Skip to content
View in the app

A better way to browse. Learn more.

HarpGamer

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

HG S2 (Intel Bot)

Members
  • Joined

  • Last visited

    Never

Everything posted by HG S2 (Intel Bot)

  1. As the U.S. decides who will be president for the next four years a review of procurement spending indicates that the Trump Administration has shown little difference in appropriations versus previous administrations, despite claims to have radically increased spending. The upshot is that the last four years saw about $2.9 in spending appropriated in inflation-adjusted dollars, which was larger than Barak Obama’s second term, but less than the Obama Administration’s first term. President Trump’s campaign speech claims of spending during his term relative to previous terms are incorrect. President Trump claimed this year that military spending in the 90s “used to be ‘million.’ And then, about 10 years ago, you started hearing ‘billion.’ And now you’re starting to hear ‘trillion,’ right?” Of course, U.S. defense spending hit the billions in the late 1940s, and recent spending has been on pace with spending from the decade previous. The Trump Administration has done little to change the often-criticized Pentagon trend of investing more money in fewer pieces of equipment, such as fighter jets that cost a quarter billion dollars each when fully kitted out. The navy is running fewer ships that each cost more. Previous administrations did no better in reversing this trend, of course. Democratic presidential candidate Joe Biden stated multiple times that he has no plans to reduce military spending, but indicated a desire to refocus military budgets and planning on “near-peer” powers Russia and China, while attempting to recover some of the goodwill of allies tested by the Trump Administration’s active skepticism in cooperation with allies, especially the NATO alliance. View the full article
  2. Sponsored: Cyber security firm CyberCatch will host a free webinar on November 18 to review current threats and soon-to-be-required compliance requirements. View the full article
  3. Americas Sikorsky won a $550.4 million modification, which is for Lot IV low rate initial production and delivery of six CH-53K aircraft and associated aircraft, programmatic and logistics support, rate tooling and physical configuration audits. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. The aircraft can be operated from austere and remote forward operating bases. It is Marine Corps’ heavy-lift replacement for the CH-53E Super Stallion. Designed to lift nearly 14 tons at a mission radius of 110 nautical miles, in Navy high/hot environments, the CH-53K is designed to lift triple the baseline CH-53E lift capability. The CH-53K will have an equivalent logistics shipboard footprint, lower operating costs per aircraft, and less direct maintenance man hours per flight hour. The Marine Corps has a requirement for 200 CH-53Ks. Work will take place in Connecticut, Kansas, Washington, Texas, Canada, Wisconsin, the UK and Florida. Estimated completion will be in July 2024. The Royal Canadian Air Force (RCAF) AWACS qualified Aerospace Controllers (AECs) and Aerospace Control Operators (AC Ops) are now able to wear a new ‘wings’ badge that was officially rolled out on October 23. The North American air arm said the new wings recognizes the demanding training, arduous qualifications, and extensive responsibilities needed to maintain Combat Mission Ready status. „When the AWACS positions were established in 1974, it was assumed that AECs and AC Ops in those positions did not directly contribute to the safe operation of the aircraft, which would justify an upswept wing-style aircrew flying badge. In addition, it was assumed they would only fly occasionally. Our understanding of their responsibilities has changed“, it says in a statement. Middle East & Africa Israel’s Elbit was chosen to supply light tanks and wheeled APCs to the Philippine Army. The contracts are said to include nearly $200 million worth of Sabrah tanks and armored combat vehicles. According to reports, Elbit Systems is the winner of two large tenders for the supply of light tanks and wheeled armored personnel carriers to the Philippine Army. According the website, the Israeli Ministry of Defense received the notice of award for these two tenders several months ago. As part of the light tank contract, Elbit will supply 18 Sabrah ASCOD 2 tracked tanks, 10 Sabrah Pandur II 8×8 wheeled tanks, one ASCOD 2 armored command vehicle and one ASCOD 2 armored recovery vehicle worth approximately $196 million. The wheeled APC contract includes 28 IVECO Guarani 6×6 wheeled APCs worth about $47 million. All APCs have a manned turret with a 12.7mm heavy machine gun