army contract awarded in August 2008. The helicopter will be assigned to the 82nd Airborne Division at Fort Bragg, NC, the 4th unit scheduled to be equipped under the Army’s ongoing Chinook modernization program. 1st MYP CH-47F Dec 24/08: +31 CH-47F. A $620.7 million firm-fixed-price contract for 31 Lot 7 production CH-47Fs, built under the 2nd year of the multi-year contract announced on Aug 27/08. This FY 2008 / Year 2 order includes 16 new-build CH-47Fs, 15 remanufactured CH-47Fs, plus Lot 8 long lead time items. These contracts also include integration of “government furnished equipment” like engines, electronics, and defensive systems, but the equipment itself is bought under separate contracts. Work will be performed in Ridley Park, PA with an estimated completion date of Sept 30/13. One bid was solicited and one bid received by the U.S. Army Aviation and Missile Command at Redstone Arsenal, AL (W58RGZ-08-C-0098). Dec 19/08: +6 MH-47G. A $114 million firm-fixed price contract for a modification that finalizes both long lead items for, and the procurement or remanufacture of, 6 Special Forces MH-47E aircraft to the MH-47G configuration. Work will be performed in Ridley Park, PA and Middletown, DE and is expected to be complete by May 30/11. One bid was solicited on May 8/08 by the Aviation Integration Directorate at Aviation and Missile Command, Fort Eustis, VA (W58RGZ-04-G-0023). Dec 15/08: Support. A $12.7 million cost plus fixed price contract for CH-47F Interim Contractor Support. Work will be performed in Ridley Park, PA with an estimated completion date of Dec 31/09. One bid was solicited and one bid was received (W58RGZ-04-G-0023). Nov 18/08: Boeing announces that its CH-47F Chinook helicopter has been fielded by Bravo Company, 2nd Battalion, 227th Aviation Regiment, 1st Air Cavalry Brigade, 1st Cavalry Division in Fort Hood, TX. This is the 3rd U.S. Army unit to field the CH-47F since the aircraft was certified combat-ready in July 2007. Nov 14/08: Sub-contractors. Eaton Corp. announces that it will receive new work from Boeing Company, as part of the CH-47F multi-year contract. Specific terms were not disclosed, but Eaton will supply a hydraulic system engine pump, motor pump and control box and the hydraulic control valves; fluid conveyance system hoses, tubes and fittings; lubrication system components and the helicopter’s engines health debris monitoring components. FY 2008 USA’s Multi-Year Buy; Canadian buy; Italian partnership; CAAS cockpit ready; Sabotage. CH-47F, Ft. Hood (click to view full) Aug 27/08: MYP-I. Boeing announces a 5-year, $4.3 billion U.S. Army contract for 181 CH-47F Chinooks, and 10 additional Chinooks under FY 2008 supplemental funding. There are also options in the award for an additional 24 helicopters over the course of the contract, which would bring the total to 215. The DefenseLINK release describes an initial $722.7 million payment on the firm-fixed-price multiyear contract (W58RGZ-08-C-0098), which runs until Sept 30/13. It comprises 109 CH-47F new-build aircraft, 72 CH-47F remanufactured aircraft, and priced options for 34 CH-47F new build aircraft (10 FY08 + 24 options). Boeing claims the multi-year award creates production security for the Boeing Rotorcraft Systems facility in Ridley Township, PA, and for its sub-contractors in over 45 states. They also claim a cost savings of more than $449 million for the U.S. Army. To date, Boeing has delivered 48 CH-47F helicopters to the U.S. Army, training and equipping two units, with a 3rd unit scheduled to stand up in August 2008. The helicopters are currently undergoing its first deployment to Iraq. Boeing release. MYP Contract July 16/08: Italian partnership. Boeing and Finmeccanica SpA subsidiary AgustaWestland sign an agreement that defines the terms for the joint manufacture of new CH-47F Chinook helicopters to replace earlier models used by the Italian Army. Orders are expected to follow, and not just from Italy. The agreement also includes a licensing arrangement that lets AgustaWestland to market, sell and produce the Boeing CH-47F Chinook to the United Kingdom, other European countries, and “several countries in the Mediterranean region.” AgustaWestland has been Boeing’s European partner for other versions of the CH-47, and this new agreement continues and extends that relationship. As prime contractor for the Italian CH-47F, AgustaWestland will be responsible for design and systems integration, and for aircraft delivery to the Italian Army. Boeing Rotorcraft Systems will build the fuselage in Ridley Park, PA. Boeing release | AgustaWestland release. Italian partnership May 13/08: Sabotage. During QA inspections, a pair of newly assembled Chinook helicopters at the Boeing plant south of Philadelphia are found to have severed wires in them, and a propeller part (washer) where one didn’t belong. The incident was subsequently determined to be deliberate sabotage, and the production line was closed for 2 days. Digital Journal, “Two Chinook Helicopters Sabotaged At Boeing Plant” | Boeing release May 15 | Philly.com, “Probe at Boeing plant shoddy workmanship or sabotage”. Sabotage May 6/08: Engines. Honeywell International of Phoenix, AZ received a maximum $48.9 million, Firm-Fixed price Indefinite Delivery/ Indefinite Quantity (IDIQ) contract for Engine and Maintenance Support for the T55-GA-714A Engines and Components used on the MH-47G Helicopters. Work will primarily be performed at Greer, SC and is expected to be completed by Dec 31/12. This contract was awarded as a sole source, to the firm that makes the engines (H92241-08-D-0006). April 7/08: Canada contract. Canada’s Ministry of Public Works and Government Services announces a March 2008 sole-source RFP to Boeing for 16 CH-47F Chinook helicopters, plus 20 years of associated in-service support (ISS), with an extension option for the life expectancy of the aircraft. These helicopters use CH-47Fs as their base, but include so many modifications that they’re almost a different helicopter. That ends up costing the Canadians. See the June 28/06 entry for details, and read “On The Verge: Canada’s $4.7B Program for Medium-Heavy Transport Helicopters” for full coverage. Canada is also looking to buy 6 CH-47D helicopters for delivery before February 2009. They end up being used in Afghanistan in order to meet Parliament’s requirements for continuing the mission, and could be upgraded after the CH-47Fs arrive. Canada: 16 “CH-147” Feb 1/08: FY 2008. A “large firm-fixed price contract [for 10] CH-47F new build production helicopters” is announced on DefenseLINK. DID is later able to confirm the figure: $280.5 million. Work will be performed in Philadelphia, PA and is expected to be complete by Dec 31/12. One bid was solicited on Dec 31/03, and 1 bid was received by the U.S. Army Aviation and Missile Command in Redstone Arsenal, AL (W58RGZ-04-C-0012). A Feb 27/08 Boeing release corrects the number 11 helicopters, and adds that this award brings the number of new CH-47F Chinooks on contract to 59. Aircraft deliveries under this award will begin in 2011. 11 CH-47Fs Oct 8/07: CAAS. Rockwell Collins announces that its Common Avionics Architecture System (CAAS) in the Boeing CH-47F cockpit has been declared operationally ready for deployment by the U.S. Army. The CAAS upgrades/suites were delivered on time, and on budget. Initially developed for US Special Operations Forces’ MH-47 and MH-60 helicopter fleets, Rockwell Collins’ CAAS solution was subsequently incorporated into the UH-60M, MH-60T, VH-60N Presidential helicopter, ARH-70A, and the CH-53E and CH-53K. CH-47F CAAS ready FY 2006 – 2007 US orders; 1st production rollout; CH-47F declared combat-ready; HH-47’s CSAR-X crash begins; Europe’s notional HLR; Requests & plans in Canada, Italy, Netherlands. CH-47F, Ft. Irwin (click to view full) Sept 14/07: +1. A $25.5 million modification to a firm-fixed-price contract (W58RGZ-04-C-0012) for a CH-47F New Build Production Helicopter. Work will be performed in Ridley Park, PA and is expected to be complete by Dec 31/12. This was a sole source contract initiated on Dec 31/03 by the U.S. Army Aviation and Missile Command at Redstone Arsenal, AL. 1 CH-47F Sept 4/07: Europe. Defense Aerospace reports that the Franco-Germany Heavy Lift Helicopter (HTL/FTH) program may not involve full development of a new design, and says that 3 helicopters are being evaluated in the initial phase: the Boeing CH-47F Chinook, the Sikorsky CH-53K project, and Mil’s Mi-26T. See DID’s in-depth coverage of this program, its emerging requirements, and the contenders. That “growth version” of the CH-47F would appear to be necessary if Boeing wants to be a serious competitor. Aug 17/07: Jane’s International Defence Review reports that: “Boeing is looking to enhance the workhorse helicopter to improve range and payload. Director of Boeing H-47 programmes Jack Dougherty said in a presentation to reporters at Fort Campbell that the company continues to fund research into the possibility of a “growth Chinook” beyond the CH-47F.” Aug 14/07: Combat-ready. The CH-47F Chinook helicopter has been certified combat-ready by the U.S. Army and 13 have been fielded to the first operational unit: the 101st Airborne Division’s Bravo Company (“Varsity”), 7th Battalion, 101st Aviation Regiment, 159th Combat Aviation Brigade, based at Ft. Campbell, KY. Boeing release. Combat ready July 16/07: Boeing announces U.S. Army authorization for full-rate production and fielding of the new CH-47F Chinook helicopter, following operational testing at Fort Campbell, KY, in April 2007. Boeing will now move forward with First Unit Fielding in July 2007. Boeing release. FRP July 8/07: CH-47F new. A $76.5 million modification to a firm-fixed-price contract for CH-47F new build production helicopters. Work will be performed in Philadelphia, PA and is expected to be complete by Dec. 31, 2012. This was a sole source contract initiated on Dec. 31, 2003 (W58RGZ-04-C-0012). CH-47F new-build July 5/07: MH-47G. Boeing Co. in Ridley Park, PA receives a delivery order amount of $52.7 million as part of a $147.3 million firm-fixed-price contract for remanufacture of H-47 aircraft to the MH-47G configuration. Work will be performed in Ridley Park, PA (98.3%), and Middletown, DE (1.7%), and is expected to be complete by Aug. 30, 2008. This was a sole source contract initiated on June 28, 2006 by the U.S. Army Aviation and Missile Command, Fort Eustis, VA (W58RGZ-04-G-0023). July 5/07: MH-47G. Boeing Co. in Ridley Park, PA receives a delivery order amount of $6.5 million as part of a $112.5 million firm-fixed-price contract for remanufacture of H-47 Aircraft to the MH-47G configuration, and an option for additional aircraft. Work will be performed in Ridley Park, PA (98.3%), and Middletown, DE (1.7%), and is expected to be complete by May 31, 2010. This was a sole source contract initiated on April 11, 2007 by the U.S. Army Aviation and Missile Command in Fort Eustis, VA (W58RGZ-04-G-0023). MH-47G rebuilds June 18/07: Testing. Boeing announces that the CH-47F Chinook helicopter has successfully completed U.S. Army operational testing at Ft. Campbell, KY. Testing was completed ahead of schedule by Bravo Company (Varsity), 7th Battalion, 101st Aviation Regiment, 159th Combat Aviation Brigade, 101st Airborne Division (Air Assault); the tests simulated numerous mission scenarios, including air assault, combat re-supply and transport operations, over more than 60 flight test hours. Boeing release. CH-47F testing done April 5/07: Italy. Boeing Corp. says it expects that Italy will buy 16-20 CH-47Fs, through a joint production agreement with Italian conglomerate Finmecccanica SpA. The deal has reportedly been in the works for a while, and Boeing said it expects the orders around 2008-2009. Boeing spokesman Joseph LaMarca says that the expected Italian purchase will be a direct commercial sale, with AgustaWestland as the prime contractor and Boeing as the lead subcontractor. In 2006, the 2 companies signed a new memorandum of understanding that lays out an industrial agreement for further Italian Chinook production. World Aeronautical Press Agency. March 3/07: MH-47G. A delivery order amount of $48.2 million as part of a $69.9 million firm-fixed-price contract for long lead items used to remanufacture Chinooks to the MH-47G US Special Forces configuration. Work will be performed in Ridley Park, PA (98.3%), and Middletown, DE (1.7%), and is expected to be complete by Aug. 30, 2008. This was a sole source contract initiated on Jun. 28, 2006 by the U.S. Army Aviation Integration Directorate in Fort Eustis, VA (W58RGZ-04-G-0023). Feb 27/06: CSAR-X hits turbulence, eventually crashes. The US Government Accountability Office upholds protests by Sikorsky & Lockheed Martin. It orders the USAF to re-bid the CSAR-X contract, and cancel Boeing’s HH-47 contract if another firm is deemed to have the better bid. This kicks off an acrimonious process featuring revisions to the RFP, public criticism by the contractors involved, and a second round of protests. It eventually leads to Air Force cancellation of the entire CSAR-X program. CSAR-X begins its crash Feb 19/07: Testing. The first production CH-47F has moved into Operational Testing at Ft. Campbell, KY after completing acceptance and developmental flight testing in December 2006. This phase, which ends in April 2007, includes more than 60 flight test hours that simulate a wide range of mission scenarios. Flight tests will be conducted by Bravo Company, 7th Battalion, 101st Aviation Regiment, 159th Combat Aviation Brigade, 101st Airborne Division (Air Assault). Boeing release. Dec 22/06: CH-47F rebuilds. The full delivery order amount of $650.3 million is received as part of a firm-fixed-price contract for CH-47F remanufacture. Work will be performed in Philadelphia, PA, and is expected to be complete by Dec. 31, 2009. This was a sole source contract initiated on July 28, 2005 (W58RGZ-04-G-0023). Dec 22/06: New CH-47Fs. A $406.4 million modification to a firm-fixed-price contract for the CH-47F new build helicopters. Work will be performed in Philadelphia, PA, and is expected to be complete by Dec. 31, 2012. This was a sole source contract initiated on July 28, 2005 (W58RGZ-04-C-0012). Dec 22/06 – Boeing addendum: A Jan 3/06 press release from Boeing puts the total value of these contracts at $1.5 billion, and describes the order as production contracts for 16 new-build CH-47Fs and 9 remanufactured CH-47Fs valued at $624 million, plus options for 22 additional new-build CH-47Fs and 19 remanufactured CH-47Fs valued at more than $920 million. Presumably, the $406.4 million announcement represents the 19 remanufactured aircraft, with an $515 million option still outstanding for the 22 new-build CH-47Fs. Aircraft deliveries will begin in early 2008. 25 CH-47Fs, options for 41 Nov 9/06: CSAR-X. Boeing announces that it has won the $10 billion CSAR-X combat search-and-rescue competition with its HH-47 variant. The contract calls for 145 aircraft: 4 test platforms, and 141 production helicopters. It’s eventually canceled. See DID’s FOCUS Article. CSAR-X “win” Nov 7/06: New CH-47Fs. A $163.3 million modification to a firm-fixed-price contract for CH-47F New Build Production Helicopters. Based on past order totals and contract values, this will buy the US Army about 8 CH-47Fs. Work will be performed in Philadelphia, PA, and is expected to be complete by Dec. 29, 2009. This was a sole source contract initiated on Dec. 31, 2003 (W58RGZ-04-C-0012). First flight (click to view full) Oct 23/06: The first production CH-47F Chinook helicopter successfully completes its first flight from the Boeing Rotorcraft Systems facility in Ridley Park, PA. 1st CH-47F flight Sept 27/06: Dutch request. US DSCA notifies Congress of the Netherlands’ request for up to 9 new CH-47F helicopters along with 18 of Honeywell’s T55-L-714A turbine engines and 18 Common Architecture Avionics System (CAAS) cockpits. The latter set will be used as spares, and will also help upgrade 11 of its existing CH-47D Chinook Cargo Helicopters to CH-47F configuration. The total value, if all options are exercised, could be as high as $652 million, and principal contractors in this sale will also include Honeywell, Incorporated of Phoenix, AZ. In February 2007, a contract is issued for only 6 new-build CH-47F (NL) helicopters, without the CAAS cockpits. DID details the new helicopters, and explains what’s going on. Dutch request 9, buy 6 June 28/06: Canada. Canada announces an estimated $4.7 billion project to acquire a fleet of 16 medium-to heavy-lift helicopters. The announcement is made as an Advance Contract Award Notice (ACAN), which permits the Government to identify an intended contract award winner (in this case, the Boeing CH-47F Chinook) and then buy that choice unless an offer deemed to be better is received from industry within 30 days. See complete DID coverage in “On The Verge: Canada’s $4.7B Program for Medium-Heavy Transport Helicopters“, including the links to the situation on the ground in Afghanistan, and some potential timing issues for the CH-47F. June 15/06: The first production CH-47F Chinook helicopter is unveiled to the U.S. Army during a rollout ceremony in Ridley Park, PA. See Boeing release. CH-47F rollout April 18/06: A $7.5 million modification to a firm-fixed-price contract for long lead parts for the CH-47 Helicopter. Work will be performed in Ridley Park, PA and is expected to be complete by Nov. 30, 2008. This was a sole source contract initiated on April 1, 2005 (W58RGZ-04-C-0012). Awards under contract # W58RGZ-04-C-0012 have also included: Feb 16/06: $24.4M for undefined new-build CH-47F Aug 30/05: $53.4M for 2 new-build CH-47F May 10/05: 186.2M for undefined new-build CH-47F Dec 23/04: $243.0M for 10 new-build CH-47F Dec 05/03: $151.5M for 7 new-build CH-47F See Appendix A for more details. Appendix A: Reconciling Previous Contracts and Numbers Helping hand (click to view full) The problem DID ran into was difficulty reconciling announced contracts with corporate releases and also getting a firmer set of numbers, in order to get a more complete picture. A January 12, 2005 Boeing press release, for instance, noted that Boeing had signed a $549 million contract on Dec. 21, 2004 with the U.S. Army for 17 new-build CH-47F Chinook helicopters. This included seven aircraft authorized in December 2003 as part of the FY ’03 supplemental defense appropriation bill, and 10 aircraft approved in the current fiscal year defense budget (which ended Oct 2005, by which point the contract announcements had risen to $634.1M). Fortunately, Boeing CH-47 Program Manager Ken Eland bails us out with an excellent explanation. Photos and links added… “Chinook contract history is complex, because it involves both undefinitized contract actions (UCAs), which you may consider initial contract agreements, that lay out approximate monetary values for statements of work, and the full contract awards, subject to a large number of terms and conditions that specify in very minute detail costs for each step we undertake in the production process, starting with procurement of components and systems. On December 5, 2003, Boeing and the Army agreed on an undefinitized contract action for $151.5 million to cover initial costs for development and production of seven new-build CH-47Fs. The funding for this action came from a supplemental appropriation. The purpose of the UCA was to energize the program quickly, given the availability of funds. The appropriation was not the final contract value, but an authorization value for the contract we would sign the following year. CH-47F (click to view full) We signed the full contract in December of 2004, with a definitized value of $306.4 million. We also signed a contract in December of 2004 for $243 million for ten new-build CH-47Fs. We had, in other words, booked 17 brand new CH-47Fs to add to the Army’s existing Chinook fleet, all of which we are modernizing under the Cargo Helicopter Modernization Program that we initiated in 2003, with first deliveries for Production Lot 1 in 2004. That program is slated to continue until about 2019 under the current production and delivery schedule. The 17 new CH-47Fs are the first installment of 55 currently authorized to increase the Army’s Chinook fleet. To effectuate this change, we modified the previous definitized contract, increasing its value to $549 million ($243 million + $306.4 million). On May 10, 2005, we agreed to a contract action for $186.2 million for “Renew” CH-47Fs. These aircraft are inducted CH-47Ds that are remanufactured into CH-47Fs. We have termed these aircraft with new fuselages “Renew” rather than remanufactured, to distinguish from those with modernized rather than new fuselages. Production Lot 3 involves 8 CH-47Fs, all of which will utilize new structures. All aircraft in Production Lots 1 and 2 used reconditioned fuselages, and were MH-47G Special Operation Chinooks, except the first one, a CH-47F. In August 2005, we also added $53.4 million in another undefinitized contract agreement for two more CH-47Fs. This amount was a not-to-exceed (NTE) value, and we later definitized the actual value at $48.6 million for two new CH-47Fs. A modification was also included for additional configuration items to the CH-47F baseline valued at $19M. This increased the value of the New Build contract to $616.6M ($549M + $48.6M + $19M) We also were awarded a $298.1 million contract for the Cargo Helicopter Modernization Program for Production Lot 4, consisting of 15 renewed CH-47Fs. This amount will cover recapitalization of aircraft systems and any over and above costs we incur for unplanned modernization work that may occur due to the condition of the inducted aircraft. This month, February 2006, we added another $24.4 million contract for one additional new-build CH-47F. So, our current contract status is as follows: We have a contract in place for 20 new build CH-47Fs with a total value of $640 million that also includes nonrecurring costs associated with development. ($549 million + $48.6 million + $19M + $24.4 million, rounded to take into account other minor contract modifications). Our Cargo Helicopter Modernization Program involves renewed CH-47Fs for Production Lots #3 (8 aircraft) and #4 (15 aircraft) totaling 23 aircraft with a contract value of $484 million. Lots 1 and 2 already have been delivered. As noted, all except one CH-47F, the initial delivery in Lot 1, have been MH-47G Special Operations Chinooks. FYI, we delivered 22 G models in those two lots. Deliveries of the 17 new-build [DID: CH-47F] Chinooks will begin in September 2006 and continue through the end of 2008.” N.B. The contracts for Lot 1 and Lot 2 related to CH-47F model are not included in this article. The values discussed here only reflected models starting with Lot 3, and the initial New Build contract. Additional Readings Background: Helicopters Boeing – CH-47D/F Chinook. Boeing, via WayBack – MH-47E/G Special Operations Chinook. Army Technology – CH-47D/MH-47E Chinook Heavy Lift Helicopter, USA. The Helicopter Page, via WayBack – How Helicopters Work. Actually, all about the H-47 Chinook and how tandem-rotor helicopters work. Very enlightening. Especially the story at the end. Chinook Helicopters and Company H, 4th Battalion, 7th Aviation Regiment: “CH-47 Chinook Helicopter News and History”, via WayBack – Chinook-Helicopter.com. Excellent site for all things related to the CH-47, with an especially impressive set of pages, photos, etc. covering actual operations. National CH-47F Family Variants DID – Australia Ordering CH-47F Chinooks. They avoided the extra costs and delays the Canadian and Dutch faced, by buying standard American configuration. Major procurement reform reports like the Kinnaird Review have consistently recommended that sort of approach. DID – Britain Ordering More Chinooks. Their “CH-47 Mk.6” sure sounds a lot like the CH-47F, with some changes. DID – On The Verge: Canada’s $4B+ Program for Medium-Heavy Transport Helicopters. Covers Canada’s CH-147s, which are a unique configuration. That really drove up costs. DID – Chinooks for the Dutch: The CH-47F (NL) Heavy-Lift Helicopter. Not the same configuration as the US model. DID – Italy Buying CH-47F Helicopters. Known as “ICH-47Fs” there. The prime contractor is AgustaWestland, who will complete final assembly and has a license to sell and produce the CH-47F for Britain, other European countries, and “several countries in the Mediterranean region.” That extends similar arrangements with previous CH-47 models. News & Views Boeing Features (Aug 19/13) – Making a ‘cool’ Chinook. Deals with the COOLS convertible cargo floor, includes a video. Rotorhub (Oct 23/12) – AUSA 2012: Boeing preparing for next steps on Chinook roadmap. Flight International, via WayBack (April 1/08) – New Chinook models extend heavylift helicopter’s life. View the full article
  10. For a moment today I put on my Chinese Red Hat, and suddenly had a bit of strategic claustrophobia. Why? A map. All it took was a map perspective. Come on over to USNIBlog to see the obvious hidden in plain sight. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1wQYX1fpJ7I:VPmaLWVQA1E:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1wQYX1fpJ7I:VPmaLWVQA1E:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1wQYX1fpJ7I:VPmaLWVQA1E:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1wQYX1fpJ7I:VPmaLWVQA1E:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/1wQYX1fpJ7IView the full article
  11. As the U.S. decides who will be president for the next four years a review of procurement spending indicates that the Trump Administration has shown little difference in appropriations versus previous administrations, despite claims to have radically increased spending. The upshot is that the last four years saw about $2.9 in spending appropriated in inflation-adjusted dollars, which was larger than Barak Obama’s second term, but less than the Obama Administration’s first term. President Trump’s campaign speech claims of spending during his term relative to previous terms are incorrect. President Trump claimed this year that military spending in the 90s “used to be ‘million.’ And then, about 10 years ago, you started hearing ‘billion.’ And now you’re starting to hear ‘trillion,’ right?” Of course, U.S. defense spending hit the billions in the late 1940s, and recent spending has been on pace with spending from the decade previous. The Trump Administration has done little to change the often-criticized Pentagon trend of investing more money in fewer pieces of equipment, such as fighter jets that cost a quarter billion dollars each when fully kitted out. The navy is running fewer ships that each cost more. Previous administrations did no better in reversing this trend, of course. Democratic presidential candidate Joe Biden stated multiple times that he has no plans to reduce military spending, but indicated a desire to refocus military budgets and planning on “near-peer” powers Russia and China, while attempting to recover some of the goodwill of allies tested by the Trump Administration’s active skepticism in cooperation with allies, especially the NATO alliance. View the full article
  12. Sponsored: Cyber security firm CyberCatch will host a free webinar on November 18 to review current threats and soon-to-be-required compliance requirements. View the full article
  13. Americas Sikorsky won a $550.4 million modification, which is for Lot IV low rate initial production and delivery of six CH-53K aircraft and associated aircraft, programmatic and logistics support, rate tooling and physical configuration audits. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. The aircraft can be operated from austere and remote forward operating bases. It is Marine Corps’ heavy-lift replacement for the CH-53E Super Stallion. Designed to lift nearly 14 tons at a mission radius of 110 nautical miles, in Navy high/hot environments, the CH-53K is designed to lift triple the baseline CH-53E lift capability. The CH-53K will have an equivalent logistics shipboard footprint, lower operating costs per aircraft, and less direct maintenance man hours per flight hour. The Marine Corps has a requirement for 200 CH-53Ks. Work will take place in Connecticut, Kansas, Washington, Texas, Canada, Wisconsin, the UK and Florida. Estimated completion will be in July 2024. The Royal Canadian Air Force (RCAF) AWACS qualified Aerospace Controllers (AECs) and Aerospace Control Operators (AC Ops) are now able to wear a new ‘wings’ badge that was officially rolled out on October 23. The North American air arm said the new wings recognizes the demanding training, arduous qualifications, and extensive responsibilities needed to maintain Combat Mission Ready status. „When the AWACS positions were established in 1974, it was assumed that AECs and AC Ops in those positions did not directly contribute to the safe operation of the aircraft, which would justify an upswept wing-style aircrew flying badge. In addition, it was assumed they would only fly occasionally. Our understanding of their responsibilities has changed“, it says in a statement. Middle East & Africa Israel’s Elbit was chosen to supply light tanks and wheeled APCs to the Philippine Army. The contracts are said to include nearly $200 million worth of Sabrah tanks and armored combat vehicles. According to reports, Elbit Systems is the winner of two large tenders for the supply of light tanks and wheeled armored personnel carriers to the Philippine Army. According the website, the Israeli Ministry of Defense received the notice of award for these two tenders several months ago. As part of the light tank contract, Elbit will supply 18 Sabrah ASCOD 2 tracked tanks, 10 Sabrah Pandur II 8×8 wheeled tanks, one ASCOD 2 armored command vehicle and one ASCOD 2 armored recovery vehicle worth approximately $196 million. The wheeled APC contract includes 28 IVECO Guarani 6×6 wheeled APCs worth about $47 million. All APCs have a manned turret with a 12.7mm heavy machine gun and a 40mm automatic grenade launcher. In addition, the APCs are equipped with an E-LynX computer-based communication system and a Torch-X combat management system made by Elbit. Europe Rolls-Royce has signed a collaborative agreement with the UK Ministry of Defense to strengthen ways of working across key Royal Navy programmes. The firm say that the Memorandum of Understanding describes a commitment of both parties to work together to deliver on-going support for Rolls-Royce MT30 and WR-21 engines and an understanding of how that will be done. The agreement will improve on-going support for the Rolls-Royce MT30 engines that power the Royal Navy’s Queen Elizabeth Class (QEC) Aircraft Carriers. It also covers support of the WR-21 engines that power the Royal Navy’s Type 45 destroyers. Lockheed Martin won a $194 million contract modification, which adds a $180,000,000 not-to-exceed, undefinitized line item for the production and delivery of four MH-60R aircraft, and exercises a $13,980,348 option to procure three airborne low frequency sonars in support of the government of Greece. This comes at a time when the Greece is running deep into a dispute with Turkey. In 2019, the US State Department cleared a $600 million foreign military sale (FMS) of seven MH-60R Seahawk multi-mission helicopters to Greece. In July 2020, Greece signed a contract for the purchase of 4 new units, via this program. The MH-60R SeaHawk helicopter is a twin-engine, multi-mission, all-weather Naval utility helicopter, based on the Army’s UH-60 BlackHawk, and is used for a variety of roles including anti-submarine warfare (ASW), anti-surface warfare (ASUW), naval special warfare (NSW) insertion, search and rescue (SAR), combat search and rescue (CSAR), vertical replenishment (VERTREP), and medical evacuation (MEDEVAC) operations. Work under the modification will take place in New York, Connecticut, Alabama, France and Rhode Island. Expected completion will be in February 2025. Asia-Pacific A spokesman of the Chinese defense ministry suggested that China will retaliate if $1.4 billion U.S arms sales to Taiwan go through. „The move seriously damages relations between the two countries and the two militaries, as well as the peace and stability across the Taiwan Strait. China firmly opposes it,” said spokesperson Col. Tan Kefei of China’s Ministry of National Defense. „China strongly urges the US side to immediately cancel the plans of selling weapons to Taiwan and cease military contact with the island and handle issues related to Taiwan prudently, so as to avoid serious consequences to Sino-American bilateral and mil-to-mil relations, as well as peace and stability across the Taiwan Strait,” he added. The statement from the ministry noted that, according to Tan, “if the US side discards the basic norms of international relations, violates its commitment and acts capriciously and obstinately, China will for sure resolutely strike back.” The U.S. State Department approved arms deals with Taiwan on Thursday, totaling $1.4 billion. View the full article
  14. CH-53K concept (click to view full) The U.S. Marines have a problem. They rely on their CH-53E Super Stallion medium-heavy lift helicopters to move troops, vehicles, and supplies off of their ships. But the helicopters are wearing out. Fast. The pace demanded by the Global War on Terror is relentless, and usage rates are 3 times normal. Attrition is taking its toll. Over the past few years, CH-53s have been recalled from “boneyard” storage at Davis-Monthan AFB in Tucson, AZ, in order to maintain fleet numbers in the face of recent losses and forced retirements. Now, there are no flyable spares left. Enter the Heavy Lift Replacement (HLR) program, now known as the CH-53K. It aims to offer notable performance improvements over the CH-53E, in a similar airframe. The question is whether its service entry delay to 2018-2019 will come too late to offset a serious decline in Marine aviation. The HLR Program Lifts Off Sikorksy on HLR, 2011 The $25.5 billion, 200-helicopter CH-53K program will define the long-term future of the US Marine Corps’ medium-heavy lift capabilities – and may be needed to save Marine aviation in the medium term. On average, existing CH-53E aircraft are more than 15 years old, have over 3,000 flight hours under tough conditions, and are becoming more and more of a maintenance challenge with a 44:1 maintenance man-hours:flight hours ratio. Not to mention the resulting $20,000 per flight-hour cost ratio. According to Jane’s Defense Weekly, a 1999 analysis showed that the existing fleet has a service life of 6,120 flight hours, based on fatigue at the weakest point where the tail folds. The USMC expected that the existing fleet would start to reach this point in 2011, at a rate of 15 aircraft per year. The funding profile below suggests a problem for the Corps: Excel download The Marine Corps itself is the source of the disconnect. The HLR program initially called for 156 new-build helicopters derived from the CH-53E Super Stallion design, with initial flight tests in 2010-2011, and initial operating capability (IOC) in 2014-2015. IOC was defined as a detachment of 4 aircraft, with combat ready crews, and prepared to deploy with all required equipment and spares. In 2010, however, the Marines grew the program plan to 200 helicopters, even as they pushed its initial flight back to FY 2013, and IOC back to FY 2018. The program wasn’t experiencing problems, and no reasons were given, beyond statements concerning the program’s aggressive schedule. Further slippage has occurred since. Here’s the full timeline: Up, up, and… (click to view full) The current schedule creates a number of risks for the Marine Corps. There’s no question that pushing the CH-53K program back will leave the Marines with a dwindling heavy-lift helicopter fleet, whose size, capability, and safety are governed by mechanical realities rather than political diktat. In April 2010, the US military ran out of stored CH-53D/E airframes to refurbish and return to the front lines. In February 2011, the USMC retired its CH-53D fleet altogether. The other risk is political. On the one hand, the CH-53K is a large program, and the farther the Marines push it away, the easier it is to cut amidst budget crises. With its heavy-lift fleet dwindling, that could be disastrous for the force. On the other hand, budgetary crises also look for programs that are late or experiencing problems, and the CH-53K is big enough to earn a lot of attention if it’s seen as screwing up. That fact that the original schedule was overly aggressive wouldn’t be remembered. Was the move to push the CH-53K back an act of political negligence, to protect less critical programs like the V-22? Or was it an act of supreme prudence, which will lead to a strong program that survives precisely because it goes out and meets its targets? Opinions vary. Time will tell. Current Status Some assembly required (click to view full) US Navy PMA-261 is responsible for the CH-53K program. Sikorsky is currently working under a $3.5 – 4 billion System Development and Demonstration (SDD) contract, to include 4 SDD flight test helicopters, 1 ground test airframe, and associated program management and test support. As the development timeline stretched out, 6 System Development Test Aircraft were added to to that mix. To date, Sikorsky’s industrial partners include: The CH-53X / CH-53K Mission example (click to view full) The CH-53K’s maximum gross weight (MGW) will increase to 88,000 pounds with external loads, versus 73,500 pounds for the CH-53E. MGW with internal loads will be 74,000 pounds, compared to 69,750 pounds for the CH-53E. It’s being designed to carry a cargo load of 27,000 pounds (13.5 tons) 110 nautical miles, operating at an altitude of 3,000 feet and an ambient temperature of 91.5 degrees Fahrenheit. This is nearly double the capacity of the current CH-53E Super Stallions, all in a helicopter that’s roughly the same size. Those altitude and temperature qualifications matter, too, because “hot and high” conditions lower aircraft load carrying capabilities and combat radius – especially for helicopters. This reduced performance has recently been a factor during operations in Afghanistan and relief efforts in Pakistan, for instance, and has been a factor with earlier models of the C-130 Hercules as well. Figures for the CH-53K operating entirely around sea level and in cooler temperatures would be higher, but would not be double that of existing CH-53Es. As an example of these variables at work, Sikorsky’s CH-53K brochure states that the improved CH-53K will have a maximum external load of 16.3t/ 36,000 lbs. On the other hand, an operation that carries an externally-slung load from sea level to a point 3,000 feet above sea level, with a total range there and back of 220 nautical miles/ 407 km, and 30 minute loiter at the landing zone, would have a maximum mission load of only 12.25t/ 27,000 lbs. MRAP: RG-31, IEDed (click to view story) Even at sea level, however, increased lift capacity will be important. As the Hummer’s fundamental lack of survivability began to marginalize it on the battlefield, the Marines led the charge to field “MRAP” blast-resistant vehicle designs instead. While an up-armored HMMWV weighs about 9,100 pounds empty, the lightest Category 1 MRAP patrol vehicles check in at weights ranging from 16,000 – 31,000 pounds, and even the “light” JLTVs that will replace a large segment of the HMMWV fleet are expected to weigh 14,000 – 20,000 pounds. Those weights mean that tactical operations to airlift mobile forces ashore beyond the beach, or within the zone of operations, will have only one helicopter available that can get the job done: the CH-53. If the Marines think their CH-53 fleet is seeing heavy use now, just wait. New Technologies CH-53K concept (click to view full) In order to meet those requirements, the CH-53K will be depending on a number of new technologies. No one technology constitutes a big stretch, which is good news for the program. Instead, a host of technologies that have been developed since the CH-53E program will be refined, and used in inter-related areas. For the basic outlines of many low-risk CH-53X/CH-53K improvements, read “An Affordable Solution To Heavy Lift” [PDF] by Lt. Col. James C. Garman, an H-53 family pilot and Senior Preliminary Design Engineer in Sikorsky’s New Product Definition Group. See also this interview with former HLR program manager Col. Paul Croisetiere. The most important new addition to the CH-53K will be its 7,500shp class GE38 / T408 engines, which have already hit 8,300 shp in ground tests. The military is hoping for 18% better specific fuel consumption than the similarly sized T64 engine, even though the engine would produce 57% more power. To improve maintenance and reliability, the GE38 is also expected to have 63% fewer parts. Other technologies slated for the CH-53K include a “glass” [digital] cockpit that has high commonality and interoperability with existing Army and Navy helicopters, high-efficiency rotor blades with anhedral tips that have 12% (main) and 15% (tail) more surface area, plus different construction to handle higher loads; a composite cuff attachment that attaches the main blades directly to an elastomerically-articulated titanium rotor head, without the need for specialized tools or multiple redundant fasteners; a cargo rail locking system; external cargo improvements, survivability enhancements, and enhancements designed to extend service life. Changes will be made as the program progresses, and engineers get a better sense of which technologies are ready, and which would create risks to the program. For example, the CH-53K was going to use a “viscoelastic lag damper” for the rotors, in order to minimize vibration and stress. It was removed in order to speed up deployment, and a modified version of standard linear hydraulic dampers will be used instead. The Navy hopes to achieve 2x reliability compared to the existing CH-53Es, but gave up the potential for 4x reliability, in exchange for less development risk. Sikorsky on CH-53K Given the CH-53E’s large maintenance ratio, reliability will matter. As former HLR program manager Col. Paul Croisetiere put it in a NAVAIR release: “Given the CH-53E’s operational costs and maintenance demands, heavy lift has built its reputation for excellence on the backs of our maintainers… We are going to take our maintainers somewhere they’ve rarely been before. Home for dinner.” Several decades of weapon program history suggest that the odds of meeting this goal are low. Instead, the trend is that these promises are made, but more advanced and complex weapons wind up having more points of failure, and require even more maintenance. If the CH-53K program can break that cycle, it would represent a landmark success in Pentagon weapons acquisition. Contracts & Key Events Unless otherwise noted, all contracts are issued by US Naval Air Systems Command in Patuxent River, MD. FY 2014 – 2020 Takeoff? (click to view full) October 28/20: Lot IV Sikorsky won a $550.4 million modification, which is for Lot IV low rate initial production and delivery of six CH-53K aircraft and associated aircraft, programmatic and logistics support, rate tooling and physical configuration audits. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. The aircraft can be operated from austere and remote forward operating bases. It is Marine Corps’ heavy-lift replacement for the CH-53E Super Stallion. Designed to lift nearly 14 tons at a mission radius of 110 nautical miles, in Navy high/hot environments, the CH-53K is designed to lift triple the baseline CH-53E lift capability. The CH-53K will have an equivalent logistics shipboard footprint, lower operating costs per aircraft, and less direct maintenance man hours per flight hour. The Marine Corps has a requirement for 200 CH-53Ks. Work will take place in Connecticut, Kansas, Washington, Texas, Canada, Wisconsin, the UK and Florida. Estimated completion will be in July 2024. August 13/20: Maintenance Sikorsky won a $25.1 million delivery order, which provides non-recurring engineering for the development of logistics support products for the Maintenance Task Analysis Phase II, a provisioning database of technical information to include 2D drawings that supports all operational, intermediate, and depot level maintenance for the CH-53K helicopter. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. The aircraft can be operated from austere and remote forward operating bases. Work will take place in Connecticut, Florida, Missouri, France, Georgia, England, New York, New Jersey and Ohio. Expected completion will be in August 2024. July 2/20: Pilot Repair Material Sikorsky won a $107 million modification for the low rate initial production of organic capability pilot repair material, technical publications, peculiar support equipment and logistics support for the CH-53K King Stallion aircraft. The Sikorsky CH-53K is a heavy-lift helicopter. It can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. At the end of June, the CH-53K finished two-week sea trial in the Atlantic Ocean. Work under the modification will take place in Connecticut, France, Canada, Florida, Mississippi, New York, Virginia, Arizona, California and the various locations within the continental US. Estimated completion date is in June 2025. June 5/20: Update Sikorsky won a $7.7 million order, which procures support to update existing CH-53K system/subsystem specifications produced by the original equipment manufacturer. The Sikorsky CH-53K Super Stallion heavy-lift helicopter is being developed by Sikorsky Aircraft to replace the CH-53E helicopter of the US Marine Corps. The Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. The aircraft can be operated from austere and remote forward operating bases. Work will take place in Stratford, Connecticut. Estimated completion will be by October 2022. June 1/20: Logistics, Management, Training Sikorsky won a $17.9 million contract modification, which provides logistics, program management, training, configuration management and sustaining engineering support for the H-53K system demonstration and test article aircraft. This modification includes pre-initial operational test and evaluation scheduled and unscheduled maintenance and software updates as well as product support packages, repair of repairable analysis and identification and interim supply support provisioning. Additionally, various pieces of peculiar support equipment and common support equipment may be identified and procured under this modification. The Sikorsky CH-53 Super Stallion heavy-lift helicopter first flew in 1974 and entered service with the US Marine Corps in 1981. A total of 172 Super Stallions have been delivered and 165 are in service with marine corps squadrons in the Pacific Fleet and in the Atlantic Fleet. May 14/20: Systems Engineering Sikorsky won a $29.9 million modification, which provides for rate tooling, physical configuration audits, associated systems engineering and program management in support of CH-53K aircraft production. The CH-53K King Stallion is a large heavy-lift cargo helicopter designed to replace the Marine Corps CH-53E to move Marines from ships to attack beaches. Back in April, it was reported that the aircraft successfully plugged into a funnel-shaped drogue towed behind a KC-130J during aerial refueling wake testing over the Chesapeake Bay. The CH-53K sea-based, long range, helicopter is designed to provide three times the lift capability of its predecessor. The CH-53K will conduct expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations deep inland from a sea-based center of operations, Sikorsky officials say. It can lift more than 18 tons. Work will take place in Connecticut, Utah, Michigan, Kansas, Washington, New York and Nebraska. Estimated completion will be by December 2023. April 20/20: Mission Master-Cargo UGV The United Kingdom Armed Forces ordered four Mission Master-Cargo unmanned ground vehicles from Rheinmetall Canada for its Robotic Platoon Vehicle (RPV) program. The contract includes training, service support, and spare parts. Rheinmetall Canada is to supply the platforms, while Rheinmetall BAE Land Systems will provide on-location support services. The Mission Master UGV is an all-terrain, multipurpose vehicle based on an 8×8 platform. It has a top speed of 40 km/h and is ruggedized and fully amphibious, with the option of being fitted with tracks or chains for additional mobility. The vehicle is air-transportable by external sling load or internally by a CH-53 or CH-46 heavy lift helicopter or a C-130 transport aircraft. None of the parts are subject to International Traffic in Arms Regulations (ITAR), facilitating export. April 10/20: Engine Reliability Improvement Program GE Aviation won a $9.7 million contract modification, which procures non-recurring engineering for the phase two assembly planning effort for the re-start of T-64 engine core production in support of the H-53E Engine Reliability Improvement Program. The deal funds the phase two assembly planning effort for the GE T64 is a turboshaft engine used in both fixed-wing aircraft and in helicopters, for which it was originally developed. It powers the CH-53E Super Stallion. The Super Stallion is a heavy-lift helicopter operated by the US Navy and Marine Corps as well as the Japanese Navy. Work will take place in Massachusetts, Vermont, North Carolina and Kentucky. Expected completion will be by December 2021. March 30/20: Advanced Acquisition Sikorsky Aircraft won a $125.4 million for a firm-fixed-price advanced acquisition contract to procure long lead items for low-rate initial production of the seven Lot 5 CH-53K heavy-lift aircraft. The CH-53K is designed to transport US Marines, heavy equipment and supplies from amphibious assaults to destinations ashore. Work will take place in Stratford, Connecticut. Expected completion will be by August 2021. March 19/20: Cargo Loading Tower The Haskell Co. won a $9.5 million contract for the construction of the P680 CH-53K cargo loading tower at the Marine Corps Air Station in New River, North Carolina. Work will provide a high-bay facility that will house an operations trainer to support CH-53K helicopter pilot and crew chief training program. Construction includes a deep pile foundation, grade beams and reinforced concrete slabs to provide the building’s base while reinforced concrete masonry unit exterior walls and a standing seam metal roof provide the building enclosure. This facility will provide a covered, all-weather training environment for the ground operations aircrew trainer, a fuselage trainer device, pallet storage, retrieval and build-out packages associated with troop deployment and mobility. The facility includes high-bay roll-up doors and concrete drive aprons to accommodate moving the aircraft frame in and out of the building. Work will take place in New River, North Carolina. Estimated completion date is April 2022. February 24/20: Electronic Counter Measure Systems Sikorsky won a $12 million contract modification, which provides non-recurring engineering to replace existing subsystems, such as the Data Transfer Unit, Defense Electronic Countermeasure System and ARC-210 radio, with the CH-53K production aircraft. This means Sikorsky is replacing Electronic Counter Measure Systems in the King Stallion. The CH-53K King Stallion is the US Marine Corps’ new-build, heavy-lift replacement for the CH-53E. The CH-53K evolves the CH-53E design to improve operational capability, reliability, maintainability, survivability, and cost of ownership. Work under the contract modification will take place in Iowa, Connecticut and Texas. Estimated completion will be in August 2021. February 21/20: Support The US Navy awarded Sikorsky a $40 million contract modification, which procures organic capability pilot repair material, technical publications, peculiar support equipment re-design and acquisition and logistical support in support of lot 2 CH-53K aircraft. The CH-53K helicopter is a new-build design variant and replacement for the current USMC heavy-lift aircraft, the CH-53E. The CH-53K evolves the CH-53E design to improve operational capability, reliability, maintainability, survivability, and cost of ownership. Work will take place in Connecticut, North Carolina and is expected to be finished by December 2024. January 10/20: Engine Issue Resolved Engineers have mitigated an ongoing engine integration issue for the CH-53K King Stallion, the new heavy-lift helicopter from Sikorsky for the United States Marine Corps. It took 8 months of study and testing. The helicopter is designed to conduct expeditionary heavy-lift transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations. The CH-53K is powered by three General Electric T-408 engines, but these engines created several integration issues in the aircraft, including exhaust gas re-ingestion (EGR). The King Stallion is an all-new heavy-lift helicopter that will expand the fleet’s ability to move more material more rapidly. October 17/19: Nacelles Production Kits For CH-53E Sikorsky won a $7.9 million firm-fixed-price delivery order that procures 36 improved nacelles production kits in support of the CH-53E in-service aircraft. The CH-53E Super Stallion is a heavy-lift helicopter. It was developed from the CH-53 Sea Stallion mainly by adding a third engine, adding a seventh blade to the main rotor and canting the tail rotor 20 degrees. A total of 172 Super Stallions have been delivered and 165 are in service with marine corps squadrons in the Pacific Fleet and in the Atlantic Fleet. King Stallion is currently being developed from the Super Stallion. It will be the largest and heaviest helicopter in the US Army. Work under the delivery order in support of the CH-53E will take place in Stratford, Connecticut and estimated completion will be in May 2022. September 6/19: T408-GE-400 General Electric Aviation won a $143.7 million contract modification for 24 low rate initial production Lot 3 T408-GE-400 turboshaft engines and three Lot 2 T408-GE-400 engines for the CH-53K helicopter. The deal also provides for associated engine and programmatic support, logistics support, peculiar support equipment and spares. T408 engines provide enough power to the aircraft to carry a 27,000lb external load over a mission radius of 110nm in the navy high / hot weather conditions. The three-stage power turbine is capable of generating 7,378-rated shaft horsepower. The Sikorsky CH-53K King Stallion is a large, heavy-lift cargo helicopter. General Electric will perform work under the modification in Lynn, Massachusetts, and estimated completion will be in December 2022. August 22/19: Spare Parts and Repair The Navy tapped Sikorsky with a $48.3 million firm-fixed-price order in support of the CH-53K King Stallion. The order is to procure spare parts to repair and maintain low-rate initial production Lot Three configuration aircraft. A couple of days ago Sikorsky won a one-year $107.3 million contract from the US Navy for the long-lead items needed to manufacture its fourth batch of six CH-53K helicopters for use by the US Marine Corps. In May, the company received a $1.1 billion contract to produce 12 CH-53Ks and provide aircraft system spares and logistics support services. The King Stallion is a heavy-lift cargo helicopter. Its design features three 7,500 shp engines, new composite rotor blades, and a wider aircraft cabin than previous CH-53 variants. Sikorsky will perform work under the newly received order in Canada as well as the UK and various parts in the US. Estimated completion date is in August 2024. July 25/19: Hydraulic Sikorsky won a $9.8 million delivery order for H-53 hydraulic fluid tanks. The firm-fixed-price delivery order is a one-year contract with no option periods. Sikorsky will perform work in Connecticut. Estimated completion date is September 30, 2020. The Defense Logistics Agency Aviation in Philadelphia, Pennsylvania is the contracting activity. H-53 is a family of heavy-lift transport helicopters built by Sikorsky. It includes the CH-53 Sea Stallion. The Stallion has mechanical flight controls which are backed by three independent hydraulic systems. July 4/19: Sikorsky tapped twice The US Navy awarded Sikorsky two contracts with a combined worth of $28.8 for production aircraft and non-recurring work to support low rate initial production of the CH-53K. One non-recurring contract is worth $21.7 million and the other $7.1 million. Each contract brings the CH-53 King Stallion closer to production. Developed for the US Marine Corps, the King Stallion is the only sea-based, long-range, heavy-lift helicopter. It can carry up to 27,000 lbs (12,200 kg) over 110 natural miles (204 km), more than tripling the load of Sikorsky’s CH-53E helicopter. Sikorsky promotes the CH-53K for expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations inland from a sea-based center of operations, as well as support for special operations forces, humanitarian missions and combat search-and-rescue. The delivery order worth 21.7 million includes a data transfer unit and a defensive electronic countermeasure system replacement program to replace existing subsystems within the CH-53K production aircraft. Tasks include investigation, systems engineering support, risk analysis, integration development, weight impact and publication updates. Work on the contract is expected to be completed in January 2021. The other contract supports low-rate initial production of the CH-53K, including non-recurring engineering, development, tooling, manufacturing, qualification, reporting and delivery of the nose, main, intermediate and tail gearbox gears. Work will take place in Stratford, Connecticut, and is expected to be completed in October 2020. May 31/19: Israel? Israel is looking at CH-53 King Stallion as a possible replacement for the CH-53 Yas’ur (Sea Stallion) helicopters that have been in Israeli service for more than 40 years. According to Jane’s, Israeli Air Force officials let Lockheed Martin know about their intention. Israel started looking for a replacement for its Sea Stallion last year. The CH-53 King Stallion, which is designed to transport dozens of fighters and heavy weaponry to operations on the front or deep inside enemy territory, can carry two heavy SUVs in its cabin. The CH-53K has three hooks for carrying cargo on ropes. The Yas’ur has only one. The King Stallion can be refueled mid-air and has cutting-edge autopilot and landing features, enabling its pilot to touch down almost without using his hands. May 21/19: Sikorsky to build 12 Ch-53Ks Sikorsky won $1.1 billion to build 12 CH-53K King Stallion helicopters. The contract with the Lockheed Martin subsidiary, issued by the Navy will include programmatic support, logistics support and peculiar support equipment. Under the terms of the contract, known as Low Rate Initial Production (LRIP) Lot 2 and 3, Sikorsky will begin deliveries of 12 CH-53K helicopters in 2022. According to Lockheed Martin, the advanced helicopters are part of the 200 program of record aircraft for the US Marine Corps. The King Stallion can carry up to 12,200 kg over 204 km, more than tripling the load of Sikorsky’s CH-53E helicopter. It is the only sea-based, long-range, heavy-lift helicopter in production. The helicopter was originally intended to be delivered in 2018, but it was delayed because of technical issues in the design that required a major restructuring of the program. Sikorsky is expected to finish work in December 2023. April 4/19: Program Management Service Sikorsky won a $7.3 million contract modification in support of CH-53K low-rate initial production. The CH-53K King Stallion helicopter will serve as a critical land and sea based logistics connector. In April 2006, the Marine Corps signed a contract for 156 CH-53K aircraft valued at $18.8 billion with deliveries to be completed by 2021. The Marine Corps now plans to receive 200 helicopters at a total cost of $25 billion. The modification includes production systems engineering and program management services for calendar year 2019 in support of CH-53K low-rate initial production. Work will take place in Stratford, Connecticut and is scheduled to be finished in February 2020. February 5/19: Rescheduling Due to Multiple design deficiencies the Sikorsky CH-53K King Stallion will miss its initial operating capability date of December 2019. The CH-53K program is working on a major schedule revision to solve structural problems found during operational testing an evaluation. The deficiencies include airspeed indication anomalies, low reliability of main rotor gearbox, hot gas impingement on aircraft structures, tail boom and tail rotor structural problems, overheating of main rotor dampers, fuel system anomalies, high temperatures in the Number 2 Engine Bay, and hot gas ingestion by the Number 2 engine, which could reduce available power. Operational Test and Evaluation will most likely start in early 2021. January 18/19: Maintenance The Navy tapped Sikorsky with a $7 million contract modification for maintenance of King Stallion CH-53K helicopters amid continued delays in its development. The deal provides for Automated Logistics Environment software maintenance operating systems and obsolescence avoidance in support of the low rate initial production CH-53K aircraft. The CH-53K helicopter was designed to serve as the US Marine’s critical land and sea based logistics connector. In May 2018 the Marine Corps took its first delivery of the King Stallion. The CH-53K program has a long history of delays due to technical issues with the latest problems emerging in December. Sikorsky is a an aircraft manufacturer and subsidiary of Lockheed Martin. The company expects work to be completed in October 2021. December 13/18: Provisioning The Naval Air Systems Command is ordering a provisioning parts database of technical information from Sikorsky. The cost-plus-fixed-fee delivery order is priced at $38 million and supports the initial operational capability of the Navy’s CH-53K King Stallion helicopter. The database will include 2D drawings that support all organizational, intermediate and depot levels in support of the helicopter. The provisioning database will determine the range and quantity of repair parts, and support and test equipment required to operate and maintain the King Stallion for its initial period of service. Provisioning is an integral part of supply chain management. The delivery order is partially funded ($8.6 million) through FY 2019 research, development, test and evaluation funds. Work will be performed at Sikorsky’s facility in Stratford, Connecticut and is scheduled for completion in November 2023. October 26/18: Maintenance Sikorsky Aircraft, a subsidiary of Lockheed Martin, is being contracted to help stem the maintenance burden of the Marine Corps’ CH-53 Super Stallion. The contract is priced at $717.4 million and covers logistics and repair support for 98 components of the CH-53 and MH-53 platforms. H-53 aircraft include the CH-53E Super Stallion medium-heavy transport helicopter that can transport up to 55 troops or 15 tons of cargo, as well as the MH-53E Sea Dragon minesweeper and the MH-53M Pave Low IV CSAR and SOF helicopter. The helicopters have on average a 44:1 maintenance : flying hours ratio. Work will be performed in Cherry Point, North Carolina and Stratford, Connecticut, and is expected to be completed by December 2022. August 27/18: Keep’em sweeping The Navy is contracting Technical Systems Integration for the provision of necessary overhaul and modification work on the USMC’s Mk-105 minesweeping system. The firm-fixed-price, indefinite-delivery/indefinite-quantity contract has a value of $10.5 million, but also includes options, which if exercises, would bring the face value to roughly $54 million. The Mk-105 Magnetic Influence Minesweeping System is a catamaran hydrofoil which is towed behind the MH-53E Sea Dragon helicopter. It is used to detect mines that use magnetic sensors to target the metallic hulls of ships before detonating. The twin magnetic tails, consisting of open-electrode magnetic sweeps, are towed behind the sled, detonating mines to clear the water for safe shipping. Work will be performed in Panama City, Florida, and is expected to be completed by August 2019. May 01/18: IOC delays Bloomberg reports that the Sikorsky CH-53K King Stallion helicopter program may be falling behind schedule, as Pentagon officials have found that a significant number of components require redesign and re-qualification. While a spokesperson from Sikorsky’s parent-company Lockheed Martin said that most of these items are already “fixed and proven or are in process,” initial operational capability—originally scheduled for December 2019—could be delayed by as much as eight months. According to a Pentagon review prepared in February, four helicopters currently in the flight test program were operating at 69 percent effectiveness as of late last year, “well below” the 75 percent to 90 percent benchmark needed. 200 King Stallions have been ordered by the US Marin Corps in a $31 billion heavy-lift program with Lockheed chasing exports to potential operators such as Germany. April 20/18: German Heavy-Lift-Industrialization plan Sikorsky, Lockheed Martin’s helicopter subsidiary, revealed on Wednesday its industrialization plan for competing in the German Air Force “Schwerer Transporthubschrauber” (STH) Program, or effort to buy new heavy-lift helicopters. Offering its CH-53K King Stallion, Sikorsky has already teamed up with German defense giant Rheinmetall Group—who will take care of in-service support if Berlin chooses the King Stallion—and the Sikorsky CH-53K team plans to host German companies in an industry chalet during the ILA Berlin Airshow April 25-29, where it will showcase plans for the long-term sustainment of the CH-53K by German aerospace industry. Companies expected alongside Rheinmetall include MTU, ZF Luftfahrttechnik GmbH, Autoflug, HYDRO Systems KG, Rockwell Collins Germany, Jenoptik, Hensoldt, Liebherr, and Rohde & Schwarz. Germany is looking to replace its legacy fleet of CH-53G, some of which have been in service since the mid-1960s, with a new capability. Facing off against the CH-53K is Boeing’s CH-47F Chinook. March 6/18: Potential Sales-Partnerships Sikorsky has selected German engine manufacturer MTU to be its engine maintenance partner as the US helicopter firm builds up local partners to help its bid to supply CH-53K heavy-lift helicopter to the German Air Force. The agreement tasks MTU with providing maintenance, repair and overhaul services for the helicopter’s GE Aviation T408-GE-400 engines should Berlin order the King Stallion as the replacement for its ageing fleet of CH-53G/GA/GS helicopters. At present, MTU already have an 18 percent share of the T408’s engine program, producing its power turbine, exhaust casing and output shaft. Also included on the team for Sikorsky’s German bid is Rheinmetall. February 16/18: Initial Production Orders The Pentagon awarded Tuesday, February 13, a $126.5 million US Navy contract modification to Sikorsky for initial production of CH-53K King Stallion helicopters. Under the terms of the deal, the Lockheed Martin subsidiary will secure “long lead items in support of the low rate initial production of seven Lot III CH-53K aircraft.” Work will take place at Stratford, Connecticut, with work running until January 2019. The US Marine Corps is scheduled to receive 200 King Stallions, replacing the service’s older E variants for its heavy-lift mission. The first units are expected to become operational by 2019. February 8/18: German Heavy Lift-Partnership Lockheed Martin subsidiary Sikorsky has signed a strategic teaming agreement with German defense giant Rheinmetall, to offer Sikorsky’s CH-53K King Stallion helicopter to Germany’s upcoming heavy-lift competition. A Lockheed Martin press release stated that further German teammates will be announced in the coming weeks and “will leverage and build upon the deep knowledge and expertise of the German defense industry.” The statement added that the King Stallion “provides the German Armed Forces with a proven heavy lift helicopter that can be entered into service seamlessly without need for upgrades for the next several decades.” Facing the Sikorsky-Rheinmetall team will be Boeing’s CH-47 Chinook, whose MG-47 variant is the only model thus far capable of Germany’s fleet-wide aerial refueling capability requirement. November 21/17: Contracts-Spares General Electric Aviation (GEA) has been awarded a $143.4 million US Navy contract to provide 22 low-rate initial production Lot 1 and 2 T408-GE-400 turboshaft engines for the CH-53K King Stallion helicopter. In additional to the engines, the sale will also include associated engine and programmatic support, logistics support, peculiar support equipment, and spares. Work will take place in Lynn, Massachusetts, and is expected to be completed in July 2021. November 17/17: Airshow Debut Lockheed Martin’s CH-53K Super Stallion will make its international debut at the Berlin Airshow next April, sources close to the program told Reuters. Built for the US Marine Corps by Lockheed subsidiary Sikorsky under the Heavy Lift Replacement (HLR) program, the heavy-lift helicopter is being touted as a possible solution to Germany’s CH-53G replacement program, which will see the King Stallion face off against the smaller Boeing CH-47F Chinook in a $4.7 billion competition for about 40 units. However, an official start to the program—along with a formal structure to the competition—is unlikely to be unveiled until Chancellor Angela Merkel’s conservatives manages to negotiate a ruling coalition with the pro-business Free Democrats and the Greens—horse-trading that could take until the end of the year. Israel is also reported to be interested in the King Stallion, adding a potential 20 units to Lockheed’s order book. September 04/17: Lockheed Martin subsidiary Sikorsky has been awarded a Low Rate Initial Production (LRIP) Lot 1 contract to deliver two CH-53K King Stallion heavy-lift helicopters to the US Marine Corps (USMC). Valued at $304 million, the firm will deliver the models by 2021 in addition to spares and support, with work to be carried out in Stratford, Connecticut. The US Department of Defense’s Program of Record remains at 200 CH-53K aircraft, with the USMC intending to stand up eight active duty squadrons, one training squadron, and one reserve squadron to support operational requirements. Designed to lift three times as much weight as its predecessor, the CH-53E Super Stallion, its increased payload capacity can internally load 463L cargo pallets, High Mobility Multipurpose Wheeled Vehicles (HMMWV) or a European Fenneck armored personnel carrier while still leaving the troop seats installed. July 11/17: With CH-53K King Stallion helicopters recently completing their first long-range flight test from West Palm Beach, Florida to NAS Patuxent River, Maryland, where it will continue flight testing, manufacturer Sikorsky has begun courting German industry in an effort to line up orders for the new heavy-lift helicopter from Berlin. The two day event, held in West Palm Beach, saw the delegates told that if the King Stallion is selected, German suppliers would be responsible for the majority of the work when it comes to platform sustainment. Germany is expected to issue a request for proposals for the replacement of its fleet of 81 CH-53GA/GS helicopters, originally delivered in the 1970s, in mid-2018, with deliveries to commence in 2023. Boeing is also likely to pitch its CH-47 Chinook as the “proven” helicopter. May 24/17: Sikorsky has been awarded a $55 million contract modification to a previously awarded contract for the long-lead support of low-rate production of four Lot II CH-53K King Stallion helicopters. An upgrade of the Sea Stallion heavy-lift helicopter, work on the King Stallion contract will be conducted at the Sikorsky plant in Stratford, Conn and is expected to be completed by March 2022. The helicopter is capable carrying up of 27,000 pounds of external sling load. It can carry artillery pieces and Humvee utility vehicles and it’s cabin is capable of carrying 463 pallets for cargo transportation. April 6/17: Lockheed Martin subsidiary Sikorsky will proceed with low-rate production of the CH-53K King Stallion since the helicopter has received a Milestone C status by a US Defense Acquisition Board review. A total of 200 CH-53Ks are to be acquired by the US Marine Corps. The first six aircraft are under contract and are expected to be delivered starting next year. Long-lead procurement of parts and materials for the first two low-rate initial production helicopters is underway. The King Stallion is capable of lifting three times as much as its predecessor, the CH-53E, and can carry as many as three external loads at the same time. March 29/17: The US Department of Defense is expected to award Lockheed Martin a multi-billion contract to start production of 200 new heavy cargo helicopters for the US Marines Corp by the end of the week. Colonel Hank Vanderborght, head of the Pentagon’s CH-53K King Stallion program, stated that each unit will cost $87 million on average and $105 million including spare parts and certain service contracts. The total value of the program is $27 billion. Developed by Lockheed’s helicopter subsidy Sikorsky, the CH-53K can lift 36,000 pounds and would replace the CH-53E Super Stallion, which has operated as the backbone of field logistics for the USMC since the mid-1980s. October 24/16: The CH-53K King Stallion helicopter has completed its initial operational testing. A two-week trial period, known as the OT-B1, took place at Sikorsky’s Development Flight Center in West Palm Beach, Florida. Requirements asked of the helicopter included multiple external lift scenarios of 27,000 lb. (12,200 kg), in-hover, and 12,000 lb. (5,422 kg) 110 nautical mile radius missions. June 29/16: Sikorsky has achieved a key USMC requirement with the CH-53K King Stallion by successfully flying 100ft above the ground with a 12,250kg (27,000lb) payload. Due to replace the CH-53E Super Stallion, the new helicopter promises better range and triple the E model’s payload in hot weather conditions, as well as flight-by-wire flight controls designed to reduce pilot workload in degraded visual environments. While successful testing has the CH-53K currently on track, it hasn’t always been plain sailing with gearbox trouble delaying its first flight for a year. May 18/16: Pricing and availability for the Sikorsky CH-53K King Stallion helicopters is being sought by Germany to meet its heavy vertical lift requirement. Other options include Boeing’s CH-47 Chinook, however the US Marine Corps is keen to take advantage of the better pricing that could be achieved by adding a sizable King Stallion order at the front-end of the production ramp. The latest K-model has twice the max gross take-off weight of the legacy CH-53G operated by the Luftwaffe at 40t (88,000lb) with external loads compared to 19t (42,000lb). April 22/16: A USMC test has seen a Sikorsky CH-53K complete its first external load flight test, lifting a 12,000 pound external load in a hover. The April 12 test will see further loads tried with external payloads of 12,000 pounds flown first in hover, then incrementally increasing speeds up to 120 knots, followed by 20,000 and 27,000 pound external payloads. The system features an electrical load release capability from the cockpit and cabin, and a mechanical load release capability at each of the pendant locations. An auto-jettison system is incorporated to protect the aircraft in the event of a load attachment point failure. March 17/16: The second prototype of the CH-53K helicopter made its maiden flight in January according to Lockheed company Sikorsky. In addition, the first aircraft into the test program has achieved flight envelope expansion to 120 knots for the USMC’s CH-53K King Stallion heavy lift helicopter program. The two are the most heavily instrumented of the Engineering Development Models (EDM) and will focus on structural flight loads and envelope expansion. Two more will join the flight line later this year and will focus on performance, propulsion, and avionics flight qualification. January 5/16: The USMC seems to have given the seal of approval to the latest CH-53 after the first marine pilot to test the helicopter commended its abilities. Lt. Col. Jonathan Morel tested the CH-53K King Stallion which is set to become the largest and heaviest helicopter in the US military. Two hundred of the rotorcraft will be procured by the USMC in a deal worth $25.5 billion. October 29/15: The Sikorsky CH-53K King Stallion helicopter has flown for the first time, eleven months behind schedule. The new helicopter is intended to replace the Marine Corps’ fleet of CH-53E Super Stallion heavy lift helicopters, with the new design boasting three times the lift capability of the older model. The first CH-53K, known as Engineering Development Model-1 (EMD-1) will be joined by an additional three aircraft to undergo 2,000 flight hours of testing. July 31/14: Engines. General Electric in Lynn, A receives a $68.6 million firm-fixed-price contract modification for 16 GE38-1B engines, closure kits, tooling, and associated systems engineering and program management in support of the CH-53K helicopter program’s Operational Evaluation phase. This is on top of the July 17/13 contract for “time critical parts”, and the $84.3 million total represents the first engine buy beyond the 20 covered by the System Development & Demonstration contract. $22.5 million in FY 2013 – 2014 US Navy RDT&E budgets are committed immediately. Note that each CH-53K is equipped with 3 engines. Work will be performed in Lynn, MA, and is expected to be complete in January 2017 (N00019-13-C-0132). See also GE, “U.S. Navy Awards GE38 Engine Production Contract”. June 9/14: Leadership. PMA-261 Program Manager U.S. Marine Corps Col. Robert Pridgen turns over command to Col. Henry Vanderborght, a long-time CH-53E pilot, former John Glenn Test Pilot of the Year, and former Light/Attack Helicopters (PMA-276) platform team lead for UH-1Y production and the UH-1N’s sundown. Vanderbought wasn’t actually a full Colonel until he was promoted on the morning of the change-of-command ceremony. Pridgen will become the program manager for the Presidential Helicopters Program (PMA-274) in July 2014. Sources: US NAVAIR, “Heavy-lift helicopters program welcomes new program manager”. May 5/14: Naming. Sikorsky officially unveils their CH-53K flight test helicopter EDM-2, and the USMC officially names the type “King Stallion”. One can see the natural extension from the CH53A/D Sea Stallion and CH-53E Super Stallion, but there comes a point where one can push the boundaries in unintended directions. Maybe they were thinking of the 1942 movie with Chief Thundercloud. In the modern era, people are more likely to think that somewhere, an adult entertainer wants his name back. Sources, Sikorsky, “Sikorsky Unveils CH-53K Helicopter; U.S. Marine Corps Reveals Aircraft Name” | South Florida Sun-Sentinel, “Sikorsky introduces new ‘King Stallion’ helicopter” | Stamford Advocate, “Sikorsky unveils its new King Stallion heavy lift helicopter”. “King Stallion” May 1/14: Testing. Sikorsky announces that full testing is finally moving ahead with the non-flying GTV, including powered “light-off” with all 7 main rotor blades and 4 tail rotor blades spinning, and powered by its three 7,500 horsepower class GE engines. This begins a rigorous 2-year test program of the rotor blades, transmission, engines, and all subsystems using the GTV. Sources: Sikorsky, “Sikorsky Begins Powered Ground Tests of CH-53K Helicopter with Rotor Blades”. March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. With respect to the CH-53K, their top concern is that the USMC is scheduled to begin ordering helicopters before testing is done. Beyond that concurrency worry: Nearly 9 years later the program’s two critical technologies – the main rotor blade and main gearbox – are approaching maturity. The program expects these technologies to be demonstrated in a realistic environment by its planned February 2016 production decision, a delay in 6 months over last year’s schedule. Program officials reported that they conducted a three-blade whirl test that produced results that exceeded required outcomes. Flight testing is expected to begin in late 2014. March 4-11/14: FY15 Budget. The US military slowly files its budget documents, detailing planned spending from FY 2014 – 2019. The current Navy plan will begin buying production CH-53Ks with an order for 2 in FY 2017, followed by 4 in FY 2018 and 7 in FY 2019. That means production has been pushed back by about a year, because: “Late delivery of components into qualification, and subsequent qualification challenges, have delayed Ground Test Vehicle (GTV) delivery, Flight Readiness Reviews (FRR – GTV & 1st Flight), Engineering Development Models (EDM) delivery and CH-53K 1st Flight, and have moved Milestone C (MSC) and other associated events to 3Q 2016. Budgetary constraints delayed start of the Aircraft Procurement (APN) program by one year. As such, Advanced Acquisition Contracts (AAC) and LRIP awards have been adjusted accordingly. In order to procure aircraft that effectively demonstrate manufacturing processes are both mature and under control, two (2) additional RDT&E,N-funded System Demonstration Test Articles (SDTAs) in FY15 with delivery in 4Q 2018 and 1Q 2019 were added to the program.” Sources: USN, PB15 Press Briefing [PDF] and detailed budget documents. Oct 31/13: Rotors. Sikorsky has completed initial tests of the CH-53Ks new rotor blades, including fatigue tests and whirl-tower balance tests. Additional blade qualification testing will continue for several years, in order to validate aspects like aerodynamic stability, tip deflection, and rotational twist. The next steps involve installation and testing on the stationary CH-53K GTV. There’s a lot to test, because the rotors are new technology. The 35 foot span, 7-bladed main rotor has blade of almost 3 foot chord width, with new airfoil designs, twist, and taper to handle the engines’ 71% power increase. The new blade tips are designed to improve hover performance, and a composite cuff attachment allows attachment of each blade to the elastomerically-articulated titanium rotor head, without tools or redundant fasteners. The rotor hub itself is almost 9 feet in diameter, and the blade radius will be 39.5 feet when assembled, with 12% more total surface area than the CH-35E. The 4-blade tail rotors are also new, with 10 foot blades and 15% more surface area compared to the CH-53E. Sikorsky says that the CH-53K tail rotor produce as much thrust as the main rotor blades on Sikorsky’s 5.5 ton S-76 medium helicopter, which is used in the offshore oil industry. Source: Sikorsky via PR Newswire, “Sikorsky Completes Initial Tests of First Rotor Blades for CH-53K Helicopter”. Oct 11/13: EVM penalty. Bloomberg News: “Sikorsky was notified Sept. 6 of three deficiencies on a contract for the Navy’s CH-53K heavy-lift helicopter related to guidelines for the recording of direct costs and material accounting, Navy Commander William Urban, a Pentagon spokesman, said in an e-mailed statement. A corrective action plan is expected from the company by Oct. 21, he said.” While Bloomberg doesn’t say so, the issue in question relates to a quantitative approach to project tracking called Earned Value Management. Until they’re satisfied, the Pentagon is withholding the maximum 5% on payments. Sikorsky responds that 2 of the 3 issues are already resolved, and they don’t expect this to affect the program. Sources: For Dummies.com, “Earned Value Management Terms and Formulas for Project Managers” | Bloomberg, “Pentagon Withholds Sikorsky Payments for Business System Flaws”. Oct 1/13: Sub-contractors. Kratos Defense & Security announces that an $8.5 million contract from Sikorsky to design and develop CH-53K maintenance trainers. The full-fidelity Maintenance Training Device Suite (MTDS) is meant to provide a true-to-life environment for maintenance training; as well as remove-and-replace training for avionics systems, electrical systems, hydraulic systems and many other mechanical subsystems. The Helicopter Emulation Maintenance Trainer (HEMT) uses a 3D virtual environment to support maintenance training scenarios: functional tests, fault isolation, troubleshooting, and remove and installation for 27 subsystems. Sources: Kratos Oct 1/13 release. FY 2013 SAR shows program cost increases; Ground Test Vehicle delivered; Flight test helicopters ordered. CH-53K GTV (click to view full) Sept 27/13: Sensors etc. Raytheon in El Segundo, CA receives a $20 million firm-fixed-price delivery order for: CH-53K, using FY 2013 USN RDT&E budget… 5 AAQ-29 day/night surveillance turrets 2 Memory Loader Verifier System cables Software update, system integration, and test support USAF HH-60 search & rescue helicopters, using FY 2011 procurement budget… 25 AAQ-29 day/night surveillance turrets 25 L2G multifunction control units and 35 L2G system control units 1 technical data package 1 repair of repairables analysis All funds are committed immediately, and $16.2 million expires on Sept 30/13. Work will be performed in McKinney, TX (92%) and El Segundo, CA, (8%), and is expected to be complete in September 2015. