Everything posted by HG S2 (Intel Bot)
-
DID - USAF To Field Interim ERVS Solution For KC-46A Tanker | France Proposed MRTT Sale To India | DoS Approved FICS Sale To TECRO
Americas International Enterprises won a $12.5 million requirements contract requirements contract for F-16 modular low power radio frequency (MLPRF) and dual mode transmitter (DMT) repairs. This contract provides for the repair of both MLPRF and DMT, which function as part of the radar systems of each F-16 C/D aircraft. The General Dynamics F-16 Fighting Falcon is a single-engine supersonic multirole fighter aircraft originally developed by General Dynamics for the USAF. One of the most versatile aircraft in the US Air Force inventory, the F-16 Fighting Falcon has been the mainstay of the Air Force aerial combat fleet. With over 1,000 F-16s in service, the platform has been adapted to complete a number of missions, including air-to-air fighting, ground attack and electronic warfare. Work will take place in Alabama. Estimated completion date is December 6, 2025. The US Air Force is to field interim enhancements to the problematic Remote Vision System (RVS) for its Boeing KC-46A Pegasus tanker-transport aircraft. The Air Force Materiel Command (AFMC) announced the move, saying that demonstration flights conducted over the summer (third quarter) had validated the Enhanced Remote Vision System (ERVS) as a stopgap measure until RVS 2.0 is rolled out in late 2023. RVS 2.0 is the agreed final solution to resolve Category 1 deficiencies associated with the current RVS. “The implementation of ERVS will provide some benefit to our ‘Total Force’ boom operators in the near-term, but most importantly will not delay the fielding of RVS 2.0,” General Jacqueline Van Ovost, commander of Air Mobility Command (AMC), was quoted as saying. Middle East & Africa The guided-missile destroyer USS Ralph Johnson captured over 2,000 pounds of suspected narcotics in the Arabian Sea, the US Navy said on Monday. The interdiction was in support of the 33-nation Combined Maritime Forces’ mission known as Combined Task Force 150, which combats illicit operations on the seas. The Navy Ship assigned to the Nimitz Carrier Strike Group, found a stateless dhow, a privately-owned sailing vessel, “loitering without power in international waters” on Friday, a Navy statement said. The Combined Maritime Forces, formed in 2002 and currently led by the Royal Saudi Naval Force, conduct security operations in the Arabian Gulf, Red Sea, Gulf of Aden, Gulf of Oman and Indian Ocean. Europe France proposed selling six MRTT aerial tankers to India in a government-to-government deal that involves converting second-hand A330 airliners. These former passenger airplanes are between five to seven years in age and France will certify them for 30 years of lifespan. Another alternative proposal being considered by the Indian Air Force was to wet-lease the tankers from a British company. The IAF now operate seven Russian IL-76 M refuellers with Pakistan acquiring four of the same refuellers from Ukraine and China operating three of the same Russian refuellers along with 10 vintage modified versions of Russian bombers. NATO announced the operational capability of a special operations command on Monday, organized by Belgium, the Netherlands and Denmark. The Composite Special Operations Component Command, or C-SOCC, was launched in 2017 to provide a unified “deployable multinational headquarters, specifically designed for commanding several Special Operations Forces task groups.” The new command is expected to provide “the participating nations with a capability that exceeds the sum of their individual national contributions,“a NATO statement said. The effort is one of 13 NATO High Visibility Projects meant to reduce costs and improve operational values through shared equipment, training and procedures. Asia-Pacific The US State Department approved a possible Foreign Military Sale to the Taipei Economic and Cultural Representative Office in the United States (TECRO) of a Field Information Communications System (FICS) and related equipment for around $280 million. The decision “shows the US commitment to the Taiwan Relations Act and Six Assurances,” the Taiwanese Foreign Ministry said Tuesday on Twitter after the sale was approved by the US State Department. “It also enables the country to maintain a robust defense in the face of China’s military provocations, as well as Indo Pacific peace and stability,” it added. The US Defense Security Cooperation Agency said on Monday the US State Department made a “determination approving a possible Foreign Military Sale to the Taipei Economic and Cultural Representative Office in the United States (TECRO) of a Field Information Communications System and related equipment for an estimated cost of $280 million”. Today’s Video Watch: Dream Realized: The Air Force’s New Multi-Mission KC-46 Tanker Is Ready View the full article
-
DID - Top Falcons: The UAE’s F-16 Block 60/61 Fighters
F-16F “Desert Falcon” (click to view full) The most advanced F-16s in the world aren’t American. That distinction belongs to the UAE, whose F-16 E/F Block 60s are a half-generation ahead of the F-16 C/D Block 50/52+ aircraft that form the backbone of the US Air Force, and of many other fleets around the world. The Block 60 has been described as a lower-budget alternative to the F-35A Joint Strike Fighter, and there’s a solid argument to be made that their performance figures and broad sensor array will even keep them ahead of pending F-16 modernizations in countries like Taiwan, South Korea, and Singapore. The UAE invested in the “Desert Falcon’s” development, and the contract reportedly includes royalty fees if other countries buy it. Investment doesn’t end when the fighters are delivered, either. Money is still needed for ongoing training, fielding, and equipment needs – and the UAE has decided that they need more planes, too. This DID article showcases the F-16 Block 60/61, and offers a window into its associated costs and life cycle, including dedicated equipment purchases for this fighter fleet. The F-16E/F “Desert Falcon” F-16A (click to view full) The F-16 has become what its designers intended it to be: a worthy successor to the legendary P-51 Mustang whose principles of visibility, agility, and pilot-friendliness informed the Falcon’s original design. The planes have been produced in several countries around the world, thanks to licensing agreements, and upgrades have kept F-16s popular. It’s no exaggeration to call the F-16 the defining fighter of its age, the plane that many people around the world think of when they think “fighter.” They remain the American defense industry’s greatest export success story of the last 40 years, but the aircraft’s ability to handle future adversaries like the thrust-vectoring MiG-29OVT/35 and advanced surface-air missile systems is now in question. The F-16 has now undergone 6 major block changes since its inception in the late 1970s, incorporating 4 generations of core avionics, 5 engine versions divided between 2 basic models (P&W F100 and GE F110), 5 radar versions, 5 electronic warfare suites, and 2 generations of most other subsystems. Moore’s Law applies as well, albeit more slowly: the latest F-16’s core computer suite has over 2,000 times the memory, and over 260 times the throughput, of the original production F-16. Block 60: Technical F-16F, F-16E (click to view full) Each new iteration of the fighter costs money to develop, integrate, and test. The UAE invested almost $3 billion into research and development for the F-16 E/F Block 60 Desert Falcon. First flight took place in December 2003, and flight testing by Lockheed Martin began in early 2004. UAE pilot training on the F-16E/F began at Tucson Air National Guard Base, AZ in September 2004, and the first group of pilots completed their training in April 2005. The first Desert Falcons arrived in the UAE in May 2005. All of the initial 60 aircraft have been delivered, and all training now takes place in the UAE. Versions of this aircraft have been entered in a number of international export competitions as well, including Brazil’s F-X2 (eliminated) and India’s MMRCA (eliminated), but it hasn’t found any buyers yet. Production will restart soon anyway, thanks to the UAE’s impending add-on buy 30 F-16 E/F Block 61s with minor component upgrades. The Desert Falcon’s unique features include… Design & Powerplant F-16E over Tucson (click to view full) The aircraft’s conformal fuel tanks (CFTs) let them carry more fuel, with less drag than underwing drop tanks. All that fuel feeds GE’s new F110-GE-132 engine, which produces up to 32,500 pounds of thrust to offset the plane’s increased weight. The -132 is a derivative of the proven F110-GE-129, a 29,000-pound thrust class engine that powers the majority of F-16 C/D fighters worldwide. Even with a bigger engine and more weight from added sensors, CFTs, etc., Block 60 fighters offer a mission radius of 1,025 miles – a 40% range increase over F-16s without CFTs. Conformal tanks aren’t exclusive to the Block 60. They’re options for many F-16 variants, and can be removed before missions, but that may not be a great idea for the UAE’s fleet. It’s a classic give/take scenario, in which more capability (q.v. electronics) means more weight, which requires a larger engine, which shortens range without more fuel. The conformal tanks more than make up that difference, creating a formidable strike fighter, but they exact their own aerodynamic cost in acceleration and handling. That tradeoff hurt attempts to export the fighter to India’s IAF, which prioritized maneuvering performance and left the Desert Falcon off of their shortlist. Electronics AN/APG-80 AESA (click to view full) The Desert Falcons’ most significant changes are electronic. Northrop Grumman’s AN/APG-80 AESA radar is the most significant advance, and made the UAE the first fighter force in the world to field this revolutionary new radar technology outside of the USA. Compared to mechanically-scanned arrays like the AN/APG-68v9s that equip advanced American and foreign F-16s, AESA radars like the APG-80 have more power, better range, less sidelobe “leakage,” near-100% combat availability, and more potential add-on capabilities via software improvements. Unlike the APG-68s, the APG-80 can perform simultaneous ground and air scan, track, and targeting, and it adds an “agile beam” that reduces the odds of detection by opposing aircraft when the radar is on. This last feature is important. Seeing the enemy first remains every bit as significant as it was in Boelcke’s day, but the inverse square law for propagation means that turning on older radar design is like activating a flashlight in a large and dark building. It can be seen much farther away than it can illuminate. An agile-beam AESA radar largely negates that disadvantage, while illuminating enemies who may not have their own radars on. The Desert Falcons also take a step beyond the standard ground surveillance and targeting pod systems fielded on other F-16s, by incorporating them into the aircraft itself. Northrop Grumman’s AN/ASQ-32 IFTS is derived from its work on the AN/AQS-28 LITENING AT, but internal carriage reduces drag and radar signature, and frees up a weapons pylon. The ASQ-32 can even be used to find aerial targets, allowing passive targeting, and offering a tracking option that radar stealth won’t evade. A JHMCS helmet mounted display provides parity with the fighter’s most modern counterparts, and displays information from the aircraft’s radar and sensors wherever the pilot looks. Its real advantage is that it creates a much larger targeting zone, which can be fully exploited by the newest air-to-air missiles like the AIM-9X. Avionics improvements round out the enhancements via an advanced mission computer to enhance sensor and weapon integration, a trio of 5″x7″ color displays in the cockpit, etc. Various advanced electronic countermeasures systems make up the Falcon Edge Integrated Electronic Warfare System (IEWS), which provides both advance warning capabilities and automatic countermeasures release. Weapons SLAM-ER Highlights (click to view full) F-16s have an extremely wide range of integrated weapons, but Mideast politics has kept some American weapons from the UAE’s hands. Their Desert Falcons won’t carry the same stealthy AGM-158 JASSM long-range, stealthy cruise missiles found on American F-16s, for instance. Nor can they carry the similar “Black Shahine” MBDA Storm Shadow derivatives that equip the UAE’s Mirage 2000 fleet. On the other hand, the Desert Falcons’ array of integrated weapons will include medium range, GPS/IIR-guided AGM-84H SLAM-ER cruise missiles that can deliver accurate hits on ships and land targets up to 250 km away. At shorter ranges, stealthy AGM-154C JSOW glide bombs and GBU-39 Small Diameter Bombs give them wide-ranging one-pass attack capabilities against hard targets. In the air, AIM-9X Block II Sidewinder short-range missiles give them over-the-shoulder kill capability, and a combat option that many of the UAE’s neighbors haven’t fielded yet. Block 60: Political Issues MBDA Storm Shadow In the course of development, 2 key issues came up with respect to the F-16 Block 60. One was the familiar issue of source code control for key avionics and electronic warfare systems. The other was weapons carriage. As a rule, the software source codes that program the electronic-warfare, radar, and data buses on US fighters are too sensitive for export. Instead, the USA sent the UAE “object codes” (similar to APIs), which allow them to add to the F-16’s threat library on their own. The other issue concerned the Black Shahine derivative of MBDA’s Storm Shadow stealth cruise missile. The Missile Technology Control Regime (MTCR) defines 300 km as the current limit for cruise missiles, and the terms of the sale allow the United States to regulate which weapons the F-16s can carry. Since the Black Shahine was deemed to have a range of over 300 km, the US State Department refused to let Lockheed Martin change the data bus to permit the F-16E/Fs to carry the missile. The Mirage 2000-9 upgrades that the UAE developed with France addressed this issue, giving the UAE a platform capable of handling their new acquisition. As of 2013, UAE F-16E/F fighters will finally receive the SLAM-ER precision attack missile, giving them the shorter-range but very accurate strike capabilities. Contracts and Key Events 2012 – 2020 F-16E, 162nd FW December 9/20: MLPRF International Enterprises won a $12.5 million requirements contract requirements contract for F-16 modular low power radio frequency (MLPRF) and dual mode transmitter (DMT) repairs. This contract provides for the repair of both MLPRF and DMT, which function as part of the radar systems of each F-16 C/D aircraft. The General Dynamics F-16 Fighting Falcon is a single-engine supersonic multirole fighter aircraft originally developed by General Dynamics for the USAF. One of the most versatile aircraft in the US Air Force inventory, the F-16 Fighting Falcon has been the mainstay of the Air Force aerial combat fleet. With over 1,000 F-16s in service, the platform has been adapted to complete a number of missions, including air-to-air fighting, ground attack and electronic warfare. Work will take place in Alabama. Estimated completion date is December 6, 2025. August 24/20: Greece The United Arab Emirates (UAE) is deploying four of its F-16 fighters to Souda Air Base to Crete, Greece. The jets will be there to train with the Hellenic Air Force over the eastern Mediterranean. In the next days, these aircraft and their crews will carry out joint training with the Greek Armed Forces over the Eastern Mediterranean. The F-16 crews will be joined by support staff – engineers and ground personnel. April 17/19: Taiwan The US State Department approved a potential Foreign Military Sale to Taiwan for the continuation of a pilot training program and maintenance and logistics support for the F-16 aircraft. The deal is valued at $500 million. The latest sale follows an announcement last week that a Foreign Military Sales (FMS) contract has been awarded to Raytheon to refurbish radar for Taiwan’s naval vessels for a total cost of nearly $50 million and a $9 million contract to develop and upgrade Taiwan’s Patriot missile defense system over the next five years. Taipei Economic and Cultural Representative Office (TECRO) has requested the possible sale for the continuation of the pilot training program and maintenance/logistics support for F-16 aircraft currently at Luke Air Force Base, Arizona. March 13/19: Falcon Depot Norway will house the world’s first licensed service center to service F-16 fighter jets. Lockheed Martin together with AIM Norway will jointly establish the so called „Falcon Depot“ center for the Royal Norwegian Air Force and other regional F-16 customers. AIM Norway provides maintenance, repair and modification services for fixed wing aircraft, helicopters and field equipment for the Norwegian Armed Forces. Lockheed Martin continues to grow its F-16 customer base and sees new F-16 production opportunities totaling more than 400 aircraft. There are approximately 3,000 operational F-16s in service today with 25 countries. March 1/19: DB-110 Tactical Reconnaissance Pod The US Air Force awarded Collins Aerospace a $47.6 million contract modification that provides Foreign Military Sales (FMS) partner nations Jordan, Qatar and Bahrain an ordering vehicle for the DB-110 Tactical Reconnaissance Pod program. Collins Aerospace designs, produces, and supports communication and aviation systems worldwide. The company offers a certified pod for F-16 and other fast-jet applications. With an integrated DB-110 sensor, this pod offers advantages over competing systems by relying on dual-environmental conditioning systems, to provide robust ground cooling and operations over a wide range of altitudes. The modification includes the following procurement of DB-110 reconnaissance pods, program infrastructure, airborne data link terminals, surface terminal equipment, mobile ground stations, fixed ground stations, transportable ground stations, and data and travel in support of orders. Work will take place in Westford, Massachusetts and has an expected completion date of November 14, 2023. February 21/19: F-21 Lockheed Martin unveiled the F-21 fighter jet, which is a proposed tailor-made version of the F-16, at the Aero India show in Bengaluru. The company is pitching the new jet to the Indian Air Force (IAF). The US defense firm previously offered its F-16 fighter for the Indian Air Force’s ongoing competition for 114 planes to be made in India. Lockheed is competing with Boeing’s F/A-18, Saab’s Gripen, Dassault Aviation’s Rafale, the Eurofighter Typhoon and a Russian aircraft for the IAF order. The proposed F-21 plane has a retractable probe, similar to the kind used by U.S. Navy and Marine Corps aircraft, that allowing them to take on fuel in flight via a hose-and-drogue system used by the Indian Air Force. Lockheed Martin’s illustrations show the place with a heavy weapon load and a Sniper targeting pod. February 8/19: SPEWS II Turkey’s F-16 was equipped with the new electronic warfare system SPEWS-II after it successfully completed tests. The Self-Protection Electronic Warfare System (SPEWS) II was designed to provide protection in hostile zones for F-16 fighter jets. It can detect radar signals coming from homing missiles and warn the jet’s pilot. The system’s electronic countermeasure capabilities enable it to confuse the signals that enable missiles to find planes and to deceive the missiles by sending signals showing the aircraft in different locations. The General Dynamics F-16 Fighting Falcon is a single-engine supersonic multirole fighter aircraft designed as an air superiority day fighter. 21 of the aircraft have already been equipped with the new system after the tests were successfully completed. January 9/19: Netherlands ends F-16 deployment The Netherlands ended its F-16 mission in the Middle East. Six F-16 aircrafts deployed by the Royal Netherlands Air Force (RNLAF) operated from Al-Azraq in Jordan since January 2018. They supported troops on the ground and conducted more than 3,000 missions using their weapons about 2,100 times to attack targets such as vehicles, logistic nodes, and weapon positions of the so-called Islamic State in Iraq and eastern Syria. The F-16 is a single-engine supersonic multi-role fighter aircraft developed by Lockheed Martin for the US Airfare. The dutch F-16s remain available in support of NATO. July 19/18: Raytheon supports HUD BAE Systems is partnering with Raytheon to support the development of BAE’s Digital Light Engine (DLE) Head-Up Display (HUD). The new digital hub will be integrated on the United Arab Emirates’ fleet of F-16s. Raytheon will design, develop and manufacture the projector for the HUD. HUDs are located immediately in front of the pilot’s line of sight and combine real-time mission critical information with the outside world view. The UAE flies the Block 60 variant of the F-16 which has been described as a lower-budget alternative to the F-35A Joint Strike Fighter. The initial order covers design, flight test and certification of the new computers, with a follow-on production order of 100 systems expected in 2020 and 2021. BAE expects a total of up to 315 units to be ordered through 2028. February 12/18: Upgrades-HUD Lockheed Martin has selected BAE Systems to modernize the head-up displays on F-16s operated by the United Arab Emirates (UAE). A press release issued by the British aerospace giant said work will see the aircraft’s analogue systems with advanced digital systems by using “cutting-edge Digital Light Engine (DLE) technology to implement a HUD upgrade that integrates seamlessly into the F-16’s existing HUD space, requiring no changes to the aircraft, cabling, or computing. The advancement will remove the outdated cathode ray tube image source and replace it with a digital projector.” DLE technology has already been selected to modernize the F-22 Raptor HUD for the US Air Force. BAE estimates it will reduce life-cycle costs by 20 percent and has four times the reliability of legacy analog systems. Last November, the UAE announced that Lockheed Martin would lead the overhaul of 80 F-16s as part of a $1.63 billion upgrade package. November 13/17: Upgrades Speaking at the Dubai Airshow, Major General Abdullah Al Sayed Al Hashemi, Chief of the Military Committee and spokesman for the UAE Armed Forces, announced that it will upgrade its 80 F-16 jet fighters as part of a $1.63 billion program agreed with Lockheed Martin. The ministry also announced other deals, including $17.9 million to US-based OTNA INC for Blu-109 ammunition and a $9.5 million agreement with Thales Communications and Security SAS to secure defense communications. Al Hashemi added that the UAE is also interested in procuring the fifth-generation F-35, calling it “an excellent jet,” but did not comment on discussions ongoing with Washington over such a purchase. Fourth generation jets also being looked at by the Emirates include the Sukhoi Su-35, Eurofighter Typhoon, and Dassault Rafale, however, no deals have ever reached completion. Jan 24/14: 30 more. The US DSCA announces the United Arab Emirates’s official export request for “equipment in support of a Direct Commercial Sale of F-16 Block 61 Aircraft and associated equipment, parts, [and] support….” The DCS purchase doesn’t have to be announced, but this Foreign Military Sale process confirms that they will buy up to 30 F-16 E/F “Block 61” aircraft. The new block number appears to involve a set of small component upgrades over the existing Block 60s, which will be upgraded to the same standard. The UAE’s request includes: 40 20mm M61A Guns 40 Embedded GPS Inertial Navigation Systems Identification Friend or Foe Equipment Unspecified “night vision devices” Joint Mission Planning System Cartridge Activated Device/Propellant Activated Devices, generally used in association with armament hard points and defensive decoys. Unspecified “Weapons Integration” F110-GE-132 International Engine Management Program-Component Improvement Program Site surveys, necessary for the required facilities expansions Ferry maintenance and services, incl. aerial refueling support Plus spare and repair parts; tools and test equipment; personnel training and training equipment; publications and technical documentation; and other forms of US Government and contractor support. The estimated cost for these items is up to $270 million, but of course it is only a fraction of the total sale, which has a likely floor price of around $2 billion. Lockheed Martin Aeronautics in Ft. Worth, TX remains the primary contractor for these items, even though several of them aren’t made by the F-16’s builder. Implementation of this sale will require the assignment of additional US Government or contractor representatives, but that will be negotiated after the initial contract is signed. Sources: DSCA #13-60. DSCA: accessories for 30 more F-16 ‘Block 61s’ Nov 19/13: More coming? Lockheed Martin is professing “near term” optimism concerning an order for 25-30 more F-16s (25 F-16E, 5 F-16F), but it’s clear there won’t be any kind of announcement at Dubai’s air show. American military sales efforts in the region are being complicated by “Smart Diplomacy’s” habit of alienating allies, but a country’s base of installed equipment has to be a major factor in its procurement decisions. We’ll have to see how all of this plays itself out in the UAE. Sources: UAE’s The National, “Lockheed Martin hoping for F-16 fighter jet deal with UAE” and “Challenges in the Middle East for US defence companies”. Oct 15/13: Weapons. The US DSCA announces the UAE’s formal export request for a variety of new precision strike weapons to equip its F-16E/F Block 60 fighters. The orders could be worth up to $4 billion, and include… 300 AGM-84H SLAM-ER cruise missiles. This Harpoon variant adds IIR terminal guidance to GPS navigation, and extended-range wings that let it hit land and sea targets 250 km away. South Korea’s F-15Ks already deploy it, and the US Navy uses its AGM-88K successor, which they consider to be their most accurate strike weapon. 40 CATM-84H Captive Air Training Missiles (CATM), with seekers but no motor. 20 ATM-84H SLAM-ER Telemetry Missiles for test shots. 4 Dummy Air Training Missiles. Sometimes you just need similar weight & form factor. 30 AWW-13 Data Link pods. Pilots can receive text, data, and photos from various sources, and can also use it to communicate with the SLAM-ER in mid-flight. 1,200 AGM-154C Joint Stand Off Weapons (JSOW). This stealthy 2,000 pound glide bomb uses GPS for navigation and IIR guidance for terminal guidance. 10 JSOW CATM. 5,000 GBU-39/B Small Diameter Bombs (SDB). These 250 pound JDAM variants can be carried 4 to a rack. GPS guidance and pop-out wings give them decent range and accuracy, and their design makes them more effective against hard targets than their weight would suggest. 16 SDB Captive Flight and Load Build trainers. 8 SDB Guided Test Vehicles for aircraft integration testing. Containers, mission planning, integration support and testing, munitions storage security and training, weapon operational flight program software development, transportation, tools and test equipment, spare and repair parts, publications and technical documentation, personnel training and training equipment, and other forms of U.S. Government and contractor support. The principal contractors will be Boeing in St. Louis, MO (SLAM-ER, SDB); and Raytheon in Indianapolis, IN; and Raytheon in Tucson, AZ (JSOW). If contracts are negotiated, they’ll need to negotiate the addition of approximately 2-4 additional U.S. Government or contractor representatives to the UAE. Sources: US DSCA 13-48, Oct 15/13 | US DoD, “Hagel, UAE Crown Prince Discuss Regional Security Issues”. DSCA: Precision strike weapons request April 21/13: More coming? During visits to the Middle East, Secretary of Defense Chuck Hagel announces a wide range of approved arms buys for Israel, Saudi Arabia, and the UAE. The UAE’s portion includes 25 more F-16E/F fighters, and unspecified “standoff weapons” that are very likely to be Lockheed Martin’s AGM-158 JASSM cruise missiles. Recall that refusal to provide such missiles is what pushed the UAE to create the Mirage 2000-9, and equip it with the Black Shahine derivative of MBDA’s stealthy Storm Shadow competitor. The potential weapons buy has to be turned into an official request from the UAE, and approved by the US State Department’s DSCA, before they can even begin negotiating a contract. What we can say is that the price will be a lot lower than the “$425 billion” attributed to an unnamed official in the Pentagon’s own release. Dr. Evil, is that you? US DoD. 2007 – 2011 F-16E Nov 30/11: The US DSCA announces [PDF] the UAE’s official request to buy 4,900 JDAM bombs for up to $304 million, which breaks out as: 304 GBU-54 Laser JDAM kits for 500 pound bombs, with 304 DSU-40 Laser Sensors as well as the GPS/INS tail kit 3,000 GBU-38v1 JDAM GPS/INS kits and BLU-111 500 pound bombs 1,000 GBU-31v1 JDAM GPS/INS kits and BLU-117 2,000 pound bombs 600 GBU-31v3 JDAM GPS/INS kits and BLU-109 2,000 pound Hard Target Penetrator bombs 4 BDU-50C inert bombs Plus fuzes, weapons integration, munitions trainers, personnel training and training equipment, spare and repair parts, support equipment, and other US government and contractor support. The weapons are explicitly slated for the UAE’s F-16E/F Block 60 fleet, and are designed to “help the UAE AF&AD become one of the most capable air forces in the region, thereby serving U.S. interests by deterring regional aggression. These munitions will be used to complement the normal war-readiness reserve stockpile of munitions and provide munitions for routine training requirements.” DSCA: Weapons Nov 16/11: What’s up in the UAE? The UAE is either engaged in the mother of all hardball negotiations, or the potential Rafale sale is crashing. Meanwhile, the UAE may be about to cut its planned new jet order and buy more F-16E/F Block 60s, regardless of what happens next. Read “Derailed Denouement in Dubai: What’s Up With the UAE’s Fighter Deal?” for a snapshot. Sept 22/11: The US DSCA announces [PDF] the UAE’s official request to buy 107 MIDS-LVT/ LINK 16 terminals and associated equipment, parts, training and support. The compact MIDS-LVT assemblies would be installed on its F-16E/F fleet, as well as ground command and control sites, giving its air force a Link-16 network that would help UAE fighters share what they see with each other, and with related forces like American and Saudi AWACS aircraft, similarly-equipped allied fighters, etc. If a contract is negotiated, it would include the systems, engineering/ integration services, aircraft modification and installation, testing, spare and repair parts, support equipment, repair and return support, personnel training, interface with ground command and control centers and ground repeater sites, and other related elements of program support. The estimated cost is up to $401 million. The prime contractor is not set; this will be a competition between Data Link Solutions and ViaSat. Implementation of this proposed sale will require the assignment of additional U.S. Government and contractor representatives to the UAE, which will be negotiated if a contract is signed and the program proceeds. DSCA: MIDS/ Link-16 May 25/11: The US DSCA announces [PDF] a formal request from the UAE to buy support and maintenance for both classified and unclassified F-16E/F aircraft systems and munitions, plus spare and repair parts, publications and technical documentation, support equipment, personnel training and training equipment, ground support, communications equipment, and related forms of U.S. Government and contractor support. The estimated cost is up to $100 million, but the exact price will depend on a contract. Implementation of this proposed sale may require the assignment of additional U.S. Government or contractor representatives to the UAE. The number and duration will be determined in joint negotiations as the program proceeds through the development, production, and equipment installation phases. DSCA: Support April 27/11: Out in India. With existing bids set to expire on April 28/11, India’s MoD reportedly sent letters to Eurofighter GmbH and Dassault, extending the validity of their bids. The net effect of this is that bids from the other 4 contenders will expire on the 28th, removing Lockheed Martin’s F-16IN Block 70, Boeing’s F/A-18E/F, Russia’s MiG-35, and Saab’s JAS-39NG from the competition. This is significant for the UAE, because they maintain close relations with India, and would have received royalties if the Block 60 derived F-16IN had won a contract. Subsequent analysis indicates that the UAE’s optimization for long-range strike hampered the maneuverability and dogfighting performance that the IAF made its top priority, and there were also concerns about the platform’s ability to continue improving. Read “India’s M-MRCA Fighter Competition” for full coverage. Loss in India April 19/11: The US Defense Security Cooperation Agency announces [PDF] the UAE’s formal request to buy 218 AIM-9X Block II Sidewinder short-range air-to-air missiles, another 18 AIM-9X-2 WGU-51/B Tactical Guidance Units, 40 CATM-9X-2 Captive Air Training Missiles (CATMs) without rocket motors, another 8 CATM-9X-2 WGU-51/B Guidance Units, 8 Dummy Air Training Missiles for loading practice and such, plus containers, support and test equipment, spare and repair parts, publications and technical documentation, personnel training and training equipment, and other forms of U.S. Government and contractor engineering and logistics support. The AIM-9X isn’t a fit for the Hawks or Mirages, so the F-16E/F fleet is their sole realistic deployment option. The UAE already fits earlier-model Sidewinders to its F-16 fleet, and the DSCA doesn’t believe that they’ll have any difficulty absorbing these newer-model missiles. The estimated cost is up to $251 million, but exact amounts must wait until/if a contract is negotiated with Raytheon Missiles Systems in Tucson, AZ. DSCA: AIM-9X-2 missiles Feb 22/11: DB-110. At IDEX 2011, the UAE announces a series of contracts, including an AED 297.3 million (about $81 million) order of DB-110 reconnaissance pods from Goodrich, beating competition from BAE Systems. DB-110s equip a number of F-16 operators around the world. In the UAE’s neighborhood, they have been ordered by Egypt, Morocco, and Pakistan, and Oman and Saudi Arabia have made formal DSCA requests for them. Janes. Oct 20/10: Goodbye, Tucson. After roughly a decade of F-16 flight and maintenance training with the Arizona Air National Guard, the UAE wraps up their formal training relationship, and flies 5 of its F-16s home. The other 8 fighters on base are scheduled to fly to the UAE in December, along with the squadron’s UAE-owned support equipment. The UAE will now train its personnel in-country, with its own cadre of instructors. On the American side, Dutch pilots are due to take the UAE’s place, flying F-16 MLU fighters in a much less crowded and restrictive environment than they would face at home. Code One Magazine. Emirati and American Airmen gathered on the flightline to bid farewell to five UAE-owned F-16E/F Block 60 Desert Falcons as they took off for home. Eight remaining fighters and additional support equipment are scheduled to depart by December. Dec 28/09: Supporting a fighter extends far beyond delivery, or even maintenance. The US Defense Security Cooperation Agency announces [PDF] the UAE’s request to buy enhanced guided bombs to support “the prior sale of the Block 60 F-16s to the UAE.” The request involves Raytheon’s dual-mode “Enhanced Paveway” bomb conversion kits, which can use GPS and laser guidance. This allows them to bomb through sandstorms, fog, and other obscurants that might obstruct a laser, while retaining the option of improved laser accuracy and the ability to hit moving targets once conditions are favorable. Specific order quantities include: 400 BLU-109/Bs: 2,000 pound bombs with penetrator warheads 400 GBU-24V 12/B Enhanced PAVEWAY III kits. Paired with BLU-109/B. 800 MK-84s: 2000 pound bombs. 400 GBU-24V 11/B Enhanced PAVEWAY III kits. Paired with Mk 84 bombs. 400 GBU-50V 1/B Enhanced PAVEWAY II kits. Paired with Mk 84 bombs, also referred to as EGBU-10 sometimes. 400 MK-82s: 500 pound bombs. 400 GBU-49V 3/B Enhanced PAVEWAY II kits. Paired with Mk 82s; 3/B variant uses non-NATO laser guidance codes. The estimated cost is $290 million, and the principal contractors are the Raytheon Corporation of Waltham, MA, and McAlester Army Ammunition Plant of McAlester, OK. If Congress doesn’t block the sale, and a contract is signed later, the deal could also include containers, bomb components, mission planning software, spare and repair parts, publications and technical documentation, personnel training and training equipment, and U.S. Government and contractor support. Implementation of this proposed sale will require the assignment of additional U.S. Government or contractor representatives to the UAE. The number of U.S. Government and contractor representatives required in UAE to support the program will be determined in joint negotiations as the program proceeds through the development, production, and equipment installation phase. DSCA: weapons Aug 22/09: Training. UAE pilots and maintainers begin their first-ever trip to the multinational Red Flag exercise at Nellis Air Force Base, NV, which lasts until Sept 5/09. They will be flying F-16E/F Block 60 fighters from the Arizona Air National Guard’s 162nd Fighter Wing, 148th Fighter Squadron, at Tucson International Airport. The 148th trains Emirati pilots, which is why some of the UAE’s Desert Falcons are based there. They currently have 9 future pilots in their course. USAF release. March 10/09: Radar. Aviation Week’s “AESA Radars Are A Highlight of Aero-India” discusses the AN/APG-80 radar’s performance to date with the UAE: “The proposed F-16IN for India is similar to the E/F and can accept the APG-80, which needs more power and cooling than RACR or SABR, and is lower risk. Northrop Grumman says no APG-80 antennas have had to be repaired, in normal use, since tests started over four years ago. “The antenna will outlast the airframe,” the company says. “A few modules might fail over its lifetime, but they won’t affect performance enough to make it worth unsealing the radome and replacing them.” Feb 22/09: A Raytheon official confirms that the UAE and the U.S. government have executed a letter of offer and acceptance for 224 AIM-120C7 AMRAAM missiles, to equip the UAE’s F-16E/Fs. Terms were not disclosed, but the number matches the DSCA sale request of Jan 3/08. Reuters Oct 1/08: Brazil has decided on the 3 finalists for its F-X2 fighter competition: Boeing’s F/A-18E/F Super Hornet, Dassault Aviation’s Rafale, and Saab/BAE’s JAS-39 Gripen. EADS’ Eurofighter, Lockheed Martin’s F-16BR Block 60+, and Sukhoi’s SU-35 all failed to make the cut. Brazilian FAB release [Portuguese] | Reuters | Boeing release | Gripen International release. Loss in Brazil AIM-120C Jan 3/08: Weapons. The US DSCA announces [PDF] the UAE’s official request for a variety of weapons to equip its F-16 E/F Block 60 Desert Falcon fleet, as well as associated equipment and services. The total value, if all options are exercised, could be as high as $326 million. The principal contractors are the Raytheon Corporation in Waltham, MA (AIM-120, Paveways); Boeing Corporation in St Louis, MO (JDAMs); and McAlester Army Ammunition Plant in McAlester, OK. Equipment requested includes: 224 AIM-120C-7 Advanced Medium Range Air-to-Air Missiles (AMRAAM). The C7 is the most recent version in production, but the AIM-120D model just entering service is more advanced. 