Skip to content
View in the app

A better way to browse. Learn more.

HarpGamer

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

HG S2 (Intel Bot)

Members
  • Joined

  • Last visited

    Never

Everything posted by HG S2 (Intel Bot)

  1. Any nation facing the Russians and are facing great odds usually look at two modern wars - the Polish-Soviet War of 1918-1921 and the Winter War of 1939 when plucky Finland held their own against the Soviet Union. Are there things Ukraine can learn from the Winter War? Over at USNIBlog, I think there is ... but it isn't tactical. Come on by and give it a read. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=B3j6hXig1P8:GX0Q93banng:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=B3j6hXig1P8:GX0Q93banng:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=B3j6hXig1P8:GX0Q93banng:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=B3j6hXig1P8:GX0Q93banng:F7zBnMyn0Lo View the full article
  2. Both the Freedom and Independence Class LCS have been - if we are to be polite - suboptimal in both utility and performance. We've documented that for the better part of 17-years and that record is all available at the LCS tag, so no need to rehash the whole sordid thing again. Well ... maybe just a little bit. Of course we should have adopted Plan Salamander as outlined over 11-yrs ago, but we have what we have. Smart people with hard jobs given enough Sailor sweat and seabags of cash have managed to get the Independence Class to contribute to the presence mission in WESTPAC, but as outlined in Megan Eckstein's latest at Defense News, Freedom remains the more troublesome of the sisters. There is a nice graphic in her article that I know the folks on The Front Porch would get a little schadenfreudesque pleasure in seeing because it reflects what many of us predicted when The Smartest People in the Room™ told us that the mission-module concept would be all that and a box of chocolates. Of course, as led by our friend Chapomatic and others, even before this blog started in 2004, people were warning that it was - like the phantasmagoric manning CONOPS - simply not realistic with the humans we have. In the end, these would be single mission ships. That was clear, but those warning were dismissed. And so, BEHOLD! The LCS program originally promised three mission packages, each interchangeable with any of the ship hulls and able to be swapped on demand. The Navy changed its operational model in 2016, assigning each ship to a division within the LCS squadrons based on a single warfare area, allowing the ship crews’ composition and training to be tailored to that warfare mission. LCSRON 2 set up a mine countermeasures division in October 2020; the division and its ships will finally get their mission package early this year. Hopefully one of the lessons Big Navy will take away from the Age of Transformationalism is that if your programs are moving forward through threats and silencing people to the point that everyone in the room agrees with you that - yes - we can ignore centuries of best practices because we are smarter and better than previous generations who did great things ... then perhaps you're not in a good place. Good to see that the Freedom Class is starting to get its footing and BZ to the good people in hard jobs for making it happen. It isn't what was promised or even what we need, but it is what we have; our legacy from the Age of Transformationalism we will simply have to make the best of. 0.5 >0.0. Yes, we were promised 4.0 and only received 0.5 ... but I will go to war with 0.5 over 0.0 any day. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=FBghfI3Em9g:FpcskTclKN8:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=FBghfI3Em9g:FpcskTclKN8:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=FBghfI3Em9g:FpcskTclKN8:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=FBghfI3Em9g:FpcskTclKN8:F7zBnMyn0Lo View the full article
  3. Americas United States Force in South Korea, is being outfitted with newest AH-64 Version 6 (V6) helicopter. “The upgraded aircraft integrates modern technology for both the aviator and maintainers in our battalion,” Capt. Timothy Luchs, D Company commander, said. “For our maintainers, the new systems onboard allows them better diagnostic capability and decreases the downtime of the aircraft. While for the aviator, AH-64E provides an overall increased situational awareness with an upgraded sensor suite, level 4 manned-unmanned teaming, and an upgraded drive system which is a vast improvement over the Delta variant of the model.” The US Air Force is passing targeting information from A-10 Thunderbolts to the F-35B jets in order for the latter to destroy them. Last week, the Idaho Air National Guard welcomed US Marines from Marine Fighter Attack Squadron (VMFA) 225, who fly the F-35B Lightning II, to Gowen Field. The squadron brought four of the fifth-generation fighters to train with A-10 Thunderbolt IIs from the 124th Fighter Wing’s 190th Fighter Squadron. Middle East & Africa Turkey’s Naval Forces Command will receive the country’s first domestically developed intelligence collection ship A-591 Ufuk on January 14. The delivery ceremony to be held in Istanbul Shipyard is expected to be attended by President Recep Tayyip Erdo?an, local media reported. Europe BAE Systems announced it signed a new support, sustainment, and readiness agreement with the Norwegian Army for its fleet of 144 CV90 Infantry Fighting Vehicles, securing a new contract model to support the availability and continuous modernization of the fleet. The seven-year agreement with the Norwegian Defence Logistics Organisation governs the purchase of components and equipment, as well as management and engineering work. It includes maintenance of the System Integration Lab, which ensures that both the customer and BAE Systems can monitor vehicles’ current conditions and state of readiness to optimize vehicle performance and capabilities across the fleet. The United Kingdom has received its ninth and final Boeing P-8A Poseidon MRA1 maritime multimission aircraft (MMA), with ZP809 arriving at Royal Air Force (RAF) Lossiemouth in Scotland on January 11. This brings a two-year delivery run that began with the arrival of ZP801 Pride of Moray in February 2020 to an end. Since then, ZP802 City of Elgin, ZP803 Terence Bulloch DSO DFC, ZP804 Spirit of Reykjavik, ZP805 Fulmar, ZP806 Guernsey’s Reply, ZP807 William Barker VC, and ZP808 have all been received. Asia-Pacific India’s Defence Research and Development Organisation (DRDO) flight tested the final deliverable configuration of Man Portable Anti-Tank Guided Missile (MPATGM). The present test was to prove the consistent performance for the minimum range. The missile performance has been proven for the maximum range in earlier test trials. Today’s Video Watch: Defence Insights: INS Vikrant Sea Trials, Turkish A591 Ufuk, AH-64E in RoK and US F-35 Integration View the full article
  4. Americas Huntington Ingalls Industries’ (HII) Ingalls Shipbuilding division launched the amphibious transport dock Richard M. McCool Jr. (LPD 29) being built for the US Navy. Richard M. McCool Jr., the 13th LPD in the San Antonio class of amphibious assault force ships, will support US amphibious assault, special operations and expeditionary warfare missions through the first half of the 21st century. The Argentinian Ministry of Defense has approved the purchase of two Sikorsky SH-3 Sea King helicopters for the Argentinian Navy. The Sikorsky SH-3 Sea King (company designation S-61) is an American twin-engined anti-submarine warfare (ASW) helicopter designed and built by Sikorsky Aircraft. ASW equipment used on Sea Kings has included the AQS-13A/B/E dipping sonar which included specialized computers for processing sonar and sonobuoy data, various models of sonobuoys, ARR-75 Sonobuoy Receivers, and the ASQ-81 Magnetic Anomaly Detector. Middle East & Africa Smart Shooter has unveiled SMASH Dragon, an armed drone system incorporating company-developed SMASH Technology for precise target elimination. SMASH Dragon is an advanced robotic weaponry payload that can be mounted on different drones and other unmanned aerial platforms. It can incorporate various types of assault rifles, sniper rifles, 40mm, and other ammunition with great precision. Extremely lightweight and therefore allowing long mission endurance, SMASH Dragon integrates a unique stabilization concept with the SMASH technology that enables the system to accurately hit static and moving targets while flying. Europe Raytheon Systems was awarded a $13.5 million contract by the UK Ministry of Defense for in-service support for the AMRAAM missile system. The AMRAAM (Advanced Medium-Range Air-to-Air Missile), also designated AIM-120, has a 30 to 40 mile range and can reach a speed of Mach 4. The system is a beyond-visual-range air-to-air missile capable of all-weather day-and-night operation. Asia-Pacific Hindustan Aeronautics Limited (HAL) is confident that the first Tejas MK-2 prototype will be rolled out by end of this year or early next year. R. Madhavan, Chief Managing Director, said that the design has been finalized and some manufacturing activities have started. Pakistan has decided not to purchase the T129 attack helicopter from Turkey, the director general of Inter-Services Public Relations (ISPR) has disclosed. Instead, the country will explore buying the Z-10 attack helicopter from China. The US government had refused to grant an export license for the T129 LHTEC T800 turboshaft engine to Pakistan. Today’s Video Watch: Smart Shooter SMASH 2000 system – ‘smart rifle’ that only shoots if the bullet will hit an enemy View the full article
  5. Thought I would start out this week doing what I forgot to do last week - review the top posts from 2021. I looked over the unique visits at both the OG home at blogspot and the parallel universe over at substack (so places where readers' IT managers block blogger.com can see it) and this is what seemed to get the most interest via sharing and being picked up by large follower accounts. What does this tell us? I'm not sure, but I think it reflects a larger concern and feeling many people have that those we have trusted with the stewardship of our nation's military are not doing a good job. That and everyone is still fascinated by the Japanese Navy. What will 2022 be most interested in? We'll see in a year. 1. Culture is Upstream of Everything (13JUL21): A congressional report on the culture of the Surface Navy. 2. This is What a Whole of Government Epistemic Failure Looks Like (17AUG21): A dozen days before the national humiliation in Kabul, a look at the inevitable. 3. Japan Back in the Carrier Game ... (05OCT21): The joy and pleasure of the Japanese getting their carrier vibe back. 4. The Global Posture Review: Strategic Vapor Lock (30NOV21): Yes, the state of strategic thought in the US government is as bad as you think. 5. We're Designing Ourselves to Lose (26JUL21): Myopic and ill-focused leadership enabled by a culture that best suits their comfort leads to an unprepared force. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4WNtO-I0B24:1kN3V6CjaJs:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4WNtO-I0B24:1kN3V6CjaJs:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4WNtO-I0B24:1kN3V6CjaJs:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4WNtO-I0B24:1kN3V6CjaJs:F7zBnMyn0Lo View the full article
  6. Americas Bell Boeing won a $1.6 billion deal for the repair, replacement, required availability, configuration management, and inventory management for supply support for 228 MV-22B (Marine); CMV-22 (Navy); and CV-22 (Air Force) Osprey aircraft components. The V-22 Osprey is a family of multi-mission, tiltrotor military aircraft with both vertical as well as short takeoff and landing capabilities. It is designed to combine the functionality of a conventional helicopter with the long-range, high-speed cruise performance of a turboprop aircraft. Work will take place e in Texas and Pennsylvania. Estimated completion will be by December 2026. Peraton Inc., a company that provides satellite and terrestrial communication, network optimization, and managed security services, was awarded a $18 million contract by the US Air Force to sustain engineering services support for the B-1B Reprogrammable Electronic Warfare Systems test and B-52 Bomber Electronic Attack Systems test facilities and special test equipment. The B-1B Lancer is the US Air Force long-range strategic bomber developed by Rockwell International, now Boeing Defense And Space Group. The B-52H is the US Air Force’s long-range, large-payload multirole bomber and is known as the Stratofortress. Work will take place in Eglin Air Force Base, Florida Estimated completion date is January 10, 2027. Middle East & Africa Morocco and Israel Aerospace Industries discussed buying the latter’s Barak-8 MR air defense missile system. IAI sent marketing director Sharon Biton to lead the negotiations, Jerusalem Post reports. The Barak-8 MR-SAM system is able to shoot down enemy aircraft at a range of 50-70 kilometers and is designed to defend naval vessels against a myriad of short-to-long-range airborne threats. Europe The US State Department approved a possible Foreign Military Sale to the France. The sale would be for the MQ-9 Follow-on Contractor Logistics Support and related equipment for an estimated cost of $300 million. France had requested to buy follow-on Contractor Logistics Support to include contractor provided MQ-9 aircraft components, spares and accessories; repair and return; software and software support services; simulator software; personnel training and training equipment; publications and technical documentation; US Government and contractor provided engineering, technical and logistical support services; and other related elements of logistical and program support. The estimated total cost is $300 million, Defense Security Cooperation Agency (DSCA) said in a release Friday. Asia-Pacific Turkish Aerospace Inc. (TAI) is said to have delivered two T129 attack helicopters to the Philippines on January 8. The South East Asian country has ordered six helicopters and two more are set to arrive next year while the last two will reach home in 2024. In November, the Philippine Air Force (PAF) commander Lt. Gen. Allen Paredes disclosed that the six helicopters would be in the country as soon as December. The T129 is a twin-engine, tandem seat, multi-role, all-weather attack helicopter based on the Agusta A129 Mangusta platform and is designed for advanced attack and reconnaissance missions in hot and high environments and rough geography in both day and night conditions. The United States and Japan will soon sign a deal on collaborating more closely in R&D of defense-related technologies, including ways to counter threats from hypersonic weapons. This was announced ahead of January 6-7 virtual US-Japan Security Consultative Committee meeting between Secretary of State Blinken, Secretary of Defense Austin, Minister for Foreign Affairs Hayashi, and Minister of Defense Kishi. Blinken said the two countries would sign a new deal designed to counter emerging threats such as hypersonic and space-based weaponry, days after North Korea tested what it claimed to be a hypersonic missile. Some Japanese media reports said the projectile fell close to its Exclusive Economic Zone. Today’s Video Watch: T129 ATAK – Turkish Attack Helicopter in Action View the full article
  7. We're going to kick out Midrats' 13th year with someone who has been with us from the start, best friend to the show Dr. Claude Berube! If you care about American history in general, and US Navy history in particular, you won't want to miss a minute of this Sunday's show. Claude will be with us for the full hour this Sunday from 5-6pm Eastern to discuss his latest and 4th non-fiction book, On Wide Seas: The US Navy in the Jacksonian Era, just released by University of Alabama Press. Claude earned his PhD in Military History from the King's College, London and holds two master's from Northeastern and the Naval War College. In his 30-year career, he has worked as a defense contractor for Naval Sea Systems Command and the Office of Naval Research, as a staffer on Capitol Hill for two U.S. Senators and a member of Congress, and teaching at the U.S. Naval Academy in the Political Science and History Departments. A Commander in the U.S. Navy Reserve, he has served at the Office of Naval Intelligence, CNO's Deep Red, at Joint Task Force Guantanamo Bay, Joint Analysis Center Molesworth England, and deployed on USS Bunker Hill to the Middle East. In addition to his four non-fiction books, he is the author of more than 60 articles, and this third novel in the Connor Stark series will be published this fall. Join us live if you can, but it not, you can get the show later by subscribing to the podcast. If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. You can find us on almost all your most popular podcast aggregators as well. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=j9R3cgXZmBQ:952MhNHFixI:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=j9R3cgXZmBQ:952MhNHFixI:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=j9R3cgXZmBQ:952MhNHFixI:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=j9R3cgXZmBQ:952MhNHFixI:F7zBnMyn0Lo View the full article