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-10-G-0018). Sept 23/13: IG OK. The Pentagon’s Inspector General submits a non-public report concerning the CH-53K program. Their public statement: the program has been managed appropriately, but it may not meet its February 2016 Milestone C decision date, or its revised costs. The Acquisition Program Baseline was updated on April 24/13, to address cost growth and schedule delays. Contractor manufacturing delays and component testing failures, hence the risk of not being ready in time for the low-rate production decision, and not meeting even its revised costs. The Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics is aware of these issues. Sources: OIG, “CH-53K Program Management Is Satisfactory, but Risks Remain (Project No. D2013-D000CD-0095.000)”. July 17/13: Engines. General Electric Co. in Lynn, MA receives a $15.7 million cost-plus-fixed-fee contract to buy “time critical parts” for incorporation into the CH-53K’s T408-GE-400 gas turbine engine. All funds are committed immediately by the US Navy. Work will be performed in Lynn, MA, and is expected to be complete in December 2016. This contract was not competitively procured pursuant to FAR 6.302-2-1(a)(1) by US Naval Air Systems Command in Patuxent River, MD (N00019-13-C-0132). June 27/13: Sub-contractors. Boeing spinoff Spirit Aerosystems announces a $60 million sub-contract, as a result of the #435 million order for 4 System Demonstration Test Article helicopters (q.v. May 30/13). Spirit makes the base cockpit and cabin, essentially the body of the helicopter. Spirit will begin work during 2013 at its Wichita, KS facility, with deliveries to Sikorsky’s CH-53K prototype assembly line in West Palm Beach, FL to begin in 2014. When the helicopters are finished, they’ll enter Operational Evaluation in 2017, to verify that their performance meets projections. The contract follows over $150 million in work on 7 structures, for the first 5 prototype test helicopters and the 2 ground test frames. Spirit recently announced work with Spintech Ventures, of Xenia, OH on a set of trademarked products called Inflexion/ Smart Tooling. The technology uses re-formable, reusable mandrels that can change states through the layup and cure phases. That helps form complex, highly integrated composite structures into large and/or unusual shapes and configurations – like full integration of skins, stringers, and frames or ribs in one step. Spirit | Wichita Eagle | Spirit re: Inflexion. May 31/13: Hostile IG Report. The Pentagon’s Inspector General issues a report under Audit Project No. D2012-D000CD-0037.000, telling the USMC that the CH-53K’s program increase to 200 helicopters isn’t justified. The Marines politely tell the IG to stick it where Chesty can’t find it. The Inspector General’s statement that “the Marine Corps risks spending $22.2 billion in procurement and operating and support funding for 44 additional aircraft” is a blatant error – that’s the entire 2011 program cost for 200, plus R&D. Beyond that, they complain that the USMC: did not follow the Joint Capabilities Integration and Development System Instruction and obtain Joint Requirements Oversight Council [DID: JROC] approval for the increase; did not have requirement studies prepared to determine a procurement quantity in consideration of program affordability; incorrectly relied on a 2008 memorandum from the Deputy Commandant for Aviation directing the increase of the procurement quantity to 200 aircraft, without support; incorrectly used the 2010-2011 Force Structure Review’s war-gaming scenarios as justification for the quantity increase; and did not justify or appropriately consider the impact of the Marine Corps personnel reductions effect on Heavy Lift quantity requirements. In response, the USMC Deputy Commandant says the existing analyses do justify it, and JROC approved the 200. Then the Milestone Decision Authority approves the Marine Corps’ request to rebaseline the program with a 54% procurement cost increase over the 2005 baseline (a jump from Dec 2011 figures, if true) and formally push the Milestone C decision from December 2012 to February 2016 (later than the current August 2015). The IG wants additional comments re: the re-baselining. Which is fine, as far as it goes, but the whole process seems like an ad for the Lexington Institute’s Daniel Goure, who argues that the Pentagon’s procurement processes are an out of control overhead burden. It’s all about paper, rather than the soundness of the conclusion. And you can’t use what you learn in war games to change procurement decisions? What idiot thinks that’s a good idea? Pentagon IG Report. May 30/13: Sikorsky Aircraft Corp. in Stratford, CT receives a $435.3 million cost-plus-incentive-fee contract modification, to buy 4 CH-53K System Demonstration Test Article helicopters. The April 5/06 System Development & Demonstration contract already included 4 test helicopters, and US NAVAIR and Sikorsky subsequently confirm that these 4 SDTA helicopters are a different set that the Marines will test during operational evaluation. The buy is structured as an additional line item under the 2006 contract, and initial funding will use $48.1 million in FY 2013 RDT&E budgets. Sikorsky CH-53K Program VP Dr. Michael Torok says the SDTA helos will be based on the configuration of the 4th and final flight test aircraft from the 2006 contract, which is currently being assembled on the prototype production line. To date, Sikorsky has delivered 2 non-flying SDD CH-53Ks: the Ground Test Vehicle and the Static Test Article. That leaves the 4 flight test prototypes, 1 stationary Fatigue Test CH-53K, and now the 4 SDTA helicopters. First flight of a CH-53K prototype is now expected in “late 2014” instead of Spring 2014, and this contract requires 1st SDTA delivery by September 2016. Final delivery is scheduled by the time OpEval begins in March 2017, with incentives for early delivery. Work will be performed in Stratford, CT (17%); West Palm Beach, FL (17%); Wichita, KS (15%); Salt Lake City, UT (10%); St. Louis, MO (4%); Bridgeport, WVA (3%); Windsor Locks, CT (3%); Ft. Walton Beach, FL (2%); Redmond, WA (2%); Forest, OH (2%); Jackson, MS (2%); Cudahy, WI (2%); Irvine, CA (2%); Kent, WA (1.2%); Bristol, United Kingdom (1%); Phoenix, AZ (1%); Chesterfield, MO (1%); Los Angeles, CA (1%); Rochester, United Kingdom (1%); Buckinhamshire, United Kingdom (1%); Longueil, Quebec, Canada (1%); Cedar Rapids, IA (0.8%); Twinsburg, OH (0.8%); St. Clair, PA (0.5%), and various other locations (8.7%) (N00019-06-C-0081). See also US NAVAIR | Sikorsky 4 flight test helos May 24/12: SAR. The Pentagon finally releases its Dec 31/12 Selected Acquisitions Report [PDF]. “CH-53K Heavy Lift Replacement Helicopter – Program costs increased $1,897.6 million (+7.1%) from $26,626.8 million to $28,524.4 million, due primarily to changing the cost estimating methodology from analogy-based to supplier bottom-up (+$1,796.6 million), use of commercial indices for materiel escalation costs (+$948.9 million), revised escalation indices (+$539.4 million), an increase in the production line shutdown estimate (+$120.7 million), and an increase in support equipment, repair of repairables, and spares costs (+$64.9 million). These increases were partially offset by decreases in other support costs (-$664.0 million), initial spares requirements (-$589.0 million), and the application of new inflation indices (-$385.3 million).” To put the estimating into English, the program had estimated costs based on similar programs, but now they’ve gone through the chosen suppliers and built an estimate using actual costs for components and materials, plus commercial figures for raw materials etc. The result adds almost $2.85 billion to the program, and other cost jumps bring the total increase to $3.47 billion. The downward revisions to spares and support, and to inflation, prevent costs from rising over 13%. Are the changes reasonable? We won’t know until flight testing is well underway and time has revealed real inflation costs, but there’s reason to be skeptical. It could be a case of “paper cuts now, then cost increases once production is underway and jobs in Congressional districts are committed.” We’ll have to talk to the program to even begin to judge. SAR: program cost increases – questionable cuts? May 17/13: General Electric in Lynn, MA receives a $7.6 million firm-fixed-price delivery order to buy critical hard tooling required to support the manufacture of the CH-53K’s GE38-1B engines. The current order involves GE38s for the CH-53K System Demonstration Test Article (SDTA) helicopters, and they’re the engine’s inaugural platform. Work will be performed in Lynn, MA (20%); Morristown, TN (20%); Groton, CT (20%); Hooksett, NH (10%); Fort Wayne, IN (10%); North Clarendon, VT (10%); and Albany, OR (10%); and is expected to be complete in November 2014. All funds are committed immediately, using FY 2013 RDT&E budgets (N00019-10-G-0007). March 28/13: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2012, plus time to compile and publish. Overall, expected costs have risen (q.v. March 30/12 entry), though the added cost per helicopter is only 5.6% above the baseline. The “ground test vehicle” non-flying model has been delivered, but issues with a test stand are delaying progress. GAO points out that the design is released, but not necessarily finished. The big break in the program remains the April 2011 shift from a cost-plus award fee to cost-plus incentive fee contract, tied to specific cost and schedule goals, and associated with a much-delayed schedule. The next big event will be the beginning of system-level prototype testing in 2013. Dec 4/12: Testing. Sikorsky delivers the 1st CH-53K Ground Test Vehicle (GTV) prototype. It won’t fly, just help test the performance of the rotor blades, transmission, and engines. The 4 follow-on flight test helicopters aren’t expected to fly until 2014-2015. Sikorsky. GTV delivered FY 2012 GAO report says development will need more $; Last CH-53D retired. CH-53E lifts M113 APC May 6/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $7.8 million cost-plus-award-fee contract modification to incorporate CH-53K live fire test and evaluation. This is exactly what it sounds like – the Navy will shoot lots of holes in test platforms, and assess damage resistance. Work will be performed at Naval Air Warfare Center Weapons Division, China Lake, CA (80%), and Stratford, CT (20%). Work is expected to be complete in December 2018 (N00019-06-C-0081). April 12/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $25.7 million cost-plus-incentive-fee contract modification, to provide detailed maintenance plans in support of the CH-53K helicopter program. Work will be performed in Stratford, CT, and is expected to be complete in December 2015 (N00019-06-C-0081). March 30/12: GAO report. The US GAO tables its “Assessments of Selected Weapon Programs” for 2012. With respect to the CH-53K: “Program officials reported that in July 2011, the contract’s estimated cost was increased by $724 million to $3.4 billion. According to Defense Contract Management Agency officials, the estimated contract costs increased because of several factors including the need for additional flight test hours and spare parts, increased material costs, and design complexity. The contract was also changed from cost-plus award fee to cost-plus incentive fee for the remaining period of performance. The incentive fees are tied to specific cost and schedule goals… According to Marine Corps officials, a force structure review has been conducted to assess the required quantity of aircraft and that review determined that the requirement for 200 aircraft is still valid despite the proposed manpower reduction.” Feb 28/12: Avionics. Northrop Grumman announces a $5.6 million Phase II contract from US NAVAIR to modify existing software for the CH-53K’s LN-251 embedded GPS/fiber-optic inertial navigation system (INS). Northrop Grumman’s Navigation Systems Division will provide updated software and engineering support for platform integration and flight tests, to both NAVAIR and Sikorsky Aircraft. Feb 24/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $15.5 million cost-plus-incentive-fee CH-53K contract modification. The program needs a condition-based maintenance plus software toolset (almost certainly ISS – vid. Oct 26/11), to integrate the helicopter’s onboard prognostics and the Navy’s fleet common operating environment maintenance computers. The contract includes installation, operation, and recurring data analysis. Funds and work will be assigned if and as needed, and work will be performed in Lexington Park, MD (90%), and Stratford, CT (10%). The contract is expected to run until February 2018. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-06-C-0081). Feb 10/12: USMC retires CH-53D. The USMC holds a “sundown ceremony” to retire its CH-53D Sea Stallion fleet, leaving only CH-53E Super Stallions. See also Aug 16/10 entry. US NAVAIR explains that the retirement isn’t immediate, but it is imminent: “The Sea Stallion’s last mission is currently underway with Marine Heavy Helicopter Squadron 363 supporting Operation Enduring Freedom in Afghanistan. The helicopter will be flown from Marine Corps Air Station Kaneohe Bay to its final destination at the Pacific Aviation Museum, where it will be displayed.” CH-53D retired Dec 19/11: Sub-contractors. Northrop Grumman announces a follow-on contract from US NAVAIR in Patuxent River, MD to define system requirements for the integration of its LN-251 embedded global positioning system (GPS)/fiber-optic inertial navigation system (INS) on the new CH-53K. The firm touts the LN-251 system as “the world’s smallest, lightest navigation-grade embedded GPS/INS unit in its class… [whose] modular, open architecture supports additional applications and evolving requirements.” Oct 26/11: Recognition. The CH-53K Helicopter Systems Engineering Team wins a Department of Defense Systems Engineering Top 5 Programs Award, at the annual NDIA Systems Engineering Conference Award Luncheon in San Diego, CA. US NAVAIR. Oct 26/11: ISS Patent. Sikorsky Aerospace Services’ Integrated Support System (ISS) aftermarket software suite has received a patent. ISS integrates onboard diagnostics (vid. Sept 26/08 HUMS entry) and usage data with ground-based troubleshooting and service information. This technology is part of Sikorsky’s efforts to move toward proactive diagnostics, and ISS platforms for the Sikorsky CH-53K and S70i are under development. Future plans include expansion to other aircraft types. Sikorsky. Oct 11/11: Sub-contractors. Thermoplastic composites firm Fiberforge announces the addition of Njord A. Rota as its CH-53K Program Manager. They explain that the Lockheed Martin veteran will lead all management aspects of Fiberforge’s work for DRS Technologies Inc. Their work includes the design, development and production of the carbon fiber composite components within the CH-53K’s Internal Cargo Handling System. Helihub. FY 2011 GE delivers 1st engine, sees GE38 civil and military market potential as $4+ billion; Sikorsky unveils virtual reality center, FAFO experimental assembly line. August 2011: Re-baselined. The CH-53K program undergoes a major time shift. Delivery dates for engineering development models are moved, 1st flight is pushed back to 2014, and Initial Operational Capability is moved from 2015 to 2018 (later 2019). Source: GAO. Contract rebaselined GE38 engine (click to view full) Aug 4/11: Engine. GE has delivered the 1st GE38 engine, for use on the Sikorsky CH-53K Ground Test Vehicle. After 2 years of testing, GE touts 57% more power and 18% lower specific fuel consumption than the CH-53E’s similarly-sized GE T64, while using 63% fewer parts. In addition to the CH-53K SDD program’s 20 flight engines, the GE38 testing program includes 5 factory-test engines that will accumulate more than 5,000 engine test hours by 2013. GE is pushing ahead on its engine despite CH-53K delays, and expects it to have applications in the fixed wing and naval markets, alongside its helicopter potential. They see a total civil and military market potential of $4+ billion. GE. June 21/11: Industrial. Sikorsky announces that they’ve begun assembly of the CH-53K Ground Test Vehicle (GTV), which is currently in position 4 on the line. It’s the 1st of 5 prototype CH-53Ks to be assembled at the Sikorsky Florida Assembly and Flight Operations (FAFO) facility in West Palm Beach, FL, which opened in March 2011. Another 2 GTVs will be assembled at Sikorsky’s main manufacturing plant in Stratford, CT, making 3 ground test and 4 flight test helicopters. CH-53K ground testing is scheduled to begin in early 2012, and flight testing during FY 2014. To give one a sense of the CH-53K, its rotor hub and transmission alone weigh 15,000 pounds – about the empty weight of a UH-60 Black Hawk. April 2011: Restructuring. The CH-53K program undergoes a major shift. The SDD contract is changed from a cost-plus award fee structure to cost-plus incentive fee contract, which is tied to specific cost and schedule goals. Source: GAO. Contract restructured March 22/11: Industrial. Sikorsky officially opens its new 60,000 square foot Florida Assembly and Flight Operations (FAFO) campus, establishing experimental assembly line operations for the new CH-53K heavy lift helicopter. The FAFO line introduces a set of new manufacturing technologies. It’s equipped with wireless data connections to all operator plasma data screens, uses digital operation sheets, and is outfitted with overhead power and air dropdowns, new aircraft work stands, and overhead cranes. Sikorsky, incl. video. Feb 16/11: Sub-contractors. Donaldson provides an update regarding its Engine Air Particle Protection System, which is a critical piece of equipment in desert or dusty environments. They received the contract in September 2007: “We built the first full-scale EAPPS in just three months following the CDR, [DID: which was August 2010]” said Sheila Peyraud, General Manager, Aerospace and Defense at Donaldson. “Developmental testing began in November 2010 to support testing of the helicopter’s GE38-1B engine in 2011. We are pleased that initial results in this phase of the program are exceeding expectations originally set during the conceptual design phase. Qualification testing will begin in May 2011.” Jan 14/11: Industrial. Sikorsky unveils a state-of-the-art virtual reality center for the CH-53K heavy lift helicopter program, attempting to help identify production and maintenance issues before the initial build takes place by using a 3-dimensional digital environment. Located within the engineering labs at Sikorsky’s main manufacturing facility in Stratford, CT, the virtual reality center uses sophisticated software, along with 12 cameras, a head-mounted display headset, gloves, and a gripping tool. All devices are linked to 3 computers, which comprise the “command center” for operating the system. Nov 19/10: Sub-contractors. ITT Corporation (formerly EDO) announces that after nearly 3 years of advanced design, development, testing and manufacturing, they’ve delivered the first pair of CH-53K sponsons to Sikorsky. Each sponson is 25 feet long by 4 feet wide and 5 feet high, and fits on the helicopter’s side to house landing gear, fuel, and other mechanical and electrical assemblies. ITT used composite materials instead of traditional sheet metal for the sponsons, and hopes they’ll provide benefits in weight, corrosion resistance, and in-flight stress tolerance. To make that work, ITT has to use advanced manufacturing technologies like electronic model control, laser-ply projection, 5-axis computer numerically controlled machining, automated trimming and drilling, and laser and ultrasonic inspection of all subassemblies. The CH-53K parts will be built at ITT’s Electronic Systems facility in Salt Lake City, UT. FY 2010 Why was the CH-53K program pushed back 2 years?; SAR raises plans to 200; Critical Design Review passed; AAQ-29 surveillance turrets for CH-53K; No more “boneyard” CH-53D/Es left. CH-53Ds in Hawaii (click for video) Sept 6/10: Sub-contractors. GKN Aerospace delivers the first major CH-53K structural assembly to Sikorsky – an aft transition fuselage section that measures approximately 20′ x 9′ x 9′, built of an advanced hybrid composite, aluminum and titanium structure covered with external composite skins. GKN Aerospace was accorded full design authority and manufacturing responsibility for the CH-53K helicopter aft transition fuselage section, cargo ramp, and overhead door structural assemblies in 2007. Structural design is carried out by the GKN Aerospace Engineering Development Center in Nashville, TN, and manufacturing of over 1,000 separate components takes place at the Company’s plant in St. Louis, MO. GKN Aerospace is employing manufacturing technologies including automated fibre placement (AFP), automated trim and drill, and digital inspection. GKN Aerospace. Aug 16/10: CH-35D plans. DoD Buzz looks at the shifting plans to replace the USMC’s 30 CH-53D Sea Stallions. The original plan was to replace them with MV-22s. At some point in 2007/08, the Marine Corps formally decided replace their aging CH-53Ds with CH-53Ks. But now USMC Lt. General Trautman is saying that he wants an east coast and a west coast MV-22 squadron to replace the CH-53Ds in Afghanistan, and “When I can do that, that’ll be the start of getting CH-53 Delta out of the way.” Exactly what “out of the way” means is ambiguous. If it means out of service, DoD Buzz correctly notes that this raises questions about the USMC’s support for the CH-53K, and would seem to be better news for the MV-22. If it means “shifted back to Hawaii while MV-22s serve in Afghanistan,” that would be something else. The exact meaning isn’t 100% clear in the article. Aug 3/10: CDR. Sikorsky announces a successful Critical Design Review for its CH-53K, following a week-long meeting in late July that included representatives from the military, Sikorsky, and 21 industrial partners. At the review, the CH-53K team had to demonstrate that their design meets NAVAIR’s system requirements. System-level performance projections indicate that all 7 Key Performance Parameters (KPPs) will be achieved with adequate risk mitigation margin built-in. Over 93% of the design has been released for manufacturing, and the final design definition concludes, the next step involves initial prototypes and testing. The overall program CDR follows previous efforts including a System Requirements Review (SRR), System Functional Review (SFR), System Preliminary Design Review (PDR), 77 supplier-level CDRs, 64 supplier and internal software reviews, and 16 sub-system CDRs. Sikorsky VP and CH-53K Chief Engineer Mike Torok offers an update of other preparations: “Parts are being made throughout the supply base and at our new Precision Component Technology Center; test facilities are being fabricated and prepped for installation in our recently opened ground test facility; the integrated simulation facility is marching toward a late 2010 opening, already having received the first increment of software for the aircraft; and the final assembly facility in West Palm Beach is being prepared to start building the ground and flight vehicles early next year. It’s time now to prove out our design and show that this helicopter system will indeed meet the war fighting requirements of the USMC…” CDR June 28/10: Sub-contractors. Raytheon Co. in El Segundo, CA received a $26.5 million firm-fixed-price delivery order for 50 forward looking infrared devices that will be fitted to CH-53E (42) and CH-53K (8) helicopters. Discussions with corporate representatives confirm that these will be AN/AAQ-29 turrets, using a 480 x 640 element, 3-5 micron wavelength indium antimonite infrared detector, and a 2 field of view telescope on a 12-inch diameter turret. This is a follow-on to a previous order. Work under this basic ordering agreement will be performed in El Segundo, CA, and is expected to be complete in June 2012. $530,000 will expire at the end of the current fiscal year, on Sept 30/10 (N00019-10-G-0018). June 4/10: No more CH-53D/Es. US NAVAIR announces that it has delivered the last available CH-53s from storage at AMARG in Tucson, AZ. The last H-53E to come out of desert retirement was delivered to Marine Helicopter Training Squadron 302 on May 7/10, while the last CH-53D was delivered April 16/10. Since the start of the program in August 2005, FRC East H-53 artisans have inducted and completed 10 of the heavy-lift helicopters. The team delivered 8 CH-53Es and 2 CH-53Ds, some of which had been idle for as many as 11 years, ahead of schedule and under budget. Each helicopter still took about 25,000 total work hours for all testing, modifications, and maintenance. Sikorsky ended CH-53 production in 1999, so AMARG was the last remaining source of airframes. Boneyard out of CH-53s May 10/10: Engine. Flight International reports that even though the CH-53E is delayed, GE remains committed to delivering the 7,500 shp class GE38-1 engine on schedule. The firm sees re-engining opportunities and related sales beyond the CH-53K, so they’ve begun delivering GE38s for ground tests years before airframes become available for flight test. As of Feb 15/10, GE had recorded 176 engine starts and 177 operating hours, with sustained power of 7,760 shp and peak power of 8,300 shp. April 2010 saw delivery of a 2nd engine for ground tests. The article is less positive about the CH-53K’s odds of winning the German/French heavy-lift helicopter program. Apparently, Germany wants a helicopter that will fit key vehicles internally, not underslung. Ultimately, the question will be whether Germany can afford to develop what it wants, can find it elsewhere, or is forced to remove some requirements. April 29/10: Why the delay? DefenseTech reports that the USMC has pushed back the initial flight date of the CH-53K by 2 years to FY 2013, and Initial Operational Capability by 3 years to FY 2018, “with little concrete justification beyond an ‘overly aggressive initial program schedule’ “, and while stressing that the program has not run into technical problems. Craig Hooper writes: “The CH-53K was an unsung showpiece for those preaching the virtues of incremental development, and, as a result, appetite for the platform has grown by about 30 percent, with the program of record expected to increase from 156 aircraft to 200. But, in the process, the CH-53K has become something of a MV-22-killer. Is this the problem?… In late 2009, the Marine Corps decided to go with the CH-53Ks to replace their 40-year old CH-53D fleet (MV-22 Ospreys were originally slated to replace the CH-53D). At about the same time, Israel decided to forego the Osprey for the CH-53K, killing the Osprey’s best hope of snaring an international buyer. And with the Osprey 65% availability and the MV-22s high operating costs of about $11,000 dollars an hour… worse, studies from the Pentagon demonstrated that a CH-53K-equipped big-deck amphib provided a lot more logistical support for embarked Marines than the MV-22… Slowing CH-53K development will… prevent real-data comparisons between platforms… [until] a second multi-year MV-22 contract gets signed in FY 2013. Even worse, slowing the CH-53K schedule raised the program price by at least $1.1 billion dollars, raising the per-unit price… Why slow a program that stands to be a high-demand showpiece with potential markets in Israel, Germany, France, Turkey, Singapore and Taiwan?” Asked for a response, US MARCORSYSCOM said that US NAVAIR was the only agency that could respond; NAVAIR did not respond to DID’s simultaneous inquiry. April 1/10: SAR – Program grows. The Pentagon releases its April 2010 Selected Acquisitions Report, covering major program changes up to December 2009. The CH-53K is included, because the Marines want more of them – but there’s a self-imposed catch: “CH-53K – Program costs increased $6,817.8 million (+36.4%) from $18,708.3 million to $25,526.1 million, due primarily to a quantity increase of 44 aircraft from 156 to 200 aircraft (+$3,108.9 million), and increases in other support costs (+$749.7 million) and initial spares (+$456.2 million) associated with the quantity increase. Costs also increased due to a three-year delay in the procurement profile shifting initial purchases from fiscal 2013 to fiscal 2016 (+$1,148.4 million), schedule growth attributable to funding constraints (+$669.6 million), and an increase in the cost estimate for the development contract (+$611.2 million).” Feb 22/10: Sub-contractors. Cobham announces [PDF] a sub-contract from Sikorsky to manufacture all leading and trailing edge details and precisely locate and bond the details onto the CH-53K’s main rotor blade spar. The work will be done by its Antenna Systems unit, which has consolidated all composites-related operations within the company. Depending on how many CH-53K helicopters are eventually built by Sikorsky for the US Marine Corps, the contract could be worth up to $25 million. Jan 22/10: Industrial. Sikorsky formally opens its new $20 million Precision Components Technology Center, as part of United Technologies Corp.’s $130 million investment the CH-53K program. The center currently employs 8 people, and was designed to allow the development of new product lines with “zero setup time” and quick changeover from one component to another. The center will produce major dynamic components of the CH-53K helicopter such as rotating and stationary swashplates, main and tail rotor hubs, and main rotor sleeves. The equipment in the center has the capability to produce any precision rotor and drive system dynamic component, including earlier-model configurations, and forgings machined there can be up to double the size of previous on-site limits. Sikorsky release. Jan 7/10: IDR. Sikorsky announces the wrap-up of its Integration Design Review for the CH-53K, in preparation for the Critical Design Review coming in 2010. The event included industrial team members , and personnel from US NAVAIR and the Office of the Secretary of Defense. Risk reduction initiatives on the critical split torque main gear box and the advanced main rotor blade are done, and 2010 will also hold a Technology Readiness Assessment. Initial Operational Capability is currently slated for early 2016. Established features of the CH-53K helicopter currently include a joint-interoperable glass (digital screens) cockpit; fly-by-wire flight controls; 4th generation rotor blades with anhedral tips; a low-maintenance elastomeric rotor head; upgraded engines; a locking cargo rail system; external cargo handling improvements; survivability enhancements; and design for reduced operation and support costs. Sikorsky release. FY 2009 CH-53s flying at 3x planned usage; 1st GE38 engine test; VELD removed from the design; Sub-contractors picked. CH-53E, Cobra Gold 2002 (click to view full) July 28/09: Engine. The GE38 team holds a ceremony at General Electric in Lynn, MA, celebrating the completion of the first full GE38 engine test. This first engine test, which began June 24/09, focused on basic engine checkout and risk reduction. All engine test parameters were within predicted values. SDD phase testing will include 5 ground-test engines that will accumulate more than 5,000 engine test hours, plus production of 20 flight-test engines for the CH-53K development helicopters (each helicopter carries 3 engines). NAVAIR release. May 7/09: Sub-contractors. Curtiss-Wright Corporation announces a contract from Sikorsky to develop and supply data concentrator units for the CH-53K. Curtiss-Wright’s system consists of 2 data concentrator units (DCUs) that will receive and provide various avionic and air vehicle discrete, digital and analog inputs for monitoring, processing data and controlling various CH-53K subsystem components. Curtiss-Wright’s Motion Control segment will develop and manufacture the DCU systems at its newly-opened City of Industry, CA, facility. The initial contract runs through 2011 with the production phase starting in 2013. The contract has a total potential value of $22 million when development and all aircraft production options and phases are completed. April 21/09: Sub-contractors. Curtiss-Wright Controls Inc., announces a contract from United Technologies subsidiary Claverham Ltd. (a Hamilton Sundstrand Flight Systems business unit) to provide multi-channel linear variable displacement transducers (LVDTs) for the fly-by-wire (FBW) systems controlling the main rotor and tail rotor on the Sikorsky UH-60M Upgrade and CH-53K helicopters. The LVDTs are special pressure sealed linear displacement transducers that are embedded in Claverham’s Primary Flight Control Actuators. The transducers provide electrical signals that are proportional to the position of the hydraulic actuator rod, and the actuators change pitch angles on the main and tail rotors in response to the pilot’s commands. These two programs have a potential contract value in excess of $20 million over a 15-year period, with shipments expected to begin in 2009. The company will supply these products from its Christchurch, UK operation. March 30/09: GAO. The US GAO audit office delivers its 7th annual “Defense Acquisitions: Assessments of Selected Weapon Programs report, which looks at 47 programs including the CH-53K HLR. The CH-53K stands out, as one of the few programs to show lower R&D projections (from $4.23 billion to $4.17 billion) and estimated delivery time (2 months early) since its 2005 baseline. The truth is, the Marines have little choice. The time crunch has already begun: “According to program officials, all available decommissioned CH-53E helicopters have been reclaimed… Currently deployed CH-53E aircraft are flying at three times the planned utilization rate… The program intends to manufacture up to 29 of the 156 total [CH-53K] helicopters (19 percent) during low-rate initial production at the same time that it is conducting initial operational testing. While concurrent testing and production may help to field the systems sooner, it could also result in greater retrofit cost…” That’s likely, since a number of requirements and systems have been shelved, in order to deliver the helicopter on time: “Both of the CH-53K’s current critical technologies, the main rotor blade and the main gearbox, are immature and are expected to be fully mature following the low-rate initial production decision in 2013. The program replaced a third technology, the viscoelastic lag damper, with a modified version of an existing [linear hydraulic damper] technology. During preparations for the preliminary design review, it was discovered that maturing system engineering tasks would potentially require additional cost and time. As a result, the program eliminated noncritical requirements to contain costs and delayed the preliminary and critical design reviews and low-rate initial production decision.” Feb 8/09: Sub-contractors. BAE Systems announces contracts from Sikorsky Aircraft for development and initial deliveries of CH-53K Cockpit Seats and Cabin Armor Systems, and for integration of the CH-53K’s fly-by-wire flight controls. BAE Systems efforts will include design, development, testing, qualification, and delivery of initial systems to support the flight test and ground test aircraft. Follow-on contracts would be placed for production orders and spares. The seats will be based on BAE Security & Survivability Systems S7000 armored, crashworthy seats, and first deliveries of both seats and cabin armor are scheduled for 2010. The total value of the programs is estimated at approximately $90 million through 2022, if 156 CH-53K aircraft are built. FY 2008 PDR successful; Sub-contractors picked. Iraq: CH-53E lifts UH-60 (click to view full) September 2008: PDR. The CH-53K program conducts a successful Preliminary Design Review. Source. PDR Sept 26/08: Sub-contractors – HUMS. Goodrich announces that it has been picked to supply its IVHMS Health Usage and Monitoring Systems (HUMS) for the CH-53K. HUMS are embedded sensors within the aircraft’s key components, like engines. They monitor these systems, and can often tell if things are beginning to wrong inside before something actually breaks. Avoiding breakdowns, and helping to pinpoint problems faster if something does break, saves money. Further savings can be had by using HUMS in conjunction with advanced maintenance and fleet management software. Once a baseline of good data is available, it becomes possible to switch from “do it just in case” maintenance and overhaul checklists, to “condition-based maintenance” that’s performed only when necessary, based on a combination of HUMS readings and predictive software. Goodrich has carved out a strong market position in this area, supplying HUMS systems of varying complexity for a number of US military helicopters. IVHMS will supposedly build on earlier IMDS systems implanted in the CH-53E, but will be broader in nature, monitoring “the CH-53K helicopter’s entire mechanical drive train from the engines to the rotor system, and hundreds of aircraft systems.” Sept 2/08: Sub-contractors. Breeze-Eastern Corporation announces that Sikorsky has picked them to provide the CH-53K’s Internal Cargo Winch System. The initial contract requires the delivery of 5 units for the System Design and Development phase. Breeze-Eastern has worked with Sikorsky in this area to supply the S-92, and to retrofit USMC CH-53Ds. Bloomberg. May 30/08: Camber Corp. in Huntsville, AL received an $8.6 million cost-plus-fixed-fee contract for program management, acquisition management, and engineering and technical services in support of the CH-53D, CH-53E, MH-53E, and CH-53K. Work will be performed in Patuxent River, MD and is expected to be complete in November 2008. This contract was not competitively procured by the Naval Air Warfare Center Aircraft Division, Patuxent River, MD (N000421-08-C-0044). Feb 18/08: Sub-contractors. Northrop Grumman Corporation announces that U.S. Naval Aviation Systems Command has picked their APR-39BvX radar warning receiver (RWR) integration program for the Navy’s CH-53K helicopter fleet. The APR-39 BvX upgrade, scheduled for completion and flight testing in late 2009 or early 2010, builds on the recently completed AvX program and includes new, faster processors and “massive” memory expansion. Under the terms of the $17 million phase Phase 2 contract, Northrop Grumman will incorporate all electronic warfare (EW) integration capabilities of the APR-39Av2 and APR-39Bv2 versions, which are variants of the same system tailored to the kind of aircraft computer and cockpit interfaces in Navy/USMC aircraft. The APR-39BvX program will create one interoperable version for the forthcoming CH-53K fleet. This phase 2 program will include electronic warfare controller and integration interfaces to multiple missile and laser warning sensors, and also tie the APR-39 into Northrop Grumman’s Directional Infrared Countermeasures (DIRCM) systems onboard each of the helicopters. The intended result is a system providing warning and protection against electro-optical, infrared, and radar guided missiles, and electronic warfare threats. NGC release. Nov 6/07: Sub-contractors. Sikorsky has selected fellow United Technologies Corporation subsidiary Eaton Corporation to design, develop and supply the CH-53K’s integrated fuel system. This is in addition to the contract for the helicopter’s hydraulic power generation system and fluid conveyance package awarded to Eaton in July 2007. During the development phase of the program, which runs through 2014, Eaton will provide the integrated fuel system support hardware for 5 helicopter shipsets in addition to a number of system development test sets. “Based on expected production of more than 156 helicopters for the U.S. Marine Corps, the contract value is approximately $96 million and, when combined with anticipated foreign military sales, is expected to exceed $160 million over the approximate 12-year life of the program.” Eaton release. FY 2007 Sub-contractors picked; Sikorsky opens CH-53K development center. CH-53E Super Stallions: 2 HMMWVs, to shore (click to view full) Sept 25/07: Sub-contractors. Donaldson Company announces that Sikorsky has picked them to provide the CH-53K’s engine air particle protection system (EAPPS), which helps keep blown sand and other contaminants from gumming up the helicopter’s engines. Sept 17/07: Sub-contractors. Fellow United Technologies’ subsidiary Hamilton Sundstrand announces that they’ve been selected to supply integrated secondary power systems for the CH-53K, consisting of the environmental control system, auxiliary power unit and main engine start system. The environmental control system (flight deck and avionics air conditioning, cabin ventilation and heating, engine bleed system, and supply air for the onboard inert gas generation system) and main engine start system will be built at Hamilton Sundstrand’s Windsor Locks, CT facility. The Auxiliary Power Unit will be built at the company’s San Diego, CA facility. The contract includes design, development and production work; design and development will begin immediately with first hardware deliveries scheduled for 2009. Hamilton Sundstrand says that this agreement has a potential value of more than $400 million. The firm already holds contracts to supply the CH-53K’s fly-by-wire flight control computers, and primary main and tail rotor actuators. Hamilton Sundstrand release. Sept 4/07: Sub-contractors. Sikorsky Aircraft Corporation has selected Goodrich Corporation to act as integrator for the CH-53K’s input and tail drive shaft system, as well as supplying the electrical power generation and distribution system (q.v. June 17/07). July 12/07: Sub-contractors. Sikorsky Selects fellow UTC subsidiary Eaton to supply the CH-53K’s Hydraulic Power Generation System and Fluid Conveyance Package. During the development phase of the program, which runs through 2014, Eaton will provide support hardware for 10 aircraft shipsets. Based on expected production of more than 156 aircraft for the U.S. Marine Corps, as well as anticipated foreign military sales, the potential value of the contract over the life of the program is expected to exceed $200 million. Eaton release. June 20/07: European HTL. France & Germany confirm their heavy-lift helicopter program, known as HTL in France and FHT in Germany. A full set of specifications have not been created yet, and the countries involved are still trying to decide whether to pay the price of a full R&D program to get exactly what they want, or base their helicopter on an existing design. Possible contenders include the CH-53K, Boeing’s CH-47F, and Rosvertol’s super-giant Mi-26T helicopter. June 18/07: Sub-contractors. Canadian aerospace manufacturer Heroux-Devtek Inc.’s Landing Gear Division received a contract from Sikorsky to design, develop, fabricate, assemble, test and deliver the CH-53K’s landing gears and tail bumper during the SDD phase, which includes the production of landing gears and tail bumper assemblies for 8 systems. Total revenue for the SDD and the Production Phase, which will be awarded in a separate contract, is expected to exceed C$ 95 million (about $89 million). Rotor News. June 17/07: Sub-contractors. Sikorsky Aircraft Corporation has selected Fortune 500 firm Goodrich Corporation to supply the electrical power generation and distribution system for the CH-53K program. Goodrich’s Pitstone Green, UK and Twinsburg, OH facilities will be involved in the development and delivery of a complete electrical power system for the aircraft, consisting of generators and controls; primary power distribution; AC/DC converters; battery; and external power controls. Goodrich currently supplies power generation for the Sikorsky S-92/H-92 Superhawk, and has recently been selected to supply the DC power generation for the Sikorsky’s upgraded S-76D civil helicopter. Rotor News | Goodrich press kit release incl. pictures May 9/07: Sub-contractors. Sikorsky Aircraft announces its selection of 4 subcontractors to design and fabricate the CH-53K’s major fuselage sections, “following an extensive solicitation and evaluation of multiple bids over a 12-month competition”: They include Aurora Flight Sciences in Manassas, VA; Bridgeport, WVA; and Columbus, MS; R&D in Cambridge, MA (main rotor pylon). EDO Corp. composites in Salt Lake City, UT; select resin transfer molding parts from Walpole, MA; and final assembly in North Amityville, NY (tail rotor pylon & side sponsons). GKN Aerospace in Nashville, TN & St. Louis, MO (aft transition). Spirit AeroSystems in Wichita, KS (cockpit and cabin). Design will be conducted in a collaborative environment between supplier sites and Sikorsky’s Heavy Lift Development Center using model management systems linked to Sikorsky IT and data systems. Composite and titanium materials are being employed extensively to provide superior fatigue and corrosion durability at minimum weight, and state-of-the-art manufacturing processes such as co-curing, automated part fabrication, super high speed machining, and determinant assembly are being pressed into service to keep costs down. Sikorsky release. Assemblies will initially be built for 7 test and certification aircraft (4 Engineering Development Models, 1 Ground Test Vehicle, 1 Static Test Article and 1 Fatigue Test Article.) The CH-53K SDD program schedule runs through the end of September 2015. ADDENDA: GKN Aerospace’s release says that they’re contracted to deliver their 7 development ship sets to Sikorsky between 2009 – 2012, and estimates that this deal could be worth up to $70 million to them. Aurora Flight Sciences’ release clarifies that the Main Rotor Pylon (MRP) is one of 6 major fuselage sections; it is mostly made of composite materials, and houses the CH-53K’s Main Rotor Head, the No. 2 engine and other aircraft subsystems. EDO Release [PDF] Feb 12/07: Manufacturing. Sikorsky Opens the CH-53K Development Center. The CH-53K program’s new Heavy Lift Development Center is a 106,000-square-foot office building in Stratford, CT, about 5 miles from Sikorsky’s main facility. It houses the CH-53K Program and Engineering staff, co-locating 500 team members consisting of Sikorsky, Naval Air Systems Command, Defense Contracting Management Agency personnel and subcontractors. These members work in Integrated Product Teams to design, develop, test and manufacture major systems and subsystems within the CH-53K. Dec 22/06: Engine picked. Sikorsky Aircraft has selected General Electric Aviation to provide the new CH-53K heavy lift helicopter’s main engines. The GE38-1B engine planned for the CH-53K is a derivative of the CFE738 commercial turbofan engine used in the Falcon 200 business jet; the CFE738 was in turn derived from the T407 turboprop intended to power the US Navy’s updated P-7 Orion (that program was canceled and a competition restarted that left the 737-derived P-8A MMA as the winner). See also GE’s Feb 7/07 release. According to this Flight International article, GE’s engine beat out Pratt & Whitney’s PW150 and a derivative of Rolls Royce’s AE1107 that powers the V-22 Osprey. Oct 30/06: Rotor. Sikorsky Aircraft has submitted test results for its 4th Generation(TM) rotor blade, which builds on the work done for the Growth Rotor Blade(TM) (GRB) currently used on their new UH-60M and S/H-92 helicopters, using anhedral tips. The CH-53K model wind tunnel testing performed late in the summer of 2006 has reportedly shown a significant improvement in forward flight efficiency over the GRB. Earlier in the year, similar model rotor hover testing indicated large gains in hover efficiency. Read Sikorsky’s release. FY 2004 – 2006 Program OK and $3 billion development contract; European HTL opportunity? CH-53D at work (click to view full) July 19/06: European HTL. Jane’s reports that EADS Eurocopter is seeking partners for a “super lift” helicopter to be fielded around 2020 with the French & German militaries, and confirms that talks have been held with Sikorsky regarding a modified CH-53K with European avionics and a larger cabin. The Germans apparently want to replace their CH-53Gs (actually modified CH-53Ds) around 2020, and will look for upgrade programs to bridge the gap. The French currently lack heavy-lift helicopters in the CH-53 or CH-47 class, though the supergiant Russian Mi-26 was evaluated recently. Eurocopter and Sikorsky recently partnered on the successful $3 billion LUH program, but the firm has said it is keeping all its options open and is making no commitments. UPDATE: Germany is updating their CH-53Gs, and the 2 countries are also going ahead with the heavy lift helicopter program. The CH-53K is still a competitor. Where does it stand? Read “The European Heavy Lift Helicopter Program?” April 5/06: SDD contract. Sikorsky Aircraft Corp. in Stratford, CT receives a $3.04 billion modification to a previously awarded cost-plus-award-fee contract (N00019-06-C-0081) for the System Development and Demonstration (SDD) of the CH-53K aircraft, to include 4 SDD aircraft, 1 ground test vehicle, and associated program management and test support. Work will be performed in Stratford, CT and is expected to be complete in December 2015. See also NAVAIR release. SDD contract Dec 22/05: Green light. A formal decision by the Honorable Kenneth R. Krieg, US Undersecretary of Defense for Acquisition, Technology and Logistics, gives the estimated $4.4 billion HLR program the green light to proceed to the System Definition and Development (SDD) phase. CH-53E Super Stallion (click to view full) August 25/05: Sikorsky Aircraft Corp. in Stratford, CT received a $43.3 million cost-plus-fixed-fee delivery order against a previous basic ordering agreement to perform requirements definition and engineering studies in support of the Marine Corps’ Heavy Lift Replacement (HLR) Program. Work on the requirements definition and engineering studies will be performed in Stratford, CT and is expected to be complete in April 2006. Jan 6/05: Sikorsky Aircraft Corp. in Stratford, CT received an $8.4 million cost-plus-fixed-fee contract for preliminary design work in support of HLR, as part of the initial system development and demonstration of the Marine Corps’ CH-53X Heavy Lift Replacement (HLR) program. Work on the preliminary design contract (N00019-06-C-0081) will be performed in Stratford, CT and is expected to be complete in January 2008 (N00019-03-G-0003). Dec 23/04: A $34 million time and materials delivery order, issued against basic ordering agreement N00019-03-G-0003, to perform requirements definition and engineering studies in support of the Marine Corps’ Heavy Lift Replacement Program. Work was performed in Stratford, CT, and was expected to be complete in May 2005. This contract number is not exclusive to the CH-53K. Other awards under this particular contract covered the Presidential Helicopter program (Sikorsky lost) and other helicopter engineering. Appendix A: Flying Between Scylla and Charbydis: Navigating the Political Shoals JHL: QTR Concept (click to view full) DID’s coverage of the HLR program has also included a report about HLR’s potential merger with the US Army’s futuristic JHL program. The Joint Heavy Lifter (JHL) is imagined as an aircraft with cargo capacity that approaches a C-130 Hercules transport (about 20 tons), but with the ability to take off and land like a helicopter. No current US military helicopter platform even comes close. JHL’s competitors are deploying some radical and different technologies in their attempt to achieve these goals – from quad tilt-rotors to coaxial skycranes and even compound helicopters. Marine Corps acquisition officials also weighed the option of participating in JHL. While Congress could always step in to force the issue – and may still do so – the Marine Corps note that this would be deeply unwise for a number of reasons: “The Army’s proposed heavy lift requirement to transport the Future Combat System greatly exceeds our requirement,” said program manager, Col. Paul Croisetiere. “The actual aircraft hasn’t been designed yet, but initial analysis suggests the joint heavy lifter will be too large to operate from current and programmed amphibious shipping. We may have a use for it, but in more of a logistical role as a possible KC-130J [air tanker] replacement – we still need the CH-53K for tactical heavy lift.” Joint Heavy Lifters may not be available any sooner than 2025, according to Croisetiere, which is more than 10 years after the Marine Corps will be forced to start retiring its current CH-53E fleet. Even if the Marines could use it, Croisetiere pointed out that as currently envisioned, JHL will be too big to operate from the Marines’ amphibious ships. V-22 Osprey This is a logical argument. However this rationale might sell better if the USMC hadn’t spent the last decade describing tilt-rotor technology as the necessary wave of the future that would make helicopters obsolete, in its quest to sell the $100 million per plane V-22 Osprey. When budgets are also being squeezed hard by multiple cost overruns on a wide swath of programs, programs that appear to be similar to each other will become big targets for Congressional cuts and pressure to merge. The US Marines have been the leading service advocates of tilt-rotor technology as a transformational necessity. Having invested so much of their prestige and credibility in the V-22, some people on Capitol Hill seem inclined to view the Marines’ rejection of a program that includes similar Quad Tilt Rotor and OSTR (Optimum Speed Tilt-Rotor) options as inconsistent, and hence mere territoriality. If this view spreads, it will not bode well for the HLR Program’s political survival. It certainly wouldn’t be the first time in US military procurement history that the promise of the shiny new thing has found itself in the way of fulfilling military necessities with cheaper, proven options. MH-53J Pave Low IV (click to view alt.) The natural response to such pressures would be twofold. One track would emphasize the comparatively speculative nature of the JHL Program’s technologies and their uncertain development timelines. The other track would tout the value of cheaper builds of proven helicopters, in order to meet immediate needs and an uncompromising timeline for fleet airframe life. This is exactly what Col. Paul Croisetiere has done. Making that argument, however, flies in the face of almost everything the USMC said when some in Congress pushed for immediately available conventional helicopter options to replace the Marines’ extremely aged Vietnam-era CH-46 Sea Knights. Options that would also have cost about half the price per aircraft. If the CH-46s could be patched together via life extension programs and extensive maintenance while the V-22s sorted out their difficulties and eventually reached production many years late, why not the CH-53Es? Especially if pursuing a similar tilt-rotor technology like the JHL’s QTR would reduce the V-22’s per-aircraft costs while increasing overall interoperability, and therefore easing long-term maintenance and logistics costs as well? These arguments may or may not be considered valid. Nevertheless, they should absolutely be expected as the Global War on Terror, unexpected future contingencies, and a looming demographic shift put increasing pressure on US defense budgets. The US Marine Corps has certainly prepared the ground well. The HLR program may have an eventful political journey ahead of it. Appendix B: Interesting Ideas: The CH-53X Skycrane Concept CH-53X Skycrane Concept (click for details) As a point of interest, this is one of the more innovative suggestions we’ve seen re: the next-generation CH-53X. It proposes turning the CH-53 into a “Skycrane” variant, and using it in conjunction with the trend toward “battle box” containerized forces, plus underslung light armor & vehicles. The idea is that this would improve both the CH-53E’s capabilities (via reducing aircraft weight but not power) and the USA’s transformational deployability (via faster and more versatile load and ship that would also improve tactical surprise). Additional Readings & Sources Sikorsky – CH-53K. GlobalSecurity.org – Heavy Lift Replacement [CH-53X]. SLD (Oct 16/10) – Adding a Core USMC Capability: The CH-53K As A Logistical Force Multiplier. An Interview with Major Jeff “Kingpin” Davis. Sikorsky Frontlines, via WayBack (Q3 2009) – CH-53K Update [PDF]. American Helicopter Society’s Vertifile Magazine, via WayBack (Spring 2002) – An Affordable Solution To Heavy Lift [PDF] by Lt. Col. James C. Garman, MH-53E pilot in HMH-772 and a Senior Preliminary Design Engineer in the New Product Definition Group, Sikorsky Aircraft Corporation. It describes the basic outlines of many low-risk CH-53X improvements. Naval Technology – CH-53E Super Stallion – Heavy-Lift Helicopter, USA. GE Aviation – GE38. CH-53K’s Engine, designated T408-GE-400 by the US Navy. MTU – GE38. The firms are partnering to develop it, with the German firm having an 18% stake; MTU will be licensed to offer it for any European FTH helicopter program. DID – Incoming & Hostile: The USN’s JATAS Aircraft Warning System. ATK picked, will be used on the CH-53K. News & Views Flight International, via WayBack (May 10/10) – CH-53K delay will not hold up GE38 engine programme. Its potential uses go beyond helicopters, to include things like hovercraft, and GE sees its market potential as $4+ billion. Flight International, via WayBack (June 25/08) – GE plots GE38 engine’s future in emerging heavylift market. Offers further details re: the CH-53K’s planned engine. US DoD DefenseLINK: Transformation, via WayBack (Jan 9/06) – New Heavy Lift Helicopter Starts Development. US Navy NAVAIR, via WayBack (April 5/06) – $3B CH-53K contract awarded to Sikorsky. Jane’s Defense Weekly, via WayBack (Feb 24/06) – US heavy-lift aircraft will stretch state of the art. Full subscriber’s article includes JHL Program coverage as well. DID (Jan 9/06) – CH-53X (HLR) Program Moves Into SDD, Preliminary Design. An $8.6 million preliminary design contract is issued to Sikorsky, beginning the SDD phase. The CH-53X program is also redesignated CH-53K. Has the HLR program dodged the bullet? DID (Sept 27/05) – CH-53X HLR & JHL: Future Heli Programs on Collision Course? The shiny new (expensive, uncertain) thing may become the enemy of the necessary, proven thing in the US military’s procurement culture. Again. DID (Sept 21/05) – CSAR-X: And Boeing Makes 3…. The HLR program may be affected by the choices Sikorsky makes in the CSAR-X competition. DID (Aug 29/05) – HLR (CH-53X) Helicopter Program Moves Toward Milestone B Approval. Aviation Today, via WayBack (July 1/05) – Future Heavy Lift for the Marine Corps. An interview with Col. Paul Croisetiere, program manager for the U.S. Naval Air Systems Command H-53 Heavy Lift Helicopters Program PMA 261. Hill News, via WayBack (June 1/05) – House language could create friction over chopper programs. USMC, Leatherneck Magazine, via WayBack (May/05) – Heavy Lift Replacement: A Vital Marine Corps Program. American Helicopter Society’s Vertifile Magazine, via WayBack (Spring 2002) – From The Past To The Future Of Heavy Lift Part Three: Heavy Lift Helicopters [PDF]. View the full article
  15. We have all seen this brief every decade or so for decades. You can almost use the same sales pitch as before, just move the clauses around. We know what is wanted - but it is hard. Instead of saying that, we try to trick everyone in to thinking there is a new idea out there. There isn't ... and every time "we" pretend there is, we lose more credibility. The latest example from the, “This is Why DOD Can’t Have Nice Things” is the superbly mockable “Joint All-Domain Command and Control" (JADC2) concept. It is almost insulting in that is seems to be written by people who either themselves don’t know what has been going on in this area for the last few decades, or they assume no one else has institutional memory either. Just bask in the opening; Joint All-Domain Command and Control (JADC2) is the Department of Defense’s (DOD’s) concept to connect sensors from all of the military services—Air Force, Army, Marine Corps, Navy, and Space Force—into a single network. For those with an Electronic Warfare background and an onion-paper thin understanding of what the Chinese and Russians are capable of today – or even what they did as far ago as the Vietnam War - just behold Figure 1. If you transmit, you will be tracked, identified, and attacked. Transmit all day long, even easier. You then have the intellectual hangover from a couple decades of colonial policing; JADC2 intends to enable commanders to make better decisions by collecting data from numerous sensors, processing the data using artificial intelligence algorithms to identify targets, then recommending the optimal weapon—both kinetic and nonkinetic (e.g., cyber or electronic weapons)—to engage the target. Do we assume the enemy can’t do the same? What is your backup? Some analysts take a more skeptical approach to JADC2. They raise questions about its technical maturity and affordability, and whether it is even possible to field a network that can securely and reliably connect sensors to shooters and support command and control in a lethal, electronic warfare-rich environment. Analysts also ask who would have decision making authority across domains, given that, traditionally, command authorities are delegated in each domain rather than from an overall campaign perspective. Some also question how much a human will be needed for JADC2 to make decisions in real time, and whether it is appropriate to reduce the amount of human involvement in military-related decisions. Oh, I don’t know … is there a reason to be skeptical? This diagram, or variations of same, is decades old. Jokes about it are older than those just putting on LCDR. This was always the promise that was never kept. Why would anyone use this diagram who wanted to be taken seriously? Unachievable at war. War isn't that clear or clinical. You simply will not have that level or reliable access in a peer conflict’s most important inflection points. The Joint All-Domain Operations concept, thus, provides commanders access to information to allow for simultaneous and sequential operations using surprise and the rapid and continuous integration of capabilities across all domains—to try to gain physical and psychological advantages and influence and control over the operational environment. Misuse of the word “concept” here and all over the place. I don’t know, maybe we can tell what you are proposing through all all the recycled CONOPS, opaque verbiage, and word salad acronyms. DOD is leading a Joint Cross-Functional Team to explore JADC2 as the concept evolves. Have you filled out your bingo card yet? Multiple bingo cards. The Army and Air Force have announced programs to implement JADC2; what are the Navy’s plans to implement this new command and control concept? Is that Deptula throwing shade there? Anyway, I don't know .. maybe we can tell what you are proposing this to be through all the recycled CONOPS, opaque verbiage, and word salad acronyms. What role would AI have in JADC2 development? None. How about that for an answer. It isn't ready - not even close - and those in industry know AI isn't ready for late night, much less prime time. That is before the JAG gets at it. How much human-in-the-loop is necessary if sensors are linked to shooters in real-time? A lot. As someone who used to work in this area, let me help you out. Ahem: “After decades of attempts, the Secretary of Defense will conduct a baseline reset of the ability for each service’s data links to communicate with each other in real time through peacetime and degraded wartime constraints. Systems shall also maintain the ability to function as stand-alone systems, partial functionality, or in an offline mode.” So much of this, again, is trying to sweep up as much money as possible for a program that promises perfect information and perfect knowledge. Both are impossible at war. Good communications links, both voice and data, are important – but history shows us that they can be as much of a danger as a help. When overused or over-relied on, they tip towards a Critical Vulnerability vice a Critical Capability. Better yet are efforts in instead invest in the ability of our commanders to understand themselves and their mission – and that of potential enemies. That should be the goal. A vain attempt to make the real world look like a game you play on your computer should not. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/I-lEKRBElOAView the full article