224 Mk84 2,000 pound General-Purpose Bombs 200 GBU-31 tail kits for JDAM GPS-guided bombs. These will fit on the Mk84s. 450 GBU-24 PAVEWAY III dual laser/GPS guidance kits on Mk84 2,000 pound bombs 488 GBU-12 PAVEWAY II laser guidance kits on Mk82 500 pound bombs 1 M61A 20mm Vulcan Cannon with Ammunition Handling System Plus containers, bomb components, spare/repair parts, publications, documentation, personnel training, training equipment, contractor technical and logistics personnel services, and other related support elements. Normally, General Dynamics ATP would also be included as a contractor, given the requests for Mk84s and the M61A cannon. The DSCA did not include them, but did say this: “This proposed sale supports the prior sale of the Block 60 F-16s to the UAE… Several U.S. Air Force pilots and maintenance Extended Training Service Specialists already in the UAE are expected to remain for the next five years and will be able to support this potential sale.” DSCA: Weapons 1998 – 2007 Allah Bless Texas! (click to view full) June 19/07: Support MoU. Lockheed Martin and Mubadala Development Company (MDC) of the Government of Abu Dhabi signed a memorandum of understanding today to expand their strategic relationship and jointly explore opportunities for military aircraft sustainment, maintenance, repair and overhaul, engineering and technical support in the UAE. Together, Mubadala and Lockheed Martin have identified various military aircraft airframes and engines as a part of a joint MRO business agreement. A regional support center will be established, and Lockheed Martin will also explore participating with Mubadala in its other aerospace development activity with particular attention to research and development. Mubadala Development Company is a wholly owned investment vehicle of the Government of Abu Dhabi, one of the 7 Emirates in the UAE and the home of most of the country’s fighter fleet. MDC’s mandate is to generate sustainable economic benefits through the development of business ventures related to a wide range of sectors including aerospace and aviation in partnership with local, regional and international investors. Lockheed Martin release. June 18/07: The US DSCA announces the UAE’s request for: “United States pilot proficiency training programs and munitions, services and support for F-16 aircraft which includes: 105,000 20mm cartridges, aircraft modifications kits, maintenance, participation in joint training Continental United States (CONUS) pilot proficiency training program, Introduction to Fighter Fundamentals training, F-5B transition and continuation training, fighter follow-on preparation training, participation in joint training exercises, fuel and fueling services, supply support, flight training, spare/repair parts, support equipment, program support, publications, documentation, personnel training, training equipment, contractor technical and logistics personnel services and other related program requirements necessary to sustain a long-term CONUS (CONtinental US) training program.” Training would take place at Alliance International Airport in Fort Worth, Texas, with the Alliance Aviation Center of Excellence at Fort Worth, TX and Lockheed Martin Simulation, Training and Support also at Fort Worth, TX as the main contractors. If all options are exercised, the agreement could be worth up to $201 million. The Netherlands and Singapore have moved to set up their F-16 pilot training programs in the USA, which offers a lot more space to fly in and combat-seasoned pilots as trainers; this would represent a similar service. This course will go from fighter fundamentals training to a “capstone” course that takes experienced pilots and significantly improves their tactical proficiency. Introduction to Fighter Fundamentals in Texas is a precursor to F-16 Block 60-transition training, which UAE pilots will receive in Tucson, AZ. DSCA: Training July 18/06: A good “slice of life” release for the F-16 program generally can be found in this Lockheed Martin release: “Most recently – in April – Lockheed Martin achieved a significant production milestone with the delivery of its 4,300th F-16 aircraft that is now in service for Oman, which purchased 12 Advanced Block 50 F-16s in the Peace A’sama A’safiyah (Clear Skies) Program. Clear Skies is a U.S. Government Foreign Military Sales program. The Omani F-16s are just one of six F-16 aircraft programs now in production at the Fort Worth facility. Lockheed Martin is currently producing F-16 aircraft for Chile, Israel, Oman, Poland and the UAE. Greece has also recently placed an order for 30 F-16 aircraft planned for delivery in 2009.” May 3/05: Delivery. The UAE celebrates the arrival of its first Lockheed Martin F-16E/F aircraft. The first “Desert Falcon” F-16s to be based in the UAE were received by the Crown Prince, His Highness General Sheikh Mohammed bin Zayed Al Nahyan, Deputy Supreme Commander of the UAE Armed Forces. Lockheed Martin release. 1st delivery Dec 6/03: 1st flight. The F-16F Block 60 completes its first flight successfully. Aug 27/03: Radar. Northrop Grumman Corporation’s Electronic Systems sector announces delivery of the first AN/APG-80 agile beam AESA radar to Lockheed Martin Corporation for the new F-16 block 60. Following formal radar acceptance tests in mid-July 2003, the radar was delivered to Lockheed Martin’s Aeronautics Company facility in Fort Worth, TX. The radar will be installed in the first F-16 Block 60 airframe by the end of September. First flight of this aircraft is scheduled for late November 2003. Testing of additional software modes will continue into 2004, using test radars on board the company’s BAC 1-11 test bed aircraft in Baltimore. July 18/2000: Training. Lockheed Martin Naval Electronics & Surveillance Systems in Akron, OH announces an award from the UAE for an F-16 Block 60 Training System valued at $50 million over 7 years. The WST will serve as the primary training device for the combat-ready pilot to achieve front seat training goals and the ULT shall be the primary training device at the squadron level. This group also produces the U.S. Air Force’s F-16 Mission Training Center, and the Israeli Air Force’s F-15I/AUP Flight and System Trainer. The UAE’s F-16 Training System, which will include Unit Level and Weapon Systems Trainers, will incorporate many features of the U.S. Air Force F-16 Mission Training Center, also in development by Lockheed Martin in Akron. A demonstration of the Brief/Debrief Station (B/DS) and its unique mission-recording feature was a key element in the win. Weapon Systems Trainers will include a dome-type visual system and the Unit Level Trainers will each have a 150-by-40-degree out-the-window visual system. The Training System’s components will interface via local and long-haul networks, and will interface with UAE’s existing Mirage 2000-9 training systems. Lockheed Martin NE&SS-Akron will supply a mission observation center, support integration between the F-16 and UAE’s Mirage 2000-9 training systems, and provide performance evaluation, mission scenario engagement, post-mission review and accounting, and a training management information system. Lockheed Martin Information Systems in Orlando, FL, Lockheed Martin Systems Support & Training Services in Cherry Hill, NJ, and French visual system supplier SOGITEC Industries SA will join Lockheed Martin NE&SS-Akron on the 7-year program under subcontract to Lockheed Martin Aeronautics Company in Fort Worth, TX. March 5/2000: Officials of the UAE and Lockheed Martin announce contractual agreements for 80 F-16 E/F aircraft and associated equipment for an estimated $6.4 billion. The aircraft will be produced by Lockheed Martin Aeronautics Company of Fort Worth, TX. The firm’s release states that: “The contract solidifies the U.A.E.’s May 1998 selection of the F-16 after a long and thorough process in which the Block 60 aircraft was evaluated against other advanced fighters including the Eurofighter Typhoon, France’s Rafale and Boeing’s F-15E.” 80 F-16E/F Block-60s Nov 29/98: FlugRevue: “Matra BAe Dynamics has signed a major contract to supply Mica air-to-air missiles and Black Shahine air-to-ground missiles to the UAE, the Lagardère group said on November 24. The contract was estimated to be worth 12 billion francs ($2.09 billion). Confirmation of the missiles purchase follows last week’s signing of a contract for 30 new Mirage 2000-9 built by Dassault Aviation. The UAE purchase marks the first export sale of the infra-red model of the Mica, which complements an electromagnetic version which Abu Dhabi is also buying. The long-range strike missile, known by its Arabic name Black Shahine, is based on the Apache and Scalp EG stand-off weapon being built for France and the Storm Shadow which will equip Britain’s Royal Air Force.” The USA’s refusal to let the UAE mount these missiles on F-16E/F fighters would become a source of controversy. Additional Readings Background: F-16E/F Desert Falcon & Ancillaries F-16.NET – F-16E/F Block 60 Lockheed Martin – F-16 Fighting Falcon Lockheed Martin Code One Magazine, via WayBack (Q3 2003) – UAE Air Force/F-16 Block 60 Lockheed Martin, via WayBack – F-16 UAE Training System. See also July 18/2000 entry, above. Maxwell AFB Air Chronicles PIREP by Capt Gilles Van Nederveen USAF, via WayBack (Fall 2000) – The F-16 Block 60: A High-Tech Aircraft for a Volatile Region GE – Model F110-GE-132 Enhanced Fighter Engine Northrop Grumman – AN/APG-80 (F-16) Northrop Grumman – AN/AAQ-32 Internal FLIR Targeting System (IFTS) Northrop Grumman – Falcon Edge Integrated Electronic Warfare Suite (IEWS) DID – New Options: Denel & Tawazun’s Precision Weapons Partnership. The Al-Tariq GPS-guided glide bomb. It has been integrated with the Mirage 2000-9 so far, but it’s unlikely to stop there. News & Views UAE’s The National, via WayBack (Sept 29/09) – UAE wants its fighters its own way. In this case, Rafales with uprated engines to 20,000 pounds thrust each, an AESA radar, and integration with MBDA’s Meteor long-range missile. The article also reveals the licensing-for-exports deals associated with the UAE’s funded modifications to the Mirage 2000 and F-16 platforms, which made several hundred million dollars in the Mirage’s case. The deal would pay out if other countries buy a version of the F-16E/F, but Lockheed Martin’s 2012 introduction of a different F-16V upgrade design makes F-16E/F royalties less likely. Flight International, via WayBack (Nov 11/07) – Dubai 2007: UAE shows off its most advanced Falcons Lockheed Martin Code One Magazine, via WayBack (Q2 2000) – UAE Signs Agreement For Block 60 F-16 Desert Falcon Lockheed Martin – F-16IN Super Viper. F-16E/F derivative, competing for India’s order against the Boeing F/A-18 E/F Super Hornet, Dassault’s Rafale, EADS Eurofighter, Russia’s MiG-35, and Saab’s JAS-39 Gripen NG. They eventually introduced the F-16V as a global offering, which may have enough changes in it to sidestep the UAE deal’s provisions re: export royalties. View the full article
-
CDR Salamander - Deadheading to Buy Time with Iran
Perhaps one day the full story will come out how Iran's top nuclear weapons scientist was taken out, but until then we'll just have to give a nod of respect to the Israeli's ability to execute superb clandestine operations in the Islamic Republic. Tom Rogan at the Washington Examiner has a nice "Top-5 Takeaways" list you really should read in full ... but here's the summary: 1) Biden will not be able to return America to the JCPOA nuclear accord without significant complication 2) There was likely some U.S. intelligence support for this operation 3) Israel's covert intelligence presence on Iranian soil is growing 4) The attack will fuel Iran's paranoia and provoke retaliation 5) This attack doesn't portend U.S. or Israeli military action against Iran's nuclear facilities Especially #4. Just amazing capabilities for such a small nation. Having everyone around you trying to kill you does focus the mind a bit. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=orGE2JNt4Z4:_AqFgK6yegA:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=orGE2JNt4Z4:_AqFgK6yegA:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=orGE2JNt4Z4:_AqFgK6yegA:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=orGE2JNt4Z4:_AqFgK6yegA:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/orGE2JNt4Z4View the full article
-
DID - Boeing Tapped For T45 SLEP Support | US Ordered Troops Out Of Somalia | Ukraine Ordered 3 An-178s
Americas Southeastern Computer Consultants won a $43 million task order, which shall provide Tactical Tomahawk Weapon Control System (TTWCS) Integrated Logistics Support (ILS) products and services in support of Training Support Activity responsibilities at Naval Surface Warfare Center, Port Hueneme Division. This is a single award, five-year, cost-plus-fixed-fee term level of effort task order that consists of one base year with four option years, which, if all line item quantities are ordered, would bring the cumulative value of this contract to $42,989,767. The Tomahawk missile is a long-range, all-weather, jet-powered, subsonic cruise missile that is primarily used by the US Navy and the Royal Navy in ship and submarine-based land-attack operations. Work will take place in Virginia, California, Florida, Washington, Georgia, Hawaii, Japan and The UK: Expected completion date is in December 2021. Boeing won a $20.7 million order, which provides for the production and delivery of 48 retrofit kits, support equipment and special tooling in support of phase two of the T-45 Service Life Extension Program (SLEP) for SLEP production Lots Three and Four. In addition, this order provides retrofit engineering and logistics from the original equipment manufacturer to support the installation of associated technical directives. The T-45A/C Goshawk is the US Navy’s two-seat advanced jet trainer. It entered service with the US Navy in January 1992. Work will take place in St. Louis, Missouri and estimated completion will be in May 2024. Middle East & Africa The Trump administration on Friday ordered most US troops out of Somalia, a move a Defense Department watchdog warned last month could damage gains the country has made against al-Shabab. The Pentagon said “the majority of personnel and assets” in Somalia will be removed from the East African country by “early 2021.” A news release from the department declined to offer a specific timeline on the moves. “As a result of this decision, some forces may be reassigned outside of East Africa,” the release said. “However, the remaining forces will be repositioned from Somalia into neighboring countries in order to allow cross-border operations by both US and partner forces to maintain pressure against violent extremist organizations operating in Somalia.” Europe The Ukrainian Ministry of Defense has placed an order for three An-178 cargo planes with Antonov. This was revealed by Vice Prime Minister, Minister for Strategic Industries Oleh Urusky. The An-178 is based on the An-158 regional jetliner but with an enlarged diameter to hold more cargo. The Defense Ministry of Ukraine and the state-owned Antonov Design Bureau are set to sign a contract for the construction of three new An-178 transport aircraft. AN-178 is a short-range medium-airlift military transport aircraft designed by the Ukrainian Antonov company and based on the Antonov An-158 (An-148-200) regional jet. Airbus Helicopters announced that it successfully performed autonomous take-off and landing (ATOL) from a moving deck using its Vertivision Surveillance Rotorcraft 700 (VSR700) optionally piloted vehicle (OPV). The milestone was achieved using the Deck Finder local positioning sensor system and the DeckMotion Simulator supplied by Airbus Defense and Space. The VSR700 OPV is being developed as a multimission naval UAS under a joint venture between Airbus Helicopters and Hélicoptères Guimbal in response to the French Navy’s Système de Drones Aériens de la Marine (SDAM) requirement announced in 2016. The effort also involves French naval shipbuilder DCNS, which is responsible for integration of the VSR700 into ship-based operations. Asia-Pacific According to Jane’s, officials from Indonesia’s defense ministry are in discussions with a consortium led by French shipbuilder Naval Group for a possible order of the Riachuelo (Modified Scorpene)-class submarine. The discussion is the latest development in what has been a series of sporadic talks between Indonesian defense planners and Naval Group since 2016, when Jakarta first indicated its interest in the Scorpene 1000 vessel type for its naval requirements. Due diligence specifically for the Riachuelo class began after a variant of the submarine type was suggested by Naval Group as being suitable for Indonesia’s requirements, said one of the industry sources. Today’s Video Watch: Launch of “Riachuelo”, Brazil’s first Scorpene-class attack submarine View the full article
-
DID - Tomahawk’s Chops: xGM-109 Block IV Cruise Missiles
Block IV Cutaway (click to view full) Block IV Tomahawk is the current generation of the Tomahawk family of cruise missiles. The BGM-109 Tomahawk family began life in the 1980s as sub-sonic, low-flying nuclear strike weapons, before being developed into long-range RGM/UGM-109 conventional attack missiles. They’re most frequently launched from submarines and surface ships, and have been the US Navy’s preferred option for initial air strikes in Iraq, Libya, et. al. Britain has also bought Tomahawk missiles, and launches them exclusively from submarines. Block IV is the latest variant. It adds innovative technologies that improve combat flexibility, while dramatically reducing the costs to buy, operate, and support these missiles. That’s why the Block IV program, under US Navy PMA-280, has been one of the USA’s defense acquisition success stories over the last decade. xGM-109: Missile & Launcher Types TLAM operation (click for video) Tomahawk missiles have become the US Navy’s major land strike missile. The USA has bought more than 4,000 over the years, and March 2011 saw the 2,000th GM-109 Tomahawk fired in combat, from USS Barry [DDG 52]. The missile typically flies at 50 – 100 feet above ground using terrain-following radar, and navigates to its targets using a combination of GPS/INS, computer matching of the land’s radar-mapped contours to the missile’s internal maps (TERCOM), and final matching of the target scene (DSMAC). Once on target the missile can fly a direct horizontal attack mode, trigger preprogrammed detonation above the target, or use a pop-up and dive maneuver. CEP is often described as being about 10 meters. There are 3 fielded variants. The xGM-109C/D Block III missiles will serve in the US Navy until FY 2020, and can be fitted with either a 1,000 pound unitary conventional warhead (xGM-109C), or a conventional submunitions warhead with hundreds of smaller bomblets (xGM-109D). The Tomahawk Block III has a 750 nautical mile range. Unfortunately, mission planning requires 80 hours of work. The xGM-109E Tomahawk Block IV achieved Initial Operating Capability in 2004, and current Pentagon plans will end purchases in 2015. Block IV reportedly increases missile range to 900 nautical miles, but it only uses the unitary warhead. Mission planning has been cut from 80 hours to just 1 hour, which makes a big difference to combat usage. The missile also has a 2-way UHF SATCOM datalink that allows the missile to be redirected in flight, or commanded to loiter over an area and wait for instructions from a Fleet HQ’s Maritime Operations Center. Submarine Launch 109 UGM-109 launch (click to view full) Submarine-launched UGM-109 missiles are more expensive than their ship launched RGM-109 VLS counterparts, because the submarines’ launch mechanism is more involved and more strenuous. UGM-109 “all-up-round” storage and interface canisters come in 2 types: CLS and TTL. CLS canisters launch UGM-109s from vertical launch tubes installed on many of America’s Los Angeles Class (SSN 719 on), all Virginia Class, and all SSGN Ohio Class submarines. TTL canisters are used to launch Tomahawk missiles from a submarine’s torpedo tubes, which is Britain’s preferred method. In both cases, a Tomahawk launches “wet”, unlike most anti-ship missiles. The canister remains in the vertical-launch or torpedo tube, while the missile is ejected. Once the UGM-109 has reached a safe distance from the submarine, its rocket booster ignites underwater to power it airborne. That booster falls away just before the missile ignites its jet engine. If the submarine needs to “clear the tube” for torpedoes, anti-ships missiles, mines, UUVs, etc., TTL canisters can be ejected into the sea after launch, as a separate evolution. In contrast, CLS vertical-launch canisters are only removed portside, when the submarine comes into base for servicing and reloading. Tomahawk: The 2019 Evolution LRASM-A Concept (click to view full) There was a plan to develop a successor to the retired xGM-109B ship-killer by 2015, as an interim capability for the US Navy’s Offensive Anti-Surface Warfare (OASuW) program. That was shelved in the FY 2014 budget, as the Navy opted to drop the interim capability. Instead, they’re moving ahead with OASuW’s main xGM-84 Harpoon missile replacement program for air and sea launch. The LRASM derivative of Lockheed Martin’s subsonic but stealthy AGM-158B JASSM-ER is the initial air-launched missile, but there will be competition for air and naval missiles beyond FY 2019. Raytheon has partnered with Norway’s Kongsberg to offer the stealthy, and accurate JSM for the air-launched OASuW, and their entry has the unique ability to fit inside the F-35C’s weapon bays. They could also offer Kongsberg’s NSM counterpart in the naval realm, but that would leave Tomahawk in the cold. Or would it? The key to the next set of Tomahawk improvements is actually a warranty. The missile has a 15-year warranty and a 30-year service life, so 2019 will begin a recertification cycle for the fleet that could last until 2030. Threats continue to evolve, so why not add some missile upgrades while they’re back in the shop anyway? The US Navy already has a specifications sheet of possible improvements, and they’ve done a number of capability studies. Raytheon is investing almost $40 million of its own funds in parallel, and they’re still talking to the Navy about that final package, which will break down into 3 broad categories. MI concept Anti-Access/ Area Denial Communications Suite. Saddam Hussein had a sophisticated anti-aircraft system, but he didn’t have the kind of high-end jamming and emissions triangulation capabilities expected of future opponents. The challenge is twofold: keep the enemy from cutting off your communications, and keep your communications from alerting the enemy. One option that has been mentioned in public involves adding a Line Of Sight datalink capability. The flip side of that move would involve training and tactics changes that push missile control farther down the command chain. That may be necessary, but is the US Navy comfortable doing that? There’s more to these A2/AD-CS discussions than just picking technologies. Autonomy. The Tomahawk is already an autonomous weapon, in the sense that it can be fired at pre-planned fixed targets and left alone. To remain relevant, it needs to add dynamic terminal autonomy: the ability to acquire targets on its own and hit them, even if the target is moving or has moved. It would also be useful to expand the missile’s navigation autonomy, by offering backups for hardened SASSM M-code GPS. Both kinds of upgrades are being contemplated. Early tests that aren’t autonomous involve Rapid In-flight Target Update, which allows units that have a lock on a target to transmit rapid final scene updates for the missile’s DSMAC guidance. This is still done via Fleet HQ as Standard Operational Procedure, but that’s enough to hit moving targets in some circumstances. Ships would become vulnerable to Tomahawk strikes if the targeting platform can survive their defenses, and the same is true for land-based air defense systems that can repeatedly move to new fixed locations. Raytheon and the Navy are looking for more, with a focus on mature technologies to cut down program risk. An ESM system for noticing and geolocating emissions has already begun testing. Raytheon personnel stress its quality, to the point that Navigation via Signals of Opportunity (NAVSOP) might be possible as a backup to GPS. During the attack run, ESM can allow the Tomahawk to home in on an active enemy ship or air defense radars, or even on other intercepted signals. That begins to add autonomous moving target capability, and the firm plans to take the next step by flight testing a dual-mode ESM/ active radar seeker system before the end of 2014. Finally, passive visual spectrum (camera or imaging infrared) guidance has also become popular for long-range strike missiles, because it doesn’t give the missile’s location away by creating electro-magnetic emissions. Raytheon has confirmed that CCD/IIR upgrades are also under consideration for Tomahawk, but stressed that no final decisions have been made about a future guidance package. Core Strengthening. All of these capabilities are great, but they demand more computer processing power, more memory, more onboard power, etc. The missile’s core will need redesigns, in order to keep up. Raytheon had to develop a Multi-Function Modular Processor to handle those computing needs. Other efforts will look to add new technology, like the Joint Multiple Effects Warhead System (JMEWS) warhead to allow mid-flight reprogramming, and improve performance against reinforced targets like bunkers. Still other attempts will take advantage of existing upgrades. As an example of the latter, Block III introduced the ability to throttle the missile’s Williams F107-WR-402 turbofan, and Raytheon has been expanding its usefulness over time. It’s a capability that’s obviously handy for adjusting the missile’s time of arrival, or extending range, but the firm has recently been testing a “high speed dash” mode. It’s still subsonic, but it represents some impressive flying that close to the ground. The Missing Link Saab S340-AEW (click to view full) Even after all of these upgrades, the Tomahawk is still a 1970s design that relies on low altitude to hide from radar. That isn’t really subject to change, even though downward-looking radars are proliferating on small AWACS planes and aerostat blimps, and radars in modern ships and air defense systems are taking big steps forward. All of the Tomahawk’s proposed technologies are well and good, and they will expand the missile’s usefulness substantially. Adding them to thousands of existing missiles is very cost effective, and makes a great deal of sense. As budget crunches force the Navy to re-examine every aspect of their programs, however, the Navy will have to make decisions about the cost, capability profile, and limitations of every weapon in their arsenal. Raytheon is trying to position Tomahawk as best they can, but the final decisions will lie elsewhere. Contracts & Key Events 45 min. documentary (click for video) Unless stated otherwise, US Naval Air Systems Command in Patuxent River, MD manages the contracts to Raytheon in Tucson, AZ. In general, these contracts aren’t competitively procured, pursuant to the “only 1 responsible supplier” exemption in 10 U.S.C. 2304(c)(1). Key subcontractors include Lockheed Martin in Valley Forge, PA (Weapon Control System element), QinetiQ North America in San Jose, CA (Command and Control element), and Boeing Inc. in St. Louis, MO (Command and Control element). FY 2016 – 2020 December 8/20: TTWCS Southeastern Computer Consultants won a $43 million task order, which shall provide Tactical Tomahawk Weapon Control System (TTWCS) Integrated Logistics Support (ILS) products and services in support of Training Support Activity responsibilities at Naval Surface Warfare Center, Port Hueneme Division. This is a single award, five-year, cost-plus-fixed-fee term level of effort task order that consists of one base year with four option years, which, if all line item quantities are ordered, would bring the cumulative value of this contract to $42,989,767. The Tomahawk missile is a long-range, all-weather, jet-powered, subsonic cruise missile that is primarily used by the US Navy and the Royal Navy in ship and submarine-based land-attack operations. Work will take place in Virginia, California, Florida, Washington, Georgia, Hawaii, Japan and The UK: Expected completion date is in December 2021. July 13/20: TTGTS Raytheon won a $17.2 million order, which provides non-recurring engineering in support of upgrading the existing Tactical Tomahawk Guidance Test Set (TTGTS) product baseline to eliminate obsolescence and production issues. Additionally, this order provides for the development, test and delivery of six new TTGTSs. Since 1994, RMS (Raytheon Missiles Systems) has been the sole developer, designer, and manufacturer for the Tomahawk Land Attack Missile. RMS solely possesses the current configuration and manufacturing data for the Tomahawk Block IV AUR missile, and is the only source capable of performing the required tasking. RMS maintains and controls both the Level III technical data package (TDP) and the manufacturing documentation for the Block IV AUR. The Tomahawk Land Attack Missile (TLAM) is an all-weather, long range, subsonic cruise missile used for deep land attack warfare, launched from US Navy surface ships and US Navy and United Kingdom Royal Navy submarines. Work will take place in Arizona, Florida, UK, Ontario, Alabama, Utah and various other locations. Expected completion date will be by December 2022. April 15/20: Delivery Order Raytheon Missile Systems won a $30.3 million delivery order to procure 32 Tomahawk Mid-Body Range Safety Subsystems and 32 Flight Test Kits. Tomahawk is a long-range, all-weather, subsonic cruise missile in service with the surface ships and submarines of the US and the UK’s Royal Navy. Originally produced by General Dynamics, Tomahawk is currently manufactured by Raytheon. The Tomahawk can strike high-value or heavily defended land targets. The Block II TLAM-A missile achieved initial operating capability in 1984. The missile was first deployed in combat during Operation Desert Storm in 1991. Work under the delivery order will take place in Arizona, Arkansas, Alabama, South Carolina, California, Florida, Missouri and various locations within the continental US. Completion is expected by March 2023. March 31/20: Block V Raytheon Missile Systems won a $493.4 million contract, which provides for recertification and modernization of Tactical Tomahawk (TACTOM) Block IV all-up round missiles to include the integration of navigation and communication kits that result in a modernized TACTOM Block V missile. The Tomahawk is a mature missile weapons system. The current version, called the Block IV Tactical Tomahawk, or TACTOM, has a data link that allows it to switch targets while in flight. It can loiter for hours and change course instantly on command. The US Navy wants to recertify and modernize the missile, extending its service life by 15 years, and resulting in the new Tomahawk Block V series. Work ist expected to be complete in September 2023. Also, Raytheon Missile Systems, is awarded a $147,8 million contract for the full rate production and delivery of 90 Lot 16 Block V Tactical Tomahawk (TACTOM) All Up Round (AUR) Vertical Launch System missiles and other hardware and related services for the Navy. Additionally, this contract procures TACTOM Block IV AUR recertification AGR-4 Spares. Estimated completion date will be in August 2022. March 13/20: Anti-Ship Role The US Marine Corps has indicated that besides the Naval Strike Missile, the service intends to field the Maritime Strike Tomahawk missile for anti-ship role as well. It could be mounted on the same unmanned Joint Light Tactical Vehicle that the Marines is using for the Naval Strike Missile, Marine Corps Deputy Commandant for Combat Development and Integration Lt. Gen. Eric Smith told lawmakers. In December the Marines shot a “slug” or inert round off the top of a JLTV to prove the missile could launch in that manner, and the test was successful. This effort is similar to work that was done with Lockheed’s Hellfire air-to-surface missile when the Navy wanted to put it on LCSs – the missile’s effectiveness was already proven, but testing needed to confirm that it could get going from a vertical launch off a ship deck instead of a horizontal launch from under an aircraft in flight. January 8/20: Hardware Component Refresh Ace Electronics Defense Systems won a $64.4 million indefinite-delivery/indefinite-quantity contract with firm-fixed-price delivery orders for the production and delivery of manufacturing kits, spare parts and first article testing for the hardware component refresh of the Tactical Tomahawk Weapons Control System (AN/SWG-5(V)6). The AN/SWG-5(V)6 upgrade offers new offensive capabilities to upgraded ships in support of the Maritime Strike Tomahawk, addresses obsolescence risks and improves the operability and maintainability of the system hardware. ATWCS is an evolutionary upgrade to the current Tomahawk Weapon Control System. ATWCS replaces 1970s’ technology with COTS/GOTS hardware and software, thereby reducing overall reaction time and operator workload, enhancing the training capabilities at all levels, and improving Tomahawk strike effectiveness. ATWCS incorporates an open-system architecture to provide for future growth, eliminates stand-alone Tomahawk desktop computers, and enhances command-and-control interoperability. The single-award, indefinite-delivery/indefinite-quantity contract has a five-year ordering period, which, if all line item quantities are ordered, would bring the cumulative value of this contract to $64,405,123, with an ordering period to January 2025. Work will take place in Aberdeen Proving Ground, Maryland, and is expected to be complete by January 2025. September 20/19: Critical Design Review The US Navy awarded Raytheon a $25.5 million contract for critical design review of the Tomahawk Weapons System Military Code to include studies, analysis, design, development, integration and test of hardware and software solutions. Additionally, the contract provides for the identification of the kit bill of materials, fabrication, assembly, integration, test and documentation of an AGR5 kit. The Tomahawk is a mature missile weapons system with Block II and III, C and D versions in fleet use. These two variants of Tomahawk cruise missile are distinguished by their warhead; TLAM-C has a conventional unitary warhead, and TLAM-D has a conventional submunitions (dispense bomblets) warhead. Raytheon will perform work in California and Arizona and expected completion will be in March 2021. June 19/19: Missile Equipment Raytheon won a $29.6 million delivery order, which provides for the upgrade of the Block IV Tomahawk missile equipment. The upgrade includes test equipment like the system Integration Laboratory, the Air Vehicle System Integration Laboratory, hot-benches, automated flight test equipment and associated test equipment. Tomahawk Block IV cruise missiles can launch from a ship or a submarine and can fly into heavily defended airspace more than 1,000 miles away to conduct strikes on targets with minimal collateral damage. The cruise missile is designed to circle for hours above or away from its target and change course on command. The Tomahawk is also able to send an image of its target to controllers right before it hits the target. The latest Block IV variant includes a two-way satellite data-link that enables the missile to be retargeted in flight to pre-programmed, alternate target. Raytheon will perform work within the US and is expected to finish in June 2021. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. April 1/19: Advanced Communications Architecture Antenna Kits Raytheon won an $18.7 million delivery order from the Naval Air Systems Command for 120 Navigation and Communication Advanced Communications Architecture Antenna Kits for the Tomahawk Block IV All-Up-Round recertification. The Tomahawk is the primary ship-based cruise missile in use by the US Navy, as well as many foreign allied fleets. It is a long-range, all-weather, sub-sonic cruise missile. The Block IV missiles have an improved turbofan engine allowing throttle control, in-flight speed changes, better fuel economy and quicker launch times. They have enhanced loiter capabilities and are equipped with a real-time targeting system for striking fleeing targets as well as onboard electro-optical sensors allowing for real-time battle damage assessment. Work for the Navigation and Communication Advanced Communications Architecture Antenna Kits will take place in Colorado and Arizona and will approximately be completed in September 2020. February 28/19: Support for Recertification The Navy awarded a $25.2 million contract modification to Raytheon for delivery of Tomahawk Block IV cruise missile spares. Under the modification Raytheon will provide All-Up-Round spares to support the recertification effort for the Tomahawk missile system. The company initially won a $303.7 million in 2016 from the military branch to supply Tomahawk Block IV missiles and spares. The Tomahawk is a long-range, subsonic cruise missile that can be launched from a ship or submarine and is able to fly into heavily defended airspace more than 1,000 miles away to conduct precise strikes on targets. The US and its allied militaries used the GPS-enabled precision weapon more than 2,300 times in combat, and flight-tested it 550 times. The recertification program of the Tomahawk will expand the missile’s service life until 2040. Work under the contract modification will take place in various places around the continental US, Canada and the UK. It is expected to be completed by October next year. August 27/18: Re-certification Raytheon is being tapped to progress with the re-certification of the Navy’s Tomahawk Block IV cruise missiles. The cost plus-fixed-fee delivery order is valued at $9.3 million and provides validation and verification and cost risk analysis. The key to the next set of Tomahawk improvements is actually a warranty. The missile has a 15-year warranty and a 30-year service life, the re-certification process will keep the Tomahawk cruise missile flying through 2040. To keep the missiles up-to-date, Raytheon will add a newly developed ability to strike targets at sea. Work will be performed at multiple locations inside the continental US, including Walled Lake, Michigan; Tempe, Arizona and Albuquerque, New Mexico. The contract is expected to be completed in August 2019. May 31/18: Test kit incoming! Raytheon is being tapped for further production of two sets of kits in support of the Tomahawk cruise missile. The $19.2 million contract modification provides for the procurement of nine mid-body range safety subsystem (MRSS) kits and flight test (FT) kits for the Navy and three MRSS and FT kits for the United Kingdom. The MRSS is installed into flight test configured missiles, one of its key components is the PCM Encoder, which Encoder samples the flight test missile guidance and avionics telemetry data stream, encodes and formats the data, and provides the telemetry information to the ground monitoring station. Block IV Tomahawk is the current generation of the Tomahawk family of cruise missiles. It adds innovative technologies that improve combat flexibility, while dramatically reducing the costs to buy, operate, and support these missiles. The Block IV missile is designed to engage targets 1,000 miles away from maritime platforms, a characteristic the manufacturer says can help keep deployed sailors out of harms way on the battlefield. Work will be performed at multiple locations, including Tucson, Arizona; Boulder, Colorado and Lancaster, Pennsylvania, among others. This effort combines purchases for the Navy ($15,6 million); and the government of the United Kingdom ($3,5 million). March 26/18: Services contract Raytheon Missile Systems was awarded a contract for the provision of various services related to its Tomahawk cruise missile production. Valued at $37 million, the contract provides for lifecycle management and technical support required to maintain a Tomahawk cruise missile depot facility, including depot maintenance, demilitarization preparation, system test operations and foreign military sales maintenance. This also includes associated support requirements for the Navy and the government of the United Kingdom. Work will be performed in Tucson, Arizona, and is expected to be completed in March 2021. Most recently, the US Navy’s FY18 Budget $3.4 billion weapons procurement request called for the acquisition of 100 ship-launched Tactical Tomahawk cruise missiles. November 07/17: The US Navy has placed fresh orders with Raytheon for 196 Tomahawk Block IV all-up-round vertical launch system missiles and spares. Worth up to $260.3 million, the contract modification also includes the procurement of spare parts and support for the government of the United Kingdom. Deliveries are scheduled for completion by August 2019 after work taking place in Tucson, Arizona, and nearly two dozen other locations across the continental US. September 04/17: Raytheon has been awarded a $119 million US Navy contract to develop an anti-ship variant of the Tomahawk missile. Work to be undertaken by the company for the Maritime Strike Tomahawk program includes analysis, trade studies, architecture, modeling, simulation development, evaluation, and prototyping activities for the integration of seeker suite technology and processing capabilities into the Tactical Tomahawk Block IV All-Up-Round missile system. The majority of the work will be undertaken at Tucson, Arizona, in addition to Dallas, Texas, Boulder, Colorado, and various other locations inside and outside the US. Completion is scheduled for August 2019. The Navy currently uses the Tomahawk on its surface combatants and submarines, but now wants Raytheon to modify the Tomahawk’s targeting system so it can strike moving naval targets, thus giving the service a long-range anti-ship capability. August 18/17: It is expected that Raytheon will be awarded a contract to turn a number of US Navy Tomahawks into anti-ship cruise missiles. The upgrade will take place when the service sends its Block IV Tomahawks back to Raytheon for mid-life recertification. A company executive said the multi-mode seeker for the anti-ship role will likely be a mix of passive and active sensors. The Block IV recertification effort will start in 2019 with the first Marine Strike Tomahawk variants to enter the fleet in the early 2020s. January 13/17: Flight testing of the Tomahawk Block IV cruise missile has been completed. A Raytheon announcement stated that the launches were conducted to demonstrate the missile’s ability to engage time-sensitive targets. The first test saw personnel onboard the USS Pinckney utilize the Launch Platform Mission Planning capability while during the second test, crew members fired the weapon for a longer duration, and also conducted a terminal dive maneuver to strike the intended target. The company said the performance confirms the Tomahawk’s ability to attack heavily defended targets. October 14/16: In response to missile attacks on US and allied vessels off the coast of Yemen, the Pentagon has ordered the US Navy to launch missile attacks at targets operated by Houthi rebels. On October 13, the USS Nitze fired three BGM-109 Tomahawk cruise missiles at radar sites in Yemen which were believed to have been active during previous attacks and attempted attacks on vessels. A defense official said the radar sites were in remote areas where there was little risk of civilian casualties. The Houthis meanwhile, reiterated their denial that they were responsible for the attack on US warship the USS Mason. May 26/16: An op-ed piece published last week, suggesting the US should supply AGM-109 Tomahawk cruise missiles to Japan has received a rebuttal from Chinese researchers. Experts from the China Institute of International Studies stated that while the idea of supplying the missile to Tokyo was not new, it would pose a threat to other countries