and a 40mm automatic grenade launcher. In addition, the APCs are equipped with an E-LynX computer-based communication system and a Torch-X combat management system made by Elbit. Europe Rolls-Royce has signed a collaborative agreement with the UK Ministry of Defense to strengthen ways of working across key Royal Navy programmes. The firm say that the Memorandum of Understanding describes a commitment of both parties to work together to deliver on-going support for Rolls-Royce MT30 and WR-21 engines and an understanding of how that will be done. The agreement will improve on-going support for the Rolls-Royce MT30 engines that power the Royal Navy’s Queen Elizabeth Class (QEC) Aircraft Carriers. It also covers support of the WR-21 engines that power the Royal Navy’s Type 45 destroyers. Lockheed Martin won a $194 million contract modification, which adds a $180,000,000 not-to-exceed, undefinitized line item for the production and delivery of four MH-60R aircraft, and exercises a $13,980,348 option to procure three airborne low frequency sonars in support of the government of Greece. This comes at a time when the Greece is running deep into a dispute with Turkey. In 2019, the US State Department cleared a $600 million foreign military sale (FMS) of seven MH-60R Seahawk multi-mission helicopters to Greece. In July 2020, Greece signed a contract for the purchase of 4 new units, via this program. The MH-60R SeaHawk helicopter is a twin-engine, multi-mission, all-weather Naval utility helicopter, based on the Army’s UH-60 BlackHawk, and is used for a variety of roles including anti-submarine warfare (ASW), anti-surface warfare (ASUW), naval special warfare (NSW) insertion, search and rescue (SAR), combat search and rescue (CSAR), vertical replenishment (VERTREP), and medical evacuation (MEDEVAC) operations. Work under the modification will take place in New York, Connecticut, Alabama, France and Rhode Island. Expected completion will be in February 2025. Asia-Pacific A spokesman of the Chinese defense ministry suggested that China will retaliate if $1.4 billion U.S arms sales to Taiwan go through. „The move seriously damages relations between the two countries and the two militaries, as well as the peace and stability across the Taiwan Strait. China firmly opposes it,” said spokesperson Col. Tan Kefei of China’s Ministry of National Defense. „China strongly urges the US side to immediately cancel the plans of selling weapons to Taiwan and cease military contact with the island and handle issues related to Taiwan prudently, so as to avoid serious consequences to Sino-American bilateral and mil-to-mil relations, as well as peace and stability across the Taiwan Strait,” he added. The statement from the ministry noted that, according to Tan, “if the US side discards the basic norms of international relations, violates its commitment and acts capriciously and obstinately, China will for sure resolutely strike back.” The U.S. State Department approved arms deals with Taiwan on Thursday, totaling $1.4 billion. View the full article
  4. CH-53K concept (click to view full) The U.S. Marines have a problem. They rely on their CH-53E Super Stallion medium-heavy lift helicopters to move troops, vehicles, and supplies off of their ships. But the helicopters are wearing out. Fast. The pace demanded by the Global War on Terror is relentless, and usage rates are 3 times normal. Attrition is taking its toll. Over the past few years, CH-53s have been recalled from “boneyard” storage at Davis-Monthan AFB in Tucson, AZ, in order to maintain fleet numbers in the face of recent losses and forced retirements. Now, there are no flyable spares left. Enter the Heavy Lift Replacement (HLR) program, now known as the CH-53K. It aims to offer notable performance improvements over the CH-53E, in a similar airframe. The question is whether its service entry delay to 2018-2019 will come too late to offset a serious decline in Marine aviation. The HLR Program Lifts Off Sikorksy on HLR, 2011 The $25.5 billion, 200-helicopter CH-53K program will define the long-term future of the US Marine Corps’ medium-heavy lift capabilities – and may be needed to save Marine aviation in the medium term. On average, existing CH-53E aircraft are more than 15 years old, have over 3,000 flight hours under tough conditions, and are becoming more and more of a maintenance challenge with a 44:1 maintenance man-hours:flight hours ratio. Not to mention the resulting $20,000 per flight-hour cost ratio. According to Jane’s Defense Weekly, a 1999 analysis showed that the existing fleet has a service life of 6,120 flight hours, based on fatigue at the weakest point where the tail folds. The USMC expected that the existing fleet would start to reach this point in 2011, at a rate of 15 aircraft