  16. Americas Four B-1B bombers left Texas this week, arriving in Guam for Bomber Task Force training missions with allied partners, the US Air Force announced. On the way, the bombers integrated with 16 F-15 and two F-2 planes of the Japan Air Self-Defense Force for training over the Sea of Japan, the Air Force said. They also conducted a training exercise with the amphibious assault ship USS America in the western Pacific Ocean. The visit to Guam comes after the Air Force adjusted its force employment model, enabling strategic bombers like to B-1B to be forward deployed in the Indo-Pacific region from a broader array of worldwide locations. The first AC-130W gunship to record a combat kill has been flown to its final home at Sheppard AFB, Texas whereby it will become a ground instructional trainer for ammo and armament students in the 363rd Training Squadron as well as crew chief student in the 362nd Training Squadron. The aircraft was received from the Lockheed-Martin factory Jun. 6, 1989, with the original nickname of ‘City of Hurricane.’ It recorded its first combat kill on February 9, 2011 and on December 2016, it became the first AC-130W to score a combat kill with the 105mm cannon. Middle East & Africa Turkish President Reccep Tayyip Erdogan confirmed the test-firing of the Russian-made S-400 air defense system, adding that US objections did not concern him. The truck-mounted S-400 system was tested in Turkey’s Sinop province on the Black Sea, where it was delivered earlier this month with British-made Banshee drones for use as targets. “It is true that tests have been carried out,” Erdogan said in televised remarks from Istanbul, Bloomberg reported. “What are we supposed to do, not test these capabilities? Obviously we’re not going to ask the US“. Europe US Chief of Naval Operations Admiral Mike Gilday conducted a bilateral Strategic Dialogue via video teleconference with the First Sea Lord this week. The leaders discussed the two navies’ alliance and areas for continued collaboration and cooperation around the globe. Additionally, the two leaders signed a Statement of Intent for ‘Future Integrated Warfighting’ that will set a “cooperative vision for inter-changeability between the two navies, synchronize pioneering capabilities, strengthen operating concepts, and focus our collective efforts to Deliver Combined Seapower, together”. The Swedish Air Force (SwAF) will retain a number of its Saab JAS 39 Gripen C/D fighters beyond their current planned 2026 retirement date, solidifying an earlier announced plan to make up an anticipated shortfall in Gripen E numbers. The plan, announced by the Swedish Defense Ministry in mid-October and confirmed by manufacturer Saab on October 23, is part of a wider increase in national defense spending by more than 40% between 2021 and 2025 that was revealed by Swedish defense minister Peter Hultqvist. Of the current six Gripen C/D squadrons fielded by the SwAF, four are set to transition to the Gripen E over the coming years. As revealed in Hultqvist’s latest announcement, the two outstanding squadrons will remain operational with their existing Gripen C/D aircraft. Asia-Pacific The US Marine Corps at Iwakuni, Japan, announced formation of a new attack squadron on Friday in anticipation of the arrival of F-35B fighter planes. Marine Aircraft Group 12 re-designated Marine All Weather Fighter Attack Squadron 242 to Marine Fighter Attack Squadron 242, or VMFA-242. The change is part of the Marine Corps’ ongoing transition process from F/A-18 Hornet fighter planes to the more-advanced F-35B. It will be the second overseas Marine squadron. Today’s Video Watch: DEFENSE UPDATES WEEKLY NEWS ROUND-UP 25th OCT – ARLEIGH BURKE DESTROYERS TO HAVE HYPERSONIC WEAPON ! View the full article
  17. South African JAS-39D (click to view full) As a neutral country with a long history of providing for its own defense against all comers, Sweden also has a long tradition of building excellent high-performance fighters with a distinctive look. From the long-serving Saab-35 Draken (“Dragon,” 1955-2005) to the Mach 2, canard-winged Saab-37 Viggen (“Thunderbolt,” 1971-2005), Swedish fighters have stressed short-field launch from dispersed/improvised air fields, world-class performance, and leading-edge design. This record of consistent project success is nothing short of amazing, especially for a country whose population over this period has ranged from 7-9 million people. This is DID’s FOCUS Article for background, news, and contract awards related to the JAS-39 Gripen (“Griffon”), a canard-winged successor to the Viggen and one of the world’s first 4+ generation fighters. Gripen remains the only lightweight 4+ generation fighter type in service, its performance and operational economics are both world-class, and it has become one of the most recognized fighter aircraft on the planet. Unfortunately for its builders, that recognition has come from its appearance in Saab and Volvo TV commercials, rather than from hoped-for levels of military export success. With its 4+ generation competitors clustered in the $60-120+ million range vs. the Gripen’s claimed $40-60 million, is there a light at the end of the tunnel for Sweden’s lightweight fighter? In 2013 a win in Brazil started to answer that question. JAS-39: The Gripen Program Saab’s JAS-39A-D Gripens “Could-have” weapons (click to view full) The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs[1] and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The “Cobra” HMD completes that capability, and became operational on SAAF Gripens as of September 2011. Power to weight ratio is good, its PS-05 radar mechanically scanned radar gets good reviews, some “radar profile shaping” techniques have been employed to reduce its own signature, and its small physical size can make it a tricky opponent for enemy pilots. Short Take-Off and Landing capability makes Gripen a difficult target on the ground as well. Sweden’s defense doctrines avoid dependence on easily-targeted bases, and its fighters are expected to fly from prepared sites next to automotive highways. Gripens can fly from a 9 x 600 meter/ 29.5 x 1,970 foot runway, and land in 600 meters or less – without using a launch catapult or an arrester hook. The Gripen has one other asset that is often overlooked: very attractive lifetime operational costs. To date, each new generation of modern fighters has proven to be more expensive than its predecessors to operate and maintain. Since operation and maintenance are over 65% of a fighter’s lifetime cost, this aspect of the defense procurement spiral forces much smaller aircraft orders with each new generation of equipment. The JAS-39 was designed from the outset to counter this trend, and lifetime operating costs were given a high priority when making design and equipment decisions. Many of the Gripen’s competitors have tried, but Saab appears to have succeeded. More exact cost figures were offered in July 2010 by Gripen technical director Eddy de la Motte, who quoted less than $3,000 per flight hour for Sweden’s Flygvapnet, and “for the export customers it will be less than $5,000, including maintenance, spare parts, fuel and manpower.” On its face, that’s stunning. By comparison, the USAF places the per-hour cost of an F-15 at $17,000 [PDF]. Even given a likely mismatch between direct flight costs, and figures that include allocated life cycle costs including depot maintenance, etc., that is a big difference. Switzerland is one customer where that difference appears to have been decisive. Swiss evaluations reportedly rated the Gripen at roughly half the O&M costs expected for its twin-engine Rafale and Eurofighter counterparts. Gripen: integrated equipment Hungarian JAS-39C/Ds (click to view full) The Gripen’s equipment commonality and choice are good. Its engine is a derivative of GE’s F404, in wide use on F/A-18 A-D Hornets and many other platforms. A wide variety of international equipment has successfully been tested and integrated with the aircraft, including equipment from American, Israeli, European, and even South African[2] suppliers. Some key slots like radar-killing missiles still need to be filled, but Raytheon’s GBU-49/EGBU-12 Enhanced Paveway GPS/laser guided bombs were added in 2009, and Gripen is serving as the MBDA Meteor long-range air-air missile’s test aircraft for flight trials. The end result is an effective lightweight fighter. As an example, the Hungarian Air Force described their experiences at Exercise Spring Flag 2007, held in May at Italy’s Decimomannu air base in Sardinia. Other participants included France (E-3 AWACS), Germany (F-4F ICE), Italy (AV-8B Harrier, F-16C, Tornado ECR and Eurofighter Typhoon), NATO (E-3 AWACS), and Turkey (F-16C), with tanker support from Italy, the UK and the US. The Gripen’s 100% sortie rate was impressive, and it also generated some interesting comments from Hungarian Air Force Colonel Nandor Kilian: “In Hungary we just don’t have large numbers of aircraft to train with, but in Spring Flag we faced COMAO (combined air operations) packages of 20, 25 or 30 aircraft. The training value for us was to work with that many aircraft on our radar – and even with our limited experience we could see that the Gripen radar is fantastic. We would see the others at long ranges, we could discriminate all the individual aircraft even in tight formations and using extended modes. The jamming had almost no effect on us – and that surprised a lot of people. Other aircraft couldn’t see us – not on radar, not visually[3] – and we had no jammers of our own with us. We got one Fox 2 kill[4] on a F-16 who turned in between our two jets but never saw the second guy and it was a perfect shot. Our weapons and tactics were limited by Red Force rules, and in an exercise like this the Red Force is always supposed to die, but even without our AMRAAMs and data links we got eight or 10 kills, including a Typhoon. Often we had no AWACS or radar support of any kind, just our regular onboard sensors – but flying like that, ‘free hunting,’ we got three kills in one afternoon. It was a pretty good experience for our first time out.” To keep the basic Gripen relevant, block upgrades occur about every 3 years. Block 19, in 2009, integrates IRIS-T SRAAM (Short-Range Air-to-Air Missile), NATO’s Link-16 as a supplement to Gripen’s own shared awareness datalink, and the Cobra helmet-mounted sight. Block 20 in 2012 is expected to include enhancements to the PS-05/A radar, and the ROVER close-air-support data link used with such success by American forces. Partnerships & Production JAS-39C The Industry Group JAS (IG JAS) is the joint venture partnership that develops the Gripen System for the Swedish Armed Forces. Partners included in IG JAS are Saab Volvo Aero Corporation and Ericsson Microwave Systems (now part of Saab Group). The development and production of the Gripen has been one of Sweden’s largest industry projects, consuming up to one-third of the Swedish defense budget in some years. Brazil’s 2014 purchase will give them a role in production, and made Embraer a design partner in the 2-seat JAS-39F. The first JAS-39s were delivered in 1993, and the last Swedish plane was due to be delivered in 2007. While exact figures are extremely difficult to come by, sources place the average flyaway cost of the JAS-39 at about $40 million[4] per plane, or about $50 million in current dollars. The whole Gripen production run for all customers, according to current orders, will reach 261 aircraft. This consists of: The multinational UK Empire Test Pilot’s School has bought Gripen flight hours from Saab since 1999. They switched from the JAS-39B to the JAS-39D in 2014. The lion in winter… (click to view full) On the marketing front, Saab now handles all international sales, and ties to its parent firms like Investor AB allow it to offer an attractive program of industrial offsets to potential owners. An initial Gripen International marketing partnership with BAE gave the Swedish aircraft wide global representation, but BAE had conflicts of interest, and a divestiture formally ended the partnership in March 2010. A limited international marketing agreement for the JAS-39E/F is being negotiated with Brazil’s Embraer, but that isn’t done yet. Unfortunately, the Gripen has lost out in or been absent from important export competitions in Austria (Eurofighter), Finland (F-18), Japan (DNP – F-35), India (Rafale, but not closed), the Netherlands (F-35), Norway (F-35), Poland (F-16), Qatar (DNP – TBD), South Korea (DNP – F-35), Switzerland (F-18, then a win but a lost referendum), and Singapore (F-15SG Strike Eagle to replace A-4 Skyhawks). Meanwhile, Sweden downsized its Gripen force to 100 JAS-39 C/D aircraft, flooding the market with second-hand models and choking new production opportunities. All in a market where overall export orders were already below Saab’s expectations. A number of factors could be cited as reasons for this situation: purchasing slowdowns across the industry, the inertia of existing relationships and equipment standardization, Sweden’s lack of geopolitical weight in contrast to countries like the USA, France or Russia. In Singapore’s case, its status as a single engine lightweight fighter with limited range also hurt it – as did its partner BAE’s greater interest in promoting its own Eurofighter. Still, the bottom line is that the Gripen was dependent on exports for profitability, as a result of the unprofitable contract Saab signed with the Swedish government. The government’s ability to assist with foreign export orders has proven to be very limited, and envisaged export orders have been more in line with skeptics’ predictions than with corporate hopes. Can the Gripen production line survive? Upgraded variants have given the fighters new traction in the global marketplace. JAS-39 Gripen: The Way Forward JAS-39NG: Evolution (click to view full) One way forward is through upgrades. Most JAS-39s offered in recent export competitions touted important improvements beyond the present C/D versions. The most important is next-generation AESA radar technology, which offers substantial improvements in detection, resolution, versatility, and maintenance costs. Other common upgrades include uprated engines and longer range. Eventually, they were formalized into 2 programs. The test and development program is called Gripen Demo. Production aircraft will be JAS-39E/Fs, though they’re also referred to as Gripen NG (“next generation”). Regardless of the exact upgrade sets offered, the hope remains the same: that appropriate upgrades would allow the Gripen to continue offering better performance and features than lightweight fighter peers like the F-16 and MiG-29, including new variants like Russia’s new thrust-vectoring MiG-35 and Lockheed’s AESA-equipped F-16 Block 60 “Desert Falcon” flown by the UAE. They’re also intended to allow the Gripen to compete on more even terms with more expensive fighters like the Rafale, F/A-18 Super Hornet, etc. In those competitions, Gripen would be positioned as a lower-budget option with “close enough” capabilities overall, and outright advantages in key areas. So far, that positioning has been right on the money in Brazil and Switzerland. Gripen NG click for video That competitiveness is essential. Like France’s Rafale, which also depends on exports to finance its ongoing development, the Gripen is finding itself dependent on home government handouts in order to remain technologically competitive. That’s less than ideal, but given the Gripen and Rafale’s status as the future backbones of their respective national air forces, non-competitiveness is hardly an option. Absent further foreign sales, therefore, the question for both aircraft is how badly future upgrade costs will eat into their home market’s fighter procurement and maintenance budgets. Which explains Saab’s eagerness to escape this trap. New weapons integration will continue, highlighted by the long-range Meteor air-to-air missile in 2014 – 2015. The sale to Brazil may be especially helpful in this regard, as it creates a customer with full source-code access who will be very interested in integrating their own weapons and systems. They’ll be building on a set of pre-planned upgrades, which form the core of the JAS-39E/F’s improvements. Sensors & C4 ES-05 Raven AESA (click to view full) The first set of chosen Gripen enhancements will improve the pilot’s situational awareness, and this set of enhancements is being designed with an eye to retrofit compatibility on existing JAS-39C/D Gripen fleets. The upgrade set includes: An AESA radar in place of the present PS-05 is an important future selling point, and has been promised in several of Saab’s recent foreign bid submissions. As of March 2009, Saab is partnered with Selex Galileo to design an ES-05 Raven AESA radar that builds on Selex’s experience with the Vixen 500 AESA, Ericsson’s PS-05 radar, and its Nora AESA experiments. The Raven incorporates an identification friend-or-foe (IFF) function that works in conjunction with the cheek-mounted active array SIT 426 IFF. In an unusual twist, the Raven AESA will be movable using a single-bearing system, increasing its total field of view by a factor of 2 to +/- 100 degrees, and improving “lock, fire, and leave” maneuvers. The cost is paid in reliability and maintenance, because the pivot mechanisms create a point of failure and maintenance, whereas fixed AESA radars are mostly maintenance-free. Saab is betting that the improved scan performance will justify the cost. The quality of Raven’s AESA transmit/receive modules, and their integration, will also play a large role in the radar’s final performance. Reaching this point wasn’t easy, and the developmental state of its radar has been a weakness for Saab in competitions like India’s M-MRCA. Saab bought Ericsson’s radar group, which also makes the Erieye AWACS radar, in March 2006. Later that year, they began the “Nora” AESA project, but by autumn 2007 they had changed their approach, and looked to leverage existing radar initiatives instead. That would have been fine in a normal marketplace, but underhanded anti-competitive behavior by Dassault and the US government left Saab without a viable partner, and cost them years of time on a critical market feature. Gripen Demo & JAS-39D (click to view full) Sensors & Datalinks. Beyond the Raven radar, a passive IRST (infra-red search and track) system will be added to improve the JAS-39NG’s aerial target detection, without running the risk that the Gripen will reveal itself by emitting detectable electro-magnetic energy. The JAS-39E/F’s Skyward-G system is air-cooled, which eliminates the weight and maintenance of cryogenic liquid cooling systems. IRST systems are useful against some ground targets, and all aerial targets. They especially enhance performance against opponents with “low observable” radar stealth enhancements. If medium-long range infrared guided missiles like MICA-IR or NCADE are integrated in Gripen at some future date, an IRST system can even provide missile guidance beyond visual range, without triggering the target’s radar warning receivers. Link 16 is a situational awareness upgrade, and retrofits are also available for earlier Gripen models. Gripens already had a proprietary datalink that allows them to see a common picture of the battlefield, but the NATO Link-16 standard is more widely used, and adds the ability to share with other types of aircraft, air defense radars, ships, etc. (see June 11/07 entry, below). EW/ECM. Electronic warfare enhancements are another component of situational awareness these days, and Swiss evaluations in 2008/2009 rated this as a platform strength. Upgrades are critical, in order to keep the platform current. The JAS-39 E/F will get them, and Elbit Systems’ PAWS-2 appears to be at least part of the upgrade. Structural/ Mechanical JAS-39NG CAP Concept (click to view full) Mechanical upgrades are in the works, too. Size & Payload. Early projections for the single-seat JAS-39NG showed a larger fighter, in order to carry more fuel, and more weapons on 2 extra stations (10 total). Subsequent reports regarding the JAS-39E/F confirm that the fighter will be longer and wider, but aims to have the same wing loading ratio as earlier models. Empty weight for the Gripen Demo technology development prototype was reported as 7,100 kg, which is up from the JAS-39C’s 6,800 kg, but still well below the 10,000 kg of the F-16E Block 60.[5] Maximum takeoff weight for Gripen Demo was a bigger jump from previous versions, rising to 16,000 kg from 14,000 kg. The derivative JAS-39E/F may end up being even heavier, at 16,500 kg or greater. Maximum payload only jumps from 5,000 kg up to 6,000 kg, however, because of… Fuel. One of the Gripen’s handicaps against competing fighters has been its range. A 38%+ jump in internal fuel capacity is meant help to offset the Gripen NG’s weight and power increases, while extending the aircraft’s combat air patrol radius to 1,300 km/ 812 miles, and boosting unrefueled range to 2,500 km/ 1,560 miles. The landing gear is repositioned to accommodate those extra fuel cells. A new underwing 1,700 liter (450 gallon) fuel tank has been flown, and tanks capable of supersonic drop will be tested in future. With the full set of drop tanks, the JAS-39E/F’s total flight range is expected to reach 4,075 km/ 2,810 miles. Engine. Hauling all of that around will require a more powerful engine than the current RM12 variant of GE’s popular F404. GE’s F414, produced in partnership with Volvo Aero and in use on the F/A-18E/F Super Hornet family, will be that engine. The base model offers a 25-35% power boost over its predecessor the F404, and the developmental F414 EPE could offer another 20% thrust increase on top of that, for a total boost of 50-62%. Key F414G alterations for the Gripen will include minor changes to the alternator for added aircraft power, and Full Authority Digital Electronic Control (FADEC) software that’s modified for single-engine operation, instead of the Super Hornet’s twin-engine configuration. Reports also indicate that Saab will look to add divertless supersonic intakes to the JAS-39E/F. This technology saves weight while offering similar or better engine performance, and can be found on the F-35, as well as on China’s JF-17, J-10, and J-20 fighters. Saab Group remains on track with the basic Gripen Demo program, which has also been referenced as the “Gripen MS21”. The next step will involve setting the final specifications for Sweden and for initial buyers, and finalizing the “JAS-39 E/F” design. Development is expected to be done by 2018-2020, with new JAS-39E/F fighters entering service in Sweden around 2023. The Next Gripens: Industrial Gripen Demo rollout (click to view full) In July 2006, Saab received a SEK 1 billion contract from the Swedish government (about $150 million) to improve the aircraft, and develop the Gripen Demo/NG. This was later followed by a NOK 150 million (about $25 million) agreement with Norway in April 2007, and a set of industrial partnerships with key suppliers. A welter of upgrade contracts, studies, and private investment initiatives have also worked to finance R&D of key components, including the avionics and radar. Saab’s approach to those Gripen Demo partnerships has been a departure from past practice. Instead of selecting key technologies and modifying them to become proprietary, as was the case for the F404-based Volvo RB12 engine, Gripen Demo is using far more “off the shelf” parts. As noted above, its new GE F414 engine will feature minimal changes, so the upgraded engine is expected to cost 20% less than the its RB12 predecessor. Suppliers like Honeywell and Rockwell were reportedly asked to just provide their products, and let Saab handle integration. There are even rumors that Saab may embrace the same HMDS pilot helmet used on the F-35, instead of Saab’s Cobra. At present, Saab is leading a team of Gripen Demo partners that include: A demonstrator for the new version was rolled out in April 2008, and has been in flight testing since. Current negotiations with the Swedish, Swiss, and Brazilian governments are aimed at freezing the configuration for the JAS-39E/F/BR, which will feed back into the final industrial team. As of April 2014, a much-modified JAS-39D (aircraft #39-7) is the primary component test bed, with upgraded avionics including a digital HUD, a production-standard ES-05 Raven AESA radar, and the SkyGuard IRST. Saab is currently assembling aircraft #39-8, a more representative test prototype of the JAS-39E/F that’s due to fly in 2015. Aircraft #39-9 is due to join the test fleet in 2016 as a primary system testbed, while aircraft #39-10 is due to fly in 2017 in the final JAS-39E configuration at the production-standard weight. Future Gripens? Sea Gripen Concept (click to view full) Other aircraft upgrades are not advertised at present, but have been the subject of industry rumor and conditional commitments. Some reports have touted the possibility of a thrust-vectoring engine in future Gripen upgrades, but this was not listed as a selling point in Saab’s submissions to Norway or Denmark, and has not been mentioned in any Gripen Demo descriptions. More probable rumors involve upgrading existing fighters to JAS-39 C+/D+, by adding the improved F414G engine. Other reports over the years have focused on a carrier-capable Sea Gripen, and Saab had indicated that it would spend up to half of Gripen NG’s development budget on this variant, if it found a partner. In May 2011, however, an announcement seemed to indicate that the firm was beginning to move forward on its own, with development centered in the UK. Carrier landing is usually a very difficult conversion, but Saab can take advantage of the aircraft’s natural Short Take-Off and Landing (STOL) design. The Sea Gripen would add new undercarriage and nose gear to cope with higher sink rate forces and catapult launches, strengthen the existing tail hook and some airframe sections, and improve anti-corrosion protection. Launch options would include both catapult (CATOBAR) and “ski jump” ramp short take-off (STOBAR) capabilities, with maximum launch weight about 1/3 lower for STOBAR launches. Carrier landing speed is already in the required range under 150 knots, but the current 15 feet per second sink rate needs to be able to reach 25 feet/sec. Sea Gripens have a possible future role in Brazil as a naval aircraft on Brazil’s NAe Sao Paolo or its successor. They also exist as a very unlikely backup to Britain’s F-35B Lightning IIs on the new CVF carriers, should absolute disaster strike. Export Opportunities Czech JAS-39C/Ds (click to view full) Time will tell whether the JAS-39 Gripen’s unique combination of performance, price, and life-cycle benefits will find enough buyers in the end, or if it will go down in history as the twilight of Sweden’s indigenous combat aircraft designs. Thus far, buyers have included Sweden (195 + 60 JAS-39E upgrade), Brazil (36), South Africa (28), the Czech Republic (14 lease/buy), Hungary (14 lease/buy), and Thailand (12). Meanwhile, Saab Defence & Security continues to pursue sales possibilities worldwide. The base list comes from a 2006 Bloomberg interview that outlined Saab CEO Ake Svensson’s thoughts about the aircraft’s potential export customers in the coming years. A report from Jane’s, based on that interview, added more specifics. Subsequent developments have closed off some opportunities, and added others. Still open Argentina: The country has been looking to replace its aged fighter fleet, and is discussing a deal for 24 JAS-39E/Fs, to be signed through Brazil’s Embraer. The catch? The USA and Britain both make critical parts. Baltics: There is an lease requirement for up to 12 aircraft in Estonia, Latvia & Lithuania, but no active pursuit yet. Belgium: interest formally notified in 2014. Bulgaria: Stated in 2004 that it has a requirement for 20 aircraft to replace 6 MiG-21s and 15 MiG-29s. Issued a Request for Information (RFI) to Saab in May 2006. A 2011 RFI cut that to 8 planes. No movement or decision, but Russian aggression seems to be adding to their sense of urgency. Croatia: Was looking for 8-12 aircraft, with an in-service date of 2011. A JAS-39C/D offer was presented, with Swedish JAS-39As to be loaned as an interim force. No action as of October 2014. Greece: In limbo. Was looking to purchase a second tranche of 30-40 advanced fighters, with the process expected to begin in 2006. That was delayed, then hope was held out, then the 2010 fiscal collapse happened. Still in limbo. Finland: Studying a EUR 6 billion program to replace their 62 remaining F/A-18C/D Hornets. Possible joint air defense cooperation with Sweden would help, but Gripen isn’t compatible with their stocks of AIM-9X and AIM-120C-7 air-to-air missiles. Buy decision expected after 2020, replacement to finish by 2030. Indonesia: Looking to replace about 16 F-5E/F fighters. Indonesia has been expanding its own SU-27/30 and F-16 fleets, but they seem to want a 3rd fighter. The shortlist is a confused mix of heavy Su-35s & F-15s, and light F-16s & JAS-39s. Malaysia: Limping along with MiG-29Ns until 2015, but not happy. Saab will offer 12-24 fighters and up to 2 Saab 340AEW AWACS aircraft for lease, competing against Boeing, Dassault & Eurofighter. Their AWACS offering, and unique experience with leasing, will help. So will neighboring Thailand’s happy experiences with the same mix. Philippines: They just bought 12 South Korean FA-50s as low-cost light fighters, but the government says they will also want more advanced fighters to counter ongoing Chinese pressure, and the Gripen has been mentioned. We’ll see. Slovakia: They need to replace their 8 serving MiG-29s, and want to cooperate with the Czech Republic, which is a Gripen customer. Believed to be looking at 6-8 JAS-39Cs, to the same standard as the CzAF. Slovenia: There have been incredible reports re: national aspirations to field 40 aircraft. It’s difficult to see how they could afford anything even close to that, and they don’t fly any fighters at present. Semi-closed Hungary: Customer. The country extended its existing Gripen lease to 2026, and is looking to phase out its fleet of MiG-29s. Saab once thought that another 6 aircraft were possible within the lease extension, but that would have to be a separate deal mow.Decided/ Closed Brazil: Win (36 – 26E, 8F). The canceled F-X program got underway again, as Swensson had hoped, and Gripen outfought the favored Dassault Rafale. Follow-on buys could expand Brazil’s orders to 60 – 104 fighters, including a potential carrier-based variant within 10-15 years. Brazil will be a Gripen NG development and export partner, with full responsibility for the JAS-39F. The Czech Republic: Extension. In July 2010, Saab officials said that they saw the potential for up to 10 more planes there, but the next 12-year cycle from 2015-2027 just extended the existing lease for 14 JAS-39C/Ds, while adding minor upgrades. On the other hand, continued Czech use makes a similar 6-plane lease/ buy the overwhelming favorite for Slovakia. Denmark: DNB. Offered about 48 JAS-39DKs for their F-16 replacement competition. The Danes cancelled that competition, and now expect to buy just 25-35 fighters (F-35A, F/A-18E/F, or Eurofighter), with a decision delayed until 2014-15. Denmark is an F-35 Tier 3 industrial partner, and Saab and FXM decided not to bid in round 2. Hungary: Extension. Renewed their 12-plane lease until 2026, and did not add any planes. Their ownership is one more reason that Slovakia is likely to fly Gripens. India: loss. India’s M-MRCA competition for 120-190 fighters. JAS-39IN is out, and France’s Rafale is the pick… if M-MRCA can finish without a restart. Escalating costs have the buy under pressure, but even if Rafale negotiations fail, Sweden’s offer has shifted from the Gripen to collaboration on India’s own Tejas Mk.2. The Netherlands: loss. A Tier 2 F-35 partner, but political pressure forced a competing bid, and Saab submitted one for 85 planes in 2008. The bid is essentially lost at this point, with the main Labour Party opposition apparently caving in to a similarly-expensive buy of just 35 or so F-35As. Norway: loss. Had a requirement for 44 fighter aircraft to replace its F-16s. EADS withdrew its Eurofighter, then the F-35A won against the JAS-39N, but it may never have been a real competition. F-35A purchases have begun. Romania: loss. Was looking for 40 new aircraft, but cut that down to 24 used F-16C/D Block 25s from Portugal. Switzerland: canceled (22 JAS-39E picked, but lost referendum). Was expected to start the process to replace 3 of its F-5 squadrons later in 2006, but starts and stops pushed a decision to 2011. Saab’s Gripen was picked against the Rafale and Eurofighter in 2013, and Parliament ratified the decision, but a lack of courage in defending their position cost the government the referendum in 2014. Thailand: Win (12). was looking to replace its aging F-5s, and Gripen won against more F-16s or Russian SU-30s. A follow on order brought their total to 12 JAS-39C/Ds, as part of a package that also included 2 S340 AEW planes. 2014 reports indicate that they may want another 6. JAS-39 Gripen: Major Events 2014 – 2020 Saab will build JAS-39Fs as well; Live opportunities in: Indonesia, Malaysia, Slovakia; Future opportunities in the Philippines? Thailand?; Government blows referendum in Switzerland, deal dead. CzAF JAS-39C, L-159As (click to view full) October 27/20: Extended! The Swedish Air Force (SwAF) will retain a number of its Saab JAS 39 Gripen C/D fighters beyond their current planned 2026 retirement date, solidifying an earlier announced plan to make up an anticipated shortfall in Gripen E numbers. The plan, announced by the Swedish Defense Ministry in mid-October and confirmed by manufacturer Saab on October 23, is part of a wider increase in national defense spending by more than 40% between 2021 and 2025 that was revealed by Swedish defense minister Peter Hultqvist. Of the current six Gripen C/D squadrons fielded by the SwAF, four are set to transition to the Gripen E over the coming years. As revealed in Hultqvist’s latest announcement, the two outstanding squadrons will remain operational with their existing Gripen C/D aircraft. September 10/20: Croatia Sweden has made a formal offer to Croatia to sell 12 Saab Gripen C/D fighters to satisfy the country’s requirement to replace its Yugoslav era MiG-21s. The government-to-government offer, announced by Saab on 9 September, is part of a wider package that, the manufacturer stated, includes “a tailored made strategic co-operation package” designed to boost Croatia’s defense industry and national security. Croatia had previously opted to acquire surplus Israeli Lockheed Martin F-16C/D ‘Barak’ Fighting Falcons, but this plan was cancelled in January 2019 following US government refusal to grant required third party transfer (TPT) permission over concerns related to bespoke equipment that had been installed on the aircraft by the Israeli Air Force. August 3/20: Offer for Canada Swedish company Saab submitted its proposal for the Future Fighter Capability Project (FFCP) to Canada. The proposal comprises 88 Gripen E fighter aircraft, with a comprehensive support and training package and an industrial and technological benefits program. The submission is a formal response to the Request for Proposal (RFP) issued by Public Services and Procurement Canada (PSPC) on July 23, 2019. Saab is committing to deliver an industrial program that has been designed to generate long-lasting, high-tech employment opportunities, and business opportunities across all regions of Canada. “Saab’s Gripen fighter is designed to operate in harsh environments and defeat the most advanced global threats. The system meets all of Canada’s specific defence requirements, offering exceptional performance and advanced technical capabilities. A unique element of the avionics design is that Gripen E’s system can be updated quickly, maintaining technological superiority against any adversary,” says Jonas Hjelm, Senior Vice President and head of Saab business area Aeronautics. Meanwhile, the deadline for Canada’s fighter competition has now closed and only three companies have submitted their bids. Boeing will enter the competition with its Super Hornet while Lockheed Martin will compete with the F-35. Europe’s only entrant in the competition is the Saab JAS-39. The winner will be decided in 2022, with the first aircraft delivery projected in 2025. The tender is worth approximately $14 billion. July 10/20: Brazil Brazil has officially begun manufacturing fighter jets with the start of production at a new facility that makes sections of the Saab Gripen, Swedish aerospace company Saab announced Tuesday. Saab Aeronáutica Montagens, a new manufacturing plant located near Sao Paulo, has begun producing Gripen E/F aerostructures, including the tail cone and front fuselage for the single-seat Gripen E version of the jet. It will eventually also make the brakes, rear fuselage, wing box and front fuselage for the two-seater “F” model, Saab stated. Those structures will then undergo final assembly at Embraer’s nearby plant in Sao Paulo and Saab’s main Gripen production hub in Linköping, Sweden. Saab won a contract with Brazil in 2014 for 36 Gripen E/F aircraft after a hard-fought competition that included Boeing’s F/A-18 Super Hornet, the Dassault Rafale and the Eurofighter Typhoon. Technology transfer was a major requirement for all proposals. March 27/20: Focus Shift According to Jane’s, Saab has shifted the focus of its Gripen E/F testing away from basic flight trials towards the aircraft’s tactical and sensor suites as the program ramps up ahead of the first upcoming deliveries to Sweden and Brazil. Speaking at Saab’s annual Gripen Seminar on March 26, the company’s head of the programme, Eddy de la Motte, said that, with flight-characteristic tests having proceeded to plan, the focus is now on validating the aircraft’s mission systems. The Gripen E/F is fitted with the Selex ES-05 Raven active electronically scanned array (AESA) radar and the Selex ES 60 Skyward G-IRST. The company also announced on March 26, that it has performed the first metal cut for the two-seater fighter aircraft Gripen F, marking an important milestone in the program. Gripen F is under development for the Brazilian Air Force (FAB) and shares the same advanced design and features as Gripen E, but with seat, displays and controls for a second crew member. February 21/20: Thailand The Royal Thai Air Force has published its new 10-year white paper and it was disclosed that the service will procure a JAS-39C/D fighter in 2023. The single airframe is expected to replace the JAS-39C that crashed during an airshow in January 2017. It was also announced in the same paper that all existing 11 Gripens will be upgraded to MS 20 software standard from next year. February 3/20: Evaluation For Finland Swedish company Saab officially launched the flight evaluation phase of its Gripen E/F fighter and GlobalEye airborne early warning and control (AEW&C) aircraft for Finland’s HX program. Gripen E test aircraft 39-10 arrived at Tampere-Pirkkala Airbase north of Helsinki the day prior to Saab’s media day to mark the commencement of its HX Challenge, although due to poor weather conditions it was decided not to fly until the following day. The single-seat 39-10 was joined by the twin-seat Gripen NG demonstrator 39-7 on January 31. A GlobalEye did fly from Saab’s facility in Linköping, Sweden, on January 30 with a Finnish Air Force delegation on board. This aircraft will continue to fly out of Linköping for the duration of the evaluation as that is where the company’s bespoke de-briefing and other specialist related equipment is located. The Gripen E 39-10, Gripen NG 39-7 and the GlobalEye will be evaluated through to February 6. January 17/20: Engine Stays in Sweden Sweden has decided not to sell its General Electric F414G engine that powers the Gripen E to the United States for scheduled servicing. It has now decided that the engines will be serviced at Trollhättan instead. All F404 engines for the Swedish Gripen C/Ds are currently maintain at Trollhättan. The Saab JAS 39 Gripen is a light single-engine multirole fighter aircraft manufactured by the Swedish aerospace company Saab. The Swedish Armed Forces commissioned the Swedish Defense Material Administration to establish technical support and maintenance for RM16 / F414 for Gripen E at GKN in Trollhättan. This means that technical support and maintenance down to component level will be co-located in the Trollhättan for the JAS 39 Gripens engines December 23/19: Philippines Philippine Secretary of National Defense Delfin Lorenzana confirmed on December 16 that the Philippine Air Force is evaluating two aircraft for its multirole fighter (MRF) program. “One of the aircraft being evaluated is from Sweden the Saab Gripen and the other is the American F-16V,” Lorenzana was quoted by the state-owned Philippine News Agency (PNA) as saying, without providing further details. During the Asian Defence and Security (ADAS) 2018 exhibition in Manila a senior PAF official told Jane’s that the PAF had budgeted $1.1 billion to procure a multirole combat aircraft over the following five years. December 9/19: DAM For Hungarian Gripen Saab announced that it has delivered the Deployable Maintenance Facility (DAM) to the Hungarian Air Force. DAM is a mobile solution that enables enhanced maintenance capacity for aircraft and other vehicles combined with superior protection. The delivery stems from a contract signed between Saab and the Hungarian Ministry of Defense in December 2018. DAM provides capability equivalent to stationary maintenance infrastructure. The official handover took place at a delivery ceremony at Pápa on December 5. The Hungarian Air Force is currently operating 14 Gripen C/D fighter aircraft on a lease-purchase agreement with the Swedish government. DAM will provide an increased level of flexibility and reduce their dependency on stationary infrastructure for maintenance and protection of their Gripen fleet, Saab said. September 12/19: Brazil Saab announced that it presented the first Gripen E to the Brazilian Air Force. However, the new fighter, part of an order for 36 units, will only move to Brazil at the end of 2020. Deliveries will actually start in 2021. Saab held a Gripen E fighter presentation ceremony for Brazil, which is expected to be the sixth country to use the Swedish aircraft from 2021. The first of 36 planes from the $4 billion order was completed weeks ago and made its maiden flight on August 26. It was this fighter that attended the event in Linköping this Tuesday with the presence of several authorities of the Brazilian Air Force as well as representatives of the companies involved in the project. „Gripen increases the operational capacity of the Brazilian Air Force and boosts a partnership that ensures transfer of technology to Brazil, fosters research and industrial development in both countries,” says Fernando Azevedo e Silva, Brazilian Minister for Defense. September 6/19: Czech Gripen in Balitc Air Policing Mission Jane’s reports that five Czech Air Force JAS 39C fighters began a four-month rotation of NATO’s Baltic air policing mission on September 1 in their first operation with their new Rafael Litening 4i laser targeting pods. The aircraft are reportedly armed with their usual cannons: the AIM-9 Sidewinder and AIM-120 Advanced Medium Range Air-to-Air Missiles (AMRAAMs). On 14 June 2004, it was announced that the Czech Republic was to lease 14 Gripen aircraft, modified to comply with NATO standards. In September 2013, the Defense and Security Export Agency announced that a follow-up agreement with the Czech Republic had been completed to extend the lease by 14 years, until 2029. September 4/19: Eurofighter Withdraws From Canada’s Fighter Acquisition, Gripen Still Running Airbus announced on August 30 that it along with the United Kingdom’s Ministry of Defense is withdrawing from Canada’s effort to acquire a new fighter aircraft. Airbus Defense and Space, which was pitching the Eurofighter Typhoon, notified the Liberal government Friday that it was not going to bid. The decision was made after a detailed review of the tender issued by the federal government in mid-July. The move leaves only three companies in the $19 billion contest: Lockheed Martin Canada with its F-35; Boeing with the Super Hornet; and Saab, which is offering an updated version of its Gripen fighter. August 2/19: F-16 Instead of Gripen for Slovakia Lockheed Martin won a $800 million firm-fixed-price incentive contract for the production and support of 14 Slovak Republic F-16 block 70 aircraft. Slovakia wants to replace its MiG-29 fighter jets with this purchase. The country had previously been in talks to purchase Saab Gripen multirole fighter jets from Sweden, but Defense Minister Peter Gajdoš stalled those discussions and invited other bidders, with the field eventually narrowing in February 2018 to a choice between F-16 Vipers and JAS-39 C/D Gripens. Among its nearest neighbors, Hungary and the Czech Republic operate Gripen jets, while Poland has fleet of F-16s. Lockheed will perform work in Greenville, South Carolina and estimated completion dare is January 21, 2024. July 23/19: Future UK Combat Air System? Saab announced in a news release that the company signed a Memorandum of Understanding regarding co-operation on future combat air systems. The British-led push to build a sixth-generation warplane has executives eyeing near-term improvements to the company’s Gripen E aircraft rather than the creation of a brand-new fighter in the more distant future. “The MoU is the starting point for the countries to analyze the conditions for deeper cooperation on the development of future combat aircraft capabilities, including future development of the JAS 39 Gripen,” Saab said. The Gripen E has an overall length of 15.2m, wingspan of 8.6m, and maximum takeoff weight of 16,500kg. The maximum speed of the aircraft is Mach 2 at high-altitude, while the speed at low -altitude is 1,400km/h. July 12/19: Continued Technical Support Saab has received an order from the Swedish Armed Forces and the Swedish Defense Material Administration (FMV) for continued technical support on weapons and external stores for Gripen. The order value amounts to $15.1 million. The order is a call-up of an option as part of a previous agreement with FMV for technical support and maintenance of Gripen’s existing weapons and external stores, which was signed in March 2015. Today’s order secures continued technical support for Gripen regarding weapons and external stores. June 17/19: Gripen+GlobaEye to Finland The offer by Saab to deliver its Gripen to Finland also entails two GlobalEye Airborne Early Warning and Control (AEW&C) aircraft, the Swedish company announced via a press release. Saab’s GlobalEye is a multi-role AEW&C solution that can detect and track airborne and surface targets on land as well as on sea. According to Saab, AEW&C capability would increase Finland’s situational awareness and provide increased pre-warning time, supporting the protection of the nation’s territorial integrity. AEW&C systems have shown to provide an efficient deterrent effect whilst enhancing and maximizing the combat effectiveness of a fighter fleet. Saab’s proposal comprises 64 Gripen aircraft, of which 52 are single-seat Gripen E and 12 are dual-seat Gripen F, as well as two GlobalEye AEW&C aircraft. Finland is planning a procurement decision in 2021. May 2/19: C/D Extension Sweden could approve an extension of operations with the Saab Gripen C/D beyond 2030. This would increase the size of Sweden’s fighter inventory beyond the 60 E-model examples currently on order for its Air Force. The Air Force holds an active fleet of 100 Gripen. Saab has been awarded to produce 60 new-generation E-model fighters for the service, with operations to commence early in the next decade. Gripen C/D is a new-generation, multi-role combat aircraft currently in operation with the Air Forces of Sweden, South Africa, Hungary, Czech Republic and Thailand. Stockholm could confirm the decision to extend Gripen C/D operations on May 14, when it publishes its next long-term defense bill. January 28/19: Offer for Switzerland Saab submitted its proposal to offer Gripen E for the Swiss New Fighter Aircraft procurement to armasuisse, the Swiss defense procurement agency. The proposal consists of options 30 and 40 new Gripen E fighter aircraft in response to the Request for Proposal (RFP) by armasuisse. Switzerland seeks to replace its fighter fleet of F/A-18 Hornet and F-5 E/F Tiger aircraft. The Gripen E or „Saab JAS 39 Gripen“ is a light single-engine multirole fighter aircraft powered by Volvo RM12. Five nations currently operate Gripen: Sweden, South Africa, the Czech Republic, Hungary and Thailand. Sweden and Brazil have ordered Gripen E. Additionally, the UK Empire Test Pilots’ School uses Gripen as platform for test pilot training. December 28/18: Sweden The Swedish Defense Materiel Administration (FMV) is allocating more funds for Gripen E combat aircraft production. The $48 million contract boost allows Saab to build the Gripen Es from new parts instead with parts from salvaged Gripen Cs. The Swedish Air Force currently has 60 Gripen Es on order and is expected to cost just short of $7 billion in total. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. November 14/18: Meteor Saab confirms that its Gripen E fighter jet successfully fired a Meteor Beyond Visual Range Air-to-Air Missile (BVRAAM) for the first time. MBDA’s Meteor missile was conceived as a longer-range competitor to popular weapons like the Russian R77/AA-12, and American AIM-120 AMRAAM. Its ramjet propulsion offers the missile a head-on closing range of 120 km, and full powered performance at Mach 4+ throughout its flight, instead of the standard “burn and coast” approach use by rocket-powered counterparts. Sweden’s JAS-39 Gripen is serving as the Meteor’s main test platform. “The aircraft continues to perform as smoothly as we have seen throughout the whole flight test phase flying with external stores. I’m really looking forward to the upcoming steps in the flight test program, taking us closer and closer to completing weapon integration. Meteor makes Gripen E extremely capable in the air dominance role”, says Robin Nordlander, Saab’s experimental test pilot. October 29/18: Test – Test Saab is one step closer to readying the Gripen E for operational use. One of the new JAS-39s successfully completed the first tests to verify the ability to release and launch external payloads earlier this month. During the test one of Saab’s pilots jettisoned one external fuel drop tank and fired an IRIS-T air-to-air missile. “As a pilot, flying with external stores such as drop tank and missiles is important to allow for evaluation of how the aircraft behaves with the stores attached. This test was also used to evaluate the effect on the aircraft when releasing and launching the stores. The highlight was of course to pull the trigger and watch the missile fire away. It also brings us closer to making the aircraft ready for its operational use”, says Marcus Wandt, Experimental Gripen Test Pilot at Saab. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. October 18/18: Philippine purchase The Philippine Department of National Defense (DND) is choosing Saab’s JAS-39 Gripen to be the country’s next supersonic jet fighter. The Philippine Air Force has been looking for new aircraft to replace its retired fleet of US-made F5 Interceptors for over a decade. Defense Secretary Delfin Lorenzana told the Philippine News Agency (PNA) that the country is opting for the Gripen due to it being cheaper and less expensive in maintenance cost than the also offered F-16. Furthermore the Gripen is a proven supersonic fighter aircraft that has been in service with several countries in Europe and the Middle East. The Philippine Air Force needs the new multi-role jetfighters to counter ongoing Chinese pressure. September 24/18: MS 20 for SAAF Saab is currently recommending that the South African Air Force (SAAF) adopts the latest software update for its JAS39C and JAS39D Gripen fighter jets. MS 20 is the latest step in Saab’s process of constant capability expansion. The MS 20 upgrade includes integration of the MBDA Meteor beyond-visual-range air-to-air missile and Boeing GBU-39 Small-Diameter Bomb, improved radar modes and a new laser designation pod (LDP) among other things. The new software will would also increase the performance of the Gripen’s radar and would allow the fitting of an automated Ground Collision Avoidance System. The Swedish Air Force was using MS 20 to improve the reconnaissance performance of its Gripens. August 23/18: Struck by a bird The Swedish Air Force needs a new fighter jet after one of its JAS 39 Gripen crashed yesterday, August 21. Shortly after take-off the aircraft collided with a bird and subsequently crashed in a forested area about five miles north of a military air base near the southern Swedish city of Ronneby. The Gripen multirole fighter aircraft, developed by Saab, was first flown in December 1988 and entered operational service with the Swedish Air Force in 1997. The JAS-39, is a canard-winged successor to the Viggen and one of the world’s first 4+ generation fighters. The Gripen remains the only lightweight 4+ generation fighter type in service, its performance and operational economics are both world-class, and it has become one of the most recognized fighter aircraft on the planet. July 11/18: Botswana can’t pay The government of Botswana is still undecided if it should acquire several Gripen C/D fighter aircraft. The African nation started negotiations about purchasing 8 to 12 aircraft with Sweden in 2016. However, the country is currently struggling to fund the $1.7 billion needed for the purchase. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The Gripens were meant to replace the Botswana Defence Force’s ageing fleet of US-made F-5 fighter jets acquired over two decades ago. The aircraft acquisition is part of a force modernization program that also includes the replacement of old troop carriers, transporters, tanks, armored vehicles, light weapons and aerial defense systems. May 21/18: Saab expects sale boost The Swedish defense contractor Saab is expecting more purchases of its Gripen fighter jet after the smooth progress with the Gripen E/F development program for Brazil has heightened interest in the Swedish-designed fighter among numerous other potential customer nations. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The Gripen has one other asset that is often overlooked: very attractive lifetime operational costs. Swiss evaluations reportedly rated the Gripen at roughly half the O&M costs expected for its twin-engine Rafale and Eurofighter counterparts. Prospective buyers for the C/D-version include Botswana, which has shown interest in the type as a replacement for its Northrop F-5s. Despite a recent setback in Europe when Croatia opted to acquire secondhand Lockheed Martin F-16s refurbished in Israel, Bulgaria and Slovakia remain firm targets for Gripen deals via the Swedish government. Indonesia the Philippines are also seen as opportunities. The air forces of the Czech Republic, Hungary, South Africa, Sweden and Thailand currently operate the Gripen C/D, while Brazil and Sweden will introduce the E/F from late 2019. April 16/18: Israeli upgrades for Saffa Gripens Israeli defense firm Rafael has offered a series of upgrades to South Africa that would upgrade its JAS-39 Gripens to the 4.5 generation standard. Working in conjunction with the warplane’s manufacturer Saab, included are offers to swap the current Litening 3 targeting pod with the 4.1 version and install a IP Mobile Ad-hoc Network Software Defined Radio. Also included in the package are the provision of Python 5 and the I-Derby ER air-to-air missiles which offer a 100 km range. February 8/18: Offer to India Saab has responded to an Indian Navy request for proposals for carrier-borne fighter aircraft, offering a marine-variant of the Gripen NG. As a sweetener to the offer, the Swedish firm is also open to a technology transfer with New Delhi—a key requirement in any major Indian defense procurement under its ‘Make in India’ initiative—adding that the Sea Gripen will have all the capabilities of the Gripen E/F as well as a “small logistic footprint”. Other potential purchasers in the Asia-Pacific region being chased by Saab at this year’s Singapore airshow including Indonesia, Malaysia and the Philippines, however, Saab has caveated by saying it will have to wait and see if military budgets “match [their] ambitions”. January 29/18: Brazilian assurances The Brazilian Defense Ministry has assured Saab that any defense tie-up between local airframer Embraer and Boeing is not going to happen. Speaking to the Swedish firm’s CEO on January 25, Defense Minister Raul Jungmann said any such deal with Boeing was off the table, adding that they had also ruled out a spin-off or sale of Embraer’s defense or commercial units. Saab and Embraer are partners in the development of the Gripen NG fighter, and Saab had feared that a partnership between Embraer and Boeing could could result in the leak of sensitive data from the Gripen project. Jungmann has subsequently asked the Brazilian Air Force as well as the Defense and Finance Ministries to keep Saab executives informed of any progress in talks between the companies, adding that any deal would mean building safeguards for Saab with its input. January 25/18: Brazil deal in doubt? Brazilian daily Folha De San Paulo reports that CEO of Saab, Hakan Buskhe will warn Brazil’s Defense Minister Raul Jungmann on January 25, that the Swedish firm may cancel its $4.9 billion contract to supply 36 JAS-39 Gripen fighters to the Brazilian Air Force (BAF) if there is a partnership between Boeing and Embraer. News of a potential tie-up between Boeing and Embraer—the “golden share” owned by the Brazilian government—surfaced in December 2017, and the Brazilian airframer is considered by Boeing as a strategic part of its positioning against European giant Airbus, which purchased Canadian company Bombardier’s regional aircraft line last October. Saab’s opposition to the deal comes from promises made during the Gripen negotiations for the mandatory provision of technology transfer to the BAF and national companies such as Embraer, as well as the joint building of a portion of the ordered aircraft. The Swedish objection comes as it is worried that its technological secrets will be at risk if such a move occurs as Embraer is participating in the development of the Gripen F, however, this may result in only increasing Brazilian negotiating power in any such deal with Boeing—although any interruption of the contract already being delivered with Saab is highly unlikely. December 19/17: Contracts-Equipment Sweden’s procurement agency, the Defence and Material Administration (FMV), has signed a multi-million dollar order with Saab for equipment for existing and new E-model JAS-39 Gripen fighter aircraft. The contract is supplemental to an earlier 2013 agreement for the development and modernization of the Gripen and is worth more than $46.9 million. While specific equipment requested was not disclosed, Saab did say that the order is a first step in changing the structure of the Gripen E production for the Swedish air force. “Saab, FMV and the Swedish Armed Forces have agreed on the terms of the contract based on the relevant needs and deliveries,” says Jonas Hjelm, Senior Vice President and Head of Business Area Aeronautics. “This joint approach is intended to secure availability so that the Swedish Armed Forces can keep the Gripen C/D fleet in operational service while Gripen E is being delivered and put into operational service in the Swedish Air Force.” December 4/17: Contracts-Support Saab has received a contract through Armscor, South Africa’s procurement agency, for weapons support services on Republic of South Africa Air Force JAS-39 Gripen C/D fighter aircraft. Valued at $24.6 million, the contract will run until February 2020 and includes airworthiness management, engineering support, maintenance, repair and overhaul, spares replenishment and updates of technical publications. No further details on the contract were disclosed. October 31/17: Saab’s Gripen E smart fighter flew its first supersonic flight on October 18, the firm announced last Friday. During the flight, conducted over the Baltic Sea, the aircraft conducted maneuvers to demonstrate its aerodynamic design and powerful engine, and the data collected will go towards the ongoing flight trials for the fighter program. Saab said that the milestone had been preceded by over 20 flying hours since the jet’s first flight back on June 15, 2017. October 25/17: Bulgaria has pulled away from plans to procure eight JAS-39 Gripen fighter aircraft and will instead launch a new tender for new fighter aircraft. The Defense Ministry said it will request new offers from Portugal and Italy—who had previously offered second-hand F-16s and the Eurofighter Typhoon respectively—after the tender is officially filed in November. The decision to ditch the Gripen was made in early October following the release of a report from the special committee of the Bulgarian parliament, who called on the Cabinet to relaunch its MiG-29 fighter replacement tender despite the recommendation of a ministerial expert group that ranked the Gripen as the top choice. Approximately $899.8 million has been earmarked for the program. September 20/17: A new electronic warfare suite for the JAS-39 Gripen E/F fighter has been launched by Saab. The Arexis electronic warfare (EW) suite comprises of a radar warning receiver (RWR), enabling the equipped fighter with situational awareness of enemy radar tracking activity. It also includes Digital Radio Frequency Memory (DRFM)-based Electronic Countermeasures (EC) systems for jamming against enemy radars, be it onboard enemy aircraft or air-to-air missiles (AAM). For dedicated EA roles, the Arexis can be packaged into a pod, which Saab states, “provides high output power” for dedicated EW/EA roles. September 14/17: Saab has unveiled its Gripen Aggressor platform for the adversary air combat training market. Based on the proven Gripen C-series, the unarmed aircraft was debuted at this year’s Defence and Security Equipment International (DSEI) 2017 expo in London, and is being offered as a solution to the Royal Air Force’s (RAF) Air Support to Defence Operational Training (ASDOT) program. ASDOT is a 15-year program to provide ‘Red Air’ adversaries for RAF fighter training, and also ‘Blue Air’ platforms for the training of joint terminal attack controllers (JTACs) and fighter controllers. The requirement also includes electronic warfare and simulation elements. Saab also sees the Aggressor as a high-level aggressor option for the United States Air Force’s Adversary Air (ADAIR) program. September 1/17: Saab is planning to link up with India’s Adani Group to bid for a contract to make Jas-39 Gripen fighter aircraft in India. The pairing will face off against a team consisting of Lockheed Martin and local partner Tata Advanced System—offering the F-16—in a two-horse race to equip the Indian military with single-engine fighter jets to be produced locally under Prime Minister Narendra Modi’s “Make-in-India” initiative. New Delhi is expected to issue a formal request to both foreign firms over the next few days to provide information about their plans to design, develop and produce combat jets in the country. July 21/17: Saab’s JAS-39 Gripen has been pulled out of Belgium’s fighter competition, leaving Brussels with the choice of either the Dassault Rafale, Eurofighter Typhoon, or Lockheed Martin F-35. While Sweden’s FMV defence materiel administration had initially touted the Gripen as a cost-effective solution that can easily fill the operational requirements required by Belgium, the request included the requirement that the delivering nation also provides extensive operational support—something that would require a change in both Swedish foreign policy and political mandate. As a result, Sweden and the FMV choose not to submit an answer to the Belgian request. June 26/17: After almost a decade of deliberation, Bulgaria is to formally start talks with Sweden over the purchase of 8 Saab JAS-39 Gripen fighters to replace its Soviet-designed MiG-29s. The official go-ahead was given by Prime Minister Boyko Borissov, months after the deal was announced by the previous interim government, much to Borissov’s chagrin. However, Sofia is now looking to seal a deal by the end of the year to acquire the jets between 2018 and 2022 in order to improve its fighter fleet and improve its compliance with NATO standards. June 19/17: Saab’s latest Gripen E variant has successfully completed its maiden flight. The forty minute flight saw the fighter cover functions such as basic avionics and retracting and extending the landing gear, and is the first model of three pre-production planes authorized by the Swedish government. 60 models are currently on order with the Swedish military while Brazil has ordered 36 Gripen E and Gripen F two-seater aircraft, and Saab expects to export the aircraft to other countries. June 16/17: Saab is hoping to start negotiations to sell Gripen fighter to the Bulgarian government after this summer. While Sofia has yet to approach the firm over the acquisition, the plane was deemed by the previous caretaker government of Boiko Borissov as the best option out of three to replace its ageing Soviet-made MiG-29s, which continue to run up huge bills in overhaul and maintenance costs. Magnus Lewis-Olsson, Saab’s president for Market Area Europe, described the Gripen as the only modern fighter in the competition, adding that any expert would know that no other aircraft was more Nato-compatible than the Gripen. He added that Saab would be able to deliver four aircraft within 18 months from the signing of the contract. May 30/17: Saab hopes that its JAS-39 Gripen fighter stands a good chance in an upcoming Croatian fighter replacement competition, adding that the Balkan nation is closer to modernizing its fighter jet force than might have been previously expected and would look to take offers soon. Zagreb has already inspected the Gripen and is now in the process of researching information on other fighters as a possible replacement for its fleet of MiG-21s. Saab has been focusing on increasing Gripen sale and lease agreements in central and eastern Europe, with the Czech Republic and Slovakia recently signing a “Joint Sky” agreement to co-operate on maintaining a joint Gripen fleet, while a Bulgarian interim government selected the Gripen as the best option for a new fighter fleet. However, Bulgaria’s new Prime Minister, Boiko Borissov, recently indicated that its MiG-29s could keep flying for another eleven years so a quick sale to Sofia may not be on the cards just yet. May 12/17: Sweden’s Saab is looking to finalize a number of near-term sales of the C and D variants of its JAS-39 Gripen fighter. Upcoming competitions in Botswana, Slovakia, and Bulgaria, have all been targeted as potential clients for the C/D models, which if agreements are reached, will boost sales and ensure the continuation of the Gripen’s production line into the future. Of the three countries, Bulgaria is the closest to moving forward with a deal, after its government announced Saab as the preferred option for its MiG-29 replacement program. Slovakia have been in negotiations with Saab since 2015, while in Botswana, a Gripen package is facing off against an offering from Korea Aerospace Industries’ (KAI) FA-50—the fighter version of its T-50 trainer. April 27/17: Bulgaria’s interim government has selected Saab’s JAS-39 Gripen as the replacement for their aging fleet of MiG-29 fighters. The Swedish jet won out against an offering of second-hand F-16s from Portugal and an Italian offer for the Eurofighter Typhoon. Further discussions with Saab on contract details are scheduled to take place once the new government takes office next month, but it is expected that at least eight aircraft will be procured at a cost of $850 million. This new government will oversee a large military modernisation effort, with plans already approved to purchase new warships as well as a new collection of armored vehicles. April 9/17: A JAS-39 Gripen fighter operated by the Swedish Ministry of Defense has completed the first flight with a GKN RM12 engine completely powered by renewable biofuel. The fuel, named CHCJ-5, is interchangeable with normal jet fuel, so no changes to the engine are necessary for use. GKN Aerospace, who conducted the flight test with Saab, said the RM12 engine demonstrated good performance during the biofuel flight. GKN, Saab and FMV, Sweden’s defense procurement agency, will use the flight to show the potential of biofuel for military aerospace. April 5/17: Saab has announced that they are developing the first Gripen fighter for the Brazilian Air Force. The two-seat version of the Gripen NG is being developed in the Brazilian state of Säo Paulo in conjunction with 56 engineers and with participation from several local firms. Saab made the announcement during a recent discussion of the Gripen NG program at the recent LAAD International Defence & Security Exhibition. March 15/17: As Saab continues marketing the Saab C and D fighters, the company has announced that their latest E variant is on course to make its debut flight during the second quarter of this year. So far, the company has conducted low-speed taxi tests on the fighter and are now validating its app-type software architecture in preparation for the first flight. Deliveries of the new fighter are expected to be made to the Swedish Air Force in 2019 with an export order to Brazil set to follow. Further potential markets include sales to Belgium, Canada, Colombia, Finland, Indonesia, Malaysia and Switzerland. March 13/17: Saab has opened an office in the Philippines as the Swedish defense firm looks to sell its JAS-39 Gripen fighter to the archipelago nation. The office was opened by Swedish Ambassador Harald Fries who said that his embassy will invite Swedish companies who do good work in terms of social responsibility to have an exchange with both government agencies, labor unions, and Filipino companies. Alongside air defense, Saab is also looking to offer coastal surveillance equipment and even submarines to the Philippines in order to profit from Manila’s maritime modernization efforts. February 13/17: Saab has offered to build the world’s most modern fighter aircraft factory in India if New Delhi selects the JAS-39 Gripen E to fill an upcoming 200-250 unit fighter requirement. The company has already been in talks with nearly 100 aerospace and defense firms in India to provide components for the production of the plane which would lay the industrial base for India to design, develop and build future fighters. Rival competitor Lockheed Martin has offered to transfer the production line of their F-16 Block 70 fighter to India if selected, even though President Donald Trump’s protectionist administration may want to take a fresh look at such plans. December 20/16: Canadian-based firm Héroux-Devtek have been tapped by Saab to manufacture landing gear systems for the Gripen E fighter. Under the contract, the company will assemble and deliver landing gear equipment for 96 Gripen planes being developed for the Swedish and Brazilian air forces. Manufacture work will be conducted at the company’s UK facilities and deliveries will commence next year. November 29/16: The first flight of the Gripen E will have to wait until 2017 as manufacturer Saab self-imposes a delay of at least six months. It was initially expected that the latest Gripen model would fly before the end of the year, however Saab has chosen to fully qualify its distributed integrated modular avionics (DIMA) design to commercial standards prior to the first flight. Deliveries of orders to the Swedish and Brazilian air forces, slated for 2019, are not expected. July 22/16: Saab has sent a proposal to Indonesian authorities to sell Gripen C/D fighters to their air force (TNI-AU). If selected, the Gripens would replace a well-seasoned fleet of Northrop F-5E Tiger II fighters, in service since 1980. The government’s replacement program initially seeks to procure 16 aircraft at a cost of $1.5 billion, but this could be expected to increase if territorial disputes in the region require Indonesia to beef up its capabilities further. July 15/16: Saab is aiming to carve out a market in South America following their export coup to Brazil. Cash conscious governments from Colombia, Ecuador, Peru, and Argentina could all find a cost effective replacement for their aging fleets in the Gripen fighter. The company has brought a mock-up of its latest model to the Farnborough Air Show alongside an older model for nations that don’t need the kinds of capabilities the new jet brings to an air force. June 17/16: Botswana has confirmed that negotiations to purchase between eight and 12 JAS Gripen C/D from Sweden are underway. With an estimated cost of $1.7 billion, the fighters will replace the country’s F-5 fleet bought from Canada in the mid-1990s. Other procurements in Botswana’s sights include a $179 million deal to purchase 45 Piranha 3 8×8 armored wheeled vehicles from Swiss company General Dynamics European Land Systems-Mowag (GDELS-Mowag). June 16/16: JAS-39 Gripens operated by the Royal Swedish Air Force have been equipped with the latest MS20 software upgrade and showcased at the annual Tactics, Techniques and Procedures exercise. Materiel System 20 is an update of both equipment and software in the aircraft, and involves everything from upgrades in the presentation areas and linkages to new and enhanced abilities. New weapons on the aircraft include the METEOR missile and the GBU-39 Small Diameter Bomb (GDB). June 6/16: Slovakia’s Ministry of Defense has rejected an offer from the Swedish government on a lease agreement for Saab Gripen fighters. Under the provisions of the deal, Slovakia would have seen Stockholm lease six JAS 39Cs and two JAS 39Ds for an undisclosed price for a total of 1,200 flight hours per year. However, since elections in March saw a change of government including the Slovak National Party, the new prime minister Robert Fico has praised the capabilities of the MiG-29 aircraft. May 17/16: Botswana is to purchase eight Gripen C/D fighters after it was revealed by the Swedish Defence Materiel Administration (FMV). It is, however, also reported that the deal could be for up to sixteen, with the total cost of the deal ranging from between $1.45 to $1.63 billion. Whatever the exact number, Botswana’s government is ordering the fighter as part of a modernization that will replace its current fleet of Canadair CF-5s. May 16/16: The Swedish Embassy has denied that it is in discussions to sell four additional Gripen fighters to Thailand’s military government. Thailand’s Deputy Prime Minister and former Air Force chief Prajin Juntong told reporters that Bangkok is interested in getting four more Gripen fighters. Juntong made the comments after meeting Swedish ambassador Staffan Herrstrom. The claims where subsequently denied by the Swedish mission, who claimed that no such discussions had taken place. Thailand currently operates 12 Gripens. March 3/16: Rheinmetall has been contracted by Saab to supply 88 BK27 automatic cannons for the latest Gripen NGs. 36 of the jets fitted with the cannon will be destined for the Brazilian Air Force. The cost of the deal has been said to be in the mid-8 figure euro amount, and delivery will take place between 2017-2025. The latest cannons feature a newly developed linkless ammunition feeding system. A linked ammunition-feeding version of the cannon features as the standard weapon in the Eurofighter Typhoon. February 5/16: Finland’s former prime minister has given his backing to the Saab Gripen as the jet of choice to replace the Finnish Air Force’s F/A-18 Super Hornet fleet. Matti Vanhanen stated his support for the Swedish aircraft in a book published this week mentioning the deepening defense cooperation between the two countries. While the government has yet to state any preference between the Gripen, Dassault’s Rafale, Boeing’s Super Hornet, Lockheed Martin’s F-35 and the Eurofighter Typhoon, Vanhanen acts as a close advisor to current Prime Minister Juha Sipila. With a final decision not to be chosen until the 2020s, the Gripen looks to be gaining the early lead in a procurement that could range between $5-11 billion. While both Sweden and Finland are non-aligned nations, increased cooperation between them, Baltic, and other Nordic states are bringing them into closer cooperation with NATO. January 19/16: Increased Swedish-Finn defense ties may see the latter purchase Gripen fighters replacing the Air Force’s F/A-18 C/D Hornet aircraft, which are scheduled to be retired between 2025 and 2030. While both governments have remained tight lipped about any particular deal, the increase in bilateral ties may see Sweden’s Gripen gain an advantage as a potential choice for the Finish HX-program. Both nations follow neutrality clauses which prevent them from joining NATO, but