in East Asia. The warning most likely comes following efforts started last year by Japanese Prime Minister Shinzo Abe to pursue changing the country’s post-WW2 constitution to allow it to re-arm and expand its forces. May 18/16: Robert Crumplar suggests in USNI News that Washington considers exporting the BGM-109 Tomahawk cruise missile to Japan to act as a “responsive deterrent option.” The suggestion comes as Japan looks to deter potential aggression from North Korea, as well as dealing against a larger Chinese military. If the sale were to go ahead, it would follow a precedent for providing Tomahawk to allies that was established nearly 20 years ago when the United Kingdom acquired 65 missiles. April 21/16: Testing of a submarine-launched UGM-109 Tomahawk was terminated by the US Navy after the inert cruise missile crashed 50 minutes after its launch in southern Florida. The Navy was conducting a routine flight test, which was coordinated by the Navy’s Tomahawk Weapon System program at the Naval Air Systems Command at Patuxent River, Maryland. Causes of the missile crash are currently being investigated by Navy officials. February 5/16: The Pentagon is to invest in the development of Tomahawk and SM-6 missiles which will be capable of hitting moving vessels. $2 billion has been requested for the purchase of 4,000 Tomahawk missiles with manufacturer Raytheon. Raytheon has invested in a multi-modal seeker that would allow the missiles to hit moving targets so that missiles may be adapted from land missiles into anti-ship missiles. A further $2.9 billion will also be made available for the purchase of 650 SM-6 interceptors as well, to advance them to become anti-ship missiles for the first time. This will allow the SM-6 to operate in an offensive capability instead of operating solely as an anti-ballistic weapon. January 19/16: Tomahawk cruise missiles could get a lot more destructive if a new development program is successful. Researchers from Energetic Materials Research and Engineering have been successfully utilizing residual fuel left inside a missile during impact and turning it into a fuel-air explosive that can contribute to the blast created by the missile’s warhead. At present the team are looking to find the best way to implode the fuel tank to generate a cloud of fuel that will mix with surrounding air to ignite into an intense, high-temperature explosion. If successful, the add on to the missile could increase the Tomahawks payload without any need to change the dynamics of the warhead. January 15/16: Testing of a new sensor on the Tomahawk missile has been successful. Raytheon owned T-39 test aircraft carried out a number trials over a three week period engaging moving targets on land and at sea. The development of the sensor was part of company funded, independent R&D looking to enhance the current Tomahawk long-range precision strike/land attack role. Since 2005, Raytheon has been investing in increasing the missile’s seeker capabilities and effectiveness in varying environments. October 7/15: Raytheon has demonstrated how a Tomahawk Block IV cruise missile can be used to assess battlefield damage, loiter and then attack a target following analysis of the data it provided to operators. The test demonstrated how the missile could be launched from one location, travel to a second area of operations and communicate via a UHF SATCOM link with a third location half-way around the world, before striking a target. The Block IV Tomahawk demonstrated flexible mission planning capabilities in flight during previous testing in August, with this latest round of testing also demonstrating that multiple missiles could be coordinated from a single control point. FY 2015 August 6/15: Raytheon’s Block IV Tomahawk cruise missile demonstrated mission planning capability during flight tests announced on Wednesday. The upgraded software allowed planners to adapt the missile’s mission profile on the fly, with this new capability now set to be rolled-out across the fleet of Tomahawks in service. The Block IV missile demonstrated similar capabilities in March 2014, when the missile received information in-flight and re-targeted itself to strike a moving vehicle. Oct 11/14: American A2/AD. Rep. Randy Forces [R-VA-4] sends a letter to Army Chief of Staff Gen. Odierno on the eve of the AUSA conference, pushing for the Army to set up a modern version of its Coastal Artillery: long-range, land-based anti-ship missiles that would be forward-based in friendly countries to endanger Chinese vessels and shipping. Missiles like LRASM and the longer-ranged but less stealthy AGM-109 Tomahawk are obvious candidates for this sort of thing, significantly outranging competitors like Kongsberg’s Naval Strike Missile or Boeing’s SLAM-ER. The RAND study that Forbes refers to actually posited using shorter-range missiles like NSM, but its maps also showed the number of deployment sites required for effective coverage. The idea would be a nice turnabout on China’s Anti-Access, Area Denial (A2/AD) strategy, and a Philippine deployment would produce a very tangible benefit all by itself, at low cost. On the other hand, Rep. Forbes probably underestimates the difficulty of getting many countries beyond the Philippines to accept an inherently provocative deployment whose use is technically beyond their control. Recent American waffling around the world suggests an even less palatable conclusion: the penalty for saying yes would be immediate, without any assurance that the weapons would actually be used to help the accepting country if push came to shove. Contrast with the Russian approach. They just sell SS-N-26 shore batteries to interested countries, helping customers to create the same barrier under their own control, without the offsetting political challenges. India’s derivative PJ-10 BrahMos missile may also wind up being used this way, if India can get its act together on the export front. Sources: RAND, “Employing Land-Based Anti-Ship Missiles in the Western Pacific” | Breaking Defense, “Army Should Build Ship-Killer Missiles: Rep. Randy Forbes”. FY 2014 Final dive (click to view full) Sept 24/14: Orders. Raytheon in Tucson, AZ receives a $251.1 million firm-fixed-price contract for 231 Tomahawk Block IV All-Up-Round missiles for the U.S. Navy (211: 147 vertical launch systems and 64 capsule launch systems / $224.5 million/ 89.4%) and the United Kingdom (20 torpedo tube launch systems / $26.7 million/ 10.6% – q.v. July 1/14 DSCA request). All funds are committed immediately, using foreign funds and FY 2013 & 2014 US Navy weapon budgets. Work will be performed in Tucson, AZ (32%); Camden, AR (11%); Ogden, UT (8%); Anniston, AL (4%); Minneapolis, MN (4%); Glenrothes, Scotland (4%); Ft. Wayne, IN (4%); Spanish Fork, UT (3%); Ontario, CA (3%); Vergennes, VT (3%); El Segundo, CA (2%); Berryville, AR (2%); Westminster, CO (2%); Middletown, CT (2%); Walled Lake, MI (2%); Huntsville, AL (1%); Dallas, TX (1%); Farmington, NM (0.2%); and various locations inside and outside the continental United States (11.8%); work is expected to be complete in August 2016. This contract was not competitively procured pursuant to FAR 6.302-1 by US Navy NAVAIR in Patuxent River, MD (N00019-14-C-0075). US/UK order July 31/14: Raytheon in Tucson, AZ, receives an $8.7 million indefinite-delivery/ indefinite-quantity contract modification for Tomahawk Depot Missile maintenance, including inventory management for the US Navy and the United Kingdom, and direct fleet support for resolving technical issues with forward deployed, in-theater weapons. Work will be performed in Tucson, AZ (60%); Camden, AR (36%); and various other continental United States locations (4%); and is expected to be complete in March 2015. Funds will be obligated on individual delivery orders as they are issued by US Navy NAVAIR in Patuxent River, MD (N00019-13-D-0002). Sept 9/14: Testing. Raytheon touts a recent pair of live warhead test firings from the USS Hampton [SSN 767: UGM-109] and USS Lake Champlain [CG 57: AGM-109], demonstrating “enhanced flex retargeting” and improved flight performance. Sources: Raytheon, “Tomahawk enhancements showcased in back-to-back flight tests”. July 17/14: Political. The Senate Appropriations Committee approves a $489.6 billion base FY 2015 budget, plus $59.7 billion in supplemental funding. If they get their way, xGM-109 Tomahawk Block IV production would continue at full rate, with $82 million in extra funding. It has been set to end with a 100 missiles, but the added funds would drive it toward the standard annual buy of 180-200. The budget still has to be voted on in the whole Senate, then reconciled in committee with the House of Representatives’ defense budget, then signed into law by the President. Sources: DID, “FY15 US Defense Budget Finally Complete with War Funding”. July 1/14: UK request. The US DSCA announces Britain’s formal request for up to 65 UGM-109 Tomahawk Block IV All-Up-Round missiles plus containers, engineering support, test equipment, operational flight test support, communications equipment, technical assistance, personnel training/equipment, spare and repair parts, and other support. The estimated cost is up to $140 million. DSCA adds that: “The UK needs these missiles to replenish those expended in support of coalition operations.” Which is to say, over Libya. The principal contractor will be Raytheon Missile Systems Company in Tucson, AZ, and Britain doesn’t need any more contractors on site from Raytheon or from the US government. Sources: US DSCA #14-30, “United Kingdom – Tomahawk Block IV Torpedo Launched Land-Attack Missiles”. DSCA request: UK (140) April 28/14: Testing. Raytheon announces a successful captive-carry test flight, using a small T-39 Saberliner business jet fitted with their passive ESM seeker. The jet flew at subsonic speed and at varying altitudes, while the “passive seeker and multi-function processor successfully received numerous electronic signals from tactical targets in a complex, high density electromagnetic environment.” This test brings the Raytheon-funded multi-mission processor to Technology Readiness Level 6. The next step for the company-funded effort is an active seeker test, which will combine the processor with ESM and active radar. That combination would likely form the core of future Tomahawk upgrades. Sources: Raytheon, “Raytheon tests new guidance system for Tomahawk cruise missile”. April 17/14: SAR. The Pentagon finally releases its Dec 31/13 Selected Acquisitions Report [PDF]. It makes early termination official, and explains the savings: “Program costs decreased $1,832.1 million (25.8%) from $7,109.0 million to $5,276.9 million, due primarily to a decrease of 1,161 TACTOM missiles from 4,951 to 3,790 (-$1,249.2 million) and associated schedule, engineering, and estimating allocations (-$586.2 million).” Note that SecNav Mabus’ comments regarding 4,000 GM-109s in stock (q.v. April 13/14) appear to have been in error. Many have been used over the years. Termination April 13/14: Secretary of the Navy Ray Mabus sees an inventory of 4,000 Tomahawks that “will carry us through any eventuality that we can foresee,” but Raytheon wants to avoid shutting down their line and cutting the chain to more than 100 suppliers in 24 states. Their lobbying is helped by the fact that the USA’s byzantine procurement and budgeting processes add some strategic risk. News that the Navy was even thinking of a next-generation replacement reportedly came as a surprise to Raytheon in January 2014. Which means that it’s entirely imaginable to have a 20 year wait between the last Tomahawk delivery, and a comparable new operational missile. On the other hand, every defense production line shuts down eventually, and a dollar spent on Tomahawks can’t buy new ships, fighters, air defense missiles, etc. Rather than waging a frontal assault that tries to keep missile orders coming, Raytheon is reportedly looking to accelerate the combined xGM-109 recertification/ upgrade process by a few years, so it picks up where Tomahawk production leaves off. Raytheon senior program manager Chris Sprinkle says that Raytheon has invested $30 million of their own funds in R&D for upgrades, and plans to invest another $8 million or so. Sources: Arizona Daily Star, “Proposed halt of Tomahawk missile buys raises concerns at Raytheon”. March 4/14: FY15 Budget. The Navy unveils a preliminary budget request briefing. It doesn’t break down individual programs into dollars, but it does offer planned purchase numbers for the Navy’s biggest programs from FY 2014 – 2019. The plan confirms 196 Tactical Tomahawk missiles in FY 2014, and proposes to end production with 100 missiles ordered in FY 2015. Source: US Dept. of the Navy, PB15 Press Briefing [PDF]. Feb 19/14: Datalink test. A Tomahawk Block IV missile is launched from the USS Sterett [DDG 104] on a loitering fire test: “… [the missile] flew a preprogrammed route while receiving updates from a simulated maritime operations center and from advanced off-board sensors updating the missile’s target location. Throughout the flight, the missile maintained communications with all the command and control assets and provided updates on its location before hitting the target.” Raytheon told DID that this is the first of many tests involving “off-board sensors”, though 2014 will also see a number of flight tests using new on-board ESM and radar sensors. Many will be captive-carry tests, using one of the US Navy’s T-39 Sabreliner modified business jets. Sources: Raytheon, “Raytheon, U.S. Navy test Tomahawk Block IV’s latest communications upgrades”. Feb 14/14: Upgrades. Tomahawk program manager Capt. Joe Mauser tells Defense Tech that they’re working on a new Joint Multiple Effects Warhead System (JMEWS) warhead for the Block IV, in order to improve performance against reinforced targets like bunkers. At the same time, Raytheon is working on a new active & passive dual seeker (q.v. Oct 7/13). Raytheon has been elbowed aside from the OASuW program, which is currently owned by Lockheed Martin’s stealthy LRASM-B. A low-cost upgrade that accomplishes some of OASuW’s goals offers Raytheon the opportunity to get some funds, keep their missile relevant for years to come, and position themselves as a weaker Plan B if further budget cuts remove their competitor. Sources: DefenseTech, “Navy Wants Its Tomahawks to Bust More Bunkers”. Jan 14/14: #3,000. Raytheon announces that they’ve delivered the 3,000th Tomahawk Block IV missile, as part of FY 2012’s FRP-9 production contract. Sources: Raytheon, “Raytheon delivers 3000th Tomahawk Block IV to US Navy”. #3,000 Oct 7/13: ESM multi-mode. Raytheon announces a successful field test of a new multi-mode seeker technology that would add an advanced Electronic Support Measure (ESM) antenna and processor to the Block IV Tomahawk missile. Raytheon told DID that the system is based on the firm’s own technology, rather than being a direct offshoot of the attempt to add AARGM technology to the Tomahawk (q.v. April 27/12). Raytheon is correct that the current Tomahawk is an open architecture ‘truck’ capable of integrating new payloads and sensors, and an ESM seeker is a helpful addition to recent improvements like the 2-way datalink. ESM would turn the missile into a radar and communications killer that could deal directly with enemy air defenses, and could begin to engage some kinds of moving targets. The challenge is that the missile still needs to survive long enough to hit its target, and the Tomahawk’s low-level flight isn’t enough to protect it from the kind of advanced air defenses that would make you want to use unmanned ESM missiles. Its best use case might be against enemy ships. Sources: Raytheon, “Raytheon demonstrates new seeker technology for Tomahawk Block IV missile”. FY 2012 – 2013 Launch. (click to view full) April 17/13: UK. The US DSCA announces [PDF] Britain’s request to import follow-on support and keep their UGM-109 Tomahawk Weapon Systems (TWS) ready for use. Work can include missile modifications, maintenance, spare and repair parts, system and test equipment, engineering support, communications equipment, technical assistance, personnel training/equipment, and other related elements of logistics support. The estimated cost is up to $170 million, but actual costs will be negotiated in a series of contracts. The principal contractors will be Raytheon Missile Systems Company in Tucson, AZ; Lockheed Martin in Manassas, VA, Valley Forge, PA, and Marlton, NJ; Boeing in St. Louis, MO; BAE North America in San Diego, CA; COMGLOBAL in San Jose, CA; and SAIC in Springfield, VA and Patuxent River, MD. Implementation of this proposed sale will require the assignment of 1 U.S. Government and 2 contractor representatives to the United Kingdom for the duration of this case. DSCA: UK support request April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage. News for the Tomahawk program is mixed. The OASuW Harpoon replacement program canceled plans for an interim solution based on the xGM-109 family, even as it plans to award Technology Development contracts in FY 2013. Raytheon will need to consider its competitive options carefully, as OASuW could grow to be a huge opportunity. Within the existing Tomahawk program, yearly budgets are rising even though the number of missiles per year remains constant at 196. This is pushing flyaway cost for new missiles from $956,000 in FY 2013 to about $1.2 million. The extra funds are going to 2 areas: obsolescence replacement/ diminishing manufacturing sources, and restoration of planned missile improvements. The former category includes such key components as the Williams turbojet engine and the satellite datalink, and is important enough that FY 2011 – 2011 contract savings are being applied to address it. Improvements will begin with missile communications that will work even in jamming-rich or otherwise hostile environments. March 11/13: UK. A $6.6 million firm-fixed-price contract modification for 4 torpedo tube launched (TTL) Tomahawk Block IV all-up-round missiles for the government of the United Kingdom under the Foreign Military Sales Program. All funds are committed immediately. Work will be performed in Tucson, AZ (32.6%); Camden, AR (13%); Ogden, UT (10.5%); Dallas, TX (3.5%); Minneapolis, Minn. (3.3%); Glenrothes, Scotland (3.3%); Spanish Fork, UT (3.1%); El Segundo, CA (3%); Walled Lake, MI (2.6%); Anniston, AL (2.5%); Ft. Wayne, IN (2.3%); Ontario, Canada (2.2%); Vergennes, VT (2.1%); Berryville, AR (1.8%); Westminster, CO (1.6%); Largo, FL (1.5%); Middletown, CT (1.3%); Huntsville, AL (1.2%); Clearwater, FL (0.8%); Moorpark, CA (0.8%); El Monte, CA (0.6%); Salt Lake City, UT (0.6%); Farmington, NM (0.2%); and various continental U.S. (CONUS) and outside CONUS locations (5.6%); and is expected to be completed in February 2015 (N00019-12-C-2000). 4 for Britain March 7/13: Support. A $12.8 million firm-fixed-price, indefinite-delivery/ indefinite-quantity contract for services in support of Tomahawk missile depot maintenance, including direct fleet support for resolving technical issues with forward deployed, in-theater weapons and inventory management for the US Navy and the United Kingdom. Work will be performed in Tucson, AZ (70%); Camden, AR (24%); Commerce Township, MI (4%); Indianapolis, IN (1%); and various other continental U.S. (CONUS) and outside CONUS locations (1%) until February 2014. $2.4 million is committed immediately, of which $2.3 million will expire at the end of the current fiscal year, on Sept 30/12 (N00019-13-D-0002). Jan 17/13: DOT&E testing. The Pentagon releases the FY 2012 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The Tomahawk gets high marks. It continues to meet its standards, and remains operationally effective and suitable (maintainable). The one thing Pentagon OT&E would like to see is restored flight testing of the Block III model, until it goes out of service in FY 2020. Dec 18/12: CCLS. A $45 million firm-fixed-price contract modification from the USN for 120 Tomahawk Block IV Composite Capsule Launching Systems (CCLS), which are used to launch UGM-109s from vertical submarine tubes. All contract funds are committed immediately. Work will be performed in Tucson, AZ (24.61%); Lincoln, NB (23.17%); Camden, AR (12.48%); Rocket Center, WVA (10.3%); Carpentersville, IL (8.74%); Joplin, MO (6.63%); Hopkinton, MA (4.76%); Huntsville, AR (4.37%); Alamitos, CA (2.05%); Torrance, CA (1.47%); Downers Grove, IL (0.75%); and Brooksville, FL (0.67%), and is expected to be complete in July 2015 (N00019-12-C-2000). Dec 17/12: 252 missiles. A $254.6 million firm-fixed-price contract modification, exercising a US Navy option for 252 Tomahawk Block IV All-Up-Round (AUR) missiles: 132 RGM-109s designed to launch from strike-length Mk.41 cells on surface ships, and 120 UGM-109 CLS missiles that are fired from different vertical launch tubes installed on American submarines. Work will be performed in Tucson, AZ (32%); Camden, AR (11%); Ogden, UT (8%); Anniston, AL (4%); Minneapolis, MN (4%); Ft. Wayne, IN (4%); Glenrothes, Scotland (4%); Dallas, TX (4%); Spanish Fork, UT (3%); Vergennes, VT (3%); Walled Lake, MI (2%); Berryville, AR (2%); El Segundo, CA (2%); Westminster, CO (2%); Middletown, CT (2%); Huntsville, AL (1%); Farmington, NM (0.2%); and various locations in the continental United States and outside the continental United States (11.8%); and is expected to be completed in August 2015. See also Raytheon. FY 2013: 252 Sept 3/12: OASuW. Aviation Week offers a look into the Tomahawk’s potential future. In June 2012, the US Navy announced a sole-source contract to Raytheon to develop the interim Offensive Anti-Surface Weapon (OASuW) by modifying a Tomahawk Block IV missiles with new sensors and data links. The missile is expected to enter service by 2015… but it’s likely to face competition from Lockheed Martin’s LRASM-A, among others. Full OASuW Technology Development awards are expected to begin in FY 2013, after a Q2 Milestone A decision. The technical Development phase runs from FY 2013 – FY 2017, to an expected total of $557.2 million. Initial Operational Capability is currently set for 2024. July 12/12: CCLS. A $45.9 million firm-fixed-price contract modification, buying 123 Tomahawk Block IV Composite Capsule Launching Systems (CCLS) for the US Navy. Work will be performed in Tucson, AZ (24.61%); Lincoln, NB (23.17%); Camden, AR (12.48%); Rocket Center, WVA (10.3%); Carpentersville, IL (8.74%); Joplin, MO (6.63%); Hopkinton, MA (4.76%); Huntsville, AR (4.37%); Alamitos, CA (2.05%); Torrance, CA (1.47%); Downers Grove, IL (0.75%); and Brooksville, FL (0.67%), and is expected to be complete in July 2014 (N00019-12-C-2000). June 7/12: 361 missiles. A $337.8 million firm-fixed-price contract for 361 Tomahawk Block IV All-Up-Round missiles for the Navy. This includes 238 RGM-109E missiles that are launched from strike-length Mk.41 Vertical Launch System (VLS) cells on surface ships, and 123 UGM-109E missiles that are launched from submarines equipped with the Capsule Launch System (CLS). Raytheon’s release says that the buy includes replenishment of weapons used during Operation ODYSSEY DAWN in Libya, as well as the FY 2012 buy. Work will be performed in Tucson, AZ (32%); Camden, AR (11%); Ogden, UT (8%); Anniston, AL (4%); Minneapolis, MN (4%); Fort Wayne, IN (4%); Glenrothes, Scotland, UK (4%); Dallas, TX (4%); Spanish Fork, UT (3%); Vergennes, VT (3%); Walled Lake, MI (2%); Berryville, AR (2%); El Segundo, CA (2%); Westminster, CO (2%); Middletown, CT (2%); Huntsville, AL (1%); Farmington, NM (0.2%); and various locations inside and outside the continental United States (11.8%), and is expected to be complete in August 2014 (N00019-12-C-2000). FY 2012 + Libya replacement: 361 April 27/12: New sensors? FBO.gov: “The Naval Air Systems Command intends to negotiate and award a sole source order under Basic Ordering Agreement (BOA) N00019-11-G-0014, pricing arrangement cost-plus-fixed-fee, for engineering services necessary to support a study to assess the possibility of integrating, onto the Block IV Tomahawk weapon, Advanced Anti-Radiation Guided Missile (AARGM) technologies.” The AGM-88E AARGM uses GPS to navigate to the target’s vicinity, then finds targets that are moving or have moved using a combination of emission-locating ESM and an active millimeter wave radar seeker. AARGM is meant to destroy enemy air defense systems, but a system for a missile of this size would also be able to target enemies like ships. ATK received a $452,000 contract on Aug 22/12. xGM-109E Block IV TLAMs: A Program Success Story Fly. (click to view full) Block IV missiles offer a number of improvements over previous versions: the missile’s purchase cost drops by almost half, to about $750,000, while lowering its future maintenance costs, and upgrading its capabilities. Capt. Bob Novak, who was the Tomahawk All-Up-Round (PMA-280) program manager until August 2005, began leading the Tomahawk AUR program team in 2002 during a critical time in the development of the Tactical Tomahawk cruise missile. Under his leadership the program awarded the Navy’s first-ever weapons multi-year contract, and was estimated to have reduced the cost per missile from Block III to Block IV by almost 50%, saving $1 billion over planned lifetime costs while upgrading the missile’s capabilities. While reducing the Block IV Tactical Tomahawk’s purchase costs, improved design and manufacturing also reduced maintenance/ recertification requirements from once every 8 years for Block III missiles to once every 15 years. PMA-280 was honored with several prominent awards, including the Secretary of Defense Value Engineering Award, the Daedalian Award, and the Ed Heinemann Award. Boom. (click to view full) One important new capability that Block IV Tomahawk brings to the US Navy’s Sea Strike doctrine is derived from the missile’s 2-way satellite data link, which enables the missile to respond to changing battlefield conditions. The strike controller can “flex” the missile in flight to preprogrammed alternate targets, redirect it to a new target, or even have it loiter over the battlefield awaiting a more critical target. Block IV Tomahawks can also transmit battle damage indication imagery and missile health and status messages via the satellite data link, allowing firing platforms to execute missions in real time. Global Positioning System-only missions are also possible in addition to the missile’s previous terrain-mapping guidance mode, thanks to an improved anti-jam GPS receiver for enhanced mission performance. The majority of Tomahawk cruise missiles are currently launched by Navy surface vessels, such as the Ticonderoga Class (CG-47) cruisers and Arleigh Burke Class (DDG-51) destroyers. The later series of Improved Los Angeles Class (SSN-688I) and the newest Virginia Class (SSN-744) attack submarines are also armed with 12 dedicated Tomahawk launch tubes, while earlier Los Angeles boats and the newest Seawolf Class (SSN-21) have to sacrifice some of their stored torpedoes to carry and launch Tomahawks through their torpedo tubes. But the USA’s premier Tomahawk carrier vehicle in future will be the Ohio Class SSGN stealth strike subs, with launch capacity for an astounding 154 Tactical Tomahawks each. Additional Readings & Sources DID would like to thank Raytheon Tomahawk Program Director Roy Donelson, and Growth Program Manager Chris Sprinkle, for their assistance with this article. Any mistakes are our own damn fault. Readers with corrections or information to contribute are encouraged to contact editor Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so. Weapon & Program Background US NAVAIR – Tactical Tomahawk Raytheon – Tomahawk Cruise Missile. See also their 2012 paper on the missile’s evolution from Block III: “Tomahawk: Serving the U.S. and Allied Warfighter“. Globalsecurity.org – BGM-109 Tomahawk DoN Acquisition One Source – Reducing Cost/Schedule for TOMAHAWK All-Up-Round Program Air Power Australia – Tomahawk Cruise Missile Variants: BGM/RGM/AGM-109 Tomahawk/TASM/TLAM/GCLM/MRASM. Last updated 2012. DID – Naval Swiss Army Knife: MK 41 Vertical Missile Launch Systems (VLS). Strike-length cells are required to fire Tomahawks. News & Views DID – LRASM Missiles: Reaching for a Long-Range Punch. Covers the USN’s OASuW program, whose sea-launched component has already affected the Tomahawk program. The current plan is based around air and sea-launched adaptations of Lockheed Martin’s AGM-158B JASSM-ER. FAS Strategic Security Blog (March 18/13) – US Navy Instruction Confirms Retirement of Nuclear Tomahawk Cruise Missile. The xGM-109B Tomahawk Block II. Defense Daily (Nov 29/07) – Navy Seeks New Uses For Tomahawks. Covers a number of program developments, including the potential for thermobaric warheads. Naval Air Station Patuxent River Tester Magazine (April 12/07) – Submarine-launched Tomahawk IV flight test a success Naval Air Station Patuxent River Tester Magazine (Dec 14/06) – Tomahawk IV in West Coast Test. “The test successfully demonstrated the Tomahawk Strike Network. The Tomahawk Strike Network (TSN) is a unique aspect of the Block IV system. Utilized in this test, TSN is a communications network that provides secure connectivity among all of the participants in a strike plan. Those participants include the Block IV missile(s), the strike controller, and the missile controller. Messages are generated, sent, and received inside the network, and are monitored by a channel controller. TSN allows the strike controller to retarget the missile in flight, monitor the health and status of the missile in flight, and collect images along the route.” Naval Air Station Patuxent River Tester Magazine (Aug 10/05) – Tomahawk program marks historic milestone. Capt. Rick McQueen became the 1st program manager for the newly formed Tomahawk Weapons System Program Office (PMA-280), as the Navy’s All-Up-Round (PMA-280) and Cruise Missile Weapons Systems (PMA-282) groups merged. Naval Air Station Patuxent River Tester Magazine (Oct 7/04) – New Tomahawk ready for warfighter. Block IV was accepted by the USN on Sept 29/04. View the full article
-
DID - US Carrier Pilots’ T-45 Training System
Do you feel lucky…? (click to view full) The T-45 Training System includes T-45 Goshawk aircraft, advanced flight simulators, computer-assisted instructional programs, a computerized training integration system, and a contractor logistics support package. The integration of all 5 elements is designed to produce a superior pilot in less time and at lower cost than previous training systems. The US Navy uses the Hawk-based T-45TS system to train its pilots for the transition from T-6A Texan II/ JPATS aircraft to modern jet fighters – and carrier landings. This is not a risk-free assignment, by any means. Nevertheless, it is a critical link in the naval aviation chain. This DID FOCUS article covers the T-45TS, and associated contracts to buy and maintain these systems, from 2006 to the end of FY 2014. T-45 History & Background T-45: The Platform T45TS Simulator (click to view full) In 1981, the T45TS beat out the Dassault/Dornier Alpha Jet in a bid to replace two US Navy training aircraft: the TA-4J Skyhawk and T-2C Buckeye. The new system trains U.S. Navy and Marine Corps pilots for conversion into the F/A-18A-D Hornet, the F/A-18E/F Super Hornet family, the AV-8B Harrier II Plus, and the EA-6B Prowler. It will also serve as a lead-in fighter trainer (LIFT) aircraft to future platforms like the F-35 Joint Strike Fighter variants. The T-45 Training System, or T45TS, is more integrated than past systems. The system includes the T-45 Goshawk aircraft, advanced flight simulators, computer-assisted instructional programs, a computerized training integration system, and a contractor logistics support package. The combined value of all five integrated elements produces a superior pilot in less time and at lower cost than previous training systems. Goshawks come in two variants: the T-45A and T-45C. What distinguishes them is the “Cockpit 21″ digital avionics in the C variant. The cockpits are equipped with two monochrome 5” multifunction displays supplied by Israel’s Elbit, which provide navigation, weapon delivery, aircraft performance and communications data. In addition, the aircraft have been equipped with a new open systems design MDP that manages the avionics and the displays in the aircraft. Approximately 80% of the MDP’s software and circuit card assemblies were reused from the F/A-18E/F Advanced Mission Computer, making project development faster and less expensive, and improving commonality with the advanced aircraft the Goshawks train their pilots to fly. A number of air forces around the world choose to use BAE Systems’ Hawk trainer in a reserve or even front-line role as a light attack aircraft. The US Navy could do so, but haven’t chosen to. The do plan to keep the Goshawks flying until 2035, however, training the next several generations of US Navy pilots. T-45: Basing & Industrial T-45 Goshawks (click to view full) T-45s are currently based at NAS Kingsville, TX and NAS Meridian, MS. The aircraft are permanently based ashore, and are flown out to the training carrier for deck landings. Since the transition to the T-45, performance has indeed improved. The training task has been accomplished with 25% fewer flying hours, using 42% fewer aircraft and 46% fewer personnel. Overall, the T45TS has enabled the US Navy to reduce student flight time by 13% for each student pilot, and the average training time by 17 weeks. Even so, with the current T-45 training demand the U.S. Navy has been able to average more than 60 hours per month per airframe – one of the highest utilization rates in the world. While the core Hawk aircraft is British, the prime contractor is Boeing Aircraft Company, St. Louis, MO. British Aerospace (BAE Systems) of Kingston, England provides the center and aft fuselage; and Rolls Royce, Ltd. of Bristol, England provides the F405-RR-401 Adour engines, along with its trademark Power By The Hour(R) support based on availability. Tests have been conducted using the more advanced F405-RR-402 as well. Smiths Industries supplies the head-up display (HUD) with its video camera system for post-mission analysis, along with primary and secondary air data indicators and a weapon aiming computer and display. L-3 Vertex provides contractor logistics support for the fleet as a whole, under 2 similar contracts. T45TS Contracts and Key Events, 2006 – 2017 Flight’s end (click to view full) This article began coverage as the T-45 was fading from production. Pentagon budget documents note that the FY 2005 budget covered 10 systems for $301 million, but FY 2006 production dropped to 6 systems and $278.8 million. The FY 2007 figures rose again to 12 systems and $410.6 million total, and were the last T-45s ordered. The FY 2008 budget request of $90.7 million was aimed at modifications to correct discrepancies and deficiencies, address critical avionics obsolescence and diminishing manufacturing source issues, and fund upgrades to the aircraft cockpit and navigation systems. Those tasks have continued beyond 2008, but by FY 2010, the T-45 was no longer listed in Pentagon budget reports for major weapons systems. Unless otherwise specified, all contracts are issued by US Naval Air Systems Command in Patuxent River, MD; and Boeing subsidiary McDonnell Douglas is the recipient. Maintenance and support contracts tend to go to L-3 Communications Vertex Aerospace LLC, and engine manufacturer Rolls Royce; they will be specifically noted where appropriate. Note that Rolls Royce’s trademarked Power By the Hour approach is designed to charge a fixed price per flight hour. FY 2020 T-45s over CVN 77 (click to view full) December 8/20: SLEP Boeing won a $20.7 million order, which provides for the production and delivery of 48 retrofit kits, support equipment and special tooling in support of phase two of the T-45 Service Life Extension Program (SLEP) for SLEP production Lots Three and Four. In addition, this order provides retrofit engineering and logistics from the original equipment manufacturer to support the installation of associated technical directives. The T-45A/C Goshawk is the US Navy’s two-seat advanced jet trainer. It entered service with the US Navy in January 1992. Work will take place in St. Louis, Missouri and estimated completion will be in May 2024. June 24/20: A- And B-Kits The Navy awarded Boeing a $12.5 million order, which procures non-recurring engineering in support of establishing a functional configuration baseline in support of the production and delivery of Automatic Dependent Surveillance-Broadcast Out (ADS-B Out) A-kits and B-kits for the T-45 Training System. The deal provides for the procurement of B-kits, to include air data computers and A-kits, which consist of associated wiring, splitters and filters and spares. This order also provides kit integration, follow-on analysis and engineering in support of issues that may arise during kit production and installation. The T-45A/C Goshawk is the US Navy’s two-seat advanced jet trainer. The aircraft is jointly manufactured by Boeing and BAE Systems. Work will take place in St. Louis, Missouri and Mesa, Arizona as well as various locations within the continental US. Estimated completion will be by January 2023. May 1/20: HUD Physical Optics won a $17.8 million order, which provides non-recurring engineering for the production, test, integration and delivery of the T-45 Head-Up Display (HUD) and its associated internal software. The T-45A/C Goshawk is the US Navy’s two-seat advanced jet trainer. The aircraft is jointly manufactured by Boeing and BAE Systems. The T-45A was selected to meet the US Navy requirement for an undergraduate jet pilot trainer to replace the TA-4J Skyhawk and T-2C Buckeye. The TA-4J was retired in 2003 and the T-2C in August 2008. Work will take place in Torrance, California. Estimated completion date is in April 2022. FY 2019 October 1/19: Engineering Support L-3 Communications Vertex Aerospace won a $180.4 million contract modification that exercises an option for organizational, intermediate, and depot level maintenance, logistics, and engineering support for Navy T-45 aircraft, aircraft systems, and related support equipment. Under the contract, L-3 will also deliver equipment, direct material, services and tools to maintain the flight, test and evaluation operations. The T-45C is a training aircraft for pilots who will eventually fly F/A-18 Hornet, the AV-8B Harrier II and other carrier-based aircraft. To meet the needs of the US Navy training mission and to ensure aircraft carrier compatibility, several modifications were incorporated into the T-45 Goshawk design, including: new twin nose-wheel with catapult launch T-bar; nose-wheel steering for maneuvering within the confines of the carrier deck; strengthened airframe and undercarriage for catapult launches; relocated speed brakes; provision of under-fuselage tailhook; revised avionics and modified cockpit layout for compatibility with front-line US Navy combat aircraft. Work will take place at the Naval Air Stations in Kingsville, Texas; Meridian, Mississippi; Pensacola, Florida; Patuxent River, Maryland. Estimated completion is in September 2020. July 2/19: Upgrade of Oxygen Concentrator Carelton Life Support Systems won an $8 million contract modification for the Phase II Upgrade and qualification testing of the CGU-25 oxygen concentrator on the T-45 aircraft. The McDonnell Douglas T-45 Goshawk is the Navy’s aircraft-carrier capable trainer. The T-45 is tandem-seat pilot trainer that replaces the TA-4J Skyhawk and T-2C Buckeye. It was modified from the British BAE Systems Hawk land-based training jet aircraft. In 2017, the USN grounded the T-45 fleet for a three-day “safety pause” after more than 100 instructor pilots refused to fly the aircraft. The pilots cited concerns about incidents of hypoxia that they believed to have resulted from faulty onboard oxygen-generation systems. Under the modification, Carelton will perform work in Davenport, Iowa, and work is expected to be finished in July 2021. May 2/19: Inlet Retrofit Kits Boeing won a $21.1 million delivery order to procure inlet retrofit kits for the T-45 aircraft. The deal also includes support equipment and special tooling and engineering as well as logistics support for installations. In January, the US Navy tapped Boeing with a $56.7 million contract for T-45 support. The T-45 Goshawk is a highly modified version of the British BAE Systems Hawk land-based training jet aircraft. The T-45 was selected to meet the US Navy requirement for an undergraduate jet pilot trainer to replace the TA-4J Skyhawk and T-2C Buckeye. It features a new forward fuselage deepened to house a new twin-wheel nose gear, redesigned main gear units, a taller fin and tailplane of increased span, a single ventral fin, fuselage side-mounted airbrakes, an arrester hook and small fins ahead of and below the tailplanes. Work for the delivery order will take place in Patuxent River, Maryland and is scheduled to be completed in July next year. March 4/19: Engineering Support The Navy awarded L-3 Communications a $21.4 million contract modification to support the Navy T-45 aircraft, aircraft system and related support equipment. The T-45A/C Goshawk is the US Navy’s two-seat advanced jet trainer that was selected to meet the US Navy requirement for an undergraduate jet pilot trainer to replace the TA-4J Skyhawk and T-2C Buckeye. The aircraft is a navalized version of the BAE Systems Hawk advanced jet trainer, selected by the Royal Air Force and flown by the Red Arrows acrobatic display team. It has a single pylon installed under each wing for carrying bomb racks, rocket pods or auxiliary fuel tanks. The Goshawk is powered by a single Rolls-Royce navalized Adour mk871 twin-spool non-afterburn turbofan engine. The contract modification exercises an option for organizational, intermediate, and depot level maintenance, logistics, and engineering support. Support includes services, equipment, tool, direct material, and indirect material required to support and maintain flight, test and evaluation operations. Work will take place in Texas, Mississippi, and Florida and is scheduled to be completed in September this year. January 30/19: Engineering Support The Navy awarded Boeing a $56.8 million contract providing program management as well as engineering and integrated logistics support for the post-production support phase of the T-45 aircraft lifecycle. The T-45 Goshawk is the US Navy’s two seat advanced jet trainer. It is a highly modified version of the British BAE Systems Hawk land-based training jet aircraft and was selected to replace the TA-4J Skyhawk and T-2C Buckeye. In order of meeting US Navy training mission and to ensure aircraft carrier compatibility, T-45 includes a new twin nose-wheel with catapult launch T-bar, nose-wheel steering for maneuvering within the confines of the carrier deck, strengthened airframe and undercarriage for catapult launches, relocated speed brakes, provision of under-fuselage tailhook, revised avionics and modified cockpit layout for compatibility with front-line US Navy combat aircraft. The current contract includes special tooling and test equipment, data accessibility and obsolescence identification, and resolution in addition to field services support that provides subject matter expertise in the areas of environmental control systems, cockpit pressurization and On-Board Oxygen Generation Systems integration. FY 2018 September 12/18: Training support L-3 Communications Vertex Aerospace is set to support the Navy’s fleet of T-45 Goshawk trainers. The $202.9 million contract modification provides for a mix of maintenance, logistics and engineering support operations needed to keep the trainer aircraft flying. The Goshawk is used to train US Navy and Marine Corps pilots for conversion into the F/A-18A-D Hornet, the F/A-18E/F Super Hornet family, the AV-8B Harrier II Plus, and the EA-6B Prowler. And also serves as a lead-in fighter trainer (LIFT) aircraft to future platforms like the F-35 Joint Strike Fighter variants. Work will be performed at multiple Naval Air Stations. They include NAS Kingsville, Texas; NAS Meridian, Mississippi; NAS Pensacola, Florida and NAS Patuxent River, Maryland. The contract will run through September 2019. July 25/18: Oxygen nedded Boeing is being contracted to support the Navy’s fleet of T-45 training aircraft. The cost-plus-fixed-fee order has a value of $12.2 million and provides for non-recurring engineering efforts to support the integration of an Automatic Backup Oxygen system into the aircraft. The T-45 Goshawk is used by the US Navy to train its pilots for the transition to modern fighter jets and carrier landings. Last year the Navy decided to equip the trainers with new oxygen monitoring systems following a rash of incidents during which pilots appeared to suffer from oxygen deprivation. Work will be performed at the company’s location in St. Louis, Missouri, and is expected to be completed in August 2019. FY 2017 October 04/17: Following a five-month grounding, the US Navy has allowed the resumption of flights of its T-45 Goshawk fleet after issues arose with the system that generates and supplies oxygen to the trainer aircraft. Under the new flight regime, student pilots can continue training only on aircraft outfitted with a digital upgrade to the CRU-99 oxygen monitor, called the solid-state oxygen monitor (CRU-123), which provides information on temperature and oxygen pressure. The Navy plans to have all of its T-45 aircraft to be fitted with the CRU-123 by the end of the second quarter of 2018. April 18/17: A US Navy ban on T-45 flightshas been lifted, although lower altitude restrictions have been put in place. The trainers were barred from flying late last month after instructor pilots reported incidents of physiological problems by pilots while in the cockpit. The pilot trainer will now fly below 10,000 feet to avoid the use of the aircraft’s On Board Oxygen Generator System as authorities continue to investigate the causes of physiological episodes experienced in the cockpit by aircrew. Air crew will also wear a modified mask that circumvents the OBOGS system. FY 2014 L-3 retains new support contract. July 31/14: L-3 Communications Vertex Aerospace LLC in Madison, MS receives a $29.8 million indefinite-delivery requirements contract modification to provide organizational, intermediate, and depot level maintenance and logistics support for T-45 aircraft based at NAS Meridian, MS; NAS Kingsville, TX; and NAS Pensacola, FL. This requirement also includes the support and maintenance of the T-45 aircraft at all operational sites, numerous outlying fields, and various detachment sites. Individual delivery orders will be placed as needed. Work will be performed in Kingsville, TX (58%); Meridian, MS (36%); and Pensacola, FL (6%), and is expected to be complete in September 2014. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-14-D-0019). July 7/14: No T-X Goshawk. Boeing’s partnership with BAE didn’t transfer to the USAF’s huge T-X trainer replacement program, which is expected to begin in 2016. Boeing made some moves to ally with Alenia and its M-346 trainer in May 2008, but decided not to extend that alliance to the USA; they finally signed an agreement with Saab for a joint clean-sheet trainer design in December 2013. BAE partnered with Northrop Grumman to offer their standard Hawk trainer for T-X (q.v. Sept 19/11), and Northrop Grumman has just shifted to the same lead contractor role that Boeing enjoyed for the T-45 Goshawk. Meanwhile, Boeing will have a very tough competitive row to hoe with an unproven clean sheet design. One wonders if they have any regrets right now about letting a productive Hawk partnership lapse. Sources: Breaking Defense, “Northrop Takes The Lead From BAE On $11B T-X Trainer”. July 1/14: Support. L-3 Communications Vertex Aerospace LLC in Madison, MS wins a $151.4 million indefinite-delivery requirements contract to provide organizational, intermediate, and depot level maintenance and logistics services in support of “approximately 200” T-45 aircraft based at Naval Air Station Meridian, MS; NAS Kingsville, TX; NAS Pensacola, FL; and NAS Patuxent River, MD. This is a new contract, issued after the previous multi-year deal expired (q.v. Sept 30/13, Jan 24/12). Work on the base contract will be performed in Kingsville, TX (48%); Meridian, MS (44%); Pensacola, FL (7%); and Patuxent River, MD (1%), and is expected to be complete in September 2015. Funds will be committed in individual delivery orders as they are issued. This contract was competitively procured via an electronic request for proposals, with 4 offers received by US NAVAIR (N00019-14-D-0011). See also FBO.gov, “USN T-45 Aircraft Maintenance and Logistics Support, Solicitation Number: N00019-12-R-0001”. Multi-year support deal March 28/14: Engines. Rolls-Royce Corp. in Indianapolis, IN receives a $107 million unfinalized contract action to provide intermediate, depot level maintenance and related logistics support for approximately 223 in-service T-45 F405-RR-401 Adour engines. Funds will be committed as delivery orders are placed. Work will be performed at US Naval Air Station (NAS) Meridian, MS (47%); NAS Kingsville, TX (46%); NAS Pensacola, FL (6%); and NAS Patuxent River, MD (1%), and is expected to be complete in March 2015. This contract was not competitively procured pursuant to FAR 6.302-1, and seems to be either an extension at the end of the current multi-year contract, or the beginning of something new (N00019-14-D-0016). March 26/14: Support. L-3 Communications Vertex Aerospace LLC in Madison, MS receives a maximum $58.5 million indefinite-delivery, requirements contract to support T45TS aircraft based at Naval Air Station (NAS) Meridian, MS; NAS Kingsville, TX; and NAS Pensacola, FL. They’ll provide logistics services and materials for organizational, intermediate, and depot level maintenance, while supporting T-45s at all operational sites, numerous outlying fields, and various detachment sites. Work will be performed in Kingsville, TX (58%); Meridian, MS (36%); and Pensacola, FL (6%), and is expected to be complete in July 2014. Funds will be committed as individual delivery orders as they are issued. This contract was not competitively procured, pursuant to FAR 6.302-1, by US NAVAIR in Patuxent River, MD (N00019-14-D-0019). FY 2012 – 2013 Engine troubles. Draft RFP for support. T-45Cs: Navy & Marines (click to view full) Sept 30/13: FY14 Fleet. L-3 Communications Vertex Aerospace LLC in Madison, MS wins a $65 million indefinite-delivery, requirements contract modification, exercising the annual option for organizational, intermediate, and depot level support for the Goshawk fleet: 36 T-45A and 168 T-45C aircraft based at Naval Air Station (NAS) Meridian, MS; NAS Kingsville, TX; NAS Pensacola, FL, and Patuxent River, MD. The type splits correspond to the FY 2012 fleet contract rather than the FY 2013 contract, which posited the retirement of some T-45As and 3 more conversions to T-45C status. As always, the fleet contract also includes organizational level maintenance for the Rolls Royce Adour engine. This represents the final contract of a multi-year fleet deal. Announced contracts total $663.8 million, for a contract whose maximum figure was $569 million. Note, however, that each year’s announcement is a maximum, not an amount that must be spent. Work will be performed in Kingsville, TX (57%); Meridian, MS (36%); Pensacola, FL (6%); and Patuxent River, MD (1%), and will run to March 2014, at which point new multi-year contracts will be needed for the aircraft and engine. Contract funds will not be obligated at time of award. Funds will be obligated on individual delivery orders as they are issued (N00019-08-D-0014). Sept 25/13: FY14 Engines. Rolls-Royce Defense Services Inc. in Indianapolis, IN receives a maximum $50.7 million firm-fixed-price, indefinite-delivery option to support about 223 of its F405-RR-401 Adour engines with intermediate and depot level maintenance, using the Power-By-the-Hour arrangement. This is the last option in a 5-year contract (q.v. Oct 1/08), and as usual, funds will be obligated for individual task orders as they are issued. All together, announced awards under this contract total $524.2 million. Work will be performed at NAS Meridian, MS (47%); NAS Kingsville, TX (46%), NAS Pensacola, FL (6%), and NAS Patuxent River, MD (1%), and is expected to be complete in March 2014 (N00019-09-D-0002). Sept 25/13: R&D. Boeing in St. Louis, MO is being awarded $9.7 million for cost-plus-fixed-fee delivery order for supplies and services in support of the T-45 Subsystems Service Life Assessment Program. It involves systems other than avionics and engines, and work required to required to meet full service life through 2035. $4 million in R&D funds are committed immediately. Work will be performed in St. Louis, MO (58.5%) and Brough, United Kingdom (41.5%) and is expected to be complete in July 2016. US Naval Air Systems Command, Patuxent River, MD, is the contracting activity (N00019-11-G-0001, #1509). Jan 24/12: Draft RFP. Following a presolicitation process initiated in November 2011, NAVAIR posts the full draft RFP (N00019-12-R-0001) on T-45 Aircraft Maintenance and Logistics Support. A presolicitation conference is scheduled for Feb. 5, with a final RFP expected at the end of February. As it is currently laid out, the contract would span a maximum of 8 years with all options exercised. Jan 14/13: Engines. US NAVAIR throws a light on recent T-45 engine problems, which hadn’t been discussed in previous DOT&E reports: “Safety problems with the Low Pressure Turbine blades in the F405 engine… forced a redesign of the old blades, which ended production [in early 2012]…. problem was that the newly redesigned blades were not yet fully qualified by U.S. Navy standards and could not be used immediately and the stockpile of old blades was forecast to be depleted by April [2012]…” Poor planning, that, and the Navy had to grant a temporary relaxation of the lifetime wear “1,000-hour Accelerated Simulated Mission Endurance Test (ASMET)” requirement. Even at a 100 hour threshold, however, the 4-6 months normally needed for test preparation would have blown the stockpile’s deadline. Instead, the team met the 100-hour deadline between Jan 20/12 – April 11/12. ASMET testing continued at the NAS Patuxent River Aircraft Test & Evaluation Facility, and was fully done by Oct 23/12, ahead of schedule and “several million dollars” under budget. Hopefully, the Navy will pass on some of the things it learned to other programs. US NAVAIR. Engine problems & blade redesign Oct 15/12: Training. An $8.5 million firm-fixed-price delivery order for 12 T-45 Virtual Mission Training System kits and spares. Work will be performed in Hazelwood, MO (96%), El Paso, TX (3%), and Mesa, AZ (1%), and is expected to be complete in April 2014 (N00019-11-G-0001). Sept 25/12: FY13 Fleet Support. L-3 Communications Vertex Aerospace LLC in Madison, MS receives a $126.5 million indefinite-delivery, requirements type contract option to support 28 T-45A and 171 T-45C aircraft based at Naval Air Station (NAS) Kingsville, TX; NAS Meridian, MS; and NAS Pensacola, FL. That’s 8 fewer T-54As than last year, and 3 more T-45Cs. L-3 Vertex will continue providing logistics support, and the materials for organizational, intermediate, and depot level maintenance. Taken together, FY 2013 support costs for the 223 plane fleet will run up to $237.9 million. Taken together, announced fleet support orders under this 5-year contract amount to $598.8 million, which is slightly higher than the contract’s announced $569 million maximum (q.v. Aug 28/08). They could still be congruent, however, because each year’s award is a maximum that could leave unspent dollars for future years. Orders will be placed, and funds will be released, as needed. Work will be performed in Kingsville, TX (57%); Meridian, MS (36%); and Pensacola, FL (7%), and the option will finish in September 2013 (N00019-08-D-0014). Sept 20/12: FY13 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN receives a $103.3 million firm-fixed-price; indefinite-delivery option to support the T-45 Goshawk’s F405-RR-401 Adour engines with intermediate and depot level maintenance, using the Power-By-the-Hour arrangement. They’ll also provide inventory control, sustaining engineering and configuration management, as well as integrated logistics support and required engineering for organizational-level sustainment. Work will be performed at NAS Meridian, MS (48%); NAS Kingsville, TX (47%), NAS Pensacola, FL (4%), and NAS Patuxent River, MD (1%), and is expected to be complete in September 2013. Funds will be obligated for individual task orders as they are issued (N00019-09-D-0002). Dec 12/11: Boeing in St. Louis, MO receives an $8.1 firm-fixed-price delivery order modification, exercising an option to support the integration testing of engineering changes to the T-45 aircraft. Work will be performed at NAS Patuxent River, MD, and is expected to run to December 2012 (N00019-11-G-0001). FY 2010 – 2011 Final delivery; 1 million flight hours. Landed. (click to view full) Sept 27/11: FY12 Fleet Support. L-3 Communications Vertex Aerospace, LLC in Madison, MS receives a $123.2 million indefinite-delivery, requirements contract modification, exercising an option for logistics services and materials for organizational, intermediate, and depot-level maintenance required to support 36 T-45A and 168 T-45C aircraft. This requirement also includes organizational level maintenance for the engine. No funding will be obligated at time of award. Work will be performed at Naval Air Station (NAS) Meridian, MS (36%); NAS Kingsville, TX (54%); NAS Pensacola, FL (6%); and NAS Patuxent River, MD (1%), and is expected to be complete in September 2012 (N00019-08-D-0014). Sept 27/11: FY12 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN receives a $99.9 million firm-fixed-price requirements contract modification, exercising an option for intermediate and depot-level maintenance and related support for in-service T-45 F405-RR-401 Adour engines, under their Power-by-the-Hour arrangement. In addition, this modification provides for inventory control, sustaining engineering and configuration management. finally, Rolls Royce will handle integrated logistics support and required engineering elements necessary to support the F405-RR-401 engine at the organization level – though that support will be performed by L-3 Vertex. No funding is being obligated at time of award; it will be called on as necessary. Work will be performed at Naval Air Station (NAS) Kingsville, TX (48%); NAS Meridian, MS (47%); NAS Pensacola, FL (4%); and NAS Patuxent River, MD (1%), and is expected to be complete in September 2012 (N00019-09-D-0002). Sept 19/11: T-X. BAE won’t be partnering with Boeing to offer its Hawk trainer to the US Air Force – they’ve signed an agreement with Northrop Grumman instead. The USAF’s current T-38 Talon supersonic trainer is a Northrop product. Boeing teamed up with Alenia in May 2008, and pledged to act as a marketing partner for Alenia’s M-311 and new M-346 trainer jets beyond Italy and the USA. They still haven’t committed to any trainer partnerships within the USA, but they clearly weren’t focused on extending their partnership with BAE. Sources: Northrop Grumman, “BAE Systems, Inc. and Northrop Grumman Partner to Pursue U.S. Air Force T-X Contract”. Partner switch for T-X April 29/11: Avionics. A $10.4 million firm-fixed-price contract modification, exercising an option for hardware and support associated with the T-45 Required Avionics Modernization Program: 30 T-45 retrofit kits, 1 additional spare mission display processor, and associated engineering support efforts. T-45 RAMP converts T-45As into T-45Cs, swapping out the analog instruments for a “glass cockpit” of digital display screens, inertial navigation, and other improvements that make them more like the systems found in the Navy’s F/A-18E/F Super Hornets. Work will be performed in St. Louis, MO, and is expected to be complete in September 2014 (N00019-09-C-0020). Sept 27/10: FY11 Fleet Support. L-3 Communications Vertex Aerospace LLC in Madison, MS received a $125 million option against its indefinite-delivery, requirements type contract to support the T-45 fleet. They’ll provide services and materials to provide organizational, intermediate, and depot level maintenance for 47 T-45As and 158 T-45Cs, plus organizational maintenance support for their engines. Work will take place where the planes are based, at Naval Air Station (NAS) Kingsville, TX (54%); NAS Meridian, MS (41%); NAS Pensacola, FL (4%), and Patuxent River, MD (1%); and the contract option runs into September 2011 (N00019-08-D-0014). Sept 27/10: FY11 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN receives an $89.1 million option under a firm-fixed-price requirements contract for the 2nd option year of intermediate and depot level maintenance and related support for in-service T-45 F405-RR-401 Adour engines. Work will take place under the firm’s MissionCare/ “power-by-the-hour” arrangement, which pays Rolls Royce for engine hours flown, not hours of maintenance done. Work will include the aforementioned maintenance for the engines and the aircraft’s gas turbine starting system, as well as inventory control, parts supply, sustaining engineering and configuration management, and other required engineering. The initial Adour engine MissionCare contract was awarded to Rolls-Royce in October 2003, and has been renewed annually. The US Navy’s T-45 fleet reached 1 million flight hours in August 2010, and in September 2010, Rolls-Royce completed 500,000 flight hours of MissionCare support for the fleet. Work will take place where the planes are based, at Naval Air Station (NAS) Kingsville, TX (54%); NAS Meridian, MS (41%); NAS Pensacola, FL (4%), and Patuxent River, MD (1%); and the contract option runs into September 2011 (N00019-09-D-0002). This would appear to be the 2nd of 4 option years under the Oct 1/08 contract. See also Rolls Royce release. Aug 26/10: Boeing and the U.S. Navy celebrate the Naval Air Training Command’s 1 millionth flight hour with the T-45 Goshawk, after 18 years of service. The ceremony is held at at Cecil Field in Jacksonville, FL. Boeing. 1,000,000 flight hours Oct 20/09: The 221st, and last, T-45C Goshawk is delivered to the U.S. Navy, during a ceremony at the Boeing production facilities in St. Louis, MO. NAVAIR release. Final delivery FY 2008 – 2009 Simulator improvements; Engine improvements get recognition; USN’s T-2 Buckeyes retired. T-45 Goshawks from NAS Kingsville (click to view full) Sept 28/09: Avionics. A $10.1 million firm-fixed-price contract for retrofit kits and associated engineering services in support of the T-45’s avionics modernization program, which is part of the T-45C upgrade. Work will be performed in St. Louis, MO, and is expected to be complete in September 2014. This contract was not competitively procured (N00019-09-C-0020). Sept 28/09: Avionics. A $7.6 million firm-fixed-price delivery order against a previously issued Basic Ordering Agreement for 36 mission display processor aircraft retrofit kits for the T-45-TS. Work will be performed in St. Louis, MO, and is expected to be complete in November 2011. Contract funds in the amount of $2.5 million will expire at the end of the current fiscal year, which is Sept 30/09 (N00019-05-G-0026). Sept 25/09: FY10 Fleet Support. L-3 Communications Vertex Aerospace LLC in Madison, MS received a $112.7 million option against its indefinite-delivery, requirements type contract to support the T-45 fleet. They’ll provide services and materials to provide organizational, intermediate, and depot level maintenance for 49 T-45As and 151 T-45Cs, plus organizational maintenance support for their engines. Work will take place where the planes are based, at Naval Air Station (NAS) Kingsville, TX (54%); NAS Meridian, MS (41%); NAS Pensacola, FL (4%), and Patuxent River, MD (1%); and the contract option runs into September 2010 (N00019-08-D-0014). Sept 25/09: FY10 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN receives a $90.7 million option under a firm-fixed-price requirements contract for intermediate and depot level maintenance and related support for in-service T-45 F405-RR-401 Adour engines that power the T-45 Goshawks. MissionCare is the defense analogue to commercial Power By The Hour(R) contracts, which offer fixed-price maintenance based on hours flown. Work will include the aforementioned maintenance for the engines and the aircraft’s gas turbine starting system, as well as inventory control, parts supply, sustaining engineering and configuration management, and other required engineering. It will take place where the planes are based, at Naval Air Station (NAS) Kingsville, TX (48%); NAS Meridian, MS (47%); NAS Pensacola, FL (4%), and Patuxent River, MD (1%); and the contract option runs into September 2011 (N00019-09-D-0002). This contract exercises the 1st of 4 option years to the base contract noted in the Oct 1/08 entry. Sept 10/09: HSRIP Recognition. The T-45 Goshawk Hot Section Reliability Improvement (HSRIP) team here is presented with the Society of Flight Test Engineers (SFTE) 2009 James S. McDonnell Flight Test Team Award at the SFTE’s 40th Annual Symposium Award Banquet in Stockholm, Sweden. HSRIP is composed of personnel from NAVAIR, Boeing, Rolls Royce and Wyle, as well as Navy, Marine Corps and Boeing test pilots. It falls under the Naval Undergraduate Flight Training Systems Program Office (PMA-273). The HSRIP team is responsible for the US Navy’s incorporation of the F405-RR-402 (Rolls-Royce MK 951 Adour derivative) engine into the T-45, including a Full Authority Digital Engine Control (FADEC), an improved backup Manual Fuel Control (MFC) system, and a new hot section that should provide longer life. Operationally, the FADEC provides automatic surge detection and recovery logic, an improved airstart envelope and the potential to optimize the engine’s performance and the plane’s handling qualities. The program conducted its first HSRIP test flight on Dec 18/07, and has since completed more than 100 flight test missions. The trophy will eventually be on display at the Smithsonian Air and Space Museum Udvar-Hazy Annex at Washington-Dulles International Airport. US NAVAIR release. Dec 10/08: Israel. The Goshawk production line might be saved. After more than 40 years of service, Israel is finally looking to replace its versatile A-4 Skyhawk fleet. The T-45TS is reportedly one of the 4 contenders. Read “Israel’s Skyhawk Scandal Leads to End of an Era” – but salvation doesn’t come for the Goshawk. Israel picks the M346 in 2012, after the Goshawk production line has already shut down. Oct 31/08: Shutdown. The Grim Reaper issues a Halloween reminder, via a $5.8 million order against Basic Ordering Agreement N00019-05-G-0026. The order is for “near and long term requirements to continue the analysis required for an efficient and orderly shutdown of the T-45 production line transition Phase II and the associated post-production support efforts for the T-45 A/C aircraft series.” Work will be performed in St. Louis, MO (77%) and Warton, Lancashire, UK (23%), and is expected to be complete in March 2010. Contract funds in the amount of $1.7 million will expire at the end of the current fiscal year. Oct 1/08: Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN received a $90.5 million firm-fixed-price, indefinite-delivery/ indefinite-quantity contract to provide FY 2009 intermediate and depot level maintenance and related support for in-service T-45 F405-RR-401 Adour engines. The contract is for 1 year with options for 4 additional years, and builds upon a successful 5-year contract established in 2003. As Rolls Royce reminds us, support is every more important than engine sales. “MissionCare solutions, along with other aftermarket services provided to global customers by Rolls-Royce, account for more than 50 percent of the company’s annual sales.” These services will be provided under their trademark Power-By-the-Hour (PBTH) arrangement, which pays for flight hours rather than maintenance hours. PBTH services include inventory control, sustaining engineering and configuration management, integrated logistics support and required engineering to support the F405-RR-401 engine beyond the flightline. Work will be performed on over 200 aircraft at the Naval Air Station (NAS) Kingsville, TX (48%), NAS Meridian, MS (47%); NAS Pensacola, FL (4%), and NAS Patuxent River, MD (1%), and is expected to be completed in September 2013. This contract was not competitively procured pursuant FAR 6.302-1, “Only one responsible source.” (N00019-09-D-0002). See also Rolls Royce release. 5-year Engine Support contract Aug 28/08: Fleet Support. L-3 Communications Vertex Aerospace LLC in Madison, MS continues its status as the T-45’s support contractor. An $111.4 million indefinite-delivery, requirements type contract will have L-3 provide all logistics services and materials for the FY 2009 maintenance and support of 71 T-45A and 108 T-45C aircraft at Naval Air Station Meridian, MS, NAS Kingsville, TX; and NAS Pensacola, FL. The contract also includes organizational level maintenance for the Adour engines, and has 4 one-year option periods that could boost its value to $569 million. Work will be performed in Kingsville, TX (58%); Meridian, MS, (36%); and Pensacola, FL (6%), and is expected to be complete in September 2009. This contract was competitively procured via electronic RFP, and 2 offers were received by the Naval Air Systems Command in Patuxent River, MD (N00019-08-D-0014). See also: L-3 Vertex, Oct 27/08 release. 5-year Fleet Support contract Aug 22/08: The historic 50-year service record of the T-2 Buckeye training aircraft comes to a close with a sundown ceremony and fly-by at the Mustin Beach Officers’ Club aboard Naval Air Station (NAS) Pensacola. The T-2C was the US Navy’s intermediate and advanced trainer before the T-45 entered service, and the twin-engined T-2C entered service in 1968. Some of these jets had remained in the fleet, but this ceremony marks their final retirement from service. US Navy release | Navy Fact File: T-2C T-2 Buckeye retires June 25/08: Training.Boeing announces a contract with Elbit Systems for a Virtual Mission Training System (VMTS) that will help students prepare for carrier strike-fighter and electronic-attack duty at lower cost. Boeing is currently under contract to develop this capability, and is due to provide 2 test aircraft and then retrofit 18 existing Goshawks by 2012. “VMTS simulates via data link an unclassified, mechanically scanned tactical radar that provides air-to-air and air-to-ground modes as well as simulated weapons and simulated electronic warfare. These functions can be networked between the participating aircraft and instructor ground stations that control the mission presentation. The current phase of VMTS work will provide flight officers with in-flight training in the use of radar and weapons against virtual enemy aircraft, including cooperative training with friendly real and virtual aircraft.” April 30/08: L3 Communications Vertex Aerospace LLC in Madison, MS received an $11.3 million modification to a previously awarded fixed-price, cost-reimbursable contract (N00019-03-D-0010) adjusting for the effects of union contracts on the T-45 trainer system contractor logistics support effort. Specifically, this modification covers the fiscal 2007 and 2008 cost impact for wages and fringe benefit adjustments as a result of the collective bargaining agreement, dated Oct 1/06 through Aug 1/09, and area wage determinations No. 05-2300 (Rev-4), 05-2300 (Rev-5), 94-2300 and 05-2508. All this is in accordance with the Fair Labor Standards Act and Service Contract Act – price adjustment clause and notification of changes clause. Work will be performed at the Naval Air Station (NAS) Kingsville, TX (51%) and NAS Meridian, MS (49%). FY 2006 – 2007 Final T-45s ordered; Production line shutdown contract. Learning to fly (click to view full) Sept 26/07: FY08 Fleet Support. L3 Communications Vertex Aerospace LLC in Madison, Miss. received a $95.8 million estimated value modification to a previously awarded fixed-price, cost-reimbursable, time and materials requirements contract (N00019-03-D-0010). It exercises a contractor logistics support option for approximately 189 T-45 Training Systems. Work will be performed at the Naval Air Station (NAS) Kingsville, Texas (51%) and NAS Meridian, Miss. (49%), and is expected to be complete in September 2008. Sept 26/07: FY08 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN received a $66.4 million modification to a previously awarded fixed-price, requirements contract. The option covers Power-By-the-Hour (PBTH) logistics support for approximately 188 of the Adour F405-RR-401 jet engines installed in the T-45 aircraft. Work will be performed at the Naval Air Station (NAS) Meridian, Miss. (50%); NAS Kingsville, Texas (48.94%); and NAS Patuxent River, Md. (1.06%), and is expected to be complete in September 2008. The contract has been developed in line with commercial PBTH agreements under a fixed price per engine flight hours. Rolls-Royce provides all engine maintenance, support, trouble-shooting, parts supply and logistics coverage; work is split between Meridian and Kingsville, TX, along with some functions at Patuxent River, MD. Rolls-Royce employs 110 maintenance, supply and management personnel across five locations in support of this program (N00019-03-D-0012). Rolls Royce release. Sept 19/07: Boeing subsidiary McDonnell Douglas Corp. in St. Louis, Mo. received a $13.3 million modification to a previously awarded firm-fixed-price contract to exercise an option for the procurement of 10 T-45 Training System Airframes, including logistic support analysis, technical manuals, and technical support of support equipment, production integration testing support and flight test instrumentation, system equipment and repair. This modification brings the total for these items to $278.5 million. Work will be performed in St. Louis, Mo., and is expected to be completed in September 2009 (N00019-06-C-0309). June 11/07: A $265.2 million modification to a previously awarded firm-fixed-price contract (N00019-06-C-0309) for 10 FY 2007 production T-45 airframes, logistic support analysis, technical manuals and technical support of support equipment, production integration testing support, and flight test instrumentation systems equipment and repair. Work will be performed in St. Louis, MO (58%) and Warton, Lancashire, England (42%), and is expected to be complete in September 2009. 10 T-45s May 31/07: Engine R&D. A $7.2 million modification to a previously awarded firm-fixed-price contract (N00019-06-C-0309) for Non-Recurring Engineering (NRE) for Phase II of the T-45 Hot Section Reliability Improvement Program. This effort is in support of flight test, including carrier suitability testing aboard ship, as well as identification of required changes to T-45 publications and retrofit activities. Work will be performed in St. Louis, MO and is expected to be complete in November 2008. Feb 5/07: Production line shutdown. A $7.6 million cost-plus-fixed-fee delivery order against a previously issued basic ordering agreement (N00019-05-G-0001) provides for T-45 production line transition efforts for orderly shut down. Specific efforts will include technical assessment of parts and tooling to identify areas to reduce post-production parts manufacturing costs. Work will be performed in St. Louis, MO (59%) and Manchester, England (41%), and is expected to be complete in December 2007. Production line shutdown contract Arrested landing (click to view full) Sept 28/06: FY07 Fleet Support. L3 Communications Vertex Aerospace LLC in Madison, MS received a $94 million estimated value modification to exercise an option for contractor logistics support for the T-45 Training System. This is a modification to a previously awarded fixed-price, cost-reimbursable, time and materials requirements contract (N00019-03-D-0010); work will be performed at Naval Air Station (NAS) Kingsville, TX (51%) and NAS Meridian, MS (49%), and is expected to be complete in September 2007. Sept 27/06: FY07 Engine Support. Rolls-Royce Defense Services, Inc. in Indianapolis, IN received a $65.3 million fixed-price modification to a previously awarded requirements contract, exercising an option for power-by-the-hour logistics support for approximately 188 F405-RR-401 Adour engines. Under this arrangement, a single contract line item number is used to pay a fixed price per aircraft flight hours; contract performance is measured almost exclusively against the fleet-driven performance metric of “ready for issue engine availability.” Work will be performed at the Naval Air Station (NAS) Meridian, MS (50%); NAS Kingsville, TX (48.94%); and NAS Patuxent River, Md. (1.06%), and is expected to be complete in September 2007 (N00019-03-D-0012). See also Rolls Royce release. April 6/06: Engine R&D. Boeing subsidiary McDonnell Douglas Corp. in St. Louis, MO received a $5 million modification to a previously awarded firm-fixed-priced contract (N00019-04-C-0013). This contract is part of the Hot Section Reliability Improvement Program for integration of the F405-RR-402 engine into the T-45 airframe, and involves nonrecurring engineering effort for Phase 1. Work will be performed in St. Louis, MO and is expected to be complete in August 2007. The Naval Air Systems Command in Patuxent River, MD issued the contract. March 31/06: Avionics. $14.4 million modification to a previously awarded firm-fixed-price contract (N00019-05-C-0025) for non-recurring engineering services associated with, and the production of, 12 T-45 required avionics modernization program retrofit kits and two simulator avionics retrofit kits. In addition, this contract provides for technical data, integrated logistics support, and approximately 12 spare kit components. Work will be performed in St. Louis, MO (77%); Mesa, AZ (15%) and Albuquerque, NM (8%), and is expected to be complete in August 2009. March 30/06: A $139 million modification to a previously awarded firm-fixed-price contract for six FY 2006 T-45 Goshawk training system airframes, plus support to build/specific sustaining engineering, ground based training support, and planning and integration. Work will be performed in St. Louis, MO (52%) and Warton, Brough, England (48%), and is expected to be complete in September 2008 (N00019-06-C-0309). 6 T-45s March 30/06: $5.7 million modification to a previously awarded firm-fixed-priced contract (N00019-04-C-0013) provides nonrecurring engineering effort required to incorporate an embedded Terrain Awareness Warning System (eTAWS) and associated digital video recorder (DVR) replacement for the current airborne video cassette recorders (AVCR) into the T-45C aircraft, flight simulators located at the T-45’s bases in Naval Air Station Meridian and Naval Air Station Kingsville, and manned flight simulators located at Naval Air Warfare Center Aircraft Division Patuxent River. In addition, this contract is for the production of up to seven pre-production DVRs in support of development, integration, simulator tests, and flight test. Work will be performed in St. Louis, MO (60%) and Germantown, MD (40%), and is expected to be complete in February 2008. March 17/06: $12.5 million firm-fixed-price, cost-plus-fixed-fee contract to provide integrated logistics support for the T-45 training system for calendar year 2006. Support to be provided includes acquisition logistics, logistics analysis, technical manuals and technical support of support equipment, production integration testing, and flight test instrumentation system equipment and repair. Work will be performed in St. Louis, MO (80%); Warton, Lancashire, England (13%); and Filton, Bristol, England (7%), and is expected to be complete in December 2006. This contract was not competitively procured (N00019-06-C-0309). View the full article
-
CDR Salamander - Infamy
http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=WkNIvdppROY:neuZhO0UwdA:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=WkNIvdppROY:neuZhO0UwdA:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=WkNIvdppROY:neuZhO0UwdA:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=WkNIvdppROY:neuZhO0UwdA:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/WkNIvdppROYView the full article
-
DID - Lockheed Martin Tapped For Trident II Missile Production | Mali Orders Additional C295 | Australia To Purchase 155mm Ammunition
Americas Bell Boeing won a $18 million contract modification, which exercises an option to continue providing technical analysis, engineering and integration services for various systems and sub systems in support of the V-22 aircraft for the Navy, Marine Corps, Air Force and Foreign Military Sales customers. The V-22 Osprey is a joint service multirole combat aircraft utilizing tiltrotor technology to combine the vertical performance of a helicopter with the speed and range of a fixed-wing aircraft. With its rotors in vertical position, it can take off, land and hover like a helicopter. Once airborne, it can convert to a turboprop airplane capable of high-speed, high-altitude flight. Work will take place in Texas and Pennsylvania. Estimated completion will be by 2022. Lockheed Martin Space won a $29.1 million contract modification to procure a pilot assessment of the contractor’s property management system and exercise options under previously awarded contract N00030-20-C-0100 for Trident II (D5) missile production and deployed systems support. The modification includes a $5 million not-to-exceed value for the pilot assessment, which is being awarded as an undefinitized contract action. The Trident II D5 fleet ballistic missile (FBM) is a three-stage, solid-propellant, inertial-guided ballistic missile developed by Lockheed Martin. The Trident II D5 submarine launched ballistic missile (SLBM) is a successor to Polaris A1, Polaris A2, Polaris A3, Poseidon C3 and Trident I C4 missiles. Work will take place in Colorado, Utah, Florida, Illinois, New York and California. Work will take place in September 20, 2025. Middle East & Africa Mali has decided to expand its C295 fleet by ordering another cargo plane to expand the number of aircraft to two. Airbus says this contract includes an integrated logistics support package with spare parts for the two aircraft and training for flight crews and mechanics. This second aircraft, to be delivered in 2021, will supplement the first C295 already in operation since December 2016 which has already accumulated 1,770 flight hours and transported more than 38,000 passengers and 900 tonnes of cargo in less than four years of operations. Europe The Italian Air Force will double its intake at the International Flight Training School after the school moves to Sardinia. Head of the training operation, Gen. Luigi Casali, says 80 new pilots will be able to complete Phase 4 training at Sardinia and two thirds of those students will be from foreign air forces. Italy currently gathers its Phase 2, 3 and 4 pilots at Galatina where pilots in Phase 2 and 3 fly the Italian MB339 and Phase 4 students fly 18 T346A air force jet trainers, built by Italy’s Leonardo, as well as another four of the type owned by the firm. As the Phase 4 pilots move to Sardinia, the earlier stage students will stay on at Galatina to take advantage of the freed up space and start to switch over to new, M345 aircraft, also built by Leonardo, which is partnering the air force in the running of the flight school. Asia-Pacific Japan media have confirmed that a Royal Navy naval task force lead by aircraft carrier HMS Queen Elizabeth will be sailing to Asia as early as next year. The British warships are likely to conduct wargames with Japanese and US forces in waters off the Nansei Islands chain in southwestern Japan. The move comes amid concerns over China’s increasing assertiveness in the East and South China seas as well as about its handling of pro-democracy protesters in Hong Kong. It could trigger an outcry from Beijing. During the dispatch, the British navy also plans to conduct maintenance on carrier-based F-35B stealth fighter jets at Mitsubishi Heavy Industries Ltd.’s aerospace systems works in Aichi Prefecture, central Japan, the sources said. The US State Department has made a determination approving a possible Foreign Military Sale to the Government of Australia of 155mm Ammunition and Accessories, and related equipment, for an estimated cost of $132.2 million. The Government of Australia has requested to buy M825A1 155mm White Phosphorous projectile munitions, M782 Multi-Option Fuze for Artillery, M762A1 electronic-timed fuzes, M231 and M232A2 propelling charges, percussion primers, technical publications and books, technical data for operational maintenance, technical assistance and services, and other related elements of logistics and program support. The total estimated program cost is $132.2 million. This proposed sale will support the foreign policy and national security objectives of the United States. Australia is one of our most important allies in the Western Pacific. The strategic location of this political and economic power contributes significantly to ensuring peace and economic stability in the region. Today’s Video Watch: Exclusive visit of the new C295 FWSAR for Canada View the full article