  8. A little different topic this Fullbore Friday as ... I want to make you mad. I won't be subtle or clever here ... thanks to a simple tweet from The Other Sal, I am just going to hit you right in the forehead with it. Here we are at the dawn of 2022 and all over the spectrum of American maritime "thought leaders" from the SECNAV, CNO, Congress, and ostensibly pro-Navy institutions - we have excuses, squid-ink cover stories, and simple defeatism flavored with a machoistic lust for decline. Decline is a choice, and bullsh1t to all that. We are a maritime and aerospace power by geography, economy, and national interest even if those who are trusted to maintain and leverage that comparative advantage fail to act on that. Until we get the leaders we need, we few - we happy few - will just call them all out from the cheap seats. So, with that lead-in ... here you go; who gets a "Fullbore" this week - and the first one of the New Year? No question ... and it isn't even close ... The People's Liberation Army Navy. The Communist Chinese - who are not a natural maritime and aerospace power (they are a land power) - desire to knock us off our perch and they are not playing around. Just look at the battleforce warships the PLAN commissioned in 2021. - 2 Type 075 Helicopter Carriers - 3 Type 055 Destroyers - 7 Type 052D Destroyers - 9 Corvettes Type 056A and - 1 Ballistic Missile Submarine (SSBN) Type 094 BEHOLD! ...and what has the United States Navy commissioned? - 1 DDG (USS Daniel Inouye (DDG 118) )- 2 LCS (USS Oakland (LCS 24) and USS Mobile (LCS 26) ) That is it from what I can see. We could have had one more LCS and two SSN commissioned, but those have shifted to the right in to 2022 ... maybe. Show me what I missed in the main battleforce navy. Please. Anyway, Fullbore to those entrusted with building the PLAN. They have a solid plan, solid funding, and ... well ... just look at the numbers. Give credit where credit is due. Fullbore. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=rUBuIQYrZs0:htITJGiGoKY:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=rUBuIQYrZs0:htITJGiGoKY:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=rUBuIQYrZs0:htITJGiGoKY:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=rUBuIQYrZs0:htITJGiGoKY:F7zBnMyn0Lo View the full article
  9. Reviewed by Ingo Heidbrink David Bosco’s new book The Poseidon Project provides not only a historical account of the development of the international Law of the Sea from Early Modern times to the present day, but also an easily accessible guide to key legal concepts in this complex area of international law. Comprising eight chapters and a conclusion, the book follows a chronological approach. The first two chapters cover modern history before the outbreak of World War I. The third chapter deals with both World Wars and the interwar period while the fourth chapter deals with the period from 1945 to1970. Chapters five through seven focuses on the period of UNCLOS III (1970-2010) and chapter eight addresses the years since 2010. The main focus of the book is on the period since the 1970s when the origins of today’s Law of the Sea emerged, with coverage of prior historical periods used to contextualize the more recent history. It is surprising that events such as the 1930 League of Nations Codification Conference and the Anglo-Icelandic Cod-wars are covered only briefly while the 1882 North Sea Fisheries Convention seems not to be mentioned at all, despite regularly being credited as the first treaty to codify the 3 nautical mile limit in an international agreement. Another treaty that seems to be missing is the Svalbard Treaty of 1920. This seems especially problematic as this treaty established the basis for an alternative to the concept of Freedom of the Seas based upon stewardship/sovereignty for one nation combined with open access use for other signatory nations, which has ultimately resulted in co-governance approaches like the Antarctic Treaty. Nevertheless, The Poseidon Project provides a concise narrative of the developments within the tradition of Freedom of the Seas. One of the main points of critique that may be directed toward Bosco’s approach is that it does not fully take into account that the Freedom of the Seas and legal concepts derived from Grotius’ Early Modern theorem have always reflected the perspectives of the nations with the most advanced maritime technology in their respective periods, and the concept of Freedom of the Seas has often been used as a tool to bring this technological superiority to full fruition. While it can be argued that the tradition of Freedom of the Seas has had a positive overall effect, it can also be argued that this tradition constituted a gentlemen’s agreement among the most advanced maritime nations to prohibit lesser developed nations gaining a fair share of the oceans, enabling quasi-colonial mechanisms to become entrenched in the maritime domain. Unfortunately, Bosco’s new book does not address this counterargument or any other critical take on the Freedom of the Seas approach. A comparison with the Antarctic Treaty System as a system that is based on international co-governance would have helped not only to identify the Freedom of the Seas as a concept favoring technologically advanced nations, but also to show that there are other solutions possible to govern huge parts of the globe outside traditional national sovereignty. The extensive notes and bibliography provided by Bosco live up to the research standards one should expect from an academic publication, but a detailed look reveals that the bibliography consists entirely of English language sources. While this might be understood as a concession to the language abilities of the intended readership, it narrows the breadth of perspectives provided in the bibliography substantially. Regardless of whether you agree or disagree with the author’s final conclusion that the Freedom of the Seas is not just a valid concept but also preferrable to alternative concepts like the Heritage of Mankind, The Poseidon Project can be commended to any historian with an interest in maritime affairs or international political history. While there are already hundreds of books on the subject of the Law of the Sea, most of these books are highly specialized studies reflecting specific debates at the time of their publication. Bosco differentiates his work by providing a broader historical overview that illuminates long-term developments and the historical origins of modern-day conflicts. Ingo Heidbrink is a Professor of History at Old Dominion University in Norfolk, Virginia. The Poseidon Project: The Struggle to Govern the World’s Oceans (David Bosco, Oxford University Press, New York, NY, 2022). The post Blog first appeared on Naval Historical Foundation. View the full article
  10. This may get lost in the background noise, but if you are concerned about the rule of law, democratic governance and security in the Pacific, you would be hard pressed to find more important news than this; Australia and Japan are set to sign a treaty to beef up defence and security cooperation at a virtual summit on Thursday, in the latest move to strengthen ties amid China's rising military power and economic clout in the Indo-Pacific region. Australian Prime Minister Scott Morrison said the two leaders will sign a Reciprocal Access Agreement, which will for the first time set out a framework for the two countries' defence forces to cooperate with each other. What do they bring to the table? Primarily, this sends a message of solidarity, but like the USA, these are nations that are primarily maritime and aerospace powers due to geography. Looking just at their navies, if you combine their fleets they have (+/-) 28 submarines (6 AUS/22 JPN), 6 LHD/CVL/DDH (2 AUS/4 JPN), and 53 destroyers and frigates (11 AUS/42 JPN). This is good. Good for them, good for the USA. Everyone smile. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=chghEjuEeIo:Si7QPI4VuwE:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=chghEjuEeIo:Si7QPI4VuwE:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=chghEjuEeIo:Si7QPI4VuwE:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=chghEjuEeIo:Si7QPI4VuwE:F7zBnMyn0Lo View the full article
  11. Americas One of two missile tracking ships operated by the Military Sealift Command was recently retired at Cape Canaveral Space Force Station on December 15, 2021. The white hulled-ship was used previously to track ballistic missile activity in the Middle East using the GRAY STAR radar. The radar system will be repurposed by the Air Force Research Laboratory to conduct testing and evaluation of advanced radar technologies, says Air Force Technical Applications center. Elbit Systems’ Brazilian subsidiary, AEL Sistemas S.A. won a contract to supply additional Hermes 900 UAS to the Brazilian Air Force (Força Aérea Brasileira). The contract is in an amount that is not material to Elbit Systems and will be performed over a period of 16 months. Middle East & Africa Aselsan has been adapting the Sarp remote weapon station (RWS) with the capability to fire the Atom 40 mm high-velocity airburst munition, the company reported in its January 2022 bulletin. Atom Sarp was test-fired in June 2021 against dummies representing dispersed insurgents under cover, inside buildings, and in the field. Europe The Hellenic Air Force will begin operating its Rafale fighters after January 19 when six aircraft arrive home at Tanágra airbase.Two dual-seat Rafales will be joined by four single-seat Rafales for the ferry flight home. Kongsberg Aviation Maintenance Services (KAMS) signed an agreement with Leonardo to provide maintenance services for the Norwegian fleet of SAR Queen / AW101 Search & Rescue helicopters. The contract will be performed in the period 2022-2026. Asia-Pacific North Korea said it conducted tests of a hypersonic missile on Wednesday, three months after it launched a similar missile. The official Korean Central News Agency (KCNA) said the Central Committee of the ruling Workers’ Party expressed “great satisfaction” at the results of the missile test observed by leading weapons officials. The KCNA had reported in September that the North fired a “hypersonic gliding warhead” which made a 120km-long lateral movement before hitting a target 700km away. It wasn’t immediately known if both are the same type of hypersonic missile. Today’s Video Watch: AW101 View the full article
  12. If you recall, the "Arab Spring" started with increases in food prices going in to winter. The Kazakh government seems to have collapses due to civil disorder resulting from increasing LPG prices gong in to winter. Don't think inflation and supply chain issues are a national security issue? You're wrong. I'm pondering over at USNBlog. Come on by and bring a wheelbarrow of Papiermarks. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vsbpjpYdZoU:aDOK3unvZrA:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vsbpjpYdZoU:aDOK3unvZrA:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vsbpjpYdZoU:aDOK3unvZrA:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vsbpjpYdZoU:aDOK3unvZrA:F7zBnMyn0Lo View the full article
  13. Americas BAE Systems won a $24.6 million deal for the Military Global Positioning System User Equipment (MGUE) Increment 2 Miniature Serial Interface (MSI) contract. The modification incorporates MSI Engineering Change Proposal-1 into the baseline and provides continued MSI with Next Generation Application-Specific Integrated Circuit Technology Development capabilities. The goal of MGUE Inc 2 is to develop, integrate, and produce M-Code capable, GPS receivers for the service requirements specified in the Joint Requirements Oversight Council approved MGUE Inc 2 Capability Development Document. Work will take place in Iowa. Estimated completion date is August 31, 2025. The MQ-8C is now in the US 7th Fleet area of operations, which spans from the International Date Line to the India/Pakistan border. Mass Communication Specialist 3rd Class Andrew Langholf posted photos of the unmanned aerial vehicle on the flight deck of USS Jackson (LCS 6) while they were in Guam on December 22. The helicopter is assigned to HSC-23. Middle East & Africa The Qatar Air Force took delivery of the first NH90 Tactical Transport Helicopter (TTH) recently, manufacturer Leonardo has announced. The first TTH version helicopter for land-based tasks was delivered on 11 December, in line with contractual commitments, and will be followed in the coming months by the first NFH, dedicated to naval operations, after qualifications. Deliveries will continue until 2025. Europe The British Ministry of Defense announced, that a logistics system critical to British military operations around the world will be supported under a new five-year, $625 million contract with Boeing Defence UK. The contract supports implementation of the Integrated Review and Defence Command Paper, published last year, which placed an emphasis on more productive, active and globally deployed Armed Forces. Leonardo completed the acquisition of 25.1 per cent of the shares in HENSOLDT AG, a leading German player in the field of sensors for defense and security applications, with an expanding portfolio in sensors, data management and robotics, for a cash consideration of €606 million. According to a news release, the transaction is a step forward in helping to achieve Leonardo’s strategic objective of acquiring a leadership position in the European Defence Electronics market, as defined by the “Be Tomorrow – Leonardo 2030” Plan, and reflects Leonardo’s determination to play an active role in the consolidation process underway, also in the light of future cooperation programmes in continental Europe. Asia-Pacific North Korea has carried out its possible first ballistic missile test in 2022 by launching one into the East Sea shortly after 8 am local time today. The country has fired an unidentified projectile into waters off the east coast of the Korean Peninsula, South Korea’s Joint Chiefs of Staff said. According to the Japanese government, the projectile may have been a “ballistic missile”. Today’s Video Watch: The Qatar Air Force Takes Delivery of First NH90 Tactical Transport Helicopter! View the full article
  14. I remain firm in my stance that Ike Eisenhower is one of the most impressive leaders this nation every produced and deserves to be in any Top-5 lists of great Americans. Perfect? No. Great? Yes. "To be well read..." - how often have you heard this phrase used? It is usually used as a way to make sure a curious mind does not - through conscious acts of commission or omission - put itself in a echo chamber. It has a secondary benefit; you find jewels you may not have found otherwise. Classic case last night when I found myself digging around for news the new German government and a whole host of problematic decisions. There happened to be an intersection with yesterday's nod to diplomacy that out of the blue brought in two of the most important people in the West; Eisenhower and Churchill. In the first year of Ike's Presidency there was regular correspondence between him and Churchill who two years earlier found himself back as Prime Minister after 6-years of Labour governance. Their correspondence eventually led up to the "Big-3" conference in Bermuda at the end of 1953 that included the French. I hope someone has compiled it in to one document or used it as a basis to get their PhD. If anyone knows, let me know. I has to represent a masterclass in personal diplomacy between allies. Let me just pull one letter out of that year to demonstrate the remarkable political, personal, and diplomatic skill of Eisenhower. The letter is clear, efficient, and gloriously free of buzzwords, lingo, and posturing - but it is crafty. It is so good - and nutrient rich - that I am going to do a sentence by sentence fisking. I would encourage you to read it in full first at this link or as embedded below. Give it a read and come back. Now that you're back, let's go back to May 5, 1953 in a letter from Ike to Winston. Their relationship dated back to 1942 and was mostly businesslike. They both had complicated views of each other as persons and leaders with a history of disagreements - but the respect for the importance of their partnership is clear, even as the relative power positions changed after a decade. There is something to learn in each sentence. Here's my take ... if I miss some nuance, please share in comments.Thank you for yours of May fourth giving me the lines of a message you are thinking of sending to Molotov. Always reference the last correspondence and thank the author for it. First, it is simply good manners, second it establishes a reference point for your comments to follow. The receiver may think your comments are based on a previous correspondence or something that followed. This is a critical detail. Never forget to include it early so as to avoid misunderstandings. With today's faster correspondence, I would include the time if by email, etc.Foster and I have considered it deeply and since you sought my views l must say that we would advise against it. Note that "Molotov" in the previous sentence - an opponent - is referred to by his last name only. That is familiar to both, but "Foster" as in "John Foster Dulles" who even among friends was referred to as "Dulles" but here, is simply among friends "Foster." Never underestimate the power of personal relationships between allies and friends. They should always be nurtured, even when the people in question may not be personally liked ... you should pretend to like them anyway. It isn't about "you" it is about the position you hold. Nations have friends, and their servants need to align as such.You will pardon me, I know, if I express a bit of astonishment that you think it appropriate to recommend Moscow to Molotov as a suit-able meeting place. Get to the point, and be clear about it. There is no question that Ike is, politely, asking, "What the hell are you thinking?" It is OK for friends to directly confront each other when they think the other is in error, especially when it can affect mutual efforts. As a matter of fact, that is a sign of friendship. No reason to be squishy about it - also there is no reason to be rude. Friends can be blunt without being insulting. Insults just make people dig in. Done the way Ike has, no one loses face. Once you tell your friend he is off, you owe them an explanation why;Uncle Joe used to plead ill health as an excuse for refusing to leave territory under the Russian flag or controlled by the Kremlin.' That excuse no longer applies and while I do not for a minute suggest that progress toward peace should be balked by mere matters of protocol, I do have a suspicion that anything the Kremlin could misinterpret as weakness or over-eagerness on our part would militate against success in negotiation. "Uncle Joe" is of course Stalin who just died 8-months earlier. Note the use of "Russian" and "Kremlin." That is not a mistake. Ike was of the same generation as my grandparents and I recall being a pedant to my grandmother in middle school when she was telling a story about raising a family in WWII. She was discussing all the talk about "aid to Russia" when I mentioned, "They were the Soviet Union Mawmaw..." She just gave me that look, "Call them what you want, but we called them Russians, they are Russians, and they will always be Russians." Boy, was she right. Anyway, "Kremlin" is simply whoever is running