they are looking build the basis for a stronger regional military-security alliance with NATO-neighbors Denmark, Norway, Estonia, Lithuania and Latvia. January 8/16: Looks like if you break, you buy. Hungary will restructure its lease agreement with the Swedish government over the leasing of Saab Gripen fighters after two of the jets crashed in 2015. The new decree states that the replacement of the lost jets will not exceed $33 million between the leasing period of 2017-2026. Prior to the crashes, Hungary had been leasing twelve of the aircraft since 2001. The leasing of Gripens is seemingly a common practice among central European governments looking for cost effective fighters. The Czech Republic also operates the aircraft and Slovakia is looking into signing a lease agreement for the plane. January 4/16: Slovakia is set to go ahead with leasing Saab’s Gripen jet fighter, although final contracts will not be signed until after elections due in March. The Gripens will replace the Mig-29 fighters currently on loan to the Slovak Air Force after the current lease ends this year. A more cost effective way of obtaining a fleet, leasing six to eight Gripens between now and 2029 is estimated to cost about $340 million. December 22/15: Saab has made another bid to sell its Gripen fighters to India, after it lost out a tender to Dassault’s Rafale in 2011. With a deal to buy 36 Rafale fighters just signed last month, Saab has claimed that India will require more fighters to maintain an at capacity fleet. The offer comes sweetened with a technology transfer, giving full system and software control and an offer to help develop India’s aerospace industry for the next 100 years. This deal would see Saab help in the development of India’s own indigenous Light Combat Aircraft Tejas and the Advanced Medium Combat Aircraft (AMCA). The promise of a Saab base in India and full technology transfer is a tempting one as it would mark a big success for President Modi’s “Make in India” program after tough negotiations with France and Dassault over the Rafale purchase. October 28/15: Sweden is offering Croatia the Saab JAS-39 Gripen fighter as a replacement for the country’s MiG-21s. The Swedish Defence and Security Export Agency has offered the fighter to Croatia, with the potential procurement likely covering between eight and twelve new aircraft. Croatia’s Defence Ministry is also thought to be looking at the F-16 Fighting Falcon alongside another Western design, with the country announcing its intention to replace its Soviet-era MiGs in April. July 30/15: Confirming reports from June indicating that Brazil was looking to refinance its procurement of 36 Saab Gripen NG fighters, Sweden has reportedly agreed to reduce the commercial interest rate applied by the Swedish Export Credit Corporation from 2.54% to 2.19%. Brazil cut the amount of funding it planned to take from Sweden in June, with the original sales contract announced in October 2014. The revised agreement will now be transferred to Brazil’s Federal Senate to be signed-off. Meanwhile, Brazilian prosecutors announced in April 2015 that they were planning to investigate the $5.4 billion Gripen deal. July 20/15: European defense giants Saab and BAE Systems may become embroiled in fresh corruption allegations, with Brazil’s Defense Minister announced on 15 July that the country will soon sign a final, refinanced $5.4 billion contract with Saab for 36 Gripens, approximately a year after the two sides struck an initial agreement on the sale. June 30/15: European defense giants Saab and BAE Systems may become embroiled in fresh corruption allegations, with the Swedish press reportedly unearthing fresh UK Serious Fraud Office documents relating to the sale of 26 Gripen fighters to South Africa in 1999, as well as a separate deal for Hawk trainers. The lucrative sale saw allegations up to and including the bribery of former South African President Jacob Zuma, just one of a set of BAE-related bribery allegations. The new documents reportedly show that the company paid out approximately $1.58 billion in bribes to secure the Gripen and Hawk deals, with Saab kept in the loop regarding the illicit payments. June 29/15: Brazil is reportedly looking to restructure its financing with Gripen-manufacturer Saab, a result of austerity-driven budget constraints and cuts to the amount of borrowed cash the country is taking from Sweden’s Export Credit Corporation to fund the fighter. Brazilian prosecutors announced their intention in April to investigate the $5.4 billion deal signed with Saab last year, after the Gripen beat out competitors Boeing and Dassault. June 17/15: The cause of the Hungarian Air Force JAS-39C Gripen crash last week is being attributed to software issues, according to the country’s defense minister. This is pre-empting the outcome of the official investigation, with defense minister Csaba Hende citing initial details of that investigation. Dec 15/14: Belgium. Sweden’s FMX defense export agency indicates that back in June it had received a request on joining a feasibility study for Belgium’s future combat aircraft procurement. FXM of course accepted and recently submitted a background document to the Belgian Ministry of Defence. The request applies to next generation Gripen Es. Belgium is going to upgrade its F-16s so they have ample time to make a decision. The F-35 is seen as a strong contender, if the Belgians can afford it. Nov 9/14: Argentina. Argentina may want to do a deal with Brazil (q.v. Oct 22/14), but Britain has now publicly said “no.” To be more precise, they reiterate the continued existence of a ban. A spokesperson for the UK Department of Business, Innovation and Skills: “We are determined to ensure that no British-licensable exports or trade have the potential to be used by Argentina to impose an economic blockade on the Falkland Islanders or inhibit their legitimate rights to develop their own economy…” About 30% of the JAS-39E/F will be British, from the ejection seats to the radar, landing gear, and a number of electronic systems. Embraer could try to downgrade and substitute, but Argentina lacks the money to finance such an ambitious effort. Now add the fact that a newly-Republican US Senate and House would block export’s of GE’s F414 engines. As knowledgeable observers expected, Argentina will have to look elsewhere. C4ISR & Networks, “Argentina Buying Gripens? Brits Say ‘No Way'”. Oct 22/14: Argentina. During the Embraer KC-390 medium jet transport’s rollout, Argentina and Brazil sign a formal “Alianca Estrategica em Industria Aeronautica.” Argentina is already making parts for the KC-390, and they need a larger partner for a number of other reasons. The FAB’s releases add that: “El Gobierno nacional decidio iniciar una negociacion con la administracion de Dilma Rousseff para la adquisicion de 24 aviones Saab Gripen dentro del programa denominado FX 2…” Regional export rights are also expected to be part of the $5+ billion deal, which is signed on Oct 24/14. That could get interesting, because the Gripen has systems from the USA and Britain in it. You might be able to replace electronics, but it’s expensive – and ejection seats and engines are a lot tougher. Sources: FAB NOTIMP, “Argentina quiere comprar 24 cazas supersonicos”. Oct 18/14: Finland. The Finnish government has commissioned a working group to investigate Finland’s future tactical and strategic air defense options, with the tactical level centered around an estimated EUR 6 billion project to replace the country’s 60+ F/A-18C/D Hornets. New fighters would be delivered by 2030, at which point the Hornet fleet would be retired; but The working group is also looking to see whether it’s possible to upgrade the existing Hornets, which beat the JAS-39A/B Gripen and 2 other contenders in 1992. MoD official Lauri Puranen puts it this way: “A 30-year old Formula 1 car can’t survive in this world, and we need to find out if a 30-year old fighter jet can…” The answer depends on what you want them for, and how much better newer alternatives like the F/A-18E/F Super Hornet, JAS-39E/F Gripen, F-35A/B etc. might be for the missions you need. An increasingly aggressive Russia, armed with SU-30SM, SU-34, and SU-35 fighters, is a significant threat – and its long-range S-400 anti-aircraft missiles can cover all of Finland. The Finns seem to understand this time, because the study will also look at options like joint air defense with Sweden, or joining the NATO alliance. A decision to pursue joint air defense with Sweden could give the JAS-39E/F Gripen a “second time lucky” edge, but Finland’s stocks of AIM-9X and AIM-120C-7 air-to-air missiles are currently incompatible, and Russian anti-aircraft missiles could force a need for stealth that pushes detection range outside of Finnish airspace. The missile-compatible and stealthy F-35 also has a constituency (q.v. April 22/14), and so does the less expensive F/A-18E/F, but the Super Hornet may not have a live production line by then. Sources: FDF (2010), “The Successor of the Hornet Needs to Be Decided Only in the Early Twenties” | YLE Uutiset, “Finnish Defence Forces to replace aging Hornet fighter fleet” | Corporal Frisk, “Replacing the ‘capabilities of the Hornet fighter aircraft'”. Sept 17/14: IHS Jane’s reports that: “Saab is offering “100% technology transfer” in its bid to supply the Indonesian Air Force (Tentara Nasional Indonesia Angkatan Udara – TNI-AU) with its JAS 39 Gripen combat aircraft, a company executive has told IHS Jane’s.” It’s a similar offer to the ones they made to India and to Brazil. Indonesia also has a native aviation industry, though PT Dirgantara has been focused on transport aircraft (CN-235, C-212) and helicopters (AS332). With that said, if Southeast Asia is an area of focus for Saab (q.v. Sept. 8/14), it makes sense to have a local partner who can build aerostructures and perform advanced maintenance. Sources: IHS Jane’s Defence Industry, “Saab offers “100% technology transfer” in bid to secure TNI Gripen deal”. Sept 8/14: Indonesia. Saab begins actively pitching the JAS-39 to Indonesia, which indicates some level of belief in a serious competition, and in Saab’s odds within that competition. To an outside observer, “F-16 capability at a lower ownership cost” seems to be the basic competitive positioning. The other driver at work may be the global market as a whole. An objective look for Saab sees the Middle East opting for the most expensive jets, while Asia’s biggest players have already made their picks. Africa doesn’t have much opportunity to offer beyond the South African win, and the coming deal with Brazil will cover any possibilities in Latin America. There are a number of small country opportunities in Europe, but those competitions are mostly in limbo. By process of elimination, Southeast Asia is a necessary focus for Saab right now, and Thailand has shown that even small wins lead to larger buys in time. A “max win” scenario in the region could add small but notable Gripen fleets in Malaysia and Indonesia, then follow-on possibilities in the Philippines (q.v. July 10/14), and perhaps even Vietnam over the medium-long term. Every regional win will make Saab more competitive within the region. Sources: Saab AB, “Gripen: Ideal for Indonesian Air Force”. Aug 30/14: Slovakia. The Czech Republic, Slovakia and Sweden have signed a Letter of Intent to co-operate on using the JAS-39 Gripen, “…for ett bilateralt samarbete kring en gemensam luftrumsovervakning av Slovakien och Tjeckien.” Which is to say, as a foundation for bilateral airspace overwatch co-operation between Slovakia and the Czech Republic. Note that past reports have gone as far as positing a common Gripen fighter squadron (q.v. April 3/14) if Slovakia also buys the aircraft, organized as a main base and a secondary forward base. Sources: Swedish FXM, “Idag har Sverige, Tjeckien och Slovakien undertecknat en avsiktsforklaring rorande samarbete kring Gripen” | Flightglobal, “Slovakia creeps closer to Gripen agreement”. July 21/14: Denmark. Confirmed media reports indicate that Saab declined to bid in the re-launched Danish fighter competition, believing that they faced a situation similar to Norway’s where Lockheed Martin’s F-35 had already been picked. Denmark is already a Tier 3 F-35 industrial partner. Boeing (F/A-18 Super Hornet) and Airbus (Eurofighter Typhoon) bid alongside Lockheed Martin and Saab, for an expected order of just 24-32 fighters. In contrast, the Norwegian experience appears to have triggered a more gimlet-eyed appraisal of opportunities by Saab, who also declined to participate in a recent Canadian RFI that was believed to be a political front. Each bid costs millions to prepare, so it’s a smart use of money – if one’s corporate intelligence is good enough to make consistently accurate assessments. Sources: Swedish FXM, “FXM not submitting tender for Gripen to Denmark” | Politiken, “Sverige opgiver at saelge kampfly til Danmark” | Reuters, “Saab will not bid for Denmark warplane order -newspaper” | Seeking Alpha, “Lockheed, Boeing, Airbus enter bids for Danish fighter jet tender”. No bid in Denmark July 15/14: Sea Gripen / Slovakia. Saab’s Lennart Sindahl tells a Swedish newspaper that the JAS-39E has become the base for a Sea Gripen design, following studies done in the UK. They don’t intend to move forward without a confirmed customer, however, and the 3 countries they cite (India, Thailand, Brazil) amount to 1 valid prospect. India has already picked the MiG-29K and Tejas Naval LCA for its carriers, and Air Force dependencies on similar planes means that neither choice will change. Thailand has a carrier that’s arguably too small for a STOBAR fighter like Gripen, but it doesn’t matter – they lost the ability to operate fixed wing aircraft from it several years ago. It’s now a helicopter carrier that isn’t used very much, because they can’t afford it. That leaves Brazil, a Gripen customer working to co-develop the JAS-39F, who will need aircraft to replace the Skyhawks on NAe Sao Paolo in about a decade. On a more optimistic note, he also says that Slovakia is getting closer to a deal for 6 JAS-39C Gripens, to give them interoperability with the Czech Republic and Hungary. Sources: SvD Naringsliv, “Saab tar kliv mot Gripen anpassad for hangarfartyg”. July 10/14: Philippines. The Philippines recently bought 12 FA-50 light fighters, but Defense Secretary Voltaire Gazmin is reportedly interested in more advanced aircraft as well. Saab’s Gripen is reportedly on their radar screen, given the type’s low maintenance costs for a modern fighter. Sources: Saab’s Gripen Blog, “Gripen Has Admirers In Philippines Too”. July 7/14: Weapons. MBDA announces that Saab and Sweden’s FMV have concluded missile integration firings with the JAS-39C/D Gripen and the Meteor BVRAAM (Beyond Visual-Range Air-to-Air Missile). The March 2014 launches completed the full integration program, which includes new MS20 operating software for the jet. Full Meteor capability will be delivered as part of Swedish Flygvapnet MS20 upgrades. Once that upgrade is cleared for service, the JAS-39 Gripen will be the 1st platform able to use the long-range Meteor, whose continuous ramjet propulsion also widens its no-escape zone. Gripen’s Eurofighter and Rafale competitors won’t even begin to catch up until 2017, and there’s no scheduled integration date for other fighters. Sources: MBDA, “Gripen Closes In On Operational Meteor Capability”. June 17/14: No Gripen for India. As negotiations to buy advanced Rafale fighters stall, and projected costs rise sharply, India’s Business Standard reveals that Saab had proposed to take a 51% share of a joint venture company, then leverage their expertise to help with HAL’s LCA Tejas Mk.2. It was an abandonment of Gripen in India, but for Saab, the JV would give them a major new niche in the global marketplace: a low-end fighter in a class below the Gripen and its Western competitors. DRDO chief Dr V K Saraswat was enthusiastic, with an RFI in 2012 and an RFP in 2013. The idea does indeed make great sense in terms of India’s needs. The catch? Incoming DRDO chief Dr Avinash Chander was more focused on developing the Mk.2 alone, and believed that any foreign partnership would require a global tender. In India, that would take years. If MMRCA negotiations for the Rafale fail, on the other hand, and DRDO continues to fail at fielding even the Tejas Mk.1, the new BJP government may decide to take a second look at all of its options. Sources: India’s Business Standard, “Rafale contract elusive, Eurofighter and Saab remain hopeful”. May 18/14: Switzerland. Unsurprisingly, a tepid and convictionless defense of the Gripen fighter deal results in a referendum loss, with projections showing about a 53.4% no vote. The only surprise is that the margin was this narrow, indicating a winnable vote. Compare and contrast with the September 2013 referendum, which resulted in the Swiss keeping conscription. Or the government’s success in the referendum that ratified their F/A-18 Hornet buy. While some governments in Europe will re-run referendums until they get the result they like, the Swiss aren’t like that. The TTE fighter buy, and the unrelated referendum proposal to implement a SFR 22 (about $25)/ hour minimum wage, are both history. Switzerland will need to depend on French and Italian jets for basic airspace protection, and Sweden is very likely to end up buying Brazilian Super Tucano trainers instead of Swiss PC-21s. Sources: Swissinfo, “Swiss Reject $3.5 Billion Gripen Purchase in Blow to Saab” | Deutsche Welle, “Swiss referendum turns down minimum wage and new fighter jets” | Reuters, “Swiss voters narrowly block deal to buy Saab fighter jets: projection”. Referendum kills Swiss buy April 24/14: Weapons. Sweden has decided that they need KEPD 350 cruise missiles on their Gripens, but their politicians are doing a poor job explaining why. The semi-stealthy Taurus KEPD 350 cruise missile uses a combination of GPS navigation and Imaging Infrared final targeting, with a range of around 500 km/ 310+ miles. They’re integrated on Gripen, but Sweden has never bought any, even though Taurus is a consortium between Airbus, MBDA, and Saab Bofors Dynamics. Now Defence Minister Karin Enstrom is pushing for a purchase, as part of the governing center-right coalition’s proposals to strengthen Sweden’s defenses post-Crimea (q.v. April 22/14). She touts their “wider reach and the ability to fight distant targets,” adding that “high-precision capacity can also have a deterring effect”. What she doesn’t explain is why that’s necessary, leading observers to conclude that it’s because Germany (KEPD 350) and Finland (AGM-158 JASSM) have been buying such weapons. Overall, it’s a terrible explanation to a country who sees its defense policy as defensive-only, especially after the government’s own foreign minister said in 2013 that cruise missiles would “never be relevant” for that very reason. It also misses a critical military need, in the face of new advanced air defense missiles with ranges beyond 160 km. In order for Sweden’s Gripens to even fly over defended territory safely, Gripens need to be able to destroy enemy surface-to-air missile platforms that may threaten them, without entering their killing range. The KEPD 350 can perform this role, but the Gripen’s other integrated weapons cannot. If advance thought had been given, and Sweden’s military had outlined a “deep strike” doctrine aimed at the gathering places and logistics of any attacking force, advance consensus on an argument to establish that policy could also have served as a springboard for buying these missiles. Firing a “bolt from the blue” works well if you’re shooting live KEPD 350s. If you’re a politician, however, it’s just poor preparation. Sources: The Local – Sweden, “Sweden wants cruise missiles ‘for defence'” | Radio Sweden, “Analyst: events sped up cruise missile decision”. April 22/14: Finland. The Finns are looking ahead to eventual replacement of their upgraded F/A-18C/D Hornet fighters, which beat Saab’s early-model Gripens to become Finland’s first post-Russian fighters. The new discussion involves the JAS-39E/F and F-35A, and will probably involve other machines as well, depending on what’s still in production. But the politics are going to make your head spin. Helsinki Times: “Carl Haglund (SFP), the Minister of Defence, has rejected the proposal by Eero Heinaluoma (SDP), the Speaker of the Parliament, to acquire JAS Gripen fighters from Sweden in a bid to promote Nordic co-operation…. “Although I advocate co-operation with Sweden, we should not acquire Swedish JAS fighters when we could acquire American F-35 stealth fighters for roughly the same price. Performance must take precedence in the investment,” emphasises Haglund…. “There may be fewer aircraft than at present, but the price tag will be a minimum of five billion euros. A special funding is required.” Let’s leave aside that the F-35 won’t be roughly the same price, creating fleet size issues, and avoid the military arguments for each plane in light of Finland’s geography. SFP is the Svenska folkpartiet i Finland – Swedish People’s Party of Finland. You read that right. Finland has a Swedish cultural minority, which has often been part of the balance of power in Parliament, and Swedish is a recognized 2nd language that is taught in Finnish schools. As one might imagine, there are also some tensions under the surface. So, the prominent Social Democratic Party (SDP) is suggesting Gripens, but the influential Swedish party is saying no. On the other hand, how would it look if they just smiled and agreed to something this big? Sources: Helsinki Times, “Haglund advises against JAS fighter acquisition”. April 22/14: 10 more in Sweden? Party representatives from all 4 parties in the current center-right governing coalition make a public statement, officially committing to more defense spending in light of Russia’s recent actions. The increase would be about $760 million per year (SEK 5 billion), and the main beneficiary will be the submarine fleet, which would add 3 newly-designed boats to the 2 in operation. The second beneficiary will be the JAS-39E fleet, which would grow to 70 planes. The 3rd new priority would be an improved air defense system. In declining order of party seats, the spokespeople were Fredrik Reinfeldt (Moderate), Jan Björklund (Liberal People’s), Annie Loof (Centre) and Goran Hagglund (Christian Democrats). This is a minority government, which currently has a majority because of the Sweden Democrats, a right-wing populist party that’s described as ultra-nationalist, but includes an influential contingent of Chaldean Christians who immigrated from the Middle East. The party is outside the formal governing coalition, but very disinclined to vote with the left-wing opposition parties. Sources: Dagens Nyheter, “Sa vill regeringen starka forsvaret” | The Local – Sweden, “Sweden to beef up air force to counter Russia”. April 18/14: Update. JAS-39E/F testing seems to be focused on components so far. A much-modified JAS-39D (aircraft #39-7) is the primary component test bed, with upgraded avionics including a digital HUD, a production-standard ES-05 Raven AESA radar, and the SkyGuard IRST. Saab is currently assembling aircraft #39-8, a more representative test prototype of the JAS-39E/F that’s due to fly in 2015. Aircraft #39-9 is due to join the test fleet in 2016 as a primary system testbed, while aircraft #39-10 is due to fly in 2017 in the final JAS-39E configuration with the production-standard weight. Sources: Selex ES, “Selex ES Advances Gripen Systems”. April 16/14: EW. Finmeccanica subsidiary Selex ES says that tests involving a fighter and ground radars have cleared the way for production of their BriteCloud decoys, which contain DRFM active jammers and are are shot out of a dispenser instead of being towed behind the aircraft. That dispensing method creates larger miss distances for missiles that home in on the decoy, which is very helpful against proximity fuse warheads. It also eliminates added drag on the fighter. The flip side is that you don’t get the decoy back, but cylindrical BriteCloud decoys are the same size and shape as a flare, and can be dispensed from a standard 55mm flare cartridge. That kind of capability is predictable given the advancing power of electronics, but realizing it is a big technological step forward. Britecloud will be part of the JAS-39E/F’s defensive systems, and is also available as an upgrade to existing JAS-39A-D fleets. Sources: Selex ES, “Selex ES successfully demonstrates BriteCloud Expendable Active Decoy technology”. April 4/14: Sensors. Saab announces the first flight with the new Selex ES SkyGuard long range Infra Red Search and Track sensor, which can pick up other aircraft using heat instead of radar. Now all they need is a beyond visual range air-to-air missile that can take full advantage, like the French MICA IR or Russian R-27T/ AA-10T. Sources: Saab, “Saab successfully completes flight test with IRST for Gripen E”. April 3/14: Slovakia. The Czech Republic’s Lidove Noviny writes that working groups are finalizing the details regarding major cross-cooperation with the Slovak Air Force, which currently flies 8 MiG-29s (2 trainer, 6 front-line) but is discussing a Gripen lease. Key goals include cross-border operations for in-process missions like air policing intercepts, and full cross-servicing of each other’s fighters. Obviously, that will become a lot easier if Slovakia leases the same planes. The newspaper adds that if Slovakia does lease Gripens for operations after the MiG-29s’ service agreement expires in 2016, a joint Czech and Slovakian fighter squadron would be formed, with one main and one minor air base. Sources: Prague Post, “LN: Czech, Slovaks to connect their fighter squadrons”. April 2/14: Espionage. Saab Switzerland spokesman Mike Helmy confirms that “Secret services have attempted to intercept our communications,” driven by unnamed states on behalf of their industries. Saab Switzerland is a very logical target. A new customer for an advanced weapon, busy sharing a lot of industrial data as they look to line up manufacturing partners, gives new meaning to the phrase “I’d tap that.” Sources: Swiss RTS, “Le groupe suedois Saab, constructeur du Gripen, se dit victime d’espionnage”. March 18/14: Malaysia. Reports suggest that just 3 manufacturers will submit leasing options in response to a Malaysian RFI. Saab will submit a bid of up to 24 fighters and 2 S340 AEW aircraft through Saab International Malaysia Sdn Bhd, addressing 2 Malaysian needs at once. Boeing (F/A-18F) and BAE (Eurofighter Typhoon) have reportedly submitted bids as well, but neither has Saab’s military leasing experience. Dassault has reportedly declined to participate with its Rafale, while Sukhoi’s status (RMAF flies SU-30MKMs) is unclear in the absence of a response. Malaysia will have to look at the bids, and decide if they’re willing to even lease new fighters as replacements for the RMAF’s dwindling MiG-29N fleet. In the wake of the mysterious Malaysian Airlines FLT 370 fiasco, however, Saab’s offer of AEW aircraft may give both the company and the program a higher profile in Malaysia. Sources: The Malaysian Reserve, “Three fighter jet makers to submit leasing bids” | TIME Magazine, “Another Lesson from MH370: Nobody is Watching Malaysian Airspace”. Feb 12/14: Thailand. Flight Global says they’re a happy customer, and may want to boost their fleet to 18: “Saab is in discussions with Thailand for six additional Gripen C/D fighters, the Swedish company says. In a press briefing, Saab Asia-Pacific president and chief executive Dan Endstedt said talks are ongoing. He did not give a timeframe for the possible acquisition, but says that he hopes the deal “happens soon”.” Sources: Flight Global, “SINGAPORE: Saab looks for additional Thai Gripen sale”. Feb 4/14: JAS-39F. IHS Janes reports that Brazil wants both single-seat and two-seat variants, unlike Sweden or Switzerland. Perhaps there will be a JAS-39F after all: “Saab has confirmed to IHS Jane’s that Brazil’s aerospace industry will be given the opportunity to develop a two-seater version of the Gripen NG as part of the USD4.5 million consignment of 36 fighter aircraft…. Out of the 36 fighter jets under the FAB F-X2 programme, eight of the aircraft will be twin-seat Gripen Fs and the rest [DID: 28] will be in the single-seat Gripen Es.” That would increase Brazil’s workshare, and give them a solid design role, but it also increases costs. Negotiations will be interesting. The other question involves weapons. The JAS-39D eliminates the 27mm cannon found in the JAS-39C, and it remains to be seen whether the JAS-39F will follow the same pattern. Sources: IHS Jane’s 360, “Saab confirms twin-seat Gripen F development for Brazil”. Jan 17/14: Swiss referendum. Switzerland’s Federal Council announces that the TTE program’s national public referendum will be held on May 18/14, as a yes/no vote re: the Swiss Gripen Fund Law approved by Parliament. The opposition still has to collect 50,000 signatures first, but an organized group is unlikely to fall short of that goal on a high-profile issue, while supported by sitting political parties, in a country of 8 million people. They make it. Subsequent developments show a pattern wherein the Swiss parties supporting the deal, Sweden, and Saab all abandon the political field under trumped-up pressure, effectively conceding the legitimacy of their argument. The government looks set to lose, even though the Swiss air force was off duty during an airline highjacking in the middle of the referendum. The hijacking had to be handled by Italian and French fighters. Read “Switzerland Replacing Old F-5 Fighters with New Gripen-E” for full coverage. Jan 8/14: Slovakia. Slovakia is reportedly leaning toward JAS-39 fighters as a replacement for its MiG-29s. They might be able to get second-hand F-16s or Kfirs for less, but the JAS-39’s low maintenance costs are very attractive, and they want to cooperate with the Czech Republic. Flying the same jets offers them the ability to share costs and services at a much deeper level. Slovakia currently fields 9 L-39 Albatros light attack planes, plus 3 in storage, and reportedly has 6-12 flyable MiG-29s. They’ve never bought fighters as an independent state – what they fly is what’s left of the fleet that was received in their “Velvet Divorce” with the Czech Republic. Sources: MINA, “Slovakia to replace Mig29s with Swedish JAS39”. Jan 7/14: Indonesia. Indonesia wants to replace its 11 remaining F-5E/F Tiger II light fighters with 16 modern aircraft. Defense Minister Purnomo Yusgiantoro confirmed that they “have received proposals from several jet fighter manufacturers,” and are evaluating them. Indonesian Military Commander General Moeldoko added that the TNI-AU has studied the SU-35, F-16, F-15, and JAS-39 Gripen. Moeldoko wants the requisition plan included in Indonesia’s Strategic Plan II for the 2015 – 2020, but the air force’s choice will also depend on available funds. The F-15 is significantly more expensive than other options, and if the air force wants 16 fighters, the state of Indonesia’s economy will influence what they can buy. Sources: Antara News, “Defense Ministry looking to replace aging F-5 tiger fighter aircraft”. Jan 2/14: Czech. The Czech government has negotiated its next lease period for their JAS-39C/D Gripens. The new deal will have a longer lease term (12 years + 2 year option), and annual payments about 31% lower. It would be interesting to know how the lease-to-buy program has been affected by these changes, and to have clarity regarding the terms of ongoing aircraft modernization. The catch is that October’s elections upended Czech politics, in the wake of scandals involving ex-PM Petr Necas and the PMO’s chief of staff that included an affair, using military intelligence to keep an eye on his estranged wife, and possible payments to legislators who resigned in advance of a critical non-confidence vote. The ODS party went from 2nd place to 5th, and its allied parties also lost ground. The new center-left government will be headed by the CSSD (Social Democrats), and includes the ANO protest party and the KDU-CSL Christian Democrats. The outgoing government could have signed the deal, but decided to leave it to the new government on the grounds that it’s a strategic decision. The new government approves the deal on March 12/14 – see “Contracts” section. Sources: Wikipedia, “Czech legislative election, 2013” | Czech Ministerstvo obrany, “Vlada schvalila prodej letounu L-159, prodlouzeni pronajmu gripenu prerusila”. 2013 Formal Swedish Gripen NG approval – with conditions; Swiss government approves Gripen NG; Gripen NG picked in Brazil; Denmark competition starts up again; Serious about Sea Gripen; Work begins to build the JAS-39E; No Gripen weapon school in South Africa. Gripen-F Demo (click to view full) Dec 18/13: Brazil. Earlier press reports that the competition was stalled for another 2 years are proven wrong by a somewhat unexpected announcement by the Ministerio da Defesa that Brazil has picked Saab’s Gripen-NG as their preferred bidder, and expects to buy 36 planes for $4.5 billion. That’s currently just an estimate, as negotiations need to sort themselves out. A final contract and financial arrangements are expected in December 2014, and deliveries are expected to begin 4 years later. That’s a challenge for Saab, as any schedule slippage in the development program would create a late delivery. Late fees can be expected to be a negotiating point, and Brazil’s MdD says that leasing JAS-39C/D Gripens as an interim force may be addressed in the negotiations as a 2nd contract. The Gripen NG contract figure tracks exactly with previous reports by Folha de Sao Paolo, which means an additional $1.5 billion contract can be expected for long-term maintenance and support. Saab was the cheapest of the reported offers, beating Boeing ($5.8 billion) and Dassault ($8.2 billion, reportedly reduced) by significant margins. Once Edward Snowden’s revelations of NSA spying on Brazil’s government killed Boeing’s chances, there was no middle ground. The Rafale’s reported $10.2 billion purchase + maintenance total made it 70% more expensive than Saab’s Gripen. Brazil’s economic slowdown, and the Rousseff government’s focus on entitlement spending, made that cost chasm a big factor. It wasn’t the only factor. The Gripen has Ministry statements indicate that industry’s long-standing preference for Saab’s industrial terms played a role, as Gripen-NG offers the prospect of participating in a new fighter’s design. So, too, did the unique prospect of full access to weapon integration source code, which the Ministry cited in its Q&A. That will allow Brazil to leverage its revived arms industry, and easily add weapons like Mectron’s MAR-1 radar-killer missile. Throw in the ability to participate in the future design of a carrier-based Sea Gripen variant to replace ancient A-4 Skyhawks on Brazil’s carrier, and Saab’s industrial combination overcame the Gripen’s reliance on an American engine and other equipment. The Brazilian Air Force has a dedicated website to explain its choice. Dassault issued a terse statement pointing out the presence of US parts on Gripens, and positioning the Rafale in a different league. Which may be true, but it’s also true that global fighter buys have historically been heavily weighted toward a less-expensive league. Sources: Brazil MdD, “FX-2: Amorim anuncia vencedor de programa para compra de novos cacas” | MdD, “Perguntas & Respostas sobre a definição do Programa F-X2” (Q&A) | Dassault, “FX2 contest – 2013/12/18” | Folha de Sao Paulo, “Dilma agradece Hollande por apoio contra espionagem dos EUA”. Brazil picks Gripen NG Dec 6/13: Not in T-X. Boeing and Saab AB sign a Joint Development Agreement (JDA) to jointly develop and build a new advanced, cost-efficient advanced jet training solution for the USA’s upcoming T-X competition to replace the U.S. Air Force’s aging supersonic T-38s. The JDA has Boeing as the prime contractor and Saab AB as primary partner. Its scope covers design, development, production, support, sales and marketing of “a completely new designed aircraft, built to meet the needs of the Air Force.” While Boeing’s predecessor companies did take Northrop’s YF-17 and develop it into the “new” F/A-18 Hornet, Boeing clarified to DID that their offering would not be derived from the JAS-39. Sources: Boeing, “Boeing and Saab Sign Joint Development Agreement on T-X Family of Systems Training Competition”. Nov 26/13: Qatar. La Tribune cites a number of French export opportunities in Qatar, where the JAS-39 Gripen reportedly wasn’t even invited to bid. That helps France’s Rafale, and so does the USA’s failure to approve export requests in time to respond to the fighter RFP. At least 1 bid from an American manufacturer is expected, but Qatar already uses French weapons on their existing fleet of 12 Mirage 2000-5s, and they are a strong French defense customer generally. If Qatar really does want a mixed fleet, per some reports, the Rafale’s competition narrows to only the Eurofighter. Sources: La Tribune, “La France au Moyen-Orient (3/5) : le Qatar premier client du Rafale?”. Sept 18/13: Switzerland. The Swiss upper house (Ständerat, or Council of States) votes 27 – 17 in favor of the Gripen fighter deal, following a 119 – 70 – 5 vote in the Swiss National Council. That completes elected political approval, but the deal is very likely to need approval in a countrywide referendum. If so, May 2014 is crunch time. Sources: SBC’s SwissInfo: “Gripen go-ahead: Fighter jets given parliamentary all-clear” | Saab Group, Sept 18/13 release. Sept 12/13: Czech Republic. After over a year of negotiations, the Czech Government has agreed on terms to lease its 14 Gripen aircraft (12 JAS-39C, 2 JAS-39D) for another 14 years, to 2029. The next step is for the contract to be detailed and then formalized in a signed agreement. The current 10-year, CZK 19.6 billion (about $1.033 billion) lease-to-buy arrangement lasts until 2015, so there’s no urgent rush. Still, it’s nice to settle the issue after a long period of proposed interim extensions (q.v. Feb 14/12), threats to end the lease (q.v. March 15/13), etc. The new Rusnok government appeared eager to settle the issue on a long term basis (q.v. July 15/13), and has successfully created a framework for doing so. Source: Swedish FXM export agency, Sept 12/13 | See also Saab, “Gripen for the Czech Republic”. Czechs agree to new 14-year lease terms Sept 11/13: T-X? Aviation Week reports that Boeing may abandon its push for a clean-sheet advanced jet trainer design, and hook up with Saab to offer a Gripen variant for the USA’s T-X. Subsequent comments from Saab EVP Lennart Sindahl that “We remain focused on the continued development of the Gripen E and the fighter will never be a trainer” make sense from a branding point of view, but Sindahl adds that Saab is open to new business opportunities, and using 2-seat JAS-39Ds as the base would offer an interesting recycling of Saab’s last-generation design. There’s no doubt that a JAS-39 Gripen, which is flown by Britain’s Empire Test Pilot School, can effectively simulate the most advanced jets. It comes built for supersonic speeds and high Gs, with a helmet-mounted sight, modern weapons, and proven low operating costs. Even with a lower-end radar than AESA-equipped front line variants, it would serve well as a swing-role entrant that could fly Air National Guard (ANG) roles for domestic emergencies. It could also function as an excellent aggressor aircraft, providing capabilities that equal or exceed existing F-16C aggressors at a lower operating cost. F-22s are already using much more primitive T-38s as opponents in order to keep operating costs down, so having Gripens on hand would be a notable upgrade. Those capabilities set Gripen apart from the General Dynamics/ Alenia M-346, but not from the Lockheed Martin/ KAI T-50, whose TA-50 and FA-50 variants can perform air policing and aggressor roles at a lesser but possibly adequate level. That’s why price is likely to be the key for Saab – and for Boeing. On the one hand, the notional T-X order of 300 planes would double total Gripen production since the fighter’s inception, creating some economies of scale for a JAS-39T. Boeing can already deliver the significantly larger, twin-engine Super Hornet for around $60 million; still, in order to beat competitors hovering around $30 million, they’ll need to do more than just use 1 GE F404 engine and a cheaper radar. Sources: Aviation Week, “Boeing And Saab To Propose Gripen For T-X”. Sept 4/13: Operating Costs. South Africa’s iOL News offers a snapshot of JAS-39C/D operational costs per flight hour (CPFH) for the South African Air Force. That’s a tricky area, for 3 reasons. The 1st is that there’s no standard formula, so different militaries can include different costs. The 2nd twist is that the SAAF fleet’s small size increases “dry” costs per flying hour, as fixed costs are amortized over fewer planes. The 3rd twist is unique to low-readiness countries like South Africa, who spend more per flight hour because they allocate few flight hours, but still have to maintain all of the jets. Even with all these caveats in mind, it’s still an interesting data point, especially alongside its comparison to a popular platform: “[SAAF Director of Combat Systems] General John Bayne… said the “dry costs” (without fuel) for a Gripen were R104 600 per flying hour and fuel cost R30 800, giving a total “wet cost” of R135 400. Hawks fly at a dry cost of R67 500, with fuel costs of R15 400 and a total cost of R82 900…. “To date the Hawks have flown over 10 000 major accident-free flying hours since 2005 and the Gripens 3 500 since 2008,” said Bayne.” At current exchange rates, that translates into JAS-39C/D flying-hour costs of about $10,465 dry and $13,350 wet; both are wildly higher than IHS Jane’s Aerospace and Defence Consulting’s 2012 estimate of $4,700 per flight hour. The same study’s figures for the F/A-18E/F Super Hornet help provide some perspective, however, with a base US Navy Super Hornet figure of $11,000 CPFH, but $24,400 listed for Australia. Fortunately, we have a 2nd set of SAAF data points from a more popular platform. Gen. Bayne’s figures for the sub-sonic Hawk Mk.120 trainer & light attack jets translate to $6,755 dry and $8,295 wet. One good way to normalize Gripen figures for prospective customers is probably to create a ratio involving in-service Hawk trainers under similar circumstances vs. SAAF costs, then adjust from there. Source: iOL, “SAAF jets aren’t in storage, says general” | StratPost, “Gripen operational cost lowest of all western fighters: Jane’s”. Operating Costs July 24/13: Netherlands. Financieel Dagblad reports that Saab’s final offer to the Dutch government included penalties for late delivery. A reasonable move, given that the F-35 is about as close to operational capability now as it was 5 years ago. To make things more interesting, Rekenkamer estimates are saying that the country’s EUR 4.5 billion acquisition budget is likely to buy just 33-35 F-35As, instead of the 85 fighters originally planned. Dutch News. July 18/13: South Africa. DefenceWeb quotes Saab South Africa President Magnus Lewis-Olsson, who tells them that the SAAF’s interim Gripen support contracts ended in April 2013. Saab was hoping to get a support contract in place within the next few months, but if it doesn’t, SAAF personnel can only provide front-line maintenance. Over time, their fleet will become unable to fly. defenceWeb | DID: “South Africa’s Sad Military: Why Maintenance Matters.” July 17/13: Weapon School. Saab South Africa President Magnus Lewis-Olsson tells defenceWeb that a planned global Gripen Fighter Weapon School in South Africa (q.v. July 10-18/12) represents a missed opportunity for the country. The 1,000 square meter training HQ would have been at AFB Overberg in the Western Cape, which Saab liked for its central location and available flight space. The course would have used a mix of Swedish and South African pilots, keeping those SAAF pilots current, and reimbursing the SAAF for the use of 4-6 Gripens that aren’t flying anyway due to budget cuts. Oddly, the South African National Defence Force (SANDF) didn’t move to support the initiative, and in fact seemed to campaign against it. Meanwhile, Saab has completed its syllabus and is ready to begin construction of the School and start training. Other countries have expressed interest, and Saab will be moving forward. defenceWeb. July 15/13: 1st JAS-39E. Saab announces that they’ve begun building pre-production test aircraft 39-8, the 1st complete pre-production version of the JAS-39E. They’re beginning with the front fuselage, as part of manufacturing and assembling of all parts of the fuselage. After the fuselage join comes the installation of cables, mount systems, the outer shell and other equipment. Other parts of the airplane are also being assembled during this process, and they will eventually be joined to or installed in the fuselage. Saab. July 12/13: Czech Republic. The new Rusnok government’s defence minister Vlastimil Picek says that he’ll submit a proposal for extending the Czech Republic’s JAS-39C/D Gripen lease after the Chamber of Deputies’ expected vote of confidence in early August 2013. Military deputy chief-of-staff Bohuslav Dvorak added that the next lease would be longer than the 10-year lease signed in 2004. The reality is that the Czech defense budget dropped 25.6% in absolute terms from 2005 – 2012, from CZK 58.44 billion to 43.47 billion and down to about 1.1% of GDP. The dueling imperative are that the Czech Air Force can’t realistically switch to another fighter, given the costs of new training, spare parts, etc. At the same time, they need to negotiate a deal they can afford within that small budget. Prague Daily Monitor | Defense News re: budget comparison. May 15/13: Sea Gripen. Saab remains serious about its “Sea Gripen NG,” and has been working on the idea since their May 2011 announcement. They’re targeting India, Italy and the UK alongside Brazil, but India has picked the MiG-29K, and is developing their own lower-tier naval LCA fighter. Italy and the UK both seem committed to the F-35B. The leaves Brazil, where a Sea Gripen may be necessary, in order to compete for F-X2. Brazil’s Navy is expected to buy its own fighters to equip a new aircraft carrier, which is expected to replace NAe Sao Paulo around 2025. They expect their 24 new fighters to be the same type as the FAB’s F-X-2 winner, which leaves Saab competing against 2 proven naval fighters in Boeing’s F/A-18 Super Hornets and Dassault’s Rafale-M. To help build their case, former Brazilian naval aviator Comte. Romulo “Leftover” Sobral is invited to flight test a JAS-39D, in order to verify the design’s basic suitability for naval conversion. Sobral liked the aircraft’s intuitive flight controls, ground handling, stability at low airspeeds, acceleration response, handling at the high angles of attack used in carrier landings, and good visibility. He even liked the flight suit. The plane landed in 800m, and Comte Sobral believes that the plane does have the basic requirements to become an effective naval fighter. The Sea Gripen’s lack of proven status, and absence of even a flying prototype, will still hurt the JAs-39. On the other hand, the time lag from F-X2 to a naval buy gives Brazilian industry a unique opportunity to participate in designing the Sea Gripen. Saab Gripen Blog | Full article at Defesa Aerea & Naval [in Portuguese]. April 10/13: Brazil. Saab executive Eddy de la Motta is quoted as saying that Brazilian JAS-39 Gripen NGs would use AEL’s avionics, creating a forked version under the wider development effort. This will help Saab meet industrial offset obligations, and also create commonality for Brazil’s fighter fleet, but integrating all of those components with the plane’s mission computers, OFP core software, weapons, etc. is not a trivial task. Elbit subsidiary AEL’s avionics are used in many Brazilian aircraft, with the exception of the Mirage 2000s that will retire as F-X2 fighters enter the FAB. A less comprehensive suite of AEL avionics will also be used in Boeing’s F/A-18 International, which offers AEL’s wide-screen display and some other components to all potential customers. Defense News. March 13/13: Denmark. The Danes pick up their fighter competition as promised, following their announced hiatus in April 2010. Invited bidders include the same set of Lockheed Martin (F-35A), Boeing (Super Hornet), and Saab (JAS-39E/F) – plus EADS (Eurofighter), who had withdrawn from the Danish competition in 2007. The goal of a 2014 F-16 replacement decision has been moved a bit farther back, and now involves a recommendation by the end of 2014, and a selection by June 2015. The Flyvevabnet are reported to have 30 operational F-16s, with 15 more in reserve, out of an original order of 58. Past statements indicate that they’re looking to buy around 25 fighters as replacements, but there are reports of a range from 24-32, depending on price. Danish Forsvarsministeriet [in Danish] | Eurofighter GmbH | Saab | JSF Nieuws. March 8/13: Brazil. Brazil has asked the 3 F-X2 finalists to extend their bids for another 6 months from the March 30/13 deadline, as the Brazilian commodity economy remains mired in a 2-year slump. The competitors had hoped for a decision by the time the LAAD 2013 expo opened in April. The length of the cumulative delays could create changes for the bids, and it effectively squashes any faint hopes that the new jets would be able to fly in time for the 2014 World Cup. Reuters. March 15/13: Czech Republic. Czech Prime Minister Petr Necas says that the latest Swedish contract extension offer doesn’t meet Czech “expectations,” and makes noises about a competition to choose different fighters. He’ll repeat that line in July, as negotiations continue. Ceske Noviny. March 13/13: South Africa. Opposition Democratic Alliance MP David Maynier forces the ANC government to acknowledge that 12 of its 26 delivered JAS-39/C/D fighters were in long term storage, and sums up the situation this way: “The sad facts of the Gripen system are as follows: 26 Gripen fighter jets were delivered; 10 or fewer are operational; 12 are in long-term storage; there are six qualified pilots; there are about 150 flying hours available to the entire squadron for 2013.” Read “South Africa’s Sad Military: Why Maintenance Matters” for full coverage. Jan 17/13: Sweden. The Swedish government gives formal approval to the planned purchase of 60 JAS-39E/F fighters, a bit more than a month after the Swedish Riksdagen voted 264-18-19 in favor. This isn’t an order, just approval to negotiate one – and there’s a big condition attached. If Switzerland backs out, and there are no orders from other countries, the Swedish deal will also die. The SEK 47.2 billion framework contract is announced on Feb 15/13, see contracts section for more. Saab’s Gripen blog | Sweden’s The Local | Aviation Week | UPI. Swedish approval – with conditions 2012 Sweden votes for JAS-39E/F; Czech extension; Swiss pick; South Korean opportunity declined. Sea or Land attack (click to view full) Dec 10-13/12: Testing. Swedish and Swiss pilots successfully test the Gripen-F Demo, and its new AESA radar, at Linkoping in Sweden. Swiss DDPS [in French] | Saab’s Gripen blog Dec 6/12: Swedish vote. Sweden’s Riksdagen votes 264 – 18, with 19 abstentions, to approve the JAS-39E/F Gripen Next-Generation program. The total estimated cost, including maintenance and operation, is estimated to SEK 90 billion up until 2042. Swedish FXM | Saab’s Gripen blog. Sept 23/12: Malaysia. RMAF chief Tan Sri Rodzali Daud tells The Sun Daily that Saab’s offer to lease 18 JAS-39 Gripens is under serious consideration, as a lower cost alternative to buying MiG-29N replacements. Other sources had told the paper that the Gripen and the RMAF’s existing SU-30MKM fighter had been eliminated in technical tests, but Daud stressed that all competing aircraft were still under consideration. He added that a special budget might be necessary to fund MRCA, and that operating and maintenance costs would play a big role in the RMAF’s choice. Indeed, O&M costs have been the main reason behind Malaysia’s desire to retire its MiGs. If those criteria turn out to be accurate, then the SU-30MKM’s installed maintenance base, and Gripen’s proven design for low operating costs, could give them an important advantage over the Eurofighter and Rafale in Malaysia. Boeing’s F/A-18E/F Super Hornet would fall somewhere in between. It’s more expensive to operate than the Gripen, and doesn’t have much commonality with Malaysia’s F/A-18D Hornets, but the joint base at Butterworth, Malaysia would offer Super Hornet interoperability with Australia. Just as the Gripen would offer interoperability with neighboring Thailand. Sept 21/12: Sweden. Sweden’s government presents its 2013 budget request to Parliament, which includes the planned SEK 300 million (about $46 million) to begin paying for Gripen E/F development. The challenge is that the agreed formula of SEK 300 million in 2013-14, and SEK 200 million thereafter, only gets them to SEK 2.3 billion by 2023. Unfortunately, the Swedish Forsvaret now says that the Gripen E/F program is expected to cost “cirka fem miljarder kronor” (about SEK 5 billion) above and beyond the current 10-year plan, and the plane is scheduled to enter service by 2023, 10 years after development funding begins. To us, that sounds like “half funded”; we’ve asked the Forsvaret to clarify. Swedish Forsvaret [in Swedish] | Swiss DDPS [in German]. July 10-18/12: Pilot school? Saab says that they’re moving to establish a new global Fighter Weapons School for Gripen pilots at the SAAF’s Overberg base, in the southern Cape area, along with the Swedish and South African air forces. The first class is said to be targeting an October 2013 opening. Aviation Week: “A former site for secret South African/Israeli missile tests, Overberg hosts the SAAF’s test squadron and was chosen because it offers access to maritime, desert and high-elevation training areas, live ordnance areas and instrumented ranges with land targets… The SAAF will provide the school with [4-6] JAS 39C/D Gripens, plus aggressors (opposition aircraft) and targets if necessary, and each student will fly 20 day and night sorties. Discussions with other Gripen operators have already started. Airborne early warning and control aircraft or tankers could be added later.” The South African National Defence Force (SANDF) follows with a sharp rebuke: “We would like to place on record that there has never been any discussion between SAAB and the SANDF. It is with dismay that we read such in the media when no interaction whatsoever with regard to the purported school. The Air Force Base Overberg is a sensitive security establishment of the SANDF and will remain solely in the hands of the SANDF. The suggestion therefore that such a school will be established is devoid of truth.” Saab tells defenceWeb that it remains 100% committed to the project, and says that the SAAF was onboard and supportive, “but final and formal approval with South African government bodies is still outstanding.” Saab | Aviation Week | defenceWeb. July 10/12: Weapons – Meteor schedule. The Gripen will be the 1st plane integrated with MBDA’s Meteor long-range air-to-air missile, and the plane’s role during the last 6 years of firing trials could allow an early finish in 2013, instead of the planned 2014 operational date. Subsequent revelations place the Eurofighter’s operational date with Meteor within 2017, and the Rafale’s in 2018. MBDA has undertaken 21 test firings to complete the development program, is about the deliver a final performance statement that it’s “fully compliant from a lethality and kinematic point of view”, and is building the first production missiles. Aviation Week. June 18/12: JAS-39E/F. Aviation Week’s Bill Sweetman reports from an aerospace conference at Sweden’s Malmen AB, where they’ve discussed details of the JAS-39E/F. They’re hoping that the first 2 development aircraft can fly in late 2013. The plane’s new sensor set, avionics, and mission computer will be designed so that they can also serve as JAS-39A-D upgrades. The airframe is another matter. Sweetman describes the airframe as “largely new” compared to the JAS-39C/D, with new mid and aft fuselage sections, and widened blended wing-body sections, based on the design and lessons from Gripen Demo. The overall description involves a longer and slightly wider fighter that maintains the same wing loading, despite a gross weight increase over the JAS-39C/D that has reached 5,000 pounds. It’s also supposed to supercruise with weapons, using divertless inlets. Even with a new engine for those inlets to feed, however, the extra weight will make armed supercruise a challenge. The F414 EPE, which adds more thrust, is reportedly under discussion, but configuring the EPE for more thrust will penalize range. Feb 29/12: JAS-39E/F. Sweden’s armed forces publish a report recommending that at least 60-80 JAS-39E/F Gripens be present in the future Swedish air force, with new aircraft beginning to arrive in 2020 and the entire effort lasting until 2030 or so. The military said its aim was to split the upgrade cost with “at least one other strategic partner country,” but did not reveal whom. It eventually becomes clear that the partner is Switzerland. This sort of arrangement would usually mean new-build planes, given the extent of the changes, but Saab itself talks about upgrades, and so have earlier reports (vid. Jan 26/12). Either way, Swedish acceptance would stabilize the future of its next-generation Gripen project. Swedish media talk about a SKR 30 billion (about $4.5 billion) project, though the military isn’t discussing any firm estimate yet. Saab | Sweden’s The Local. Feb 14/12: Czech mates. The Czech Republic’s government has reportedly decided to pursue a 5-year extension of the 10-year, CZK 19.6 billion (about $1.033 billion) lease-to-buy for its 14-plane JAS-39C/D fighter fleet, rather than opting for an immediate replacement tender. Czech defense minister Alexandr Vondra said that he didn’t expect Czech-Swedish negotiations to last longer than 4 months, but they have. The net effect is to freeze the Gripen as the country’s intermediate-term fighters, and make the Czechs’ long-term fighter fleet plan an issue for a follow-on government. Subsequent negotiations and a new government would later change the country’s plans. Ceske Noviny | Ottawa Citizen. Feb 13-14/12: Swiss 2009 evaluation leaked. The confidential 2008/2009 Swiss Air force evaluation results are publicly leaked. Its verdict that the Gripen didn’t meet minimum Swiss requirements for its future fighter directly contradicts earlier statements from Swiss military and political leadership that all 3 planes on offer had done so. This leaves the entire basis of the Swiss selection open to question, and pressure is building across the political spectrum. In response, the Swiss have stated that they’re still open to formal offers, essentially touching off another round of bidding. Officials have staunchly defended their pick in the meantime, saying that it met Swiss requirements by the time the final offer was evaluated. Saab’s public stance reinforces both tracks, saying that they are finalizing Switzerland’s JAS-39E/F configuration, while dropping strong hints that they will lower their price in response to Dassault’s maneuvers (vid. Jan 29/12). DID has confirmed that at least 2 key attributes did change between the report and the award: the Gripen’s ability to hit multiple targets in one pass, using newly-integrated GPS-guided weapons; and an operational helmet-mounted display. Read “Switzerland’s F-5 Fighter Replacement Competition” for full coverage, including report excerpts. Jan 31/12: India loss. Dassault’s Rafale is picked as the “L-1” lowest bidder for India’s 126-aircraft M-MRCA deal, even after the complex life-cycle cost and industrial calculations are thrown in. Next steps include the negotiation of a contract, in parallel with parliamentary approval and budgeting. Until a contract is actually signed, however, India’s procurement history reminds us that even a “close” deal is just 1 step above a vague intention. The contract may take a while. Even the French government sees a deal as only an 80% probability within 6-9 months. The budgeting is likely to be even trickier. The IAF’s exclusion of cost considerations in picking its finalists means that the only question now is: how far over the stated budget will a full Rafale buy go? Some reports place the deal’s cost at around $15 billion – an increase of up to 50% from previous estimates. If economic downturns or squeezed defense budgets make those outlays a big enough issue, early enough in the process, it could have the effect of re-opening the competition. British PM David Cameron has expressed an intent to change India’s mind, and both Saab and Boeing are still positioned within India, in order to be ready for a renewed opportunity. In a competition that’s re-opened for financial reasons, the Gripen would have much better odds. Read “India’s M-MRCA Fighter Competition” for full coverage. Jan 29/12: Switzerland. Dassault makes Switzerland a new final offer, after the competition: 18 Rafale fighters for SFR 2.7 billion (EUR 2.24 billion, $2.96 billion), instead of 22 Gripens for SFR 3.1 billion. On a per-plane basis, that’s 17.5% less than Dassault’s reported “final” RFP offer of SFR 4 billion for 22 Rafales. The offer is aimed at the Swiss parliament, but the way it was handled looks set to create plenty of enemies. Parliamentary discussions are expected to begin in mid-February. Jan 29/12: South Korea. The Korea Times quotes a DAPA spokesman, who confirms that Saab submitted an application to attend the F-X-3 fighter program’s mandatory explanatory session. They were joined by Boeing, Lockheed Martin, and EADS. The report adds that DAPA doesn’t see the Gripen as likely to meet its competition’s requirements. Then again, that’s what explanatory sessions are for. Saab itself told the newspaper that it hadn’t decided whether or not it would bid. When the bids are submitted, Saab isn’t among them. Jan 26/12: Swedish JAS-39E/Fs? Defense News reports that the Swedish government will soon begin examining a proposal from Swedish Air Force Command to upgrade 100 Gripens to next generation status: “Some 20 possible new configurations for a Gripen E/F version are being examined by Saab, the AFC and FMV… The AFC advocates that the Air Force’s stock of C/D version Gripens be upgraded on a phased basis to spread the total cost over a five- to 10-year budgetary period. The AFC views the impending government decision, which it anticipates will be made in March, as the most critical funding issue facing Swedish defense.” Jan 26/12: Switzerland. An anonymous letter from a “Groupe pour une armee credible et integree” alleges that Switzerland’s benchmark fighter tests had their results manipulated. The accusations are seen as being detailed and specific enough to prompt Switzerland’s parliamentary sub-committee for security policy to investigate further. 24 Heures [in French]. Jan 5/12: Czechmate? Financial Times Deutschland reports that Germany is looking to sell some of its used Eurofighters to Eastern European countries, at the cut-rate price of EUR 60-80 million each. The Czech Republic, Croatia, Slovakia and Romania are named. Even that price is likely to be rather steep for these countries, in comparison to alternatives like used F-16s, unless Germany can propose substantial savings on training and maintenance. Czech defense ministry spokesman Jan Pejsek says that: “I can completely exclude that talks have taken place, even a [informal] probing.” Meanwhile, allegations that the CSSD government’s original deal to buy 24 JAS-39 fighters may have been marred by corruption, is creating uncertainty around the possible 2015 renewal of the 12-year, CZK 20 billion (now around $1.04 billion), 14-plane Czech lease-to-buy deal. The current OSD government is reportedly very cool to the idea, and may be considering less-capable options like the American F-16. Czech Prime Minister Petr Necas said in June 2011 that it would be difficult to imagine renewing the contract until the corruption investigation was concluded, and recently added that the country’s deteriorating economic situation would have to be taken into account when making this choice. Czech Position. 2011 Swiss win; India elimination; Doing the Brazilian limbo; Competition in Croatia; RM12 engine upgrades; Cobra HMD operational; Thais operational; Sea Gripen started. Swiss takeoff (click to view full) Dec 1/11: Swiss win. Switzerland announces their choice – and it’s Saab’s JAS-39 Gripen. Swiss Defence Minister Ueli Maurer estimates the cost of the envisaged deal at up to CHF 3.1 billion (currently $3.5 billion, probably more by 2014), for 22 planes. The DDPS explicitly stated that Gripen also won because it offered lower maintenance costs that made it affordable over the medium and long term. The deal includes a provision for 100% value industrial offsets to Swiss firms. Dassault wasn’t very happy, though they did concede that the Gripen beat them on price. For various reasons, a secure contract isn’t expected until sometime in 2013. If the contract goes through, Switzerland will join Sweden, the Czech Republic, Hungary, South Africa, and Thailand as Gripen operators. Read “Switzerland Replacing its F-5s” for full coverage. Swiss pick Oct 14/11: Croatia. The Swedish Defence and Security Export Agency (FXM) publicly presents the Swedish JAS-39 Gripen offer, which has already been submitted to the Croatian government. It involves the sale of 8-12 JAS-39C/D fighters, rather than more advanced Gripen Demo/NG planes. Sweden would also loan Croatia some older JAS-39As as an interim force, to avoid a fighter gap as its aged MiG-21s are retired. The offer also support and training agreement for pilots and technicians, and an industrial co-operation package backed by Saab’s delivery record in the Czech Republic, Hungary and South Africa. The biggest competitor in Croatia is thought to be the Eurofighter. It’s more expensive than the Gripen, but German influence, and the potential for shared training and support, is expected to make it a competitive option. Vid. March 27/08 entry re: the RFI. Saab Group. Sept 20/11: Cobra HMD operational. South Africa’s air force becomes the 1st customer to declare the Gripen’s Cobra Helmet-Mounted Display operational, on 2 Squadron in Makhado. South Africa was the system’s first customer, but Sweden has since ordered its own Cobra HMDs. Like all helmet-mounted displays, the Cobra dramatically improves the effectiveness of the plane’s short-range air-to-air missiles, by allowing launches at targets within a much larger field of view. Saab Group. HMD operational Sept 14/11: Switzerland. The Swiss House of Representatives and Senate approve a SFR 5 billion per year armed forces budget, instead of SFR 4.4 billion. The difference is about $682 million per year, and some of that will reportedly be used to help fund Switzerland’s fighter purchase. Sept 12/11: RM12 engine upgrade. Volvo Aero discusses a 2-15% thrust increase for the JAS-39A-D model’s F404-derived engine, at the ISABE 2011 conference in Sweden. They also tout the engine’s record of over 150,000 flight hours without a single major engine mishap, which is indeed impressive. It helps to begin from a very stable, long-serving design like GE’s F404, but it also requires a design focus by Saab and Volvo Aero, extending into the maintenance system used by operating air forces. Project leader Torbjorn Salomonsson saw the RM12’s improvements coming from an improved FADEC controller, improved fan and blisks for better airflow, and a new high-temperature turbine adapted from GE advances in the F404 and F414. Volvo Aero head of research, Henrik Runnemalm, added that: “We have stated previously that it is possible to significantly increase the thrust of the existing RM12 engine at a very competitive cost. We will then have a more powerful and economical engine. It also means that we can upgrade the 220 engines that the Air Force already has whilst maintaining engine competence within country.” July 8/11: Thailand. In a ceremony at Wing 7’s air base in Surat Thani, The Royal Thai Air Force (RTAF) officially declares its new air defense system operational. That includes the 6 initial Gripens, the S340 AEW Erieye plane, and the ground command and control systems. The system was originally intended to reach this milestone in September, but they managed to be 2 months early. Saab. May 24/11: Sea Gripen starts development. A Saab Group release states that Saab AB will open a new UK headquarters and a new Saab Design Centre in London. The engineering center: “…will capitalise on the UK’s maritime jet engineering expertise and is scheduled to open in the late Summer. Initially staffed by approximately 10 British employees, its first project will be to design the carrier-based version of the Gripen new generation multi-role fighter aircraft based on studies completed by Saab in Sweden.” A 12-18 month concept design phase will follow. After that, Saab will need to decide whether or not to build a flight demonstrator. Sea Gripen was initially pushed for India (q.v. Dec 28/09 entry), but with Gripen out of M-MRCA unless something changes, the likely targets would appear to be Brazil’s suspended F-X2 program, or a Plan B for Britain if its F-35 plans go awry. As an example, imagine that catapult installations in the new CVF carriers prove unaffordable, ruling out F-35Cs, while the F-35B STOVL fails its probation and is canceled. With UK firms already providing 28% of the Gripen NG, Sea Gripen could tout itself as a legitimate British alternative to the more-expensive Eurofighter Naval concept. See also Flight International. Sea Gripen studies May 18/11: Brazil. Official opening of the Swedish – Brazilian centre of research and innovation (Centro de Inovacao e Pesquisa Sueco-Brasileiro, CISB) in Sao Bernardo de Campo, Brazil, which grew out of the Saab CEO’s September 2010 visit to Brazil. So far, the centre has attracted over 40 partners from academia and industry, who will be active partners in the specific projects. Areas of focus will be in Transport and Logistics, Defence and Security, and Urban development with a focus on energy and the environment. Saab President & CEO Hakan Buskhe cites a coastal surveillance radar project with Atmos and a datalink development project with ION as examples, and the firm sees many opportunities in Brazil beyond the Gripen project. Civil security will get special attention, as Brazil is hosting both the FIFA World Cup and Olympic Games within the next few years. Saab Group. April 27/11: Indian elimination. Saab confirms that the JAS-39IN Gripen has been eliminated from India’s M-MRCA competition, which has become a duel between Dassault’s Rafale and EADS/ BAE/ Finmeccanica’s Eurofighter Typhoon. Read “India’s M-MRCA Fighter Competition” for full coverage. India Feb 22/11: Thailand. The initial batch of 6 Gripen fighters arrives in Thailand. Bangkok Post. Thai delivery Feb 8/11: India. Saab announces the establishment of a Research and Development Centre in India, with an initial base of 100-300 Indian engineers. Areas of focus would include aerospace, defense, and urban innovation, including civil security. See also Saab’s “India – an important part of Saabs production flow“, which covers Saab Aerostructures’ industrial strategy more generally. To date, Saab is working with Tata Advance Material (small to medium sized composite parts), QuEST Engineering (sheet metal and machined parts), and CIM Tools (machining and sub-assemblies). Feb 4/11: Bulgaria. Bulgaria issues another fighter replacement RFI, soliciting information from Boeing (Super Hornet), Dassault (Rafale, Mirage 2000), EADS (Eurofighter), Lockheed Martin (F-16), and Saab (JAS-39 Gripen) re: 8 new and/or second-hand fighter jets, to replace its existing fleet of 12 MiG-21s. Bulgaria issued a similar RFI in 2006, for 20 jets, but the global economic crash, and Bulgaria’s own issues in trying to pay for past defense purchases, forced a hold. The Defense Ministry has taken pains to emphasize that this is just an exploratory request, and is not the start of a purchase tender. Nevertheless, November 2010 saw the formation of a National Steering Committee and an Integrated Project Team, to draft preliminary fighter replacement operational, technical, and tactical requirements. That followed October 2010 remarks by Bulgaria’s Defense Minister Anyu Angelov, who discussed spending BGN 1 billion (around $725 million) for the purchase of an uncertain number of new fighter jets to replace its MiG-21s, while modernizing its fleet of 16 MiG-29A air superiority jets. Sofia News Agency | Saab | SNA re: Saab visit. Jan 17/11: Brazilian limbo. President Rousseff leaves the entire F-X2 competition in limbo, in light of concerns about the financing of the purchase, how much to borrow for the initial fighter purchase, and inter-agency disagreements. The exact commitment is a decision later in 2011, but no contract until 2012. In practice, however, there is no firm timeline or deadline for a decision, the 2011 decision date is later revoked, and domestic spending priorities loom large in Rousseff’s agenda. Which makes this a de facto suspension. If it is a suspension, it leaves the situation of every contender in play. 2010 BAE divests, ends partnership; Swedish sims upgraded; Danish delay; DJRP Reco pod; SAAF just for show? Gripen Demo w. IRIS-Ts, Meteors, GBU-10s (click to view full) Sept 23/10: DJRP Reco pod. Thales announces that it has delivered its Digital Joint Reconnaissance Pod (DJRP) for installation and integration flight trials on South Africa’s JAS-39C/Ds. The electro-optic and infrared Thales DJRP completed its factory integration tests at Thales’s optronics facility in Glasgow, Scotland in June 2010. Handover of the reconnaissance pod to the South African Air Force (SAAF) will occur after the integration phase. Aug 7/10: India. India’s Times Now news show reports that the M-MRCA trials will leave only Dassault’s Rafale and EADS’ Eurofighter in the race. To be confirmed. Brahmand | Livefist. July 13/10: Sea Gripen, Exports. Flight International reports from Farnborough on JAS-39NG plans and testing, including plans to allocate development funds for a carrier-based “Sea Gripen” variant, as described above. Having said that: “The Sea Gripen will not be developed by Sweden alone… but potential partners could include Brazil and India, who have been offered to do work in their own countries. [Gripen technical director Eddy] De la Motte says the “cost of that programme will be a couple of billion Swedish crowns; more than one billion [DID: over $135 million]. It will be half of the Gripen NG’s development programme cost.” The big challenge is that India has already picked the MiG-29K as its carrier-borne fighter, and Brazil may well close its door by picking the carrier-capable Rafale. Other carrier-using countries have locked in their future fighter choices, with the exception of Thailand and Spain. This means the Gripen would need to win in Brazil, or depend on new countries joining the ranks of naval fighter operators, in order to make Sea Gripen viable. For now, the announcement adds to their existing bid in Brazil, and thanks to the stated need for a partner, it costs nothing up front. With respect to export opportunities overall: “Looking out to 2016, Saab-led Gripen International sees multiple export opportunities for almost 230 aircraft with Bulgaria (16), Croatia (12), the Czech Republic (10), Denmark (36), Hungary (six), Malaysia (12), the Netherlands (85), Romania (24), Switzerland (22) and Thailand (six).” Finally, Gripen technical director Eddy de la Motte gave JAS-39 figures of less than $3,000 per flight hour for Sweden’s Flygvapnet, and “for the export customers it will be less than $5,000, including maintenance, spare parts, fuel and manpower.” On its face, that’s stunning. By comparison, the USAF places the per-hour cost of an F-15 at $17,000 [PDF]. Gripen is engineered for significant savings, but there’s also a possible mismatch between direct flight costs, and figures that include allocated life cycle costs including depot maintenance, etc. Mid-May 2010: India. Gripen NG demo makes its international debut by taking part in the last phase of the Indian evaluation trials for the M-MRCA competition, following 135 test flights in Sweden. Testing includes high altitude trials at Leh airbase, 3,300m/ 10,826 feet above sea level, as well as testing under tropical conditions and comparative flight tests. Saab AB. April 21/10: Raven AESA. Finmeccanica subsidiary SELEX Galileo provides an update concerning its “Raven 1000P” prototype AESA radar. The radar is flying on the Gripen Demo, and has been demonstrated in air-air and air-ground modes, including long range synthetic aperture radar scans at medium and high resolution imagery. The company says simply that “expected performance has been achieved,” without providing clarifying details, and notes that development and new capabilities will continue. SELEX Galileo release [PDF]. April 15/10: Romania. Agence France Presse quotes Jerry Lindbergh, a Swedish government official in charge of defense exports, who says that Sweden could provide Romania with 24 new “fully NATO interoperable Gripen C/D fighters, including training, support, logistics and 100 percent offset for the amount of one billion euros ($1.3 billion),” paid off over 15 years with low interest rates. In essence, they’re offering newer and better fighters, for the same price as very-used F-16s. Alenia would later match this with an offer of its own for 24 used Italian Eurofighter Tranche 1s, which possess no precision ground attack capability. Read “Nothing But Netz: Romania’s New Fighters” for full coverage of Romania’s fighter buy. March 24/10: Danish delay. Denmark decides to delay its fighter decision to 2014, with no delivery until 2018. That gives the F-35 a chance to stabilize costs, and win an order it appeared to be losing to Boeing’s F/A-18 E/F Super Hornet. The Gripen remains a distant 3rd, but could recover. The US Navy plans to end Super Hornet production in FY 2015, barring exports to countries like India. Aviation Week Ares. March 23/10: Exports drive Swedish simulator upgrades. Saab Group announces that Swedish Air Force Wing F 7, based at Satenas, is upgrading from JAS-39 A/B to JAS-39 C/D aircraft and simulators. The Multi Mission Trainer is already converted, and will soon be followed by the Full Mission Simulator. What’s driving the conversion is the Thai order. The Gripen instructors at 1st OCTU are now preparing to train the first batch of Thai Gripen pilots, who recently arrived to Sweden. March 15/10: Denmark. Danish radio station DR Forside reports that the Tier 3 JSF partner Denmark will pick Boeing’s F/A-18 E/F Super Hornet as its future fighter, instead of the F-35A JSF or Saab’s JAS-39DK Gripen NG. According to the report, the ministry’s decision awaits an auditor’s review before being forwarded to the full government and to parliament. The formal contract and delivery date for new fighters are also expected to be delayed, with the F-16 fleet flying on and their replacements entering service in 2017-18. DR Forside [in Danish] | Aviation Week Ares. March 9/10: India. Sweden flies its Gripen fighters into Bangalore for MMRCA-related trials – but India’s Business Standard reports that they’ll be JAS-39D Gripens, not the new Gripen NG. That could get the platform disqualified, depending on the decisions made by the IAF and Indian MoD: “The Gripen NG… has always been one of the hottest contenders in the fray. Saab’s default on the MoD’s trial directive, which lays down that the fighter being offered must be the one that comes for trials [leaves it] vulnerable to disqualification… the Swedish Air Force, having opted to buy the Gripen NG, has ordered a series of improvements on the Gripen NG prototype. With those under way, Sweden’s flight certification agency, SMV, has ruled that the prototypes require additional flight-testing in Sweden before the aircraft can be sent to India… Sources close to the Gripen campaign say IAF pilots will be offered a chance to fly the Gripen NG during a visit to Sweden from April 6 to April 10. Gripen International will also ask for fresh dates for bringing the Gripen NG to India for trials.” March 5/10: BAE divests. BAE’s 11.2 million Class B shares in Saab Group are sold to Investor AB, the Wallenberg family’s publicly traded holding company, at SEK 95.50 per share. The 10.2% share is half of BAE’s remaining 20.5% stake in Saab. Following the sale, and some conversions of some Investors AB and all BAE stakes from Class A to Class B shares, Investor AB’s stake in Saab will change from 19.8% of the capital and 38% of the voting rights, to 30% of Saab and 39.5% of its voting rights. Investor AB Head of Corporate Communications, Oscar Stege Unger, reportedly had this to say: “[Cooperation between BAE and Saab has] in practice ceased, in as much as Saab manages the Gripen exports itself. There has also been a degree of overlapping between BAE and Saab in larger deals… Now BAE have decided that they do not see this as a strategic holding and want to pull out. We also think that it is good that we clarify the ownership structure.” The March 4/10 closing price for Saab amounted to SEK 106.00 per share, so Investor AB is presumably happy already. Investor AB | BAE Systems | Sweden’s The Local | UK’s Telegraph | Bloomberg | Defense News. BAE divests March 4/10: South Africa. South Africa’s News24 reports that the country’s Gripen jets, along with its MEKO-A frigates and Manthatisi Class U209/1400 submarines, are effectively present only for show, given their extremely low budgets for actual usage. The SAAF’s current fleet of 11 Gripens will spend 550 hours in flight in the current financial year, which compares to NATO standards of 20 hours per pilot per month (240 per plane per year). Most of that will take place during the 2010 World Cup. In the next 2 years, that meager total will shrink to a fleet total of 250 flight hours per year – or about 9.6 flight hours per plane, per year, with the full fleet of 26 planes. 