-
CDR Salamander - From Fleet to the NSC, with Mark Vandroff - on Midrats
Midrats regulars and all sound thinking navalists rejoiced earlier this year when one of our favorites were offered the honor to serve once again - in this case one of our favorite guests and all around great guy, Mark R. Vandroff, Captain, USN Ret. Mark found himself back in the mix with his appointment as Deputy Assistant to the President, Senior Director, Defense Policy and Strategy at the National Security Council. Just in time for the holiday season, Mark will come visit us this Sunday from 5-6pm to talk about his experience so far at the NSC, the NSC in general, and other related topics that may come up in the process. A 1989 graduate of the United States Naval Academy, Mark was the 10th Major Program Manager for the Arleigh Burke Class Destroyer program and the 37th Commanding Officer of NSWC Carderock. Immediately before coming to the White House, he was the Vice President of Maritime Programs at Zenetex, LLC. He holds a Master’s of Science in Applied Physics from the Johns Hopkins University and is a frequent contributor to the Naval Institute’s “Proceedings” and online publications such as Strategy Bridge and CIMSEC. The programs he led have been the recipient of some of Department of Defense’s highest awards for acquisition excellence, including the 2011 Secretary of the Navy’s Competition Excellence Award and the 2012 David Packard Award. Mark was recognized by the American Society of Naval Engineers with 2018 Gold Medal award for excellence in naval engineering. If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=UTbXDAQBx0Y:VuFvo9E_VMQ:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=UTbXDAQBx0Y:VuFvo9E_VMQ:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=UTbXDAQBx0Y:VuFvo9E_VMQ:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=UTbXDAQBx0Y:VuFvo9E_VMQ:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/UTbXDAQBx0YView the full article
-
CDR Salamander - Fullbore Friday
http://3.bp.blogspot.com/-jMxlWqNjWjs/U1nIwXMMBjI/AAAAAAAAIJ4/839fmIwW8yk/s320/Galanti-portrait-Newswk-cap.jpgI bumped into a post I did over six years ago on the passing of one of our greats. Phyllis. Thought I'd repost today ... because, she deserves it. Circumstances display character. Character comes often from places least expected - unless of course you know the best of military spouses; She said in a Richmond News Leader interview in 1971 that while Galanti was a POW, she just “wanted to be a housewife.” She wanted to “sink into oblivion” when he returned. By 1969, she had become active with other POW wives. In 1970, the wives group became the National League of Families and Friends of POWS and MIAs in Southeastern Asia. It evolved into a tour de force in crusading for the North Vietnamese to adhere to Geneva Convention protocols in treatment of prisoners and eventually for the release of POWs and the accounting for those missing in action. Mrs. Galanti served as chairwoman of the league. In a televised speech before the Virginia Senate on Feb. 12, 1971, she kicked off an areawide campaign, “Write Hanoi: Let’s Bring Paul Galanti Home,” part of a nationwide project. Her efforts generated more than 450,000 letters from the Richmond area, around 300,000 letters from Northern Virginia and 378,000 from Gastonia, N.C., where Paul’s parents had moved in 1964. More than 80 percent of people living in the Richmond area contributed a letter, which was thought to have been the greatest response to the Write Hanoi campaign anywhere in the United States. In March 1971, Mrs. Galanti was among a delegation of 10 Write Hanoi campaigners who went to Stockholm, Sweden, to try to obtain information on the POWs from the chargé d’affaires in the North Vietnamese embassy there. They also wanted to send the letters asking for freedom for American servicemen being held in Southeast Asia to the North Vietnamese and Viet Cong delegations attending the World Assembly of Paris for Peace and Independence of Indochinese Peoples. Because “they knew we had” the letters, Mrs. Galanti said they were able to talk with officials. The letters were flown to Paris to be given to the North Vietnamese delegation at the peace talks. By Christmas Eve 1971, she received two letters and two postcards from her husband. “Those four little pieces of mail were the most elaborate Christmas gift,” she said. She reported in March 1971 that she was using the services of a peace group to correspond with her husband. Mrs. Galanti called for a shift in strategy in July 1971. Instead of writing Hanoi, she asked Americans to write to President Richard Nixon and Congress. “The issue has become a political matter,” she said. “Their release can come from one place — Washington.” In an op/ed piece in The News Leader in 1971, she wrote, “I can honestly say that I have never done anything so rewarding and worthwhile in my life. Knowing that so many people were genuinely concerned gave me a much-needed boost.” When she and other POW wives went to Versailles, near Paris, in February 1972 to talk about release of POWs with 800 communist delegates from 75 countries at the World Assembly of Paris for Peace, they failed to get an audience. However, Mrs. Galanti said she felt a softening on the part of communist officials to Nixon’s plan to end the war. Mrs. Galanti and two other POW wives talked about prisoner issues with Nixon and Henry Kissinger, then national security adviser, on May 15, 1972. In October 1972, she was elected chairwoman of the league and early the next year learned that her husband’s name was on a list of living POWs. Galanti was released on Feb. 12, 1973, among the first group of POWs freed by the North Vietnamese. Their plane landed at Clark Air Base, Philippines. He arrived in Virginia from Travis Air Force Base, Calif., on Feb. 15. He was reunited with his wife at the Norfolk Naval Station. At the time, he told reporters, “Phyllis was pretty shy when I left, and I came back to a real tiger.” We should all be so lucky. Ms. Galanti passed in the spring of 2014 after 51 years of marriage. Fullbore. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1eQKP2U8nJw:avurWd5CZyY:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1eQKP2U8nJw:avurWd5CZyY:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1eQKP2U8nJw:avurWd5CZyY:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=1eQKP2U8nJw:avurWd5CZyY:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/1eQKP2U8nJwView the full article
-
DID - DoS Agrees To MK 54 Sale to Brazil | Morocco To Receive Gulfstream G-550 | Philippines Postpone Purchase Of BrahMos
Americas Lockheed Martin won a $48.7 million contract modification to exercise an option for AEGIS Combat System Engineering Agent efforts for the design, development, integration, test and delivery of Advanced Capability Build 20. The Aegis Combat System is the Navy’s most modern surface combat system. It was designed as a complete system: the missile launching element, the computer programs, the radar and the displays are fully integrated to work together. This makes the Aegis system the first fully integrated combat system built to defend against advanced air and surface threats. The Aegis combat system uses powerful computers and radar to track and guide weapons to destroy enemy targets. Aegis, not an acronym, refers to the shield of the mythical Greek God Zeus. Work will take place in Moorestown, New Jersey, and is expected to be finished by December 2021. Estimated completion will be by December 2021. The State Department approved a possible Foreign Military Sale to the Government of Brazil of MK 54 Lightweight Torpedoes and related equipment for an estimated cost of $70 million. The Government of Brazil has requested to buy twenty-two (22) MK 54 conversion kits – to convert MK 46 Mod 5 A(S) torpedoes to MK 54 Mod 0 lightweight torpedoes. Also included are torpedo containers, Recoverable Exercise Torpedoes (REXTORP) with containers, Fleet Exercise Section (FES) and fuel tanks, air-launch accessories for rotary-wing, torpedo spare parts, propellant, lanyard start assembly suspensions bands, thermal batteries, training, publications, support, and test equipment. U.S. Government and contractor engineering, technical, and logistics support services, and other related elements of logistics and program support. The Government of Brazil intends to utilize MK 54 Lightweight Torpedoes on its Sikorsky S-70B “Seahawk” aircraft and surface ships. The principal contractor will be Raytheon Integrated Defense System, Portsmouth, RI. There are no known offset agreements proposed in connection with this potential sale. Middle East & Africa Moroccan tabloid Al Ahdath Al Maghribia reports that the country will take delivery of the first G550 intelligence, surveillance and reconnaissance (ISR) aircraft early next year. This will be the first of four aircraft that was ordered with Raytheon in 2019. The Gulfstream G-550 business jet is equipped with an Israeli-American made intelligence, surveillance and reconnaissance (ISR) system. The subcontracting has also been entrusted to the Israeli group Elta Systems, a subsidiary of Israel Aerospace Industries, giant of Hebrew state aerospace technology. Europe German defense contractor Rheinmetall on Wednesday announced the sale of MK-82-EP general purpose aircraft-dropped bombs to France and Germany. The order, for about 2,000 bombs, totals $42.3 million, Rheinmetall said. The 500-pound bomb bodies will be used by France’s Mirage 2000 and Rafale fighter planes, the Direction General de l’Armament said, and as the warhead of the GBU-54 Laser Joint Direct Attack Munition system for Germany’s Tornado and Eurofighter platforms. The upgraded bomb, designed by General Dynamics, is regarded as a free-fall, standard bomb, although it can be fitted with laser guidance and other improvements. Asia-Pacific The US State Department has made a determination approving a possible Foreign Military Sale to the Republic of Korea of two (2) MK 15 MOD 25 Phalanx Close-In Weapons System (CIWS) Block 1B Baseline 2 (IB2) systems and related equipment for an estimated cost of $39 million. The Republic of Korea has requested to buy two (2) MK 15 MOD 25 Phalanx Close-In Weapons System (CIWS) Block 1B Baseline 2 (IB2) systems; and four thousand (4,000) rounds, 20MM cartridge API linked. Also included are spare parts; other support equipment; ammunition; books and other publications; software; training; engineering technical assistance and other technical assistance; and other related elements of the program and logistical support. The estimated total cost is $39 million. The proposed sale will improve the Republic of Korea’s capability to meet current and future threats. Korea will use the systems aboard its first KDX III Batch II Class destroyer to provide it with effective means of detecting and defending itself against incoming airborne threats. The Republic of Korea will have no difficulty absorbing this equipment into its armed forces. CNN Philippines reports that Manila has decided to postpone the purchase of BrahMos missiles from India due to lack of funds. The government is putting on hold plans to purchase the country’s first cruise missile system from an Indian-Russian joint venture. This was supposed to be part of the military’s long-term modernization program to boost the country’s defense capabilities. BrahMos is a supersonic cruise missile, which can fly at three times the speed of sound (2.8 Mach). It can be used for both coastal defense and ground attack. Today’s Video Watch: C-RAM • MK 15 Phalanx Close-In Weapons System (CIWS) View the full article
-
DID - Phalanx CIWS: The Last Defense, On Ship and Ashore
Phalanx, firing (click to view full) The radar-guided, rapid-firing MK 15 Phalanx Close-In Weapons System (CIWS, pron. “see-whiz”) can fire between 3,000-4,500 20mm cannon rounds per minute, either autonomously or under manual command, as a last-ditch defense against incoming missiles and other targets. Phalanx uses closed-loop spotting with advanced radar and computer technology to locate, identify and direct a stream of armor piercing projectiles toward the target. These capabilities have made the Phalanx CIWS a critical bolt-on sub-system for naval vessels around the world, and led to the C-RAM/Centurion, a land-based system designed to defend against incoming artillery and mortars. This DID Spotlight article offers updated, in-depth coverage that describes ongoing deployment and research projects within the Phalanx family of weapons, the new land-based system’s new technologies and roles, and international contracts from FY 2005 onward. As of Feb 28/07, more than 895 Phalanx systems had been built and deployed in the navies of 22 nations. The Phalanx Platform: Competition, Upgrades & Developments click for video The MK 15 Phalanx system was originally developed as a last-ditch defense against enemy missiles, and possibly aircraft. It weighed in at around 13,600 pounds, and carries 1,550 rounds of 20mm ammunition. As radars have improved, and electronics have become both smaller and more powerful, the system has been improved to defend against a wider range of threats. Block 1, Baseline 2. Uses high pressure air instead of hydraulics to release the rounds, boosting the MK 15’s firing rate from 3,000 rounds per minute to 4,500. That gives the system 21 seconds of full-rate firing before a reload is required, enough for several engagement sequences. Phalanx maintenance (click to view full) Block 1B. This is the new standard for the US Navy, and the baseline for SeaRAM missile systems. Block 1B adds day/night FLIR optics that boost performance against drones, small boats, and missiles with low radar cross-sections, while boosting angle tracking against conventional targets. For conventional MK 15s, the gun barrels are tweaked, and new MK224 “Enhanced Lethality Cartridge” (ELC) ammunition has a 48% heavier tungsten penetrator that maximizes the effect of the small 20mm round. The US Navy wants to be an all-1B fleet by 2015, at a conversion cost of about $4.5 million per unit. A number of allies are following that lead within their own time frames. Paul Gilligan, head of platform integration for Raytheon’s UK subsidiary, was quoted saying that: “This upgrade is vitally important, especially in the context of the evolving threats worldwide… It provides protection to ships and their crews against an increased number of threats including small, fast gunboats; standard and guided artillery; helicopters; mines and a variety of shore-launched, anti-ship missiles.” Block IB Baseline 2. Radar modifications swap out some hard-to-get analog components for digital off-the-shelf signal processing electronics, a new signal source and mixer, and a “surface mode” software upgrade that improves performance against targets on or near the water’s surface. The US Navy wants to standardize at this level by 2019, using upgrade kits that cost just under $1 million. Phalanx: New Frontiers SeaRAM (click to view full) The high speed and hence low warning time provided by many supersonic anti-ship missiles are also an evolving concern for global navies. Given the Phalanx’s limited range of just a couple of miles, coping with saturation attacks by missiles traveling at speeds of 0.5 – 1 mile per second requires layered defenses. To that end, the MK 15 Phalanx Block 1B’s mountings and electronics are also the base platform for the SeaRAM short range anti-air missile system. Unlike vertically-launched missiles, the SeaRAM’s RIM-116 missile is fired on a flat trajectory from an 11-round launcher. That saves precious seconds compared to vertical launch, allowing the system to provide an intermediate zone of defense between Phalanx guns and medium-range vertically-launched missiles like the RIM-162 Evolved Sea Sparrow or SM-2. RIM-116 missiles can also be used against surface targets, and a number of ships use RAM or SeaRAM systems instead of standard Phalanx guns. Another option to extend the system’s range involves an entirely new technology: lasers. Kevin Peppe, Raytheon’s Phalanx program director, has said that “a robust but relatively low power, low beam-quality commercial laser” is under investigation. It could offer an effective range about 3 times that of the existing M61A1 20mm gun, along with lower life-cycle costs and fewer worries about civilian casualties when used on land. Even so, this concept is a long way from becoming a practical battlefield weapon. More powerful solid-state lasers will probably be required in order to make the concept feasible against the full range of threats, and other complications like the effects of fog on lasers, and stopping power issues, must also be overcome. Land, Ho! C-RAM/ Centurion Phalanx C-RAM (click to view full) One area of clear progress for the Phalanx system is on land. Back in June 2005, “Phalanx R2D2s to Counter Land Mortars” drew attention to the US Army’s land-based version, imaginatively known as the “Land-based Phalanx Weapon System” and also known as MK 15 MOD 29 Centurion. The MK 15 MOD 29 Centurions are Block 1B CIWS weapon systems mounted on low-boy trailers, with self contained diesel electric power and cooling water. Centurion fires explosive rounds that self-destruct if they don’t hit a target, so that falling 20mm bullets don’t kill people in the base itself or in nearby populated areas. Unofficially, many refer to these weapons as “R2D2s,” after the Star Wars robot they resemble. Originally developed to defend US bases against mortar attack, these trailer-mounted weapons could also provide defensive options against the kinds of rocket attacks encountered in Round 1 of Israel’s 2006 war with Hezbollah, Iran & Syria. This appears to be a spiral development contract, with fielding of interim solutions as development progresses. AN/TPQ-36 Firefinder Centurion can reach beyond its own array and use other target acquisition sensors to detect and track fired rounds, including Northrop Grumman’s AN/TPQ-36 short-range Firefinder radar and the Lightweight Counter Mortar Radar. C-RAM (Counter Rockets, Artillery and Mortars) is both a term used to refer to Centurion’s general role, and a specific command and control program that makes use of the weapon. The fire-control subsystem Northrop Grumman Mission Systems provides for C-RAM uses software modified from their Forward Area Air Defense Command and Control (FAAD C2) system, which ties together the sensors and weapons of the Army’s short-range air-defense battalions. Northrop Grumman is the prime contractor for FAAD C2, which is operational throughout the world and has been especially critical to homeland security efforts in the Washington, DC area. Once a threat is detected by Army sensors FAAD C2/C-RAM triggers audio and visual alarms sound to warn exposed soldiers. A fire-control subsystem predicts the mortar’s flight path, prioritizes targets, activates the warning system, and provides cueing data to help Centurion defeat the mortar round while still in the air. Centurion has been deployed by the USA, and Britain. In October 2008, Raytheon and Oshkosh unveiled the Mobile Centurion, which mounts the system on a hybrid-electric HEMTT A3 heavy truck. Phalanx: Competitors Thales Goalkeeper (click to view full) Phalanx is not alone on the market. Its principal competitor is the Thales Nederland Goalkeeper system, which uses the same GAU-8 30mm tank-killer gatling gun mounted on the A-10 Thunderbolt close support aircraft, and a dual frequency I/K-band track while scan radar. The GAU-8/A offers a firing rate of 4,200 rounds per minute, and the heavier projectiles offer more hitting power, which may help stop fragments of a supersonic missile from hitting a ship and doing damage. On the flip side, Goalkeeper takes up a larger footprint of space on board ship, and requires significant “deck penetration” and integration instead of being a bolt-in offering like Phalanx. The Goalkeeper is a distant second in the market, but it has a solid foothold. It’s currently in service with the British Royal Navy, as well as Belgium, Chile, the Netherlands, Portugal, Qatar, South Korea, and the UAE. There are no reports of a 30mm Phalanx, but Raytheon is taking other steps to keep its platform on top of the market, and relevant to modern threats. Phalanx Contracts and Key Events Unless otherwise specified, all contracts are issued by the US Naval Sea Systems Command in Washington, DC to Raytheon Co. in Tucson, AZ. FY 2014 – 2020 Korea buys Block 1Bs for FFX frigates; Japanese multi-year support; Australia requests upgrades; Other contracts. MK15, HMCS Ottawa (click to view full) December 4/20: Korea The US State Department has made a determination approving a possible Foreign Military Sale to the Republic of Korea of two (2) MK 15 MOD 25 Phalanx Close-In Weapons System (CIWS) Block 1B Baseline 2 (IB2) systems and related equipment for an estimated cost of $39 million. The Republic of Korea has requested to buy two (2) MK 15 MOD 25 Phalanx Close-In Weapons System (CIWS) Block 1B Baseline 2 (IB2) systems; and four thousand (4,000) rounds, 20MM cartridge API linked. Also included are spare parts; other support equipment; ammunition; books and other publications; software; training; engineering technical assistance and other technical assistance; and other related elements of the program and logistical support. The estimated total cost is $39 million. The proposed sale will improve the Republic of Korea’s capability to meet current and future threats. Korea will use the systems aboard its first KDX III Batch II Class destroyer to provide it with effective means of detecting and defending itself against incoming airborne threats. The Republic of Korea will have no difficulty absorbing this equipment into its armed forces. September 1/20: Taiwan Taiwan decided not to buy three sets of Centurion C-RAM system from the US after it was told by the Pentagon that no evaluation testing data exists for the Centurion. Taiwan had wanted the Centurion to act as an area defensive weapon system to protect its airfields but the system can only do point defense. Therefore, the military has decided to invite the local National Chung-Shan Institute of Science and Technology (NCSIST) to modify the Phalanx close-in weapon system (CWIS) for its needs. The institute had previously taken a Phalanx CIWS from the Navy’s Yang-class destroyer and installed it on a mountain top to protect the Songshan radar station on the top of Zhuzi Mountain. A total of seven Gearing-class destroyers transferred to Taiwan as the Yang-class had been upgraded under Wu Chin III program that turn these World War Two ships into guided-missile destroyers. However, since the Air Force’s requirement is for area defense, the new system will have to be integrated with the service’s Sky Guard air defense system. It will modify existing Phalanx CIWS in the inventory for the purpose. March 13/20: Close-In Weapon System Raytheon Missile won a $109.6 million contract modification for MK 15 Close-In Weapon System upgrades and conversions, system overhauls and associated hardware. MK 15 Phalanx CIWS provides ships of the US Navy with an inner layer point defense capability against anti-ship missiles, aircraft and littoral warfare threats that have penetrated other fleet defenses. Phalanx automatically detects, evaluates, tracks, engages and performs kill assessment against ASM and high speed aircraft threats. The current Phalanx variant adds the ability to counter asymmetric warfare threats through the addition of an integrated, stabilized, Electro Optic sensor. Work will take place Kentucky, Arizona, California, Florida, Pennsylvania, Massachusetts, Arizona, Missouri, Utah, Texas. Estimated completion will be by October 2023. February 26/29: Engineering Technical Support Raytheon won a $8 million contract modification for design agent engineering and technical support services for the Phalanx Close-In Weapon System, SeaRAM, and Land-based Phalanx Weapon System. Only one responsible source and no other supplies or services will satisfy agency requirements. Phalanx Close-In Weapon System (CIWS) is a fast-reaction terminal defense against low and high-flying, high-speed maneuvering anti-ship missile threats that have penetrated all other defenses. CIWS is an integral element of the Fleet Defense In-Depth concept and the Ship Self-Defense Program. Operating either autonomously or integrated with a combat system, it is an automatic terminal defense weapon system designed to detect, track, engage and destroy anti-ship missile threats penetrating outer defense envelopes. The Raytheon Phalanx weapon system is a rapid-fire, computer-controlled, radar-guided gun that can defeat anti-ship missiles and other close-in threats on land and at sea. Work will take place in Arizona and estimated completion date is January 2022. November 8/19: Taiwan A new report from Taiwan’s Up Media says the military is reassessing a plan to buy the land-based Phalanx weapons system to help protect its underground Air Bases at Hualien and Taitung. Although Taiwan had floated a tender to buy the system, it had yet to receive a response from the United States. The Ministry of National Defense is evaluating whether the protection offered by the land-based Phalanx system will overlap with the Air Force’s Oerlikon 35 mm twin cannon. The Orelikon has been upgraded to GDF-006 standard with AHEAD rounds. The Phalanx weapon system is a rapid-fire, computer-controlled, radar-guided gun that can defeat anti-ship missiles and other close-in threats on land and at sea. September 24/19: CIWS Sensor Kits Raytheon Missile Systems won a $13.6 million contract modification to exercise options for Mk 15 Close-In Weapon System (CIWS) sensor kits. CIWS is a fast-reaction terminal defense against low- and high-flying, high-speed maneuvering anti-ship missile threats that have penetrated all other defenses. CIWS are a shipboard necessity for detecting and engaging missiles and aircraft at short range. The CIWS is an integral element of the Fleet Defense In-Depth concept and the Ship Self-Defense Program. Operating either autonomously or integrated with a combat system, it is an automatic terminal defense weapon system designed to detect, track, engage and destroy anti-ship missile threats penetrating outer defense envelopes. CIWS consists of three variants: Phalanx, which utilizes a six barrel Gatling gun; Land-based Phalanx Weapon System (LPWS) and SeaRAM, which replaces the gun with an 11-round Rolling Airframe Missile (RAM) guide. The Phalanx CIWS is a close-in weapon system for defense against airborne threats such as anti-ship missiles and helicopters. It was designed and manufactured by the General Dynamics Corporation. Raytheon will perform work under the CIWS contract in El Segundo, California and expected completion will be by December 2022. August 20/19: Upgrades Raytheon won a $199.6 million firm-fixed contract for MK 15 Close-In Weapon System or CIWS upgrades and conversions, system overhauls, and associated hardware. CIWS is a fast-reaction terminal defense against low- and high-flying, high-speed maneuvering anti-ship missile threats. At sea, Phalanx is designed to defeat anti-ship missiles and “close-in” threats that have pierced other lines of defense. On land, as part of the US Army’s counter-rocket, artillery and mortar systems, it detects and destroys incoming rounds. It also helps provide early warning of attacks. The Phalanx weapon system is installed on all US Navy surface combatant ship classes and on those of 24 allied nations. The land-based version is forward deployed and has been used in combat. This contract includes options which, if exercised, would bring the cumulative value of this contract to $367,195,456. February 14/19: Phalanx for Queen Elizabeth Ahead of its first operational mission, Britain’s HMS Queen Elizabeth was bolstered with the Phalanx 1B Weapon System. The Phalanx is a rapid-fire, computer-controlled, radar-guided gun that is able to defeat anti-ship missiles and other close-in threats on land and at sea.The 1B variant’s configuration augments the Phalanx system’s proven anti-air warfare capability by adding a forward-looking infrared sensor. It allows the system to be used against helicopters and high-speed surface craft at sea while the land-based version helps identify and confirm incoming dangers. Because of the Phalanx’s distinctive barrel-shaped radome and its automated nature, it is sometimes known by the nickname R2-D2 – based on the Star Wars character. HMS Queen Elizabeth will boast three Phalanx 1B computer-controlled guns, which can empty a 1,550-round magazine at 4,500 rounds-per-minute. October 1/18: Making it the new Standard Raytheon being tapped to deliver CIWS upgrades to the US Navy, US Army and several partner nations. The firm-fixed-price contract is priced at $482.3 million and provides for the delivery of Mk15 upgrades and conversions, system overhauls, and associated hardware. The Mk15 serves as the last layer of defense against enemy missiles and aircraft. The current Block IB Baseline 2 Upgrade Kits cost $1 million per piece and will be the new US Navy standard by 2019. This contract includes purchases for the Navy, Army and the governments of Taiwan, Saudi Arabia, Japan, New Zealand and Australia. Work will be performed at multiple locations inside and outside the US, including – but not limited to – Melbourne, Florida; Tempe, Arizona and Ottobrunn, Germany. Performance is expected to be completed by April 2024. September 25/18: UK Upgrades The State Department is determined to approve a possible Foreign Military Sale to the United Kingdom. The UK is looking to purchase 50 Mk15 Phalanx CIWS upgrade kits at a cost of $75 million. The radar-guided, rapid-firing MK 15 Phalanx Close-In Weapons System serves as a last-ditch defense against incoming missiles and other targets. The Block IB Baseline 2 Upgrade Kits incorporate digital off-the-shelf signal processing electronics, a new signal source and mixer, and a “surface mode” software upgrade that improves performance against targets on or near the water’s surface. The deal would also include support equipment, test equipment, initial spare parts, technical documentation, training, and engineering technical assistance, and other related elements of logistics and program support. Prime contractor will be Raytheon. August 10/18: Taiwan up-next? Taiwan wants to procure Phalanx style systems to protect its air force bases. The government’s public solicitation for the “Near Force Air Defense Fast Propeller System” requires the air-defense weapon to have high-precision, a high rate of fire, to be mobile and to operate automatically. It must be able to counter a number of airborne threats ranging from subsonic missiles to UAVs. The US military has used the Phalanx Centurion in Iraq to protect FOB Kalsu from incoming rockets, artillery shells and mortars. The Centurion can reach beyond its own array and use other target acquisition sensors to detect and track fired rounds. The Air Force plans to install the land-based Phalanx Centurion at the Jiashan, the Hualienjia and the Taidong Zhihang bases where large stockpiles of AMRAAM missiles are stored. March 8/18: DCSA clears conversion kits The US State Department has cleared the potential sale of MK 15 Phalanx Close-in Weapon System (CIWS) conversion kits to the government of Japan, a Defense Security Cooperation Agency (DSCA) notification has said. Estimated to cost $45 million, the package includes 24 kits that will convert Tokyo’s Block IB Baseline 1 Phalanx systems to the upgraded Baseline 2 version, as well as support equipment, spare parts, publications, software and associated support, logistical support services, and other related elements of logistical and program support. Raytheon’s Tuscon Arizona facility will be the program’s lead contractor. MK 15 Phalanx CIWS provides navy’s with an inner layer point defense capability against anti-ship missiles (ASM), aircraft and littoral warfare threats that have penetrated other fleet defenses. Baseline two upgrades includes a better radar that improves detection performance, increase reliability, and reduce maintenance. February 28/18: Support Contract The Pentagon announced Monday, February 26, the award of a $48.06 million US Navy contract to Raytheon for work on the Phalanx close-in-weapon system (CIWS). The agreement tasks Raytheon with providing performance-based logistics support for the Phalanx in managing the systems by furnishing repaired and new units for 1041 line items under prescribed performance metrics in response to Fleet requisitions. Work will take place in Louisville, Kentucky, and and is scheduled to be completed by August 2019. June 8/17: Raytheon has bee awarded at $12.5 million modification to an existing contract for the Phalanx Close-in Weapons System (CIWS). Under the terms of the deal, the company will deliver Phalanx CIWS hardware kits to the US Navy that are intended to upgrade the Phalanx weapons system to the latest approved configuration. Work will be performed at El Segundo, Calif. And Louisville, Ky, and the program is expected to be completed by March 2019. April 20/17: The Taiwanese Navy has issued a request for tender to produce the island’s first indigenous landing platform dock. Funding worth $207 million has been allocated for the project up to 2021, and calls for a length of 502 feet and a weight of 10,000 tons. The tender also requires that the vessel be fitted with a 76mm gun and Phalanx close-in weapon system, as well as the indigenous TC-2N missile system for air defense, a top speed of 21 knots, and a range of up to 7,000 miles. It’s expected that Taipei will build two such vessels by 2021 and use them to support amphibious operations and transport tasks, and act as hospital ships and vessels for humanitarian assistance and disaster relief missions in peacetime. April 6/17: Raytheon has tested a new electric gun that allows varying rates of fire for the Phalanx Close-In Weapon System. The gun has been designed to replace the Phalanx’s pneumatic motor, compressor and storage tanks, resulting in a 180 pound weight reduction. Testing conducted aimed to validate if the gun could handle the platform’s heavy vibrations. Capable of firing 75 rounds a second, the new gun also possesses a larger magazine, allowing operators to fight for longer. December 23/16: The US Navy has awarded Raytheon a $64.6 million contract to perform technical support services for several of the service’s naval anti-ship weapon systems. Systems included in the work are the Phalanx Close-In Weapon System (CIWS), the SeaRAM, and the Land-based Phalanx Weapon System, and the contract also involves foreign military sales to Saudi Arabia, Taiwan, Canada, Britain, South Korea, Portugal, and Greece. Work is expected to be completed by January 2018, and the deal is comprised of options which, if exercised, have the potential to raise the contract value to $398 million. August 15/16: Taiwan has agreed to part of a US weapons package that will see delivery of 13 sets of Phalanx close-in weapons systems (CIWS) and other equipment set to the tune of $286.6 million. While not due for delivery until at least 2024, the new CIWS systems will add to one MK 15 Block 1B CIWS system found on one of its Kidd-class destroyers and give an uplift in capabilities to the older Phalanx systems currently in use. The deal is part of a wider $1.83 billion defense package that includes two Oliver Hazard Perry-class guided missile frigates, 36 AAV-7 amphibious assault vehicles, and 250 Block I-92F MANPAD Stinger missiles. July 11/16: The Royal Australian Navy (RAN) is to install the Phalanx close-in weapon systems (CIWS) on its three two Canberra-class landing helicopter dock (LHD) ships. Each vessel will potentially have up to three systems on board pending final design and radar cross-section analysis. Installation is unlikely to begin until 2018 at the earliest. February 16/16: The US State Department has approved a $154.9 million Foreign Military Sale (FMS) to Saudi Arabia. The deal includes the provision of five MK 15 Phalanx Close-In Weapons System (CIWS) Block 1B Baseline 2 Kits, equipment, training, and logistics support. The systems will be installed on Patrol Chaser Missile (PCG) Ships operated by the Royal Saudi Naval Forces Eastern Fleet, as well as one going to the Naval Forces School. The Phalanx CIWS will give the ships greater defense capabilities against enemy anti-ship missiles. November 11/15: Raytheon has received a $10.4 million contract modification for Navy Close-In Weapon System (CIWS) SeaRAM upgrades. The company received a $159 million production contract in October for CIWS systems, with the contract also covering support equipment for the Rolling Airframe Missile-based SeaRAM system. The SeaRAM improves the CIWS’s Phalanx Block 1B radar system with an eleven-missile RAM launcher to expand the system’s defensive capabilities. October 27/15: The Navy has awarded Raytheon a $159 million production contract for the company’s Phalanx Close-In Weapon System. The contract also includes an option valued at $291 million for FY2016. The company will manufacture, inspect and test the new systems and provide support equipment for the Rolling Airframe Missile-based SeaRAM air defense system, including Block 1B radar upgrades, which equips Independence-class Littoral Combat Ships. May 22/15: Turkey has requested upgrades for its Phalanx close-in weapon systems, as well as four new systems, in a potential $310 million deal. The deal would also include Remote Weapons Stations, equipment, parts and training, as well as contractor (Raytheon) support. The Phalanx has been exported to several countries, with Australia recently requesting an upgrade package, with the UK and South Korea having imported the system, alongside other international customers. The CIWS is designed to provide a final tier defensive capability, with radar guiding a cannon to shoot down missiles and aircraft. Oct 30/14: Japan. Raytheon announces a multi-year, $205 million bulk-buy contract to provide Phalanx upgrade kits, support equipment, and hardware spares to the Japan Maritime Self-Defense Force (JMSDF). Sources: Raytheon, “Raytheon awarded $205 million Phalanx upgrade contract”. Japan: multi-year support Oct 14/14: Australia. The US DSCA announces Australia’s formal export request for up to 3 Phalanx Block 1B Baseline 1 to Block 1B Baseline 2 upgrade kits; overhaul and upgrade of up to 9 Phalanx Block 1A mounts to Block 1B Baseline 2 systems; 11 Remote Control Stations; 11 Local Control Stations, spare and repair parts; support equipment; test equipment; personnel training and training equipment; publications and technical documentation; and other forms of US Government and contractor logistics and technical support. The principal contractor will be Raytheon Missile Systems Company in Tucson, AZ, and the estimated cost is up to $76 million. Implementation of this proposed sale will not require the assignment of any additional U.S. Government or contractor representatives to Australia. Sources: US DSCA #14-50, “Australia – Close-In Weapon System Block 1B Baseline 2 Upgrade”. DSCA request: Australia Sept 26/14: Support. Raytheon Co. in Tucson, AZ, receives a $15.5 million contract modification, which buys spares for Land-based Phalanx systems. All funds are committed immediately, using FY 2013 and 2014 US Army budgets. Work will be performed in Williston, VT (23.4%); Louisville, KY (16.9%); Andover, MA (11.6%); Grand Rapids, MI (6.2%); Phoenix, AZ (4.5%); Tucson, AZ (3%); and other locations under 1% (34.4%), and is expected to be complete by February 2017. US Naval Sea Systems Command, Washington, DC manages the contract (N00024-13-C-5406). June 27/14: Support. Serco Inc. in Reston, VA, received a $31.2 million cost-plus-fixed-fee/ firm-fixed-price, indefinite-delivery/indefinite-quantity contract for Close-In Weapons System (CIWS) waterfront installation support. they’ll help with installation of Ship Alterations, Ship Change Documents, and Ordnance Alterations for Phalanx systems on US Navy and US Coast Guard vessels, and for the US Army. Only $114,000 is committed immediately, with the rest awarded as required. Work will be performed in Norfolk, VA (41%); San Diego, CA (30%); Pearl Harbor, HI (5%); Everett, WA (6%); Mayport, FL (6%); and various overseas ports (12%); and is expected to be complete in June 2017. This contract was competitively procured via FBO.gov with 3 offers received by the US Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division in Indian Head, MD (N00174-14-D-0028). May 22/14: Support. Raytheon in Tucson, AZ receives a $115.5 million contract modification for MK15 Phalanx upgrades and conversions, system overhauls and associated hardware. All funds are committed using various FY 2013 & 2014 budgets, with $43.6 million expiring on Sept 30/14. Work will be performed in Williston, VT (13%); Melbourne, FL (9%); Andover, MA (6%); Louisville, KY (5%); Tempe, AZ (5%); Pittsburgh, PA (5%); Ottobrunn, Germany (5%); Bloomington, MN (3%); Ashburn, VA (3%); Phoenix, AZ (3%); El Segundo, CA (2%); Hauppauge, NY (2%); Syracuse, NY (2%); Salt Lake City, UT (2%); Joplin, MO (2%); Bracknell, United Kingdom (2%); Grand Rapids, MI (1%); Norcross, GA (1%); and various other locations less than 1% each (29%); it is expected to be completed by September 2017. US NAVSEA in Washington, District of Columbia, is the contracting activity (N0024-13-C-5406). Feb 24/14: South Korea. Raytheon announces a $123 million Direct Commercial Sale (DCS) contract to deliver 9 Phalanx Block 1Bs for installation aboard the ROK Navy’s FFX Batch II light frigates, and aboard the AOE II successors to their 3 Cheonji Class fast combat support ships. Phalanx deliveries will begin in 2016, and are scheduled to be complete in 2022. DCS contracts are subject to different announcement rules than Foreign Military Sale contracts, and are managed directly by the buyer instead of by a US military surrogate. This is Raytheon’s largest DCS contract for Phalanx systems, and it was actually signed in Summer 2013. Sources: Raytheon, “Raytheon awarded $123 million Phalanx contract from Republic of Korea”. 