the Russia/Soviet Union - not solidified in to a specific person at that time after Stalin's death, but the surviving Communist nomenklatura. I think it is important to pull out something in this sentence again that applies as much today as it did then; ...anything the Kremlin could misinterpret as weakness or over-eagerness on our part would militate against success in negotiation. I am not confident our present State Department or Executive Branch fully understand that centuries old constant in diplomacy in general, and dealing with the Russian mind in particular. In my note to you of April twenty-fifth I expressed the view that we should not rush things too much and should not permit feeling in our countries for a meeting between heads of states and government to press us into precipitate initiatives.If your position has not changed, and indeed you are now even more firmly welded to it - then emphasize that fact if it appears no one really understood it. You can also see here Ike's natural caution and bias against recklessness. A serious man for a serious time. Churchill could be a bit overly aggressive - a nice feature as long as he has friends and confidents who can convince him to dial things back now and then. Ike could do that.I feel just as strongly now as I did ten days ago that this is right, and certainly nothing that the Soviet Government has done in the meantime would tend to persuade me differently. If something is important enough to repeat, there is nothing wrong with saying it a third time a different way. Note the first use of "Soviet." Perhaps used interchangeably with "Kremlin" as it appears.I do not feel that the armistice negotiations are going well and this to me has been the first test of the seriousness of Communist intentions.If you are dealing with stubborn, but fair, personalities - which Churchill was - and you are concerned that they may bully through your concerns they may not fully appreciate, then don't be afraid to point out your top reasons. In this case the "armistice negotiations" involved the Korean War. I would also point out the first use of "Communist." Russia, China and their captive nations were on a global expansion that would continue for the next few decades. Though in conflict with each other in some places but coordinated in others, there was a trans-national "Communist" threat that was part of yet distinct from "Soviet" or "Russian." A complicated time demanded nimble thinkers.Far from there having been any communist actions which we could accept as indications of such seriousness of purpose the Pravda editorial repeats all the previous Soviet positions3 and we are now faced with new aggression in Laos.Continue to sell your opinion in the face of what appears to be thick-headed obstinance - even from friends. We forget how little insight we had in to the thinking of Soviet leaders at the time. Not shocking considering how thoroughly they had penetrated the US and UK's intelligence and foreign services agencies. "Kremlin watchers" and "Sovietologists" were a thing ... so yes, reading Pravda editorials was one of the few ways you could see what might be going on in the minds of Soviet leaders. Also note "Laos." The problems in Southeast Asia were starting.But in my mind the most important considerations are the results which might be expected to flow from such a personal contact and the effect of such a meeting on our allies, the free world in general and the Russians themselves. It would of course finally become known that you had consulted me, and it would be difficult for me to explain the exact purpose of the visit. What is the diplomatic equivalent of "emotional intelligence?" Well, Ike sure had it. I'm not sure Churchill ever did. Ike was good at second and third order effects. Not perfect, but good and it shows here in spades.Beyond this, failure to consult the French would probably infuriate them, especially when the situation in Indo-china is hanging in the balance. If they were consulted in advance, the result would almost certainly be a proposal for a four-party confer-ence, and this, I am convinced, we are not ready for until there is some evidence, in deeds, of a changed Soviet attitude. Oh yes, the French. Are you thinking of this years clown-show roll out of AUKUS? The French were, are, and will be looking for reasons to have their honor hurt. I'm a fan of the French, but you simply have to keep this national character in mind. Ike knew this, but I don't think Churchill cared.Many would expect dramatic and concrete achievements from a personal visit to Moscow by the Prime Minister of Great Britain. What- ever you said publicly about the purposes of your solitary pilgrimage, I suspect that many in the Far East as well as the West would doubt you would go all the wav to Moscow merely for good will. Expectation management. This is Ike again helping Churchill understand second and third order effects. You can read the frustration Ike has with Churchill, but his understanding that frustration was to be overcome, not to dominate, their working relationship as there were simply too many important matters to attend to.I feel this would be true in this country, and the effects on Congress which is this week taking up consideration of our Mutual Defense Program and extension of our Reciprocal Trade Act, would be unpredictable.Is that a warning or a threat? I don't think it matters. Firm message, but not insulting.It seems to me that in this crucial period when the Soviet peace offensive is raising doubts in people's minds, the things we must strive for above all others are to maintain mutual confidence among the members of NATO and other free nations and to avoid any action which could be misinterpreted. NATO was still a young organization and was important to the UK as it ensured that continental Europe did not build its own military arrangements that would leave the UK out. Remember, at this time a goal was to get American ground forces out of Europe once the Europeans were able to rebuild their militaries. Well, here we are, seven decades later ... Naturally the final decision is yours, but I feel that the above factors are so important that I should in all candor and friendship lay them before you. Respect for national sovereignty, yet clearly outlining what to expect if your concerns are ignored. Diplomacy is all about give and take with a goal of a net positive for your interests and those of your friends. You just can't focus on what you want, you have to consider the primary and secondary stake holders who support you, as well as those who oppose you. What leverage do you have vs. what leverage others have against you. In this dance, personal relationships and personalities matter. This isn't math, this is something much more human. All I know is that I need to find a good book on the relationship between these two great men. If a page and a half letter such as this is as impactful as it is on its own, then the whole body must be something grand to behold. h/t @brisavoine http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4mqJHXOQhao:l5Ab0hG_n9g:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4mqJHXOQhao:l5Ab0hG_n9g:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4mqJHXOQhao:l5Ab0hG_n9g:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=4mqJHXOQhao:l5Ab0hG_n9g:F7zBnMyn0Lo View the full article
  15. Americas Bell-Boeing won a $7.9 million contract modification, which provides for additional post-production repairs and related system engineering and program management support for the MV-22B Common Configuration Readiness and Modernization retrofit program. The V-22 Osprey is a joint-service, medium-lift, multimission tilt-rotor aircraft. The Marine Corps variant, MV-22B, provides reliable and safe transportation of personnel, supplies, and equipment. Work will take place in Pennsylvania and Texas. Estimated completion will be in March 2023. The Abraham Lincoln Carrier Strike Group is underway for a patrol of the Indo-Pacific and this deployment notes a number of firsts. The Marine Corps is sending its F-35C out to sea for its first operational deployment by bringing VMFA-314 aboard the carrier. VRM-30 will also deploy for the first time along with its CMV-22B. The squadron was established at NAS North Island in 2018. Middle East & Africa According to Elbit Systems, the UAE Air Force’s Airbus A330 Multi-Role Tanker Transport aircraft will soon be fitted with Direct Infrared Countermeasures and airborne Electronic Warfare systems supplied by Elbit Systems Emirates Limited in a $53 million contract. The contract runs for five years. Europe Norwegian F-16s will fly their last mission out of Bodø Air Base on January 6 and the base will end all fighter operations after that. Quick Reaction Alert (QRA) duties in the Artic area will be taken over by fighters stationed at Evenes Air Station. Two F-16s will launch from Bodø on Jan. 6 but one will land back at the base to be retired as an exhibit in the local museum. Asia-Pacific South Korea started constructing the second KSS-III Batch-II submarine. The boat, built by local shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME), will be completed by 2026 and delivered to the Republic of Korea Navy (ROKN) in 2028 after undergoing sea trials. According to local news, an F-35A fighter operated by the Republic of Korea Air Force made an emergency landing during a training session Tuesday due to avionic system issues. The radar-evading jet made the belly landing on a runway at an air base in Seosan, 151km south of Seoul, at 12:51 pm after the issues caused the landing gear to momentarily malfunction, officials were quoted as saying by Yonhap News Agency. Today’s Video Watch: Airbus A330 SMART MRTT Reveal | Next Level Multi Role Tanker Transport Aircraft View the full article
  16. Happy New Year everyone on The Front Porch! 2022 will be 18th year that we've been meeting together here at CDRSalamander ... come July my alter-ego will be legal to vote. Damn, time flies. So many of you I see here have been with us from the beginning. I've only had the pleasure of meeting a few of you IRL, but I do appreciate you taking time from your busy lives to visit here, see what I think you might find interesting, and add your flavor to the stew. Some of you I count as friends, and almost all friendly acquaintances. I really do appreciate all of you and enjoy our exchanges here ... even when you tell me I'm wrong. I learn more from you as a collective than anything else out there. Here's to another great year, Lord will'n and the Creek don't rise. So, what do we kick off the New Year with? We all know 2021 was just horrible ... and the peak of that horribleness was, at least for me, the national humiliation of our negotiated surrender and dishonorable withdraw from Afghanistan. I don't know about you, but I'm still working through that. So, in difficult times, it is helpful to return to the basics. Let's go back to JPME-1 and the levers of national power to see how the good-not-so-old-USA starts 2022 - D.I.M.E.. We already covered M-Military above. Like I said, I'm still working through it all, but I do know this - we are in the negative in ways we still don't understand. We haven't been humiliated like that since Vietnam. It will take a lot of hard work internally and externally to climb out of that pit. E-Economic? COVID-19, supply chain issues, unknown inflationary byproducts from the unprecedented injection of trillions of fiat currency in to the system ... let's just say it could be worse, I guess. We'll give E a wash as the rest of the planet has their own problems. I-Informational? No ... that ain't going that hot either. Even potential bright spots like the AUKUS were fumbled. We can call that a wash too ... if for no other reason than Russian and China seem determined to piss everyone off so that we don't seem so bad ... as long as you don't show pictures of Kabul at the end of August. In a moment of delusion, I might even give that a sliver of being in the positive. A net-sliver, but a sliver at that. So, let's take a peek at D-Diplomatic. President Biden has his team in place. I have been reliable informed that the adults are back in charge and many Smartest People in the Room™ are running things. What does "his team" have to say? Let's check in with part of the establishment natsec academic-left nomenklatura via Francis Gavin at WOTR ... what does he have to say? For reasons fair or not, another disappointing Eagles season has me thinking about reactions to the desultory foreign policy of the first year of the Biden presidency. ... Beginning with a curious decision to hold an unpleasant meeting with America’s most important strategic rival at the Hotel Captain Cook in Anchorage and continuing with the embarrassing self-own on the Australia-United Kingdom-United States (or AUKUS) pact — a promising strategic play that could not have been presented to the world in a more hapless, self-defeating manner — the Biden team has done far worse than expected. The military withdrawal from Afghanistan — which, grand strategically, was the correct move, but was carried out in a disastrous fashion — has come to reflect an administration that overpromised competence and consultation but has often delivered too little of either. ... there appears to be no overarching conceptual model to make sense of and act in the world, no sense of priorities and necessary tradeoffs. ... In a world of limited means and unlimited challenges, good grand strategy requires both a theory of how the world works and ruthless prioritization. Attempting to do everything only guarantees you will do nothing well. Slogans, such as “a foreign policy for the middle class,” offer little guidance about how the administration will make difficult, consequential choices about an uncertain future. Things can't be that bad, can they? I mean, we've covered the sub-optimal SECSTATE Blinken and National Security Advisor Sullivan here before, surely in other important areas on President Biden's agenda he's got top people pursuing America's interest? Like Iran policy, right. Gird you loins and take a reading of Jake Wallis Simons over at the UK's, The Spectator; One of the West’s great foreign policy failures of 2021 was the Iran nuclear negotiations, which remained bitterly unresolved as the clock passed midnight. ... Not only has there been a dramatic failure to extract any concessions from Tehran – even a meaningful freeze on progress towards the bomb has remained elusive – but western negotiators have become enveloped themselves in an Asterix-style dust cloud of infighting, competing agendas and tension. ... In truth, the project was all but doomed to begin with. Before he was even elected, Joe Biden telegraphed his desperation to re-enter Obama’s JCPOA deal. ‘The good news is there remains a better way,’ he wrote for CNN. ‘A Biden administration will make it a priority to set Iran policy right.’ The President might not have said in so many words that he would bend over backwards for a deal. But the Iranians are skilled at reading between the lines; and so are the senior members of his own administration. Diplomatic sources have described Robert Malley, the US Special Representative for Iran, who is leading the negotiations in Vienna, as ‘the most dovish official we’ve ever seen’. In fact, the former head of the International Crisis Group – a think-tank devoted to dispute resolution, the very embodiment of the doctrine of softness – has bent over backwards so far that, as one official put it, he now speaks to Tehran from between his legs. Of course. Is there some light to be seen at the end of this tunnel? Is there any glimmer of hope? Traditionally, the Americans tend to let their negotiators and envoys run until they fall, then replace them. There is a palpable feeling in diplomatic circles that the clock is ticking for Mr Malley. If his head were to roll soon, the negotiations would be thrown into temporary disarray, and the ensuing delay would benefit Iran. But this creative destruction may allow a more serious player to lead the American delegation. That, I’m afraid, is the best we can currently hope for. Believe me, reader, I wish there was better news. And so does the world. And that is where we are. We have to let things get worse until we can get better. Wonderful. So if 2022 could just take it easy while we try to to step on our crank some more ... that would be wonderful. And so completes our New Year review of the four levers of national power. Two negatives, a neutral, and maybe a sliver of positive ... and that is the optimistic call. At this point I'd like to take one of my hobby horses out of the barn. I want to review the academic pedigree of Blinken, Sullivan, and Malley in undergrad/grad/profession Blinken: Harvard / Columbia - lawyer/government/politics Sullivan: Yale / Oxford (Rhodes Scholar) / Yale - lawyer/academic/politics/government Malley: Yale / Oxford (Rhodes Scholar) / Harvard - lawyer/thinktankie/government What an incredibly narrow world view and perspective these people have - and it shows. There is little to no geographical, intellectual or life experience diversity at all. Heck Blinken and Malley even graduated from the same high school class in Paris. Where in their educational background have they ever been challenged? Have they ever found themselves alone in their beliefs, surrounded by those diametrically opposed to their world view? It is easy to roll your eyes when the rubes say, "East Coast Elites" but in the name of all that is holy, just look at it. The 17th Century Habsburgs were less inbred. A funny backgrounder on Malley. He is what is known in my circles as a "red-diaper baby". He grew up in a hard-left household. His mother worked at the UN for the Marxist–Leninist/Arab-Socialist Algerian FLN right after they established a 1-party state and slaughtered 70-90,000 of their fellow Algerians who supported the French during that Cold War horror show. His father was a journalist who wound up running a leftist magazine in France (that's how he and Blinken were in the same high school class) that was so radical that in 1980 he managed to get himself and his entire family expelled from the country and returned to New York. Of course ... he wound up writing a book in the mid-1990s on the Algerian revolution, The Call From Algeria: Third Worldism, Revolution, and the Turn to Islam. ... and of course he was at law school with President Obama. Of course. People are policy. If you wonder why things seem a bit off-frequency, look who is in government. Outside a polygamous cult in the mountains of northern Arizona, you'd be hard pressed to find a more culturally isolated group of people from the world around them. When it comes specifically to Iran, if those are the three people around the table - do you really have a balanced view of the challenge at hand? Who is going to offer alternatives or different perspectives when these all come out of the same machine? Are these people and institution really giving our nations its best from our best? These are unquestionably book-smart people who test well, but are they doing anything productive with it? What is their track record since JFK started this trend in government 60-yrs ago with his "Best and Brightest?" What, exactly, has this pedigree of people successfully accomplished as of late? If we keep selecting the same people from such a narrow spectrum of experience - and only those people - is it any wonder that we are surprised at developments? We miss when we're being played? That we are out foxed by much weaker nations? Perhaps we need to start thinking that the "best" institutions and our "smartest" people - perhaps - might not be the best and only thing we need working our nationals challenges. Just an idea. I think the record speaks for itself. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=HASrTox4eEU:aQGalMCzyt4:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=HASrTox4eEU:aQGalMCzyt4:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=HASrTox4eEU:aQGalMCzyt4:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=HASrTox4eEU:aQGalMCzyt4:F7zBnMyn0Lo View the full article