2009 Raven AESA partnership; EGBU-12 GPS/laser guided bombs integrated; Brazilian dogfight; Dutch deal delineated; Dassault’s double-cross; JAS-39NG Supercruise. Gripen Demo (click to view full) Dec 28/09: Sea Gripen. Reports confirm that co-development of a carrier-capable “Sea Gripen” design was part of Saab’s response to India’s M-MRCA fighter competition RFI, adding that Brazil’s future fighter requirements were also targeted. Key changes are outlined, and Gripen VP of Operational Capabilities Peter Nilsson tells StratPost that the Sea Gripen is intended for both CATOBAR (Catapult Assisted Take Off But Arrested Recovery) as well as STOBAR (Short Take Off But Arrested Recovery – “ski jump”) operations: “There will obviously be differences in the MTOW (Maximum Take-Off Weight). In a CATOBAR concept, the Sea Gripen will have a MTOW of 16,500 kilograms and a maximum landing weight of 11,500 kilograms. In a STOBAR concept it depends on the physics of the carrier. Roughly, the payload of fuel and weapons in STOBAR operations will be one-third less than the payload in CATOBAR operations. There will be no differences in ‘bring-back’ capability,” he says.” Oct 22/09: Denmark downgrade. Danish Defence Minister Soren Gade says that Denmark plans to purchase just 25-35 jets to replace its 48 operational F-16s, instead of the 48 aircraft originally envisioned. Gade now believes the soonest an agreement can be reached on the purchase would be the start of 2010, and the Copenhagen Post reports that the military has estimated the purchase will eventually cost “at least 100 billion kroner” (at current rates, about $20 billion – presumably, this includes lifetime maintenance and full equipping costs). That cost estimate is creating pause, especially in light of a February 2009 report that says the current F-16 fleet still has many hours left in their airframes. The cost imperative to stretch the current fleet runs up against the potential Danish aerospace jobs and manufacturing technology improvements that will accompany any new fighter order. A Danish Defence Command committee was set up in 2007 to evaluate the competitors, which currently include the F-35A, Boeing’s F/A-18E/F Super Hornet, EADS’ Eurofighter Typhoon, and Sweden’s JAS-39NG Gripen. Defence minister Garde is quoted as saying that at this point, there is no preference among the competitors. Copenhagen Post | defense aerospace. Oct 4/09: Brazil. Brazil’s FAB confirms that revised bids are in from all 3 short-listed contenders, and Saab’s offer clearly has significant support from the Swedish government. Gripen International’s revised bid offers a wide range of elements, including: Full involvement in the Gripen NG development program; Complete technology transfer and national autonomy through joint development; Independence in choice of weapons and systems integration; Production in Brazil of up to 80% Gripen NG airframes, via a full Gripen NG assembly line; and Full maintenance capability in Brazil for the Gripen NG’s F414 engine. That last offer would largely remove the threat of future American interference, and it would be interesting to see how Gripen International proposes to achieve it. Gripen International touts “significantly lower acquisition, support and operating costs” for its plane, and all this would be backed by a firm proposal for full long-term financing from the government’s Swedish Export Credit Corporation. The additional offers are equally significant. Brazil will have the sales lead for Gripen NG in Latin America, with joint opportunities elsewhere. Saab would join the KC-390 program as a development and marketing partner, and Sweden will evaluate the KC-390 for its long term tactical air transport needs, as a future replacement for its recently-upgraded but aging C-130 Hercules aircraft. Saab also proposes to replace Sweden’s aged fleet of about 42 SK60/ Saab 105 jet trainers with Embraer’s Super Tucano, but it received a SEK 130 million ($18.8 million) deal in September 2009 to upgrade the planes’ cockpit systems, and current Swedish plans would see the SK60s continue in service until mid-2017. FAB release [in Portuguese] | Gripen International release. Sept 29/09: Brazil. Embraer release: “Regarding the article published in the Valor Econômico newspaper, dated September 28, 2009, Embraer clarifies that it is not directly participating in the selection process of the new F-X2 fighter for the Brazilian Air Force and, contrary to what was stated, it has no preference among the proposals presented. Embraer reaffirms its unconditional support of this process, always in close alignment with Brazil’s Aeronautics Command and the Ministry of Defense.” Sept 28/09: Brazil. Brazil’s leading aerospace firm Embraer drops a political bombshell. Embraer’s Deputy Chief Executive for the defense market, Orlando Jose Ferreira Neto, tells Valor Economico that the firm was asked to advise the Air Force re: industrial proposals, and concluded that participating in the JAS-39NG Gripen’s development offers Brazil’s aerospace industry the best long-term benefits. Embraer reportedly saw the JAS-39NG as offering the opportunity to participate in the design process, rather than just producing parts. The opinion is a shock, as France’s interest in buying Embraer’s KC-390 transports was expected to leave Brazil’s top aerospace firm solidly on-side for the Rafale bid. T-1 Holdings executives (see Sept 17/09 entry) were also quoted in the article. In response, Defence Minister Jobim fires back to say that the government will make these decisions, not Embraer. Dow Jones | Defense Aerospace translations (note: links will not last) | Valor Online, via Noticias Militares [in Portuguese] | Defesa Brazil [in Portuguese] | O Globo [in Portuguese]. Sept 17/09: Brazil. Saab announces that over 20 engineers from the Brazilian firms Akaer, Friuli, Imbra Aerospace, Minoica, and Winnstal are already working on the Gripen NG project in Linkoping, Sweden, with the Swedish government’s authorization. The 5 firms will participate as the T1 holding, and would be responsible for projecting and manufacturing the JAS-39BR’s central and rear fuselages and wings. If all goes well, Akaer predicts that as of 2010 a team of at least 150 engineers and technicians from the T1 holding will start working in Brazil, alongside 20 Swedish specialists. Beyond Gripen production, the holding’s goal is to form a new Brazilian aeronautical center in Brazil, and some technology transfer in the area of composite materials is reportedly underway already. Shaping the wing of a supersonic craft requires higher quality levels than civil applications, as well as manufacturing challenges owing to thicker and more resistant parts. Management and integration training within a holding structure of this type will also be required. Sept 7/09: Brazil. Brazil’s Ministerio Da Defesa announces that Dassault Aviation is now the F-X2 competition’s preferred bidder, and the country will order 36 Rafales subject to further negotiations. The announcement also says that Brazil has secured French cooperation to develop Embraer’s KC-390 medium transport, and possibly buy 10-12 of the aircraft when they’re introduced. This sale would be France’s 1st export order for its Rafale fighter, after numerous attempts spanning more than a decade. The twist in this story is that the air force has yet to request final bids, or deliver its evaluation and recommendations. Sept 7/09: Dutch deal described. The Dutch TV show KRO reporter does an expose, which claims that the Ministerie Van Defensie (MvD) has knowingly misled Parliament regarding its F-35 procurement plans. The report says that the Dutch Defence Materiel Organization head had told the MvD in 2005 that its plans for 85 F-35s was not sustainable at expected budget levels. But the MvD continued to use that number when describing its planned budget and plans to Parliament, and even signed off on that number in the 2006 production phase agreement. The MvD responds that it still intends to buy 85 aircraft, and that a budget increase to EUR 6.1 billion will take care of the gap. Which is true – if the pricing for the F-35As can be relied on. In contrast, KRO reveals that Gripen International has submitted a firm fixed-price bid for 85 in-service JAS-39NLs at EUR 4.7 – 4.8 billion. KRO reporter video [Flash] | Defense Aerospace KRO partial translation | MvD response [in Dutch]. June 16/09: South Africa. Swedish Chief Prosecutor Christer van der Kwast decides to close the preliminary investigation concerning alleged bribes in connection with the sale of Gripen fighters to South Africa. Saab SVP for Communications and Public Affairs Cecilia Schon Jansson, is unequivocal: “No illegal methods have been forthcoming from Saab, and this is strengthened by the fact that the Chief Prosecutor now decided to close the investigation.” See: Chief Prosecuror’s statement [in Swedish] | Saab Group release. March 24/09: ES-05 Raven AESA. Saab and SELEX Galileo sign an agreement to develop an Active Electronically Scanned Array (AESA) radar for the JAS-39NG. This is both a major milestone event and a contract, so it’s covered in full the “contracts” section, below. March 10/09: RBE-2 Dassault double-cross. Aviation Week’s “AESA Radars Are A Highlight of Aero-India” points to problems with the JAS-39’s AESA radar, which stems from Dassault’s acquisition of a large shareholding in Thales. Rather than produce an RBE2 AESA radar that’s available on 2 platforms, Dassault appears to be excluding other options. The hope appears to be that this will lead to more orders for Dassault’s Rafale, rather than just shrinking Thales’ installed base for AESA fighter radars. Aviation Week: “In 2007, Saab struck a deal with Thales to provide an AESA antenna for the Gripen Demo program, to be mated with the signal processor from the JAS 39C’s Saab PS-05 MSA radar… Thales will honor the Gripen Demo contract but its AESA will not be available for a production NG. Sweden has talked about [Raytheon’s] RACR, but would prefer the PS-05/A’s “back end” modules for ease of integration and to stay away from control issues associated with U.S. components. The answer may lie with Selex, which, first as Ferranti, then as GEC-Marconi and subsequently as BAE Systems, was Sweden’s partner on the original PS-05/A.” Selex was also Saab’s partner in the M-AESA R&D project. Selex Galileo’s Italian division has considerable experience with the Grifo family of mechanically scanned radars, while Selex S&AS UK division has already created the Vixen AESA radar for smaller fighters. Korea’s F/A-50 was recently barred from using the Vixen 500E, under an agreement with co-developer Lockheed Martin that did not allow the F/A-50’s capabilities to surpass the ROKAF’s F-16s. Feb 2/09: Brazil. Gripen International confirms a Brazilian F-X2 bid involving 36 JAS-39NG aircraft. Their release adds that Brazil will have “direct involvement in the development, production and maintenance of the platform but it will also generate transfer of key technology including access to Gripen source codes.” Boeing confirms that it has submitted a bid involving 36 F/A-18 Super Hornet Block IIs, with the APG-79 AESA radar. It is presumed that Dassault also submitted a 36-plane bid for its Rafale fighter. Boeing release | Gripen International release. Jan 21/09: “Supercruise.” A JAS-39NG “supercruises” over the Baltic Sea, flying at 28,000 feet above Mach 1.2, without using afterburners, until the pilot ran out of test area and had to head back to the Saab Test Flight Centre in Linkoping. Saab Group release. Very few aircraft can supercruise at all, and the fuel penalty means that most fighters’ time above Mach 1 during their entire service lives is measures in minutes, not hours. Supercruise cannot be operationally useful, however, unless it can be maintained with weapons mounted. The extra weight and drag created by externally-mounted weapons can make this a real challenge, which is why supercruise reports beyond America’s F-22A have been in “clean” configuration, with no weapons carried. Unless details are given to the contrary, the working assumption is that this was a “clean” configuration flight. 2009 Gripen Demo rollout; Norway loss. JAS-39D, Swiss arrival (click to view full) Dec 18/08: Dutch study. Tier 2 Joint Strike Fighter partner The Netherlands issues a comparative study of the F-16 Block 60+, JAS-39MG Gripen, and F-35A, which has been compiled in cooperation with several organization, and audited by 2 ministries and RAND Europe. It recommends the F-35 as the best combat aircraft. Surprisingly, it also concludes that the F-35 also has the lowest capital costs, and the lowest anticipated life-cycle costs. The issue will now go before Parliament. Read “Dutch MvD Report Urges F-35 over Gripen NG, F-16E Fighters” for full details and updates. Nov 20/08: Loss in Norway. The first domino falls. Norway chooses the F-35 over the JAS-39, though the way they chose to make that decision and announce it has created controversies, and had a negative effect on relations with Sweden. The decision itself is now controversial as well, after Sabb’s CEO took the very unusual step of holding a public presentation full of very specific criticisms regarding the accuracy and fairness of Norway’s process. Nov 6/08: Jane’s publishes “Analysis: Why 2009 could be the year of the Gripen.” It calls attention to the ongoing competitions in Brazil (36+), Croatia (12), Denmark (48), India (126+), the Netherlands (85), Norway (44), Romania (around 40) and Switzerland (36) make final selections, and estimates total sales of up to 523 aircraft worth around $35-40 billion at stake: “It will be a truly crucial period in shaping the future of the global fighter market. The common link between these eight contests is the presence of the Saab Gripen in the bidding process… Jane’s believes the Gripen team has reasons for optimism, however. First of all, in terms of the aircraft’s capability, Saab is offering its enhanced Gripen NG (Next Generation) variant for the Brazilian, Danish, Dutch, Indian and Norwegian requirements… According to Saab, further enhancements will be rolled out in three-year increments… Development and incorporation of specific customer-funded requirements is also envisaged as part of a 50-year programme plan… the Gripen NG programme would be accelerated in the event of a contract win and the aircraft would be available to enter service from 2014. With regard to cost, the Gripen NG is viewed by Jane’s as competitive in terms of both acquisition and through-life support costs when compared to its rivals. Bob Kemp, sales and marketing director for Gripen International, citing figures produced for the Dutch fighter contest, said Saab believes that the Gripen NG, as part of an 85-aircraft fleet, would cost EUR6 billion (USD7.6 billion) less than the F-35 in terms of life-cycle costs over a 30-year period…” Aug 25/08: Netherlands. Gripen International delivers its formal response to The Netherlands’ F-16 replacement program, which has been re-opened due to ongoing political controversies concerning the F-35’s eventual costs. Eurofighter GmbH and Dassault refused to participate in this exercise, citing unrealistic time limits and perceived favoritism, and Saab’s request for an extension was denied. Saab reportedly replied to 85% of the 250 questions that had to be answered by 25 August; some questions with respect to integration with American products were reportedly not answered, as American firms must receive clearance from the US government in order to even discuss that information with Saab. The F-35A is still heavily favored, but Saab’s offer is an all inclusive package comprising 85 next-generation “JAS-39NL” Gripen NG aircraft, plus a complete package of training, spares, simulators and support, and industrial co-operation to at least 100% of the total value of a possible contract. Other interesting elements include an option for final assembly in the Netherlands, and a ‘Repairables Exchange Service’ designed to lower costs and reduce their customers’ need for initial inventories of spare parts. Gripen International release | Gripen International Presentation [PDF, 3.2MB] | Gripen International Offer Summary [PDF, 3.2MB]. July 2/08: Switzerland. Gripen International delivers its initial bid to the Swiss government, and announces conditional industrial partnerships. See DID coverage. April 28/08: Gripen International delivers its MMRCA bid to India’s Ministry of Defence. The JAS-39IN is based on the Gripen NG/ Gripen Demo, and includes an AESA radar and an IRST (InfraRed Scan and Track) system, a Transfer of Technology (ToT) program, a life-time logistics support solution sourced from Indian suppliers with support from Saab and its partners, and full industrial offset cooperation. Gripen International release | Saab release. Eddy de la Motte, Gripen International’s India Campaign Director: “Gripen IN will provide India with a capability that offers complete independence of weapon supply… We will do this by transferring all necessary technologies to enable Indian industry and the Air Force to build, operate and modify Gripen to meet all indigenous requirements over time.” April 28/08: Norway. Gripen International delivers its bid to the Norwegian government. Dagbladet reported, and Gripen’s release confirmed, that Norway added a new wrinkle – a guarantee from Sweden that it would not be the only operator of this fighter type. That guarantee may have consequences for the size of Sweden’s Gripen force. Gripen Demo c. Gripen International (click to view full) April 23/08: Gripen Demo Rollout. A 2-seat version of the next-generation Gripen Demonstrator aircraft is ‘rolled out’ to the media and public at a ceremony in Linkoping, Sweden. Photos show it equipped with illustrative mock-ups of IRIS-T short range air-air missiles, Meteor long-range air-air missiles, and Paveway precision-guided bombs. Gripen International release | Saab release | Saab: Videos from the ceremony | Gripen: Saab CEO interview & rollout videos March 27/08: Croatia. Sweden’s FMV procurement agency announces that it has answered a Request For Information from Croatia, involving a potential lease to buy deal for 12 Saab-made Gripen fighter jets. No prices are quoted at this stage, but Reuters reports that the jets would be former Swedish Air Force planes. Other candidates for Croatia’s air force reportedly include the EADS Eurofighter, Lockheed Martin’s F-16, and Russia’s MiG-29. Sweden’s FMV adds that : “This invitation from the Croatian authorities follows the recent receipt of similar invitations from Norway, India, Denmark, Switzerland, Romania and Bulgaria…” Reuters report | Reuters Sidebar: “FACTBOX-Balkan candidates offer NATO leaner military muscle” March 3/08: India. With Gripen competing in India’s MMRCA contest, Saab hosts Indian TV journalist Vishnu Som from New Delhi Television for an episode of his new show, “The Jet Set.” See the full episode: Saab release | Full episode [Windows Media] Jan 17/08: Switzerland. The JAS-39 Gripen is one of 4 aircraft solicited in a competition to replace 3 of Switzerland’s 5 aging F-5 E/F squadrons. Other competitors are Boeing’s F/A-18 E/F Super Hornet, Dassault’s Rafale, and EADS’ Eurofighter. See “Switzerland Replacing its F-5s” for more. Jan 17/08: Norway. Gripen International announces that it has been formally invited to bid on the Norwegian F-16 replacement fighter contract. It will compete one-on-one with the F-35A lightning II. 2007 F414 for Gripen Demo; Brazil’s back; Link-16 added; Spring Flag 2007. Gripen w. “smokewinders” c. Gripen International (click to view full) Dec 21/07: Norway, Netherlands. EADS pulls its Eurofighter out of the Norwegian and Danish competitions, leaving both future fighter programs as a straight-up competition between the JAS-39 and the F-35. The rationales given are vague and make little sense, but many sources believe their key objection is official favoritism toward the F-35. The government-to-government nature of the F-35 deal, it seems, wouldn’t require the same industrial offsets, though the F-35 program has pledged significant production contracts with Denmark’s Terma and with Norwegian firms. The Motley Fool, on the other hand, wonders if the same dollar devaluation that’s hammering EADS in the passenger jet market is also creating a price chasm for the Eurofighter. At $100-120 million per aircraft vs. $50-70 million for its Gripen and Lightning II competitors, it was already a significantly more expensive aircraft before dollar devaluation. Bloomberg | Financial Times | Flight International | Motley Fool. Dec 13/07: Hungary. Hungary receives its last 3 Gripen fighters from its 14-aircraft lease/buy deal signed with the supplier and Sweden’s Defence Materiel Administration (FMV). Its fleet now consists of 12 JAS-39Cs and 2 JAS-39Ds. A Dec 10/07 announcement by Kaj Rosander of Gripen International added that “We have fulfilled our total export [read: industrial offsets] obligations to the Hungarian Ministry of Economy and Transport.” Flight International Dec 5/07: Denmark. Gripen International release: “In connection with a Gripen deal with Denmark, Saab is planning extensive co-operation with Danish industry. Saab has signed a large number of agreements for over 100 percent of the contractual value.” Denmark’s F-16 replacement order will cover up to 48 planes, and Saab Group’s DKK 10 billion ($1.9 billion) co-operation agreement with dominant Danish defence company Terma in the areas of aviation, space, defense and civil security includes non-military contracts. Saab’s automotive enterprise remains a significant asset when competitions turn on industrial offsets, and is a much wider focus than Terma’s F-35 related contracts; then again, it has to be, since far fewer Gripens are likely to be produced. The Saab-Terma agreement is spread over 10-15 years, and parts of it are dependent on Denmark selecting the Gripen NG for its air force. See full Gripen release. Nov 29/07: Denmark. The Gripen team submitted their formal proposal to Denmark in December 2005, in response to that country’s RFI(Request for Information), but supplementary information was also requested. The Gripen team’s response is formally handed-over, on time. Gripen International release. Nov 8/07: IRIS-T. A JAS-39 Gripen fires an IRIS-T short range air-air missile with an operational target seeker for the first time. It was a high g-load test firing using a fully operational missile without a warhead, and was successful at hitting the target over the Vidsel range in northern Sweden. The IRIS-T is a multinational (Germany, Greece, Italy, Norway, Spain, Sweden) 4th-5th generation SRAAM that is currently under development for several air forces. Gripen International’s Jan 16/08 release adds that: “The missile is being developed to combat targets at short range and is also designed to strike targets behind the firing aircraft. IRIS-T will enter service alongside the Cobra HMD (Helmet Mounted Display) System…” Nov 5/07: Brazil re-launch. Brazil’s F-X competition appears to be on again, with a $2.2 billion budget for 36 front line fighters. A 50% boost to defense spending in the FY 2008 budget accompanies the announcement. Looks like Brazil may be serious this time, and the Gripen is tagged as one of the contenders. Oct 2/07: Gripen International announces that a 10-ship flight of Swedish Air Force F21 Wing’s JAS-39C/D Gripens were hosted by the USAF 493rd Fighter Squadron “Grim Reapers” at Lakenheath, England for joint exercises. Electronic warfare systems were the focus of the exercise, the pilots performed Close Air Support missions and executed air-to-ground attacks against targets defended by simulated surface-to-air missile systems during the week-long exercise. They also flew air combat missions against the Grim Reapers’ F-15C Eagles; unfortunately, no results were given. Sept 28/07: South Africa. As is often the case, South Africa’s Gripen purchase involved industrial offsets. Given the nature of South Africa, those offsets involved special quotas for small and medium “black empowered enterprise” engineering firms. Saab discusses those efforts, with a focus on a 2006 R11 million ($2 million) contract between Saab and Aerosud under which local engineering firms secured sub-contracts for the supply of ground support equipment. South Africa’s Aerosud is responsible for the program, including managing and mentoring a select group of BEE companies which manufacture the various items, raising their quality standards so that they could become qualified suppliers to the aerospace industry. Items supplied include electrical test equipment, overhaul platforms and test rigs to tailored engine inlet covers, engine trolleys and cockpit access ladders. Companies supplying these items include Cape Town’s Quad Engineering, ContactServe of Olifantsfontein, and the Tshwane-based companies Vacuform and Hartell. Gripen International feature. Sept 12/07: Denmark. Danish Minister of Defence Soren Gade and the Swedish Minister of Defence Sten Tolgfors signed a Memorandum of Understanding (MoU) regarding Gripen at Saab in Linkoping, Sweden. Denmark is planning to replace its aging F-16 fleet of 48 aircraft within the next 10 – 15 years, and are conducting a comprehensive evaluation of different aircraft types. The MoU guarantees that all relevant Swedish information which is needed for the Danish evaluation of the Gripen fighter will be available; in practical terms, the JAS-39DK is now an official member of the fighter competition. Saab release. A Gripen International release adds that the Danish Air Force Chief, Major General Stig Ostergaard Nielsen flew in a JAS-39D during his August 2007 visit to Sweden. July 2/07: F414 picked. Saab announces that GE Aviation’s new F414G fighter engine will power its next-generation Gripen models. The F414G is derived from the popular 22,000+ pound/ 96 kN thrust F414-GE-400s that power the twin-engine F/A-18 E/F Super Hornet, and offers a 25-35% power boost over its predecessor the F404. Key F414G alterations will include minor changes to the alternator for added aircraft power, and modified Full Authority Digital Electronic Control (FADEC) software for enhanced single-engine operation. GE Aviation and Volvo Aero Corporation will be working together on the new F414G fighter engine. Although Volvo Aero has manufactured modified F404 engines under license for past Gripen fighters, GE will be supplying GE F414G engines directly to Saab for the Gripen Demo project, with Volvo as a major sub-contractor. GE is currently delivering 2 F414 Engines, with flight-tests and customer demonstration evaluations planned for 2008-2010. Gripen International. July 2/07: Gripen International continues to tout its aircraft for India’s MRCA fighter competition. India Defence reports that the firm has gone one step farther than the July 2006 promise to have all airframe production take place in India. The firm stresses that the aircraft would be next-generation “Gripen Demo” aircraft, and adds that they were “willing to provide all the know-how for India to carry out modifications according to its needs.” This is a very high level of technology transfer, and resembles the benchmark adopted by the partner nations in the F-35 Joint Strike Fighter consortium. India’s government finally issued the formal RFP for the MMRCA competition on Aug 28/07. June 11/07: Link-16 added. Saab announces that Link 16/ MIDS compatibility will become an option on the JAS-39, replacing or complementing the existing Swedish datalink. Full Link 16 certification is planned for 2008. The Link-16 program is part of the SEK 1 billion ($139 million) Version 19 systems upgrade – see July 3/06 entry in the contracts section, below. Finally, this tidbit was interesting: “By the late 1950s Sweden’s military thinkers and aircraft builders had recognized the game-changing effect that a linked flow of secure electronic combat data could have on tactics and operations. It is well known now – but was once a highly-classified national secret – that Saab’s J 35 Draken was fielded with one of the world’s first operational datalink systems. Since then, every generation of Saab combat aircraft from Draken to Viggen to Gripen has fielded more and more powerful datalink capabilities.” May 2007: Spring Flag 2007. In September 2007, Hungarian pilots described their experiences at Exercise Spring Flag 2007, held in May at Italy’s Decimomannu air base in Sardinia. It included combat assets from France (E-3 AWACS), Germany (F-4F Phantom ICE), Italy (AV-8B Harrier, F-16C, Tornado ECR and Eurofighter Typhoon), NATO (E-3), Turkey (F-16C), and Hungary (JAS-39C/D Gripen) with tanker support from Italy, the UK and the US. The Gripens were the only participating aircraft with a 100% sortie rate, and generated some interesting comments from Hungarian Air Force Colonel Nandor Kilian re: the Gripen’s radar capabilities and low visual cross-section (see above, or follow the link). If you’re curious about the view from inside these kinds of exercises, DID recommends former USAF Air Weapons Controller John S. Green’s “Command and Control” recounting of a 1980s exercise involving American F-15s in Germany. Feb 8/07: Norway. “F-35 Lightning II Faces Continued Dogfights in Norway.” Endre Lunde chronicles developments in Norway, including endorsement of the Gripen by one of the governing coalition’s political parties. 2006 and earlier Saab buys Ericsson Microwave; Saab layoffs; Red Flag EW; Terma MoU in Denmark; Terma MRP reco pod. JAS-39 landing c. Gripen International (click to view full) Nov 16/06: Red Flag Alaska – Gripen EW rules! Saab’s release discusses Gripen’s performance at Red Flag Alaska. During the 11-day exercise, the 4 aircraft each flew 2 sorties per day, accumulating 340 flight hours (150 ‘on mission’) with a staff of 12 pilots and 35 maintenance technicians. In the tactical realm, note the release’s confirmation that the JAS-39 has the ability to drop Laser Guided Bombs carried on one Gripen aircraft, using laser designator pods fitted to another Gripen aircraft. The aircraft’s warning and electronic warfare systems (EWS) also got high ratings: Lt. Col. Lindberg said that: “…it was almost impossible for the Red air force to get through our EW systems. We always knew where the air defense was, could avoid them and still do our work, even in very dynamic situations, with the threat getting more complex each day.” Nov 16/06: IRIS-T. Saab announces successful tests with the IRIS-T short-range air-air missile, in order to verify Gripen compatibility. IRIS-T is in production, and is a multinational project that includes Germany, Greece, Italy, Sweden, Norway and Spain. It was developed following German experience with the Russian R-73/AA-11 Archer on East German MiG-29s, which caused them to rethink the entire design philosophy behind ASRAAM and pull out of the multinational project. Nov 3/06: Terma MoU. Saab and Danish defence and aerospace company Terma announce a Memorandum of Understanding for a longer-term business relationship. As a first concrete step, Terma and Saab signed a Contract for production of DKK 10 million (about $1.7 million) worth of Gripen parts, to begin immediately at Terma’s facilities in Grenaa, Denmark. Gripen International Nov 1/06: Denmark. Danish Aerotech A/S and Saab AB conclude a conditional cooperation agreement worth up to DKK 200 million (about $34.3 million). If Denmark decides to purchase the Gripen fighter as a replacement for its current F-16 fighters, Danish Aerotech is expecting to supply Saab with mechanical, electrical and electronic components as part of the new cooperation agreement. Since its establishment in 1992, Danish Aerotech has been a Saab partner responsible for all maintenance on Danish Saab T-17 training aircraft. Gripen International. Aug 23/06: Bulgaria RFI. Gripen International announces its response to Bulgaria’s May 2006 RFI: 16 JAS-39 Gripen C/D aircraft (12 single and 4 two-seater) with full support and training provided in cooperation with the Swedish Armed Forces. Several financing options were outlined, and Saab/GI’s usual 100% offset promise was included. The first aircraft could be delivered within two years. July 19/06: India. Saab pledges to conduct all production in India if it wins the MRCA fighter competition, and cites its record of successfully meeting industrial offset provisions. June 26/06: Red Flag, ho. Flight International reports that 7 Swedish Air Force Gripens (5 JAS-39Cs and 2 two-seater JAS-39Ds), Two Tp84s (C-130H), and 12 pilots will be headed to Eilson AFB, Alaska under Lt. Col. Ken Lindberg for the latest Red Flag Alaska exercise. As a traditionally neutral country, Sweden has not participated in such exercises before. The Gripens will be deployed with LITENING III targeting pods, and will participate in both air-air and air-ground missions (4-6 aircraft each day, 2 missions per day), including leading mixed air groups from participating nations. They will take off from Ronneby AFB, Sweden on July 13, fly mostly overland without air-air refueling, and arrive on July 17, 2006. This Red Flag Alaska will run from July 24 – August 4, 2006, and is expected to involve 47 fighters and 6 support aircraft from participating countries. See Flight International article for more on the Gripen deployment, and a US Air Force Link article has more background re: the Red Flag Alaska exercises. June 20/06: Meteor. The JAS-39 Gripen successfully completes its first test set of MBDA Meteor missile firings. Further flight test campaigns will be performed with the Meteor on the Gripen combat aircraft during 2006 and beyond. June 12/06: Saab buys Ericsson Microwave. Saab Group acquires Ericsson Microwave Systems, who make the Gripen’s current PS05 radar – and probably its future AESA radar as well. EMS also makes the Erieye AESA radar that serves on Saab’s S-1000 and Embraer’s EMB-145 airborne early warning aircraft. See DID coverage. JAS-39N concept (c) Gripen International (click to view full) May 15-16/06: Denmark, Norway. Gripen International announces the tabling of offers to Denmark and Norway for JAS-39 Gripens to replace those nations’ aging F-16 fleets. The aircraft would have “longer range and greater payload” than existing JAS-39 C/D Gripens, but other than that no details of the offers themselves are released. For slightly more background, see also their Dec 9/05 release “Gripen for Denmark – Tailor-made to suit Danish needs!” April 25/06: Swedish cuts? The Swedish Armed Forces submit their 2007 budget proposal, which includes a plan for the reduction of Sweden’s Gripen force to just 100 aircraft. The remainder of the force will either be sold on the international market to approved buyers, or scrapped. March 24/06: eDefense Online publishes “Gripens in Hungary Spark EW Revival.” The archive no longer exists, but an excerpt follows: “The original decision to lease 14 Gripens from Sweden was made in September 2001 by the country’s previous conservative government. Although many, mostly economic reasons were given for this surprise move against the US offer of Lockheed Martin (Ft. Worth, TX) F-16s, insiders in Hungary say that as a kind of “side effect,” the HDF will have access to a more comprehensive electronic-warfare (EW) system that offers a more “independent” EW capability. While providing “indigenous” EW planning for the customer was included in the original December 2001 contract calling for the leasing of air-to-air-combat-oriented JAS 39A/B aircraft, when the current post-communist government altered the deal in March 2003, more capable hardware was ordered as well. The revised contract includes the lease-to-own of the unique JAS 39 EBS (Export Baseline Standard) HU (Hungary) version, which has a significantly improved EW system compared with its predecessor.” Dec 13/05: Meteor. Gripen is the first aircraft to flight-validate system integration with MBDA’s Meteor long-range air-air missile. Gripen International. June 8/05: Layoffs. Saab announced that it will lay off 350 workers in four business units, owing to a reduction of work for the JAS-39 Gripen. The 350 lay-offs involve workers at Saab Aerostructures, Saab Aerosystems, Saab Aircraft and Saab Support. Saab had already laid off 1,000 people in 2003 and 2004; and including this latest move, notice had now been given to 760 people in 2005. The company warns that it expects to lay off a further 1,000 – 1,500 people in 2005 and 2006. March 29/05: Terma MRP. Flight tests validate Terma’s new Modular Reconnaissance Pod (q.v. contract, Jan 7/02). Flight tests and evaluation will be ongoing at Saab in Linkoping for approximately a year, and introduction into Swedish service to replace the AJSF-37 Viggens will be in 2006. Saab Group’s release quotes Richard Ljungberg, Saab test pilot and former Swedish Air Force recce pilot: “Excellent handling qualities, the digital flight control system took care of everything; it just feels like flying a clean aircraft… We even tested camera functions in the pod together with maneuverability of the aircraft during the first flight.” JAS-39 Gripen: Contracts & Awards 2014 – 2017 Czechs extend lease to 2027; ETPS multi-year support to 2018 and new fighter; JAS-39F development MoU. Gripen for FAB (click to view full) March 30/17: Saab has been awarded a $42 million contract to perform operational and developmental support for Swedish Gripen fighters throughout 2017. The contract will include the operation of rigs and simulators, alongside work to test, verify and validate Gripen C/D and Gripen E fighter aircraft systems. Gripen C/D planes will also receive operational support. Work will be carried out in various cities in Sweden, including Linköping, Järfälla, Arboga and Gothenberg. Oct 27/14: Sweden. Sweden’s 2015 budget will need to make some changes, in the wake of the Swiss fighter referendum defeat: “In order to ensure the development and acquisition of the new JAS Gripen 39 E, we will take the responsibility for the completion of its upgrade and production. As a consequence of the incomplete JAS-deal with Switzerland, the allocation to defence equipment will be given an additional SEK 2 billion in 2014. This initiative will be funded in part by reducing the appropriation for international operations by SEK 500 million. The allocation for defence equipment will also receive a further SEK 900 million in 2015. The JAS-project will thereby receive a total of SEK 2.9 billion over the next two years. This is crucial in order to ensure that the lost revenues in the JAS-project do not have a negative impact on other planned equipment acquisitions.” SEK 2.9 billion is about $404 million at current exchange rates. Sources: Swedish MoD, “Budget reinforcement to the Swedish Armed Forces’ regimental- and air surveillance capabilities”. Oct 24/14: Brazil. Saab signs a SEK 39.3 billion / BRL 13.363 billion / $5.475 billion contract with Brazil’s COMAER for 28 JAS-39E and 8 JAS-39F fighters, alongside provisions for training, initial spares, and a 10-year Industrial Co-operation contract to transfer technologies to Brazilian industry. Embraer will have a leading role as Saab’s strategic partner, with a JAS-39F co-development role and full responsibility for production. This contract winds up having wider implications as well, by securing Sweden’s order for 60 JAS-39Es. As signed, it required at least 1 other customer, which was going to be Switzerland until a weak effort from that government destroyed the deal in a referendum. Brazil has now become that additional customer, and Saab expects that this commitment will keep the JAS-39 in service to 2050. What’s left? Brazil’s FAB confirms that the interim lease agreement for 10-12 JAS-39C/Ds will be a separate deal with the Swedish government. Meanwhile, the JAS-39NG contracts still require certain conditions before they become final, such as required export control-related authorizations from the USA et. al. All of these conditions are expected to be fulfilled during the first half of 2015, with deliveries to take place from 2019 – 2024. Sources: Saab, “Saab and Brazil sign contract for Gripen NG” | Brazil FAB, “Brasil assina contrato para aquisicao de 36 cacas Gripen NG”. Brazil: 36 Gripen NG July 12/14: ETPS. Saab signs a new agreement with QinetiQ’s Empire Test Pilots’ School from 2015 – 2018, continuing an association that has been in place since 1999. ETPS will continue to use the JAS-39D fighter they switched to earlier in 2014, after a long period using a JAS-39B for the most advanced portions of the curriculum. Hakan Buskhe, Saab’s President and CEO: “Since 1999 Gripen has trained more than 70 test pilots and provided more than 800 hours for the ETPS. Saab has a record of 100 per cent on-time delivery with a jet that is totally reliable. The relationship between Saab and the ETPS is something really unique.” ETPS buys Gripen flight hours from Saab, plus all required support, instead of owning the planes. Operations are conducted at Saab’s Flight Test Department in Linkoping, Sweden, with ETPS instructor pilots flying under Saab supervision. Saab provides supervisory pilots, the Gripen aircraft, logistics, ground support and facilities. Saab 105 jet trainer aircraft are also provided, to act as radar targets for training. Campaigns typically last for 1 week in May and 4-5 weeks in August and September. Sources: QinetiQ/ UK MoD LTPA, ETPS | ETPS, “The Saab Gripen” | Saab, “Saab and ETPS sign new multi-year agreement for continued Gripen training”. Empire Test Pilot School July 11/14: JAS-39F Brazil MoU. There’s no agreement yet for the Gripen lease, but Saab and Embraer have signed the expected Memorandum of Understanding around JAS-39E/F production. Embraer will be the Brazilian industrial lead, performing its own assigned work while managing all local sub-contractors in the program. They’ll also work with Saab on systems development, integration, flight tests, final assembly and deliveries, with full joint responsibility for the 2-seat JAS-39F Gripen NG. Sources: Embraer and Saab, “Embraer to partner with Saab in joint programme management for Brazil´s F-X2 Project”. March 3/14: Brazil. Brazil and Saab sign advance agreements on defense cooperation, which lay the foundation for the future Gripen contract. This includes a defense cooperation framework agreement, whose scope is already wider than just fighters, and a corollary agreement that commits to appropriate levels of secrecy and security procedures within that cooperation framework. The new agreements build on documents signed in 1997 and 2000, and both will be forwarded to Brazil’s National Congress for approval. The industrial goal is to be able to produce 80% of the plane in Brazil, which has future implications given that final Brazilian orders over time are estimated at 60 – 104 fighters. Equally significant, the accompanying security agreements include access to the Gripen’s source code. That will allow Brazil to add its own weapons to the new fighters, increasing the global attractiveness of both Saab’s Gripens and of Brazil’s weapons. A current wave of Latin American upgrades could create timing issues for wider regional sales, but export partnership arrangements are under discussion. They currently revolve around Latin America, and developing nations with close Brazilian ties (“das nacoes em desenvolvimento com as quais o Brasil possui estreita relacao bilateral”). Sources: Brazil FAB, “Brasil assina acordos de cooperacao e da prosseguimento a compra dos cacas suecos” | See also Defense News, “Fleet Modernization Drives Requirements Across South America”. Brazil: Defense cooperation agreements March 12/14: Czech Republic. The Czech cabinet approves a 12-year the extension of their Gripen fleet lease, with a 2-year option to 2029. Annual outlay will be CZK 1.7 billion, for a total of CZK 20.4 billion over the base period ($1.033 billion). That’s reportedly about a 31% drop. The official contract signing is expected later, but this decision was the key event. The deal includes the jets, training for 25 pilots and 90 maintenance technicians, depth logistics support, and upgrades to add Link-16 and night vision optics. Sources: Swedish FXM, “Czech Republic approves new Gripen agreement” | Ceske Noviny, “Czech govt approves extension of Swedish Gripen fighters lease” | Sweden’s The Local, “Czech renew lease on Jas Gripen jets”. New Czech lease March 4/14: Sub-contractors. Switzerland’s RUAG receives a CHF 68 million ($41.1 million) contract from Saab to develop and produce payload mountings for the JAS-39E’s hardpoints. The order reportedly includes 4 work packages, with CHF 15.5 million ($9.4 million) committed immediately for design, system development, and prototypes for 3 JAS-39E test planes. RUAG is already soliciting sub-contractors within Switzerland. An option for series production would make up the rest, but Saab can award it elsewhere if the Swiss referendum fails. As appears likely. Sources: RUAG, “RUAG wins contract for SAAB Gripen E payload mountings” | UPI, “RUAG making payload mountings for Gripen fighters” (their currency conversion is wrong) | Saab’s Gripen Blog, “Swiss Technology Group RUAG Collaborates With Saab”. Jan 30/14: Support. Saab announces a SEK 174 million (about $27 million) Swedish option to support and maintain Gripen fleets throughout 2014, placed under the June 29/12 multi-year contract. The contract still covers JAS-39 fleets in Sweden, the Czech Republic, Hungary, and Thailand. South Africa has its own independent support contract, after a long period of bungles and a near-crisis for its fleet (q.v. Dec 19/13). Work will take place at Saab’s facilities in Linkoping, Arboga, Jarfalla, Gothenburg… and Ostersund, which wasn’t mentioned in the 2012 contract. Saab’s June 2012 announcement placed the contract’s maximum option value at SEK 2 billion (about $283.6 million), but this release has revised that to SEK 1.36 billion (about $208 million), with SEK 795 million allocated so far. Sources: Saab, “FMV places order for Gripen support and maintenance”. 2012 – 2013 Sweden & Switzerland agree in principle to buy 82 JAS-39Es, followed by a framework contract and the development contract; Sweden issues 60-plane conversion contract; Hungary extends lease to 2026; South Africa gets a real support contract. JAS-39D & Swiss F/A-18 (click to view full) Dec 19/13: South Africa. South Africa has been relying on short-term interim support contracts that expired in April and endangered the fleet, but a SEK 180 million ($27.5 million) contract with Armscor creates a longer-term arrangement from 2013 – 2016 that should improve costs and predictability. The contract includes typical support services like engineering support, MRO (maintenance, repair, and overhaul), and spares replenishment, as well as technical publications amendments to keep them current with SAAF changes. Read “South Africa’s Sad Military: Why Maintenance Matters” for full coverage. South African support Dec 18/13: Sweden. Saab receives its Swedish Defence Materiel Administration (FMV) contract to convert 60 JAS-39Cs to JAS-39 Gripen Es. The SEK 16.4 billion (about $2.498 million) contract covers the next decade of work from 2013 – 2023, with initial deliveries scheduled in 2018. The contract is announced the same day that Brazil picks Gripen NG for an initial $4.5 billion buy of 36 planes. That may be simple coincidence, but the Feb 15/13 umbrella contract did have provisions that would allow Sweden to end the conversion contract if the Swiss referendum rejects a fighter buy, and no other customers had committed. While the final contract with Brazil isn’t expected until December 2014, their selection puts that doomsday scenario to rest. This contract was expected in the fall, and is larger than the math in the initial contract had suggested (SEK 12.962 billion, q.v. Feb 15/13). It follows SEK 13.2 billion in final development contracts (q.v. Feb 15/13, March 22/13), and represents Gripen NG’s 1st production order. Swedish Gripen E conversion contract Dec 18/13: Meteor. Saab announces an SEK 186 million (about $28.4 million) order from Sweden’s FMV procurement agency, to finish integration of the Meteor long range air-to-air missile on Gripen E. These funds are on top of the February 2013 contract to develop the JAS-39E Gripen NG. The order will play out over Gripen E’s 2013 – 2023 development, but Meteor is scheduled to become operational on JAS-39C/D models in 2014, and JAS-39E conversion shouldn’t take that long. The challenge will be bringing the new fighter itself up to an adequate readiness state for qualification trials, which creates a likely certification threshold of 2017 – 2019. Sources: Saab Group, “Saab Receives Order for Integration Support of Weapon System for Gripen E”. Dec 3/13: Sub-contractors. Israel’s Elbit Systems EW and SIGINT – Elisra announces a contract “for the integration and delivery” their PAWS-2 passive missile warning system “onboard the Gripen fighter.” They don’t say whether this is only for a particular country, as an available upgrade for any model, or targeted for the new JAS-39E/F. The latter option is most likely, as an improved Missile Approach Warning System was an explicit component of the Gripen-E’s upgrades. PAWS looks for the heat plume of incoming missiles, and calculates whether it’s a potential threat. If it is, PAWS triggers a pilot warning, and can fire automatic flare/ chaff countermeasures while cueing DIRCM direct laser countermeasures. If it isn’t a threat, the system doesn’t bother the pilot, and saves on-board resources until they’re needed. PAWS-2 already serves aboard Israel’s unique F-16i Soufa deep strike fleet, and Elisra says that it was picked for Gripen after in-depth evaluations that included a comparative live fire test. Sources: Elbit Systems, “Elbit Systems Selected to Provide Electronic Warfare Systems for the Gripen Fighter System”. April 2/13: Industrial. Saab announces that they’ve set Swiss workshare for all future JAS-39E fighters, but haven’t set their exact industrial partnerships yet. They’ve committed to the armasuisse policy of having 5% of their industrial benefits in Italian-speaking regions, 30% in French speaking regions, and 65% in German speaking regions. Swiss industry will become sole suppliers of the fighter’s rear fuselage, tail cone, air brakes, pylons, and external fuel drop tanks. March 22/13: Gripen E SDD. Saab receives its SEK 10.7 billion (about $1.65 billion) system design & development order for the JAS-39E, covering work over 2015-2023. It includes full definition and development work for the type, as well as adaptation of test and trial equipment, simulators and rigs. This brings total Gripen-E funding to date SEK 13.2 billion, on top of funding to create and test Gripen Demo over the last several years. Additional funds under the SEK 47.2 billion development and production framework agreement will be booked when each order is received, and are expected in 2013-2014. If Sweden’s FMV exercises a cancellation under the conditions of the framework agreement, they are liable to Saab for both costs incurred to date, and for cancellation fees. FMV [in Swedish] | Saab Group. JAS-39E development contract Gripen Demo (click to view full) Feb 15/13: Contract. About 2 months after an overwhelming Dec 6/12 parliamentary vote (q.v. Events section, above), Sweden’s FMV signs a SEK 2.5 billion development contract with Saab for 2013-2014 work on the JAS-39E Gripen Next-Generation. The contract also comes with a number of development and procurement options, which could raise the total to SEK 47.2 billion (currently $7.471 billion). Within another month or 2, Saab expects to sign a contract that funds the rest of Gripen E development, worth SEK 10.6 billion. This would bring the development and testing total to SEK 13.1 billion (about $2.075 billion) on top of Gripen Demo, far higher than initial estimates (vid. Sept 21/12 entry). By the end of 2013, Saab expects to sign a contract to convert 60 Swedish JAS-39C fighters to JAS-39Es. That will require a lot of work, because the fuselage is substantially different. Initial JAS-39E deliveries aren’t expected until 2018, and the type isn’t currently expected to gain its operational capability designation before 2023 or so. By the end of 2014, Saab expects to sign a tranche contract for JAS-39E specific equipment, support and maintenance. It would begin in 2018, alongside the first upgraded Swedish fighters. The umbrella contract adds provisions for 22 new Swiss JAS-39Es, plus initial support, training, etc. By 2014, Saab should know if the referendum on the purchase has passed. The Swiss contract will be CHF 3.126 billion, or SEK 21.138 billion / $3.384 billion at current rates. If Switzerland’s referendum fails to pass and no other customer has bought the JAS-39NG, however, the contract has provisions that would cancel the conversion deal with Sweden at agreed-upon terms. A bit of math leaves an interesting question. If the Swiss deal is included in the SEK 47.2 billion figure, then 47.2 billion – 13.1 billion development – 21.138 Swiss = just SEK 12.962 billion/ $2.04 billion. That has to cover major structural modifications on 60 Swedish fighters, add expensive new equipment including engines and radars, AND finance a support deal encompassing all of the JAS-39E’s unique new features and parts. $34 million per fighter is possible for the conversion, but conversion and maintenance is a stretch. The Riksdagen’s Gripen upgrade vote had approved SEK 90 billion to 2042, so the explanation may be that the JAS-39E support annex is very short term. [DID adds: the final conversion contract alone was SEK 16.4 billion] Swedish FMV | Saab. JAS-39E contract framework for Sweden, Swiss Aug 25/12: JAS-39E/F. Sweden’s government announces that they are committed to buying 40-60 next-generation JAS-39E/F fighters, as part of a joint effort with Switzerland who will buy 22 more. To fund this effort, they’ve agreed to commit another SEK 300 million to the defense budget in 2013 and 2014, and SEK 200 million per year after that. By the time the 1st planes are scheduled to enter service with the Flygvapnet, in 2023, that extra funding would amount to SEK 2.3 billion (currently almost $350 million), if subsequent governments maintain it. It’s hard to know if that’s enough, as negotiations are reported to be in progress for the system development contract, but if the aircraft includes everything it’s supposed to have, that would be a cheap price. Green Party MP Peter Radberg says that his party calculates the likely development cost at “a couple of billion kronor per year” instead. At the same time, the Swiss government issues a statement that there is an agreement in principle between armasuisse and Sweden, completing a Memorandum of Understanding signed on June 29/12. The countries will reportedly share support and upgrade costs under an umbrella model, and final details of specifications, delivery dates, prices, equipment and infrastructure have reportedly been settled, pending final approval from Swiss political authorities. That will include a national referendum – see “Switzerland Replacing Its F-5 Fighters” for full coverage of that buy. Swedish government Release [in Swedish] & Video | Swedish Armed Forces | Svenska Dagbladet – full statement from 4 party leaders [in Swedish] | Swiss government [in German] | Swedish-Swiss Framework Agreement [PDF, in French] | Saab Group || Sweden’s The Local | Expatica Switzerland | Agence France Presse | Aviation Week | Bloomberg | Reuters. JAS-39E/F commitment June 29/12: Support. A multi-year support deal with Sweden’s FMV replaces all of the existing Gripen support contracts with a single contract that includes performance-based support and maintenance, extra funding for the MS20 upgrade package, and studies and definition activities for further Gripen development. It covers Gripen fleets in Sweden, the Czech Republic, Hungary, and Thailand, but not South Africa. The initial order is SEK 3.6 billion ($510.5 million) plus a series of 1-year options totaling up to SEK 2 billion (currently $283.6 million) until December 2016. Performance-based activities include spare parts, maintenance of aircraft systems, and technical engineering support. there’s also an international angle, as Saab’s work maintains updated technical publications and logistics solutions for operation of the Gripen system in Sweden, the Czech Republic, Hungary and Thailand. Most of the work will take place at Saab’s facilities in Linkoping, Arboga, Jarfalla and Gothenburg. Sources: Saab, “Saab signs support and development agreement with FMV for Gripen”. Swedish support, 2012-2016 Jan 30/12: Hungarian extension. Hungary opts to extend its lease of 14 Gripens for another 10 years, to 2026, but doesn’t add any more planes just yet. Terms aren’t disclosed, but the Budapest Business Journal reports that: “Hungarian Defence Minister Csaba Hende said earlier that extending the lease until 2026 would save the state HUF 63bn [DID: about $290 million]… Government data show the Gripen lease costs the budget an annual HUF 30bn. Training programmes for the aircraft cost an additional HUF 2bn a year.” That would place the 10-year extension at about $1.1 to $1.4 billion equivalent, including training, based on straight-line extrapolation. In 2001 the Swedish and Hungarian governments entered into a lease-purchase agreement, with a further modification in 2003 that included 14 Gripen C/Ds (12 single-seater and 2 two-seater aircraft). All aircraft were delivered in 2006 and 2007, and all 14 aircraft were in operation with the Hungarian Air Force by the end of 2008. The current contract was due to expire in 2016. Saab | Budapest Business Journal. Hungarian extension 2010 – 2011 Thais orders another 6 JAS-39C/Ds, AEW plane, missiles; Meteror BVRAAM integration contract; Swedish orders to modernize and maintain the fleet, incl. new avionics system; Curtiss-Wright DSPs for new AESA; Swedish JAS-39 (click to view full) Sept 6/11: ES-05 Raven. Curtiss-Wright Corporation announces a $15 million contract from SELEX Galileo to supply rugged embedded digital signal processor modules from 2010 – 2014. The company’s Motion Control segment will develop the DSP modules at its Ashburn, VA facility. The firm has confirmed that their DSPs will provide the radar processing for the new ES-05 Raven AESA fire control radar system, and the contract could rise to $25 million over the lifetime of the program. July 1/11: Support. Sweden’s FMV issues SEK 1.034 billion (about $159 million) worth of contracts to Saab for a variety of Gripen-related services in 2011. First, Saab will undertake continual maintenance and updates for Sweden’s JAS-39C/D fighters, in compliance with the Swedish Armed Forces’ long-term planning. Second, related efforts will work to maintain the Swedish fleet’s operational capability, including technical support, product maintenance, flight testing, and flight simulator operation. finally, Saab will conduct studies regarding further JAS-39 development, and a resource baseline will be laid down for renewed Gripen testing and verification in the long-term. Saab. May 18/11: Avionics. Saab announces a SEK 152 million (about $24.1 million) order from the Swedish FMV for cockpit development work on the Gripen C/D fighter, upgrading the material system 39/ edition 19 configuration during 2011-2012. March 3/11: Support. Saab announces a SEK 120 million (about $19.1 million) order from the Swedish FMV Defence Material Administration, to provide technical support, product maintenance, flight test and simulators to ensure that Sweden’s Gripen fleet remains ready and operational. The work will be done during Q2 2011, mainly at Saab facilities in Linköping, Arboga, Gothenburg and Järfälla. Jan 25/11: Upgrades. Saab announces a SEK 127 million (about $18.2 million) order from the Swedish FMV to modify undeclared sub-systems of Sweden’s JAS-39 edition 19 fighters – the 2009 upgrade baseline. Work will be carried out in 2011 and 2012. Nov 23/10: Thai Order #2. Saab receives a SEK 2.2 billion (currently $316.6 million) order from Sweden’s FMV to provide Thailand’s 2nd tranche of fighters (6 JAS-39C Gripens) and equip the 2nd S340 AEW&C aircraft being sold to Thailand. There’s also a 3rd component to the overall deal – Saab’s RBS-15F air-launched anti-ship missiles. Precise designations matter here. The FMV specified RBS-15Fs, which are radar-guided Mk.I missiles, without the land attack capabilities of the longer-range, GPS/radar guided Mk.III variants. The RBS-15Fs can be carried on the Gripens to hit ships over 70 km away, using a 200 kg warhead delivered by a stealthy, wave-hugging approach that includes programming for indirect attack vectors, and evasive maneuvers. The agreement is reportedly signed by RTAF commander in chief Air Chief Marshal Itthaporn Subhawong and FMV Director General Gunnar Holmgren, and FMV’s announcement would not disclose the full value of the government-to-government contract. Swedish FMV | Gripen International | Saab Group | Bloomberg | Engineering News, South Africa | Flight International | ScandAsia | China’s Xinhua. Thailand Nov 16/10: Training. Saab announces an order from the Swedish FMV procurement agency, to deliver 3-dimensional (3D) models to the Swedish Gripen simulators, to be generated from aerial images using Saab’s new Rapid 3D Mapping(TM) system. Sept 8/10: Meteor. Sweden’s FMV military procurement agency gives Saab a 4-year, SEK 312 million (about $42.75 million) contract to integrate MBDA’s Meteor long-range air-to-air missile with their JAS-39 fleet’s radar, displays, and support and maintenance systems like simulators and planning computers. The order includes test flights and test firing, as well as a 2-way datalink for communication with the missile and even “hand-off” targeting after it has been fired. The JAS-39 has a head start in this area. It has been the Meteor missile’s test platform since 2006, and has already conducted several Meteor test firings. Work will mostly be performed in Linkoping, Sweden, with some involvement from the Gothenburg facilities. Sweden is now the 3rd country to sign Meteor production orders, after Britain and Spain, but the other 2 countries will mount them on the Eurofighter Typhoon. Saab Group | Gripen International | Defense News. Meteor integration June 1/10: Support. Saab announces a SEK 230 million (currently $29.4 million) support contract from the Swedish Defence Material Administration. It covers product maintenance, technical support, and basic operations such as test flying, rigs and simulators, in order to ensure that the Svenska Flygvapnet’s Gripens remain operational. Work will be undertaken during the second half of 2010, at Saab’s Swedish plants in Linkoping, Arboga, Goteborg, and Stockholm. Saab AB. May 25/10: Upgrades. Saab AB announces a 2-year, SEK 450 million (currently $57.25 million) contract from Sweden’s FMV procurement agency, in order to develop a next-generation set of Gripen avionics upgrades. Saab VP and head of the Aeronautics business area, Lennart Sindahl, explains part of the problem, which is common to all modern combat aircraft: “Computers with the best performance possible today will be viewed as inadequate for the tasks facing Gripen in ten years, when the aircraft must remain modern for a further twenty years. Few high-tech products have a service life as long as Gripen.” In response, Saab will develop a completely new avionics system that includes new displays, back-end computing, and features like sensor fusion, the ability to sort and selectively display information with different security classifications, and changes to the electronic system architecture. The challenge is doing these things without breaking existing capabilities, of course, and the new package isn’t scheduled to enter service with Sweden until about 2020. Saab AB. March 31/10: Upgrades. Sweden’s FMV procurement agency issues a 4-year, SEK 400 million (about $42.3 million) contract to Saab Group to improve the reconnaissance pod’s user interface, and give it night-time capability. The Gripen can also carry the LITENING-III surveillance and targeting pod, which has full night-time capability, and its ReeceLite relative. This order, however, almost certainly involves Terma’s Modular Reconnaissance Pod (MRP 39, q.v. Jan 7/02 entry below). March 30/10: Support. Saab announces a SEK 600 million (about $82.6 million) support contract for 2010-2011: “The contract represents a part of continual system maintenance and updating tasks for the Gripen and complies with the Swedish Armed Forces’ long-term planning for the Gripen… as well as maintaining the material prerequisites for conducting coordinated testing of the flight system. The material prerequisites include renewal of test equipment and test aircraft for testing of the Gripen system on the long term.” March 10/10: Upgrades. Saab announces a 5-year, SEK 2 billion (currently about $280 million) contract from Sweden’s FMV procurement agency, aimed at upgrading the existing fleet of JAS-39 C/D Gripen fighters. On the capability front, upgrades will include improved communications systems, and ECM (Electronic Counter-Measures) defensive systems, upgrades to the existing PS05 radar that will increase its range and add new functions, and integration of additional weapons. On the operational front, Saab will be making some changes to reduce operating costs, based on the fleet’s 130,000 hours of flight experience to date. Interestingly, there’s also a project to “reduce the noise and emissions from test runs during engine maintenance.” Work will mainly take place at Saab’s Swedish plants in Linkoping, Gothenburg, Jarfalla, Kista and Arboga. Saab release. Feb 16/10: IRST. Saab picks SELEX Galileo’s Skyward-G Infrared Search and Track (IRST) to equip Gripen NG. Saab Gripen blog. 2008 – 2009 Swedish government support & upgrade contracts, incl. EW & IFF, IRIS-T SRAAM integration; Sweden orders Cobra HMDs; MRP 39 reece pod development; ETPS support agreement; ES-05 Raven AESA radar development contract with SELEX, after Thales sabotages RBE2-AA AESA collaboration; F414 picked for Gripen NG; improvements. RTAF Gripens (click to view full) May 9/09: Thailand. The Thai Democrat Party government cancels its 15 billion baht follow-on option for 6 Gripens. Faced with a drop in government revenues, it slashes the coming defense budget from 171 billion to 151 billion baht. Subsequent comments indicate that the purchase may end up being delayed, rather than canceled. That is what happened, in the end. March 24/09: ES-05 Raven AESA. Saab and SELEX Galileo sign an agreement to develop a mechanically-pivoted Active Electronically Scanned Array (AESA) radar for the JAS-39NG. Terms are not disclosed. The Raven’s base technology comes from SELEX Galileo’s proven Vixen family of AESA radars, but it has evolved while incorporating technologies and experiences from other radars, including the existing PS-05. Part of that evolution is an innovative combination of AESA focus and low signal “leakage” beyond its focus area, with the potentially wider field of regard that mechanically-pivoted radars can possess. The result will be a far more capable radar than previous Vixen offerings. The new joint radar is now known as the ES-05 Raven, and the addition of mechanical rotation to traditional AESA strengths is an interesting design choice that will give the Raven a unique set of strengths (wider scan; lock, fire and leave tactics) and weaknesses (reliability, maintenance). The end quality of its AESA transmit/receive modules, and their integration, will also play a large role in the radar’s final performance. The arrangement is initially aimed at Brazil’s F-X2 fighter competition, where it leverages Selex Galileo’s strong pedigree equipping Brazil’s F-5BR fighters (Grifo-F radar) and AMX light attack jets (Scipio radar). Once integrated and proven, of course, the AESA upgrade would be available to any Gripen customer. Saab | Gripen International. Raven AESA partnership Feb 10/09: Sub-contractors. Saab and TATA Consultancy Services (TCS) partnered Aeronaoutical Design and Development Centre (ADDC) has been awarded its first contract by Saab to participate in the aerostructural design and development for Gripen NG. Gripen International. Feb 9/09: Studies. Saab announces an SEK 400 million (about $49.7 million) order from the Swedish Defence Materiel Administration (FMV) for 2009 studies regarding future Gripen capabilities. Until significant export sales are made, Sweden remains the home market and financier of the ongoing upgrades required to keep Gripen current. This order is a continuation of a project that started last year, and will form the base for the Swedish Armed Forces decisions regarding what capabilities and technologies to incorporate in subsequent versions. Jan 8/09: Support. Saab announces a SEK 550 million (about $70 million) order from the Swedish FMV procurement agency, to support the Swedish Air Force. Covered activities during 2009 will include program management, product maintenance, support, flight testing, pilot equipment and simulators. Gripen Demo rollout (click to view full) July 9/08: EW. Saab announces a pair of orders from the Swedish FMV procurement agency worth SEK 574 million (about $95.5 million). A SEK 324 million order for Electronic Warfare Systems (EWS) will equip Sweden’s aircraft with up to date antennae, transmitters and appropriate electronics, and deliveries will be made during 2008-2009. The second contract is a SEK 250 million contract for weapons pylons that will enable the Gripens to use GPS-equipped weapons systems like JDAM bombs; most likely this involves pylons with MIL-STD 1760 circuitry. Deliveries will take place between 2009-2011. April 23/08: Thales AESA. Saab announces a contract with France’s Thales to develop a new advanced radar based on AESA technology. Peter Andersson, product manager at Saab Microwave Systems: “At present Thales is developing an AESA within a French radar programme and, like Saab Microwave Systems, is one of the world leaders within the radar field. Together we can quickly develop a demo-product that can show the markets the advantages of AESA technology. The collaboration over the antenna is also cost effective and is in line with Saab’s overall strategy of finding industrial partners for Gripen… Our collaboration is for the Gripen demo. We will have to see what happens in the future.” The collaboration is good for Thales, which have been building the RBE2 AESA radar for France’s Rafale fighter. With other future fighter markets locked up, a Gripen deal offers them their best hope of leveraging that technology into wider sales. Both Thales and Saab have experience with AESA radars, but the global fighter market pits them against established competitors in the USA’s Northrop Grumman and Raytheon, and prospective competitors in Russia’s Phazotron and Euroradar (EADS, Finmeccanica’s SELEX SAS and Galileo Avionica, and INDRA). Saab Microwave Systems is responsible for the overall radar system and its capability, Thales contributes with the antenna, and Saab Aerosystems is responsible for integrating the final product into the JAS-39. Collaboration surrounding the AESA radar actually started in autumn 2007; integration of the complete radar system will continue during 2008, and is expected to be completed in the spring of 2009. The first test flights are planned for summer 2009, and Saab intends to follow that with customer demonstrations. RBE-2 AESA Jan 8/08: IFF. Saab has awarded the Thales Group a contract to supply new IFF (Identification, Friend or Foe) Combined Interrogator-Transponders (CITs) for existing and future JAS-39 Gripen fighters. Price was not disclosed. The contract covers a total of 143 aircraft. 