9 Block 1Bs for ROK FFX Jan 3/14: Support. Raytheon in Tucson, AZ receives a $52.1 million Design Agent Engineering and Technical Support Services modification for maintainence of, and improvements to, the Mk15 Phalanx, Land-based Phalanx, and SeaRAM weapon systems. Work will be performed in Tucson, AZ, and is expected to be complete by January 2015. $12.5 million is committed immediately from a wide array of USN FY 2014 and FY 2013 R&D, weapons, and shipbuilding budget lines, plus a US Army budget. Of that, $4 million will expire on Sept 30/13 (N00024-12-C-5405). FY 2012 – 2013 British order; US upgrades. Target shoot-down (click for video) Sept 10/13: FY 2013-14. A $136.2 million contract to overhaul and upgrade 19 MK 15 Phalanx systems, and produce 4 new SeaRAM systems. This contract provides purchases for the U.S. Navy (80%), Japan (15%), the US Army (4%) and Pakistan (1%) under the foreign military sales (FMS) program; and all funds are committed immediately. $55 million will expire at the end of the current fiscal year, on Sept 30/13. Another $94.8 million in options exist for a FY 2014 buy of 12 more Phalanx upgrades, and another 4 SeaRAM systems, to bring the total contract to $231 million. Work will be performed in Louisville, KY (26%); Anaheim, CA (16%); Melbourne, FL (11%); Dayton, OH (11%); Syracuse, NY (10%); McKinney, TX (5%); Andover, MA (5%); Bloomington, MN (5%); Radford, VA (5%); Salt Lake City, UT (3%); and Tucson, AZ (3%), and is expected to be complete by September 2017. This contract was not competitively procured in accordance with FAR 6.302-1(a)(2)(iii) “one responsible supplier” provisions (N00024-13-C-5406). Sources: Pentagon | Raytheon Sept 11/13 release. FY 2013 order Oct 23/12: 5 for RFA. Raytheon signs a GBP 42.8 million (about $68.6 million) contract to deliver 5 Phalanx Block 1B systems to Britain, beginning in 2013. Installation and in-service support will be provided by Babcock Marine. The weapons are destined for Royal Fleet Auxiliary support vessels. At the moment, Raytheon’s Phalanx system is installed on 14 Royal Navy vessels, including their 6 new Type 45 destroyers. Other British ships use Thales’ Goalkeeper 30mm system. Royal Navy | Raytheon. British order May 17/12: FY 2012. Raytheon in Tucson, AZ receives a $57.9 million contract modification, covering FY 2012 requirements for MK 15 Phalanx Close-In Weapon Systems (CIWS). It includes Phalanx Block 1B BL2 upgrade kits and conversions; MK 15 Mod 31 CIWS SeaRAM missile upgrade kits and conversions in support of Austal’s forthcoming LCS 10 and 12; 2 Phalanx Block 1Bs for the forthcoming DDG 116 destroyer; MK 15 CIWS hardware product improvements and ancillary equipment; Block 1B Ordalt (Ordnance Alternation) kits; and MK 15 CIWS Block 1B Class A overhauls. Raytheon’s release cites 9 Phalanx overhauls and upgrades, 20 Phalanx radar upgrade kits, and 2 SeaRAM systems that use the Phalanx system as the chassis for an 11-shot RIM-116 short-range anti-aircraft missile launcher, instead of a 20mm gatling gun. Work will be performed in Louisville, KY (39%); Germany (12%); Palm Bay, FL (12%); Tucson, AZ (9%); Pittsburgh, PA (8%); Burlington, VT (6%); Andover, MA (4%); Syracuse, NY (4%); Long Beach, CA (1%); Radford, VA (1%); Bloomington, MN (1%); Salt Lake City, UT (1%); Norcross, GA (1%); and New Albany, IN (1%); and is expected to be complete by September 2015. $24.2 million will expire at the end of the current fiscal year, on Sept 30/12 (N00024-10-C-5427). FY 2012 order FY 2011 Japan; South Korea; Poland; UK. MK.15 IB on JS Hyuga (click to view full) Dec 27/11: Support. A $45.6 million cost-plus-fixed-fee contract for Phalanx, SeaRAM, and Land-based Phalanx design agent engineering and technical support services covering overall maintainability, reliability, and improvements. The contract is initially funded with $726,000, with more to be allocated as needed. Work will be performed in Tucson, AZ, and is expected to be completed by January 2013. This contract was not competitively procured by US NAVSEA in Washington, DC (N00024-12-C-5405). Sept 12/11: Raytheon signs a $65.5 million Direct Commercial Sale contract to deliver 5 Phalanx Block 1B Close-In Weapon Systems to the Republic of Korea Navy for the new 3,200 ton Ulsan-1 Class FFX inshore patrol frigates. The contract calls for the systems to be installed starting in April 2013, and represents Phalanx’s largest sale to the ROK fleet – which generally uses Thales’ larger 30mm Goalkeeper instead. Raytheon. South Korea: FFX buy Aug 31/11: Support. A 5-year, $162.2 million not-to-exceed fixed-price requirements contract for performance based logistics support for the Phalanx CIWS. This announcement includes service to the governments of Australia, United Kingdom, New Zealand, Japan, Poland, and Bahrain, which will be issued as separate delivery orders, on an as-required basis. Work will be performed in Louisville, KY, and is expected to be completed August 2016. This contract was not competitively procured pursuant to FAR 6.302-1, by US NAVSUP Weapon Systems Support in Mechanicsburg, PA (N00104-11-D-ZD43). Aug 25/11: FY 2011. A not-to-exceed $161 million contract modification to previously awarded contract for MK 15 Mod 31 SeaRAM systems in support of Independence Class ships LCS 6 Jackson and LCS 8 Montgomery, and Japan’s “DDH 2405 helicopter destroyer”; as well as Phalanx CIWS Block 1B class “A” overhauls, and land-based Phalanx Weapon System class “A” overhauls. The SeaRAM systems differ from other RAM launchers by having the full Phalanx enclosure, including the accompanying radar, as well as added infrared sensors. This creates a bolt-on missile system that can be operated semi-autonomously, or integrated and coordinated via the ship’s combat system. In exchange, it holds just 11 missiles in its launcher, instead of 21. DID covers it as a separate system. As for Japan’s “DDH-2405,” this is the first ship of Japan’s new 22DDH project to field 800 foot, 30,000t vessels that are larger than its existing 18,000t Hyuga Class. These ships are properly characterized as escort carriers, but Japan’s constitution forbids them from owning carriers. The SH-60 Seahawk helicopters on board JMSDF Hyuga and JMSDF Ise certainly proved themselves in the wake of the 2011 tsunami, however, which should mute any domestic criticism. The Pentagon adds that Phalanx CIWS is currently installed on approximately 152 US Navy and 14 US Coast Guard ships, and is in use in 23 foreign navies. Work will be performed in Louisville, KY (30%); Andover, MA (19%); Tucson, AZ (9%); Germany (7%); Syracuse, NY (7%); Long Beach, CA (6%); Radford, VA (6%); Burlington, VT (6%); Palm Bay, FL (2%); Pittsburgh, PA (2%); Bloomington, MN (2%); Salt Lake City, UT (2%); Norcross, GA (1%); and New Albany, IN (1%). Work is expected to be complete by September 2015, but $90.7 million will expire at the end of the current fiscal year, on Sept 30/11 (N00024-10-C-5427). FY 2011: USA, (Japan) Aug 1/11: Support. A $7 million contract modification for MK 15 Phalanx engineering and technical services to the US military, and the governments of Japan and Saudi Arabia (1%) under the Foreign Military Sales Program. Work will be performed in Tucson, AZ, and is expected to be complete by April 2012. $200,000 will expire at the end of the current fiscal year, on Sept 30/11 (N00024-07-C-5437). July 26/11: Poland submits a DSCA notice for service life extensions of its FFG-7 frigates, which includes upgrades to its MK 15 systems from Block 0 to Block 1B/ Baseline 2. Read “Poland to Extend, Improve its FFG-7 Frigates” for full coverage. Poland request June 21/11: UK. Babcock International Group announces the pending qualification and testing of Raytheon’s Phalanx 1B 20mm close-in weapon system on HMS Daring. The Type 45 air defense destroyers were not delivered with secondary defensive systems for use against UAVs, small boats, and incoming missiles, so the pending qualification will help to patch the gaps in their defenses. Babcock will supervise the installation of 2 systems in HMS Daring at Portsmouth Naval Base, as a lead-in to Naval Weapon Sea Trials (NWST), including a towed target firing. Most British ships have used Thales larger 30mm Goalkeeper system, but the Phalanx is an easier and cheaper “bolt-on” addition. Babcock’s previous Phalanx installations have been upgrades on the Type 42 destroyer HMS York, and the fleet replenishment ship RFA Fort Victoria. April 29/11: The US Defense Security Cooperation Agency announces [PDF] Britain’s official request for Ordnance Alteration Kits for 36 MK 15 Phalanx Close-In Weapon System (CIWS) upgrade (Ordnance Alternation, or OrdAlt) kits. The request includes 20 kits for converting Phalanx Block 1A systems to Block 1B Baseline 2, and 16 kits that raise systems from Block 1B Baseline 1 to Baseline 2. Spare and repair parts, support equipment, personnel training and training equipment, publications and technical documentation, software support, and other US government and contractor support are also included. The estimated cost is up to $137 million, but exact costs will depend on a negotiated contract. The Block 1B Baseline 2 upgrades improve optical and radar close-in detection, tracking and engagement, and extend Block 1A capabilities to include targets like helicopters, UAVs, and fast boats. Raytheon Systems Company in Tucson, AZ will be the contractor, but implementation will not require any contractor or US government support personnel. Britain request April 11/11: Raytheon announces that it has delivered the 1st 20mm Phalanx Block 1B Close-In Weapon System to the Republic of Korea Navy. The direct commercial sale calls for the Phalanx Block 1B system to be installed on the lead FFX light frigate in 2011. Other South Korean ships use Thales 30mm Goalkeeper system, but Phalanx’s bolt-on nature makes it a friendlier choice for smaller vessels. Raytheon expects to sign another contract with South Korea for an additional 5 Phalanx systems in the near future, representing the other 5 FFX ships. South Korea: initial order & delivery FY 2010 Support and tests. Phalanx, reloaded (click to view full) Sept 29/10: Support. A $35.2 million contract modification for engineering and technical services in support of the MK 15 Phalanx close-in-weapon system. Work will be performed in Tucson, Z, and is expected to be complete by December 2011. $8,379,133 will expire at the end of the current fiscal year, on Sept 30/10 (N00024-07-C-5437). May 19/10: Support. A $22.9 million modification to a previously awarded contract (N00024-07-C-5437) for engineering and technical services in support of the MK 15 Phalanx CIWS. Work will be performed in Tucson, AZ, and is expected to be complete by September 2010. Contract funds in the amount of $5.3 million will expire at the end of the current fiscal year. March 31/10: FY 2010. A $204 million not-to-exceed contract for MK 15 Phalanx Close-in Weapon System (CIWS) upgrades and conversions, system overhauls, and associated hardware. Work will be performed in Louisville, KY (30%); Andover, MA (19%); Tucson, AZ (16%); Syracuse, NY (7%); Long Beach, CA (6%); Radford, VA (6%); Burlington, VT (6%); Palm Bay, FL (2%); Pittsburgh, PA (2%); Bloomington, MN (2%); Salt Lake City, UT (2%); Norcross, GA (1% ); and New Albany, IN (1%). Work is expected to be complete by September 2014, and $51.3 million will expire at the end of the current fiscal year. This contract was not competitively procured (N00024-10-C-5427). FY 2010 March 24/10: Support. A $5.8 million modification to a previously awarded contract (N00024-07-C-5437), exercising options for engineering and technical services in support of the MK 15 Phalanx Close-In-Weapon System. Work will be performed in Tucson, AZ, and is expected to be complete by September 2010. March 9/10: Testing. USS Abraham Lincoln [CVN-72] successfully completes a PACFIRE test firing of her 20mm Phalanx Close In Weapons System (CIWS), while exercising the boat’s combat systems. Upgrades to the close-in self-defense weapon system included transition from block 1 baseline 0, to block 1 baseline 2. The main improvement uses compressed high pressure air instead of hydraulics to release the rounds faster, allowing the gun to fire 4,500 rounds per minute instead of 3,000. US Navy. FY 2009 Israel; Canada. Boat beat-down (click for video) Sept 23/09: Support. A $13.7 million modification to previously awarded contract (N00024-07-C-5437), exercising options for engineering and technical services in support of the MK 15 Phalanx Close-In-Weapon System. Work will be performed in Tucson, AZ and is expected to be complete by September 2010. Contract funds in the amount of $1.3 million will expire at the end of the current fiscal year. June 19/09: The Government of Canada awards Raytheon Canada Limited of Calgary, AB an 8-year, C$ 180 million contract to overhaul, repair and upgrade the Canadian Navy’s Phalanx Close-In Weapon Systems (CIWS). The Phalanx serves on Canada’s Halifax class frigates, its aged Iroquois/Tribal class “air defense” destroyers, and its Protecteur class supply ships. The upgrades will likely take the systems to Phalanx Block 1B status, which improves capabilities against fast boats, helicopters, and UAVs. Canada’s Industrial and Regional Benefit (IRB) Policy applies to this procurement. It requires that Raytheon Canada Limited undertake “high quality and advanced-technology business activities in Canada valued at 100 per cent of the contract value.” Canada support & upgrades May 15/09: FY 2009. A $259.9 million contract modification for MK 15 Phalanx Close-In-Weapon System (CIWS) Block 1B upgrades and conversions, system overhauls, and associated hardware. This includes the MK 15 MOD29 Centurion land-based system. $8.8 million will expire at the end of the current fiscal year, on Sept 30/09. Work will be performed in Louisville, KY (30%); Andover, MA (19%); Tucson, AZ (16%); Syracuse, NY (7%); Long Beach, CA (6%); Radford, VA (6%); Burlington, VT (6%); Palm Bay, FL (2%); Pittsburg, PA (2%); Bloomington, MN (2%); Salt Lake City, UT (2%); Norcross, GA (1%); and New Albany, IN (1%), and is expected to be completed by September 2012 (N00024-07-C-5444). FY 2009 May 13/09: Training. A $5.8 million contract modification for phalanx simulated infrared/visible engagement target simulator kits with shorting plugs in support of the Phalanx CIWS Program. The shorting plugs are useful, in order to make sure the simulated targets can’t lead to live firing. Raytheon will work on the contract in England (80%); Louisville, KY (15%); and Tuscon, AZ (5%); and expects to complete work by January 2011. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command manages the previously awarded contract (N00024-07-C-5444). April 21/09: Israel. Despite news reports that Israel would order the land-based Mobile Centurion system, the Jerusalem Post quotes “senior defense officials” who say that a decision won’t be made until Israel can watch live tests in summer 2009. The report adds that Israel is interested in the system’s potential along the Gaza Strip border, but there are still several obstacles that must be overcome first. One is its effectiveness against Kassam rockets and mortars, which will be answered by the live tests. The second obstacle is cost, given that each system covers 1.2 square km and costs about $25 million. That works well for protecting a base, but protecting a city like Sderot become far more costly. In a democracy, issues like noise levels are an obstacle that must be evaluated under environmental regulations, though that’s likely to be a minor hindrance at best. The final obstacles would involve American approval of the sale, which is very likely, and the willingness of American military customers to give up their own production slots, which is less certain. If they do not expedite delivery with production slot swaps, the required wait time might affect the rationale for choosing the Phalanx-based system over other options. Jan 30/09: Laser Phalanx. White Sands Missile Range in New Mexico state continues to test a solid-state laser version of the Phalanx weapons system. The laser has proven capable of “rapidly” penetrating armor plating even when not at full power, and the next step is to test the system on mortar rounds. The exact time required for burn-through or detonation of incoming rounds is a very important number. US Army release. Oct 8/08: Mobile Centurion. Raytheon and Oshkosh unveil the “Mobile Centurion,” which mounts the Phalanx system on a hybrid-electric HEMTT A3 heavy truck. To make room, the truck’s normal load-handling system was removed, in favor of a fixed platform for the Phalanx. The ProPulse drive A3 model was picked because it has 120 kW of power to divide between the truck’s drive train and the Pahlanx as needed, which removes the need to tow a bulky generator. The other benefit is air mobility. Instead of fitting just 1 current model Centurion/C-RAM trailer into a C-17 strategic transport plane, 3-4 Mobile Centurions could be fitted instead. Defense News. FY 2008 Australia, New Zealand. Over Baghdad click for video Sept 22/08: Support. A $31.3 million modification to previously awarded contract N00024-07-C-5437, exercising an option for engineering and technical services in support of the MK 15 Phalanx CIWS. Phalanx CIWS is currently installed on approximately 187 USN ships and is in use in 20 foreign navies. This modification combines support for the US Navy, US Army and the Governments of Egypt, Portugal and Australia under the Foreign Military Sales Program. Work will be performed in Tucson, AZ, and is expected to be complete by September 2009. Contract funds in the amount of $1.7 million will expire at the end of the current fiscal year. Sept 18/08: FY 2008. A not-to-exceed $220.5 million modification to a previous contract for MK 15 Phalanx Close-In-Weapon System Block 1B upgrades and conversions, system overhauls, and associated hardware. Contract funds in the amount of $19.9 million will expire at the end of the current fiscal year. Most Phalanx Block 1B conversions involve naval ships, due to the upgrade’s defensive value against small boats. The land-based C-RAM system is also based on Block 1B, however, and they will require system overhauls and spares of their own as part of their regular maintenance. Work will be performed in Louisville, KY (30%); Andover, MA (19%); Tucson, AZ (16%); Syracuse, NY (7%); Long Beach, CA (6%); Radford, VA (6%); Burlington, VT (6%); Palm Bay, FL (2%); Pittsburg, PA (2%); Bloomington, MN (2%), Salt Lake City, UT (2%); Norcross, GA (1%); and New Albany, IN (1%), and is expected to be complete by September 2012 (N00024-07-C-5444). FY 2008 May 23/08: Support. A $14.3 million modification to previously awarded contract (N00024-07-C-5437) provides more incremental funding for engineering and technical services, bringing the contract’s current exercised value to $57.6 million. This modification combines purchases for the U.S. Army (45%); U.S. Navy (42%) and the Government of Pakistan, (13%) under the Foreign Military Sales Program. Work will be performed in Tucson, AZ and is expected to be completed by September 2008. The Naval Sea Systems Command in Washington Navy Yard, DC issued the contract. May 16/08: New Zealand’s TV3 reports that the country’s 2 ANZAC Class frigates will upgrade their Phalanx guns to Block 1B status, as the first step in a larger overhaul and upgrade. See “NZ Looks to Upgrade ANZAC Frigates.” NZ upgrade May 12/08: Centurion. A not-to-exceed $61.2 million modification to previously awarded contract (N00024-07-C-5444) for MK 15 Phalanx Close-In-Weapon System (CIWS) ordnance alteration kits, spares, and associated hardware for Land-Based configurations to support the Global War on Terrorism. Work will be performed in Louisville, KY (22%); Andover, MA (19%); Tucson, AZ (16%); Syracuse, NY (9%); Long Beach, CA (9%); Radford, VA (7%); Burlington, VT (7%); Palm Bay, FL (3%); Pittsburg, PA (2%); Bloomington, MN (2%); Salt Lake City, UT (2%); Norcross, GA (1%); and New Albany, IN (1%); and is expected to be complete by September 2010. Contract funds in the amount of $1.5 million will expire at the end of the current fiscal year. Jan 22/08: Support. An $18.7 million modification to previously awarded contract (N00024-07-C-5437) for engineering and technical services in support of the MK 15 Phalanx Close-In-Weapon System. Work will be performed in Tucson, AZ and is expected to be complete by September 2008. Contract funds in the amount of $3.6 million will expire at the end of the current fiscal year. “PHALANX CIWS is currently installed on approximately 187 USN ships and is in use in 20 foreign navies.” Nov 9/07: FY 2007. Raytheon Co. in Tucson, AZ received a $225.1 million firm-fixed-price contract for MK 15 Phalanx Close-In Weapon Systems (CIWS) Block 1B Upgrade and Conversion equipment, plus U.S. Army Block 1B Land-based Phalanx Weapon System (LPWS) Upgrade and Conversion equipment, and U.S Army Block 1B LPWS’s and associated spares and support equipment. This effort also includes purchases for the Governments of Portugal (1.23%) and Australia (1.09%) under the Foreign Military Sales Program. A subsequent Raytheon release adds more details: they will overhaul and upgrade 34 Phalanx CIWS systems for the U.S. Navy and 1 system for the Royal Australian Navy, and will build 12 Land-Based Phalanx Weapon Systems for the U.S. Army, while providing associated hardware to all customers under the agreements. Work will be performed in Louisville, KY (55.7%), Burlington, VT (12.4%), Palm Bay, FL (8%), Andover, MA (4.9%), Pittsburg, PA (4.8%), Carson, CA (4.1%), Tucson, AZ (3.4%), Brooklyn, NY (3.4%), Bloomington, MN (3.3%), and is expected to be complete by November 2010. Contract funds in the amount of $7.3 million will expire at the end of the current fiscal year. The contract was not competitively procured by the Naval Sea Systems Command in Washington Navy Yard, Washington DC (N00024-07-C-5444). FY 2007: USA, Australia Oct 1/07: Overhauls. A $16.7 million firm-fixed-price modification under previously awarded contract (N00024-04-C-5460) for 7 Phalanx Close-In Weapon System (CIWS) Class A Overhauls. PHALANX CIWS is currently installed on approximately 187 USN ships and is in use in 20 foreign navies. Work will be performed in Louisville, KY and is expected to be complete in February 2011. All contract funds will expire at the end of the fiscal year. FY 2007 FLIR; Lasers? UK Phalanx at night (click to view full) Sept 27/07: Centurion. Jane’s International Defence Review reports that Raytheon is planning to approach NATO with a strategy to lease or sell a number of its Centurion land-based Phalanx systems for deployment at fixed bases in Iraq and Afghanistan. Sept 25/07: Ammo. Alliant Techsystems Inc. (ATK) in Mesa, Ariz., USA, won an estimated $44.6 million firm-fixed-price contract for MK 244 Mod 0, linked armor-piercing discarding sabot (APDS) 20mm cartridges, electric-primed 20mm rounds designed to be fired by the M61A1 20mm gatling cannon mounted in the shipboard Phalanx CIWS. This cartridge is referred to as the Enhanced Lethality Cartridge, as it contains a heavier projectile and inflicts more damage to the target than the precursor to this round, the MK149 Mod 4. Work will be performed in Independence, MO, and is expected to be complete by September 2010. Contract funds in the amount of $512,519 will expire at the end of the current fiscal year. This contract was competitively procured and advertised via the Internet, with 2 offers received [General Dynamics ATP was almost certainly the other bidder]. The US Naval Surface Warfare Center, Crane Division in Crane, Ind. issued the contract. (N00164-07-D-4285) Sept 11/07: Laser Phalanx. Jane’s reports from the British DSEi exhibition that Raytheon is working on a Phalanx variant that can fire lasers. What advantages would a laser system offer? Would it really be an advance over the current Phalanx system? DID explains. Aug 23/07: Sub-contractors. DRS Technologies, Inc. announced a $26 million contract, with an option for an additional $23 million contract, to produce, integrate, test and deliver Phalanx Thermal Imagers for the MK 15 Phalanx Close-In Weapon System (CIWS). The contract was awarded to DRS by the Missile Systems business of Raytheon in Louisville, KY. The imagers were developed by the company’s DRS Sensors & Targeting Systems unit – California Division in Cypress, CA, and DRS-produced work for this contract will be accomplished by the unit’s Optronics Division in Palm Bay, FL. DRS will start delivering the imagers immediately, with completion expected by July 2008. DRS’s Phalanx Thermal Imagers incorporate 2nd-generation FLIR (Forward Looking Infra-Red) technology, similar to that used by the company in the Horizontal Technology Integration series of sighting system products being delivered to the U.S. Army and Marines for ground combat systems like the M2/M3 Bradley IFV and M1 Abrams tanks, LRAS3, et. al. The new systems will replace 1st generation FLIR technologies currently in use on MK 15 Phalanx mounts. May 25/07: UK C-RAM. Jane’s Defence Weekly reports that Britain will deploy a C-RAM system to protect UK forces in southern Iraq. Speaking at the Royal United Services Institute’s (RUSI’s) Air Power conference in London on May 17/07, Air Chief Marshal Sir Clive Loader, Commander-in-Chief of the RAF’s Air Command, disclosed that the Raytheon Land-based Phalanx Weapon System (LPWS) was being acquired “to protect the UK’s deployed bases in operational theaters.” May 2/07: EDO Corporation announces a $15 million follow-on award for expanded support of the Army’s C-RAM (Counter Rocket, Artillery, and Mortar) system, which includes a land-based Phalanx weapon coupled with self-destructing explosive bullets. The task order was effective April 1, 2007 and includes in-theater support. EDO services have included testing and validation of the systems at test facilities and in the field, assistance in fielding systems, and logistics services to ensure their continued operation. These services are being provided in the U.S. and in support of nearly 20 locations in combat zones. EDO release Feb 28/07: Call UPS! Raytheon announces a 5-year, $169.9 million Performance Based Logistics contract to manage the spare parts for the U.S. Navy’s Phalanx CIWS. More than 1,100 part numbers amounting to more than 30,000 individual Phalanx parts are warehoused in Louisville, KY, where, for a firm-fixed-price, Raytheon, in partnership with United Parcel Service Supply Chain Solutions, guarantees delivery of spares to drop points within an agreed-to time frame. The distribution and management functions allow for worldwide delivery using the best commercial carrier available, while maintaining process control through in-transit tracking. This process also allows for retail and wholesale spares modeling, spares procurement and, perhaps most importantly, inventory management. The provisions and benefits of the contract apply to both the U.S. Navy and the 24 international navies that have Phalanx in their inventories. Frank Wyatt, vice president for Raytheon’s Naval Weapon Systems in Tucson, AZ: “The partnership with United Parcel Service, developed through the previous Phalanx logistics contract, has greatly improved inventory accuracy. Currently, Phalanx inventory accuracy stands at 99.9 percent resulting in a substantial increase in supply availability and a reduced wait time… Future cost savings and improved responsiveness can be anticipated by reducing parts demands through engineering redesign of selected high-demand, high-cost parts.” Feb 8/07: Shingo. Raytheon Missile Systems’ Louisville, KY facility has captured a prestigious Shingo Prize for Excellence in Manufacturing, marking the 4th consecutive year that Raytheon facilities have won. The Louisville facility manufactures the Phalanx CIWS and RAM/SeaRAM systems. Jan 3/07: Northrop Grumman Mission Systems in Huntsville, AL received a delivery order amount of $29.9 million as part of a $144.5 million firm-fixed-price and cost-plus-fixed-fee contract for the Forward Area Air Defense Command and Control/ Counter-Rocket Artillery Mortar Systems (FAAD C2/ C-RAM) Integration contract. Work will be performed in Huntsville, AL and is expected to be complete by Sept. 28, 2009. This was a sole source contract initiated on Nov. 20, 2006 by the U.S. Army Aviation and Missile Command in Redstone Arsenal, AL (W31P4Q-06-D-0029). Northrop Grumman’s Jan 17/07 release describes it as “a contract valued at up to $71 million to continue their support in system engineering, integration, and installation for…C-RAM… In addition to continuing to support systems engineering, integration and installation of C-RAM capabilities, the indefinite delivery/indefinite quantity (IDIQ) C-RAM installation and support contract includes logistics and training support.” FY 2006 Pakistan; Australia; UK. Calibration on CVN 73 (click to view full) Sept 29/06: Northrop Grumman Mission Systems in Huntsville, AL received a delivery order amount of $28.6 million as part of a $670 million firm-fixed-price and cost-plus-fixed-fee contract for Forward Air Defense Command and Control/ Counter-Rocket Artillery and Mortar Systems (C-RAM) Integration. Work will be performed in Huntsville, AL and is expected to be complete by Sept. 28/08. This was a sole source contract initiated on May 4, 2006 by The U.S. Army Aviation and Missile Command in Redstone Arsenal, AL (W31P4Q-06-D-0029). Under a $38 million contract awarded in October 2005, Northrop Grumman was tasked with integration, deployment, and installation of the C-RAM command and control systems architecture; assisted in integrating the command and control with target acquisition and tracking radars, warning, and response subsystems; and trained soldiers to operate and support the “system of systems.” Sept 13/06: FY 2006. A $369.1 million firm-fixed-price modification under previously awarded contract N00024-04-C-5460 for Phalanx CIWS and associated spares for FY 2006 US Navy (51%) and US Army (35%) purchases, and the Governments of Pakistan (12.8%) and Australia (1.2%) under the foreign military sales requirements. Work will be performed in Louisville, KY and is expected to be complete December 2009. Contract funds in the amount of $7.3 million will expire at the end of the current fiscal year. FY 2006: USA, Pakistan, Australia Aug 9/06: Centurion. A $6.9 million firm-fixed-price modification under previously awarded contract (N00024-04-C-5460) for land-based Phalanx weapon system ancillary equipment. This is the land-based configuration for the US Army’s counter-rocket, artillery, mortar program. Work will be performed in Louisville, KY and is expected to be complete by April 2007. Feb 7/06: Support. Raytheon Missile Systems in Tucson, AZ received a $169.9 million firm-fixed-price requirements contract for performance-based logistics in support of the Phalanx CIWS. This contract combines procurements between the US Navy (74.79%); US Coast Guard (4.6%); and the Governments of Australia (5%); Israel (5%); New Zealand (5%); Japan (1%); United Kingdom (1%); Canada (1%); Taiwan (1%); Poland (1%); Bahrain (0.4%); and Saudi Arabia (0.21%) under the Foreign Military Sales Program. Work will be performed in Louisville, KY (90%), and Tucson, AZ (10%), and is expected to be complete by April 2011. This contract was not competitively procured by the Naval Inventory Control Point in Mechanicsburg, PA (N00104-06-D-L007). January 2006: UK. The British Defence Logistics Organization’s (DLO) Maritime Gunnery and Missile Systems (MGMS) Integrated Project Team signs a 10-year support, maintenance and availability contract with DML, with incentives to increase the number of days the guns are available and fit for use. On Oct 31/06, the DLO noted that the target time each Phalanx spends having operational defects fixed was 1.56 days per operational mount, but DML was already achieving 1.24 days. As of October 2006, there were 36 Phalanx guns in service on Royal Navy Ships and Royal Fleet Auxiliaries; an upgrade of these units to Mk 15 Phalanx 1B status is slated to begin entering service by May 2008. British long-term support Oct 24/05: Northrop Grumman announces that the U.S. Army has selected them the prime contractor for the Counter-Rocket, Artillery, Mortar (C-RAM) Integration and Fielding contract. Northrop Grumman’s Mission Systems sector is developing a systems architecture and integrating the C-RAM target acquisition, fire control, warning and engagement subsystems. Under a $38 million contract, Northrop Grumman will first deploy a mortar-attack warning capability and install that capability at 8 forward operating bases in Iraq. Northrop Grumman Mission Systems will also train soldiers to use the system and integrate an intercept subsystem as it is fielded. Northrop Grumman release | DID article. FY 2005 Canada; Portugal. Phalanx CIWS May 16/05: FY 2005. A $45 million not-to-exceed, firm-fixed-price modification to previously awarded contract (N00024-04-C-5460) for Block 1B Upgrade and Conversion performance enhancement equipment for United States and Portuguese Navy Phalanx Close-In Weapon Systems (CIWS). This contract combines purchases for the U.S. Navy (31%) and the government of Portugal (69%) under the Foreign Military Sales program: 3 upgrade and conversions for the U.S. Navy, and 3 Phalanx MK-15 CIWS and ancillary hardware are planned in support of Portugal requirements. Work will be performed in Louisville, KY and is expected to be complete by December 2007. FY 2005: Portugal, USA March 24/05: A $5.3 million firm-fixed-price contract modification to previously awarded contract N00024-04-C-5460 for production of 99 sets of Reliability and Maintainability Spares in support of the MK 15 Phalanx Close In Weapon System (CIWS) program. Work will be performed in Tucson, AZ (10%) and Louisville, KY (90%), and is expected to be complete by July 2007. March 3/05: A not to exceed $129 million firm fixed price modification to previously awarded contract N00024-04-C-5460 for the Phalanx Close In Weapon System (CIWS). The contract includes Block 1B upgrades, overhauls, parts and support equipment, and other ancillary equipment. This equipment will be installed aboard several Arleigh Burke Class Destroyers (DDGs 107, 108, 109, 110, 111 & 112) and backfit upon various classes of ships. Additionally, 2 mounts will be provided to the United States Army. Work will be performed in Louisville, KY (90%) and Tucson, AZ (10%), and is expected to be complete by May 2009. Dec 8/04: Canada exercised a contract option, engaging engage Raytheon Canada to repair, overhaul and upgrade its 16 Phalanx Close in Weapon Systems (CIWS). The contract lasts to 2009 and will cost at least C$ 82.5 million (about $68 million). The original multi-million dollar contract was signed between Raytheon Canada and Canada’s Department of Public Works and Services in 2003. Under that contract, Raytheon Canada was to provide total life-cycle support for Canada’s 21 Phalanx CIWS systems, including fleet repair work, field service support, overhauls, upgrades, overhaul support material and engineering services. The new contract extends Raytheon’s service to the Royal Canadian Navy to 2009, and the new C$ 44.6 million modification means the contract is now valued at in excess of $82.5 million. Work, including upgrade to the Mk 15 Phalanx 1B configuration, will be performed in Calgary, Alberta, at Raytheon Canada’s Naval Systems Support (NSS) facility. Canadian upgrades & support Additional Readings US Navy – MK 15 – Phalanx Close-In Weapons System (CIWS). Raytheon – Phalanx Close-In Weapon System (CIWS). GlobalSecurity.org – MK 15 Phalanx Close-In Weapons System (CIWS). GlobalSecurity.org – Counter Rocket, Artillery, and Mortar (C-RAM). LiveLeak – C-RAM video. Defense Tech (Aug 21/13) – Navy Overhauls Phalanx Ship Defense Weapon. Good overview of the changes in Block 1B, and of refit costs. US military DVIDS (July 3/10) – Army, Navy Team Up to Protect Victory Base Complex. In Iraq. Illustrates how the land-based Centurion system works in practice. They seem to be rather maintenance intensive. US Army (March 16/09) – Iron Shield mission forges Army, Navy bond. DID – A Laser Phalanx?. Competitors DID FOCUS Article – RAM Missile Systems: Contracts & Events. SeaRAM is based on the MK 15 Phalanx Block 1B platform, but has an 11-round missile launcher instead of a gun and ammunition drum. Northrop Grumman (July 12/06) – Northrop Grumman Develops Skyguard Laser Defense System For U.S., Allies to Defend Against Rocket, Missile, Mortar Attacks. See also DID’s Oct 20/07 article, “Israel Facing Sharp Debates Over Missile Defense Approaches.” Lasers aren’t a competitor yet, even in 2013, but steady progress to the 20-40 kW level says they will become one soon. Rheinmetall subsidiary Oerlikon-Contraves (November 2006) – New challenges for air defense. Describes their competitor Skyshield system for land-based defense, which is also gun and radar based but claims longer range and heavier projectiles. Thales – Goalkeeper – close-in weapon system. See also product datasheet [PDF]. Phalanx’s top naval competitor. View the full article
-
CDR Salamander - Even the Chairman Goes Salamander on Overseas Forces
As regulars here know, from the start of the blog - and a decade earlier IRL - one of my core stands is that we are long past the need for having large formation of maneuver forces based overseas in now rich and ready allies. Besides unit rotations, occasional exercises to practice surge, and combined training and logistics facilities, everyone needs to come home. As a maritime and aerospace power, we need to be home based, but postured for forward deployment of land forces to support allies and interests. We are a mercantile republic, not an empire. It has been a lonely vigil, and I know many of the respected and wise members of the Front Porch disagree with me, but that's OK. That being said, the Chairman is not all the way Salamander, but I'll take 80%; In remarks on the future of warfare, Army Gen. Mark Milley said he believes the military should be more selective in its peacetime presence abroad. He said he strongly favors an overseas U.S. presence but prefers that it be rotational or “episodic” rather than permanent. He was not referring to counties like Afghanistan and Iraq, where U.S. forces have been involved in wars for nearly two decades. “Large permanent U.S. bases overseas might be necessary for rotational forces to go into and out of, but permanently positioning U.S. forces I think needs a significant relook for the future,” not just because of the cost but also because it can leave military families vulnerable in high-risk areas, he said. In the same article, I found these remarks interesting from a navalist point of view; Competing effectively and peacefully with China requires a vastly larger U.S. Navy, he said, including a much larger investment in robotic surface and underwater vessels. That was right after a discussion about flat to slightly smaller budgets. So, an Army 4-star can see the argument for Navy getting a larger slice of the pie? Interesting. UPDATE: I'm sorry, but I refuse to not LOL. Even NAVSEA is going Salamander. No one of the Front Porch should ever have to buy a beer again. Also, we need to make clear that I am not VADM Galinis IRL. The Navy’s experience with fielding new warships in the last two decades has shown that an evolutionary approach to ship design is more likely to succeed than a revolutionary approach, the commander of Naval Sea Systems Command design said. “As we go forward and look at future platforms, [consider an] evolutionary approach versus a revolutionary approach,” said Vice Adm. William Galinis, speaking Dec. 3 in a Defense Forum 2020 webinar sponsored by the U.S. Naval Institute. “Where we have done that [evolutionary approach], frankly we’ve been pretty successful.” I would laugh harder is it weren't for the untold hundreds of billions of dollars, and untold destroyed careers that resulted from the Age of Transformationalism. Just read all the above and join me in saying, "NOT ONE DAMN LINK OR CREDIT TO CDRSALAMANDER? That is just rude." http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=8lalXujE6nA:I-HSuO02TZM:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=8lalXujE6nA:I-HSuO02TZM:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=8lalXujE6nA:I-HSuO02TZM:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=8lalXujE6nA:I-HSuO02TZM:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/8lalXujE6nAView the full article
-
CDR Salamander - Have We Forgotten the Art of Deception?