  17. Americas The Air Force awarded Canadian Commercial a $70 million deal for the Wescam Aggregate Services Plan. This contract provides for the continuation of contractor logistics support for the three configurations of L-3 Communications/Wescam MX Electro/Optical Infrared (EO/IR) Sensor System line replaceable units installed on the AC-130U/W/J. The AC-130U Spooky is the third generation of C-130 gunships. All gunships evolved from the first operational gunship, the AC-47, to the AC-119, and then the AC-130A which was the basis for the modern C-130 Hercules gunship. Work under the contract will take place in Florida and New Mexico. Estimated completion date is December 31, 2028. Raytheon won a $55 million contract modification for engineering and technical services in support of the Evolved Seasparrow Missile and NATO Seasparrow Missile Systems programs. The deal combines purchases for the US government and the governments of Japan and United Arab Emirates under the Foreign Military Sales (FMS) program. The Evolved Sea Sparrow Missile (ESSM) or RIM-162 is a medium-range, surface-to-air missile. The missile is currently in service with the US Navy and some of the 12 Nato Sea Sparrow consortium nations. Work will take place in Arizona, Rhode Island, Massachusetts, Spain, Australia and Greece. Estimated completion date will be in December 2022. Middle East & Africa Spanish news Larazon reports that Morocco will soon be taking delivery of the MBDA VL MICA ground based air defense missile system. The new system will complement the Chinese-made FD-2000 air defense system protecting Morocco. Europe First of Russia’s new S-550 air defense systems have entered combat service after clearing state trials. “The S-550 air defense system has successfully completed state trials. The first S-550 brigade has entered combat duty,” a source close to the Russian defense ministry was quoted as saying by government-owned TASS. Asia-Pacific Boeing won a $471.3 million contract action for the F-15 Japan Super Interceptor Program. The contract action provides for the design and development of an integrated suite of aircraft systems to support modification of the Japan Air Self Defense Force F-15MJ aircraft and the development, test, and delivery of four Weapon System Trainers. Work will take place in Missouri. Estimated completion date is December 31, 2028. Hindustan Times reports that French Navy Rafale M fighter will be at INS Hansa to carry out suitability trials with the ski jump there. The trials, which begins on January 6, is to determine whether the French fighter is a good fit for Indian aircraft carrier INS Vikrant. Testing will last 12 days. The same article says India might lease up to five Rafale Ms when INS Vikrant is commissioned later this year. Today’s Video Watch: URafale M to be tested in India for STOBAR take off | Will it fit the Vikrant’s hanger? View the full article
  18. This week, navalists everywhere are having fun with the comments by Secretary of the Army Christine Wormuth at Center for Strategic and International Studies back on December 1st. First of all ... let's go to the map room. What? Not clear enough? Let me help. Over on twitter, I promised a thorough fisking of her comments ... so here we go. "A more powerful Chinese military helps to underwrite Beijing's strategy to achieve the 'great rejuvenation of the Chinese nation' by 2049 — to include development of the PLA [People's Liberation Army] into a 'world class military' by midcentury," "China's focus on modernizing its military capabilities will strengthen its ability to coerce Taiwan and rival claimants in territorial disputes, project power globally, and counter interventions along the PRC's [People's Republic of China] periphery," she said. First of all, besides those forces trained and equipped for amphibious operations, the People's Liberation Army is mostly a concern of the Indians and Russians ... with the Vietnamese a close third. We have no concerns with China on the Asian landmass as long as they keep their forces out of the Korean peninsular. Right now, the Chinese military is manned with about two million service members — 975,000 of them in army combat units. It also has the most ships of any navy in the world, Wormuth said. And within the Indo-Pacific region, the Chinese military also has the largest air force. Huh. That sounds to me like we should allocate more funds to address <checks notes> naval forces to counter their expanded capabilities at sea. China now has the ability to attack U.S. sensors and communication links in space and also has missiles that can sink U.S. ships and take down aircraft, Wormuth said. "They have missiles that can reach U.S. bases in Japan and Guam, exposing our planes and runways to attack," she said. "Not only does China have advanced precision weapons, it has them in large and growing quantities. And just recently, China conducted a missile test that sent a missile around the world, dropping off a hypersonic vehicle that glided all the way back to China where it then struck a test target." So, what you're saying is that static, land based assets are a bad idea due to their vulnerability? Maybe it wouldn't be a bad idea to perhaps allocate more funds for mobile, sea-based solutions? Yes? Solid thinking Madam Secretary. Considering the advancements made by the Chinese military and the challenges it poses to the U.S., Secretary of Defense Lloyd J. Austin III has identified China as a "pacing challenge" for the Defense Department. In the name of all that is holy, there is nothing "pacing" about the challenge from China. Anyone who uses this word calls their credibility in to question. If anything they are accelerating, passing, or lapping us. "In my view, the Army will have at least five core tasks if a conflict breaks out, and these are tasks the Army can usefully perform without presuming substantial expansion of Army permanent presence in the region in the near term future," Wormuth said. Five, as in the numbers of fingers on a hand? Nice. We can hold track on that. First, she said, the Army will serve as the 'linchpin" service within the joint fight. Oh no, not "linchpin." As in the thing that needs to be removed in order to make a grenade useful in combat? This isn't going to go well, is it? "The Army will establish, build up, secure and protect staging areas and joint operating bases for air and naval forces in theater," Wormuth said. "We will be prepared to provide integrated air and missile defense, both for fixed sites and using mobile elements. We will provide area security and quick reaction forces where needed." So, should we disregard previous comments about the vulnerability of static, shore based infrastructure, or no? Is this just a way to give PLA rocket forces more targets in the hope we'll confuse them? Also ... about those bases, you may want to review 10 U.S. Code § 8063 - United States Marine Corps: composition; functions. It states; The Marine Corps shall be organized, trained, and equipped to provide fleet marine forces of combined arms, together with supporting air components, for service with the fleet in the seizure or defense of advanced naval bases and for the conduct of such land operations as may be essential to the prosecution of a naval campaign. Not your job Army. The Army will also use its vast logistics capacity to sustain joint force partners across the Indo-Pacific region, she said. With what resources will you go from island to island, exactly? Remember, this is WESTPAC, not EUCOM. No choo-choos. "The Army, for example, will provide much of the secure communication network background. We will generate intra-theater distribution networks to keep the joint force supplied from dispersed locations, and we will maintain munition stockpiles and forward arming and refueling points," she said. How many times has the Army done this with multiple maritime formations at sea or for that matter integrated long distance air campaigns? With the Army having the lead in AFG and IRQ recently, do they instill confidence they are ready for this as the supported service? Really? The Army can also provide command and control capability at multiple levels to ensure coordination and synchronization across the joint force."The Army, with its substantial planning and operations capacity at the division and corps level, is uniquely well placed to provide command and control for the joint force," Wormuth said.As mentioned earlier ... this is a maritime and aerospace fight. The Army is not well placed at all. Beyond just mission support, Wormuth also said the Army brings substantial combat capability to the joint force. For instance, she said the Army will provide ground-based, long-range fires to enhance the joint force’s strike capability. They will? Please, bring me the map with your range rings. "Using our long-range hypersonic weapons, mid-range capability and precision strike missiles — all of which we will begin fielding in fiscal year 2023 — we will be able to interdict fires across sea lines of communication, suppress enemy air defenses and provide counter fires against mobile targets." IOC in 2023? Is that in combat effective numbers? By then end of FY25, how many warshots will be in theater? Those will serve how many targets? What is the monthly production capacity for replacement rounds? Finally, she said, the Army can provide counter-attack capability using its maneuver forces. Infantry stryker elements or combat aviation brigades, for instance, can be used to restore territorial integrity of allies and partners. Wait ... bring those maps back. Where outside Korea on the Asian landmass are you planning to insert those mechanized forces? While Wormuth said the Army is currently capable of providing such capabilities to the joint force without changes in its existing permanent presence in Indo-Pacom, some changes would be useful. Right now, the U.S. military footprint in Asia is oriented towards the northeast, in places like Japan and Korea, for instance. Like ... now? Really? "Currently" is doing a lot in this paragraph. Should we wargame JUN2022 or no? "I think there is very much a desire to be able to expand our access and basing arrangements more into Southeast Asia; because, if we were able to do that, we would have ... a more dispersed posture that would give us much more flexibility," she said. "I think it is very much in our interest, and in the interest of our allies and partners, to explore how we can shift that posture over time." What are we talking about here, Vietnam? Malaysia? Indonesia? Thailand? Who is willing to let the US Army put a flagpole down? Nevertheless, considering where the U.S. operates now in Asia, she said it's important to maintain realistic assumptions about where the U.S. will be operating from, at least in the near future. "Realistic." Indeed. May want to review previous comments. "The Indo-Pacific ... is a region of great opportunity for the United States, but also real challenges," she said. "The Army is stepping up to that challenge, both in terms of how we contribute to the country’s ability to compete with China and our ability to deter coercion and aggression in the region." Yes, the Army has a role, and important role, in any fight west of Wake, but not as the lead. They are no more the lead for the Pacific than the US Navy would be in Ukraine. They are the supporting, not the supported service. Unless you are planning to restart a drive up the Korean peninsular or reinforce India on her border with China, the Army should not be even pondering the lead. Geography, history, national comparative advantage all tell us this is a maritime and aerospace battle. Any plan that includes engaging our Army in any significant force level on the Asian mainland is to invite national ruin. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=6yuHXwdVT8g:uBH-24Rytt8:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=6yuHXwdVT8g:uBH-24Rytt8:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=6yuHXwdVT8g:uBH-24Rytt8:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=6yuHXwdVT8g:uBH-24Rytt8:F7zBnMyn0Lo View the full article
  19. Americas Sikorsky won a $30.7 million contract modification by the US Navy, which increases the scope to procure 681 spare parts for the CH-53K low-rate initial production configuration aircraft. The CH-53K King Stallion is a large cargo helicopter designed to replace the Marine Corps fleet of CH-53E heavy-lift helicopters to help move Marines and their equipment from ships offshore onto attack beaches. The CH-53K is a general redesign of the CH-53E. Work will take place in Connecticut, France, Washington, Canada, Florida, West Virginia, Kentucky, Massachusetts, North Carolina and Georgia. Estimated completion date will be in December 2026. The Navy awarded General Atomics a $14.5 million order, which provides facilities, labor, material, and logistics services in support of the correction of deficiencies identified during prior qualification cycles for the block A21/A22 sustainment phase of the advanced arresting gear for CVN 78 and testing sites. CVN 78 is the Gerald R. Ford Class, the future aircraft carrier replacement class for Enterprise and Nimitz class aircraft carriers for the US Navy. Work will take place in California, Massachusetts, New Jersey and Mississippi. Estimated completion will be in April 2023. Middle East & Africa The Turkish Armed Forces (TSK) has received upgraded ILGAR Combat Electronic Warfare System from Aselsan. Ismail Demir, chairperson of the Presidency of Defense Industries (SSB), announced on Twitter that the ILGAR system was handed over to the Army recently. Europe The ‘Future Cruise/Anti–Ship Weapon’ will reportedly be fitted to the Royal Navy’s Type 26 Frigates. The vessel will also be armed with a five inch main gun as well as Sea Ceptor anti-air missiles. Asia-Pacific On December 27, Philippine’s Department of Budget Management (DBM) issued two special allotment release orders (SARO) worth around $54 million to buy shore-based anti-ship missile system for the Philippine Navy. Media reports in India also said that the Philippines is close to finalizing the BrahMos anti-ship missile deal. Pakistan’s Interior Minister Sheikh Rashid Ahmed confirmed the country’s acquisition of 25 J-10C multirole fighters from China. The minister told reporters in Rawalpindi that a full squadron of 25 J-10C jets will do a flyover on Pakistan Day ceremony on March 23 next year. The minister repeatedly mispronounced the name of the fighter, referring to them as “Chinese JS-10.” He added that the J-10C is “an answer to India’s Rafale jets.” Today’s Video Watch: USS Gerald R. Ford (CVN-78) Super Aircraft carrier in action View the full article
  20. Americas Lockheed Martin won a $102.4 million deal for production and delivery of hardware components and spares of the Apache Attack Helicopter Modernized Target Acquisition Designation/Pilot Night Vision Sensor System. The Apache Arrowhead (also Modernized Target Acquisition and Designation Sight/Pilot Night Vision Sensor or M-TADS/PNVS), is an integrated targeting and night vision system developed by Lockheed Martin for the Boeing AH-64 Apache attack helicopter. Work locations and funding will be determined with each order. Estimated completion date is July 31, 2024. General Atomics won a $69.9 million deal that provides non-recurring engineering and program management services in support of the Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) system for the CVN 81 aircraft carrier, minus energy storage subsystem. The deal provides for the evaluation, production, manufacture, assembly, integration and test of engineering changes to product hardware, software, technical data, and logistics products throughout the configuration management process associated with the EMALS and AAG system for the CVN 81 aircraft carrier, minus the energy storage subsystem. Work will take place in California. Estimated completion will be in December 2023. Middle East & Africa Israel unveiled a package of “confidence-building measures” for the occupied West Bank, after Defense Minister Benny Gantz hosted talks with Palestinian president Mahmud Abbas on his first visit in years. Abbas, leading a high-ranking delegation on his first visit to Israel for an official meeting since 2010, held talks with Gantz at his home in the central town of Rosh HaAyin, according to Israeli sources and media. After the rare visit, which drew condemnation from the enclave’s Hamas rulers, an Israeli was wounded in a shooting attack on the Gaza border on Wednesday, the military said. Europe Russia’s state-owned Rostec handed over modernized A-50U long-range Airborne Warning And Control System (AWACS) aircraft to the military. The A-50U can detect fundamentally new types of aircraft, and is also capable of simultaneously tracking a greater number of targets and guided fighters than the previous modification. The US State Department last week approved the sale of 230 Javelin FGM-148F anti-tank Missiles and 20 Javelin Command Launch Units (CLUs) to the Lithuanian Army for an estimated cost of $125 million. The original Foreign Military Sale (FMS), valued at $28.23 million, included one hundred eleven (111) Javelin FGM-148F missiles and ten (10) Javelin CLUs. Therefore, this notification is for a total of three hundred forty-one (341) Javelin FGM-148F missiles and thirty (30) Javelin CLUs. Asia-Pacific Raytheon won a $23.2 million deal for the procurement of multi-spectral targeting systems for the US Navy Triton unmanned aircraft system (UAS) and for the Royal Australian Air Force (RAAF). These systems provide intelligence, surveillance and reconnaissance (ISR) detection, identification and targeting capability in day/night operations for both manned and unmanned platforms. Work will take place in Texas. Estimated completion will be by March 2023. Today’s Video Watch: Episode 86. The A-50: Chasing the Invisible View the full article