68 Swedish Gripens will receive NATO Mode 4 CITs, and another 75 Gripens (47 Swedish, 14 Hungarian, 14 Czech) will be upgraded to Mode 4 CITs with Mode S capability that gives each aircraft its own “squawk” and can tell aircraft apart in a crowded sky. The aircraft will be ready for the transition to the new NATO Mode 5 secure IFF capability, but this will not be part of the current upgrades. [Source Epicos report link now broken.] 2007 and Earlier Thailand orders 6; Note that this section is not complete. See the Gripen Program Timeline, above, for key milestones and buys involving Sweden, South Africa, Hungary, and the Czech Republic. Gripen & S-1000 (click to view full) Oct 17/07: Thailand. The Thai government announces a $1.1 billion deal for 12 JAS-39 Gripens and 2 S-1000 Erieye AWACS aircraft. Phase 1 will feature 6 Gripens and 1 AWACS for $600 million, with a $500 million Phase 2 option for another 6 Gripens and the 2nd AWACS. Thailand’s current political situation did much to clinch the deal – but it also risked unraveling it. Read: “Thailand Buying JAS-39 Gripens, AWACS” for full coverage. Thailand Oct 17/07: Gripen Demo – Go! SEK 3.9 billion ($600 million) contract with the Swedish Defence Material Administration (FMV) to upgrade 31 Swedish Air Force JAS-39 A/B Gripens to the very latest JAS-39 C/D standard. The FMV has also given the go ahead for the next-generation ‘Gripen Demo’ variant. Gripen Demo Oct 3/07: Cobra HMD for Sweden. A SEK 345 million ($54 million) deal between Sweden’s FMV and Saab promises to equip Swedish Gripens with the Cobra Helmet-Mounted Display. South Africa has already ordered it for their Gripens, and an HMD can really add to a fighter’s air-air capabilities. July 2/07: F414 picked. Saab announces that GE Aviation’s new F414G fighter engine will power its next-generation Gripen models. The F414G is derived from the popular 22,000+ pound/ 96 kN thrust F414-GE-400s that power the twin-engine F/A-18 E/F Super Hornet, and offers a 25-35% power boost over its predecessor the F404. Key F414G alterations will include minor changes to the alternator for added aircraft power, and modified Full Authority Digital Electronic Control (FADEC) software for enhanced single-engine operation. GE Aviation and Volvo Aero Corporation (now part of GKN) will be working together on the new F414G fighter engine. Although Volvo Aero has manufactured modified F404 engines under license for past Gripen fighters, GE will be supplying GE F414G engines directly to Saab for the Gripen Demo project, with Volvo as a major sub-contractor. GE is currently delivering 2 F414 Engines, with flight-tests and customer demonstration evaluations planned for 2008-2010. Gripen International release. F414G for Gripen Demo April 26/07: Norway. Norway and Sweden sign a Memorandum of Understanding on co-operation in development work on future versions of of the JAS-39, worth NOK 150 million (currently about $25 million) over 2 years, plus the option to further extend the agreement. There was also a Letter of Agreement (LoA) signed between Norway and Saab subsidiary Gripen International that will enable Norwegian companies to undertake advanced development work in a range of high technology areas, such as composites, communication systems, studies and integration work for Norwegian weapon systems, ammunition, logistics and data systems connected to Next-Gen Gripen development. July 17/06: UK ETPS. Trainee test pilots at Britain’s world-class ETPS (Empire Test Pilots’ School), which is operated by QinetiQ in partnership with the UK MOD, have signed a new agreement that increases their use of the JAS-39 Gripen. In 2005 all syllabus requirements were met, zero flights were lost due to unserviceability, and where all teaching goals in all areas were exceeded. The new 2006 deal will see a 30% increase in student numbers, a 20% increase in flights per student, the training of a third ETPS Instructor Pilot (IP) and the inclusion of Flight Test Engineer students within a refined syllabus. The 2006 program goes very well, with 56 sorties in just 10 flying days, and no downtime due to mechanical issues. The 2006 test pilot students will be drawn from the French Air Force, the United States Navy, the Royal Australian Air Force and Britain’s Royal Air Force. See Saab release for more details.TEXT UK ETPS MRP-39 on Gripen (click to view larger) July 3/06: Upgrades. Saab received a SEK 1 billion ($150 million equivalent as of 05/07) order from the Swedish Defence Material Administration, covering continued development of the Gripen System. The order reportedly covers various software upgrades, as well as other development activities supporting the long term development of the Gripen system. Work will be performed at Saab Aerosystems and Saab Aerotech in Linkoping, Sweden as well as at Saab Avitronics in Jarfalla and Kista, Sweden. See release. March 23/06: Drop tanks. Saab Aerosystems appoints Swiss firm RUAG as single source supplier for drop tanks to the Gripen. At the same time, an initial EUR 4 million order for more than 60 export drop-tanks was announced, with first deliveries scheduled for August 2007. Note that entries before 2006 are incomplete at this point. Dec 29/05: IRIS-T. Saab receives a SEK 150 million ($18.9 million) contract for integration of the IRIS-T 4th generation short-range air-air missile on the Gripen. Saab is planning to fire the first shot with IRIS-T in 2007, but the integration process will continue to 2009. IRIS-T Jan 7/02: Terma MRP. Terma A/S announces a sub-contract from Saab Avionics AB to make Modular Reconnaissance Pods for the Swedish JAS-39 Gripen fleet, in order to meet the Swedish FMV’s request for a new reconnaissance system. Terma bid jointly with Saab on that contract as the partner responsible for the pod system. AerotechTelub is responsible for Integrated Logistic Support, Recon Optical for the CA270 sensor, and L3 Communication for the digital mass memory. Terma is contracted to develop, qualify and supply the Modular Reconnaissance Pod (MRP 39), including the Environmental Control System, Electrical System, Ground Support System, and part of the Reconnaissance Management System (RMS). The MRP 39 is conceptually based on Terma’s successful F-16 MRP, but it employs a circular cross-section on the lower area of the pod, and an advanced rotating window section. The rotating window is attached directly to the MRP 39 strongback and can be positioned at various positions along the length of the pod mid-section, giving the system more flexibility to add different sensors with different weight and balance restraints. The window section’s 360 degree rotation is electronically synchronized to the sensor aiming, except for take-off and landing where it is rotated up to a safe position. The upper part of the MRP 39 has a square cross-section providing room for the strongback, ducts for the environmental control system, cabling, etc. The idea is to offer more internal pod space, and provide separation that helps eliminate or limit buffeting and dynamic vibrations on the sensitive equipment. The Environmental Control Unit (ECU) will be a new, hybrid structure providing both air and liquid coolers and heaters, plus two symmetrical, multi-speed fans. The ECU will be installed in the aft cone of the MRP 39 and it will be handled as a single, line replaceable unit for ease of maintenance. Saab re: partners. Terma MRP 39 Reco Pod End notes fn1. Defense-Aerospace.com’s July 2006 report attempting to estimate the true cost of western fighters placed the JAS-39C Gripen at over $68.9 million per plane based on the offer to Poland, and estimated the plane’s program cost (R&D amortized) at $78.7 million. To give the reader a quick idea of how that benchmarks, costs for the F/A-18 E/F Super Hornet were estimated at $ 78.4/ 95.3 million, the Eurofighter at $ 100-120/ 120-145 million, and the F-35 Lightning II at $ 115 LRIP / 112.5 million. Read the full report here. The report also noted Saab’s official response of $35-40 million per plane flyaway costs, however, and acknowledged the problems involved in calculating per-plane figures based on foreign orders due to other costs and terms. [Return to story] fn2. Saab clarified that they had not integrated and qualified all of the weapons shown in the “could-have weapons” illustration. Rather, it was intended to display a full range of options that Saab could integrate, in response to customer requests and funding. DID is working on a current list. [Return to story] fn3. The Gripen’s “visual stealth” may surprise some people, but it shouldn’t. A lightweight fighter with a small frontal cross-section always has this edge in air-air combat. An especial disparity occurs when fighters like that confront bigger aircraft; American F-4 Phantoms had some nasty experiences along these lines in Vietnam, flying against much older MiG-17s and MiG-19s. A trip to the Pima Air Museum in Tucson, AZ, where a MiG and Phantom are positioned right across from one another, makes the difference clear. Now throw in the Gripen’s high maneuverability, and the widened ‘threat cone’ for modern short-range infrared missiles. An enemy pilot must now scan for threats in a much larger area – when seconds are all he has, he risks missing an oncoming Gripen in a quick scan, or looking in the wrong place. In exchange for these advantages, lightweight fighters have traditionally given up the powerful radars that could guide medium-range missiles. Moore’s Law of rising silicon chip power has removed this trade-off, and turned it into a difference of degree rather than an absolute difference in capability. [Return to story] fn4. “Fox 2 kill” means an infrared missile shot. Many current Gripens are equipped with Sidewinders, but the plane has also been integrated with the European multinational IRIS-T, and the South African/ Brazilian A-Darter. [Return to story] fn5. Many thanks to reader Dave Dogman, who took the time to read the Saab presentation to Norway and noted the typo – it isn’t 8,100 kg empty weight for Gripen NG, but 7,100 (up from 6,800). DID is grateful to him for pointing this out. [Return to story] Additional Readings & Sources DID thanks Saab and the Swedish FMV for their assistance with this article. Any mistakes are our own. Readers with corrections, comments, or information to contribute are encouraged to contact DID’s Founding Editor, Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so. JAS-39 Gripen: The Platform Gripen Official Site. Was the URL for the Gripen International collaboration with BAE, now redirects back to Saab. See also their old PDF brochure “Gripen: Seeing is Believing“. Saab – The official Gripen multi-role fighter blog. Swedish FMV Procurement Agency – JAS-39 Gripen. Air Force Technology – Gripen Multi-Role Fighter Aircraft, Sweden. JAS-39 Gripen: Ancillary Equipment Saab – PS 05/A Fighter Radar. Used to be an Ericsson Microwave product, until Saab bought them. GE Aviation – F414. Engine installed on JAS-39E/F. GE Aviation – F404. Engine installed on JAS-39A-D. GKN Aerospace – Engines. GKN bought Volvo Aero. Deagel – NORA. Ericsson’s initial AESA radar project involving the Gripen. Defense Update – RBE2 – AESA for the RAFALE. Thales’ current offering in the field. Thales – Active Electronically Scanned Array (AESA) RBE2 radar. UK Parliament, Select Committee on Defence (April 2012) – Written evidence from Saab. Mentions that “up to 36%” of the Gripen is made in the UK, including the new AESA radar, landing gear, etc. Peer Competitors DID FOCUS Article – Eurofighter’s Future: Tranche 3, and Beyond. DID – Top Falcons: The UAE’s F-16 Block 60/61 Fighters. The world’s most advanced F-16s. Vipers have been competitors in several countries, and recent F-16V upgrades offer a slightly less advanced configuration for existing and potential F-16 buyers. DID FOCUS Article – Super Hornet Fighter Family MYP-III. The F/A-18E/F, Advanced Super Hornet, and EA-18G. DID FOCUS Article – EA-18G Program: The USA’s Electronic Growler. A very specialized Super Hornet variant that performs high-power jamming and air defense suppression. Gripen’s integrated weapon set has important limitations in that role, but so do all of its European competitors. DID FOCUS article – Lightning Rod: F-35 Fighter Family Capabilities and Controversies. RAC MiG – MiG-35/MiG-35D. Russian MiG-29 upgrade with an AESA radar and thrust vectoring. DID – France’s Rafale Fighters. Export Competitions: Highlights Norwegian Ministry of Defence, via Wayback Machine – Industripakkane i sokelyset. Unfortunately, the downloadable Gripen International presentation, which is in English and included many details regarding plans for future Gripen versions, isn’t reachable this way. Saab – Official India campaign pages. See also their Gripen India Calendar, a clever marketing campaign. IDSA (Sept 28/12) – Swedish Investments in the Indian Defence Industry: Prospects and challenges. Gripen India (Dec 29/09) – Sea Gripen for Indian Carriers [link dead]. News & Views DID – nEUROn UCAV Project Rolling Down the Runway. Saab is a major player in this stealth attack UAV. Part of the deal included offsetting Swedish government financing in order to keep the JAS-39 Gripen current. Veja Magazine, translated by Saab (February 2014) – Sweden is a model: Interview with Hakan Bushke, CEO of Saab. Talks about Brazil’s F-X2 competition, which Saab won. Flight International (July 13/10) – FARNBOROUGH: Saab plots bright future for Gripen programme. Including a carrier version. Defpro, via Wayback Machine (April 14/09) – Interview with Ake Svensson, President and CEO of Saab AB Saab (July 3/06) – Saab receives 1 Billion SEK order for Continued Development of the Gripen System. Flight International (June 27/06) – New Gripen Variants Studied by Saab. Flight International (June 27/06) – Red Flag Alaska exercise to test Sweden’s Gripens. DID (June 13/06) – Saab Acquires Ericsson Microwave Systems. Once the acquisition is complete, Saab will own all of JAS. DID (May 11/06) – Norway Remains in F-35’s SDD Program But Evaluates Other Aircraft. The Gripen faces off vs. the 5th generation F-35, and the 4th generation Rafale and Eurofighter. DID (May 4/06) – 2007 Budget Proposal Cuts Swedish Gripen Force, Looks to Buy Strategic Lift. The target number put forward is 100 Gripens, down from 204. DID (March 8/06) – Mirage 2000s Withdrawn As India’s MRCA Fighter Competition Changes. Technically, the Gripen is still a possibility for India. Realistically, it’s a long, long shot. edefense Online (July 14/05) – Gripen Settles In. This excellent article covers the Gripen’s evolution and technical capabilities very thoroughly. Dead link, though there’s a partial WayBack version. DID (June 16/05) – Dassault Discusses Global Fighter Market to 2015. Some interesting insights regarding the overall market and replacement timelines. DID (June 13/06) – Gripen Offsets Set – But Drooping Sales Leave Workers Gripin’. BreakingNews.ie (June 8/05): Swedish defence firm Saab lays off 350 [dead link]. DID (May 27/05) – Meteor Missile Will Make Changes to Accommodate F-35. No integration date set, and will be at least 2023. Meanwhile, operational integration of the long range air-to-air missile on Gripen is scheduled for 2015. View the full article
  18. It is one thing to talk about a "Pacific Pivot" or the importance of the Indo-Pacific theater ... but you signal you are serious by your actions. I think Australia has put down a marker ... and they are making the correct move. They see the Long Game. A three-decades-long Australian naval presence in the Middle East will come to an abrupt end this year as the Federal Government grapples with an increasingly uncertain strategic environment closer to home. Defence Minister Linda Reynolds has announced Australia will no longer send a Royal Australian Navy ship to the Middle East every year. ... The shift was flagged in the Government's recent Defence Strategic Update, which declared that deteriorating strategic circumstances would force the military to focus more sharply on the Indo-Pacific and Australia's immediate region. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/xkNyOQguIx0View the full article
  19. Americas Honeywell International won a $15.8 million delivery order for V-22 spare parts. The V-22 Osprey is a joint-service, medium-lift, multimission tilt-rotor aircraft developed by Boeing and Bell Helicopters. Boeing is responsible for the fuselage, landing gear, avionics, electrical and hydraulic systems, performance and flying qualities. The delivery order was a sole-source acquisition using justification 10 US Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. Work will take place in Arizona. Estimated completion date is October 31, 2021. L3 Technologies von a $23.8 million contract to perform survivable super high frequency (SSHF) upgrades to the E-4B platform. The SSHF upgrade seeks to build new capabilities that form the foundation for maintaining the E-4B as an effective nuclear command, control and communications platform. The E-4B is a militarized version of the 747-200 commercial airliner and acts as the United States’ principle airborne command and control operations center during times of war. Originally designed to carry the Secretary of Defense and the Joint Chiefs of Staff during a nuclear attack, the aircraft provides a highly survivable, command, control and communications center to direct US forces, execute emergency war orders and coordinate actions by civil authorities. Work will take place in Utah and Nebraska. Expected completion will be by April, 2022. Middle East & Africa Bombardier Recreational Products (BRP) says it will no longer export its Rotax engines to Turkey after the company become aware that the power plants were installed on the latter’s Bayraktar TB2 unmanned aerial vehicles (UAVs). “We have recently been made aware that some Rotax engines are currently used in military UAVs, and have started a thorough investigation immediately,” Martin Langelier, BPR’s senior vice president and the company’s spokesperson, told Radio Canada International in an email statement. He added that those engines are produced in Austria exclusively for civilian purposes and are certified for civilian use only. An Azerbaijan Bayraktar TB2 was shot down by Armenia last week and components from the wreckage showed that they were made by Canadian companies. Europe The US State Department announced that the Trump administration intends to give two decommissioned F-16 fighters to Bulgaria. The donation was announced during Assistant Secretary for Political and Military Affairs R. Clarke Cooper’s visit to the country. The transfer is subjected to approval by the US Congress. The jets will be used as training aids and general familiarization tools for Bulgarian Air Force personnel. Asia-Pacific A US Air Force C-17 had to make an emergency landing with its nose gear up on October 18 in Afghanistan. US Forces in Afghanistan spokesman Army Col. Sonny Leggett confirmed the incident. A video, taken from a car driving by the runway, shows the C-17 landing on its rear landing gear and then easing its nose down as it slows to a stop, with sparks streaking from its fuselage. Pictures of the C-17 on the ground after the emergency landing show the markings of the 62nd and 446th airlift wings at Joint Base Lewis-McChord in Washington. VT-ALW, the second Boeing 777 airliner modified as the VVIP aircraft for the Indian government has arrived home on October 24. The first aircraft, VT-ALV, was delivered to India on October 1.The B777 is fitted with the state of the art defense systems, including missiles and jamming mechanisms. The plane has a state of the art missile defense system called as the Large Aircraft Infrared Countermeasures (LAIRCM) and Self-Protection Suites (SPS). Today’s Video Watch: US NAVY’S JOHN S.MCCAIN, JMSDF’S JS KIRISAME & AUSTRALIAN ROYAL NAVY’S HMAS ARUNTA JOIN HANDS ! View the full article
  20. E-4B NAOC (click to view full) In December 2005, the U.S. Air Force awarded Boeing a contract as Product Support Integrator (PSI) for the USAF’s E-4 National Airborne Operations Center fleet. These 4 modified 747-200s were introduced in 1974, and serve as complete flying command posts for national and military authorities. As one might imagine, they are hardened to resist the side-effects of nuclear attack, such as electro-magnetic pulse effects. The 2005 contract was a 5-year, indefinite delivery/indefinite quantity contract vehicle, with one 5-year option and a $2 billion cost cap. That’s a lot of money for a small fleet, but the E-4’s plays a military and civil role that gives the program enough leverage to justify it. A long history of support from Boeing includes a number of modernizations, and those continue for various systems within the fleet. DID looks at the aircraft, the program, and ongoing awards. The E-4B and Its Update Team The USAF operates 4 of these 747-200 aircraft variants, assigned to the 55th Wing at Offutt Air Force Base, NE. They’re big planes, for a set of big missions. The E-4B is designed for full national command, including the President of the United States and/or successors, Secretary of Defense, and/or Joint Chiefs of Staff. These command functions extend to nuclear forces if necessary. It also has a civil role in the event of natural disasters. As of 1994, the E-4 fleet will also ferry Federal Emergency Management Agency crews to natural disaster sites and serving as a temporary command post on the ground until facilities can be built on site. E-4B support can cut timelines from days to hours. E-4B overview click for video So, how does this relate to other command planes in the USAF’s inventory? The VC-25 Air Force One is the President’s transport plane, with a much nicer interior and secondary command functions. An E-4B is kept on full alert at all times, and 1 remains relatively close to Air Force One so that the American President can get into an E-4B quickly from anywhere in the world. The smaller 707-based E-6B Mercury/TACAMO has a simpler primary mission: it mirrors the command systems of the military’s STRATCOM authority for nuclear missiles, including VLF communications with American nuclear ballistic missile submarines. Its “Looking Glass” theater command post role offers helpful redundancy, but it would never be the primary option if a choice is available. Inside tour click for video The E-4A debuted in late 1974, and the first E-4B conversion was delivered in 1980. By 1985, all E-4s were E-4Bs. As one might imagine, the E-4B has always had electromagnetic pulse protection, an electrical system designed to support advanced electronics, and communications equipment that’s as new as the requirements for hardened systems can offer. A spool within the aircraft can extend a long antenna up to 5 miles behind the plane, for VLF transmissions. E-4B improvements include newer nuclear and thermal effects shielding, acoustic control, an improved technical control facility, and an upgraded air-conditioning system for cooling all those electrical components. An advanced satellite communications system improves worldwide communications. The main deck is divided into 6 functional areas: a command work area, conference room, briefing room, an operations team work area, and communications and rest areas. An E-4B crew may include up to 112 people, including a joint-service operations team, an ACC flight crew, on-board maintenance and security personnel, a communications team and “selected augmentees.” The goal of the 2005 PSI contract is to provide increased readiness for the fleet, and integrate multiple contracts (Contractor Logistics Support, Engineering Support Services, Message Processing System, and Block I upgrades) into a single best-value contract. USAF Air Combat Command (ACC) is the single-resource manager for the E-4B, and provides aircrew, maintenance, security and communications support. The Joint Chiefs of Staff actually control E-4B operations, and provide personnel for the airborne operations center. Boeing remains the lead system integrator for the E-4 fleet, and leads a team that also includes L3 Communications, Rockwell Collins, and Greenpoint Technology Inc. Contracts & Key Events FY 2012 – Today E-4B (click for full photo) October 26/20: SSHF L3 Technologies von a $23.8 million contract to perform survivable super high frequency (SSHF) upgrades to the E-4B platform. The SSHF upgrade seeks to build new capabilities that form the foundation for maintaining the E-4B as an effective nuclear command, control and communications platform. The E-4B is a militarized version of the 747-200 commercial airliner and acts as the United States’ principle airborne command and control operations center during times of war. Originally designed to carry the Secretary of Defense and the Joint Chiefs of Staff during a nuclear attack, the aircraft provides a highly survivable, command, control and communications center to direct US forces, execute emergency war orders and coordinate actions by civil authorities. Work will take place in Utah and Nebraska. Expected completion will be by April, 2022. Sept 30/14: Boeing Aerospace Operations in OK City, OK receives a $9.8 million contract modification to design and develop a modern “E-4B low frequency transmit system,” through to the stage of system requirements review and finalized system requirements. $4.7 million is committed immediately, and this is just the 1st stage of a FY14$ 92 million effort to replace onboard LF/VLF systems that are considered obsolete. Initial Operational Capability for the new system is planned for FY 2019. Low frequency is also known as the kilometer band, and is useful for long-range transmission because it can be bounced off of the ionosphere and diffract over obstacles. A small subset in the 30-50 kHz range can even communicate with submarines that aren’t too far underwater. Surer sub-surface communication can be had below this range through ELF and VLF sites, but those methods require structures whose size is measured in square miles. The USA decommissioned its fixed ELF sites in 2004, but continues to maintain several VLF locations. Work will be performed at OK City, OK, and is expected to be complete by April 30, 2015. The USAF Life Cycle Management Center in Tinker AFB, OK, manages the contract (FA8106-07-C-0001, PO 0204). See also Briefing slide [PDF]. Sept 26/14: Boeing in Wichita, KS receives a sole-source $26.6 million task order for E-4B programmed depot maintenance and modifications. All funds are committed immediately, using USAF FY 2014 O&M and aircraft budgets. Work will be performed at San Antonio, TX, and is expected to be complete by May 15/15. This award is the result of a sole-source acquisition. The USAF Life Cycle Management Center at Tinker AFB, OK manages the contract (FA8106-06-D-0001, 0047). June 2/14: FAB-T terminals. Raytheon in Marlborough, MA receives a $298 million firm-fixed-price and cost-plus-fixed-fee contract modification for 84 FAB-T Command Post Terminals (CPT), which will allow broadband-speed reception from the USAF’s hardened, secure new AEHF satellites. FAB-T CPTs will equip E-4B NAOC and E-6B Mercury Block II command post aircraft, as well as some ground and mobile locations. After FAB-T reaches Milestone C, Phase 2 production contract options for Low-Rate Initial Production and beyond will open up for Raytheon, expanding the contract considerably. It’s a sharp blow to prior incumbent Boeing, but not entirely unexpected. Buying FAB-T terminals for USAF B-2 and B-52 bombers, RC-135 SIGINT/ELINT aircraft, or other planes, would require another procurement process. Work will be performed in Marlborough, MA and Largo, FL, with the Florida location serving as the assembly point. USAF FY 2013 through 2019 budgets will fund FAB-T buys over time, with just $31,274 committed immediately. Two bids were solicited and two received. The USAF Life Cycle Management Center/HNSK at Hanscom AFB, MA, solicited 2 bids, and received 2 (FA8705-13-C-0005, PO 0002). Sources: Pentagon DefenseLINK | Raytheon, “Raytheon awarded $298 million for US Air Force FAB-T satellite terminal program” | Defense News, “Space Fence, FAB-T Awards Show an Emboldened DoD”. Dec 3/13: Support. Boeing in Wichita, KS receives a $75.7 million firm-fixed-price contract modification, attached to the $1 billion E-4B “Product Service Integrator” deal (q.v. Dec 8/05). They’ll provide support and spares, programmed depot maintenance, modifications, and related activities. $24.5 million in FY 2014 operations and maintenance funds are committed immediately. The Pentagon said that work would be performed in Wichita, KS and is expected to be complete by Nov 30/14. That’s half-right. Wichita has traditionally been the E-4’s base of support, but Boeing announced their intent to close the plant in January 2012, and it’s still on schedule for closure in March 2014. E-4 work has been moved to Oklahoma City, OK and San Antonio, TX. The USAF Life Cycle Management Center/WLKLC at Tinker AFB, OK manages the contract (FA8106-06-D-0001, PO 0030). See also Wichita Eagle, “Boeing: Work from Defense contract won’t be done in Wichita”. July 1/13: Broadband SATCOM. Raytheon Network Centric Systems in Marlborough, MA receives a $34 million contract modification to continued development and testing of air (E-4, E-6) and ground fixed and transportable command post terminals with presidential and national voice conferencing. The systems are a parallel project award under the Family of Advanced Beyond line-of-sight Terminals (FAB-T) program, which leverages new AEHF hardened broadband satellites. The goal is a production-ready system by September 2014. Work will be performed at Marlborough, MA, and is expected to be complete by by October 2013. Fiscal 2012 Research and Development funds are being obligated at time of award. Air Force Life Cycle Management Center/HNSK, Hanscom Air Force Base, MA manages the contract (FA8307-12-C-0013, PO 0013). Sept 10/12: Broadband SATCOM. The Raytheon Co. Network Centric Systems in Marlborough, MA, is being awarded a $70 million firm fixed price contract for development, testing and production of FAB-T engineering development models of air (E-4B, E-6B TACAMO), ground fixed and transportable Command Post Terminals with Presidential and National Voice Conferencing (PNVC). FAB-T terminals are designed to work with the US military’s new AEHF hardened broadband satellites. The location of the performance is Marlborough, MA. Work is to be complete by July 2013. The AFLCMC/HSNK at Hanscom AFB, MA manages the contract (FA8307-12-C-0013). Feb 24/12: Raytheon in Largo, FL receives an $8.9 million cost-plus-fixed-fee price contract for 1 installation lot of E-4B Mod Block 1 audio infrastructure obsolescence upgrades. Work will be performed in Largo, FL and is expected to be complete by Feb 28/13. The OC-ALC/GKSKH at Tinker Air Force Base, OK manages the contract (FA8106-12-C-0003). FY 2005 – 2011 E-4B mission click for video Sept 19/11: Delivery. Boeing returns another E-4B to Offut AFB, NE after its programmed depot maintenance (PDM). Boeing’s E-4B program manager, Glenn Winkler, referred to “over and above” surprise issues uncovered during the maintenance, but the maintenance and modifications were completed, and the plane flew on to Offut AFB, NE after a new paint job by Boeing partner L-3 in Greenville, TX. Boeing. June 7/11: CNS/ATM upgrade. Boeing announces an unspecified USAF award for the E-4B Communications Navigation Surveillance/Air Traffic Management (CNS/ATM) upgrade, Phase 1. The CNS/ATM upgrade will bring the fleet in line with new Federal Aviation Administration requirements for flight in civilian and international airspace, and will also allow the E-4Bs to operate more efficiently at airports and in crowded airspace. Their solution will be derived from current Boeing 737 cockpits, and the 4 E-4Bs will be upgraded in 3 phases. Phase 1 includes next-generation flight-management hardware and software, as well as a multimode receiver radio that combines several aircraft systems into a single component. Boeing Global Transport & Executive Systems (GTES) will incorporate the Phase 1 upgrades during the E-4Bs’ regularly scheduled maintenance cycle at Boeing’s Wichita, KS facility. The initial E-4B CNS/ATM Phase 1 aircraft is expected to enter flight test in Q4 2012. Aug 20/10: Accident. A USAF Air Combat Command Accident Investigation Board rules that a May 12/10 accident at Offut AFB, NE was caused by pilot error. The E-4B’s tail hit the runway between 2-3 feet past the centerline, causing about $3.1 million worth of damage. The aircraft was quickly brought to a stop, with no injuries or further property damage. According to the report, the board ruled that major factors included misperception of the operational conditions in altitude, glide path and descent rate on the aircraft’s short final; breakdown in visual scan during a night landing; overcontrolling the input to the yoke of the aircraft; and procedural error recovery technique that resulted in too much pitch. USAF. Sept 21/07: Delivery. Boeing announces the delivery of a refurbished E-4B National Airborne Operations Center to the U.S. Air Force Strategic Command after completing programmed depot maintenance (PDM) at its modification center in Wichita, KS. Dec 8/05: Support. Boeing in Wichita, KS receives a maximum $1 billion indefinite delivery/ indefinite quantity contract fee to be the E-4B’s Product Support Integrator (PSI): a sole source, performance based effort to take care of logistics, maintenance, modernization, and engineering work, combining a number of separate contracts (CLS, ESS, MPS, & Block I) into one contract. Boeing has supported the E-4 fleet of 4 modified Boeing 747 aircraft for 25 years now, offering contractor logistics support, engineering services and technical order support. Solicitation began August 2005, and negotiations were complete December 2005. The indefinite delivery/ indefinite quantity contract will have a 5-year basic period, plus 1 more 5-year option period, which would extend it to FY 2016. The Oklahoma City ALC at Tinker AFB, OK (FA8106-06-D-0001, announcement Feb 13/06). Boeing’s corporate release pegs the total value at up to $2 billion. $1 billion performance-based support deal Additional Readings USAF – E-4B. Boeing – E-4B Advanced Airborne Command Post. TIME Battleland (April 2/13) – Costly Flight Hours. If the C-5C is removed as a massive outlier (even compared to other C-5s), The E-4B is the most expensive plane per flight hour, just ahead of Air Force One. Both cost over $160,000 by AFCAP figures, which include aircraft modifications as a cost. Defense Media Network (April 23/11) – E-4B Emergency Command Post Doubles as SECDEF’s Ride. Other C2 Aircraft DID – Boeing Contracted to Support Air Force One VC-25s. DID – The USA’s E-6 Fleet: TAke Charge, And Move Out!. View the full article
  21. We don't do politics here ... but we do touch on how politics can impact national security issues ... so here we go! Why has national security almost been a non-issue this election? What to expect if Trump gets a second term. What and who will come to the front if Biden is elected. What will drive the challenge regardless of who gets elected? Come join us for the full hour this Sunday from 5-6pm Eastern as we discuss this and more with an open chat room and open phones if you want to join in. It will be an open topic, open phones free for all ... so if you think our topics are bogus, bring your own! If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/7WbNVXfrsusView the full article
  22. http://1.bp.blogspot.com/-RcvUrMT2jmg/Vbr0UnCZ3GI/AAAAAAAAKFw/D6h-Gx0SfkQ/s320/horace-greasley-confronting-heinrich-himmler-like-a-boss.jpg I look at what some men did so young, and I look at pity at what little I have done, and am perplexed about all the complaining from others. That photograph on the right? That is Horace Greasley looking down at Himler. As Peter outlines, He admitted to not know who the man was, only that he was a high ranking Nazi. He is shirtless because he was showing Himmler how skinny he was and was requesting more rations for the prisoner. Because that is what you do when you are carrying on a secret love affair with a Jewish girl that could get you killed, you stand up to the head of the SS and the guy most responsible for the Holocaust. He was maybe 25 when that was happened. What else did he do? Via TheTelegraph; The reason for the frequency with which Greasley put his life in danger, he admitted with engaging good humour and frankness, was simple: he had embarked on a romance with a local German girl. Rosa Rauchbach was, if anything, running even greater risks than Greasley. A translator at the camp where he was imprisoned, she had concealed her Jewish roots from the Nazis. Discovery of their affair would almost certainly have meant doom for them both. Greasley recounted the almost incredible details of his wartime romance in the book Do The Birds Still Sing In Hell? (2008), which he had been "thinking about and threatening to write" for almost 70 years. But while the book is described as an "autobiographical novel", the story was largely confirmed at his debriefing by MI9 intelligence officers shortly after the war. ... He was 20 and working as a young hairdresser when Hitler invaded Czechoslovakia, ... But his war proved a short one. After seven weeks' training with the 2nd/5th Battalion Leicestershire Regiment, he landed in France at the end of the "Phoney War" as one of the British Expeditionary Force; on May 25 1940, during the retreat to Dunkirk, he was taken prisoner at Carvin, south of Lille. There followed a 10-week forced march across France and Belgium to Holland and a three-day train journey to prison camps in Polish Silesia, then annexed as part of Germany. Many died on the way, and Greasley reckoned himself lucky to have survived. In the second PoW camp to which he was assigned, near Lamsdorf, he encountered the 17-year-old daughter of the director of the marble quarry to which the camp was attached. She was working as an interpreter for the Germans, and, emaciated as he was, there was, Greasley said, an undeniable and instant mutual attraction. Within a few weeks Greasley and Rosa were conducting their affair in broad daylight and virtually under the noses of the German guards – snatching meetings for trysts in the camp workshops and wherever else they could find. But at the end of a year, just as he was realising how much he cared for Rosa, Greasley was transferred to Freiwaldau, an annex of Auschwitz, some 40 miles away. The only way to carry on the love affair was to break out of his camp. ... Sometimes, Greasley reckoned, he made the return journey three or more times a week, depending on whether Rosa's duties among various camps brought her to his vicinity. His persistence in their love affair was not the only testimony to his daring. A wartime photograph shows Heinrich Himmler, head of the SS, inspecting a prison camp and a shirtless skinny PoW close to the fence confronting him. ... Rosa repaid his attentions, he said, by providing small food parcels and pieces of equipment for him to take back into the camp, eventually including radio parts which enabled 3,000 prisoners to keep up with the news by listening to the BBC. Greasley was held prisoner, working for the Germans in quarries and factories, for five years less one day, and was finally liberated on May 24 1945. He still received letters from Rosa after the war's end, and was able to vouch for her when she applied to work as an interpreter for the Americans. Not long after Greasley got back to Britain, however, he received news that Rosa had died in childbirth, with the infant perishing too. Horace Greasley said he never knew for certain whether or not the child was his. After demobilisation he returned to Leicestershire, swearing that he would never take orders from anyone again. He ran a hairdressers', a taxi firm and a haulage company in Coalville, where he met his wife, Brenda, at a fancy dress party in 1970. They married in 1975, retiring to the Costa Blanca in Spain in 1988. Greasley was delighted with the publication of his book and was to have undertaken a return visit to Silesia for a television company this spring, having, he said, been promised the company of "a very attractive 21-year-old female nurse for the entire journey". He died in his sleep before the offer could be made good. Horace Greasley is survived by his wife and by their son and daughter. First posted in July 2015. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/vq87-FkMnqsView the full article
  23. Americas The US Air Force has started a search to find a supplier for its Global Precision Attack Weapon, a small, lightweight bomb that fits in the weapons bays of the B-21 and F-35. The weapon is to have “high loadout” and digitally engineered, Air Force magazine reports. „High load“ means many can be carried on a single platform, suggesting a small size—and digitally engineered, with open-systems architecture. It should enable “maximum flexibility to integrate a suite of technologies,” including position, navigation, and timing and guidance, navigation, control; as well as “cockpit-selectable warhead effect,” fuzing, sensors, propulsion, “signature optimization” or stealthiness, “maritime apps, multimode seeker, affordable mass, and autonomy/sensing.” GPAW will have to operate “within the joint, all-domain functional environment against near-peer competitors.” It was suggested the weapon should be able to collaborate autonomously. The announcement modified a previous announcement published by the Air Force and Special Operations Command in the spring. This year’s Trident Warrior 20 exercise saw the US Marine Corps deploy four oceanographic sensors from its MV-22Bs for the first time. Dropped into the Pacific Ocean by VMM-163, these sensors were previously deployed from the back of C-130s or directly by ships. The data collected would provide the Marines with the best environmental awareness possible prior to conducting amphibious operations. Trident Warrior is an annual large-scale field experiment in operational naval environments. Middle East & Africa The United States contracted the sale to Jordan of one Sikorsky UH-60 Black Hawk helicopter for royal duties. The Department of Defense announced that Sikorsky had been awarded $13.7 million for a single UH-60M to be delivered by November 30. Fiscal 2010 Foreign Military Sales (Jordan) funds for the full amount were obligated at the time of the award. “The UH-60M will supplement Jordan’s existing Royal Squadron fleet of Black Hawk helicopters and be used to facilitate the movement of the Jordanian royal family in a safe and efficient manner,” the DSCA notification said. Europe Leonardo successfully demonstrated unique integrated capabilities between a manned aircraft and an unmanned aerial vehicle (UAV). This took place in the UK during Manned-Unmanned Teaming (MUMT) trials between a Leonardo AW159 Wildcat helicopter and a semi-autonomous UAV from Callen-Lenz Associates. The demonstration was part of the British Army’s MUMT themed Army Warfighting Experiment (AWE) 19, and was planned and executed by Dstl and took place on Salisbury Plain in September. Asia-Pacific A notice released Wednesday says the State Department has approved the sales to the Taipei Economic and Cultural Representative Office in the United States of 135 Standoff Land Attack Missile Expanded Response (SLAM-ER) missiles and related equipment estimated for more than $1 billion, 11 High Mobility Artillery Rocket Systems (HIMARS) M142 Launchers and related equipment for an estimated $436.1 million and six MS-110 Recce Pods and related equipment for an estimated $367.2 million. “This proposed sale serves U.S. national, economic, and security interests by supporting the recipient’s continuing efforts to modernize its armed forces and to maintain a credible defensive capability,” the Defense Security Cooperation Agency announcement said. Today’s Video Watch: Why America’s V-22 Osprey Just Keeps Getting Better – Able to Fly Across the Pacific Ocean View the full article
  24. Americas Lockheed Martin won a $138.8 contract modification, which adds scope to continue the development of pilot training device software to align the F-35 air system with continued capability development. Additionally, this modification provides for testing and continuous re-certification activities for dual capable F-35 aircraft as Block 4 capabilities are developed, matured and fielded in support of the Navy, Marine Corps, Air Force and non-Department of Defense (DOD) participants. The Lockheed Martin F-35 Lightning II is an American family of single-seat, single-engine, all-weather stealth multirole combat aircraft. Just recently it was reported, that by the end of 2020, F-35 fighter jets from Lockheed Martins production will be equipped with a modified lightning protection system that will fix problems discovered earlier this year, the company’s head of production said. Work under the current modification will take place in Texas. Expected completion date will be in June 2024. The first live fire test of the MK 57 Vertical Launching System on the first-in-class USS Zumwalt, using a Standard Missile-2, was executed successfully on the Naval Air Weapons Center Weapons Division Sea Test Range, Point Mugu, earlier this month. The Zumwalt, delivered to the Navy in April, successfully showed off its ability to detect, track and engage an anti-ship cruise missile with an SM-2, the US Navy announced this week. The test also assessed the ship’s ability to hold up against the shock and vibration of weapon firing, along with any hazards and degradations resulting from the live firing, the Navy said. At 610 feet long and 80 feet wide, which is 100 feet longer and 13 feet wider than the Arleigh Burke Class destroyer, Zumwalt has the space to conduct a wide array of surface, undersea and aviation missions, the Navy has said. Middle East & Africa The UN’s Libya envoy said she was “quite optimistic” about the prospects of a ceasefire emerging from talks underway in Geneva between the two warring factions in the troubled north African country. After two days of face-to-face discussions at the United Nations, which are scheduled to last until Saturday, the two sides have agreed to open internal land and air routes. They also agreed to maintain the current calm on the frontlines and to avoid military escalation, and on moves which should ensure the increase of oil production. “The two sides have reached agreement on several important issues which directly impact the lives and welfare of the Libyan people,” Stephanie Williams, the head of the UN Support Mission in Libya (UNSMIL), told a press conference. “I’m quite optimistic… there is an air of seriousness and commitment,” she said on the prospect of a ceasefire. Europe Eurofighter formally submitted to Spain its offer to provide a further 20 Typhoon aircraft under the country’s Project ‘Halcon’ (Falcon). Delivery of the offer, which was disclosed by the consortium on 19 October, came three months after Spain announced that it was seeking to augment its existing Typhoons and to begin the process of replacing its Boeing EF-18 Hornet fleet. “Eurofighter has submitted proposals for the replacement of the Spanish Air Force’s EF-18s which are based on the Canary Islands. Spain is looking to secure 20 new Eurofighter Typhoon aircraft to boost its existing fleet under what is called Project Halcon,” the consortium said. Asia-Pacific Bucking the trend, the Republic of Korea Air Force (RoKAF) will not be assigning a local nickname for the RQ-4. Instead, the unmanned air vehicle will still be called Global Hawk. The service had given the nickname “Freedom Knight” to the F-35A last year. Separately, Korea Herald reports that the Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) system for the RQ-4 is expected to be delivered to the country next month. The “due to prolonged negotiations between the US government and its manufacturer, along with the COVID-19 situation,” the Defense Acquisition Program Administration (DAPA) mentioned in a report to the National Assembly. The US government made requests in July and August this year to Indonesia for its P-8A to land and refuel in the South East Asian country but those requests were rejected. Indonesia’s President Joko Widodo personally rejected those requests, Reuters reports. Representatives for Indonesia’s president and defense minister, the US State Department press office and the US embassy in Jakarta did not respond to requests for comment. Representatives for the US Department of Defence and Indonesia’s foreign minister Retno Marsudi declined to comment. The proposition, which came as the US and China escalated their contest for influence in Southeast Asia, surprised Indonesia’s government, the officials said, because Indonesia has a long-standing policy of foreign policy neutrality. The country has never allowed foreign militaries to operate there. Today’s Video Watch: STAND-OFF ANTI-TANK (SANT) MISSILE TESTED SUCCESSFULLY | CHINESE TANKS ON CROSSHAIR! View the full article
  25. Italian Eurofighters (click to view full) The multi-national Eurofighter Typhoon has been described as the aerodynamic apotheosis of lessons learned from the twin engine “teen series” fighters that began with the F-14 and F-15, continued with the emergence of the F/A-18 Hornet, and extended through to the most recent F/A-18 Super Hornet variants. Aerodynamically, it’s a half generation ahead of all of these examples, and planned evolutions will place the Eurofighter near or beyond parity in electronic systems and weapons. The 1998 production agreement among its 4 member countries involved 620 aircraft, built with progressively improved capabilities over 3 contract “tranches”. By the end of Tranche 2, however, welfare state programs and debt burdens had made it difficult to afford the 236 fighters remaining in the 4-nation Eurofighter agreement. A 2009 compromise was found in the EUR 9 billion “Tranche 3A” buy, and the program has renewed its efforts to secure serious export sales. Their success will affect the platform’s production line in the near term, and its modernization plans beyond that. Eurofighter: Design & Evolution Eurofighter, Spain (click to view full) The Eurofighter program emerged out of a long and conflicting set of multinational efforts to design a new European fighter. By 1983, Britain, France, Germany, Italy and Spain had coalesced around the Future European Fighter Aircraft (FEFA) program. That partnership lasted only until 1985, as differences with France over carrier compatibility, weight limits, and French insistence on the lead industrial role, ended their partnership. Britain, Germany, Italy and Spain established Eurofighter Jagdflugzeug GmbH in 1986 to manage the Eurofighter project, while France went its own way and developed their Rafale fighter. Both projects went on to develop clipped delta, canard-equipped twin-engine fighters, whose “radar shaping” designs significantly lowered their radar signature compared to earlier fighters like the Mirage F1, Tornado, or F/A-18A-D Hornet. Even so, it would be a misnomer to call these European jets stealth aircraft. The standard term is a “4+ generation” fighter, distinguishing them from “5th generation” aircraft like the American F-22A Raptor and Indo-Russian PAK-FA. While the Rafale’s development emphasized weapon load and multi-role capabilities, squeezed budgets and ample fleets of strike aircraft led Eurofighter’s partner nations to focus on the air superiority role. An excellent aerodynamic design, very good thrust-to-weight ratio, and fast slew-and-point capability was fused with a very integrated set of electronic sensor and defensive systems, including a pilot-friendly cockpit design that offered the first use of voice commands in a fighter. This made Eurofighter’s Typhoon very capable in its chosen aerial role, able to compete with or best serving opponents short of the American F-22A. Typhoons even proved capable of armed supercruise during 2011 Libyan operations, but this was only possible with low-drag “4 + 2” air-to-air missile configurations, at high altitudes, to Mach 1.2. PIRATE IRST: B-2, ICU (click to view full) For air-to-air combat, the Eurofighter currently relies on long range detection using its mechanically-scanned, phased array ECR-90 CAPTOR radar and PIRATE IRST(Infra-Red Search & Track) system, coupled with a good array of advanced air-to-air weapons. Non-British Eurofighters will also have a 27mm Mauser cannon on board, considered by many observers to be the best fighter cannon on the market. On defense, the Typhoon’s Praetorian (formerly EuroDASS) self-protection suite is designed for 360 degree coverage, with high automation. The Defensive Aids Computer (DAC) controls a package that includes Towed Radar Decoys, a Missile Approach Warner (MAW), wingtip ECM pods, and a Countermeasures Dispensing System (CMDS). They are integrated with each other, and with the Eurofighter’s radar and IRST. Unfortunately for the consortium, this aerial combat strength ended up being the flip side of their biggest weakness. Initial “Tranche 1” machines were severely hobbled on the export market by their poor ground attack capabilities, a serious weakness in a world of multi-role fighters. When combined with the plane’s $100+ million cost, the result has been a slew of lost export competitions. Dassault’s Rafale, which had gaps of its own, could not capitalize on that failing, and is still looking for its first export win. Embarrassingly, the Eurofighter has usually lost to modernized, multi-role versions of the very F-16s and F-15s it was meant to supplant. That, in turn, has affected both prices and the pace of upgrades. A list of current weapons may help snap the plane’s evolution into clearer focus: As the list above notes, the Tranche 2 fighters that began delivery to member countries in 2008 have added precision ground attack capabilities under programs like P1E, but still fall well short of the full capabilities and weapon arrays offered by competitors like the American F/A-18E/F Super Hornet and F-15E Strike Eagle. Their lack of a helmet-mounted display (HMD) compounded this issue, preventing the Typhoon from taking full advantage of its new air-to-air missiles, and detracting from their ground attack capabilities. A BAE “Striker” HMSS Helmet-Mounted Display is in low-rate production now, but it didn’t become operational until 2011. Tranche 3 Eurofighters will reportedly be based on the Tranche 2 standard, with provisions for dorsal conformal fuel tanks (CFTs) that can extend range while creating minimal drag. The other big change involves upgraded power systems and electronics that can more easily support future growth and upgrades. The weapon bus can handle fiber optic cabling, onboard computing is upgraded, and a high speed data network improves sharing with weapons or other platforms. The most important upgrade remains a CAPTOR “E-Scan” Active Electronically Scanned Array (AESA) radar to replace the ECR-90. Industry is developing it for a 2015 delivery date, but there doesn’t seem to be a contract framework in place. The lack of an AESA radar leaves the Eurofighter a generation behind its American counterparts in radar technology, and until it catches up, it’s likely to suffer in export competitions. F-35A Lightning II (click to view full) Even as these upgrades are being discussed, however, the Eurofighter’s export window as a leading-edge fighter choice is closing. The F-35 Joint Strike Fighter is aerodynamically inferior, but it offers a stealth fighter with a tested AESA radar, a wider array of sensors, and sensor fusion at an even higher level. By the end of this decade, 5th generation projects like the Russo-Indian PAK-FA will also become viable choices for some export targets. Successful upgrades can keep the Eurofighter Typhoon competitive, even in that environment, if its production line lasts long enough. The key word will be “competitive.” As an example, see this comparison of the Eurofighter vs. Saab’s single-engine contemporary, the 4+ generation JAS-39 Gripen. Saab already has a development contract for an ES-05 Raven AESA radar, and is significantly ahead in weapons integration: Eurofighter: What’s Next? A Weak Core Eurofighter 2020 (click to view full) Tranche 3 aircraft are expected to deliver a few important new capabilities, including an AESA radar and Conformal Fuel Tanks. At present, however, only Tranche 3 Eurofighters are designed to add CFTs. The biggest question at present is whether Tranche 3A aircraft will be the only CFT-capable Typhoons. The status of core countries’ Tranche 3B orders is very unclear, but Britain and Germany have already firmly ruled out further buys, and it appears likely that Tranche 3A will be the last production order from the original member countries. In 2011, Eurofighter’s CEO placed the end of production at 2015, barring a major export win like India or Japan, or a Tranche 3B purchase from the consortium partners. By 2014, that date had been revised to 2017/18, but 2015 still marks the point that parts of the supply chain will begin to stop. This will leave core countries with smaller fleets, for 2 reasons. One is limited orders. The other is Typhoon fleets that won’t serve in parallel. UK Air Chief Marshal Sir Glenn Torpy has said that he expects the RAF to operate on the basis of a Typhoon fleet of 120 aircraft. By the time the last jets of the 3A tranche come into service, between 2015 and 2020, the first batch of Tranche 1 Typhoons would be approaching the end of their life. This is likely to be true in other partner countries as well. A 2009 Der Spiegel article illustrates some of the issues in Germany, for instance: “The German air force didn’t get the first jets until July 2006. It now has 38 Eurofighters. But 14 of them have been sent back for repairs. Some of them still suffer instrument failure during flights. Of the six single-seat aircraft at the Neuburg air base only four are fit for service on average. That’s just enough to provide day and night cover for Germany’s airspace. The defense ministry recently admitted to budget committee members that the approved sum of [EUR] 14.7 billion would only be enough to pay for 143 Eurofighters. Parliament would have to approve an additional [EUR] 3 billion if the air force was to get the planned 180 aircraft…” Upgrade Lifeline? IPA7 tests KEPD-350s (click to view full) At the same time, remaining aircraft in these existing fleets offer strong opportunities for piecemeal upgrades, from moves to give Tranche 1 planes precision ground attack capabilities, to helmet-mounted sights, AESA radar retrofits, and even thrust-vectoring engines to create super-maneuverability. Conformal fuel tanks (CFTs) could also become possible, if Eurofighter devises an appropriate upgrade process. It would be logical to make that part of a life-extension structural refit, which would help existing customers keep expensive investments in service for longer. Key export order competitors like the F/A-18E/F Super Hornet, F-15 Strike Eagle, F-35 Lightning II, JAS-39 Gripen, Rafale, and Russian SU-30MKx/SU-35 already field every one of these capabilities – but none currently field all of them. Weapon upgrades are absolutely expected. Expansion of the Typhoon’s ground attack weapon choices is an ongoing process. MBDA’s medium-range stealthy Storm Shadow cruise missile is in testing for full integration by 2015, reportedly thanks to Saudi Arabia and Oman. Taurus’ similar KEPD 350 will undergo partial testing at the same time. Saudi Arabia also reportedly wants to add the French Damocles surveillance and targeting pod, which makes sense because the Israeli LITENING-III runs up against their boycott. Storm Shadow (click to view full) In the air, 2017 is expected to mark full integration of the long-range Meteor air-to-air missile. Over the medium term, planned weapons reportedly include Diehl’s medium-range PILUM and HOSBO glide bombs, short-range MBDA Brimstone light strike missiles, and possibly their longer-range SPEAR-3 successors. Raytheon’s AGM-88 HARM anti-radar missiles have been discussed, and they would fix a critical deficiency for an important mission. So, too, would anti-ship missiles, which all of its competitors already carry. None of these items come with a schedule, however. National budgets will play a role in the pace of these upgrades, as they have throughout the Eurofighter’s history. The question, for current and future customers, is timing. Until integration is done, the absence of key capabilities like long-range precision strike and anti-radar missiles will continue to hobble the Typhoon’s positioning as a fully multi-role aircraft. What has changed now is the consortium’s seriousness about winning exports, along with a dawning understanding that most of these upgrades are now basic requirements for serious players. The question is whether this understanding came too late. Exports Required Eurofighter Display click for video Export wins will be necessary in order to finance the full range of timely improvements, and keep the line open past 2017/18. An August 30/09 Financial Mail article reported that Eurofighter GmbH was hoping for sales of 300 Eurofighter Typhoon to 10 export countries by 2020, but that will be very challenging. The Eurofighter’s cost of $100-140 million each is already creating tough sledding against F-35 stealth fighters whose production quantities will eventually create prices in the $100 million range, and F/A-18 Super Hornets or JAS-39E/F Gripens that can be sold for around $60-70 million. With existing operators interested in selling some of their aircraft, even an export win or 2 may not change the Eurofighter’s overall production numbers. The Tranche 3A release from Eurofighter cited active export campaigns in Switzerland, India, Japan, Romania, Greece, and Turkey, while “exploring possible opportunities” in South Korea, Bulgaria, Croatia, et. al. Romania (F-16s) and Turkey (F-35A) never went ahead with a real competition. Subsequent losses in Brazil (JAS-39E/F Gripen), India (Rafale, unfinalized), Japan (F-35A), South Korea (F-35A), Switzerland (JAS-39E Gripen, canceled by referendum), and the UAE (TBD, q.v. Dec 19/13 entry) have hurt. Greece, which canceled an order for 30-60 Eurofighters in 2005, and bought F-16s instead, still had plans for an additional next-generation fighter buy to counter Turkey’s planned purchase of 100 F-35As. With Greek finances in tatters, however, don’t hold your breath. After that, Eurofighter’s options narrow sharply. On the bright side, the Gulf states of Bahrain, Kuwait, and Qatar all have fighter competitions in progress, and successful sales to Saudi Arabia and Oman help the Typhoon’s chances within the Gulf Cooperation Council. With Japan and South Korea out, the once-promising Asian market has few options left for Eurofighter. A MiG-29N replacement competition in Malaysia has run into trouble due to finances, and they are exploring leasing deals. That will be a tough win for Eurofighter. In Europe, Eastern European countries like Bulgaria and Croatia would normally be problematic sales due to the Eurofighter’s costs, but Germany is pushing hard, and offering umbrella maintenance agreements and training packages. Even if they succeed, however, the end result is just a handful of sales. Typhoon at Sea? Naval variant, cutaway (click to view full) India was pitched with very explicit offers to have their needs and investments drive the Typhoon’s future enhancements, and significant roles for Indian industry. At Aero India 2011, Eurofighter and BAE even unveiled an initial internally-funded design for a navalized Eurofighter than can operate from aircraft carriers. In a direct nod to potential Indian sales, they touted the plane as being able to take off from “ski jump” carriers without catapults – a design that describes all of India’s current and planned carriers, as well as the initial design for Britain’s own Queen Elizabeth Class. Eurofighter GmbH describes the goal as 95% commonality with land-based aircraft, and required changes as “limited… include a new, stronger landing gear, a modified arrestor hook and localised strengthening on some fuselage sections near the landing gear, as well as updates the EJ200 engines,” which could include thrust-vectoring as well as structural reinforcement. It didn’t help. India picked the French Rafale, which already has a carrier-capable version, as their future M-MRCA medium fighter. The Indian Navy is currently flying MiG-29Ks as its naval fighters, and plans to add Indian-designed LCA Naval light jets. Britain could have been a long-shot backup option, but they’re planning to use the F-35B from future carriers, which won’t be fitted with steam catapults and arrester wires after all. Brazil might have been a future option, on the assumption that they will replace their aircraft carrier at some point. Unfortunately for Eurofighter, Brazil picked Saab’s JAS-39E/F Gripen as their future air force fighter, and Saab also has plans for a naval variant. That leaves a carrier-capable Eurofighter variant without a plausible future customer. Eurofighter: Industrial Structure & Orders IPA7 over Manching (click to view full) Technically, the NATO Eurofighter and Tornado Management Agency (NETMA) is the customer for the Eurofighter project. Eurofighter GmbH is the contractor, with joint ownership by all of the key industrial partners: BAE Systems, EADS, and Finmeccanica. Overall, Eurofighter GmbH cites a total of 100,000 supported jobs in 400 companies across Europe. Aircraft production work shares were designed to correspond to the number of aircraft ordered under the 1998 Umbrella Contract: 37.5% UK (232). BAE Systems: Front fuselage including foreplanes, canopy, dorsal spine, tail fin, inboard flaperons, rear fuselage section. 30.0% Germany (180) EADS Deutschland: Main center fuselage. Airbus spinout Premium AEROTEC is the main sub-contractor. 19.5% Italy (121). Alenia Aeronautica: Left wing, outboard flaperons, rear fuselage sections 13.0% Spain (87). EADS CASA: Right wing, leading edge slats The Eurofighter’s 2 EJ200 turbofans deliver 20,000 pounds thrust each in reheat mode, and are manufactured by the EUROJET partnership of Avio (Italy), ITP (Spain), MTU Aero Engines (Germany) and Rolls-Royce (UK). The Euroradar consortium supplies the ECR-90 CAPTOR radar, and is developing the “E-Scan” AESA successor for introduction by 2015. It is led by Finmeccanica subsidiary SELEX Sensors and Airborne Systems in Edinburgh, UK (formerly BAE Systems Avionics), and also includes EADS and Spain’s Indra. The Eurofighter contract was designed to protect the fairness of each participants’ agreed manufacturing work shares, by making it very expensive to back out of committed orders. On the other hand, European defense spending continues to decline due to pressure from welfare state commitments and debt burdens, even as European military operational deployments and their costs have increased. Hence the fractious contract negotiations around Tranche 3, and also the investigation of foreign sell-offs by the member countries. In June 2009, the partners took a diplomatic way out, splitting Tranche 3 into 2 parts. At the end of July 2009, the 4 partner nations placed a EUR 9 billion Tranche 3A order, which will keep production going for several more years. The table below summarizes the Eurofighter’s evolving production plans, from the original 1985 plan to the 1998 agreement, and then planned and actual orders for each production tranche. Note that 24 of Britain’s Tranche 2 aircraft have been diverted to Saudi Arabia, in order to satisfy Saudi demands for early delivery. In response, Britain ordered 24 more Tranche 3 aircraft as replacements. In practice, this means that Britain has ordered only 16 of its originally planned 88 Tranche 3 Eurofighters – and high-level statements indicate that Tranche 3A agreement absolves Britain of the need to place any further Eurofighter orders. Other reports explain the gap by claiming that the other 48 British Tranche 3 aircraft will go to Saudi Arabia, meaning that all of Saudi Arabia’s 72 planes will have been siphoned off from British orders. Maintenance contracts to keep the fleets in service involve a small core of multi-national contracts for key systems and general service, followed by a number of national umbrella contracts to address other areas, and then a set of national maintenance agreements that are less comprehensive. See the chart below for tracking of the main support contracts currently underway: Contracts & Key Events New dawn, or twilight? (click to view full) DID coverage focuses on purchases related to consortium aircraft buys under Tranche 3, platform improvement efforts, international opportunities, and sales. See the “Additional Readings” section for coverage of the comprehensive support contracts for the various countries, and of the Saudi and Austrian export deals. 