per year. The funding profile below suggests a problem for the Corps: Excel download The Marine Corps itself is the source of the disconnect. The HLR program initially called for 156 new-build helicopters derived from the CH-53E Super Stallion design, with initial flight tests in 2010-2011, and initial operating capability (IOC) in 2014-2015. IOC was defined as a detachment of 4 aircraft, with combat ready crews, and prepared to deploy with all required equipment and spares. In 2010, however, the Marines grew the program plan to 200 helicopters, even as they pushed its initial flight back to FY 2013, and IOC back to FY 2018. The program wasn’t experiencing problems, and no reasons were given, beyond statements concerning the program’s aggressive schedule. Further slippage has occurred since. Here’s the full timeline: Up, up, and… (click to view full) The current schedule creates a number of risks for the Marine Corps. There’s no question that pushing the CH-53K program back will leave the Marines with a dwindling heavy-lift helicopter fleet, whose size, capability, and safety are governed by mechanical realities rather than political diktat. In April 2010, the US military ran out of stored CH-53D/E airframes to refurbish and return to the front lines. In February 2011, the USMC retired its CH-53D fleet altogether. The other risk is political. On the one hand, the CH-53K is a large program, and the farther the Marines push it away, the easier it is to cut amidst budget crises. With its heavy-lift fleet dwindling, that could be disastrous for the force. On the other hand, budgetary crises also look for programs that are late or experiencing problems, and the CH-53K is big enough to earn a lot of attention if it’s seen as screwing up. That fact that the original schedule was overly aggressive wouldn’t be remembered. Was the move to push the CH-53K back an act of political negligence, to protect less critical programs like the V-22? Or was it an act of supreme prudence, which will lead to a strong program that survives precisely because it goes out and meets its targets? Opinions vary. Time will tell. Current Status Some assembly required (click to view full) US Navy PMA-261 is responsible for the CH-53K program. Sikorsky is currently working under a $3.5 – 4 billion System Development and Demonstration (SDD) contract, to include 4 SDD flight test helicopters, 1 ground test airframe, and associated program management and test support. As the development timeline stretched out, 6 System Development Test Aircraft were added to to that mix. To date, Sikorsky’s industrial partners include: The CH-53X / CH-53K Mission example (click to view full) The CH-53K’s maximum gross weight (MGW) will increase to 88,000 pounds with external loads, versus 73,500 pounds for the CH-53E. MGW with internal loads will be 74,000 pounds, compared to 69,750 pounds for the CH-53E. It’s being designed to carry a cargo load of 27,000 pounds (13.5 tons) 110 nautical miles, operating at an altitude of 3,000 feet and an ambient temperature of 91.5 degrees Fahrenheit. This is nearly double the capacity of the current CH-53E Super Stallions, all in a helicopter that’s roughly the same size. Those altitude and temperature qualifications matter, too, because “hot and high” conditions lower aircraft load carrying capabilities and combat radius – especially for helicopters. This reduced performance has recently been a factor during operations in Afghanistan and relief efforts in Pakistan, for instance, and has been a factor with earlier models of the C-130 Hercules as well. Figures for the CH-53K operating entirely around sea level and in cooler temperatures would be higher, but would not be double that of existing CH-53Es. As an example of these variables at work, Sikorsky’s CH-53K brochure states that the improved CH-53K will have a maximum external load of 16.3t/ 36,000 lbs. On the other hand, an operation that carries an externally-slung load from sea level to a point 3,000 feet above sea level, with a total range there and back of 220 nautical miles/ 407 km, and 30 minute loiter at the landing zone, would have a maximum mission load of only 12.25t/ 27,000 lbs. MRAP: RG-31, IEDed (click to view story) Even at sea level, however, increased lift capacity will be important. As the Hummer’s fundamental lack of survivability began to marginalize it on the battlefield, the Marines led the charge to field “MRAP” blast-resistant vehicle designs instead. While an up-armored HMMWV weighs about 9,100 pounds empty, the lightest Category 1 MRAP patrol vehicles check in at weights ranging from 16,000 – 31,000 pounds, and even the “light” JLTVs that will replace a large segment of the HMMWV fleet are expected to weigh 14,000 – 20,000 pounds. Those weights mean that