  21. EMALS Components (click to view full) As the US Navy continues to build its new CVN-21 Gerald R. Ford Class carriers, few technologies are as important to their success as the next-generation EMALS (Electro-MAgnetic Launch System) catapult. The question is whether that technology will be ready in time, in order to avoid either costly delays to the program – or an even more costly redesign of the first ship of class. Current steam catapult technology is very entertaining when it launches cars more than 100 feet off of a ship, or gives naval fighters the extra boost they need to achieve flight speed within a launch footprint of a few hundred feet. It’s also stressful for the aircraft involved, very maintenance intensive, and not really compatible with modern gas turbine propulsion systems. At present, however, steam is the only option for launching supersonic jet fighters from carrier decks. EMALS aims to leap beyond steam’s limitations, delivering significant efficiency savings, a more survivable system, and improved effectiveness. This free-to-view spotlight article covers the technology, the program, and its progress to date. From Steam to Magnets: EMALS vs. Current Approaches Steam cat, ready (click to view full) Current steam catapults use about 615 kg/ 1,350 pounds of steam for each aircraft launch, which is usually delivered by piping it from the nuclear reactor. Now add the required hydraulics and oils, the water required to brake the catapult, and associated pumps, motors, and control systems. The result is a large, heavy, maintenance-intensive system that operates without feedback control; and its sudden shocks shorten airframe lifespans for carrier-based aircraft. To date, it has been the only option available. Hence its use on all full-size carriers. EMALS (Electro-Magnetic Aircraft Launch System) uses an approach analogous to an electro-magnetic rail gun, in order to accelerate the shuttle that holds the aircraft. That approach provides a smoother launch, while offering up to 30% more launch energy potential to cope with heavier fighters. It also has far lower space and maintenance requirements, because it dispenses with most of the steam catapult’s piping, pumps, motors, control systems, etc. Ancillary benefits include the ability to embed diagnostic systems, for ease of maintenance with fewer personnel on board. EMALS’ problem is that it has become a potential bottleneck to the USA’s new carrier class. It opportunity is that it may become the savior of Britain’s new carrier class. The challenge is scaling a relatively new technology to handle the required weights and power. EMALS motor generator weighs over 80,000 pounds, and is 13.5 feet long, almost 11 feet wide and almost 7 feet tall. It’s designed to deliver up to 60 megajoules of electricity, and 60 megawatts at its peak. In the 3 seconds it takes to launch a Navy aircraft, that amount of power could handle 12,000 homes. This motor generator is part of a suite of equipment called the Energy Storage Subsystem, which includes the motor generator, the generator control tower and the stored energy exciter power supply. The new Gerald R. Ford Class carriers will require 12 of each. Ford Class Enhancements (click to view full) Because it’s such a big change, it’s a critical technology if the US Navy wishes to deliver its new carrier class on-time and on-budget, and fulfill the CVN-21 program’s cost-saving promises. If EMALS cannot deliver on time, or perform as advertised, the extensive redesign and additional costs involved in adding steam catapult equipment throughout the ship could easily rise to hundreds of millions of dollars. Launches have begun, and the 2nd phase of EMALS aircraft compatibility testing is scheduled to begin in 2012. Engineers will continue reliability testing through 2013, then perform installation, checkout, and shipboard testing, with the goal of shipboard certification in 2015. The related Advanced Arresting Gear (AAG) sub-program will replace the current Mk 7 hydraulic system used to provide the requisite combination of plane-slowing firmness and necessary flexibility to the carriers’ arresting wires. The winning AAG design replaces the mechanical hydraulic ram with rotary engines, using energy-absorbing water turbines and a large induction motor to provide fine control of the arresting forces. AAG is intended to allow successful landings with heavier aircraft, reduce manning and maintenance, and add capabilities like self-diagnosis and maintenance alerts. It will eventually be fitted to all existing Nimitz class aircraft carriers, as well as the new Gerald R. Ford class. CVF concept (click to view full) EMALS was also set to play a pivotal role in the British CVF Queen Elizabeth Class, until the window of opportunity shut in 2012. The F-35B’s ability to take off and land with full air-to-air armament was already a matter of some concern in Britain before the 2010 strategic defense review, which moved the heavier F-35C from “Plan B” for British naval aviation, to the Royal Navy’s preferred choice. An F-35C requires catapults, but the Queen Elizabeth Class carrier’s CODAG (COmbined Diesel And Gas) propulsion doesn’t produce steam as a byproduct, the way nuclear-powered carriers do. Instead, it produces a lot of electricity. Adding steam would require a huge redesign in the middle of construction, and raise costs to a point that would sink the program entirely. Instead, after commissioning some research of their own with British firms, they placed a formal request to buy EMALS. By 2012, however, the Royal Navy had discovered that adding catapults to its new carrier design was much more difficult and expensive than BAE had led them to believe. In an embarrassing climb-down, the government retreated back to the F-35B STOVL (short Take-Off, Vertical Landing) fighter, and ended efforts to add catapults to its carriers. Program Teams Growler, EMALed The program is managed by US NAVAIR’s PMA-251, under the Aircraft Launch and Recovery Equipment (ALRE) program manager. General Atomics’ EMALS team includes: GA’s Electromagnetic Systems Division – Electromagnetic System Design and Fabrication, System; Integration, Power Electronics and Controls, Software, and Logistics; Alion Science and Technology – Specialty Engineering; Kato Engineering – Energy Storage Systems Manufacture; L3 Communications’ Applied Technologies Pulse Sciences – Power Electronics; QinetiQ’s Foster Miller, Inc. – Control Systems, System Health Monitoring; STV, Inc. – Test Site Design/Integration, Naval System Logistics; University of Texas at Austin Center for Electromechanics – Energy Storage Systems Design and Analysis. General Atomics’ related Advanced Arresting Gear team, which is part of the larger ALRE program and can be ordered under EMALS contracts, includes: GA’s Electromagnetic Systems Division – Systems Integration, Cable Drum and Cable Shock Absorber, Power Electronics/ Controls/ Software, Arresting Controls Software, System Health Monitoring, Test Site Design and Integration; Alion Science and Technology – Shipboard Integration, Thermal Systems, Electric Power; Curtiss-Wright Electro-Mechanical Corporation – Electric Motor; ESCO Corporation – Water Twister and Mechanical Brake Systems ITT Corporation – Naval System Logistics QinetiQ’s Foster Miller, Inc. – Control Workstations Contracts and Key Events FY 2013 – 2020 Tests expanding to all carrier-launched manned aircraft. CVN 78 cost growth (click to view full) December 30/21: CVN 81 General Atomics won a $69.9 million deal that provides non-recurring engineering and program management services in support of the Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) system for the CVN 81 aircraft carrier, minus energy storage subsystem. The deal provides for the evaluation, production, manufacture, assembly, integration and test of engineering changes to product hardware, software, technical data, and logistics products throughout the configuration management process associated with the EMALS and AAG system for the CVN 81 aircraft carrier, minus the energy storage subsystem. Work will take place in California. Estimated completion will be in December 2023. February 20/20: Planning Phase II General Atomics won a $25.2 million delivery order, which procures Electromagnetic Aircraft Launch System (EMALS) Depot Planning Phase II efforts, including depot level logistics support analysis, engineering support for logistics, supportability analysis, maintenance planning, reliability maintenance, technical manual development and engineering support as it directly correlates to depot planning for the USS Gerald Ford (CVN 78) and USS John F. Kennedy (CVN 79). More than 99 percent of the work on this contract will be performed in San Diego, with one-tenth of one percent of work on the contract taking place in Tupelo, Mississippi. Expected completion date is February 2022. March 13/19: Engineering and Diagnostics Support The Navy awarded General Atomics a $18.9 million delivery order to provide engineering and diagnostics support for the Electromagnetic Aircraft Launch System (EMALS). The deal includes test and evaluation effort for EMALS test site operations, Failure Reporting Analysis and Corrective Actions System, prototype and testing, environmental qualification testing and remediation, electromagnetic interference testing, and training efforts. The EMALS is a type of aircraft launching system designed to replace the steam catapult systems currently used on the Navy aircraft carriers. The USS Gerald R. Ford is the first carrier to use EMALS. John F. Kennedy and Enterprise are also scheduled to install and use EMALS. EMALS can launch a wide variety of aircraft weights and can be used on a variety of platforms with differing catapult configurations. Work will take place in New Jersey, Mississippi, and California and is expected to be finished in January 2021. February 8/19: Spares acquisition The Navy contracted General Atomics with $8.4 million for the delivery of 17 various line items for initial spares acquisition in support of the Electromagnetic Aircraft Launch System for use on aircraft carriers. The Electromagnet Aircraft Launch System (EMALS) launches carrier-based aircraft by means of catapult employing a linear induction motor. The EMALS was developed by General Atomics for the Gerald R. Ford aircraft carriers. Conventional launch systems are steam catapults. The EMALS however, accelerates aircraft more smoothly, it is lighter, costs less and needs less maintenance. In 2017, General Atomics received a $532.6 million contract modification to manufacture the EMALS for the Navy. Work under the current order will take place in Mississippi and is expected to be completed by early 2022. October 5/18: ARB General Atomics Electromagnetic Systems successfully completes testing of its Advanced Arresting Gear (AAG) in support of a US Navy propeller Aircraft Recovery Bulletin (ARB). The tests included the C-2A Greyhound, E-2C+ Hawkeye and the E-2D Advanced Hawkeye aircraft. The Advanced Arresting Gear is part of the Navy’s EMALS system developed for the new Gerald R. Ford-class aircraft carriers. The AAG sub-program will replace the current Mk 7 hydraulic system used to provide the requisite combination of plane-slowing firmness and necessary flexibility to the carriers’ arresting wires. AAG is intended to allow successful landings with heavier aircraft, reduce manning and maintenance, and add capabilities like self-diagnosis and maintenance alerts. July 6/18: Russia to develop own EMALS Russia’s United Shipbuilding Corporation is reportedly developing a new aircraft launch system to be deployed on aircraft carriers. The company did yet not specify the characteristics of these systems or the timeframe of their development. Russia currently has one Soviet-era aircraft carrier that is equipped with a ski-jump ramp. An aircraft launch system aboard an aircraft carrier is needed to accelerate radar surveillance aircraft or planes whose thrust/weight ratio is insufficient for taking via a ski-jump ramp. Current steam catapult technology is very stressful for the aircraft involved, very maintenance intensive, and not really compatible with modern gas turbine propulsion systems. It is quite likely that the system to be developed will be an electromagnetic aircraft launch system. EMALS aims to leap beyond steam’s limitations, delivering significant efficiency savings, a more survivable system, and improved effectiveness. An electromagnetic catapult is a mechanism, which accelerates an aircraft by linear induction motors instead of steam shuttles. This principle is used on monorail railroads. July 28/17: The US Navy has validated a software fix to the service’s Electromagnetic Aircraft Launch System (EMALS) after it was found during testing that the next-generation catapult generates excessive vibration to the aircraft when external fuel tanks are attached. However, final testing involving launches with an instrumented aircraft have been postponed for an additional year, with the service citing competing testing priorities as the reason for the delay. EMALS is one of many new technologies planned for the Navy’s Ford-class aircraft carrier fleet and is already installed on the Gerald R. Ford (CVN-78). The Ford is expected to receive the software update in 2019, following the ship’s Post Shakedown Availability. June 28/17: Acting Secretary of the US Navy (USN) Sean Stackley has revealed that there are issues concerning the General Atomics-built Electromagnetic Aircraft Launch System (EMALS) when launching F/A-18 aircraft that are loaded with fuel tanks. Stakley told a congressional hearing on June 16 that vibrations were detected when fuel tanks were attached to Super Hornets, “so now what they’re doing is going back through the software and adjusting the system to remove that vibration.” Installed onboard the USS Gerald R. Ford aircraft carrier, EMALS is intended to enable a higher degree of computer control, more accurate end-speed control, and smoother acceleration when launching carrier-based fixed-wing aircraft, and is also intended to adapt to future carrier air-wing platforms, such as lightweight unmanned systems or future heavy strike aircraft. January 26/17: Developments on the new Advanced Arresting Gear (AAG) have been given the thumbs up from the US Navy and will be installed on board the next USS John F. Kennedy. Designed to stop carrier-borne aircraft, the decision was made following a thorough review by an AAG Resource Requirements Review Board (R3B) last November. The 350th trap of an F/A-18E Super Hornet fighter was completed in December and the AAG team continues multisite test operations with the next type/model/series and the E-2/C-2 platform. June 14/16: A report by the US Armed Services Committee on the 2017 National Defense Authorization Act has revealed that the Navy is having second thoughts on whether to stick to the Advanced Arresting Gear (AAG) on the Ford-class carrier or revert back to the current version. The committee says the service is reviewing the installation of the AAG on CVN-79 and CVN-80, however, since the AAG has been ordered for CVN-79, it is unlikely to switch to the arresting gear from the Nimitz-class. July 20/15: Details have emerged regarding the technical specifications of India’s second indigenous aircraft carrier. The Indian Navy has reportedly sent requests to four shipyards to begin a design dialogue. These include Lockheed Martin, BAE Systems, DCNS and Rosoboronexport. The new design will differ significantly from the first indigenous carrier, INS Vikrant, currently under construction at Cochin; instead of a ski-jump used to launch aircraft, the new carrier will use a catapult system. The US has offered to sell the Northrop Grumman EMALS/AAG system to India under the Defense Trade and Technology Initiative, with the two sides recently establishing terms of reference for such a potential sale, as well as a joint working group. June 15/15: The Navy awarded a $737 million contract on Friday for one Advanced Arresting Gear and Electromagnetic Aircraft Launch System shipset in support of CVN-79 (the future USS John F. Kennedy). Testing of the EMALS system aboard CVN-78 (Pre-Commissioning Unit Gerald R. Ford) has been underway for several weeks, with dead-load testing taking place last week. Manufacturer Huntington Ingalls was awarded a $3.35 billion fixed-price contract earlier in June for the construction of CVN-79. The Ford-class of carriers has recently been criticized for being overly expensive, with a Congressional cost-cap of $11.5 billion. Apr 6/15: Export possibilities. The US would be willing to sell aircraft carrier-related technologies to India, DoD procurement chief Frank Kendall said Friday, including the EMALS catapult system. India’s aircraft carrier – the INS Vikramaditya – is not equipped with an aircraft catapult system. A joint working group has now been established to move things forward. Aug 11/14: Testing. EMALS deck testing begin aboard CVN 78, Gerald R. Ford. The Launch Control Subsystem is the 1st below-deck testing assessment, which will try to get a handle on how all of the sub-systems work together on