2014 – 2020 Germany confirms no Tranche 3B, but how much will they have to pay?; German maintenance costs an issue; Eurofighter needs new orders, soon. with Brimstones October 22/20: Spain Eurofighter formally submitted to Spain its offer to provide a further 20 Typhoon aircraft under the country’s Project ‘Halcon’ (Falcon). Delivery of the offer, which was disclosed by the consortium on 19 October, came three months after Spain announced that it was seeking to augment its existing Typhoons and to begin the process of replacing its Boeing EF-18 Hornet fleet. “Eurofighter has submitted proposals for the replacement of the Spanish Air Force’s EF-18s which are based on the Canary Islands. Spain is looking to secure 20 new Eurofighter Typhoon aircraft to boost its existing fleet under what is called Project Halcon,” the consortium said. September 2/20: Air Policing Mission On August 31, the German Air Force Eurofighter detachment took over the augmenting role of NATO’s Baltic Air Policing mission from the French Air Force at Ämari Air Base, Estonia. The French Air Force Mirage 2000-5 detachment, deployed at Ämari since last May, handed over its augmenting role in NATO’s Baltic Air Policing to a German Air Force Eurofighter detachment during a ceremony today. The second Air Policing detachment at Ämari takes place under NATO’s assurance measures introduced in 2014 as the Alliance’s response to Russian interventions in Ukraine and is aimed at reassuring eastern Allies and demonstrating NATO’s commitment and resolve. August 6/20: Lithuania The first ever Luftwaffe Eurofighter training detachment while embedded with a Royal Air Force (RAF) contingent that is deployed to Lithuania as part of the NATO Baltic Air Policing Mission has concluded. Pilots from RAF Lossiemouth-based 6 Sqn RAF flew with pilots from the German Tactical Fighter Wing 71 Richthofen to practice air intercepts and basic fighter maneuvers together as a pair. Both sides will reverse roles in September when the British will embed with a German detachment in Amari, Estonia. June 22/20: Upgraded AESA in Germany The German Bundestag approved funding to develop, build, and integrate a new active electronically scanned array (AESA) radar system for the Luftwaffe’s Eurofighter combat aircraft fleet. The approval by the Bundestag’s Budget Committee will see national sensor-house Hensoldt lead the effort to equip the Luftwaffe’s 79 Tranche 2 and 31 Tranche 3A Eurofighters with an updated AESA (also known as electronically scanned [E-Scan]) radar system. The Eurofighter consortium that comprises Germany, Italy, Spain, and the UK is already developing an AESA/E-Scan radar through the Euroradar consortium. This effort, led by Leonardo UK, builds on the aircraft’s existing Captor mechanically scanned (M-Scan) radar, and is known as Captor E-Scan and/or Captor AESA (CAESAR). June 4/20: E-SCAN Italian defense firm Leonardo announced that a flight test campaign dedicated to the configuration chosen by Kuwait is proceeding at pace. According to the company, Leonardo ISPA 6 (Instrumented Series Production Aircraft) is the most advanced Eurofighter Typhoon test aircraft with E-SCAN radar and it recently joined the other Typhoon test aircraft after the successful completion of an important lay-up in November last year. ISPA6 has completed the overall P3Eb Flight Test campaign, which represents a significant step forward to allow the delivery of the Eurofighter to the Kuwait Air Force. ISPA 6 is one of the three EF Typhoon test aircraft equipped with the Electronic Scan Radar made by the EuroRadar Consortium, led by Leonardo UK in Edinburgh, and it’s currently allocated to the EF/NETMA P3Eb (Eurofighter Consortium/NATO Eurofighter and Tornado Management Agency – Phase 3 Enhancements Package b) development programme to perform E-SCAN Entry Into Service flight tests and provide final clearance to the Kuwait customer. May 21/20: JTAC Training Lithuanian, German and Norwegian Joint Terminal Attack Controllers (JTAC) carried out training with Royal Air Force Eurofighters and Spanish F/A-18s at Kazl? R?da training ground on May 11. The German and Norwegian JTACs are part of NATO’s enhanced Forward Presence Battlegroup in Lithuania. The British and Spanish air force contingents operate from Šiauliai Air Base and help guard the skies over the Baltic region as part of NATO’s Air Policing mission. NATO’s battlegroup in Lithuania is composed of around 1,200 personnel from Germany, Belgium, Croatia, Czech Republic, Iceland, Luxembourg, Netherlands and Norway. The battlegroup is part of the biggest reinforcement of the Alliance’s collective defense in a generation. March 20/20: Production Plans During COVID-19 Pandemic According to Jane’s, the Eurofighter consortium has a strategy in place to ensure that work across its four national production lines continues amidst the worsening coronavirus crisis. The deliveries to the four partner nations of Germany, Italy, Spain, and the UK are all recently completed. The pan-European consortium has now introduced plans to protect the delivery of its outstanding orders for Kuwait and Qatar. The program-of-record (PoR) for the Eurofighter partner nations of 160 aircraft for the UK, 143 for Germany, 96 for Italy, and 73 for Spain was concluded in January. The export orders of 15 aircraft for Austria, 12 for Oman, and 72 for Saudi Arabia, had already been delivered, leaving an outstanding backlog of 28 aircraft for Kuwait and 24 for Qatar. To satisfy these Kuwaiti and Qatari orders, all four national production lines will manufacture parts, with final assembly to take place at Caselle and Warton respectively. The delivery of these two orders, expected from late 2020 to 2023 for Kuwait and from 2022 to an unspecified date in the mid-2020s for Qatar, will conclude the 623-aircraft PoR for the partner nations and export customers. January 15/20: Kuwait The first Eurofighter combat aircraft configured for Kuwait made its maiden flight towards the end of 2019, the company announced. Instrumented Series Production Aircraft (ISPA 6), equipped with the Kuwait Air Force configuration, departed the Flight Test Centre of Leonardo Aircraft Division in Turin-Caselle on December 23, 2019. As written by Eurofighter, ISPA 6 is the most advanced iteration of the aircraft to date, and while other elements have previously been flight tested, this is the first time that all of the enhancements have been brought together. ISPA 6 is the first to fly the Captor E-Scan Radar with Phase Enhancement 3 b (P3Eb), for which Kuwait is to be the launch customer. Other enhancements for Kuwait include the Lockheed Martin Sniper advanced targeting pod, the introduction of the DRS-Cubic ACMI P5 combat training pod and an enhanced Very High Frequency (VHF) Omni-Directional Range navigation aid. December 31/19: Kuwait The first Instrumented Series Production Aircraft (ISPA 6) configured for the Kuwaiti Air Force has successfully completed its first flight. The aircraft is the first to fly the Captor E-Scan Radar with Phase Enhancement P3Eb, and is a key milestone for the entry into service of Eurofighter with the State of Kuwait. ISPA 6 is the first Eurofighter in the planned export configuration for the Kuwait Air Force, with the second iteration of the Phase 3 Enhancement software (P3EB) and fitted with the new Captor E-Scan radar (known as Radar One Plus, or Captor E Mk0), an active electronically scanned array (AESA) derivative of Typhoon’s highly regarded Captor radar. The capability package for Kuwait includes the integration of Storm Shadow and Brimstone and other air-to-surface weapons. November 15/19: UK Deploys To Iceland The United Kingdom has sent fighter aircraft to Iceland for the first time since a diplomatic spat between the two countries over the Nordic nation’s banking crisis scuppered a previous planned deployment in 2008. An undisclosed number of Royal Air Force Eurofighter Typhoon FGR4s from 1 (Fighter) Squadron and 100 personnel were deployed from their home station of RAF Lossiemouth in Scotland to Keflavik Air Base on November 13. According to the UK Ministry of Defense, the aircraft will spend the next month protecting the airspace as the UK’s contribution to NATO’s Icelandic Air Policing Mission, returning to Scotland in mid-December. The RAF deployment to Iceland was announced by the then-Defense Secretary Gavin Williamson in June 2018, at which time he said four Typhoon aircraft would be sent to the island. The announcement came a decade after the last scheduled deployment was called off after Iceland’s banking system collapsed owing billions of pounds to UK savers. In 2016, the UK Treasury announced that it had received the final compensation payment from Iceland, resetting the relationship between the two countries. November 8/19: Germany Airbus Defence and Space disclosed a plan for a Electronic Combat Reconnaissance (ECR)/Suppression of Enemy Air Defenses (SEAD) variant of the Eurofighter for Germany. Germany plans to replace its Tornado fighter, 40 of them are the ECR variant. Airbus wants to put escort jammer pods on the underwing stations while moving the 1,000 liter tanks to another station that has to be modified to carry fuel tanks. Speaking at the company’s Manching facility in southern Germany on November 5, Kurt Rossner, head of Air Combat, provided the first insight into Airbus DS plans for an Electronic Combat Reconnaissance (ECR)/Suppression of Enemy Air Defenses (SEAD) version of the Eurofighter to replace the Luftwaffe’s Tornado ECR aircraft. This Tornado ECR replacement covers 40 aircraft as part of the wider Tornado IDR/ECR replacement program for 85 aircraft. October 22/19: Next-Generation EW Suite The four-country EuroDASS consortium, which consists of UK’s Leonardo, Italy’s Elettronica, Germany’s Hensoldt, and Spain’s Indra, has outlined its vision of a next-generation electronic warfare (EW) suite for the Eurofighter Typhoon combat aircraft. Global Flight reports, that the industry partners launched plans for a so-called Praetorian Evolution, or “Evo” package of capabilities. Known as Praetorian Evolution, the future Defensive Aids Subsystem (DASS) builds on the Typhoon’s existing Praetorian DASS but introduces a new all-digital architecture and expands electronic warfare functionality beyond platform self-protection. EuroDASS has developed its roadmap independent of the Praetorian Long Term Evolution (LTE) study activity awarded earlier this year, although Praetorian Evolution work is expected to inform LTE outputs. October 3/19: UK BAE Systems delivered an advanced Typhoon to the UK Royal Air Force, the company announced in a press release. The delivery of the final Tranche 3 aircraft brings a production run of 160 Typhoons for the RAF to an end that began in 2003. The RAF fields eight Typhoon units with 1 (Fighter), 2 (Army Cooperation), 6, and 9 (Bomber) squadrons based at RAF Lossiemouth in Scotland; and 3 (Fighter), 11 (Fighter), and 12 (Bomber) squadrons based at RAF Coningsby in England. There is also a permanent detachment located on the Falkland Islands. A ceremony was held at BAE Systems’ final assembly facility at Warton to mark the latest milestone delivery. September 5/19: Headed East British Royal Air Force Typhoons based at Coningsby have left for a four-month tour of the Middle East and the Far East to participate in exercises. The first stop for the multi-role Typhoon jets will be Oman, the Royal Air Force announced in a statement. There, pilots from both nations will test their skills in a two week ‘live’ weapons exercise in the desert. The Royal Air Foce of Oman also operates the Typhoons and has a long history in training with the UK. The exercises prepare personnel performing support functions to become familiar with operating in tough conditions away from home. The jets will then be flying on to a multi-national exercise in Malaysia at the end of September. Meanwhile Typhoons, which have been deployed to Estonia under Operation Azotize have returned to the UK. August 15/19: Spectre For UK Typhoons BAE Systems announced in a news release that their ‘revolutionary’ new mission planning software will be rolled out to the Royal Air Force by November 2020. The software, named Sceptre, will be used throughout a mission, from the initial plan, to the execution of it, to the debrief. BAE says it’ll allow users on the ground to “make better, more informed decisions” to support the flight crew. The RAF plans to initially use it primarily to support its Typhoons. BAE Systems developed and funded Spectre internally. The value of the contract with the Ministry of Defense is yet to be released. August 13/19: RAF Tranche 3 Makes Second Flight Craig Hoyle from Flight Global reports that the final Eurofighter Tranche 3 for the UK Royal Air Force has made its second flight and will be delivered to the customer by end of the year. The Royal Air Force has an active fleet of 116 Typhoons, the oldest of which are 14 years old. Under current plans, the type should remain in UK service until 2040, operating alongside its short take-off and vertical landing Lockheed Martin F-35Bs. The same news report also said that Qatar has requested to accelerate the delivery of its own Eurofighters. The jets will start arriving in 2022 and most of the 24 jets on order will be delivered in 2023. The final aircraft will reach home in 2024. August 7/19: EJ200 The UK and Rolls-Royce signed a contract to provide maintenance for the engines of Typhoon fighter jets. The deal is valued at $425.9 million. The contract will provide support for the Eurojet EJ200 jet engine until 2024, Reuters reports. The company will also be required to provide modules, spares and accessories to support the Typhoon fleet. “Not only will this contract help to maintain our world-class jets, it secures 175 jobs across the UK and boosts the skills base our world-leading defense industry relies upon,” junior defense minister Anne-Marie Trevelyan was quoted by the news agency. June 26/19: Largest Export Credit Deal Qatar’s $6.4 billion deal with the UK in 2018 to supply Qatar with 24 Typhoon fighter jets was the largest UK export credit deal ever, the recent UK Export Finance report shows. In the UKEF report, it says: „As well as being its centenary, this has also been a record year for UKEF, with the largest amount of business underwritten in a single year for decades. This included support for the biggest transaction in its history, worth nearly £5 billion for the export of defence equipment to Qatar. As well as supporting BAE Systems, MBDA UK and their thousands of UK employees and suppliers, this contract will strengthen our own defence capabilities and those of an important strategic ally“. According to Jane’s the provision of credit to Qatar continues the UKEF’s trend in recent years to engage primarily with the defense materiel requirements of countries from the Middle East and Asia Pacific. June 25/19: Crash in Germany Two German Eurofighter Typhoons collided and subsequently crashed in the northeast of Germany, reportedly killing one of the pilots. According to the German Air Force, the aircraft were taking part in an air combat exercise when they collided and crashed near Laage Air Base. The German newspaper „Die Welt“ called the incident „the worst crash in the history of the Eurofighter“. It is yet unknown, what caused the collision. The accident comes in the midst of the Luftwaffe’s plans to procure more Eurofighters. The old models of the German Eurofighters are to be replaced by modernized variants. The cost for one Eurofighter is roughly valued at $148 million. June 18/19: Scrambling Russian Fighters British Typhoons in Estonia have yet again been busy intercepting Russian fighters. The British Ministry of Defense said that Typhoon jets launched during the evening of Friday the 14th of June to intercept a Russian SU-30 fighter aircraft that was flying to the north of Estonia. Royal Air Force crews made a second scramble on Saturday June 15 to intercept a Russian SU-30 Flanker fighter and an Ilyushin IL-76 Candid transport aircraft transiting north from Kaliningrad towards Estonian and Finnish airspace. The RAF Typhoons are deployed at Ämari Air Base in Estonia in support of NATO Baltic Air Policing. This was already the eight time the British aircraft intercepted Russian fighters since taking over the Baltic Air Policing mission on May 3, 2019. During both intercepts, pilots reportedly flew the aircraft at a safe distance and operated in a professional manner throughout. May 27/19: RAF tests BriteCloud The British Royal Air Force started testing the latest version of the BriteCloud missile decoy on its Typhoon fighter aircraft. Leonardo will support a series of trials in which the ‘BriteCloud 55’ Expendable Active Decoy is being trialled for operations with the Royal Air Force (RAF)’s fleet of Eurofighter Typhoon Aircraft. Designed and built by Leonardo Aerospace in Luton, Bedfordshire, BriteCloud is a line of expendable anti-missile decoys. With mission programmable electronics packages, the small canisters come in a number of variants to fit different aircraft. Each canister has spring-loaded airfoils and contains a miniaturized radio-frequency jamming module. In recent tests, the RAF dispensed 33 BriteCloud rounds from Typhoon fighters against a series of simulated battlefield threats. The trials were not only to demonstrate the effectiveness of the decoy, but also that the canisters can be launched safely from the Typhoon. May 17/19: Interception British Typhoons were launched twice in two days after taking over the NATO Baltic Air Policing mission in Estonia. On Wednesday, the aircraft intercepted two SU-27 fighters and an IL-22 and escorted the formation towards Russia. On Tuesday, British Typhoon fighters scrambled out of Ämari Air Base in Estonia in response to two Russian SU-27 fighter aircraft and one IL-22 aircraft that were flying along the Baltic coast heading towards Kaliningrad. Britain took over the NATO Baltic Air Policing mission from the German Air Force last month. May 7/19: Air Policing Mission British Typhoons officially started their NATO Baltic Air Policing mission from Amari Air Base in Estonia on May 3. The aircraft from XI(F) Squadron normally based at RAF Coningsby in Lincolnshire already arrived on April 24 and the crew has been working with the German Luftwaffe and their Eurofighters to prepare themselves for the NATO mission of providing a Quick Reaction Alert capability off the Baltic Sea area around Estonia. The Handover Ceremony marked the replacement of the German aircraft with the British Typhoons and their crew. April 19/19: Italian Eurofighters on a Mission to Montenegro According to local reports, NATO for the first time launched Italian Air Force Eurofighters based at Gioia del Colle Air Base on April 9. The mission was to intercept a civilian airliner that lost communications with civilian air traffic control over Croatia and was heading south towards Montenegro and Albania. It was established that the loss of communications was related to a misunderstanding between civilian air traffic control and the airliner crew. After resuming regular contact with the civilian controllers, the airliner continued to proceed to its destination to Hurghada, Egypt. On December 16, 2005, the F-2000 Typhoon reached initial operational capability with the Italian Air Force. The Italian Air Force uses the Eurofighter Typhoon as the main nation’s asset for air defense and coalition missions. March 19/19: RAF in Estonia The British Royal Air Force (RAF) sent vehicles and supplies from Southhampton to Estonia to mark the start of a new deployment in the region. The RAF will join the already deployed British Army Battlegroup that formed part of the NATO Enhanced Forward Presence mission. The Enhanced Forward Presence is an allied, forward deployed defense and deterrence military posture in Eastern Europe to reassure the countries of their security. British Defense Minister Gavin Williamson announced the RAF Mission already last year. As part of the mission the Air Force will deploy four Coningsby based Typhoon jets to the Amari Air Base in Estonia. March 5/19: Spain Airbus delivered the first upgraded Tranche 1 Eurofighter to Spain. The company performed the upgrade at its facilities in Getafe near Madrid, Spain. The enhancements included the introduction of hardware modifications, which support the Operational Flight Program 02 (OFP-02) developed by Spain’s Armament and Experimental Logistics Centre (CLAEX). The company also integrated Tranche 2 and Tranche 3 equipment on the aircraft, including a computer symbol generator, digital video and voice recorder, laser designator pod and maintenance data panel. CLAEX will use this first single-seat Eurofighter, to be followed by a second two-seat aircraft currently undergoing the upgrade, as a test aircraft for the qualification of these new capabilities that will be implemented on the Air Force’s fleet of 15 Tranche 1 Eurofighters. The Eurofighter Typhoon is a project with four European nations, the UK, Germany, Italy and Spain as founding members. December 12/18: UK Typhoons armed with MBDA Meteor Jane’s reports that the Royal Air Force is arming its Eurofighter Typhoon combat aircraft with MBDA’s Meteor missile. This is the first time the French-made beyond visual range air-to-air missiles are deployed on the British Typhoons. The Meteor was conceived as a longer-range competitor to popular weapons like the American AIM-120 AMRAAM. Its ramjet propulsion is intended to offer the missile a head-on closing range of 120 km, with a 2-way datalink and full powered performance at Mach 4+ throughout its flight, instead of the standard “burn and coast” approach use by rocket-powered counterparts. The intent is to give the Meteor both longer reach, and a wider “no escape” profile. The Meteor program partners include France, Germany, Italy, Spain, Sweden, and the UK. September 20/18: Qatari milestone Qatar is marking another milestone in its Eurofighter Typhoon acquisition program. The country made its first payment to BAE Systems on Tuesday, and thus finalises the $6 billion purchase of 24 Eurofighter jets and 9 Hawk trainers. This deal is the first major defense contract between the Emirate and the UK. In October 2017 the deal was hailed by former UK Defence Secretary Sir Michael Fallon as “an important moment in our defence relationship and the basis for even closer defence co-operation between our two countries.” The contract also provides for the training of Qatari pilots, facilitated by the British Royal Air Force’s (RAF) No. 12 squadron. This joint UK-Qatari operational squadron will also help to police the skies during he Gulf state’s hosting of World Cup 2022. Deliveries of the fighter aircraft are expected to commence in 2022. September 13/18: Kuwait orders Kuwait’s budget for the current fiscal year suggests that the country will buy several additional Eurofighter Typhoon aircraft. The Ministry of Defense plans to spend $1.1 billion on the Typhoons and another $1.1 billion on machinery and air transport equipment. Kuwait purchased an initial 28 Eurofighter aircraft equipped with the Captor-E active electronically scanned array (AESA) radar back in 2016. First deliveries of which are expected to commence in 2019. August 9/18: Oops! A Spanish Eurofighter accidently launched an AIM-120 AMRAAM in Estonia. The fighter aircraft was flying near defenses near Pangod in the vicinity of Otepää when the incident occurred. It is yet unclear if the AIM-120D’s built in self-destruct mechanism terminated the flight or if the missile landed at an unspecified location. The Estonian Defense Forces have sent helicopters to search for the missile. The Spanish Eurofighter is part of NATO’s Air Policing Mission that support member states that do not have the necessary air capabilities to independently protect their airspace. The Spanish air force currently deploys six Typhoons as part of this mission. An investigation has been initiated to clarify the circumstances. July 11/18: Project Centurion upgrade Jane’s reports that, the UK Royal Air Force (RAF) can now fly the first of its Eurofighter Typhoon combat aircraft upgraded with the Project Centurion weapons fit. The multi-national Eurofighter Typhoon has been described as the aerodynamic apotheosis of lessons learned from the twin engine “teen series” fighters that began with the F-14 and F-15, continued with the emergence of the F/A-18 Hornet. The Project Centurion configuration is intended to combine the already-delivered Raytheon Paveway IV precision-guided bomb, and the Storm Shadow, Meteor beyond-visual range air-to-air missile (BVRAAM), and Brimstone on the Typhoon FGR4 in time for the retirement of the Tornado in April 2019. May 04/18: Small parts cause big problems The magazine Der Spiegel reports that the German Luftwaffe is currently facing problems keeping the ground readiness of its Eurofighter Typhoon fleet. According to the magazine the majority of the Luftwaffe’s 128 fighter planes is currently not cleared for conducting missions. Engineers are concerned about faulty wing-pods that could seriously impede the functionality of the plane’s self-protection system. Without this system the planes are not ready for conducting missions as part of its NATO obligations. The technicians managed to fix some issues with the pods but are unable to fix an issue with leaking cooling-fluid. The component issue, centers on a so-called “grease nipple” that is part of the system that cools the wingtip pods that house elements of the self-protection system, which was designed by BAE Systems. Supplies of the component have been restricted while the primary supplier, a U.S.-based company, is recertified after a change in its ownership. “We hope to get this problem under control in several weeks or months,” the Defense Ministry spokesman Colonel Holger Neumann told a regular German government news conference. He declined to give any details about how many of Germany’s Eurofighters were affected by the spare parts logjam. March 29/18: Leonardo targets Poland The Italian airframe manufacturer Leonardo prepares to promote the Eurofighter Typhoon to the Polish government which should launch its “Harpia” fighter tender to replace its remaining RAC MiG-29s and Sukhoi Su-22s within the next few weeks. The company is willing to negotiate the relating integration of weapons used by the Polish air force. This would involve the Eurofighter consortium clearing the type to operate with Lockheed Martin’s AGM-158 JASSM air-to-surface cruise missile. Warsaw is a strategic costumer for the company as it has previously bought Leonardo’s Aermacchi M-346 advanced jet trainers. Eurofighter Typhoons can be either assembled in Italy, Germany, Spain or the UK. The companies that took part in the analysis and market survey phase are Boeing, Leonardo, Lockheed Martin and Saab. March 12/18: Saudi MoU The three-day visit of Saudi Arabia’s Crown Prince Mohammed Bin Salman to the UK has seen the kingdom’s heir sign a memorandum of intent for the purchase of 48 Eurofighter Typhoon fighter jets. While the accord stops short of committing to an order, manufacturer BAE Systems sees the sale as a “positive step towards agreeing a contract for our valued partner.” Before offsets are included, the sale could be worth as much as £8 billion. The visit, which included meetings with the British cabinet and the Queen, was marred by protests by human rights and anti-war campaigners critical of the kingdom’s ongoing war in Yemen, backed by British weaponry. February 14/18: Austria Corruption Probe-Defense Ministry Statement The Austrian Defense Ministry has announced that the government has handed over its findings on suspect money flows related to its 2003 purchase of Eurofighter jets to international bodies including the US Department of Justice. “Foreign authorities were informed about the results of the defense ministry’s investigation in the context of the international fight against corruption. The Department of Justice has also been informed,” it said, adding that the documents were handed over two months ago. The sale is being investigated by Austrian prosecutors over allegations of fraud against Airbus and the Eurofighter consortium based on earlier complaints from the defense ministry. Austria is seeking up to 1.1 billion euros ($1.4 billion) in compensation, while the consortium dismiss any wrongdoing, calling the accusations politically motivated. Another investigation into the sale by German prosecutors, was closed after Airbus agreed to pay fines nearing $99 million. February 14/18: Potential Sale-Malaysia BAE Systems has offered the Malaysian government a UK government-sanctioned financing deal, if Kuala Lumpur selects the Eurofighter Typhoon as its new fighter jet. “We have an offer on the table…It’s competitively priced and we have offered UK government financing so the Malaysian government can spread the payment over a longer period,” Alan Garwood, the Group Business Development Director for BAE Systems, said from the Malaysian capital. “We can offer training, local partnership and lots of jobs,” he added. Malaysia could buy as many as 18 fighters in a $2 billion program to replace its MiG-29 fighters, with Dassault’s Rafale also in the running for selection. However, a decision on the acquisition has been delayed until after elections, which much be held by August. February 12/18: Austria Corruption Probe Airbus will pay $99 million in fines in order to settle one of two investigations into alleged corruption surrounding the sale of Eurofighter combat jets to Austria in 2003. The settlement was reached with German prosecutors based in Munich and includes an administrative fine of 250,000 euros and “disgorgement”—which legal experts broadly define as the recovery of ill-gotten gains—of 81 million euros. In a statement, prosecutors said they had not found evidence of bribery but that Airbus had been unable to account for over 100 million euros in payments to two shell companies. Airbus said in a statement the penalty, which it had agreed to pay, related to the “negligent breach of supervisory duties” by unidentified members of Airbus Defence and Space’s former management. February 9/18: Project Centurion Britain’s Royal Air Force (RAF) has hailed 2018 the “Year of the Typhoon” as modernization work to the multi-role fighter’s continues to pass tests. Upgrades to systems and weapons under Project Centurion—an effort to improve the capabilities of Eurofighter Typhoons in the RAF fleet as it replaces the Tornado as the force’s main fighter—have been undergoing testing by 41(R) Squadron, a Test and Evaluation Squadron based at RAF Coningsby, Lincolnshire. The head of Project Centurion, Gp Capt John Cunningham, said that by the end of the year “no other aircraft in the world will have all of the Typhoon’s capabilities.” He added: “It will have the long-range air-to-air Meteor missile, Brimstone and Storm Shadow which can hit moving targets and underground structures, Paveway IV laser guided bombs, the Litening III targeting pod and ASRAAM air-to-air missiles. All this will come together by December 2018 making the next year the biggest game changer ever in the development of this aircraft.” January 31/18: Fleet Retirement-Reduce To Produce The British Royal Air Force (RAF) plans to retire 16 two-seat Eurofighter Typhoons, as the service looks to trim $1.13 billion in operating costs. Following their retirement, the aircraft will then be cannibalized for spare parts under the Reduce to Produce (RTP) project, which aims to generate over $70 million worth of parts from each airframe “back into the supply chain”, according to RAF Air Command at High Wycombe, in Buckinghamshire, UK, in response to a Freedom of Information (FOI) Act request submitted by Jane’s. News of the cost-saving measures comes less than a week after chief of the general staff, General Sir Nicholas Carter, told the Royal United Services Institute (RUSI) that an increase in defense spending was required to fill a $28 billion funding shortfall to stave off cuts to key capabilities and personnel numbers. January 22/18: Qatar-Support A joint Qatari-UK operational squadron will be formed to help police the skies during the Gulf state’s hosting of World Cup 2022. The announcement was made by Qatar’s Deputy Prime Minister and Defense Minister Dr Khalid bin Mohamed al-Attiyah during his speech at the Royal United Services Institute (RUSI) in London last week, with the agreement made last month as part of the UK’s support and training package within Qatar’s Eurofighter procurement program. Qatar’s World Cup bid and preparations have been shrouded in criticism, which have been made worse by its neighbors enforcing a blockade and cutting off ties which included earlier offers of providing hotels and training facilities—Iran is now believed to be in talks to fill this void—while some allege that governing body FIFA, received bribes from the Qataris to help bring the competition to a state with little soccer culture. January 16/18: Settlement-Probe Germany’s Sueddeutsche Zeitung newspaper has reported that Airbus has offered to pay between €70 million and 80 million settlement ($85 million to $98 million) in order to stop an investigation by German prosecutors into its 2003 sale of 15 Eurofighter Typhoon fighters to Austria. While the firm refused to comment on the reported figure, the settlement would end one probe into the sale, while the Austrian government still investigates fraud allegations in relation to offsets attached to the agreement that never materialised. The newspaper report followed an Airbus statement on Saturday in which the company said it was talking to Munich prosecutors about “the potential termination of the investigation”. January 3/18: Training-Qatar The British Royal Air Force’s (RAF) No. 12 squadron will stand again in order to help Qatari air and ground crews be trained to operate the Eurofighter Typhoon combat aircraft. Previously based at RAF Marham, the unit will relocate to RAF Coningsby in Lincolnshire, where Qatari Air Force personnel will be temporarily integrated with the squadron ahead of the delivery of Typhoons to the Gulf. The British Ministry of Defense (MoD) said the arrangement will provide Qatar with valuable joint frontline experience on an RAF Typhoon Squadron and speed up their preparation for when their own jets are delivered. December 15/17: Potential second-hand sale According to a story originally reported in the Spanish-language news website, Defensa, the Colombian Air Force is currently evaluating a series of options that will boost its fighter-interceptor fleet capabilities. The main option involves procuring about a fighter wing’s worth of second-hand, Trance 2 standard Eurofighter Typhoons from Spain, equipped with the advanced Meteor missile. If the deal was to go ahead, Colombia would become the first operator of the Typhoon in the region, and the aircraft itself would be one of the most advanced fighters in South America, comparable only to the future Brazilian Saab JAS-39E/F fleet. Other (mostly second-hand) options being considered by Bogota include both Dassault Aviation’s Mirage 2000 and Rafale fighter, the American Lockheed-Martin F-16 and Boeing F/A-18, the Swedish Saab JAS-39 Gripen, and even the Russian Sukhoi Su-30. December 15/17: Program update-Kuwait Eurofighter partner companies are on track to start Typhoon fleet deliveries to Kuwait from 2019. According to the consortium, “Production activities have begun in order to comply with the contract and the Customer expectations,” adding that “activities to establish infrastructures in Kuwait to operate the aircraft are also proceeding according to the plans.” Italy’s Leonardo is lead partner in the sale, which calls for 28 Eurofighters, including six two-seat trainers, with all aircraft equipped with the consortium’s Captor-E active electronically scanned array radar, Lockheed Martin Sniper targeting pod, plus precision-guided weapons including MBDA’s Brimstone air-to-surface missile and Storm Shadow cruise missile. Detailing of the program’s status comes during the annual Gulf Defence & Aerospace exhibition in Kuwait, which ran from December 12-14. December 13/17: Potential FMS The German Defense Ministry has come out in favor of the Eurofighter Typhoon combat aircraft as the replacement for its fleet of 85 Panavia Tornado jets. However, the decision contradicts an announcement by the Luftwaffe last month that hailed Lockheed Martin’s F-35 Joint Strike Fighter as the best option to meet the service’s requirements of stealth and long-distance operational capabilities. News of the ministry’s preference came to light in a letter sent to a Greens lawmaker who had inquired about the deliberations, with the ministry listing the F-35, alongside Boeing’s F-15 and F-18 fighters as secondary options. Built by the Eurofighter consortium consisting of Britain’s BAE Systems, France’s Airbus, and Italy’s Leonardo, a Typhoon purchase by Berlin may come as a precursor to eventual Franco-German cooperation on a new European fighter effort, intentions on which were announced earlier this year. A decision on the Tornado’s replacement needs to be approved by parliament within the next two years and a contract signed by 2020 or 2021to ensure deliveries by 2025. However, no final decision is likely to be made before a new government is formed, which has remained undecided since elections in September left no party with a majority or workable coalition. December 11/17: Contract Signing BAE Systems and Qatar finalized Sunday a $6.7 billion deal to deliver 24 Eurofighter Typhoon combat jets to the Gulf nation. Delivery is expected in late 2022 and the contract is subject “to financing conditions and receipt by the company of first payment” that is “expected to be fulfilled no later than mid-2018”. The deal was signed during a ceremony in Doha under the auspices of the UK Defence Secretary Gavin Williamson and Qatari Minister of State for Defence Affairs Khalid bin Mohammed al Attiyah. Williamson hailed the sale as a “massive vote of confidence, supporting thousands of British jobs and injecting billions into our economy”. November 30/17: Foreign Sales In what may be some kind of record, a senior BAE Systems official has told the UK Parliament’s Defence Select Committee that a deal to sell Eurofighter Typhoon fighters and Hawk jet trainers to Qatar is complete—just six weeks after the signing of a statement of intent. Chris Boardman, the managing director of BAE Systems’ military air and information business, said all that is needed to be decided is an appropriate date to sign contracts, but would not speculate on what that date would be. Boardman also urged the British government to provide clarity on its vision for combat air requirements in a post-Typhoon era. Qatar’s purchase of 24 Eurofighter Typhoons is the first major arms contract to be signed between the UK and the Gulf state, and is the first Typhoon sale by the British since the Ministry of Defence took over responsibility for leading the government’s Typhoon export sales effort from the Defence and Security Organisation, the department responsible for most overseas sales in the sector. November 06/17: BAE Systems has completed firing tests of the Brimstone precision strike missile from a Eurofighter Typhoon aircraft, paving the way for evaluation by the British Royal Air Force (RAF) in 2018. A total of nine firings and nine jettisons were conducted from the aircraft as part of the firm’s Phase 3 Enhancement (P3E) package, which aims to transfer capabilities from the Tornado GR4 onto the Eurofighter before the former is taken out of service in 2019. The flight trails, which commenced in July, covered a range of specific release scenarios, testing at various heights, speeds, levels of G-force and in different positions on the aircraft wing and in the launcher. It was also used to perform data analysis and models of the weapon’s performance, and was completed with support from the UK Ministry of Defence, MBDA, QinetiQ, Eurofighter GmbH and the Eurofighter Partner Companies, Airbus and Leonardo. October 11/17: BAE Systems confirmed Tuesday that it is to cut nearly 2,000 jobs from its UK operations in what is being deemed a “significant blow” to the country’s manufacturing industry. Approximately 1,400 jobs are expected to go at its military aerospace business over the next three years, along with a further 375 in maritime services and 150 at its cyber-intelligence business. The brunt of the cuts will take place at BAE’s aerospace bases at Warton and Samlesbury in Lancashire, where the Eurofighter Typhoon combat jet is assembled, with 750 losses, while another 400 posts will go at its other aerospace base in Brough, east Yorkshire. 340 posts will go in Portsmouth, 245 at the RAF bases Marham in Norfolk and Leeming in North Yorkshire, and 150 in London, Guildford and at other cyber-intelligence sites. A further 30 job losses will take place at other UK locations. The firm’s new CEO, Charles Woodburn, said the “organisational changes we are announcing today accelerate our evolution to a more streamlined, de-layered organisation, with a sharper competitive edge and a renewed focus on technology.” Citing the timing of future Typhoon orders, BAE said the cuts were necessary “to ensure production continuity and competitive costs between the completion of current contracts and anticipated new orders, we now plan to reduce Typhoon final assembly and Hawk production rates.” It also blamed the British government’s decision to take the RAF Tornado fleet out of service in 2019, which will affect Marham and Leeming, although BAE will continue to work on the F-35 fighter jet at Marham. BAE employs more than 83,000 people worldwide, including 34,600 in the UK. October 10/17: BAE Systems is expected to announce this week, redundancies that are likely to result in the loss of over 1,000 jobs. The cuts are believed to take place primarily at the firm’s Warton plant in Preston, England, but “trimming” could also take place at other locations as well. While sources said that Brexit—the UK’s exit from the European Union—was “not a factor” in BAE’s decision, the cuts are being largely attributed to the continued slowdown in production of the Eurofighter Typhoon fighter aircraft, with ongoing uncertainty about the timing of a potentially large order from Saudi Arabia. Last month, BAE announced that Qatar made its first major defense deal with the UK, ordering 24 Typhoon aircraft in a sale that was hailed by Defence Secretary Sir Michael Fallon as “an important moment in our defence relationship and the basis for even closer defence co-operation between our two countries.” October 05/17: The Eurofighter consortium has pitched its Typhoon fighter to Poland at the recent MSPO defence exhibition. Raffael Klaschka, head of marketing at Eurofighter GmbH said that by being part of the Eurofighter program, Poland would experience “new and additional opportunities…both from a military and economic perspective, with a number of possible options in scope, from assembly and manufacturing to support and maintenance.” She added, “Poland would play a role in the definition of any future development of the aircraft, which will continue to be in service well beyond 2050.” Finishing her pitch, Klaschka told the audience that industrial collaboration was an inherent part of the Typhoon program, promising an attractive and cost-effective solution for Warsaw. September 19/17: Airbus has refuted claims levelled at it by Austrian prosecutors that it carried out fraud and willful deception during a $2 billion Eurofighter Typhoon deal. The aerospace giant went on to threaten legal action at Austria’s Defence Minister Hans Peter Doskozil, accusing the minister of disregarding the presumption of innocence in the case and therefore violated the firm’s rights. A final report of a parliamentary inquiry into the 2003 jet purchase, how side deals were awarded and whether bribes were paid, is expected on Tuesday. September 18/17: Qatar has signed a Statement of Intent with the British government for the purchase of 24 Eurofighter Typhoons from BAE Systems. Speaking on the deal, British Defence Secretary Sir Michael Fallon, who is on a visit to the Gulf State, said this will be the first major defence contract between both countries, and will run into the billions of dollars. Human rights and anti-war organisations are likely to protest the sale, which comes as the UK’s $16 billion defence industry is facing intense scrutiny over exports to Saudi Arabia and other states accused of major human rights violations.The UK has exported more than $6 billion in arms to authoritarian states since the summer’s general election, with a huge increase in arms exports to Saudi Arabia and exports worth $160 million to Qatar, where political opposition is banned. August 1/31: BAE Systems, in conjunction with the British Royal Air Force (RAF), are testing a new package of advanced weapons, software and avionics enhancements for the Eurofighter Typhoon as part of its Project Centurion program. Upgrades already tested during the program—which looks to provide a seamless transition between use of the GR4 Tornado and Typhoon—have included the successful live firing of the Brimstone air-to-surface missile. The ongoing operational testing and evaluation of the upgrades, known as the Project Centurion Phase 1 capability package, includes trials of MBDA’s Meteor ‘beyond visual range’ air-to-air and Storm Shadow deep attack air-to-surface missile software systems. July 21/17: The British Royal Air Force (RAF) is to drive funds into Eurofighter Typhoon fleet enhancement from savings made through a new in-service support model. Known as the Typhoon total availability enterprise (Tytan), the 10-year arrangement between the RAF and industry partners BAE Systems and Leonardo is expected to reduce the Typhoon’s per-hour operating cost by 30-40%, generating savings of at least $712 million over the agreement’s lifetime. These funds will then be generated back into upgrading the aircraft. UK-specific initiatives already introduced via the Tytan contract include increasing the intervals between scheduled major maintenance activities, which will increase aircraft availability and reduce repair bills. Deep maintenance initially scheduled after every 400 flight hours has previously been extended to a 500h interval, and is expected to be stretched further to 750h. July 18/17: Following a series of flight trails earlier this year, a British Eurofighter Typhoon has test-fired a Brimstone air-to-surface missile for the first time. The missile’s integration is part of Phase 3 Enhancements developed for the jet in a wider a program known as Project Centurion, which aims to deliver a series of upgrades that will improve the strike abilities of RAF-operated Tornado GR4s and Typhoons. The missile is expected to enter service in 2018. July 14/17: UK Defence Secretary Michael Fallon has announced that Whitehall will spend $52 million on upgrading the anti-missile defense system of its Eurofighter Typhoon fighter jets. The Eurofighter consortium member Leonardo will undertake the work on the jets’ Defensive Aids Sub System (DASS), and the government said it would help the aircraft in missions against Islamic State in Iraq and Syria. The work will sustain approximately 65 jobs at Leonardo’s site in Luton, 30 miles north of London, as well as a further 41 jobs at fellow consortium member BAE Systems’ site in Warton, northwest England. June 26/17: Oman have received delivery of the first of 12 Typhoon fighters ordered from the Eurofighter consortium. The aircraft’s arrival to the sultanate was marked by a ceremony at Adam AFB, with Commander of the Royal Air Force Air Vice-Marshal Mattar bin Ali bin Mattar Al Obaidani in attendance. Ordered in 2012 to beef up its fighter fleet, the squadron of Typhoons along with eight Hawk aircraft will join Muscat’s current fleet of F-16 and Hawk aircraft. June 21/17: The Eurofighter consortium has announced a record year in operations of its Typhoon fighters, with further sales on the horizon. Operators of Eurofighter fleets have exceeded a combined 400,000 flight hours, including operations by RAF aircraft in Syria and supporting Baltic Air Policing commitments for NATO. The consortium also announced that its fighter will soon commence the first live firings of missile manufacturer MBDA’s Brimstone air-to-surface missile. June 13/17: The head of Airbus has called on the French government to join German and Spanish efforts on a proposed new fighter to succeed the Eurofighter Typhoon. “I really hope that France will be involved,” says Fernando Alonso, speaking to reporters on 9 June at the company’s media day. “We have to do this in Europe. There’s no place to do two or three different systems.” While Paris had initially stayed out of the Eurofighter program—instead favoring to work with Dassault on the Rafale—there has been much talk of further integrated European defense research and procurement among EU members, and with the UK gearing up to leave the EU, France is being seen as a potential replacement partner in such joint programs. Last year, Germany and Spain partnered to draw up requirements for the New Generation Weapon System (NGWS), a proposed new fighter that would be developed under the Future Combat Air System effort, which includes other elements of air warfare technology, including unmanned air vehicles (UAV) and space-based capabilities. May 16/17: BAE Systems has rolled out the lead example of its Eurofighter Typhoons destined for delivery to Oman later this year. Muscat’s Typhoon order, signed in December 2012, is for nine single-seat aircraft and three two-seat examples to support training activities. A ceremony to mark the occasion was hosted at the firm’s final assembly in Lancashire, UK, with the Typhoon joined by Oman’s first new-generation Hawk advanced jet trainer, of which eight Mk 166 examples are on order by the Gulf sultanate. April 13/17: Italian manufacturer Leonardo has handed over its 500th operational Eurofighter Typhoon to the Italian Air Force. Marking the occasion was a ceremony at the firm’s Turin facility and saw attendance from various military and security industry representatives, including leaders from Leonardo, NETMA, and Eurofighter Jagdflugzeug. Speaking at the event, Eurofighter Jagdflugzeug CEO Volker Paltzo stated that the “500-strong Eurofighter Typhoon fleet represents one of the largest and most capable fighter fleets in the western hemisphere, and will be the backbone of European airpower for decades to come.” European armed forces have been operating the Typhoon since 2003, when the first completed jet was delivered to Britain’s Royal Air Force. The service received their 100th plane in September 2006 while Germany’s air force accepted the delivery of the 400th jet in 2013. March 15/17: The British Royal Air Forces and BAE Systems have completed a series of trials as part of the Phase 3 Enhancement package that the company is developing for the Eurofighter Typhoon aircraft under the Centurian program. RAF pilots in conjunction with support from BAE’s engineers flew over 40 flights with the aircraft which set out to test its high precision MBDA Brimstone air-to-surface weapon. Each flight carried two launchers; each containing three Brimstone missiles alongside four AMRAAM, two ASRAAM, and two Paveway IV laser-guided bombs. The Centurian program aims to upgrade the Typhoon to sufficient multi-role standards in order to effectively replace the Tornado GR4 currently in service, by 2018. March 5/17: Opposition parties in the Austrian parliament have agreed to the setting up of an inquiry into the 2003 purchase of Eurofighter jets. The parliamentary inquiry formally announced on Friday by the Greens and far-right Freedom Party (FPO) comes just a week after Austrian prosecutors opened a criminal investigation into allegations of fraud against Airbus and the Eurofighter consortium, based on a complaint by the defense ministry. This is the second parliamentary inquiry in relation to the deal. The first, in 2006, sought to find reasons to cancel the contract but only resulted in the order being scaled back while the new investigation will examine the terms of that settlement and seek to claim back any monies it finds to have been wrongly paid out. February 20/17: Northrop Grumman and the British RAF have successfully demonstrated communication system interoperability between an F-35 and Eurofighter Typhoon jets. The test was carried out during an MoD-funded two week trial, called Babel Fish III, and saw a Lockheed Martin F-35B communicate with a Typhoon fighter by translating its Multifunction Advanced Data Link messages into a Link 16 format. It was the first time a non-U.S. 5th- and 4th-generation aircraft shared MADL-delivered data. Northrop claimed that the test integrated its Freedom 550 technology into the F-35’s Airborne Gateway, which translates information from various sources to enhance situational awareness and interoperability. February 17/17: After four years of investigation, Austria has filed a lawsuit against Airbus and the Eurofighter consortium over alleged deception and fraud linked to the 2003 purchase of Eurofighter jets. The investigation into the $2.1 billion deal by the Defense Ministry found that the defense groups gave misleading information on the purchase price, deliverability, and equipment of the jets, and are seeking damages that could amount to $1.17 billion. Vienna’s purchase of 15 fighters has faced scrutiny since the outset of the deal, with allegations that money was pocketed by politicians, civil servants, and others via brokers for side deals accompanying the purchase. January 18/17: Eurofighter will provide a five-year support deal for four NATO countries operating the Typhoon fighter. Two contracts were signed between NETMA, the NATO Eurofighter & Tornado Management Organization on behalf of core Eurofighter nations, and Eurofighter Jagdflugzeug GmbH on behalf of aircraft makers Airbus Defense and Space, BAE Systems and Leonardo. The deals cover the sustainment of engineering capabilities and program management, and for logistics, repairs, and the provision of spare parts for the Eurofighter fleet. October 24/16: Eurofighter Typhoons recently ordered by Kuwait will be fitted with Lockheed Martin’s Sniper advanced targeting pods. Under a contract with the Aircraft division of Leonardo-Finmeccanica, a member of the Eurofighter consortium, Lockheed Martin will supply 18 pods for Kuwaiti Typhoons, plus integration and logistics support. Deliveries are expected to begin in 2017. October 10/16: Efforts to market the Eurofighter Typhoon to Belgium will be lead by BAE Systems, as Brussels shops for its aging F-16 fleet’s replacement. As part of the bid, BAE has spoken to more than 100 Belgian companies in the defense, aerospace, and space sectors. Other fighters included in the mix are Lockheed Martin’s F-35, Boeing’s F/A-18, Dassault’s Rafale, and Saab’s Gripen. October 6/16: A lack of orders alongside a complex production process has seen production of the Eurofighter Typhoon suspended and potentially removed from the German market, at least until 2018. A joint European offering, the Typhoon receives components manufactured at four plants in Germany, Britain, Italy and Spain, which makes the production very complicated and expensive. It’s believed that Spain may soon follow in suspending production but production lines are likely to remain open in Italy and the UK. This is due to orders arranged between Italy and Kuwait as well as UK ambitions to shift Eurofighters to Saudi Arabia. July 15/16: A UK operated Eurofighter Typhoon has commenced flight testing of the E-scan radar following successful ground trials on the aircraft. The trials are designed to ensure the radar and weapons system reach the required capability in time for first deliveries to the Kuwait Air Force, which became the aircraft’s eighth customer earlier this year. Development of the new radar underpins the Typhoon’s current and future capability evolution. July 7/16: A Spanish Eurofighter Typhoon has dropped the GBU-48 dual-mode GPS and laser guided bomb for the first time. Testing took place in the Gulf of Cadiz in support of the Air Force´s Arms and Experimentation Logistical Centre (CLAEX) between June 20-24. According to the service, the event marks a significant increase for the C-16’s air-to-ground capabilities allowing the fighters to carry out simultaneous offensives against several ground targets. June 23/16: Eurofighter is to target fresh export sales of the Typhoon fighter as the consortium announced deliveries of 47 of the multi-role aircraft in the 12 months running up to May. A backlog of 106 deliveries now remain, with orders from Germany, Italy, Kuwait, Oman, Saudi Arabia, Spain and the UK. Targets for the fighter include campaigns with Indonesia and Malaysia, several European nations and a watchful eye is being kept on the ongoing situation in Canada. May 10/16: With the company currently rolling out its Leonardo re-brand, Finmeccanica has reported a strong financial first quarter thanks to its recent $9.1 billion Eurofighter deal with Kuwait. However, a drop in helicopter sales is negatively affecting the company. Helicopter orders dropped a massive €964 million in the first quarter from €1.35 billion last year to €384 million, which managers are attributing to turmoil in the oil and gas sector, resulting in companies buying fewer helicopters to access oil rigs. April 8/16: Kuwait is to become the launch customer of the Eurofighter Typhoon’s Captor-E active electronically scanned array (AESA) radar. The country will be the first to flight test the new technology upon delivery of its long awaited order for 28 of the multi-role fighters. Finmeccanica, who has taken the lead on the Kuwait sale has said that the Typhoons that will be delivered to Kuwait will be the most advanced configuration of the type, and will include the company’s Praetorian defensive aids suite and Pirate infrared search and track system. April 6/16: Kuwait’s delayed Eurofighter deal was eventually signed on Tuesday. The 28 jets making their way to the Gulf state will be the largest order of the jet for Italian Eurofighter partner Finmeccanica, who spearheaded the deal. The fighters will also come with a new electronically scanned radar designed by the European EuroRADAR consortium and specifically developed for the Eurofighter. Kuwait will be the first to have such radars installed on their jets as the four Eurofighter launch partners, Germany, Spain, Italy, and UK have yet to adopt the radar. March 3/16: Finmeccanica can breath a sign of relief as Kuwait’s parliament approved a draft law to allow for a $500 million down payment on its future Eurofighter deal. The purchase of 28 jets at a total cost of $8.7 billion had been hanging in the balance since a memorandum of understanding was signed in September. A final was expected to be signed in January, but issues over final cost and training requirements had been put under scrutiny. The delay had stoked fears that the deal could be cancelled, causing a 6 percent tumble in the Italian manufacturers’ shares in early February. February 23/16: Oman’s ordered Eurofighter Typhoon’s move one step closer to delivery according to Eurofighter partner BAE Systems. Final assembly has begun at BAE’s Warton site in Lancashire, UK with 12 to be delivered to the Royal Oman Air Force in 2017. The sale will also include eight Hawk 166 advanced jet trainers. Exports of the joint European Typhoon have been on the increase, with Italian partner Alenia Aermacchi and the Italian government leading the charge for the sale of 28 of the fighters to Kuwait. February 15/16: Following the delays in finalizing Kuwait’s Eurofighter fighter deal, Kuwaiti Deputy Premier and Defense Minister Sheikh Khaled Jarrah Al-Sabah has said that contracts will be signed this week. Italian Defense Minister Roberta Pinotti will visit Kuwait after both ministers discussed issues surrounding the deal during wider NATO talks over tackling the Islamic State in Brussels. With the deal originally planned to be finalized by the end of January, procedural delays over cost and training had put in doubt a deal being concluded any time soon. February 3/16: Last weekend’s expected signing of a deal for Kuwait to purchase twenty-eight Eurofighter jets has been put off. Italian Ministry of Defense officials cited “procedural” delays on Kuwait’s behalf, and that no clear date had been set. It had been expected that the deal would close quickly after some initial delays over pilot training had pushed an agreement into 2016. News of the deal came as Kuwait’s initial plan to purchase F-18 Super Hornets from Boeing was scrapped after their frustration over congressional delays in gaining approval for the sale. The loss of the sale to the Eurofighter has put into question the security of some jobs at Boeing’s St. Louis plant. The plant specializes in the manufacture of the Super Hornet, and were set to start production of the $3 billion deal before the change. January 28/16: After delays in gaining approval from the US to buy new F-18 Super Hornets, Kuwait instead looks set to sign contracts for twenty-eight Eurofighter Typhoon jets to replace their older F-18s. An official in the Italian Ministry of Defense said minister Roberta Pinotti would visit Kuwait on Sunday to sign papers finalizing the deal estimated to be worth $8.7 billion. Talks had been ongoing since November with issues over pilot training delaying the deal, but should be completed within eighteen months. The switch in allegiance will no doubt annoy manufacturer Boeing, and may see renewed frustrations over the lengthy congressional approval process for foreign military sales. December 14/15: Kuwait’s purchase of 28 Eurofighter jets from Finmeccanica is set to experience further delays, as contracts may not be signed until 2016. The CEO of Finmeccanica expressed concerns last week, saying that he did not expect a sale to be agreed upon before December 25. The $9 billion purchase has been delayed repeatedly since a memorandum of agreement was signed in September. Reasons for the delay have apparently arisen due to disagreements over pilot training and the dispatching of specialized personnel. On December 1, the Kuwaiti government requested parliament to release a supplementary budget of $20.4 billion to fund military weapon purchases over the next ten years. November 30/15: A $9 billion Eurofighter sale to Kuwait has been delayed. Italian defense company Finmeccanica announced that problems with pilot training and the dispatching of specialized personnel has resulted in the deal being postponed until mid-December. An initial memorandum of agreement for 28 fighters was signed in September and it was hoped contracts would have been signed by November. Kuwait is one of several Gulf nations currently driving to acquire high-tech aircraft and weaponry to protect themselves from neighbouring Iran as well as internal threats in the region. November 13/15: BAE Systems is slowing Eurofighter production in order to sustain production lines out past 2018, in addition to cutting jobs on the fighter’s UK production line. The decision reflects the company’s orderbook, covering production orders which conclude in 2018 and an expected uptick in production as a result of an order for 28 Eurofighters by Kuwait, following an agreement between the Italian and Kuwaiti governments earlier this year; however a finalized deal has yet to materialize. October 19/15: In further bad news for the German Eurofighter program, a malfunction with the aircraft’s external fuel tank grounded [German] the fleet from flying with the additional fuel pod attached, reducing the ability of the fighters to operate at longer distances. One of the German contingent of Eurofighters deployed to the Baltic region saw one of its fuel tanks fall off last week, leading to the grounding. This follows news earlier this week that the German government has temporarily suspended deliveries of new Eurofighters, citing manufacturing defects. German press also reports [German] that the EUR1 billion ($1.27 billion) contract to develop the CAPTOR-E radar system for the fighter, signed in November 2014, is now delayed by five months, as well as being above budget. October 14/15: Germany’s Defence Ministry has halted deliveries of Eurofighter Typhoon fighters following the discovery of a technical fault with the Airbus-manufactured jets. The technical problem is thought centered around the connection between the aircraft’s vertical stabiliser and the fuselage. This is the second time quality control measures for the European fighter have caused problems, with manufacturing defects in September 2014 [German] also leading to a suspension of deliveries. In both cases BAE Systems was the consortium member responsible for manufacture of the defective parts; however this latest problem is not thought to pose any immediate flight safety issues for operators of the aircraft. September 14/15: Kuwait is buying 28 Eurofighters through the Italian government, following an order for a dozen of the aircraft in December 2012. The order is the first in three years for the multinational Eurofighter, with the Eurofighter consortium’s partner company Alenia Aermacchi reportedly having led the marketing campaign in the Gulf state. Oman similarly ordered twelve of the multi-role fighters in December 2012, with the aircraft already in operation with six national air forces. Dec 12/14: Weapons. BAE announces that the 1st Brimstone trial onto a Typhoon was completed, following a June 19/14 award to study integration between the missile and the aircraft. The firm says that “6 Brimstone missiles were fitted to the aircraft, each wing carrying a launcher with three missiles. Training missiles were used for the purposes of the trial and demonstrated that the weapon can be fitted to the aircraft.” Of course that’s not the toughest part in such an endeavor, and full integration is not expected before 2018. November 2014: Weapons. The 1st release of a Storm Shadow cruise missile was performed successfully by the Italian IPA2 test aircraft, following initial tests in August. Now that inert drop tests and store release trials were performed, Phase 3 will involve environmental data gathering, followed by additional flights to assess handling qualities. BAE Systems was also able to test the installation of a Storm Shadow onto a RAF Typhoon. Source: Eurofighter. Captor-E concept (click to view full) Nov 19/14: Sensors. NATO’s Eurofighter and Tornado Management Agency (NETMA) finally signs a EUR 1 billion/ GBP 800 million / $1.273 billion contract with Eurofighter Jadgflugzeug GmbH to finish and integrate Euroradar’s Captor E-Scan movable AESA radar (q.v. March 22/12, July 30/12, Nov 15/13, Oct 17/14), whose absence is currently a big disadvantage compared to every other top-tier fighter on the market. This deal was supposed to be done by the end of 2012, and the delay has been costly, but better late than never. Captor-E is touted as having an unspecified “very large” antenna size that’s expected to be comparable to F-15s (APG-82v1) and F-22As (APG-77). That means more raw power for performance, and more T/R modules available for specialized functions; though materials, build quality, and the number of the T/R modules will all modify final performance statistics. Instead of using a fixed mounting like American fighters and the French Rafale, Eurofighter’s Captor-E will be mounted on a movable plate for an extremely Wide Field of Regard (WFoR). The current contract release appears to have expanded the touted FoR from about 120 to 200 degrees, thanks to the combination of mechanical movement and electronic beam steering. Eurofighter sees that capability as very useful for fire-and-evade dogfighting maneuvers that use the Eurofighter’s speed and maneuverability to their fullest, without breaking the launching fighter’s radar lock. The tradeoff is paid in poorer reliability and higher maintenance costs, compared to a fixed AESA array. The contract value for Finmeccanica alone will be EUR 400 million, as the leader of the Euroradar consortium. Finmeccanica-Selex ES will produce the new radar at its facilities in Edinburgh, UK and Nerviano (Milan), Italy while Finmeccanica-Alenia Aermacchi’s Turin, Italy site will be responsible for the navigation systems during the integration phase. Airbus DS in Germany, and Spain’s Indra, round out the consortium. Sources: Eurofighter GmbH, “Eurofighter And NETMA Sign One Billion Euro Radar Contract” | UK MoD, “€1 billion contract to develop cutting-edge radar for Typhoon” | Airbus Group, “New radar ensures superiority of the Eurofighter” | Finmeccanica Selex ES, “€1 billion contract signed between the Eurofighter consortium and the inter-governmental agency NETMA” | Defense News, “Action Pending on AESA Radar for Typhoon”. CAPTOR-E AESA Radar Flying low… (click to view full) Oct 17/14: P1E. BAE Systems announces that deliveries of Eurofighter Typhoon Phase 1 Enhancement upgrades have created 17 P1Eb standard aircraft in service with the RAF. A further 18 are to be delivered by April 1/15, under a EUR 1.2 billion program that will eventually convert all 67 Tranche 2 Typhoons in RAF service; BAE offers a useful summary of key features. Now that the UK has completed testing and undertaken initial fielding, the upgrade package will also become a proven installation option for other Eurofighter Tranche 2 customers, beginning in 2015. Meanwhile, future P2E and P3E upgrades are being planned, but the biggest wild card and competitive disadvantage remains: “Eurofighter is still waiting for the partner nations to sign a production contract for the introduction of the Captor-E [AESA radar]…. A program source confirmed that the signing of the deal had slipped to the end of 2014, and “the staffing process within some partner nations is taking more time than originally planned.” “Germany is still sorting out some details,” a second source said.” Sources: BAE Systems, “Royal Air force now flying their most advanced fighter jets ever” | Defense News, “British RAF Now Flying Improved Typhoon Aircraft”. Sept 30/14: Defects. Germany suspends their remaining 32 Eurofighter deliveries, pending resolution of a manufacturing defect and negotiations re: what to do about it. They also sharply cut the estimated number of safe flying hours in each of their 108 delivered Eurofighters to just 1,500, and Austria and Britain are apparently taking similar measures. The timing is terrible, coming on the heels of revelations that budget cuts have forced the German armed forces into deep disrepair, with most of its key equipment unready for war. BAE Systems and Britain’s RAF reportedly discovered that some of the rivet holes in the rear fuselage of the jet were drilled in ways that could introduce splinters and cracks into the rear fuselage, giving it less ability to resist wear and tear. That section is built by BAE, and tests are underway to get a more precise estimate of the effect on the fighter’s safe lifespan. Meanwhile, the problem isn’t an immediate safety issue, and the Luftwaffe won’t hit even this low hours limit until 2018, so the planes aren’t grounded. Exports to Oman and Saudi Arabia are expected to continue. Note that 1,500 flight hours is a ridiculously short life span, even for fighter jets whose forecasts in a capable military amount to just 150-300 hours per plane per year. Base figures of 5,000 – 8,000 are expected, with deep repair and refurbishment extending some airframes to around 10,000. The original official limit of 3,000 hours was itself just half of the Eurofighter Typhoon’s 6,000 hour design life, with the expectation that hard flight data would extend the official limit as experience offered greater certainty. It’s a very German approach, but the introduction of a big uncertainty is pushing estimates the other way for now. Sources: German Bundeswehr, “Eurofighter: Flugbetrieb der Luftwaffe aktuell nicht von industrieller Flugstundenreduzierung betroffen” | Der Spiegel, “Desolate Bundeswehr-Ausrustung: Hersteller warnt vor Mangeln am “Eurofighter” | Defense-Aerospace, “Eurofighter: Air Force Flight Operations Currently Not Affected By Flight Hours Reduction” | Agence France Presse, “Germany ‘erring on side of safety’ regarding Eurofighter defect” | Reuters, “UPDATE 2-Manufacturing flaw halts some Eurofighter deliveries” | Reuters, “Austria says Eurofighter has part problem” | SwissInfo, “Austria says Eurofighter has part problem, some deliveries halted” | Russia Today, “Eurofighter hull hitch: Germany halves fighter flying hours” || Der Spiegel, “Marodes Material: Bundeswehr erfullt Nato-Anforderungen derzeit nicht” (re: massive disrepair in armed forces) | Deutsche Welle, “Bundeswehr struggles with faulty defense equipment”. Manufacturing defect could shrink fighter lifespan Aug 5/14: Weapons. Italy’s Alenia Aermacchi has confirmed that the 1st phase of tests for Storm Shadow long-range cruise missile integration (q.v. July 26/13, Nov 20/13) is complete. They add that the fighter will be able to carry 2 Storm Shadows and up to 8 air-to-air missiles. That’s a good load for fighting your way in and out, which is useful to customers like Saudi Arabia and Oman who are paying for the work. The ability to add drop-tanks would be another valuable load-out, extending the Storm Shadow’s reach. Countries like Britain would find that exceedingly useful, but weight and aerodynamics make this combination a more challenging load-out. Perhaps Tranche 3 upgrades and Conformal Fuel Tanks (q.v. May 13/14) can offer this capability in a more elegant way. Sources: Eurofighter GmbH, “Success For Italian Eurofighter Storm Shadow Trials”. July 16/14: HMD. BAE unveils its Striker II Helmet-Mounted Display (HMD), which builds on the original Striker system flying with Eurofighter and Gripen fleets. The new system removes the need for night vision goggles, integrating a center-mounted ISIE-11 sensor based on Intevac Photonics’ patented electron bombarded active pixel sensor (EBAPS) advanced imaging sensor technology. The result is brighter and lighter than standard HMD/NVG combinations. the system is fully digital, and new hybrid opto-inertial technology is designed to reduce jitter and other syncing issues as the HMD tries to stay aligned with the pilot’s head movement and display its symbology. Sources: BAE Systems, “BAE Systems Unveils Digital Striker II Helmet-Mounted Display System with Superior Tracking, Night Vision Capabilities”. June 19/14: Weapons. BAE announces an initial GBP 5 million study contract from the British Ministry of Defence, to conduct initial integration studies for the dual-mode radar/laser guided Brimstone 2 short-range light strike missile. Brimstone is already operational on Britain’s Tornado GR4 strike fighters, and this is an expected development that will improve the Typhoon’s capabilities for close air support against land targets and swarming motorboats. Initial wind tunnel tests are already underway at Warton, Lancashire, and the study also intends to explore a common launcher for future derivatives like the 75+ km SPEAR 3 light strike missile. The target date for Brimstone 2 integration is 2018. Sources: BAE, “UK Study Contract Awarded to integrate Brimstone 2 onto Typhoon”. June 10/14: Crash. A Spanish Eurofighter Typhoon crashed just before landing at Moron de la Frontera AB, killing the pilot. The pilot was an experienced flyer with 600 flight hours in the type, and the cause is under investigation. It’s the first Spanish Air Force plane to go down, though a consortium prototype and a Saudi Eurofighter have crashed in Spain within the last decade. Sources: The Local – Spain, “Eurofighter jet exploded shortly after 2pm shortly after take-off for a routine practice mission” | Reuters, “UPDATE 2-Eurofighter jet crashes at Spanish base, killing pilot” | UK Daily Mail, “Eurofighter jet crashes just short of southern Spain airbase runway killing pilot”. Spanish crash June 9/14: Weapons. The Eurofighter’s weak weapons array has come back to bite it again, this time in Malaysia and Qatar. In “response” to this demand for “maritime attack capabilities,” which all of its competitors already possess in full: “Peter Maute, the head of combat aircraft sales at Airbus Defence, said the Boeing Harpoon and MBDA’s Marte and Sea Brimstone missiles were being considered as possibilities…. work on the weapons was done by Eurofighter in its development simulator but that full integration would have to await a customer. Qatar and Malaysia are known to have stipulated a maritime-strike capability for their next purchase of combat jets.” One hears “discussion,” study” and “plan” a lot, with respect to key Typhoon capabilities. In a competitive market, that doesn’t substitute for action. If you await a customer, you’ll be watching them buy something else: F-16s with Penguin Mk3s, F-15s with SLAM-ERs, JAS-39 Gripens with RBS-15s, Rafales with Exocets, Russian jets with Kh-31/ Kh-35s, or Super Hornets with Harpoon and SLAM-ER anti-ship and land strike missiles. It’s also doubtful that most customers would consider the short-range Brimstone missiles to be a “maritime attack capability,” unless one confines potential targets to small boats. Sources: Defense News, “Eurofighter Studying Missiles To Give Typhoon Maritime Attack Capability”. May 21/14: P1Eb. Eurofighter GmbH formally unveils the Phase 1 Enhancements B package in Berlin at the ILA 2014 airshow. It’s essentially the EP2 capabilities (q.v. Oct 30/13) of enhancements to the existing radar for Meteor missile compatibility, DASS defensive system improvements, MIDS/Link-16 interoperability updates, as well as Flight Control System (FCS) and the Utility Control System (UCS) improvements. Plus Storm Shadow cruise missiles, which weren’t announced in EP2 because payments are coming from outside the core group. Storm Shadows should be integrated by 2015, but full Meteor long-range air-to-air missile integration isn’t scheduled until 2017. The FCS/UCS upgrades will inprove compatibility with future civil airspace requirements, and also allow the pilot to switch seamlessly between air-to-air and air-to-ground modes. Overall, there’s less here than meets the eye. The Eurofighter’s aerial performance is very good, and they have a reputation for implementing very good pilot interfaces. With the exception of Meteor, however, comparable or better capabilities are already fielded in competitive aircraft like the F-15. This is more of a partial catch-up than a paradigm shift in anything. Sources: Eurofighter GmbH, “Eurofighter Unveils ‘Paradigm Shift’ In Capability At Berlin Air Show”. May 13/14: CFTs. BAE Systems has begun wind tunnel tests for conformal fuel tank designs, based on a “geometrically perfect 1/12th scale model” of the Tranche 3. The CFTs are created using additive manufacturing, then attached and removed for the tests. CFTs are one of the big changes inherent in the Tranche 3 aircraft, which will form a small portion of the core partners’ Typhoon fleets. Removing drag-creating fuel tanks from underwing hardpoints is a big plus, but a great deal depends on good design. Boeing and Northrop Grumman managed to craft CFTs that added 3,500 pounds of fuel to the F/A-18E/F Super Hornet, while creating nearly zero drag at sub-sonic speeds. Even those CFTs impose a trans-sonic penalty, which will be an issue for Super Hornets, but the Eurofighter has such a good power to weight ratio that a minor trans-sonic penalty won’t matter. Sources: BAE, “British Engineers test new configuration of fighter jets in high speed wind tunnel”. April 30/14: Germany – Costs. Germany’s Bundesrechnunghof (Federal Court of Auditors) publishes a supplementary annex to its 2013 report, and the Eurofighter is one of their subjects. The press release goes over known ground by saying that the EUR 11.5 billion budget will buy just 140 planes, instead of 180. What’s new is an acknowledgement that Eurofighter maintenance costs continue to increase, driven by added need for support and spares, and that life-cycle costs are expected to be roughly double the 1997 estimate of EUR 30 billion. 