Looking back at some overlooked but critically important - and successful - naval tactics that have a direct and sometimes dramatic strategic effect ... I found myself thinking of a great example from WWII. Can you defeat the worlds most feared warship with just some lumber and canvas? Maybe ... I'm pondering over at USNIBlog. Come by and give it a ponder with me ... and think why this may be of use today. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ZlRR0pcS22c:2NvUlcOXAbQ:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ZlRR0pcS22c:2NvUlcOXAbQ:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ZlRR0pcS22c:2NvUlcOXAbQ:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ZlRR0pcS22c:2NvUlcOXAbQ:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/ZlRR0pcS22cView the full article
-
DID - Raytheon Tapped For Silent Knight Support | US Ambassador Confirms Greece’s Intention To Buy F-35s | Final Two MQ-9s Delivered To Spain
Americas Raytheon won a $235.6 million deal for the production and delivery of the Silent Knight Radar in support of US Special Operations Command (USSOCOM) requirements. The Silent Knight radar is designed to be outfitted on the MH-47G Chinook and MH-60M Blackhawk helicopters, MC-130 transports and CV-22 Osprey tilt-rotor aircraft. The Silent Knight is built for safe navigation through low altitudes at night or in bad weather. In June 2019 Raytheon was awarded a $96.6 million contract for the initial production of the Silent Knight system for Special Operations Command. Work will take place in McKinney and Forest, Mississippi. Estimated completion will be by July 2025. Canada will receive new equipment for its Royal Canadian Air Force C-17 transport planes, the US government announced. The DoS approved the upcoming sale that is estimated to cost $275 million and the US Congress has been notified of the proposed deal. The Canadian government “has requested to buy C-17 sustainment support to include aircraft hardware and software modification and support; software delivery and support; ground handling equipment; component, parts and accessories; GPS receivers; alternative mission equipment; publications and technical documentation; contractor logistics support and Globemaster III Sustainment Program participation”, according to the US announcement. The deal will also include US government and contractor engineering, technical, and logistical support services; and related elements of program and logistical support. Middle East & Africa Kellogg Brown and Root Services won a $28.3 million contract modification for the incorporation of additional services for Option Periods Three through Seven under the base operating service contract at Naval Support Activity (NSA) Kingdom of Bahrain. The work to be performed provides for, but is not limited to, all management, supervision, tools, materials, supplies, labor and transportation services necessary to perform security operations, galley services, unaccompanied housing, facility management, emergency service requests, urgent service, routing service, facilities investment, custodial, pest control service, integrated solid waste, grounds maintenance, utility management, wastewater, operate reverse osmosis water treatment system, chiller and transportation, at NSA Kingdom of Bahrain. Work will take place in Bahrain. Performance period is December 1, 2020, to November 30, 2021. Europe US Ambassador to Athens Geoffrey Pyatt has confirmed Greece’s intention to buy F-35s. Pyatt says the US government welcomes the decision by Athens “at the highest levels” and will support the aquisition. “We have signaled our support for procurement and are working closely together on a future acquisition program, which would enhance Greece’s defense capabilities, ensure interoperability with US Armed Forces and improve regional stability. All reports to the contrary are false and misrepresentations of US policy“, Pyatt said in a statement. Although some in Greek media claimed that the US was reversing its decision in procuring the F-35 fighter jet, the American ambassador ensured that these reports are false. “We take great pride in our defense and security partnership with Greece and work daily to advance that from strength to strength, including through Greece’s future acquisition of the F-35,” Pyatt said. General Atomics has delivered the final two MQ-9A Block 5 UAVs ordered by the Spanish Air Force. The delivery took place on November 23 and includes a ground control station. The new MQ-9s will be operated by the 233rd Squadron at Talavera la Real Air Base near Badajoz, Spain. Besides being the first for the issuance of the Airworthiness Military Type Certificate, Spain’s program represents the first MQ-9A Block 5 acquisition by an international partner. Other milestones for the program have included the SpAF taking initial delivery of its MQ-9A Block 5 aircraft at the end of 2019 and launching its first flight in January 2020. The 233rd Squadron has flown nearly 300 hours with its MQ-9A Block 5 aircraft and is steadily building the expertise of its crewmembers and maintainers as the SpAF moves towards declaring the Initial Operational Capability for the system. Asia-Pacific Lockheed Martin won a $12.4 million contract modification, which adds scope to provide non-recurring engineering and obsolescence services in support of the Airborne Low Frequency Sonars integration into MH-60R production aircraft for the governments of India and Denmark. The MH-60 R integrates advanced mission systems and sensors developed by Lockheed Martin Mission Systems and Training (MST). The helicopter is intended to carry out a range of missions, including anti-submarine warfare (ASW), anti-surface warfare (ASuW), surveillance, communications relay, search and rescue (SAR), naval gunfire support (NGFS), personnel transport, vertical replenishment (VERTREP) and logistics support. It can be launched from aircraft carriers, destroyers, cruise ships, frigates and amphibious ships. Today’s Video Watch: Just How Big is America’s C-17 Globemaster III View the full article
-
DID - Raytheon Wins $642M For F135 Support | BAE Systems Wins $3.2B For British Munitions | Australia Partners With US To Develop Hypersonic Missiles
Americas Raytheon and Pratt and Whitney Military Engines won a $642 million deal, which provides for the procurement of performance-based logistics activities including maintenance of support equipment, common program activities, unique and common base recurring sustainment, repair of repairables, field service representatives, common replenishment spares, conventional take-off and landing/carrier variant F135 unique maintenance services and short take-off and landing F135 unique services in support of the F-35 Lightning II F135 propulsion system for the Air Force, Marine Corps, Navy, non-Department of Defense participants and Foreign Military Sales customers. Pratt & Whitney’s F135 propulsion system powers all the three variants of F-35, the combat-proven fighter jet developed by defense major Lockheed Martin LMT, with BAE Systems BAESY and Northrop Grumman NOC being the co-manufacturers. Notably, F135 delivers more than 40,000 lbs. of thrust and unmatched advances in safety, design, performance, and reliability. An initial contract obligation amounting to $215.5 million will come from the US military’s fiscal 2021 operation and maintenance funds. Work will run at Eglin Air Force Base in Florida; Hill AFB in Utah; Edwards AFB in California; Luke AFB in Arizona; Beaufort Marine Corps Air Station in South Carolina; Oklahoma City; East Hartford, Connecticut; and Camari, Italy, through November 2021. IAP Worldwide Services won a $11 million contract modification, which increases the contract value and provides additional funding for inventory replenishment, operational and depot spare parts in support of the E-6B Mercury airborne command post take charge and move out aircraft. The Boeing E-6 Mercury is a command post and communications relay aircraft manufactured by Boeing for the US Navy. The aircraft relays communications for ballistic missile submarine forces and provides airborne command and control for strategic forces. Work will take place in Oklahoma City, Oklahoma; Patuxent River, Maryland; Bellevue, Nebraska; and Fairfield, California. Expected completion will take place in January 2021. Middle East & Africa Leidos Inc. won a $38.4 million modification for contractor logistics support services supporting the Afghan Air Force. Leidos had also received a multi-million contract modification in support of the Afghan Air Force and the Special Mission Wing of the Afghan armed forces back in March. The Department of Defense awarded a $728 million contract to Leidos Inc. in support of the Afghan Air Force in late in late 2018. Work under the current modification will take place in Kabul, Afghanistan. Estimated completion date is February 28, 2021. The US Army awarded AITC-Five Domains JV LLC a $36 million contract to provide train, advise, assist and mentor services to the Kingdom of Saudi Arabia. Bids were solicited via the internet with one received. Fiscal 2021 Foreign Military Sales funds in the amount of $36,000,547 were obligated at the time of the award. Work will take place in Riyadh, Saudi Arabia. Estimated completion date is November 30, 2024. Europe BAE Systems won a $3.2 billion munitions contract for Britain’s Next Generation Munitions Solution program, the defense ministry announced. The British-based company will manufacture 39 different munitions for the Royal Navy, Army, Royal Air Force and Strategic Command for front-line use, including small arms ammunition, mortars, medium-caliber gun rounds and large-caliber artillery and tank shells. The 15-year contract calls for manufacturing improvements in five BAE facilities in Britain, and is part of a $22 billion, four-year increase in British defense spending announced on November 19. “This vital multi-billion-pound contract will provide our service men and women with fire power on the front line for years to come whilst investing in British industry, British jobs and British infrastructure,” Defense Minister Jeremy Quin said in a press release. Asia-Pacific The United States and Australia, in an agreement announced on November 30 by the US Defense Department, will soon start speeding the development and testing of hypersonic weapons, officials of both governments said. The process of certifying the missiles capable of flying five times the speed of sound, or up to 6,000 mph, has been accelerated by a regional arms race involving China and Russia, each working on hypersonic missile programs of their own. The interest in air-launched missiles comes after defense strategists warned that a planned 10-year schedule of development is inadequate against potential threats. Today’s Video Watch: It Could Nuke a Country: The E-6 Mercury is America’s Deadliest Plane Ever View the full article
-
CDR Salamander - Hug Your Local SINKEX Today
Some of my most memorable peacetime experiences in my naval career were SINKEX. I mean ... really people. There is the "fun" factor - but I also fully appreciated the good information we received from sending warshots downrange. Sure, the targets didn't shoot back or try to intercept our weapons ... but it did give you a good outline of the performance of those things in the kill chain you could control. That is why - while using the exceptional google translate function - this bit from Russian open source caught me off guard; ... testing modern means of destruction of the Navy on it. And as an example here, we, alas, the US Navy, which does not just use old ships as targets, such firing has a pronounced research character, all reports on which, of course, the US Navy is tightly secret (with a minimum of details for the media). Such events have not been carried out in our fleet for many decades, despite the fact that new anti-ship missiles with a sharply reduced mass of warheads are being adopted for service, the issues of the real effectiveness of which on large ships are acute. That's right kiddies ... the Russians and the Soviets before them were not in to doing SINKEX. I find that, frankly, amazing. You learn so much by doing even these highly controlled and scripted exercises from both a weaponeering and damage control point of view. While we may need to work on basic seamanship and preservation, there are two things we like to think we are good at compared to other navies; damage control and weaponeering. Both of these assumptions - which I think are very defendable - derive a fair bit from what we learn from SINKEX. At war, our weapons may not be as good as we think they are ... but pondering the Russian admission above, I have to wonder ... what effectiveness are Russian weapons in comparison? I know what I assume ... but maybe even less effective? Hmmm. As a side note, take time to read the full article linked to above. Nice discussion of lost opportunities by not having proper stewardship of existing warships ... and even a dig at LCS. Nice confirmation of what I had heard SEPCOR about Soviet Era gas turbines. H/t SJS. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=-9XSYLI3kmY:wIa6ThCf388:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=-9XSYLI3kmY:wIa6ThCf388:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=-9XSYLI3kmY:wIa6ThCf388:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=-9XSYLI3kmY:wIa6ThCf388:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/-9XSYLI3kmYView the full article
-
DID - B-1B Lancer Armed With Hypersonic Weapons | Top Aces Might Buy Israeli F-16A/Bs | Philippines Formally Received ScanEagle2
Americas According to the US Air Force, a B-1B Lancer bomber conducted a demonstration testing its ability to externally carry potential hypersonic weapons. The “external captive carry” test was conducted last week by the 412th Test Wing’s 419th Flight Test Squadron at Edwards Air Force Base, Calif., the Air Force said on Tuesday. The plane carried an inert Joint Air-to-Surface Standoff Missile outside its fuselage. An earlier test demonstrated the capability of carrying large weapons within the plane. The tests indicate that the B-1B can deliver and launch large hypersonic weapons, which by definition fly at over five times the speed of sound. The United States, China and Russia are all developing hypersonic missiles. According to media reports, the Brazilian Navy completed the modernization of amphibious assault ship Atlantico on 12th November. After the modernization, the ship will be able to operate with fixed-wing medium-altitude long-endurance unmanned aerial vehicles as well as crewed tiltrotor VTOL aircraft. After the modernization, the Brazilian Navy decided to reclassify the helicopter carrier “Atlantico” as an aircraft carrier. The Atlantico was procured in 2018 for a value of £84 million from the United Kingdom, where it has operated since 1995. With 203 meters in length and 21,600 tons of displacement, the vessel was used as a platform for helicopters on amphibious assault missions. Despite the new name, the ship has no characteristics to be considered an aircraft carrier, such as catapult or ski-jump takeoff systems. Middle East & Africa Israeli media is reporting that Israel’s Ministry of Defense is in talks with Canada’s Top Aces for the purchase of 29 surplus F-16A/B fighters. Israel is asking for between $3 million and $4 million for each jet and the Ministry of Defense’s International Defense Cooperation Directorate (SIBAT) is responsible for the talks. General Dynamics F-16 Fighting Falcons were delivered to Israel in the early 1980s and over the past decade have been gradually phased out of service. The United Arab Emirates approved the establishment of a new national cybersecurity council, Sheikh Mohammed bin Rashid Al Maktoum, UAE Prime Minister and Vice-President and ruler of Dubai, said. The cabinet of the UAE government also appointed Industry and Advanced Technology Minister and head of Abu Dhabi National Oil Company (ADNOC) Sultan al-Jaber as a special envoy for climate change. Europe The first two of fifty new Apache AH-64E attack helicopters have been delivered to the British Army. The British Army expects to operate 50 AH-64E aircraft. Approval for the upgrade of fifty of the UK’s WAH-64 fleet to AH-64E Apache Guardian standard was given by the US Defense Security Cooperation Agency in August 2015 however in July 2016, the UK placed an order for 50 AH-64Es through the US Foreign Military Sales program instead of upgrading their Westland-built WAH-64s. To date, more than 500 AH-64E model Apaches have been delivered worldwide. “The arrival of the first Apache E model attack helicopter to be delivered to the British Army over the next two years marks the beginning of a significant uplift in capability to enhance the army’s contribution across the spectrum of military operations,” Major General Jez Bennett, Director Capability, was quoted as saying. Asia-Pacific The Philippine Navy formally received an Insitu Inc ScanEagle 2 unmanned aerial system from the United States during a “turnover, acceptance and blessing ceremony” held at the Naval Base Heracleo Alano in the Philippine city of Cavite near Manila on November 25. The PN said in a statement that the $14.79 million system – which comprises eight unmanned aerial vehicles (UAVs), two launchers, the SkyHook recovery system and a ground control station – was handed over by US Acting Deputy Chief of Mission Kimberly Kelly and representatives from the US Embassy in the Philippines’ Joint US Military Assistance Group (JUSMAG). Today’s Video Watch: B-1 Lancer – The Bone – Supersonic Bomber View the full article
-
CDR Salamander - China Bully-boys Australia
Here is one hard fact; Australia has 1.7% of the population of Communist China. Additionally, Australia is 80% of the landmass of Communist China. Australia is also heavily reliant on China with regard to trade. 39% all goods exported in 2019-20 go to China, while 27% of all goods imported were from China. This is top of mind to the Chinese Communist Party. As they have in other parts of the world, once China gets comfortable with their economic leverage, they will begin to use it against you. They are not too good at it, and more often than not they come out as rather thuggish. They also lack cultural competence to see that what may work in some parts of the world, may not work elsewhere. Case in point, Australia. China has been pushing its influence in Australia for awhile, resulting in the occasional scandal and insult. Their latest play seems a bit much; Fraying relations between Australia and China have sparked a more than 25 per cent drop in coking coal prices even as iron ore — the other ingredient needed to make steel — has soared to six-year highs. China last month placed what has been seen as an unofficial ban on imports of coal from Australia, following a sharp deterioration in diplomatic relations after Canberra called for an inquiry into the origins of the Covid-19 pandemic. On Friday, Beijing followed up with tariffs on Australian wine. In a sign of China’s influence over commodity prices, since the coal ban came into effect the price of premium Australia low-volatility coking coal — the current industry benchmark — has dropped from $138.50 a tonne to $101.25. Julien Hall, Asia metals pricing director at S&P Global Platts, said October was a “big tipping point” for the market as its recovery from the demand hit caused by the pandemic was put on hold by Beijing’s action. “The need to find other destinations [for Australian cargoes] led to a rapid fall in the price,” said Mr Hall. To top things off, this happened over the weekend; A Chinese Foreign Ministry spokesperson has hit back at the Australian government's demands for an apology over a doctored photo posted by a Communist Party official. The photo, blasted as "repugnant" by Prime Minister Scott Morrison, has been altered to depict an Australian soldier holding a knife to the throat of a child atop the Australian and Afghanistan flags. China's Foreign Ministry spokesperson Zhao Lijian today tweeted the faked image, sparking Mr Morrison's swift rebuke demanding an apology from China and for the image to be taken down. ... "The Australian side is reacting so strongly to my colleague's Twitter," Ms Hua said, the Sydney Morning Herald reports. "Does that mean that they think the coldblooded murder of Afghans is justified? The Australian government should feel ashamed of this; they owe an explanation to the world and they should solemnly pledge such crimes will not be repeated." The Brereton report was actioned by the Australian government after allegations of improper conducted by SAS troops. READ MORE: PM urges restraint over alleged war crimes exhibits at War Memorial Mr Morrison earlier today said Australia was demanding an apology and immediate removal of the image, which he labelled as "false and a terrible slur". "There are undoubtedly tensions that exist between China and Australia. But that's not how you deal with it," he said. "It is deeply offensive to every Australian who has served in uniform. "It is outrageous and can't be justified on any basis whatsoever." The Australians don't need me to tell them this - but make no mistake, the Chinese don't just want to force Australia to submit to their will - they want to humiliate Australia. The Chinese do not see them as equals - and in the long run they have plans for Australia that they need to set the proper conditions for. I'm not sure what we can do from here but be an even better friend and ally to Australia. Buy some Australian wine ... but more importantly, let both Australia and the Communist Chinese government know that we see exactly what they are trying to do, and call them on it. The international community needs to get used to this. This is what dealing with a powerful China will look and feel like. Best thing nations can do is not to rely on Chinese money all that much. Their money comes with strings. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=9U-n93MkFPA:P9jjG9GX1XM:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=9U-n93MkFPA:P9jjG9GX1XM:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=9U-n93MkFPA:P9jjG9GX1XM:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=9U-n93MkFPA:P9jjG9GX1XM:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/9U-n93MkFPAView the full article
-
DID - USAF Selects Next C-130J Locations | Final Test Firing Of Sea Venom/ANL missile Completed | Japan Launches Data Relay Satellite
Americas Lockheed Martin won a $14.1 million contract modification for AN/SLQ-32(V)6 design agent engineering services. The AN/SLQ-32 is a shipboard electronic warfare suite built by Raytheon and the Hughes Aircraft Company. It is currently the primary electronic warfare system in use by US Navy ships. AN/SLQ-32(V)6, the latest fielded variant of the AN/SLQ-32, incorporates receiver, antenna and combat system interface upgrades developed under the SEWIP Block 2 ACAT II program and adds the High Gain High Sensitivity adjunct sensor developed under the SEWIP Block 1B3 ACAT II program. Work will take place in Syracuse, New York, and is expected to be completed by November 2021. Three National Guard bases and a Navy Reserve base were selected to receive new C-130J Super Hercules cargo planes, the US Air Force announced. Louisville Air National Guard Base in Kentucky, McLaughlin ANGB in West Virginia and Naval Air Station Joint Reserve Base in Texas are set to start receiving eight new aircraft each in the coming year. Savannah ANGB in Georgia is also scheduled to receive C-130Js “if they become available in the future,” officials said in a press release. The Lockheed Martin-built planes are improvements over earlier C-130 variants they will replace, and offer reduced manpower requirements and operating and support costs, providing life-cycle cost savings, the Air Force said. The C-130J climbs faster and higher, flies farther at a higher cruise speed, and takes off and lands in a shorter distance than its predecessors. Middle East & Africa Acting Defense Secretary Christopher Miller made a surprise visit to Somalia Friday in the last of a four-country tour as President Donald Trump contemplates a draw down of counterterrorism troops there. Miller, who replaced Mark Esper on November 9, was making his first trip abroad in the position. The US military has about 700 troops in the country. Miller was visiting neighboring Djibouti as part of his scheduled trip when he took a flight to Somalia without traveling press. Officials said he is believed to be the first defense secretary to visit the country. Europe The final test firing trial of the Sea Venom/ANL missile was completed November 17 at the French Armament General Directorate (DGA) test site at Ile du Levant. The final qualification trial tested the missile’s advanced target discrimination within a complex and cluttered naval scenario, MBDA says. Soon to start equipping the Royal Navy’s AW159 Wildcat and Marine nationale’s H160M Guépard shipborne helicopters, the Sea Venom/ANL anti-ship missile is a co-operation project developed under the Lancaster House treaty between France and the United Kingdom. Asia-Pacific The governments of India and Sri Lanka are in talks for the donation of one Do 228 maritime patrol aircraft. Another aircraft will be sold to Sri Lanka as well. It has been discussed that the cost of one aircraft is said to be around $8 million. During the discussion, it has been decided to deploy an aircraft currently used by India with Indian pilots and coast guard officers immediately for surveillance operations and to provide the necessary training to the Sri Lankan counterparts. Thereafter, it is planned to deliver the first aircraft of this type manufactured by Hindustan Aeronautics Limited to Sri Lanka free of charge. Japan will attempt to launch a military communications satellite today that will relay data collected by its optical and radar-imaging reconnaissance satellites. This new satellite replaces the Data Relay Test Satellite (DRTS) that was decommissioned in 2017. It has a Laser Utilizing Communication System (LUCAS) that allows a network throughput of 1.8 gbps. The Optical Data Relay Satellite payload aboard this mission will be used to relay data collected by Japan’s fleet of Information Gathering Satellites (IGS) – including both optical and radar-imaging reconnaissance spacecraft – back to Earth for analysis. Today’s Video Watch: This Is Why the C-130 Is Such a Badass Plane View the full article
-
DID - USN Ship Protection: From “Slick 32s” to SEWIP
“Slick 32” (click to view full) The US Navy’s AN/SLQ-32 ECM (Electronic Countermeasures) system uses radar warning receivers, and in some cases active jamming, as the part of ships’ self-defense system. The “Slick 32s” provides warning of incoming attacks, and is integrated with the ships’ defenses to trigger Rapid Blooming Offboard Chaff (RBOC) and other decoys, which can fire either semi-automatically or on manual direction from a ship’s ECM operators. The “Slick 32” variants are based on modular building blocks, and each variant is suited to a different type of ship. Most of these systems were designed in the 1970s, however, and are based on 1960s-era technology. Unfortunately, the SLQ-32 was notable for its failure when the USS Stark was hit by Iraqi Exocet missiles in 1987. The systems have been modernized somewhat, but in an era that features more and more supersonic ship-killing missiles, with better radars and advanced electronics, SLQ-32’s fundamental electronic hardware architecture is inadequate. Hence the Surface Electronic Warfare Improvement Program (SEWIP). SEWIP Blocks “Slick 32” screen on USS Iowa, 1984 (click to view full) Overall, SEWIP is a $5.297 billion program, with spending ramping up sharply as of FY 2014. Though SLQ-32 is a Raytheon system, SEWIP began in 2003 with General Dynamics as the lead integrator. Blocks 1A, 1B2, and 1B3 all use the improved control and display (ICAD) console, which is a GD-AIS upgrade based on the commonly used Lockheed Martin AN/ULQ-70 computing and display console. SEWIP Block 1A adds the improved displays and a modern interface noted above, along with some hardware switchouts that add modern commercial-off-the-shelf hardware to drive the new display, and handle some signal processing (Electronic Surveillance Enhancements, or ESE). SWEIP Block 1B1 made more changes to replace obsolete SLQ-32 electronics, some of which aren’t even manufactured any more, and improved the system’s ability to locate the source of incoming radar signals. SEWIP Block 1B1 provides a AN/SSX-1 stand-alone specific emitter identification (SEI) subsystem to ships with the active AN/SLQ-32(V) variant. For small ships, the Small Ship Electronic Support Measures System (SSESM) provides Specific Emitter Identification (SEI) capability in a stand-alone configuration. SEWIP Block 1B2. For those ships which already have 1B1, this adds federated Specific Emitter Identification, and fully integrates SEI with Block 1A’s ICAD/Q-70 console. SEWIP Block 1B3 adds additional display upgrades, and a High Gain High Sensitivity (HGHS) subsystem, to help ships deal with modern missiles that announce their presence less boldly and offer less warning time. It received its Milestone C/Low-Rate Initial Production (LRIP) go ahead in summer 2012, and is expected to hit Full Rate Production (FRP) in spring 2014. SEWIP-2 concept (click to view full) Those low-cost, low-risk inserts deal with some of the SLQ-32 system’s issues, but not all. Over the longer term, the system’s fundamental receiver/emitter electronics need to be updated to modern technologies. Its software needs improvements that let ships take better advantage of the new hardware’s capabilities, make it easier to share SEWIP information with their own ship’s combat system, and allow sharing with other ships. SEWIP Block 2 is described as an upgrade, but it’s more like a major home renovation. It replaces the old SLQ-32 receivers and antennas with modern digital technologies, adding new capability, flexibility, and signal processing muscle. Block 2 also modifies the software, creating a single, unified interface to the combat system in place of multiple interfaces to individual components of the combat system. This makes future upgrades simpler, and may also have the effect of improving performance. Lockheed Martin’s ICEWS materials touted under 200ms end-to-end latency, a low false alarm rate, and good high-pulse throughput for cluttered environments. The Block 2 contract was awarded to a Lockheed Martin/ ITT partnership at the very end of FY 2009. June 2010 was the next key milestone, and a July 2010 contract continues development. The system passed its Critical Design Review in early 2011, and the partnership was scheduled to deliver 2 prototypes in 2012. This ACAT II program achieved Milestone C approval in January 2013, with approval to begin Low Rate Initial Production, and the contract was restructured to begin LRIP in March 2013. Contracts for production and installation are now underway. SEWIP Block 3 and beyond could look very different. Block 3 looks to add improvements to SEWIP’s Electronic Attack (EA, or jamming) capability. The goal is a common EA capability to all surface combatants (CVN, CG, DDG, LHA) outfitted with the active V3/v4 variants of the AN/SLQ-32, mainly the (V)3 and (V)4, as well as “select new-construction platforms.” It builds on ESM improvements in Blocks 1 and 2, but isn’t expected to hit its Milestone C Low-Rate Initial Production approval until early 2017. Initial Operational Test & Evaluation isn’t scheduled until summer 2018. A US Navy program called “Integrated Topside” aims to take all of the little bolt-ons and antennas used for communications, basic radar functions, and electronic warfare, and make them all part of 1 unified architecture. That could help improve ships’ anti-radar profiles, increase their communications bandwidth, and resolve electromagnetic interference and compatibility issues between different devices. New-generation AESA radars have already demonstrated communications and electronic jamming potential, and current research is focused on that technology as the way forward. SEWIP Block 3T will provide “an initial interim capability of a focused application of the Naval Research Laboratory Transportable EW Module (TEWM) to meet an urgent operational needs statement.” Contracts and Key Events FY 2015 – 2020 LM awarded $153.9M; NG awarded $91.7M November 30/20: Engineering Services Lockheed Martin won a $14.1 million contract modification for AN/SLQ-32(V)6 design agent engineering services. The AN/SLQ-32 is a shipboard electronic warfare suite built by Raytheon and the Hughes Aircraft Company. It is currently the primary electronic warfare system in use by US Navy ships. AN/SLQ-32(V)6, the latest fielded variant of the AN/SLQ-32, incorporates receiver, antenna and combat system interface upgrades developed under the SEWIP Block 2 ACAT II program and adds the High Gain High Sensitivity adjunct sensor developed under the SEWIP Block 1B3 ACAT II program. Work will take place in Syracuse, New York, and is expected to be completed by November 2021. January 30/20: Full Rate Production Lockheed Martin won a $185 million deal for follow-on full rate production of Surface Electronic Warfare Improvement Program AN/SLQ-32(V)6, AN/SLQ-32A(V)6 and AN/SLQ-32C(V)6 systems. The Surface Electronic Warfare Improvement Program or SEWIP is an evolutionary acquisition and incremental development program to upgrade the existing AN/SLQ-32(V) electronic warfare system. SEWIP provides enhanced shipboard electronic warfare for early detection, analysis, threat warning and protection from anti-ship missiles. AN/SLQ-32(V)6 is the latest fielded variant of the AN/SLQ-32. It incorporates receiver, antenna and combat system interface upgrades developed under the SEWIP Block 2 ACAT II program and adds the High Gain High Sensitivity adjunct sensor developed under the SEWIP Block 1B3 ACAT II program. Work will take place in New York and Pennsylvania. Expected completion will be by April 2022. November 11/19: Engineering Services The US Navy awarded Lockheed Martin a $13.9 million contract modification, which is for engineering services and travel for the AN/SLQ-32(V)6 upgrades design agent contract under the Surface Electronic Warfare Improvement Program or SEWIP. SEWIP is an evolutionary acquisition and incremental development program. AN/SLQ-32(V)6 upgrades the existing AN/SLQ-32(V) electronic warfare system by incorporating SEWIP Block 1B3 and SEWIP Block 2 systems. The AN/SLQ-32 is an electronic warfare system that provides powerful countermeasures protection for small and mid-size surface ships. The SLQ-32 systems feature a lens-fed multi-beam array that generates very high jamming power at continuous wave so that an almost unlimited variety of jamming techniques can be used. Work will take place in Syracuse, New York and estimated completion will be by September 2020. February 11/19: SEWIP full-rate production The Naval Sea Systems Command contracted General Dynamics Mission Systems with a $14.5 million modification to exercise options for Surface Electronic Warfare Improvement (SEWIP) Block 1B3 full-rate production. SEWIP is an evolutionary acquisition and incremental development program to upgrade the AN/SLQ-32(V) electronic warfare system. The AN/SLQ-32 Electronic Warfare Suite or „slick-32“ is the primary electronic warfare system utilized by the US Navy. The system achieves EW objectives by providing full threat band frequency coverage, instantaneous