board. Fortunately, EMALS has personnel on hand like EMALS integrated product team lead George Sulich, who has been with the program since its inception in 1999. The EMALS top deck components for the catapult trough are still arriving, as the last 6% of equipment to be delivered. Dead-load launches from the ship are scheduled to begin in late 2015, with manned aircraft launches to follow CVN 78’s scheduled delivery in spring 2016. Sources: US NAVAIR, “Navy’s brand new aircraft launch system embarks on below-deck testing”. July 23/14: Recognition. PMA-251 program manager Capt. James Donnelly presents NAVAIR’s Affordability Championship Award (ACA) and Letters of Appreciation to the Advanced Arresting Gear (AAG) Thermal Management Fluid Working Group at Joint Base McGuire-Dix-Lakehurst in Lakehurst, NJ. The AAG Thermal Management Fluid Working Group was stood up in response to failures of the AAG water twister. The cross-organizational team consisted of representatives from the Research and Engineering Office (AIR 4.0), PMA-251, the Future Aircraft Program Carrier Office (PMS-378) and the Naval Systems Engineering Directorate (SEA 05) to identify an acceptable fluid substitute that could take the heat. The group identified NALCOOL 2000 for its unique physical and chemical properties, and NAVAIR has estimated the savings as being over $1 million. Sources: US NAVAIR, “NAVAIR team members receive recognition for improved affordability work”. July 15/14: CVN 78. General Atomics in San Diego, CA receives a $10.3 million firm-fixed-price contract modification for CVN 78 EMALS shipboard software and support. All funds are committed immediately, using FY 2011 US Navy shipbuilding budgets. Work will be performed in San Diego, CA (79%), and Waltham, MA (21%), and is expected to be complete in October 2015. Fiscal 2011 shipbuilding and conversion (Navy) funds in the amount of $10, 267,000 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity (N68335-09-C-0573). May 8/14: CVN 79. General Atomics in San Diego, CA receives a maximum unfinalized contract for $26.6 million, to buy Electromagnetic Aircraft Launch System and Advanced Arresting Gear long-lead time materials for CVN 79. $15.4 million in FY 2013 US Navy shipbuilding budgets is committed immediately. CVN 79 is scheduled to be delivered to the U.S. Navy in 2023, so the main award doesn’t need to happen before January 2017. GA Electromagnetic Systems Group will manufacture EMALS and AAG components at its state-of-the-art 367,000 square foot manufacturing facility in Tupelo, MS. Work will also be performed in San Diego, CA (47%); Mankato, MN (35%); Spring Grove, IL (16%), and Detroit, MI (2%), and is expected to be complete in January 2017. This contract was not competitively procured pursuant to FAR 6.302-1, by US NAVAIR in Patuxent River, MD, (N00019-14-C-0037). See also: GA, “General Atomics Awarded Initial Contract for Launch & Recovery Systems for Future John F. Kennedy Aircraft Carrier”. March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. There’s some added information re: EMALS/ AAG: “Deficiencies affecting water twister components—used to absorb energy when arresting aircraft—of the advanced arresting gear (AAG) technology continue to disrupt the system’s development. Recent water twister redesign proved unsuccessful in testing last year. The Navy resolved problems with the redesign and is planning for concurrent testing. Despite these steps, the Navy forecasts AAG land-based testing to be complete in August 2016 – a new delay of nearly two years—and after the Navy has accepted CVN 78 delivery…. Land based testing for EMALS and DBR has progressed enough that program officials do not anticipate significant redesign.” March 4-11/14: FY15 Budget. The US military slowly files its budget documents, detailing planned spending from FY 2014 – 2019. For EMALS and AAG, unit costs are listed as FY08$ 762.9 million (614.7 + 148.2) for CVN 78, and FY13$ 883.1 million (713.7 + 169.4) for CVN 79. Jan 28/14: DOT&E Testing Report. The Pentagon releases the FY 2013 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). EMALS is included, as part of the CVN-78 assessment, and EMALS/AAG remain 2 of the 4 key risks for the carrier. Both are far below expected reliability levels at this stage “Aircraft compatibility testing continued in 2013. Approximately 400 aircraft launches are being conducted using EA-18G, F/A-18E, F/A-18C, E-2D, T-45, and C-2 aircraft. The Navy has also conducted an additional 1,200 dead-load launches (non-aircraft, weight equivalent, simulated launches). Approximately 55 percent of the EMALS government furnished equipment (GFE) has been delivered to the shipyard. At the Lakehurst, New Jersey, test site, over 1,967 launches have been conducted and 201 chargeable failures…. approximately 240 Mean Cycles Between Critical Failure… where a cycle represents the launch of one aircraft. Based on expected reliability growth, the failure rate is presently five times higher than should be expected. ….Testing to date has demonstrated that AAG should be able to recover aircraft planned for the CVN-78 air wing, but as with EMALS, AAG’s reliability is uncertain. At the Lakehurst, New Jersey test site, 71 arrestments were conducted earlier this year and 9 chargeable failures occurred. The Program Office estimates that AAG has approximately 20 Mean Cycles Between Operational Mission Failure…. 248 times higher than should be expected.” Sept 5/13: GAO Report. EMALS and AAG delays and cost increases have hit a point where they’re creating problems for the new Ford Class carriers, driving up costs to $12.8 billion for the 1st ship, adding risk, and impairing initial capabilities. Costs: Since 2008, EMALS-related costs for the first-of-class Gerald R. Ford [CVN 78] have risen by 133.7%, from $317.7 – $742.6 million. AAG costs have also spiked, though its 124.8% jump is only from $75 – $168.6 million. This is so despite the Navy’s 2010 firm fixed-price contracts to produce these systems for CVN 78. Even with cost caps, however, late delivery and testing means that changes have to be made to a partially-complete ship. EMALS configuration changes have already forced electrical, wiring, and other changes within the ship; and instead of just being hoisted into place, the Advanced Arresting Gear will now have to be installed in pieces via a hole cut in the flight deck. AAG continues to undergo redesigns, most recently to its energy-absorbing “water twister,” and limited EMALS testing with the delayed F-35C risks forcing further changes after the ship has been built. The Navy says that all future changes will take place within the components’ allotted space and weight, but GAO doesn’t think they can possibly know that. Risk: Beyond redesign risks, the Navy needs to confront larger ship delivery risks. At present, EMALS isn’t scheduled for TRL 7 level maturity until FY 2014, with AAG to follow in FY 2015. The ship is due for delivery in FY 2016. Systems are already maturing so late that comprehensive testing must wait until the ship is at sea, so further schedule delays have nowhere else to go. Launch delays would mean delays to post-launch test programs, which are closely synced with ship delivery. Once CVN 78 is built, EMALS and AAG’s reliability will continue to hamper operations. As of March 2013, both systems are far below where they’re supposed to be, with critical failures every 2-3 cycles. Since Initial Operational Test & Evaluation requires certain reliability levels between critical failures (MTBCF), continued problems could endanger the ship’s entry into service. GAO points out that the Navy’s “Duane” model for reliability growth doesn’t match their long-standing data, and even under optimistic planned growth levels, AAG isn’t supposed to hit the ~100 cycle MTBCF minimums before 2027. EMALS will take even longer, to 2032. Unless and until they succeed, they’ll destroy the new carriers’ key 2007 promise of generating 25% more aircraft sorties per ship than the Nimitz Class. As things stand, even meeting the USS Enterprise’s OEF wartime record of 2,970 combat missions and a 99.1% sortie completion rate seems unlikely. Sources: GAO Report #GAO-13-396 | Virginian-Pilot, “The costs and doubts keep growing for carrier Ford”. June 25/13 Testing. NAVAIR successfully launched an EA-18G Growler for the 1st time. This starts the 2nd phase of their manned aircraft launch tests, as they intend to proceed with more than 300 launches this year to test all aircraft currently launched from carrier catapults, save for E-2C Hawkeyes. They have already launched each of the Navy’s newest planes at least once. This ramp-up comes at about the same time railguns are also seeing more tests. April 15/13: Budget. The FY 2014 Presidential Budget adds funding and/or reprogramming to FY12 and FY14 to properly reflect pricing. At $43 million, FY14 is the final year with significant spending built over the FYDP, as FY15/16 see about $2.5 million each, and there’s nothing for FY17/18. This accelerates slightly the spending plan from the FY13 president budget. Cost to completion is now seen reaching $834.7 million. In parallel the Navy is working on demonstrating “an automation control environment for carrier shipboard equipment,” in order to reduce manpower requirements and ongoing costs. They won’t elaborate, but EMALS System Development and Demonstration (SDD) continues to be scheduled for completion by Q2 2015. To get there, the Navy intends to conduct full system and risk mitigation testing at the System Functional Demonstration (SFD) site by completing repeated cycles with deadload testing and gap variation tests. They aim to reach 4,000 deadload launches to assess reliability. Sources: US Navy PE 0603512 [PDF]. EMALS generator (click to view full) March 14/13: Testing. US Navy PMA-251, the Aircraft Launch and Recovery Equipment Program Office, completes shared generator testing for EMALS at Joint Base McGuire-Dix-Lakehurst, NJ. Launches to date have involved just 1 aircraft, but the real system will have to drive up to 4 launchers. The motor generator stores the system’s energy in the inertia of its rotor, and releases that energy for aircraft launch. Hence “shared generator” testing for multiple catapults, which was completed ahead of schedule. That should make OT&E happy. The team also used General Atomics’ CVN 78 ship-representative controls lab in Rancho Bernardo, CA, to conduct extensive modeling and simulation of the 4-catapult system. That ensured that the software and launch controls were set up correctly, before they began experiments with weighted sleds at Lakehurst on the East Coast. Sources: US NAVAIR. Jan 17/13: DOT&E Report. The Pentagon releases the FY 2012 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). EMALS is included parenthetically, as OT&E addresses the next-generation aircraft carrier program. They remind that “EMALS, AAG, DBR, and Integrated Warfare Systems remain pacing items for successful delivery of the ship,” and add: “DOT&E holds moderate concern regarding the performance risk generated by the inability to test the full four-catapult electrical distribution system prior to initial trials aboard ship.” FY 2011 – 2012 1st ever electro-magnetic aircraft launch is an F/A-18E; Other aircraft follow. UK adopts then abandons EMALS. 1st F-35C launch (click for video) Aug 15/12: Support. General Atomics in San Diego, CA receives a $44.5 million cost-plus-fixed-fee order for maintenance planning related to the Gerald R. Ford’s EMALS system. They’ll develop supportability analysis, repair level analysis, maintenance plans, a logistics management information database, maintenance guidance that make reliability the top priority, and create associated technical manuals and training. Work will be performed in San Diego, CA (90%), and Lakehurst, NJ (10%), and is expected to be complete in April 2016 (N68335-11-G-0003). May 10/12: Britain. Britain’s government confirms long-standing rumors that it would abandon the F-35C and its associated catapult modifications to 1 carrier, returning to the ski-jump deck and F-35B STOVL variant. A DSTL report has explained some of the capabilities Britain would lose by abandoning the F-35C, but the government justifies their decision by saying that the F-35C’s improved capabilities and compatibility with American and French carriers would come at too steep a cost. Staying with the F-35C, they say, would delay Britain’s return to carrier capability from 2020 – 2023 or later, cost nearly GBP 2 billion to modify 1 of their 2 carriers, and leave the Royal Navy with no carrier capability if their converted ship needs maintenance. In contrast, the F-35B will be compatible with the US Marines and with Italy, and gives Britain the option of taking its 2nd CVF carrier out of strategic reserve when the primary carrier is out of service for long refits or maintenance dockings. UK MoD. No EMALS for Britain Dec 21/11: UK. General Atomics in San Diego, CA receives $17.4 million cost-plus-fixed-fee contract modification to provide engineering support for the development of EMALS and Advanced Arresting Gear configurations for Britain’s Queen Elizabeth Class Aircraft Carrier Program. One of Britain’s 2 new carriers is slated to receive the combination, and operate F-35C fighters. Work will be performed in San Diego, CA, and is expected to be complete in June 2012. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-11-C-0057). Initial contract for Britain’s CVF Nov 18/11: F-35C launches. The land-based EMALS at Lakehurst, NJ launches an F-35C Lightning II fighter for the 1st time. The EMALS launch of test aircraft CF-3 follows more than 50 steam catapult launches, and “also provided information for the United Kingdom’s Ministry of Defence as the UK proceeds with including EMALS in the Queen Elizabeth-class aircraft carrier.” Both EMALS and the F-35C are currently in test and evaluation, but the F-35C is especially important to the new catapult. The heavy fighter will be EMALS most significant technology companion over their life cycle together, and its 70,000 pound/ 31,800 kg maximum takeoff weight places it very close to the F-14D Tomcat. EMALS and the F-35C need to demonstrate that they can help each other with maintenance costs, or the real price of EMALS will escalate significantly. US NAVAIR. Nov 15/11: The US DSCA announces [PDF] Britain’s official request for Electromagnetic Aircraft Launch System/Advanced Arresting Gear (EMALS/AAG) long lead sub-assemblies. EMALS long-lead items include the Energy Storage System, Power Conditioning System, and Launch Control System. AAG long-lead items include Power Conditioning, Energy Absorption Subsystems, Shock Absorbers, and Drive Fairleads. The request would also cover Aircraft Launch and Recovery Equipment, spare and repair parts, support equipment, personnel training and training equipment, publications and technical documentation, software support, and other forms of U.S. Government and contractor support. The estimated cost is up to $200 million, and the prime contractor will be General Atomics in Rancho Bernardo, CA. This is still just a potential sale, but the nature and specificity of the request strongly suggests that Britain has decided to abandon its own electro-magnetic catapult research. Now that EMALS is launching real aircraft, they can certainly reduce technical uncertainties and costs by buying it to equip one of their forthcoming Queen Elizabeth Class carriers. British request Sept 27/11: E-2D launches. The EMALS test site at Lakehurst launches an E-2D Advanced Hawkeye, one of the new aircraft that will accompany it onto its new carriers. EMALS has already launched an F/A-18E Super Hornet, a T-45 Goshawk jet trainer, and the Hawkeye’s C-2A Greyhound cargo cousin. About 63 – 65 launches are planned for each aircraft type, and the 2nd phase of aircraft compatibility testing is scheduled to begin in 2012. Engineers will continue reliability testing through 2013, then perform installation, checkout, and shipboard testing, with the goal of shipboard certification in 2015. US Navy. June 8-9/11: C-2A launches. EMALS performs 18 launches of a VX-20 Sqn. C-2A Greyhound cargo delivery aircraft, over a wide range of aircraft weights. The C-2 is also the E-2 Hawkeye AWACS plane’s base airframe. US NAVAIR. June 1-2/11: T-45 launches. EMALS takes a new step by launching a T-45C Goshawk jet from the NAVAIR Lakehurst, NJ test site. VX-23 Sqn. made 12 successful launches with the Goshawk over this period, as part of on-going aircraft compatibility testing. US NAVAIR. May 9/11: Delivery. General Atomics delivers the 1st set of EMALS production components to US NAVAIR, for installation in the Gerald R. Ford. NAVAIR will convey the items on to Huntington Ingalls Industries, Inc., in Newport News, VA. General Atomics. March 9/11: Testing. Gannett’s Navy Times reports that EMALS testing has been put on hold since its 1st aircraft launch. The problem involves a gap in the handoff between linear motors, as the aircraft is accelerating. General Atomics has reportedly been working on the system’s software to cure the problem, and a system functional demonstration is planned for later in March 2011. The information emerged during a House Armed Services Seapower & Expeditionary Forces subcommittee hearing, in response to question from Rep. Todd Akin [R-MO]. Earlier testimony indicated that the CVN 78 Gerald R. Ford is 20% complete and on schedule for September 2015 delivery, which intensifies the pressure on EMALs to deliver in time. As the publication notes: “Further EMALS delays, one source said, could begin to impact the carrier’s building schedule and threaten cost increases.” See also full HASC hearing. 1st EMALS launch: F/A-18E (click to view full) Dec 18/10: Launch! The EMALS test catapult at Naval Air Systems Command in Lakehurst, NJ successfully performs the 1st electro-magnetic aircraft catapult launch in history. The F/A-18E Super Hornet from Air Test and Evaluation Squadron 23 (VX-23) was piloted by Lt. Daniel Radocaj. Chief Petty Officer Brandon Barr of NAWCAD’s Test Department was the “shooter,” assisted by Petty Officers 1st Class Hunsaker and Robinson, and Petty Officers 2nd Class Williams, Wong, and Simmons. Engineers will continue system functional demonstration testing at NAVAIR Lakehurst, with test launches set to expand to C-2 Greyhound cargo aircraft and T-45 Goshawk trainers in 2011. The ALRE program manager at this time is Capt. James Donnelly, and Cmdr. Russ McCormack of PMA-251 is deputy program manager for future systems. US NAVAIR | USN Photo release | Gannett’s Navy Times. 