2011 and 2012 reportedly had the Eurofighter fleet consuming about 1/3 of the air force’s maintenance budgets, even though the fleet was smaller than planned and didn’t reach its maximum flight hours. By 2020, the fleet is expected to rise from 86 to 140, and flight hours would roughly triple to 28,400 per year. A comparative graph in the full report shows the rising operating & maintenance costs from the F-4F Phantom, to the Tornado fleet, to the Eurofighter fleet. The United States has seen similar trends as it fielded each new generation of fighters, but the Tornado is known to be a maintenance problem, and the Eurofighter still graphs significantly above it. The Bundesrechnunghof adds that even Germany’s Ministry of Defence doesn’t seem to know the full cost, and explains the Ministry’s rationalizations for not knowing. Other countries seem to manage such things, somehow. Perhaps the Germans could visit those countries and find out. Sources: German FCA, 2014 Pressemitteilung 04 – Bemerkungen 2013, weitere Prüfungsergebnisse [Press release] | “2013 Bemerkungen – Weitere Prufungsergebnisse – Nr. 09 “Kostentransparenz beim EUROFIGHTER herstellen” [Eurofighter summary, incl. link to full report] | Langfassung der Bemerkung Nr. 09 [Full report, PDF]. German costs Feb 27/14: Pessimism, or Realism? Airbus CEO Tom Enders doesn’t sound very sunny about Eurofighter’s future: “Enders said he’s also “not very optimistic” about securing further deals for the Eurofighter combat jet…. “We do hope we can still score one or two other successes in exports,” he said. “But we also have to prepare for a scenario — due to lack of export orders plus cancellations from others — that we’ll have to ramp down production of this otherwise very impressive aircraft sooner rather than later.” Sooner would be an end of production in 2017, which means that preparations within the supply chain would begin sometime in 2015. Sources: Bloomberg BusinessWeek, “Airbus CEO Says Turkish Delay in Taking A400M Threatens Ramp-Up”. Feb 25/14: Germany. The Handelsblatt business daily says that Airbus is demanding EUR 800 – 900 million in compensation for Germany’s Tranche 3B cancellation. Britain finessed its absence from Tranche 3B by substituting Saudi jets, which were bought under a direct government-to-government deal with Britain, but the other partners aren’t able to do that. That’s a steep price. Negotiations are expected, but even if Germany ends up paying in full per their original contract, it will still be a small percentage of what they would have paid to buy 37 new Typhoons. Obvious options involve some shifting of payments into R&D or upgrade work, or a refundable “export loan” whose repayment depends on reaching a certain number of fighter exports. The larger question for Eurofighter GmbH is whether financially fragile Italy and Spain take the same approach as Germany, or stand by their Tranche 3B orders. Sources: Sky News Australia, “Airbus ‘wants money’ for scrapped jets” | Frankfurter Allgemeine Wirtschaft, “Airbus will Entschadigung fur abbestellte Eurofighter”. Feb 20/14: Germany. German Defense Minister Ursula von der Leyen removes 2 senior procurement officials: Stephane Beemelmans and Detlef Selhausen. Part of the issue involves Eurofighters, specifically, a EUR 55 million euro (~$75 million) settlement to Germany’s MTU in lieu of EUR 340 million for Eurofighter Tranche 3B engine work. Not bad, but Bundestag budget committee approval is required for contracts over EUR 25 million, and the payment was authorized without that. Relationships with these individuals were already tense, so that was the end of the road. Sources: Defense News, “Germany Plans Procurement Overhaul After Program Missteps” | Der Spiegel, “Rustungsprojekt “Eurofighter”: Verteidigungsministerium gab Millionensumme ohne Bundestagsvotum frei” | Frankfurter Allgemeine Zeitung, “Wie von der Leyen aufräumen will”. Feb 19/14: Saudi Arabia. Saudi Arabia finalizes their contract for 72 fighters, agreeing on price escalation terms to upgrade the fighters bought under the Salaam program toward Tranche 3 standard (q.v. Feb 21/13, Aug 1/13, Dec 19/13). BAE was very involved in the process, but because the underlying agreement is actually with the British government, the amendment must also be negotiated between the governments involved. BAE had continued Eurofighter deliveries during the long negotiations, which meant rising amounts of cash committed without booking any profits. Clearing this issue up frees BAE to deploy its cash reserves more freely, while also removing a source of uncertainty for potential Gulf Cooperation Council customers. The firm describes the settlement as “broadly consistent with the Group’s prior trading outlook for 2013.” That outlook (q.v. Dec 19/13) estimated a 6-7 pence earnings per share drop without any agreement, or about GBP 250 million (~ $410 million) maximum, based on total shares revealed in a recent transaction. That’s on top of the original GBP 4.43 billion pounds/ $7.4 billion. Sources: BAE Systems, “Agreement on Salam Price Escalation” and “Feb 20/14 Transaction in Own Shares” | Reuters, “UPDATE 2-BAE Systems agrees pricing on Saudi Eurofighter deal”. Saudi finalization Feb 19/14: Germany. News reports are describing a German decision to cancel 37 Eurofighters, based on Deputy Defense Minister Stephane Beemelmans’ testimony before their the parliamentary defense committee. That isn’t quite true. What it means is that Germany doesn’t intend to pay for a Tranche 3B, which would have included 37 fighters to finish their agreed purchases. A Tranche 3B offer was reportedly extended to the core countries by Eurofighter on June 9/10, but Europe’s financial woes have left the core partners uninterested. Indeed, Germany ended their plans for a Tranche 3B order back in 2011 (q.v. Oct 21/11). 2014 was supposed to be a year of decision for the core countries, but with Germany and Britain on the sidelines, Spain or Italy become that much more difficult to convince. The wording of the July 31/09 Tranche 3A agreement, and of the broader Eurofighter partnership agreements, determine how much the decision costs Germany in cancellation fees. Britain found a way to disclaim any Tranche 3B buy the moment the Tranche 3A contract was signed, but they appear to have done so by shifting Saudi exports under their own account, which avoids any penalties. Unless Eurofighter GmbH finds additional orders somewhere, the production line will begin shifting toward upgrades and maintenance only in 2015 (q.v. Jan 25/11). Sources: Reuters, “Germany cancels delivery of last 37 Eurofighter jets: source” | Handelsblatt, “Deutschland bestellt 37 Eurofighter wieder ab”. Feb 9/14: Italy. The center-left Democratic Party is reportedly preparing a policy document that would cut F-35 buys from the current reduced plan for 90 F-35A/Bs to around 45 planes, while trying to make Italy invest in Eurofighter’s Tranche 3B buy. Significant reductions in planned buys by Italy, Denmark, the Netherlands, etc. will all hit Italy’s own F-35 Final Assembly and Check-Out plant. Part of the party’s push despite this incentive is ideological, reflecting a bias that’s in favor of European defense programs and less friendly toward the USA. Part of it reflects a level of general uneasiness with F-35 costs, capabilities, and delivery dates. Sources: Defense News, “Italian Lawmakers Consider New Cuts to JSF Purchase”. Jan 15/14: Testing. Test flights with the KEPD 350 cruise missile begin from at Manching Military Air Systems Center, north of Munich. They’re technically part of the Storm Shadow integration program, thought the KPED 350 won’t be fully integrated, and will include flutter tests, air data system large store interference assessment and aerodynamic data gathering. Sources: Eurofighter, “Eurofighter Typhoon: Flight tests with Taurus KEPD 350 missile started”. 2013 Saudis abandon local assembly; Competitions in Denmark, South Korea; Problems in Germany?; Testing begins for Storm Shadow & KEPD 350 missiles; Tranche 3 flies; 400th delivered; New CEO has a big job ahead. Saudi Eurofighters (click to view full) Dec 19/13: Low Rents of Arabia. A BAE investors release suggests that the UAE “have advised that they have elected not to proceed with [Eurofighter] proposals at this time,” and adds that negotiations with the Saudis over Tranche 3 upgrades to their Al-Yamamah buy of 72 planes may be deadlocked. The UAE’s decision is a very big blow to the Eurofighter’s future in the Gulf. A UAE buy offered the prospect of sustaining production for several years beyond 2018 by making Eurofighter the GCC’s de facto standard fighter, just as key competitions in Bahrain, Kuwait, and Qatar were coming up. If the UAE goes back to the Rafale instead, their fellow Mirage 2000 operator Qatar becomes a much harder target for Eurofighter, and the standardization momentum that was bringing unlikely customers like Bahrain to the table evaporates. The British government tried to use diplomacy on Eurofighter’s behalf, but they may have done more damage than good. None of the Gulf Cooperation Council were pleased with Britain’s failure to support the Syrian rebels. They were even less pleased when Britain’s government pushed hard for an Iranian nuclear deal that most of them regard as both catastrophically stupid and directly threatening. In contrast, France has played a leading role in pushing the Syrian issue, and was a very public dissenter regarding the Iranian deal. Sources: BAE, “BAE Systems – Status of prospective business in the UAE and Salam pricing discussions” | The Telegraph, “Blow for Britain and BAE Systems as UAE rules out Eurofighter deal” | The Telegraph, “David Cameron’s Typhoon debacle a sign of Britain’s declining Arabian influence”. UAE loss Dec 9/13: Tranche 3. British Single Seat aircraft #116 conducts the 1st Eurofighter Tranche 3 flight, with pilot Nat Makepeace at the controls. The biggest differences from earlier versions include a structure that can mount dorsal conformal fuel tanks; and a modified nose with a new internal structure, power, cooling and electronics for the future E-Scan AESA radar. Another development aircraft has been modified to take an E-Scan development radar for testing purposes. It’s currently being prepared at Warton, UK, ahead of its coming 1st flight. Eurofighter GmbH, “Eurofighter Typhoon Tranche 3 Takes to the Skies” | BAE Systems, “Eurofighter Typhoon Tranche 3 Takes to the Skies”. 1st Tranche 3 flight Dec 4/13: #400. The 400th Eurofighter Typhoon has been delivered. The single-seat fighter in question was handed over to the German Air Force at Cassidian’s Military Air Systems Center, located in Manching, Southern Germany. Sources: Eurofighter GmbH, “Eurofighter Typhoon Marks Delivery of 400th Aircraft”. #400 Nov 27/13: Testing. Flight tests of the Storm Shadow missile (q.v. Nov 20/13) begin from Alenia Aermacchi’s Flight Test Centre at Decimomannu Air Base, in Sardinia, Italy. Sources: Eurofighter, “Eurofighter Typhoon: Flight tests with Storm Shadow missile started”. Nov 22/13: Industrial. BAE and Finmeccanica’s Selex ES announce a teaming agreement to provide Electronic Warfare Operational Support (EWOS) for future Eurofighter Typhoon customers, “and the Eurofighter Typhoon core programme where appropriate.” Electronic warfare is often a pretty “black box”, as-is affair, but its importance makes it something that customers want to be able to modify for local threats and local needs. Technology has made that ideal easier, as software-defined digital systems are fielded. The flip side is that full export customer access to key items like threat libraries and operational modes creates a greater attack surface area for the core countries’ enemies to steal secrets. Under this agreement, the partners pledge to provide willing customers with a “sovereign” EWOS capability. That word is usually associated with full ability to maintain and modify a system, but absent further details, use of the word alone isn’t something to rely on. Selex ES SVP Electronic Warfare, Chris Bushell, adds that the partners have “agreed to also look at non-Typhoon EW support solutions where there is mutual benefit to doing so.” Sources: BAE, “Boosting Eurofighter Typhoon Electronic Warfare Support”. Nov 20/13: Weapons. At the Dubai Air Show, Eurofighter GmbH commits to full integration of the stealthy, medium range GPS/IIR guided Storm Shadow cruise missile by 2015. Storm Shadows are already used by Eurofighter customers in Britain, Italy, and Saudi Arabia (q.v. July 26/13). Ground tests are complete, and flight tests will begin using the IPA2 test aircraft upgraded to the P1E equipment standard. The similar KEPD 350 missile in service with Germany and Spain won’t be fully qualified, but it will be flight tested at the same time on the IPA7 test aircraft. That will cut time and costs if a customer decides to spend the money and pay for full integration. Sources: Eurofighter, “Flight tests for Storm Shadow and Taurus stand-off precision missiles announced”. Nov 15/13: CAPTOR-E AESA. The Eurofighter’s new AESA radar has finished its 4-nation program review at Cassidian’s site in Ulm, Germany, with antenna, repositioner, and Antenna Power Supply and Control Unit results that meet the theoretical design. Next, the antenna sub-system will go to Selex Edinburgh for integration and test with receiver and processor. Final integration of the Captor-E radar into Eurofighter test plane IPA5 is planned in springtime 2014. Source: EADS Cassidian, Nov 15/13 release. Nov 12/13: Bahrain. Flight International quotes Col. Salah Al-Mansoor from the Royal Bahraini Air Force’s planning headquarters, who says that Bahrain will be upgrading its 21-plane F-16 fleet to roughly F-16V status from 2014-2018, under a deal whose initial outline is already agreed with Lockheed Martin. Bahrain would represent the 3rd such F-16 upgrade, after Taiwan and South Korea. Major upgrades under the Common Capability Integration Program will reportedly include an AESA radar (NGC APG-80 or SABR, or Raytheon RACR), new cockpit displays, the Link-16/MIDS datalink, software upgrades, and Lockheed’s AN/AAQ-33 Sniper surveillance and targeting pod. Al-Mansoor also mentions GPS-guided JDAMs, an upgrade to AIM-9X short range air-to-air missiles, and “the D-model version of Raytheon’s AIM-120 AMRAAM”. That last is unlikely; the AIM-120D isn’t approved for export, and is still working toward Initial Operational Capability in the USA. Col. Al-Mansoor says that the kingdom is considering a follow-on order of new F-16s, adding that “We must analyse and determine the cost of the future force structure.” The RBAF’s 16 F-5E/F fighters need replacement, and a winner is expected to be announced in January 2014 at the Bahrain international air show. BAE’s Eurofighter remains the front-runner, but the same outlay that would buy just 12 Eurofighters would net Bahrain around 20-22 F-16E/F Block 60s or similar F-16V equivalents, with all of these upgrades already baked in. Questions remain. Can Bahrain buy new F-16s and Eurofighters, given the need to aid countries like Egypt and pacify its own restive population? Is the F-16 CCIP + Eurofighters their best Plan B, or could they decide to operate an all-F-16 future fleet of upgraded and new fighters, offering lower short and long-term force structure costs, and commonalities with the nearby UAE? Finally, what about Gulf monarchs’ growing wariness concerning US intentions and support? How will that play into Bahrain’s decisions? Flight International, “Bahrain to launch F-16 upgrade in 2014”. Nov 4/13: Tranche 3. The 1st Tranche 3 Typhoon (BS116), has successfully completed engine ground runs at Warton, UK, from green screen checks through Stage C checks of the engine’s integration with all onboard systems. 1st flight is expected to take place before the end of 2013 – and does, in December. Sources: Eurofighter GmbH, Nov 4/13 release. Oct 30/13: EP2. The NATO Eurofighter and Tornado Management Agency (NETMA) signs a development contract with Eurofighter Jagdflugzeug GmbH for Evolution Package 2. It includes enhancements to the existing radar, DASS defensive system, and MIDS/Link-16 system, as well as Flight Control System (FCS) and the Utility Control System (UCS) improvements to inprove compatibility with future civil airspace requirements. MBDA’s Storm Shadow cruise missile isn’t mentioned (q.v. July 26/13). Development is supposed to be done by the end of 2015. Earlier reports (q.v. July 30/12) suggested that the radar enhancements may involve a new AESA system, but current sources indicate that EP2 this just adds Meteor missile capability to the existing Captor-M radar (q.v. June 18/13). Sources: Eurofighter GmbH, Oct 30/13 | AIN, “Eurofighter Signs New Contract, Describes AESA Radar Status”. EP2 development Oct 28/13: P1E. The Eurofighter Typhoon Phase 1 Enhancements (P1E) program has finished flight testing in Manching, Germany and Getafe, Spain, and will be ready for installation and retrofit on existing Tranche 2 aircraft by the end of 2013. P1E implements full Air-to-Surface capability, with full integration of a Laser Designator Pod (RAFAEL LITENING III), full smart bomb integration (Paveway laser-guided, and dual-mode Paveway IV/ EGBU-16 GPS and laser), Helmet Mounted Sight System upgrades for ground attack use, Mode 5 Identification Friend or Foe, improved Radios and Direct Voice Input, Digital integration of Short Range Air-to-Air Missiles (full IRIS-T integration with HMSS for high off-boresight shots, and allowing future AIM-9X integration), and an updated MIDS/Link-16 Datalink for wider interoperability. All of these enhancements will come factory-installed in Tranche 3 aircraft. Sources: Eurofighter GmbH, Oct 28/13 | Aviation Week, “Partners Chart Course For Eurofighter Typhoon Enhancements”. Tranche 2 P1E upgrades approved Aug 19-20/13: South Korea. Conflicting messaging from DAPA and contractors give a somewhat muddled picture, but the upshot is that Eurofighter was disqualified on a questionable technicality, and the F-35 for budgetary reasons, apparently leaving the F-15SE as the de facto winner. That was reversed in late September, when South Korea’s government decided to cancel the competition and start over. In effect, they’ve signaled that it isn’t really a competition, they want the F-35. Which is confirmed in November, when the F-35 is picked as a sole-source winner. Read “South Korea’s Reboots F-X Multi-Role Fighter Buy, Wants 5th Gen” for full coverage. Loss in Korea Aug 7/13: Bahrain. BAE Systems says that Bahrain “has expressed an interest in Typhoon and the British government are leading very early discussions”. That’s new, and the motivation is interesting. Bahrain’s King Hamad al-Khalifa reportedly told British Prime Minister David Cameron that they were interested in buying Eurofighter jets to “create a cohesive defence system between the Gulf Cooperation Council (GCC)” nations. Saudi Arabia is the linchpin of the GCC, and Oman is a respected member. This is a clear dividend from their purchases, and the king’s comment may also be good news for prospective sales in the UAE (40-60 jets), Kuwait, and Qatar. At the same time, every one of these sales is expected to be hotly contested, with competition in place or expected from Boeing’s F/A-18E/F Super Hornet, Dassault’s Rafale, Lockheed Martin’s F-16E/F, and Saab’s JAS-39E/F Gripen. Reuters. Aug 1/13: Saudi Arabia. BAE’s 2013 Half-Year Results says that deliveries have resumed, with the Saudi fleet up to 28 fighters, construction beginning on new facilities, and pilot training in-country progressing: “Four Typhoon aircraft were delivered in the first half, adding to the initial phase of 24 Typhoon aircraft deliveries between 2009 and the end of 2011…. A [GBP] 0.3bn contract was signed in March for the construction of airfield facilities at King Fahd Air Base in Saudi Arabia. Discussions on the provision of maintenance and upgrade facilities in-Kingdom, and further capability enhancement of the Typhoon aircraft remain ongoing. Under an order received at the end of 2012 to deliver training to the RSAF, the first graduation ceremony of cadets from the King Faisal Air Academy was held in May [2013].” With respect to finalizing terms for Tranche 3 upgrades, BAE’s accompanying presentation cites “good progress,” and says “Significant trading bias to second half anticipated.” Translation: we expect a deal before the end of the year. That will need to be taken care of before BAE can talk about further sales, though they do cite a “KSA B2” opportunity as one of their top prospects. Half-Year Results statement [PDF] and presentation [PDF] | Daily Mail. July 26/13: Storm Shadow. AIN reports that key Tornado upgrades may end up being funded by Saudi Arabia and Oman. RAF assistant chief of the air staff AVM Ed Stringer says that “Storm Shadow will be on the Typhoon sooner than you think.” From “Middle East Customers Funding Eurofighter Upgrades”: “…further indication that some key upgrades to the combat jet are being funded by Saudi Arabia and possibly Oman. The four original partner nations have proved reluctant to collectively fund in the near term enhancements… such as integration of the MBDA Storm Shadow cruise missile. The four partners have also so far failed to approve full development of the Captor-E AESA radar by the Euroradar consortium…. “Other Typhoon customers are involved [in providing] funding profile,” [RAF Air Vice Marshal Ed Stringer] added…. During a briefing at the IDEX show in Abu Dhabi earlier this year, a BAE Systems official said that the Storm Shadow would enter flight-test on the Typhoon this year because this is a requirement of the Royal Saudi Air Force.” The RSAF already uses Storm Shadow missiles on their Tornado strike fighters. July 7/13: Germany. Der Spiegel takes a strafing run at the Eurofighter program in Germany, pointing out both its budget overruns, and citing recent documents that discuss safety and quality issues with the planes. Germany and the other Eurofighter partners are expected to make their Tranche 3B decisions sometime in 2014, so the articles feed into a live political debate as an election approaches. On the budgetary front, the Bundestag approved EUR 14.7 billion for 180 fighters, but Der Spiegel says that EUR 14.5 billion has already been spent on just 108 machines. The current Bundeswehr estimate is reportedly EUR 16.8 billion for 143 fighters (Tranche 1 through 3A) by 2018. That would average out to EUR 117.5 million/ $157 million per plane. The 2nd issue involves quality control problems. On Oct 1/08, the military did not extend the Manching, Bavaria plant’s license to remain a Bundeswehr aviation site. Aircraft were still accepted after more detailed inspections, but that could leave the government liable in the event of a crash on German soil. Later, on April 18/13, an auditor from the Bundesamt fur Ausrustung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw) in Koblenz cited the ejection seats as a fleet-wide problem area. Der Spiegel alleges that German quality control and inspections have suffered as a result of austerity measures and military “reforms,” but it isn’t the first time this has been publicly cited as an issue. In August 2010, an RSAF Lt. Col. and member of the Saudi Royal family was killed in a 2-seat Typhoon crash near Moron, Spain, when his parachute separated from the harness. His Spanish counterpart ejected safely. The accident led the RAF to modify its fleet’s ejection seat harnesses. Der Spiegel re: budgets [in German] | Der Spiegel re: reliability [in German] | Reuters. Program problems July 5/13: South Korea. DAPA suspends bidding on its fighter competition, after none of the entries (Eurofighter, F-15SE, F-35A) could meet South Korea’s industrial demands, and performance specifications, and budget limits. Something clearly has to be rethought, if South Korea wants those fighters. If they don’t drop the number bought, then either the budget must be increased, or cost-adding elements like industrial offsets need to be revised, or the performance specifications need to be relaxed and new competitors contemplated. Yonhap | Yonhap follow-on. July 2/13: P1E Weapons. BAE announces that they have finished initial Paveway IV GPS/laser guided bomb trials with a Eurofighter, as part of the Phase 1 Enhancement Programme that will give Eurofighter Typhoon Tranche 2 planes independent precision strike capabilities. Other elements of the program include the LITENING laser designation & surveillance pod, and EGBU-16 Enhanced Paveway laser/GPS guided bomb. BAE Systems. June 20/13: Qatar. AFP says that the Middle Eastern Emirate intends to launch its RFP for 24-36 fighters “soon.” They own a fleet of Mirage 2000-5s, which recently flew to enforce the no-fly zone over Libya. French President Hollande will visit Doha for high-level economic talks on June 22, and France has close ties with the Emirate, but the Qataris aren’t waiting around. They reportedly spent time in May 2013 evaluating the Eurofighter Tornado with the RAF, and will soon host a Eurofighter team in-country for flight trials. Boeing also remains in the mix. Agence France Presse. June 19/13: Industrial. New Eurofighter GmbH CEO and former Airbus Military head Alberto Gutierrez seems to understand what his firm needs to do. Now, can he do it? He tells Reuters: “In this market, where we are, there is competition and we have to keep on going, finding out whatever improvement is available to catch up, to make the product cheaper and a way of getting into decisions leaner and faster…” All true. The problem is, he has just admitted that his plane is behind competitors in key areas, too expensive, and hobbled by an industrial structure that doesn’t foster either lean costs or fast action. Fixing even 1 of those problems is a serious challenge. Fixing all 3 in time to land new orders, before the plane goes out of production, while keeping governments from derailing improvement plans, starts edging toward “Mission: Impossible” territory. June 18/13: Weapons. Eurofighter Jagdflugzeug GmbH signs a full weapon system integration contract with the NATO Eurofighter and Tornado Management Agency (NETMA) for MBDA’s Meteor long-range air-to-air missile. This will reportedly include 2-way datalink integration, which will offer parity with the JAS-39 Gripen and an advantage over the Dassault Rafale. Germany became the last of the 6 core Meteor partners (Britain, France, Germany, Italy, Spain, Sweden) to sign a contract for missile stocks, on May 31/13. The NETMA contract completes the other coverage loop, and means that MBDA now has contracts to integrate its missile onto all 3 originally-envisaged platforms: the Dassault Rafale, Eurofighter Typhoon, and Saab’s JAS-39 Gripen. BAE had done some preliminary work (q.v. June 20/11, July 11/12) in Britain, which led to an unguided test firing (Dec 6/12). That was an excellent set of 1st steps to cut integration time for everyone, but that isn’t the same as full integration. Further design and test work on the missile system will continue at Alenia Aermacchi, BAE Systems, and EADS Cassidian… which doesn’t seem like a very efficient way to conduct things. What the releases don’t say is when integration will be complete. Eurofighter GmbH has now confirmed the date as 2017. That’s about 3 years later than Saab’s JAS-39 Gripen (2014), and later than original Eurofighter forecasts of mid-2015, and but a year earlier than the French Rafale (2018). Eurofighter | MBDA | UK MoD | Aviation Week. Full Meteor air-air missile integration contract June 7/13: Engine. EUROJET Turbo GmbH celebrates the delivery of its 1000th EJ200 production engine, of over 1,500 orders places so far. This one was assembled at ITP for Spain, and the firm touts 789 engines in service so far on operational Eurofighter Typhoons. To date, the engines have accumulated over 390,000 flying hours. Eurojet [MS Word] | Eurofighter. 1,000th EJ200 May 23/13: South Korea. EADS Cassidian reportedly announces that they would invest $2 billion in the K-FX fighter development project, and help market the plane internationally, if the Eurofighter is chosen for F-X-3. Investments would include a maintenance repair and overhaul (MRO) facility that could extend to the KF-X, and an aerospace software center. It isn’t a bad idea for EADS. Barring multiple orders from new sources, it’s very unlikely that the Eurofighter will still be in production by 2022. Upgrades and maintenance will continue for some time, but the C-203 KF-X design could offer EADS a new option to sell, with a fundamental design that can improve toward stealth fighter status. The question is whether South Korea wants to go forward. Yonhap News. April 5/13: South Korea. An un-named military official tells the government’s Yonhap News Agency that after 2 years of discussions and negotiations with DAPA, EADS has changed its industrial offer. Instead of having the first 10 made in Europe, the next 24 made using Korean components, and the last 26 assembled in Korea, EADS has offered to build just 12 in Europe, with the other 48 Tranche 3 planes at KAI in South Korea. The news report is imprecise, leaving the question of structural manufacturing vs. kit assembly unaddressed. It also fails to address how EADS can promote the idea of 20,000 South Korean aerospace jobs for a 5-year period, when the company also says that building the Typhoon for the much larger orders of the core country participants created just 10,000 jobs in Europe. On its face, the statement seems less than plausible, but it does point to the likelihood of significant structural manufacturing in Korea. Yonhap. April 4/13: South Korea. The ROKAF has picked Taurus’ KEPD 350 long range cruise missile for their future fighter force. They’ll have to pay extra to integrate it with their F-16s and F-15Ks. The proposed F-15SE Silent Eagle is different enough that it will probably require added testing, so Eurofighter may garner a slight advantage from German & Spanish plans to add the KEPD 350 to Eurofighter by 2015. Read “Korea’s F-X Multi-Role Fighter Buys: Phases 2 & 3” for full coverage. March 26/13: Tranche 3. The Tranche 3 Instrumented Production Aircraft 8 test plane has joined all major structural pieces, and moves on to the next production station on the final assembly line in Manching. Work is now focused on hydraulics, defensive aids, test flight instrumentation, and electrical systems with over 110 km of complex special cabling. IPA8 will play an important role testing and integrating new features like the AESA radar, new weapons, etc. EADS Cassidian. March 13/13: Denmark. The Danes pick up their fighter competition as promised, following their announced hiatus in April 2010. Invited bidders include the same set of Lockheed Martin (F-35A), Boeing (Super Hornet), and Saab (JAS-39E/F) – plus EADS (Eurofighter), who had withdrawn from the Danish competition in 2007. The goal of a 2014 F-16 replacement decision has been moved a bit farther back, and now involves a recommendation by the end of 2014, and a selection by June 2015. The Flyvevabnet are reported to have 30 operational F-16s, with 15 more in reserve, out of an original order of 58. Past statements indicate that they’re looking to buy around 25 fighters as replacements, but there are reports of a range from 24-32, depending on price. Danish Forsvarsministeriet [in Danish] | Eurofighter GmbH | Saab | JSF Nieuws. Feb 21/13: Saudi Arabia. BAE’s end of year investor presentation [PDF] discusses changes in Saudi Arabia, including a contract amendment that formally abandons Saudi plans for a final assembly line in-country. That insistence had been holding up deliveries, and the remaining 48 aircraft will begin arriving in 2013. Meanwhile, work to “expand the multi-role capabilities” of Saudi Typhoons continues, as do negotiations to continue expanding those capabilities toward Tranche 3 levels. Pricing remains an issue several years after the contract, and the next stage of support contracts is also in long negotiations: “Under the Saudi British Defence Co-operation Programme (SBDCP), orders totalling £3.4bn were awarded for support through to 2016, including the provision of manpower, logistics and training to the RSAF…. The initial three-year Typhoon support contract finished at the end of June and two subsequent six-month extensions have been secured. Discussions continue with the customer on the next five years of support. Discussions on Typhoon price escalation with the Saudi Arabian government remain ongoing. Negotiations are also ongoing for the provision of maintenance and upgrade facilities in-Kingdom, and further capability enhancement of the aircraft.” Feb 11/13: DACT distilled. A veteran Eurofighter test pilot doesn’t see the logic behind Lockheed Martin test pilot Bill Flynn’s recent claim that an F-35 will beat any 4+ generation aircraft, including the Eurofighter Typhoon: “The F-35 thrust to weight ratio is way lower [than Eurofighter] and its energy-manoeuvrability diagrams match those of the F/A-18…. starting from medium altitude and above, there is no story with a similarly loaded Typhoon…. [F-35] Transonic acceleration is… better than in an F/A-18 or F-16, but mainly due to its low drag characteristics than to its powerplant. That means that immediately after the transonic regime, the F-35 would stop accelerating and struggle forever to reach a non operationally suitable Mach 1.6…. The Typhoon will continue to accelerate supersonic with an impressive steady pull, giving more range to its BVR (Beyond Visual Range) armament…. Angle-of-attack is remarkably high in the F-35, as it is for all the twin tailed aircraft, but of course it can not be exploited in the supersonic regime, where the limiting load factor is achieved at low values…. Excessive energy bleeding rates would operationally limit the F-35 well before its ultimate AoA is reached.” Both Britain and Italy will eventually find out for sure, as they will soon have both types in service. Italy will be the best test, as its F-35As are more capable dogfighters than Britain’s F-35Bs. About 2 months earlier, the Aviationist had canvassed Italian pilots, who fly both the F-16 and the Eurofighter, for their opinion concerning those 2 platforms: “During more or less a decade of service with the Italian Air Force, the F-16 has been extensively used to train Typhoon pilots in WVR engagements. According to the Italian pilots, the F-16 matches the F-2000 under 10,000 feet. But above FL100 the Typhoon becomes quite difficult to beat since its superior aerodynamics give the Eurofighter can out maneuver the Viper at every engagement.” Sources: The Aviationist, “No way an F-35 will ever match a Typhoon fighter jet in aerial combat” Eurofighter test pilot says” | and “How does the F-16 perform against its adversaries in dogfight?” vs. F-35 & F-16 2012 EUR 2 billion support deal; Oman buys 12; India loss. Eurofighter & Paveways (click to view full) Dec 21/12: Oman. It isn’t Christmas over there, but the RAFO is getting a present anyway. The Sultanate signs a GBP 2.5 billion (about $4.057 billion) deal with Britain for 12 Eurofighters, and 8 Hawk LIFT advanced trainers. This makes them the Eurofighter Typhoon’s 3rd export customer, a status they share with their neighbor Saudi Arabia. The deal includes in-service support, and deliveries are expected to begin in 2017. See “Oman’s Air Force Upgrades: From Jaguars to F-16s & Eurofighters” for full coverage. Oman buys 12 Dec 6/12: Weapons. 1st firing of MBDA’s Meteor long range air-air missile from a Eurofighter Typhoon. It’s part of Britain’s Future Enhancements Flight Test Programme, and builds on BAE’s unpowered trials to verify safe separation. The flight trials were conducted with integrated support from QinetiQ and MBDA. BAE | Eurofighter. Nov 29/12: UK Updates. BAE Systems has finished upgrading 43 RAF Eurofighters under the Retrofit 2 program, which began as its own effort but was subsumed into the wider Typhoon Availability Service (TAS) contract. Their Tranche 1 Block 5 standard installs the PIRATE forward looking infra-red (FLIR) system, improves air-to-air capability; and adds precision strike by using a combination of Paveway II family laser-guided bombs, and RAFAEL’s LITENING-III surveillance and laser designator pod. Eurofighter GmbH. Nov 6/12: UAE. British Prime Minister David Cameron issues a joint communique with the UAE. The 2 countries will improve their defense ties, with specific commitments that include: “Deepen our defence ties by; continuing the development of our joint plans for the security of the UAE and wider Gulf region; increasing our joint exercises and training; and by investing in the British military presence in the UAE. Establish a defence industrial partnership that involves close collaboration around Typhoon and a number of new technologies.” The Eurofighter is competing with France’s Rafale for a 60-plane buy, and these sorts of agreements are normal under the circumstances. It’s also normal for specific defense deals to depend on the customer’s final choice, though the joint communique includes economic relations beyond defense. UK PM | Reuters. Nov 6/12: Flight costs. From Britain’s House of Commons: Mr Ellwood: To ask the Secretary of State for Defence what the average hourly cost was of flying the Typhoon fighter (a) with and (b) without fuel costs. [126215] Mr Dunne [holding answer 1 November 2012]: The standard marginal flying hour cost for a Typhoon is £3,875, including the cost of fuel. Excluding fuel costs the figure reduces to approximately £2,670.” Even GBP 3,875 (about $6,200) is considerably cheaper than published American fighter costs per flight hour. The comparable F-15 Eagle family is generally quoted as being in the $17,000 – $30,500 range. The difference has less to do with the respective machines, and more to do with differing approaches to calculating those costs, especially in one’s choice of what to include. A standard calculation method would be informative, but it doesn’t exist. RAF flight costs HEA click for video Oct 16/12: HMD. Eurofighter GmbH touts the new “Head Equipment Assembly (HEA), developed by BAE Systems’ Electronic Systems, [which] comprises the aircrew helmet and all the sub-system elements needed to display a real world overlaid picture on the helmet visor.” The accompanying video has a Typhoon pilot explaining why this is so powerful, and expressing his belief that it’s impossible to beat an enemy if they have a system like this and you don’t. “Once you’ve had this helmet on, you don’t ever want to be without it.” All well and good, but American fighters have had these capabilities for almost a decade now. A fact that they have used to their advantage in international competitions against the Typhoon, and against other fighters like the French Rafale that lack an accompanying HMD. Why HMDs matter July 2012: Japan. The Japanese Ministry of Defense releases its “Defense of Japan 2012” White Paper. Among other things, it explains exactly why the F-35 won. All 3 contenders fulfilled all mandatory requirements, but the F-35 was rated as the overall winner based on the 2nd stage evaluation of capability, industrial participation, cost, and support. Part of the problem is that Japan simply accepted Lockheed Martin’s paper performance and cost promises at face value, in the absence of data. Even then, the Typhoon was seen as the most fuel-efficient plane, and its bid had the best industrial benefits for Japan. On the other hand, EADS and BAE had trouble meeting Japan’s purchase cost targets while giving Japanese firms all of that work, and picking EADS/BAE would have meant deviating from Japan’s strongly American industrial links and equipment infrastructure. The Eurofighter Typhoon also had a compatibility problem with the JASDF’s KC-767 aerial tankers, who don’t carry hose-and-drogue refueling pods. KC-767 retrofits would have been required, driving up the program’s expense. Read “Japan’s Next Fighters, From F-X Competition to F-35 Buys” for full coverage. Luftwaffen (click to view full) July 30/12: Eurofighter vs. F-22. Combat Aircraft leaks some results from the 2012 Red Flag exercises. WIRED Danger Room: “In mid-June… [8] Typhoons arrived at Eielson Air Force Base in Alaska for an American-led Red Flag exercise involving more than 100 aircraft from Germany, the U.S. Air Force and Army, NATO, Japan, Australia and Poland. Eight times during the two-week war game, individual German Typhoons flew against single F-22s… The results were a surprise to the Germans and presumably the Americans, too. “We were evenly matched,” Maj. Marc Gruene told Combat Aircraft’s Jamie Hunter. The key, Gruene said, is to get as close as possible to the F-22 … and stay there. “As soon as you get to the [close-in] merge … the Typhoon doesn’t necessarily have to fear the F-22,” Gruene said.” That’s interesting, and an impressive testament to the Eurofighter’s design and ergonomics. On the other hand, let’s acknowledge that it isn’t exactly easy to “get to the merge” against an opponent who is invisible to your radar at range, moving up to 50% faster than you are, and able to see you just fine on their own radar. vs. F-22 July 30/12: AESA. NETMA(NATO Eurofighter and Tornado Management Agency) has reportedly issued an RFP to Eurofighter GmbH for the development of an E-Scan Active Electronically Scanned Array Radar. Eurofighter CEO, Enzo Casolini says the 2015 target remains, per announcements in June 2011: “The timescale is to answer the RFP by October this year and to have an agreement with the nations by the end of the year. The target is to have a contract by the middle of next year and to have an E-Scan entering into service by 2015.” See: Arabian Aerospace. July 11/12: Weapons. BAE describes cockpit assessment trials for the long-range Meteor air-to-air missile. They took pilots from “each of the Eurofighter nations,” and put them through a range of scenarios in a modified simulator. That led to a series of recommendations for the final cockpit design. On the one hand, getting the user interface really right pays big dividends in combat. On the other hand, the fact they’re doing these exercises a good indication of how early they are in the process. It also points to how much more is involved in this sort of thing, beyond just hanging a new missile on a pylon. BAE Systems. July 10/12: Gulf opportunities. Reports from Farnborough shed some light on potential Eurofighter Typhoon sales to Oman, Qatar, and the UAE. Dassault has been sounding quite confident about the Rafale’s ultimate prospects in the UAE, but BAE Systems’ business development director Alan Garwood told Reuters that he believed the UAE’s interest is “real and genuine,” adding that they “could tell by the questions they were asking us that they were serious.” BAE is still working with the British government to put together a package for 60 planes. With the loss in India, and the near-certain demise of Tranche 3B, the UAE represents the fighter’s largest near-term opportunity. Oman is a higher-odds opportunity, and Garwood said that: “We’ll start formal negotiations [for 12 jets] with Oman towards the end of August [2012] I would imagine. The two governments have targeted it for completion this year and we want it done this year as well… I see no reason why we shouldn’t be able to do that.” With respect to Qatar, he would say only that: “We are talking to the Qataris quite a bit.” That’s normal in a competition like this, which is reported to include Boeing’s F/A-18E/F Super Hornet, Dassault’s Rafale, Lockheed’s F-35A Lightning II, and Saab’s JAS-39E/F Gripen. Reuters | WSJ’s The Source blog. July 9/12: Upgrades at last? At the opening of the Farnborough defense exhibition, British Prime Minister David Cameron discusses the Eurofighter’s future: “Typhoon’s growth potential is huge and the four partner nations, Italy, Germany, Spain and the UK have agreed the next steps required to further exploit this. The integration of the METEOR missile, an Electronically Scanned Radar, enhancements of the Defensive Aids System, further development of the air-to-air and air-to-ground capabilities and integration of new weapons.” With Tranche 3B fading away, and India out as a big export win, upgrades like these are the only way to keep part of the manufacturing base going for much longer, and are also its best hope for landing significant export orders. The question is when some of these upgrade “agreements” will become signed contracts with actual dollars behind them. Read “Eurofighter’s Upgrades: Enough? In Time?” for more. March 30/12: “Contract 1”. Eurofighter Jagdflugzeug GmbH signs a major 5-year contract with NATO’s Eurofighter and Tornado Management Agency (NETMA), to support the fleet of Typhoon jets across the 4 Eurofighter core nations: Germany, Italy, Spain and the UK. The overall contract total is not disclosed, but is estimated to be around EUR 2 billion (currently $2.66 billion). BAE estimates its share of the total at GBP 446 million (about EUR 533 million). Finmeccanica estimates its share of the total at “more than EUR 500 million.” EADS declined to give figures. “Contract 1” replaces previous Integrated Logistics Support (PC1-11) contracts and a number of sustainment contracts, covering items like day-to-day support, studies, and customer queries and investigations. It also includes continued development, testing, and upgrade work on the fighters’ systems. Replaced contracts will morph into Contract 1 over a period of time, but they will not include any of the major support contracts announced by various member countries in 2009. Eurofighter GmbH | BAE | Finmeccanica | Defense News. “Contract 1” for support March 30/12: #321. A Finmeccanica release notes that so far, the consortium has delivered 321 Eurofighter Typhoons to customer nations. March 22/12: AESA – just a sim. EADS Cassidian touts the benefits of an “E-Scan” AESA radar for the Eurofighter, and touts its operation of the largest assembly line in Europe for the individual transmit/ receive modules that make up those radars. The German BWB’s 2-year study, using IABG GmbH’s MILSIM (man-in-the-loop simulator), is nice enough. What it isn’t, is a development and production contract. American F-15 Strike Eagles, F-16s, and F/A-18E/F Super Hornets are offered with AESA radars right now. France’s Dassault just received the 1st RBE2-AA AESA radar for its Rafale production line. Saab is well underway developing its own ES-05 Raven AESA radar for the JAS-39E/F Gripen NG, which will join the Eurofighter’s notional AESA design in using a pivoting plate approach. They’re doing so in conjunction with Finmeccanica’s SELEX Galileo, the current leader of the Euroradar consortium. Unless the Eurofighter consortium and its governments get moving soon, their fighter will begin to find itself at a severe disadvantage in international competitions. Jan 31/12: India loss. Dassault’s Rafale is picked as the “L-1” lowest bidder for India’s 126-aircraft M-MRCA deal, even after the complex life-cycle cost and industrial calculations are thrown in. Some reports place its cost as $5 million lower per plane. Next steps include the negotiation of a contract, in parallel with parliamentary approval and budgeting. Until a contract is actually signed, however, India’s procurement history reminds us that even a “close” deal is just 1 step above a vague intention. The contract may take a while. Even the French government sees a deal as only an 80% probability within 6-9 months. The budgeting is likely to be even trickier. The IAF’s exclusion of cost considerations in picking its finalists means that the only question now is: how far over the stated budget will a full Rafale buy go? Some reports place the deal’s cost at around $15 billion – an increase of up to 50% from previous estimates. If economic downturns or squeezed defense budgets make those outlays a big enough issue, early enough in the process, it could have the effect of re-opening the competition. British PM David Cameron has expressed an intent to change India’s mind, and both Saab and Boeing are still positioned within India, in order to be ready for a renewed opportunity. Eurofighter’s problem is that it’s hard to see how it might succeed in a competition that was re-opened for financial reasons. Dassault | President Sarkozy [in French] | Economic Times of India, see also their timeline | Indian Express | Rediff (thanks for using our descriptions, sans attribution) | Times of India || Aviation Week | BBC | UK’s The Guardian | Reuters report and expert roundup. India loss 2011 HMD at last; Tranche 3 sub-system contracts; German cuts to 3B plans; Competitions in Bulgaria, India, Japan (loss), South Korea, UAE; Opportunities in Indonesia & Turkey?; AESA by 2015?; Paveway IV and EGBU-16 bomb tests; PILUM glide bomb; Naval Eurofighter; Negative British NAO report; 100,000 flying hours. Eurofighter over Dubai (click to view full) Dec 20/11: Japan loss. Japan’s Ministry of Defense announces that Lockheed Martin’s F-35 Lightning II has won the F-X competitive bid process for 42 planes, beating the Eurofighter and Boeing’s F/A-18 Super Hornet International. As F-4 replacements, the F-35As will have an air defense role, but Japan does have a large cadre of dedicated F-15Js to perform that mission. Conclusion? Their undeclared role is as strike fighters. Note that there’s still an F-XX program in the future, aimed at replacing Japan’s F-15Js. Numbers as high as 100+ planes have been floated, but that will depend on both economic straits, and local geopolitical threats. Read “Japan’s Next Fighters, From F-X Competition to F-35 Buys” for full coverage. Japan loss Nov 16/11: UAE. The UAE is either engaged in the mother of all hardball negotiations, or the potential Rafale sale is crashing. Critical comments at the highest levels are accompanying the invite to Eurofighter, strengthening the belief that the Typhoon is more than just a stalking horse to lower the French bid. The question is, how big is the opportunity? Reports have surfaced that the UAE may be about to cut its planned new jet order, regardless of its choice, and buy more of its unique F-16E/F Block 60s. Read “Derailed Denouement in Dubai: What’s Up With the UAE’s Fighter Deal?” for a snapshot. Nov 13/11: UAE. Flight International reports that the UAE must have liked their October briefings re: Eurofighter’s capabilities, because they’ve asked Eurofighter GmbH for an RFP bid to replace their current fleet of Mirage 2000-9s. The UAE has been in negotiations to buy Rafale planes for several years now, but hasn’t been able to clinch a deal. It’s hard to tell if the UAE is just looking to add pressure and get a better price from Dassault, or if their interest is serious. One sign that they might be serious is the fact that they’ve also received classified technical briefings regarding the F-15E Strike Eagle and F/A-18 Super Hornet, but haven’t asked for RFP bids from the Americans. Flight International believes that this may be a prelude to consideration of the stealth-enhanced F-15SE Silent Eagle or F/A-18 Super Hornet International for the UAE’s planned 2018-2025 fighter modernization. The obvious 3rd contender there is Lockheed Martin’s F-35. Nov 12/11: Eurofighter GmbH touts their Dubai flying display, complete with a graphic showing their impressive flight plan. They also tout a range of technologies that they hadn’t advertised much before, including thrust-vectoring engine nozzles, an AESA radar, and MBDA’s Marte anti-ship missile. The release appears to blur the line between concepts/plans, and field-ready equipment. Oct 21/11: Germany & Tranche 3B. Germany announces further defense cuts, which include a proviso that their Eurofighter orders will end at Tranche 3A, instead of adding another 37 planes in a Tranche 3B. With Britain also saying that Tranche 3Ais the end, and the governments of Spain and Italy under severe financial strain, it appears less and less likely that there will be a Tranche 3B. The question is how to escape termination costs. Negotiations can be expected, but one option is to count future exports as re-sales of scheduled orders from existing partner countries. Aviation Week. Aug 18/11: Sub-contractors. Finmeccanica’s SELEX Galileo contracts with BAE Systems Manufacturing at Hillend in Fife, in GBP 20+ million procurement and electronic manufacturing services contract related to Tranche 3A’s Captor radars. Work at the Hillend facility will run from 2011-2013. BAE’s release adds that the facility has won over GBP 165 million in Captor and Typhoon DASS orders, over the last 12 years. July 20/11: South Korea. As South Korea’s DAPA eases the criteria to try and foster more competition, DAPA’s Col. Wi Jong-seong says that “Russian aircraft manufacturer Sukhoi expressed its intent to compete in the fighter jet procurement project early this year.” The report quotes him as saying that Sukhoi’s T-50 PAK-FA will be up against Boeing’s stealth-enhanced F-15SE Silent Eagle, Lockheed Martin’s F-35 Lightning II, and the Eurofighter Typhoon. Assuming we don’t have an FX-II competition repeat, where all competitors but one drop out. At this point, FX-III is being touted as a 60 jet buy of high-end fighters, with a budget of 8.29 trillion won ($7.86 billion). Eurofighter reportedly offered a better deal than the F-15K in F-X-2, but lost. The firm recently proposed to phase in Korean assembly for Phase III, with the 1st 10 made in Europe, the next 24 using Korean components, and the last 26 assembled in Korea. Korea Times. June 27/11: Weapons. Diehl BGT and Israel’s RAFAEL unveil a new weapon for Eurofighter at the 2011 Paris Air Show. The PILUM long-range glide bomb concept has a range variously reported as 100-160 km/ 62 – 99.5 miles, but it’s a developmental weapon, so exact figures remain to be proven. PILUM uses RAFAEL Spice’s combination of GPS/INS and imaging infrared guidance, within Diehl’s HOSBO modular glide bomb system. HOSBO is a steamlined glide bomb that can carry a modular payload, including warheads of various sizes and types, even warheads designed to disrupt electronics. This JSOW Block III competitor will be able to attack defended targets, vehicles, ships, or even smaller targets. It will be integrated on Germany’s Tornado and Eurofighter aircraft. Will the Saudis, who fly both types, want any? Diehl BGT release | Jerusalem Post. June 24/11: HMD. A Reuters report offers an update on progress with the Eurofighter’s BAE “Striker”/ HMSS helmet-mounted displays. HMDs are now considered a standard feature for fighter jets, as they’re required in order to take full advantage of new short range air-to-air missiles, and boost ground attack capabilities. British RAF pilots tested the first helmets in summer 2010. So far, about 50 total helmets have been delivered to Italy, Germany, Spain and UK, at a delivery rate of about 8 per month, but none are being used over Libya. They’re expected to become operational in the RAF by the end of 2011. June 22/11: AESA. After a year of preliminary industry funding, Eurofighter GmbH and Euroradar agree to continue development, and announce 2015 as the target date for entry into service of a Typhoon with the new “E-Scan” AESA radar. A later date wasn’t really feasible, given the delivery schedules involved in critical competitions like India’s M-MRCA. Indeed, even a 2015 date could be a disadvantage as the Eurofighter competes with France’s Rafale, which has begun testing its own RBE2-AA. The firm does say that: “The new AESA array, larger than the ones available to our competitors thanks to the Typhoon’s voluminous radome, will be fitted on a repositioner that will provide a wider field of regard when compared to those installed or scheduled for introduction on other fighters. The new radar will offer customers the freedom to retrofit their existing Typhoons when required.” E-Scan AESA date announced June 20/11: Weapons. Eurofighter IPA1 has completed the first of a series of Meteor missile trials, beginning with safe separation across the flight envelope on the Aberporth range in Britain. Eurofighter GmbH. May 17/11: Leadership. EADS Cassidian Spain has appointed 56 year old Luis Hernández Vozmediano as their new Head of the Eurofighter program. He has spent virtually his entire professional career at EADS, and has been heavily involved in Britain’s A330 Future Strategic Tanker Aircraft (FSTA), and the related American KC-X pursuit. Eurofighter GmbH. May 11/11: Turkey. Eurofighter has courted Turkey for a long time, despite Turkey’s political & industrial commitment to the F-35 program. Hurriyet reports growing interest in a fighter split-buy, to reduce dependence on the USA. Naturally, Italy’s government is pushing Turkey to solve that problem by joining the Eurofighter consortium. Turkey might also pick a hi-low approach, and join South Korea and Indonesia in KF-X instead. The real wild card? Turkey’s current account deficit is hitting levels that worry some observers. High levels have been predictors of Turkish economic crises in the past. April 27/11: India. Fulfilling long-standing rumors that it had gained a leading position in India’s M-MRCA future fighter competition, Eurofighter is confirmed as one of 2 finalists, alongside Dassault’s Rafale. Read “India’s M-MRCA Fighter Competition” for full coverage. April 2011: Weapons. EADS Cassidian Spain achieves the first 1,000 pound EGBU-16 Enhanced Paveway II precision guided munition release. The EGBU-16 is the selected dual mode bomb for Germany, Spain and Italy, whereas the locally-developed Paveway IV is the dual mode choice for the UK. Eurofighter GmbH. March 7/11: Weapons. The first ever Eurofighter release of a Paveway IV dual guidance bomb takes place from development aircraft IPA6, in an hour long test flight over the Aberporth Range in Wales. BAE Systems | Eurofighter GmbH, incl photo. March 10/11: Indonesia? The Times reports that more of Britain’s fighters could be leaving the force, if Indonesia’s interest in up to 24 Typhoons pans out. That could be politically challenging, though. Britain has led the way into attacks on Libya for bombing its civilians, but Indonesia has used its BAE Hawk light attack jets against its own insurgencies, and in East Timor. That triggered a defense export ban 12 years ago. Indonesia continues to operate a large fleet of Hawk jets, but it has since filled its high end air superiority slot with a handful of Sukhoi’s SU-27/30 Flanker family fighters – a cheaper choice with similar capabilities. The UK MoD says it has “no current plans” to export Typhoons to Indonesia, but that means little to nothing when the statement is carefully parsed. If Indonesia really is interested in adding Typhoons, one option might be to re-export 24 RAF Tranche 1 aircraft that haven’t been given precision ground attack modifications. The Times [subscription-only] | Agence France Presse | The Guardian | UPI. March 2/11: Britain’s reluctance to invest in additional Typhoon fighters is partly explained by the findings of an NAO report, which notes that: “The cost of the Typhoon project has risen substantially. Despite the MOD’s now buying 72 fewer aircraft (down from 232 to 160, a reduction of 30 per cent), the forecast development and production cost has risen by 20 per cent to [GBP] 20.2 billion. This is a 75 per cent increase in the unit cost of each aircraft. The cost of supporting each aircraft has also risen by a third above that originally expected. The MOD now estimates that, by the time the aircraft leaves service, some [GBP] 37 billion will have been spent.” There are concerns that the report might affect the jet’s chances in India. Meanwhile, a report in The Register highlights the importance of paying attention to Tranche buy totals, in an atmosphere of declining budgets. Note that the retirement of the RAF’s Tranche 1 jets will happen long before they reach their service life design limits, raising the possibility of resale: “Probably the most dismal figure we are given is that the RAF will actually put into service just 107 Typhoons. At the moment it has received 70: the last of the 160 planes ordered by the UK will be delivered in 2015. But, we are told, “by 2019” all the Tranche 1 jets (which were still being delivered to the RAF at the start of 2008) will be “retired” – that is, thrown away. We’ll pay for 160 jets (actually we’ll pay for 232), but we’ll only ever get a fleet of 107.” UK NAO report March 2/11: During high level visits, British officials continue to press the case for the Eurofighter as Japan’s future F-X fighter, over offerings from Boeing (F/A-18E/F Super Hornet or F-15SE Silent Eagle) or Lockheed Martin (F-35A/B/C). One interesting wrinkle is that reconnaissance capabilities could become an important requirement, a move that would give the F-35 family an edge. BAE et. al. are fighting an uphill fight, but they’re not alone: in January 2011, the European Business Council in Japan launched a defense and security committee to promote defense-related business cooperation. Asahi Shimbun | Japan Times | L.A. Times. Naval concept (click to view full) Feb 21/11: Aero India 2011 sees Eurofighter and BAE unveil an interesting wrinkle: an initial design for a navalized Eurofighter than can operate from aircraft carriers, based on an internally-funded set of studies and simulations. In a direct nod to potential Indian sales, they tout the plane as being able to take off from “ski jump” carriers without catapults – a design that describes all of India’s current and planned carriers, as well as the initial design for Britain’s own Queen Elizabeth Class. Eurofighter GmbH describes the goal as 95% commonality with land-based aircraft, and required changes as “limited… include a new, stronger landing gear, a modified arrestor hook and localised strengthening on some fuselage sections near the landing gear, as well as updates the EJ200 engines,” which could include thrust-vectoring in flight. India is currently planning to use MiG-29Ks as its naval fighters, but it’s currently the type’s only customer, and the Typhoon is seen as a leading contender in its M-MRCA competition for land based aircraft. Britain is planning to use the F-35C from its future carrier, but further cost increases or delays for the multinational program could open an opportunity for a jet type that the RAF already flies. Eurofighter GmbH. Naval concept unveiled Feb 4/11: Bulgaria RFI. Bulgaria issues another fighter replacement RFI, soliciting information from Boeing (F/A-18E/F), Dassault (Rafale, Mirage 2000), EADS (Eurofighter), Lockheed Martin (F-16), and Saab (JAS-39 Gripen) re: 8 new and/or second-hand fighter jets, to replace its existing fleet of 12 MiG-21s. Bulgaria issued a similar RFI in 2006, for 20 jets, but the global economic crash, and Bulgaria’s own issues in trying to pay for past defense purchases, forced a hold. The Defense Ministry has taken pains to emphasize that this is just an exploratory request, and is not the start of a purchase tender. Nevertheless, November 2010 saw the formation of a National Steering Committee and an Integrated Project Team, to draft preliminary fighter replacement operational, technical, and tactical requirements. That followed October 2010 remarks by Bulgaria’s Defense Minister Anyu Angelov, who discussed spending BGN 1 billion (around $725 million) for the purchase of an uncertain number of new fighter jets to replace its MiG-21s, while modernizing its fleet of 16 MiG-29A air superiority jets. Sofia News Agency. Feb 3/11: Upgrades. The first Spanish single-seat instrumented production aircraft version 4 (IPA4) completes 500 hours of flight at the EADS Cassidian Spain facility at Getafe, near Madrid. After a functional upgrade from its original Tranche 1 air superiority standard to Tranche 2, this aircraft is testing new technology including a Link-16 MIDS system, as well as integration trials and the launching of precision air-to-ground weapons. The UK has already upgraded a number of its Eurofighters along similar lines, and added advanced LITENING targeting pods. Eurofighter GmbH believes that this Spanish IPA4 platform may serve as a model for the possible upgrade of the Tranche 1 fleets currently in service with Eurofighter customer nations. That’s the good news. The bad news is that an upgrade program of this type may also be seen as an alternative to ordering the final Tranche 3B set of Eurofighters. Eurofighter GmbH. Jan 28/11: Sub-contractors. Premium AEROTEC’s Varel, Germany plant has successfully started assembling structural components for the Eurofighter. EADS Cassidian announces that Varel’s first 3/2b Eurofighter fuselage section, a 3m section that mates with the wings, has been delivered to the Augsburg plant, where the entire fuselage center section will be assembled. Premium AEROTEC is a spin-off of the former Airbus sites in Nordenham and Varel and the former EADS site in Augsburg. It began operations on Jan 1/09, and in addition to various Airbus passenger aircraft components, it manufactures the fuselage center section for all Eurofighter aircraft, including the 4 program partners (United Kingdom, Spain, Italy and Germany) and export customers Austria and Saudi Arabia. This makes Premium AEROTEC GmbH, with over 6,000 employees and 2009 revenues of EUR 1.1 billion, the largest supplier of structures for the Eurofighter. The company has production plants in Augsburg, Bremen, Nordenham and Varel in Germany; and in Ghimbav, Brasov County, Romania. Premium AEROTEC | EADS Cassidian. Jan 25/11: Eurofighter GmbH’s CEO sees 2011 as a pivotal year, in order to avoid the end of production in 2015. India’s M-MRCA competition, and hopes of a Tranche 3B from its consortium countries, are the key underpinnings. Britain has been very clear that there will be no Tranche 3B buy there, and the austerity programs underway (voluntarily or otherwise) in Germany, Italy, and Spain make a Tranche 3B buy extremely unlikely. 100k milestone @ Moron (click to view full) Jan 25/11: Eurofighter GmbH announces that the multinational operational fleet of Eurofighter Typhoons in service since the second half of 2003 achieved 100,000 flying hours in January 2011. As aircraft are delivered and air forces declared their Typhoons to be operational, usage has accelerated. The first 5,000 flying hours was achieved by November 2005, and 10,000 hours was reached in August 2006. May 2007 included the 20,000 hour milestone, and by August 2008 the Typhoon had surpassed 50,000 hours. According to the firm, global operational fleets currently have more than 260 aircraft in service, with 6 squadrons in the UK (4 in Coningsby, 1 in Leuchars and 1 in Mount Pleasant, Falkland Islands); 4 squadrons in Italy (2 in Grosseto and 2 in Gioia del Colle); 3 squadrons in Germany (Laage, Neuburg and Nörvenich), as well as 1 each in Spain, Austria and in the Kingdom of Saudi Arabia. At present, all 148 Tranche 1 aircraft have been delivered, and Tranche 2 production is in full swing. 100,000 fleet flight hours Jan 4/11: HMD. BAE announces that its “Helmet Mounted Symbology System” (HMSS) is scheduled to enter service with the RAF in 2011, giving Britain’s Eurofighters the same helmet mounted sighting capability already enjoyed by pilots of competing aircraft, via systems like the Israeli/American JHMCS. The HMSS does add some advanced wrinkles. A Eurofighter pilot can now look at multiple targets, lock-on to them, and prioritize them by voice-command. This will work even for targets over the shoulder, or targets picked up by the radar but located underneath the aircraft. HMD at last 2009 – 2010 EUR 9 billion Tranche 3A deal; Tranche 3A sub-system contracts; Tranche 3B offer on table; Private work toward a “CAPTOR-E” AESA radar. CAPTOR-E (click to view full) Oct 5/10: Sub-contractors. Finmeccanica subsidiary SELEX Galileo announces a EUR 242 million (about $333.5 million) contract for 88 Captor-M mechanically scanned phased array radars, as part of the Eurofighter Typhoon Tranche 3A buy. Deliveries would begin in 2012. The CAPTOR-M is the Eurofighter’ standard radar. Contracts are in progress to develop and field new CAPTOR-E Active Electronically Scanned Array radars for future buys or retrofits, vid. the July 20/10 entry. SELEX Galileo [PDF] | Defense News. Sept 7/10: Sub-contractors. Finmeccanica subsidiary SELEX Galileo announces [PDF] a EUR 400 million sub-contract from BAE Systems, to supply Tranche 3A fighters with the Praetorian Defensive Aids Sub System (DASS), delivered to the same standard as the Tranche 2 fighters. SELEX Galileo leads the EuroDASS Consortium of Elettronica, Indra Sistemas, EADS and SELEX Galileo, which shares the production of more than 20 major Line Replaceable Items (LRIs) that make up the system. First deliveries are expected in mid-2012. The Praetorian DASS includes Electronic Support Measures (ESM) to find hostile radars, active Electronic Counter Measures (ECM) to confuse them, and Missile Approach Warning (MAW) systems, tied into an array of defensive subsystems that include chaff, flares, and towed decoy options. Aug 19/10: Sub-contractors. Northrop Grumman announces a contract from EADS Military Air Systems business unit to deliver 88 inertial measurement units (IMU) for Tranche 3A of the Eurofighter Typhoon. The IMU system is the sole sensor which measures the motion of the aircraft and continuously provides motion data to the flight control computer. In a secondary function, the IMU provides backup navigation data. The IMUs, which provide motion data for the aircraft, will be built by the company’s German navigation systems subsidiary, Northrop Grumman LITEF, which also provided IMUs for Tranche 1 and Tranche 2 of the aircraft. More than 400 Northrop Grumman LITEF IMUs have been delivered and are already in service on Eurofighters in Germany, Spain, Italy, United Kingdom, Austria and Saudi Arabia July 20/10: AESA. Eurofighter GmbH and Euroradar announce that they have begun full scale development of an Active Electronically Scanned Array (AESA) radar to serve in the Eurofighter, with a target in-service date of 2015. The Eurofighter/Euroradar groups have been conducting preliminary AESA development and flight testing since 2007, and Selex Galileo is already working towards integrating an AESA array with the UK’s Eurofighter (vid. Feb 19/10 entry). Full-scale development of a CAPTOR AESA successor is a new step that could become a factor in Tranche 3B discussions, or later 3A upgrades. Still, SELEX Galileo CEO Steve Mogford says move represents a standalone offer, and is not linked to the proposed Tranche 3B production phase. The Euroradar consortium has reportedly proposed retaining as much “back-end” CAPTOR equipment as possible, as part of delivering the proposed E-Captor AESA system. The consortium also plans to make CAPTOR-E a mechanically scanned AESA radar, rather than mounting it in a fixed position as American fighters have done. This will expand the AESA radar’s slightly narrower cone, and also make it easier for the aircraft to use “launch and break away” tactics against aerial opponents that are beyond visual range. Eurofighter GmbH | Flight International | Microwave Journal. June 9/10: Tranche 3B offer. At the ILA Air Show in Berlin, Germany, Reuters relays word from a Eurofighter GmbH spokesman that it has submitted a Tranche 3B offer to the partner nations for 124 more Eurofighters, finishing the planned Tranche 3. Defense industry sources at the Berlin Air Show said the offer was around EUR 10 billion. To date, Britain, Germany, Italy and Spain have so far taken delivery of a combined 222 Eurofighter Typhoons, out of 473 ordered. Eurofighter says a production decision is needed within a year, in order to avoid the beginning of a supplier shutdown and a production gap. The member countries will face a choice between declining defense budgets, versus the likely need to pay some cancellation costs if there is no Tranche 3B. Feb 19/10: Finmeccanica subsidiary SELEX Galileo announces [PDF] a GBP 19 million contract from Britain’s defense ministry to install a first of type, multi-function, wide field of regard AESA radar on a British Eurofighter as a technology demonstration program. The AESA TDP will focus on Day/Night All Weather targeting, high resolution Synthetic Aperture Radar (SAR), air to air targeting, and communications. It’s designed to raise the technology readiness levels of the enabling hardware, de-risk the capability and demonstrate maturity of concept. Following ground and antenna range testing, the radar is planned to fly on a Royal Air Force Typhoon around 2013. Future weapons array? (click to view full) July 31/09: NETMA (NATO Eurofighter and Tornado Management Agency), Eurofighter Jagdflugzeug GmbH and EUROJET Turbo GmbH signed the Tranche 3A contract, a EUR 9 billion (about $12.96 billion) order for 112 aircraft and 241 EJ200 engines (224 engines to equip 112 planes, plus 17 spares). This new contract also sets the baseline for subsequent support contracts. BAE cites a work value of GBP 2 billion (EUR 2.35 billion), Finmeccanica cites EUR 3 billion worth of work from Tranche 3A, divided between subsidiaries in Italy (EUR 1.6 billion) and the UK (EUR 1.4 billion). Rolls Royce values its 37% share in the EUROJET order at GBP 300 million (EUR 352 million). The EJ200 includes advanced integrated Health Monitoring, and is already supported by availability-based contracting terms. Eurofighter GmbH | UK MoD | BAE Systems | EADS | Finmeccanica | Rolls Royce | BBC | Deutsche Welle | Financial Times | Hamburg Local | Reuters says last buy for Britain | London Telegraph | Times Online | UPI Asia. Tranche 3A Additional Readings Readers with corrections or information to contribute are encouraged to contact editor Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so. Eurofighter GmbH. Official site. Eurojet Turbo GmbH. SELEX Galileo – CAPTOR-M radar [PDF]. Eurofighter GmbH – Eurofighter Typhoon Helmet. Includes Quicktime video. Official Reports German Bundesrechnunghof (April 30/14) – Press release [in German] | Eurofighter summary, incl. link to full report: 2013 Bemerkungen – Weitere Prufungsergebnisse – Nr. 09 “Kostentransparenz beim EUROFIGHTER herstellen [in German] | Full Report: Langfassung der Bemerkung Nr. 09 [PDF, in German]. UK National Audit Office (March 2/11) – Management of the Typhoon Project. See also The Register. News & Views The Aviationist (Feb 11/13) – No way an F-35 will ever match a Typhoon fighter jet in aerial combat. The Aviationist (Dec 10/12) – How does the F-16 perform against its adversaries in dogfight? “….above FL100 the Typhoon becomes quite difficult to beat since its superior aerodynamics give the Eurofighter can out maneuver the Viper at every engagement.” Smithsonian Air & Space (May 21/12) – Under the Eurofighter’s Hood: Europe’s frontline fighter is a marvel of technology. Aviation Week Ares (March 1/10) – JSF – Mid Year Check. Includes a detailed anecdote covering serious aerodynamic issues with the Typhoon, which delayed its entry into service until 2005, when its automatic low-speed recovery system was qualified. Defense et Securite Internationale (May 2006) – Rafale et Typhoon: Les Europeens auraient-ils tort d’avoir… raison? [PDF, in French]. Other Eurofighter Contracts DID – The 2006 Saudi Shopping Spree: Eurofighter Flies Off With Saudi Contract. DID – Eurofighter’s Rough Ride in Austria. DID – UK’s Eurofighters Fly To Availability-Based Contracting . DID – Spain’s Moron Maintenance: EUR 150M to EADS for Typhoons. DID – Eurofighter GmbH Signs EUR 600M+, 5-year Support Contract for Italy. DID – BAE Wins Big PBL Support Contracts for European & Saudi Eurofighters. DID (July 5/05) – $1.5B for Eurofighter Electronic Warfare Suite. Part of Tranche 2 production. tag: typhoonfocus, eurofighterfocus View the full article

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.