azimuth coverage, 100 percent probability of intercept and simultaneous response to multiple threats. It can detect aircraft search and target radars well before they detect the ship. SEWIP provides enhanced shipboard electronic warfare for early detection, analysis, threat warning, and protection from anti-ship missiles. SEWIP Block 1 focuses on obsolescence mitigation and special signal intercept. Work will take place in Pittsfield, Massachusetts and is expected to be finished by May next year. December 24/18: Block 2 advancing The Naval Sea Systems Command is modifying a contract with Lockheed Martin. Priced at $184 million, the modification exercises a contract option that sees for full-rate production a SEWIP subsystem. The Surface Electronic Warfare Improvement Program (SEWIP) is and electronic countermeasure system that uses radar warning receivers, and in some cases active jamming, contributing to a ships’ self-defense system. SEWIP Block 2 is the most recent version of the system, which aims to expand upon the receiver and antenna groups necessary to support threat detection and improved system integration. Work will be performed at multiple locations – including, but not limited to – Liverpool, New York; Brockton, Massachusetts and Lansdale, Pennsylvania. Performance is scheduled to run through June 2021. May 7/18: More upgrades incoming The US Navy has awarded General Dynamics Mission Systems, Fairfax, Virginia a contract for services in support of the Navy’s Surface Electronic Warfare Program (SEWIP) at a cost of $9.7 million. The program is an evolutionary acquisition and incremental development program to upgrade the existing AN/SLQ-32(V) electronic warfare system to Block 1B3. This system provides enhanced shipboard electronic warfare for early detection, analysis, threat warning, and protection from anti-ship missiles. The US Navy’s AN/SLQ-32 system uses radar warning receivers, and in some cases active jamming, as the part of ships’ self-defense system. The ’Slick 32s’ provides warning of incoming attacks and is integrated with the ships’ defenses to trigger Rapid Blooming Offboard Chaff (RBOC) and other decoys, which can fire either semi-automatically or on manual direction from a ship’s ECM operators. The “Slick 32” variants are based on modular building blocks, and each variant is suited to a different type of ship. Work will be performed at various locations, including Pittsfield, Massachusetts; Thousand Oaks, California and Fairfax, Virginia and is scheduled for completion by May 2020. December 13/17: Report-Wasting of Funds A report released Monday by the Department of Defense (DoD) Inspector General into the US Navy’s Surface Electronic Warfare Improvement Program has found that the service did not effectively develop and manage electronic warfare capabilities for upgrades to the AN/SLQ-32 Electronic Warfare Suite. The mismanagement resulted in the waste of almost $2 million and lengthened the acquisition process by about two years with inadequate results. Managed by the Program Executive Office Integrated Warfare Systems under Naval Sea Systems Command, the Inspector General found that Navy officials waived a step of the development process—details of which were redacted from the report—in order to stay on schedule instead of correcting problems before entering initial operational test and evaluation. This skipping resulted in additional costs of $1.8 million to conduct a second phase of initial operational test and evaluation on Block 2, delaying the acquisition schedule by almost two years. Program Executive Office Integrated Warfare Systems said it will continue to work with the commander for operational test and evaluation force to close the remaining deficiencies, according to the declassified report. March 20/17: Lockheed Martin has won a $98 million US Navy contract to produce and deliver the service’s Surface Electronic Warfare Improvement Program systems. The modification covers work for the program’s Block 2 subsystems, which aim to expand upon the receiver and antenna groups necessary to support threat detection and improved system integration. Work will be completed by July 2019. October 7/15: Northrop Grumman has been handed a $91.7 million contract modification for the SEWIP Block 3’s engineering and manufacturing development phase. The Surface Electronic Warfare Improvement Program (SEWIP)’s Block 3 increment is intended to provide a scalable electronic warfare and electronic attack capability, building on out-of-production AN/SLQ-32(V) electronic warfare systems. Block 2 is already in low rate initial production, following a $147.5 million contract to Lockheed Martin in September 2014. July 13/15: Lockheed Martin has been awarded a $153.9 million contract modification to supply components for the out-of-production AN/SLQ-32(V) ship electronic warfare system as part of the Surface Electronic Warfare Improvement Program (SEWIP) Block 2 acquisition program. This follows a $147.5 million contract in September 2014 for SEWIP Block 2 low rate initial production and fielding, also awarded to Lockheed Martin. SEWIP Block 2 replaces the old SLQ-32 receivers and antennas with modern digital technologies and modifies the software, creating a single, unified interface to the combat system in place of multiple interfaces to individual components of the combat system. FY 2013 – 2014 SEWIP 2 restructured to fixed-price components; LRIP orders for Block 1B3 and Block 2; EW simulator shortage could affect Block 2 testing. Sept 11/14: Block 2. Lockheed Martin Mission Systems and Training in Liverpool, NY receives a maximum $147.5 million firm-fixed-price, cost-plus-fixed fee, and cost-type-letter contract for SEWIP Block 2 low rate initial production and fielding of 14 upgrade sets. This would be the LRIP-2 order, with $76.75 million committed immediately from FY 2013 Navy shipbuilding and FY 2014 Navy RDT&E budgets. Options could increase LRIP-2 to $158.8 million. LRIP-1 involved 10 upgrade sets, and in July 2014, the Navy installed SEWIP Block 2 system on USS Bainbridge [DDG-96] for operational testing. Work will be performed in Syracuse, NY (69%); Lansdale, PA (19%); and Chelmsford, MA (12%), and is expected to be complete by September 2017. This contract was not competitively procured in accordance with 10 U.S.C. 2304(c)(1) – only one responsible source and no other suppliers or services will satisfy agency requirements. US Navy NAVSEA at Washington Navy Yard, Washington, DC manages the contract (N00024 14-C-5340). See also Lockheed Martin, “Lockheed Martin Receives Additional Electronic Warfare Contract To Protect The Navy’s Fleet”. Block 2: LRIP-2 order Aug 18/14: Block 1B3. General Dynamics AIS in Fairfax, VA receives a not-to-exceed $19.5 million firm-fixed-price contract for 15 SEWIP Block 1B3 sets; FY 2014 orders are still Low-Rate Initial Production (LRIP) units, instead of hitting Full Rate Production as expected. $8.1 million is committed immediately, using US Navy FY 2011, 2013, and 2014 budget lines. Work will be performed in Pittsfield, MA (50%): Fairfax, VA (18%); Thousand Oaks, CA (17%); and San Diego, CA (15%), and is expected to be complete by September 2016. This contract was not competitively procured pursuant to 10 U.S.C. 2304(c)(1) and FAR 6.302-1 by US Naval Sea Systems Command in Washington, DC (N00024-14-C-5341). Block 1B3, FY 2014 Jan 14/14: Block 2. Lockheed Martin has been doing land based testing of SEWIP Block 2 since the January 2014 Milestone C decision, and they have now completed shore-based tests of full system operation in multiple scenarios. Work on the SEWIP program is performed at the company’s Syracuse, N.Y. facility, which houses a new electronic warfare system test facility. Low-rate production is underway, and the program’s next steps involve ship installation, via upgrades of existing AN/SLQ-32(V)2 systems. Sources: Lockheed Martin, “Lockheed Martin Completes Critical Milestone To Upgrade The Navy’s Electronic Warfare Defenses”. May 31/13: Block 1B3. General Dynamics, Advanced Information Systems in Fairfax, VA receives a $15 million contract modification to previously awarded contract for 9 high-gain, high-sensitivity antenna systems in support of SEWIP Block 1B3 low-rate initial production requirements. The new antennas give SEWIP the ability to detect and identify additional enemies. Work will be performed in Fairfax, VA, and is expected to be complete by March 2015. All funds are committed immediately, using FY 2012 and 2013 funds. The Naval Sea Systems Command is the contracting activity (N00024-09-C-5396). Block 1B3 into production May 29/13: Block 2, LRIP-1. Lockheed Martin in Liverpool, NY receives a $39.1 million firm-fixed-price option for SEWIP Block 2 System low-rate initial production units. Lockheed Martin had originally announced it as a $57 million contract (vid. March 26/13), but if this is the same production year, the LRIP Lot 1 total appears to be $70 million instead. Work will be performed in Syracuse, NY (68%), and in Lansdale, PA (32%), and is expected to be complete by September 2014. All funding is committed immediately by US Naval Sea Systems Command in Washington, DC (N00024-09-C-5300). April 29/13: Block 1B3. General Dynamics Advanced Information Systems announces a $15 million contract modification to continue SEWIP Block 1B3 development and production. Since 2003, GD-AIS has partnered with the Navy on the continued evolution of SEWIP through Blocks 1A, 1B1, 1B2 and now 1B3 as the systems integrator. For the 1B3 system, Lockheed Martin MST is supporting GD-AIS as a major subcontractor. Sources: GD-AIS, “General Dynamics Awarded $15 Million to Continue Work on U.S. Navy’s Surface Electronic Warfare Improvement Program”. April 10/13: FY 2014 Budget. The President releases a proposed budget at last, the latest in modern memory. The Senate and House were already working on budgets in his absence, but the Pentagon’s submission is actually important to proceedings going forward. See ongoing DID coverage. This budget is an important inflection point for SEWIP, as critical production approvals are now in place. The procurement budget request jumps from $92.3 million in FY 2013 to $203.4 million, and is set to increase further in the coming years, reaching $372.1 million in FY 2018. The overall procurement program is $5.297 billion. March 26/13: Block 2, LRIP-1. Lockheed Martin Corp. in Liverpool, NY receives a $30.6 million contract modification, exercising firm-fixed-price options for low-rate initial production SEWIP Block 2 units. Work will be performed in Syracuse, NY (68%), and Lansdale, PA (32%), and is expected to be complete by September 2014. All funding is committed immediately, and will be managed by US Naval Sea Systems Command in Washington, DC (N00024-09-C-5300). See also Lockheed Martin, who values it at $57 million, but subsequent orders (q.v. May 29/13) appear to sum to $70 million instead. March 22/13: Lockheed Martin Corp. in Liverpool, NY received a $27.4 million modification and restructuring of the SEWIP Block 2 contract. The restructuring converts fixed-price with incentive-options for Block 2’s System long-lead time pre-production material to firm-fixed-price options. All funds are committed immediately. Work will be performed in Syracuse, NY, and is expected to be complete by March 2014. US Naval Sea Systems Command in Washington, DC manages the contract (N00024-09-C-5300). Block 2 contract restructured, 1st LRIP order Jan 17/13: DOT&E Testing Report. The Pentagon releases the FY 2012 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). SEWIP Block 2 is included only in passing: “At present, there exists only one each of the Kappa, Uniform, and Gamma EW simulators. These simulators are flown on Lear Jets against shipboard EW systems. SEWIP Block 2 is the latest EW system under development. Two of these simulators are needed (one for each Lear Jet) so that threat-realistic stream raid profiles can be used to adequately test the SEWIP Block 2 in FY14. An estimated development/procurement cost is $5 Million.” FY 2011 – 2012 Block 1B1 and 1B2 production; Block 2 full SDD contract and CDR; Budget documents provide some updates; Vendors thinking about Block 3. Aug 1/12: Block 3. Lockheed Martin and Raytheon demonstrate their proposed SEWIP 3 solution during the multinational Rim of the Pacific (RIMPAC) maritime exercise near Hawaii. It went to sea aboard Lockheed Martin’s mobile Integrated Common Electronic Warfare System (ICEWS) test bed. Lockheed Martin. Feb 13/12: The USA’s FY 2013 budget documents include documents that don’t break SEWIP spending out specifically, but do discuss some past SEWIP activities and future plans, as part of a larger suite of research: “[2011] Continued the Enhanced Surface Electronic Warfare Improvement Program (SEWIP) Transmitter FNC effort by starting system architecture design and Low Voltage Gallium Arsenide (GaAs) High Power Amplifier (HPA) Monolithic Microwave Integrated Circuit (MMIC) purchases. This effort develops affordable and reliable solid state transmitter technologies to engage anti-ship cruise and ballistic missile RF seekers. [2013] Complete Enhanced SEWIP Transmitter – Conduct a final test of the enhanced Surface Electronic Warfare Improvement Program (SEWIP) transmit array in the anechoic chamber…. Complete Enhanced Surface Electronic Warfare Improvement Program (SEWIP) Transmitter – Demonstrate full enhanced SEWIP array performance in a relevant field environment.” Jan 31/12: Block 3. Lockheed Martin (SEWIP Block 2) and Raytheon (original SLQ-32) announce that they’re teaming to compete for SEWIP Block 3, whose details aren’t clear yet. Lockheed Martin | Model of their proposed solution [JPG graphic, 2.3 MB]. July 18/11: Block 1. General Dynamics Advance Information Systems (GD-AIS), Inc.in Fairfax, VA receives cost-plus-fixed fee job orders estimated at $9.9 million to continue systems engineering and system software/firmware support for SEWIP Blocks 1A, 1B1, 1B2, and 1B3. Work will be performed in Fairfax, VA, and is expected to be complete by January 2015. The basic ordering agreement was not competitively procured because the US Naval Surface Warfare Center, Crane Division in Crane, IN determined there was only one responsible source, and no other suppliers will satisfy the agency requirements (N00164-11-G-PM04). March 16/11: FY 2011 Block 1. General Dynamics Advanced Information Systems in Fairfax, VA receives a $7 million contract modification, exercising firm-fixed-price options for FY 2011 SEWIP Block 1B1 and 1B2 full-rate production and spares. Work will be performed in Fairfax, VA, and is expected to be complete by July 2012. US Naval Sea Systems Command in Washington Navy Yard, DC manages the contract (N00024-09-C-5396). March 15/11: Block 2. Lockheed Martin announces a successful critical design review (CDR) for SEWIP Block 2. Lockheed Martin’s SEWIP program director, Joe Ottaviano, notes that the CDR’s success serves as the contractual go-ahead to produce 2 system prototypes by 2012. Block 2 CDR FY 2010 – 2011 Block 1B3 development; Block 2 development contract & PDR. Aug 11/10: Testing. Raytheon Integrated Defense Systems in Tewksbury, MaA receives a $36.1 million contract modification (N00024-05-C-5346) for mission systems equipment (MSE) that will be used on the US Navy’s Self Defense Test Ship, in support of the Anti-Air Warfare Self Defense Enterprise Test and Evaluation Master Plan. The equipment will support the DDG 1000 and CVN 78 classes of ships, which use the new Dual Band Radar. Raytheon will also conduct follow-on operation test and evaluation efforts for the Evolved Sea Sparrow Missile (RIM-162 ESSM) and Surface Electronic Warfare Improvement Program (SEWIP). July 28/10: Block 2. Lockheed Martin announces that the U.S. Navy has approved their SEWIP Block 2 upgrade design, in a Preliminary Design Review. This is a significant milestone under the initial design contract (vid. Sept 30/09 entry). Block 2 PDR July 8/10: Lockheed Martin Corp. in Liverpool, NY received a $51.1 million modification to a previously awarded contract (N00024-09-C-5300), exercising the cost-plus-incentive-fee option for SEWIP Block 2 system development and demonstration. Work will be performed in Syracuse, NY (74.5%); Lansdale, PA (13.7%); and Morgan Hill, CA (11.8%). Work is expected to be complete by January 2013. US Naval Sea Systems Command in Washington Navy Yard, DC manages the contract (N00024-09-C-5300). Block 2 SDD March 25/10: Block 1. General Dynamics Advanced Information Systems, Inc. in Fairfax, VA received a $12.4 million modification to a previously awarded contract (N00024-09-C-5396), exercising a cost-plus-fixed-fee option for FY 2010 SEWIP Block 1B engineering services. It also exercises firm-fixed-price options for FY 2010 SEWIP Block 1B1 production units and spares, and for Block 1B2 production units, modification kits, and spares. Work will be performed in Fairfax, VA (65%), and Annapolis Junction, MD (35%), and is expected to be complete by December 2012. The Naval Sea Systems Command in Washington, DC manages this contract. Sept 30/09: Block 2. Lockheed Martin Corp. in Liverpool, NY receives a $9.9 million cost plus incentive fee contract for the Preliminary Design of the Surface Electronic Warfare Improvement Program (SEWIP) Block 2. Lockheed Martin’s Nov 2/09 release says that their team will provide a modular solution based on the Integrated Common Electronics Warfare System that was demonstrated at sea in summer 2008, using commercial-off-the-shelf (COTS) electronics. The company confirmed that it remains partnered with ITT, and their team will produce a preliminary design by June 2010. If development is successful, there will be no re-compete, and production options could total $166.9 million. Work will be performed in Liverpool, N.Y. (76%); Lansdale, PA (13%), and Morgan Hill, CA (11%). This contract was competitively procured under full and open competition, and 3 offers were received (Lockheed/ITT, GD/BAE, and Northrop Grumman) by the Naval Sea Systems Command in Washington Navy Yard, D.C. (N00024-09-C-5300). See also Lockheed Martin. Team Lockheed wins SEWIP Block 2 development March 31/09: Block 1. General Dynamics Advanced Information Systems, Inc. in Fairfax, VA received a $40 million not-to-exceed contract for Surface Electronic Warfare Improvement Program (SEWIP) Block 1B research and development, and production requirements. This contract includes the continued design and development of SEWIP Block 1B3, with a specialized HGHS (High Gain High Sensitivity) subsystem, to enhance the SLQ-32’s detection capabilities against emerging threats, and full rate production of SEWIP Block 1B2 units. GD-AIS has been the SEWIP program’s lead integrator since 2003. Work will be performed in Fairfax, VA (60%) and Syracuse, NY (40%), and is expected to be complete by July 2011. This contract was not competitively procured by the Naval Sea Systems Command in Washington, DC (N00024-09-C-5396). Dec 3/08: Block 2 competition. Defense Daily offers a roundup of the SEWIP Block 2 program competition between GD/BAE, Lockheed/ITT, and Northrop Grumman, who’s thinking about adapting the system it’s developing for the Navy’s DDG-1000 Zumwalt Class destroyers. Read: “Industry Readying For Navy’s Release of SEWIP Block 2 RFP.” Dec 1/08: Block 1. Lockheed Martin Maritime Systems and Sensors wins a contract from General Dynamics Advanced Information Systems, Inc., to develop and produce SEWIP Block 1B3’s High Gain, High Sensitivity (HGHS) sub-system. The contract includes the topside antenna systems, the below decks signal processor, and the processing algorithms that accompany the processor. It is valued at up to $36 million including options, and was awarded after a competitive bidding process. GD-AIS. Dec 1/08: Block 2 competition. Lockheed Martin and ITT announce that they’ve teamed up to compete for the SEWIP Block 2 contract. Lockheed Martin. October 23/08: Block 2 competition. General Dynamics and BAE Systems announce that they’ve teamed up to compete for the SEWIP Block 2 contract. Their solution is called “Sea Lightning.” BAE Systems. Additional Readings DID – InTop: Sorting out Ships’ Topside Mess. Northrop Grumman has explicitly said that these efforts will lay the hardware and controller foundations for SEWIP 3. US Navy – Surface Electronic Warfare Improvement Program (SEWIP). General Dynamics AIS – Surface Electronic Warfare Improvement Program (SEWIP). Lockheed Martin – Electronic Warfare. Naval EW page, includes SEWIP. Lockheed Martin – Integrated Common Electronic Warfare System (ICEWS) Brochure [PDF]. ICEWS forms the basis for SEWIP Block 2. Raytheon – AN/SLQ-32 (V). Global Security – AN/SLQ-32 Electronic Warfare (EW) system. Harold Lee Wise – Inside the Danger Zone: The U.S. Military in the Persian Gulf, 1987-1988. Includes what is very probably the best public account of the attack on the USS Stark. View the full article
-
CDR Salamander - Fullbore Friday
One of the highest forms of the military arts is to use your enemy's habits against them. Not forcing them, but simply opening a door for them they are simply too willing to enter out of habit. Anyone who has lived in Europe - especially around or with Germans, French, Dutch, and Scandinavians, will enjoy this FbF. This story is short, but it is important in a couple of ways. First, the French military was never really given a chance in WWII. Beset with spotty leaderships and in some cases just bad luck, the incredible martial example of WWI just two decades earlier was as if it never happened. They had a few bright spots against the Germans ... and this was one. Secondly ... the naval battle in the Mediterranean was a near run thing. If the Royal Navy were not so good and the Italians such sub-performers, the entire course of the war would have changes. A big "what if" was the large and modern French Navy fleet in Toulon. Most here know it was scuttled ... but do you know the story about why the French Sailors had time to make it happen? Well, let's set the board. Remember here, this is the German Wehrmacht and Waffen SS of the early war. Man to man ... the modern world has probably not seen a more effective fighting force. ...the 7th Panzer division arrived in Toulon. There were tanks, armored cars, armored personnel carriers and an SS motorcycle battalion. This fast-moving force entered the town and rapidly took control of the major port defenses to the west and east of the harbor. They entered the headquarters of the fleet on land and arrested the French officers, but not before a warning was radioed to Admiral Laborde on the great flagship Strasbourg. Laborde was shocked at the rapid and unexpected attack, but he swiftly took command of the situation. The orders went out to the fleet. They were to prepare to scuttle their ships and to fire on any German troops who approached. Have you worked in a shipyard? This will make complete sense. It took the German soldiers longer than they had planned to reach the harbor. It was surrounded by a great maze of naval infrastructure, sheds and warehouses, barracks and administrative buildings, turrets, watchtowers and high walls and fences topped with barbed wire. When they finally found their way to the main gates they found them closed and manned by French soldiers. ...but here is the trick; The German officers demanded the gates be opened. The French officer in charge smiled. ‘Of course,’ he replied in German, ‘Do you have your access paperwork?’ Yes ... right out of a bad Hollywood WWII movie; "Your papers please." The German officer was perplexed, but his orders were to capture the port and the fleet without bloodshed, if possible, so he began to debate with the officer at the gate. The conversation went on for some time, and in the end, the German officer was obliged to produce documentation for the Frenchman, who nodded, smiled, thanked him, and then left him standing at the gate. The French soldiers began to banter and chat with the Germans. The officer returned with more questions and requests for further paperwork. He delayed the German officer for as long as he could, but eventually the man’s patience was at an end, and the French soldiers were obliged to open the gate. It was 5.25am when the German tanks finally rolled through the gates, by which time all was ready on board the doomed fleet. The order was given to scuttle the ships, and the French crews began to pour onto the harbor. Dull explosions reverberated through the air as the pale light of early dawn began to spread across the sky. The main force of the German tanks rumbled toward the flagship Strasbourg, which was already listing to one side in the water. Infantry dismounted from their motorcycles and ran toward the disembarking crews. Sporadic fighting broke out as thick greasy black smoke began to pour from the docked ships. Can we count this as a French victory? I think so ... but such a tragedy. If only the French Navy had made a run for it instead ... that would have been a story. Total cost: 3 battleships (scuttled) 7 cruisers (scuttled) 15 destroyers (scuttled) 3 destroyers (seized by Germany) 13 torpedo boats (scuttled) 6 sloops (scuttled) 12 submarines (scuttled) 4 submarines (seized by Germany) 9 patrol boats (scuttled) 19 auxiliary ships (scuttled) 1 school ship (scuttled) 28 tugs (scuttled) 4 cranes (scuttled) 39 small ships (seized by Germany) 12 killed 26 wounded http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ahzoA4FOxfg:zNRuoXsHD7E:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ahzoA4FOxfg:zNRuoXsHD7E:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ahzoA4FOxfg:zNRuoXsHD7E:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=ahzoA4FOxfg:zNRuoXsHD7E:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/ahzoA4FOxfgView the full article
-
DID - Northrop Grumman Wins $4.8B Global Hawk Deal | UK to have Carrier Strike Group permanently available | South Korea Starts Mass Production Of KTSSM
Americas Northrop Grumman Systems won a $4.8 billion deal for Global Hawk development, modernization, retrofit and sustainment activities for all Air Force Global Hawk variants. The contract provides for management, including program, business and technical areas; engineering efforts, including configuration management, data management, reliability, availability and maintainability, and related areas of concern such as technical refresh, diminishing manufacturing sources, etc.; studies and analyses; design, development, integration, test and evaluation; contract/production line closeout/shutdown; training; sparing; overseas contingency operations support; fielding; cyber security/information assurance; interoperability support; facilities modifications/renovation; integrated logistics support; requirements management specification management; and quality assurance. The USAF has 31 Block 20, 30, and 40 Global Hawk HALE UAVs in its inventory. The RQ-4 Global Hawk is a high-altitude, long-endurance unmanned aircraft system with an integrated sensor suite that provides intelligence, surveillance and reconnaissance, or ISR, capability worldwide. Global Hawk’s mission is to provide a broad spectrum of ISR collection capability to support joint combatant forces in worldwide peacetime, contingency and wartime operations. Work will take place in San Diego, California. Estimated completion date is September 30, 2030. Perspecta Engineering won a $9.7 million deal, which provides engineering services in support of test and evaluation and systems engineering activities related to Aegis Ballistic Missile Defense on behalf of the Missile Defense Agency. The Aegis Ballistic Missile Defense system is a US Department of Defense Missile Defense Agency program. It is developed to provide missile defense against short to intermediate-range ballistic missiles. It is part of the US national missile defense strategy. Work will take place in Hawaii, California and Virgina. Estimated completion is November 2025. Middle East & Africa According to Stars and Stripes, Acting Defense Secretary Christopher Miller is serving Thanksgiving meals to troops in the Middle East this week during his first international trip as the Defense Department begins the transition to President-elect Joe Biden’s administration. With the official switch to a new administration less than two months away and only being on his new job for a couple of weeks, Miller was already part of a major decision last week to reduce the US forces in Iraq and Afghanistan. Europe Great Britain’s Prime Minister Boris Johnson stated that the UK will routinely deploy a ‘permanently available, ready to fight’ Carrier Strike Group. Having two aircraft carriers, HMS Queen Elizabeth and HMS Prince of Wales, allows for one to be available at short notice year round. The additional funding announced by the Prime Minister will also support the purchase of three new Fleet Solid Support ships and the development of a new multi-role research vessel. Asia-Pacific South Korea’s government approved the production of more than 200 Korean Tactical Surface to Surface Missiles (KTSSM). The Defense Acquisition Program Administration (DAPA) says the missile is designed to destroy long-range artillery pieces hidden in underground tunnels. During the defense project promotion committee presided over by Defense Minister Suh Wook, the government approved the plan to produce more than 200 units of the Korean Tactical Surface to Surface Missile (KTSSM) by 2025, according to the Defense Acquisition Program Administration (DAPA). The Russian Defense Ministry successfully carried out a check of its antiballistic missile (ABM) system. A recently-released video shows the interception in the skies above Kazakhstan’s Sary-Shagan testing ground. According to Lieutenant General Andrey Demin, commander of the 1st air and missile defense army of the Russian aerospace forces, the missile “reliably confirmed its characteristics” by successfully hitting the simulated target. The Defense Ministry described the interceptor as intended to defend against air and space attacks. Earlier this month, the US successfully tested the SMM 3 interceptor against a simulated ICBM. Following the test, Moscow accused Washington of providing “false information” about its capabilities. Today’s Video Watch: Most Advanced Of U.S Military Technology : RQ-4 Global Hawks. View the full article
-
CDR Salamander - Have a Happy Navy Thanksgiving
...and take a moment not just to think about all the Sailors at sea, but every single person on the Mess Decks who work hard to make it happen. I love those guys. Few ratings are as great a combat multiplier than those who can make the magic happen during the holidays at sea. From the dedicated Culinary Specialists to those just mess cranking for a spell. BZ. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=iAbzYYKRaqY:yK7LvUw5kb0:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=iAbzYYKRaqY:yK7LvUw5kb0:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=iAbzYYKRaqY:yK7LvUw5kb0:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=iAbzYYKRaqY:yK7LvUw5kb0:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/iAbzYYKRaqYView the full article
-
DID - BAE Systems Wins Deal For Work On USS Wasp | Switzerland To Vote On Banning Funding Of Weapons | Bell Boeing To Modify Japan’s V-22
Americas The US Naval Air Warfare Center Aircraft Division (NAWCAD) has down selected L3Harris Technologies and Martin UAV for the phase two demonstration of the MI2 technology demonstration. The program’s objective is to identify unmanned air vehicles capable of operating in austere deployed environments without ancillary support systems. Such drones must not require dedicated launch or recovery equipment. Phase 2 demonstrations will take place at Yuma Proving Ground from November 30 to December 18. BAE Systems won a $197.5 million deal for the execution of the USS Wasp (LHD 1) fiscal 2021 Chief of Naval Operations scheduled docking selected restricted availability. This availability will include a combination of maintenance, modernization and repair of USS Wasp (LHD 1). Under the deal, BAE will drydock and perform maintenance and modernization work on the amphibious assault ship. The company’s last maintenance availability aboard the Wasp was from December 2016 to May 2017, when it added modifications to support Joint Strike Fighter operations. The contract includes options that, if exercised, would bring the total value of the deal to $237.7 million. This is the second time in four years the contractor has been hired to perform significant work on the ship. Work will take place in Norfolk Virginia. Estimated completion will be by May 2022. Middle East & Africa A Israeli Air Force flight instructor and his student died on the spot in a field north of Beersheba on November 24 when their G-120 single-engine light aircraft crashed. The two had taken off from the IAF flight school at Hatzerim Airbase in their two-seat Grob G-120 ‘Snunit’ (‘Swallow’) aircraft. An IAF helicopter from the 669 Search and Rescue Unit and Magen David Adom paramedics arrived at the scene of the crash, near the Kibbutz Mishmar Hanegev shortly after the accident and found two men unresponsive. They were later pronounced dead at the scene. Europe The budget committee of the Bundestag, the German parliament, has approved funding for the German Navy’s new NH90 Sea Tiger frigate helicopter and tank ammunition, as well as for the upgrade of DM2A4 torpedoes and the Bundeswehr’s IT wide area network (WAN). The German Ministry of Defense announced on its website that it had approved $3.2 billion in funding for 31 Sea Tigers, accessories, spare parts, and training. Starting in 2025, the helicopters will replace the German Navy’s Sea Lynx Mk88A frigate helicopters dating from the 1980s. The German MoD said the Sea Tiger would be the Bundeswehr’s only multirole helicopter, providing close protection for frigates, armed with torpedoes and missiles for anti-submarine and anti-surface warfare and conducting transport and search and rescue (SAR) missions. Swiss voters decide on Sunday whether to ban the funding of arms makers, the latest anti-military referendum in the neutral country that hasn’t fought an external war for 200 years. Swiss banks have given loans and hold shares worth nearly $11 billion in companies like Lockheed Martin, Northrop Grumman and General Dynamics, according to a study by independent researchers Profundo. The Swiss National Bank (SNB), UBS and Credit Suisse have the biggest exposure, the study said. “An enormous amount of money comes from Switzerland into an industry which profits from death and destruction,” said Julia Kueng, co-president of the Young Greens Party. Asia-Pacific Bell Boeing won a $12.8 million contract modification, which exercises options to modify the V-22 aircraft to the government of Japan’s unique configuration requirements. Additionally, the modification exercises options for the production and delivery of nine traffic collision avoidance systems, technical support representation and preservation of aircraft post completion of unique modifications. Last week, the Japanese Ground Self-Defense Forces kicked off flight operations with the first V-22 aircraft at Kisarazu Air Field, in the Chiba Prefecture, Japan, becoming the first military outside of the US to operate the Osprey. Japan selected and procured the type through foreign military sales (FMS) in 2015. The first two aircraft, JG-1701 and JG-1705, were transported from the US to Iwakuni via ship in May 2020. Today’s Video Watch: Episode 17. Mi-28N. Natural-born hunter View the full article