tactical operations to airlift mobile forces ashore beyond the beach, or within the zone of operations, will have only one helicopter available that can get the job done: the CH-53. If the Marines think their CH-53 fleet is seeing heavy use now, just wait. New Technologies CH-53K concept (click to view full) In order to meet those requirements, the CH-53K will be depending on a number of new technologies. No one technology constitutes a big stretch, which is good news for the program. Instead, a host of technologies that have been developed since the CH-53E program will be refined, and used in inter-related areas. For the basic outlines of many low-risk CH-53X/CH-53K improvements, read “An Affordable Solution To Heavy Lift” [PDF] by Lt. Col. James C. Garman, an H-53 family pilot and Senior Preliminary Design Engineer in Sikorsky’s New Product Definition Group. See also this interview with former HLR program manager Col. Paul Croisetiere. The most important new addition to the CH-53K will be its 7,500shp class GE38 / T408 engines, which have already hit 8,300 shp in ground tests. The military is hoping for 18% better specific fuel consumption than the similarly sized T64 engine, even though the engine would produce 57% more power. To improve maintenance and reliability, the GE38 is also expected to have 63% fewer parts. Other technologies slated for the CH-53K include a “glass” [digital] cockpit that has high commonality and interoperability with existing Army and Navy helicopters, high-efficiency rotor blades with anhedral tips that have 12% (main) and 15% (tail) more surface area, plus different construction to handle higher loads; a composite cuff attachment that attaches the main blades directly to an elastomerically-articulated titanium rotor head, without the need for specialized tools or multiple redundant fasteners; a cargo rail locking system; external cargo improvements, survivability enhancements, and enhancements designed to extend service life. Changes will be made as the program progresses, and engineers get a better sense of which technologies are ready, and which would create risks to the program. For example, the CH-53K was going to use a “viscoelastic lag damper” for the rotors, in order to minimize vibration and stress. It was removed in order to speed up deployment, and a modified version of standard linear hydraulic dampers will be used instead. The Navy hopes to achieve 2x reliability compared to the existing CH-53Es, but gave up the potential for 4x reliability, in exchange for less development risk. Sikorsky on CH-53K Given the CH-53E’s large maintenance ratio, reliability will matter. As former HLR program manager Col. Paul Croisetiere put it in a NAVAIR release: “Given the CH-53E’s operational costs and maintenance demands, heavy lift has built its reputation for excellence on the backs of our maintainers… We are going to take our maintainers somewhere they’ve rarely been before. Home for dinner.” Several decades of weapon program history suggest that the odds of meeting this goal are low. Instead, the trend is that these promises are made, but more advanced and complex weapons wind up having more points of failure, and require even more maintenance. If the CH-53K program can break that cycle, it would represent a landmark success in Pentagon weapons acquisition. Contracts & Key Events Unless otherwise noted, all contracts are issued by US Naval Air Systems Command in Patuxent River, MD. FY 2014 – 2020 Takeoff? (click to view full) October 28/20: Lot IV Sikorsky won a $550.4 million modification, which is for Lot IV low rate initial production and delivery of six CH-53K aircraft and associated aircraft, programmatic and logistics support, rate tooling and physical configuration audits. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. The aircraft can be operated from austere and remote forward operating bases. It is Marine Corps’ heavy-lift replacement for the CH-53E Super Stallion. Designed to lift nearly 14 tons at a mission radius of 110 nautical miles, in Navy high/hot environments, the CH-53K is designed to lift triple the baseline CH-53E lift capability. The CH-53K will have an equivalent logistics shipboard footprint, lower operating costs per aircraft, and less direct maintenance man hours per flight hour. The Marine Corps has a requirement for 200 CH-53Ks. Work will take place in Connecticut, Kansas, Washington, Texas, Canada, Wisconsin, the UK and Florida. Estimated completion will be in July 2024. August 13/20: Maintenance Sikorsky won a $25.1 million delivery order, which provides non-recurring engineering for the development of logistics support products for the Maintenance Task Analysis Phase II, a provisioning database of technical information to include 2D drawings that supports