1st EMALS Launch Nov 8/10: UK. Babcock Deputy Chairman Lord Hesketh tells London’s Telegraph newspaper that: “Britain could afford to run both ships – and put aircraft on them from the start – were it not for the “vested interest” of BAE Systems, the prime contractor. “We are paying twice as much as we should to get half the capability,”… said the [GBP] 5.2 billion project was a “Loony Tunes” operation that was “about to turn into a classic British disaster”… the F35 will not be ready until 2020, and plans for a jump-jet version have been scrapped – meaning an electric catapult to launch the aircraft will have to be developed at extra cost. Lord Hesketh said a far quicker and cheaper solution was to adapt the RAF’s existing Typhoons for work at sea. But he said this was less remunerative for BAE than buying dozens of new F35s.” Note the bit about “an electric catapult.” Oct 29/10: UK. In an interview with BBC Scotland during a visit to the Govan shipyard, Defence Secretary Liam Fox said that estimates for the addition of catapults to the Queen Elizabeth Class ranged “upwards from GBP 500m,” with studies on going to pick a catapult system and determine likely costs. Meanwhile, Minister for Defence Equipment, Support and Technology Peter Luff confirmed that the government had not yet been decided whether one or both carriers would be converted, what type of catapult system to use, procurement approach, or delivery dates, though the SDSR would give a planned 2020 in-service date for Britain’s lone operational carrier. Defence Management. FY 2009 – 2010 Initial orders; Cost jumps & concurrency concerns; EMALS survives review; Testing; UK becomes interested in EM launch. CVN-74 hydraulics: legacy system? (click to view full) Sept 23/10: US NAVAIR announces that EMALS has completed catapult commissioning testing for its system functional demonstration (SFD), with no-load and dead-load launches in all areas of the required performance envelope, including a 154-knot dead-load launch equivalent to the weight of an F/A-18E Super Hornet. Cmdr. Russ McCormack, PMA-251 deputy program manager for future systems, notes that EMALS hardware production is occurring independently from the SFD, “as component operation was previously proven in the High Cycle Testing and Highly Accelerated Life Testing phases of the program.” Moving into SFD as of Sept 12/10 marks the opening of the test program window for the F/A-18E launch and future launches. The F/A-18E is currently being instrumented and test data is being analyzed in order to obtain flight clearances and launch approval for later in 2010. Aug 23/10: Leadership. NAVAIR PMA-251, The Aircraft Launch and Recovery Equipment (ALRE) Program Office gets a new program manager, as Rear Adm. Randy Mahr leaves PMA-251 to become NAWCAD(Naval Air Warfare Center Aircraft Division) Commander. He is replaced by his deputy, Capt. Jim Donnelly, who became the deputy program manager for future systems – EMALS and the Advanced Arresting Gear (AAG) in April 2008. Donnelly is a 1986 U.S. Naval Academy graduate and naval aviator, whose previous stints include piloting EC-130Q Hercules and E-6A/B Mercury national command aircraft, Catapult and arresting gear officer and assistant air officer on the USS Theodore Roosevelt (CVN-71), Executive officer and commanding officer of the VQ-3 Ironmen squadron, and Program Executive Officer for NAVAIR Tactical Aircraft Programs. NAVAIR’s release adds that: “The future Electromagnetic Aircraft Launch System (EMALS) full-scale test catapult went operational for the first time at NAVAIR Lakehurst, N.J., and has since demonstrated max speed of 180 knots, or 207 miles per hour. The program is scheduled to launch its first test aircraft later this year.” July 20/10: UK. Jane’s reports that the UK Ministry of Defence (MoD) is funding development of an electromagnetic catapult system for the Royal Navy’s Queen Elizabeth-class aircraft carriers, in case the F-35B STOVL is abandoned. Rather than go through the involved process of joining America’s EMALS program, however, they appear to have contracted with Converteam, who was already developing an electro-magnetc launch systems for UAVs under an April 2006 EMKIT(Electro Magnetic Kinetic Integrated Technology) contract. A GBP 650,000 (about $1 million) EMCAT (electro-magnetic catapult) contract was reportedly awarded in July 2009, as a follow-on effort to continue the design, development and demonstration of high-power electrical systems for its EMCAT system. In October 2009, a smaller-scale demonstration of both controlled acceleration and braking was performed using electromagnetic linear motors. This could lead to the same core systems being used for launch and recovery. New Low Voltage linear motors with reduced end effect coils were delivered in early 2010, paving the way for the design of medium voltage linear motors which will help Converteam scale up their design. Jane’s Naval Intelligence | Converteam project page. May 5/10: Testing Problem. The Newport News Daily Press reports that in January 2010, a software glitch caused one of the EMALS shuttles to reverse course and slam into other equipment during one of the initial full-scale land-based tests. It caused $52,000 worth of damage, set back the testing program by about 3 months, and set back the overall EMALS program by 7 months. “Despite the problems, the Navy’s program manager for the launch system, Capt. Randy Mahr, said the delay would not affect the delivery of the Ford… scheduled to enter the fleet in 2015. The Navy and General Atomics had planned to begin launching aircraft from the land-based system this summer, but that’s now been delayed until later this fall, Mahr said… The things that are delaying me right now are software integration issues, which can be fine-tuned after the equipment is installed in the ship.” That particular software problem has since been fixed, and more than 750 no-load test runs of the equipment have been done, with about 250 at full speed. Dead loads with weighted sleds are the next step, aircraft trials are expected in fall 2010, and the first pieces of EMALS equipment are now scheduled to begin arriving in Newport News for installation in May and June 2011. April 1/10: SAR. EMALS is cited in the Pentagon’s April 2010 Selected Acquisitions Report for major cost increases. The Pentagon’s own decisions are causing even larger cost increases in the carrier program, but EMALS’ contribution is still quite substantial at almost $1.3 billion in additional costs: “Program costs [for the next-generation aircraft carrier] increased $5,426.4 million (+15.5%) from $35,119.1 million to $40,545.5 million, due primarily to the shift from a four-year to five-year build cycle (+$4,131.2 million), which placed the program on a more fiscally sustainable path while continuing to support a minimum of 11 aircraft carriers through fiscal 2040. Additional increases resulted from revised cost estimates for the Electromagnetic Aircraft Launch System (EMALS) (+$1,292.6 million)…” See also Newport News Daily Press. SAR increase March 30/10: GAO Report. The US GAO audit office delivers its 8th annual “Defense Acquisitions: Assessments of Selected Weapon Programs report. For the EMALs and Advanced Arresting Gear projects: “While CVN 21 program officials stated that the EMALS program is on schedule to deliver material to the shipyard when it is needed for construction, concurrent EMALS testing and ship construction continue to present cost and schedule risks to the program… As a result of the [2009 EMALS] tests, the program identified design changes that are necessary to improve the performance of EMALS, but add cost and schedule risk to the program… The Navy plans to test EMALS with actual aircraft in summer 2010. The Navy awarded a not-to-exceed fixed-price production contract to General Atomics for EMALS and the advanced arresting gear in 2009. At the time of award, the contract price had not been finalized. The Navy expects to finalize the price of this contract in March 2010.” “The advanced arresting gear includes seven major subsystems. Programs officials expect that six of the subsystems will be mature after analyzing data from a recent reliability test. The remaining subsystem – control system software – will remain immature until integrated [AAR] land-based testing with actual aircraft occurs in fiscal year 2012. This testing will overlap with the first arresting gear deliveries to the shipyard.” March 25/10: Testing. Federal Business Opportunities issues pre-solicitation #N00019-10-R-0060, “Corrosion Resistant Study Reports & Test Equipment.” Excerpt: “NAVAIR Hwadquarters, Patuxent River, MD intends to enter into a sole source contract with McGee Industries, Inc. for one simulated Electromagnetic Aircraft Launch System (EMALS) simulated Trough Exposure Test Rig and engineering reports on environmental effects on fatigue and fracture mechanical properties of EMALS materials. The Government intends to procure these reports and test equipment under the authority of 10 USC 2304( c)(1) as implemented by the Federal Acquisition Regulation Section 6.302-1. Award to an alternate source would result in a substantial duplication of costs that could not be recovered through competition. McGee Industries has performed start-up studies using techniques that are not commercially available at standard testing labs, and is the only source possessing the requisite background knowledge and technical data necessary to provide the required support without substantial re-work at additional program costs. Firms that believe they can satisfy this requirement are encouraged to identify themselves…” Nov 12/09: Ready. NAVAIR’s Aircraft Launch and Recovery Equipment Program Office (PMA-251) hosts a ribbon-cutting ceremony for the EMALS full-scale catapult test site at Joint Base McGuire-Fort Dix-Lakehurst, NJ. In an interesting twist, the EMALS armature is used to cut the ribbon. Engineers at JBMDL will begin dead-load testing this fall with the first aircraft launch scheduled for summer 2010 with an F/A-18 Hornet. US NAVAIR. Lakehurst ready Nov 9/09: CVN 78. General Atomics in San Diego, CA receives a $102.2 million modification to the unfinalized EMALS Ship-set contract to provide for the production of 1 counterpart advanced arresting gear system ship-set for CVN-78. While EMALS will serve as the Ford’s launch technology, the Advanced Arresting Gear will offer related improvements around carrier landings, using a system based on electric motors rather than the Mk7 hydraulic system used with current arrester wires. Unlike EMALS, AAG is also slated for refits to existing Nimitz class carriers. Work will be performed in San Diego, CA (35%); Mt. Pleasant, PA (28%); Tupelo, MS (15%); Waltham, MA (12%); and Aston, PA (10%), and is expected to be complete in September 2015. The Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages the contract (N68335-09-C-0573). CVN 78 AAG Oct 20/09: AAG testing. General Atomics Electromagnetic Systems Division (GA-EMS) announces the end of 1st phase Extended Reliability Testing (ERT) of the Advanced Arresting Gear (AAG) at its Rancho Bernardo, CA facility. Phase 1 cycled the AAG hardware through more than 5,400 shipboard-representative “arrestments” to obtain reliability growth data, and to prove out the real-time control software. Future dead-load arrestment testing will begin in spring 2010, followed by aircraft arrestment testing scheduled for late 2010. ERT Phase 2 will begin February 2011 in GA’s Tupelo, MS manufacturing and test facility, and will test the equipment over an additional 104,000 cycles. GA-EMS believes that the transfer will help reduce program costs. Prepping EMALS Sept 28/09: Testing. US Navy NAVAIR announces that EMALS has completed Phase 1 of Highly Accelerated Life Testing (HALT) and the 2nd phase of System Functional Demonstration (SFD) commissioning. HALT tests look at the system’s launch motor will perform under at-sea conditions, and provides data to verify peak performance, even in extreme conditions. SFD testing replicates full-scale launching capabilities, and SFD commissioning ensures that the system is ready for upcoming test launches of dead-loads (weighted, steel-framed sleds) and aircraft. Phase 2 of SFD commissioning integrated and tested all power components of the system with the launch controller. The upcoming 3rd phase will integrate the remainder of the system, and test the basic ability to convert electrical power to mechanical force. The testing culminates with the launch of dead-load weights and non-operational test aircraft at Naval Air Engineering Station Lakehurst, NJ; commissioning with dead loads is scheduled to begin during fall 2009. Aug 17/09: SDD. Inside the Navy reports that: “The Navy has added another $24 million to the budget for a revamped research, development, test and evaluation (RDT&E) effort for the Electromagnetic Aircraft Launch System aboard the new Gerald R. Ford class of aircraft carriers bringing FY-09 spending on developing the troubled program to more than $168 million.” June 30/09: CVN 78. General Atomics in San Diego, CA received an unfinalized $573 million ceiling-priced contract to build the EMALS shipset for the Gerald R. Ford [CVN 78]. This is added to a $43 million long-lead contract (q.v. March 27/09), creating a total of $613 million. Work will be performed in San Diego, CA (49%); Tupelo, MS (19%); Mankato, MN (12%); Waltham, MA (4%); and various locations across the United States (16%), and is expected to be complete in September 2015. This contract was not competitively procured, pursuant to FAR 602-1. The Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages this contract (N68335-09-C-0573). CVN 78 main April 15/09: Review. Reuters reports that the U.S. Navy has completed a major review of EMALS that weighed possible technical, costs, and schedule risks. The Navy has decided to proceed, on the grounds that EMALS is the best option for keeping the program on schedule, vs. redesigning and building the ship for steam. The system’s potential cost savings are also listed as a factor by US Navy spokesman Lt. Cdr. Victor Chen. The Navy is reportedly starting detailed, fixed-price contract negotiations with General Atomics. If that becomes the basis for a renegotiated contract, it would shift the risk of delays or additional work onto the contractor. EMALS survives April 3/09: Naval site Information Dissemination runs an article assessing EMALS’ current state, and the Navy’s contention that the system poses no schedule risks. The title: “Wal-Mart Called, They Want Their Yellow Smiley Face Back.” Despite the title, the background is valuable, and the discussion is substantive. Is EMALS a technology too far? Or is it just a complex technology with more issues than expected, each of which is being dealt with but at a rate that creates some schedule concerns? What, if anything, does a realistic Plan B look like? Delay construction until EMALS is ready, given its promised operations costs savings? Extensively redesign CVN 78 for steam catapults? Buy another CVN 77 design ship instead, and store the pieces that have already been made? March 31/09: Review. The Daily Press of Virginia reports: “We’re still conducting a review to assess and mitigate risks in the program cost, schedule and performance of EMALS,” said Lt. Cmdr. Victor Chen, a Navy spokesman. “At this point, EMALS is still the launching system of record for (the Ford). …If EMALS is scrapped for the Ford, the shipyard would have to re-engineer the carrier to support the old steam-driven catapults used on previous ships. That process, which includes running thousands of feet of new pipe to and from the Ford’s propulsion system, could extend the construction schedule by up to a year and is expected to cost several hundred million dollars.” “At this point…” is perhaps not the ringing endorsement one had hoped for. March 30/09: GAO report. The US government’s GAO audit office issues GAO-09-326SP: “Defense Acquisitions: Assessments of Selected Weapon Programs.” With respect to EMALS and the CVN-21 program, it says that 10/14 technologies are either fully mature, including the nuclear propulsion and electrical plant, or approaching maturity. Of the remaining 4 immature technologies: “…the development and design of the electromagnetic aircraft launch system (EMALS), the advanced arresting gear, and the dual band radar (composed of the volume search and multifunction radars) present the greatest risk to the ship’s cost and schedule.” Ominously, it adds: “A February 2008 program assessment recommended a number of changes to the EMALS program to improve performance. The Navy re-planned the test program and changed the management approach. The CVN 21 program office is now responsible for overseeing EMALS production and ship integration, rather than the Naval Air Systems Command. In addition, EMALS will no longer be provided as government-purchased equipment. Instead, the shipbuilder will purchase EMALS, giving it a more direct role in managing the integration on CVN 78. The cost impact of this change has not been finalized.” There are also schedule concerns: “Problems during EMALS development have already resulted in cost growth and schedule delays. In order to meet CVN 78’s delivery date, the Navy adopted a strategy that will test, produce, and ultimately install EMALS with a high degree of concurrency. In September 2008, the contractor completed the first round of high- cycle testing, gaining confidence in the performance of the generator–a source of past problems. Contractor-led integrated land-based system testing will not be complete until the end of fiscal year 2011–2-years later than estimated in December 2007. Assuming no further delays, EMALS will not demonstrate full performance of a shipboard ready system until at least 7 months after installation on CVN 78 has begun…” March 27/09: CVN 78. Northrop Grumman Shipbuilding, Inc. in Newport News, VA received $43 million, unfinalized modification to a previously awarded contract (N00024-08-C-2110). The contract covers long lead-time materials that must be ordered early, in order to ensure timely production of Gerald R. Ford’s [CVN 78] EMALS catapults. Materials bought will include Energy Storage Subsystem (ESS) Induction Motor Stator Assemblies, ESS Induction Motor Rotor Assemblies, ESS Exciter Stator Assemblies, ESS Exciter Rotor Assembly, ESS Rectifier Assemblies, ESS Main Rotor Assemblies and Power Conversion Subsystem Rectifier material components. Work will be performed in North Mankato, MN (74%); Mt. Pleasant, PA (17%); and San Diego, CA (9%), and is expected to be complete by November 2012. The US The Naval Sea Systems Command in Washington Navy Yard, D.C. manages this contract. March 19/09: Testing. NAVAIR’s EMALS developers have given a green light to engineers at General Atomics in Tupelo, MS to engage in full power train testing of EMALS motor components. This second phase of High Cycle Testing (HCT-2) will involve full power train testing, and will give a specific prediction of EMALS operations. HCT-2 will also perform environmental qualification testing, which is used to confirm the adequacy of the equipment design and safety under normal, abnormal, design basis event, post design basis event and in-service test conditions. US NAVAIR. Dec 23/08: Infrastructure. Sauer, Incorporated in Jacksonville, FL wins an $8.3 million firm-fixed-price task order to design and build an Electromagnetic Launch RDT&E(Research, Development, Test, and Evaluation) facility at Naval Support Activity South Potomac in Dahlgren, VA (N62477-04-D-0036, #008). Work is expected to be complete by May 2010. The Naval Facilities Engineering Command, Washington in Washington, DC received 5 proposals under an existing multiple-award construction contract. FY 2004 – 2008 From development contract to Preliminary Design Review; Considerable worry that EMALS will be ready in time. EMALS motor, HCT-1 (click to view full) Sept 3/08: Testing. EMALS reaches the 10,000 High Cycle Testing, phase 1 (HCT-1) milestone at the General Atomics test facility in Tupelo, MS. HCT-1 was conducted in order to verify the performance capabilities of EMALS’ electrical and thermal power equipment, and the shipboard cycling rate of the energy storage subsystem. Those tests reduce the risk of structural failure, strengthen confidence in EMALS’ reliability, and help to validate both system life predictions and electromagnetic interference predictions. EMALS is scheduled to begin its second phase of HCT in winter 2009. US NAVAIR. March 14/08: During US House Armed Services Seapower and Expeditionary Forces Subcommittee hearings about the proposed the FY 2009 budget, chairman Gene Taylor [D-MS] discusses the state of the program: “Another very risky program is the new aircraft carrier. Not that the Navy and Newport News Shipyard don’t know how to build aircraft carriers, they do. However, one of the major new technologies, the electro-magnetic launch system, or EMALS, has not even been tested in a shipboard configuration and the ship is already under construction. Just this last week the Navy requested an additional $40 million dollars for continued development of EMALS because, and I quote, ‘the contractor underestimated design and production cost.’ The cynic in me would say the contractor purposefully low-balled the bid to get the contract knowing full well the Navy would be forced to pay whatever the true costs of the system turned out to be. Perhaps we should have built another Nimitz class carrier until the research and design for EMALS was complete.” Read “US Navy’s 313-Ship Plan Under Fire in Congress” for more. April 17/08: The first full size test motor generator for the Navy’s Electromagnetic Aircraft Launch System (EMALS) has now been assembled, and finished its 30 days of factory acceptance testing at Kato Engineering’s plant in Mankato, MN on April 11/08. The motor generator weighs over 80,000 pounds, and is 13.5 feet long, almost 11 feet wide and almost 7 feet tall. It’s designed to deliver up to 60 megajoules of electricity and 60 megawatts at its peak. In the 3 seconds it takes to launch a Navy aircraft, that amount of power could handle 12,000 homes. This motor generator is part of a suite of equipment called the Energy Storage Subsystem, which includes the motor generator, the generator control tower and the stored energy exciter power supply. The new Gerald R. Ford Class will require 12 of each, and 5 of each are currently being manufactured under General Atomics’ Systems Development & Demonstration contract. One is slated for component level testing, and 4 will be installed and used for system level testing at the Lakehurst, NJ, EMALS catapult site. NAVAIR release. Nov 28/07: General Atomics’ Electromagnetic Aircraft Launch System (EMALS) catapult recently passed its final critical design review (CDR), led by Mr. Dave Cohen of NAVAIR’s Systems Engineering competency. The team spent a week thoroughly reviewing the entire EMALS program, and determined that the design is technically compliant with requirements and properly documented, although “a few open action items remain.” As noted above, EMALS is one of the new technologies that will be critical to the CVN-21 Class’ ability to fulfil its cost-saving promises and enter service on time. Capt. Stephen Rorke, Aircraft Launch & Recovery Equipment program manager thanked the team for open and honest dialog during the months leading up to the CDR as evidenced by the fact “the team knew about all open issues prior to the review and that no issues of major significance surfaced during the CDR.” The next step in the process is to begin installing the full size, ship representative EMALS equipment in the recently completed EMALS test facilities at Naval Engineering Station Lakehurst, NJ. The EMALS equipment installation is scheduled to begin in mid 2008, with actual testing to begin in early 2009 and continue throughout 2009. The first components of the EMALS equipment is scheduled to be delivered to Northrop-Grumman Newport News Shipbuilding in Norfolk, VA for installation in the Gerald R. Ford [CVN-78] in 2011. The USS Gerald R. Ford is scheduled to be delivered to the US Navy in 2015. NAVAIR release. CDR Nov 27/07: Infrastructure. Officials at the Lakehurst Naval Base hold a ribbon-cutting ceremony to acknowledge the completion of the base’s new Electromagnetic Aircraft Launch System (EMALS) facility. General Atomics will have the system’s equipment installed at the Lakehurst base in the beginning of March 2008, with the strong intent of beginning testing in February 2009. Manchester Times story. March 17/06: SDD. General Atomics’ team receives $6 million for engineering changes to the EMALS catapult system. April 2/04: General Atomics is awarded an SDD $145 million contract to design, build, integrate test and support a full scale, full length, shipboard representative Electromagnetic Aircraft Launch System (EMALS) for NAVAIR Lakehurst, at the Naval Air Engineering Station Lakehurst, NJ. The contract is the final step in a multi-phase research and development acquisition program to replace the current steam catapults used on aircraft carriers. According to the Navy release, “General Atomics, based in San Diego, will have its equipment installed at Lakehurst by 2006 and conduct testing in 2007-2008.” The EMALS land based support facility is to be built by Hensel Phelps Construction Co., of Aurora, CO under a $20.5 million contract, and is expected to be complete by December 2005 [DID: the ribbon cutting would actually take place in November 2007, and construction will last to late 2008]. It will include building the infrastructure, supporting buildings and related utilities for the EMALS program. US Navy | General Atomics. EMALS base SDD Background: EMALS & AAG NAVAIR, via WayBack – Aircraft Launch & Recovery Equipment (ALRE). NAVAIR – Electromagnetic Aircraft Launch System (EMALS). General Atomics – Electromagnetic Aircraft Launch System (EMALS). GlobalSecurity.org – Electromagnetic Aircraft Launch System – EMALS NAVAIR PMA-251 – Advanced Arresting Gear Program. General Atomics – Advanced Arresting Gear. QinetiQ North America – Advanced Naval Control Systems (ANCS). Includes EMALS/AAG work. Smithsonian Air & Space Magazine, via WayBack (Dec 2007 – Jan 2008) – How Things Work: Electro-Magnetic Catapults. American Heritage Magazine, via WayBack (Spring 2006) – Shot Into the Air. A very good look at the use of naval catapults from their earliest days to the forthcoming EMALS. Includes a fine conceptual schematic of the modern steam catapult. Electronics Design News (April 11/02) – Electronics poised to replace steam-powered aircraft launch. See esp. the references and linked diagrams. Official Reports US GAO (Sept 5/13, #GAO-13-396) – Ford-Class Carriers: Lead Ship Testing and Reliability Shortfalls Will Limit Initial Fleet Capabilities. EMALS and AAG are big contributors to this situation. News & Views Aviation Week (July 13/07) – Risk Areas In CVN 21 Cost, Development [dead link] Defense Tech, via WayBack (April 5-7/07) – EMALS: Next-Generation Catapult and Building a New Ford. Latter includes some interesting background re: EMALS integration challenges and solutions. Background: The Carriers DID FOCUS Article – Design & Preparations Continue for the USA’s New CVN-21 Super-Carrier. DID (Dec 19/05) – Costing the CVN-21: A DID Primer. Sets the record straight on the CVN-21 Class’ cost per ship, and also goes into detail re: the lifetime operating cost savings expected as a result of design and technology innovations. DID FOCUS Article – Design & Preparations Continue for Britain’s New CVF Future Carrier (updated). At one point, EMALS was slated for use in this class as well. View the full article
  22. If you are going to call something a presence mission, then it needs to actually be present where it matters. If we are trying to make a point about Ukraine ... is the Ionian Sea really where we need to be? I'm pondering over at USNIBlog. Come join the pondering. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=DgM0iuqOfao:asacLhbOZm8:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=DgM0iuqOfao:asacLhbOZm8:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=DgM0iuqOfao:asacLhbOZm8:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=DgM0iuqOfao:asacLhbOZm8:F7zBnMyn0Lo View the full article
  23. Americas General Electric Aviation won an $18.4 million order, which provides engineering and engine system improvement services for F414 engine component improvements in support of the Joint Strike Fighter aircraft.The engine is a 22,000-pound class afterburning turbofan engine. It features an axial compressor with 3 fan stages and 7 high-pressure compressor stages, and 1 high-pressure and 1 low-pressure turbine stage. At a weight of 2,445 pounds, the F414-GE-400 has a thrust-to-weight ratio of nine. Work will take place in Massachusetts. Estimated completion will be in December 2022. BAE Information and Electronic Systems Integration won a maximum $42 million contract modification with one five-year option period adding National Stock Number 1680-K0-107-337VM for ALR-56M radar warning receiver shipsets. The AN/ALR-56 radar warning receiver (RWR) is designed to detect incoming radar signals, identify, associate these signals to a known threat and alert the aircraft crew. Work will take place in New York and New Jersey. Estimated completion date is March 30, 2024. Middle East & Africa According to the Associated Press, Iran’s paramilitary Revolutionary Guard (IRGC) has staged a military exercise consisting of a five-day drill across the country’s south region amid heightened tensions over the government’s nuclear program. The news was first published last week. Saeed Khatibzadeh, Iran’s foreign ministry spokesman, at a news conference gave a vague answer when asked by a reporter whether the country would enrich uranium to weapons-grade 90 percent purity. On December 24, Al Jazeera reported that the IRGC has fired 16 surface-to-surface ballistic missiles at the close of five days of military drills. Generals reportedly said the drills were a warning to Israel. Europe The Netherlands Ministry of Defense officially declared Initial Operational Capable (IOC) for the Air Force’s F-35 squadron. The military will now be able to deploy a unit of 4 F-35s with personnel and equipment anywhere in the world for a short period of time. Asia-Pacific Russia has reportedly offered India to develop its own armored vehicles with the country based on the Armata universal Armata platform. At the Army-2021 forum, the head of Rosoboronexport, Alexander Mikheev, told defense ministry’s Zvezda that in the coming years Russia will bring about 50 new types of weapons and special equipment to foreign markets. South Korea’s Defense Project Promotion Committee has approved a plan to replace the country’s CH-47D helicopters with new ones. The project will cost $1.2 billion and will run from 2022 to 2028. Today’s Video Watch: T-14 Armata Russian Main Battle Tank – Tank Overview View the full article
  24. Think of thing in the Navy that, well, just don't make it to the recruiting advertisements. Deploying over the holiday season. Finding out your "liberty port" is Guantanamo Bay, Cuba. Throw in the post COVID-19 experience, and, well ... so sorry Shipmates. USS Milwaukee (LCS 5), a Freedom variant littoral combat ship, remains in port as some Sailors test positive for COVID-19. The crew is 100% immunized and all COVID-19 positive Sailors are isolated on board and away from other crew members. A portion of those infected have exhibited mild symptoms. The vaccine continues to demonstrate effectiveness against serious illness. I've spent a bit of time in GTMO. Besides swimming with the iguanas, I'm not sure they are missing all that much. Knowing how Omicron is burning through everywhere ... is this going to be our standard response from here on out? We'll see. Well, besides working on PQS and catching up on PMS ... I wonder what else they can do? Do they have a ships band? If so, GenX has an idea for them. If you modify the lyrics (suggestions below) ... they the 80s may have something for them to work with. This should be the USS Milwaukee's breakaway song: (apologies to the Dead Kennedys); Watch the above but with these lyrics in your head ... I think it works. So, you've been on sea duty for a year or two And you know you've seen it all In COVID's Navy, thinking you'll go far In the Caribbean your type don't crawl Playing counter-drug to parade your aluminum On your 3-jab vax Braggin' that you know, how the Coasties feel warm And sea duty is sea duty It's time to test what you most fear Cloth masks will not help you here Test yourself, my dear Test yourself, my dear It's a holiday in Guantanamo It's tough, kid, but it's life It's a holiday in Guantanamo Don't forget your deployment wife You've lost your taste, your smell You want everyone to quarantine Do PQS while you bitch, per diem will make you rich But your CO gets more PMS from you Well, COVID gets you more time in your rack For a slider a day Asymptomatic no one cares Then your test is pos anyway Now you can go nowhere Now you are welded to the pier What you need, my son... What you need, my girl... Is a holiday in Guantanamo Where MA's won't let you leave the pier A holiday in Guantanamo Where you'll still get sea duty credit anyway LCS, LCS LCS, LCS LCS, LCS LCS, LCS, LCS, LCS, LCS, LCS LCS, LCS, LCS, LCS, LCS, LCS LCS, LCS, LCS, LCS, LCS, LCS LCS, LCS, LCS, ... And it's a holiday in Guantanamo Where you're called a plague ship A holiday in Guantanamo Where the banana rat makes fun of you LCS! photo credit Anne Ney http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=EFRlfQs9Jn8:fZgb3wtwQdg:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=EFRlfQs9Jn8:fZgb3wtwQdg:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=EFRlfQs9Jn8:fZgb3wtwQdg:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=EFRlfQs9Jn8:fZgb3wtwQdg:F7zBnMyn0Lo View the full article
  25. Americas Lockheed Martin won a $324.1 million contract modification, which exercises options to support calendar year 2022 modification and retrofit activities for the F-35 Joint Strike Fighter program to include the procurement of material modification kits as well as program management, non-recurring engineering, aircraft induction, contractor field, depot site and laser shock peening site support. The modification adds scope for the procurement of material kits as well as special tooling and test equipment necessary to support F-35 Joint Strike Fighter aircraft retrofit and modification efforts for the Air Force, Navy, Marine Corps, non-US Department of Defense participants and Foreign Military Sales (FMS) customers from the governments of Israel, Japan and the Republic of Korea. Work will take place in Texas, Japan, Italy, Australia, North Carolina and Utah. A successful ground demonstration of solar energy to radio frequency (RF) conversion for the Space Solar Power Incremental Demonstrations and Research (SSPIDR) Project has been successfully conducted. Manufactured by Northrop Grumman, the single “sandwich tile” will be the first of many panels that will form up to a square meter onboard the Arachne satellite that will launch into space in 2025. Scientists hope to generate electrical power by converting solar energy in space and beam it back to earth. Middle East & Africa Turkey carried out tests of the Hisar O+ short-range air defense system from an autonomous missile launching system in Aksaray Shooting Range last week. In a statement Sunday, the Defense Ministry said the HISAR O+ is ready for use. Europe Russia’s MC-21-300 aircraft with a locally-made polymer composite wing has made its first flight. The liner took off from the airfield of Irkutsk Aviation Plant, a branch of United Aircraft Corporation (UAC)-owned Irkut company, Rostec announced. Asia-Pacific Japan’s cabinet has finalized the defense budget for 2022 and Tokyo will allocate $445 million to buy four F-35B fighters. Another $671 million will go towards the purchase of another eight F-35A fighters. To prepare JS Izumo for the operation of F-35Bs, a sum of $53 million was approved. South Korea’s Defense Acquisition Program Administration (DAPA) signed a contract worth nearly $750 million with LIG Nex1 and Hanwha for mass production of military satellite communication system-II ground terminals. The contract will be performed over a period of five years from 2021 to 2025. Today’s Video Watch: H?SAR Anti-air Missile Defense System | TURKISH DELIGHT! View the full article

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.