all operational, intermediate, and depot level maintenance for the CH-53K helicopter. The CH-53K Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. The aircraft can be operated from austere and remote forward operating bases. Work will take place in Connecticut, Florida, Missouri, France, Georgia, England, New York, New Jersey and Ohio. Expected completion will be in August 2024. July 2/20: Pilot Repair Material Sikorsky won a $107 million modification for the low rate initial production of organic capability pilot repair material, technical publications, peculiar support equipment and logistics support for the CH-53K King Stallion aircraft. The Sikorsky CH-53K is a heavy-lift helicopter. It can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. At the end of June, the CH-53K finished two-week sea trial in the Atlantic Ocean. Work under the modification will take place in Connecticut, France, Canada, Florida, Mississippi, New York, Virginia, Arizona, California and the various locations within the continental US. Estimated completion date is in June 2025. June 5/20: Update Sikorsky won a $7.7 million order, which procures support to update existing CH-53K system/subsystem specifications produced by the original equipment manufacturer. The Sikorsky CH-53K Super Stallion heavy-lift helicopter is being developed by Sikorsky Aircraft to replace the CH-53E helicopter of the US Marine Corps. The Super Stallion can be fielded from amphibious assault ships for the transportation of personnel and equipment. It will also be used to carry external cargo loads. The aircraft can be operated from austere and remote forward operating bases. Work will take place in Stratford, Connecticut. Estimated completion will be by October 2022. June 1/20: Logistics, Management, Training Sikorsky won a $17.9 million contract modification, which provides logistics, program management, training, configuration management and sustaining engineering support for the H-53K system demonstration and test article aircraft. This modification includes pre-initial operational test and evaluation scheduled and unscheduled maintenance and software updates as well as product support packages, repair of repairable analysis and identification and interim supply support provisioning. Additionally, various pieces of peculiar support equipment and common support equipment may be identified and procured under this modification. The Sikorsky CH-53 Super Stallion heavy-lift helicopter first flew in 1974 and entered service with the US Marine Corps in 1981. A total of 172 Super Stallions have been delivered and 165 are in service with marine corps squadrons in the Pacific Fleet and in the Atlantic Fleet. May 14/20: Systems Engineering Sikorsky won a $29.9 million modification, which provides for rate tooling, physical configuration audits, associated systems engineering and program management in support of CH-53K aircraft production. The CH-53K King Stallion is a large heavy-lift cargo helicopter designed to replace the Marine Corps CH-53E to move Marines from ships to attack beaches. Back in April, it was reported that the aircraft successfully plugged into a funnel-shaped drogue towed behind a KC-130J during aerial refueling wake testing over the Chesapeake Bay. The CH-53K sea-based, long range, helicopter is designed to provide three times the lift capability of its predecessor. The CH-53K will conduct expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations deep inland from a sea-based center of operations, Sikorsky officials say. It can lift more than 18 tons. Work will take place in Connecticut, Utah, Michigan, Kansas, Washington, New York and Nebraska. Estimated completion will be by December 2023. April 20/20: Mission Master-Cargo UGV The United Kingdom Armed Forces ordered four Mission Master-Cargo unmanned ground vehicles from Rheinmetall Canada for its Robotic Platoon Vehicle (RPV) program. The contract includes training, service support, and spare parts. Rheinmetall Canada is to supply the platforms, while Rheinmetall BAE Land Systems will provide on-location support services. The Mission Master UGV is an all-terrain, multipurpose vehicle based on an 8×8 platform. It has a top speed of 40 km/h and is ruggedized and fully amphibious, with the option of being fitted with tracks or chains for additional mobility. The vehicle is air-transportable by external sling load or internally by a CH-53 or CH-46 heavy lift helicopter or a C-130 transport aircraft. None of the parts are subject to International Traffic in Arms Regulations (ITAR), facilitating export. April 10/20: Engine Reliability Improvement Program GE Aviation won a $9.7 million contract modification, which procures non-recurring engineering for the phase two assembly planning effort for the re-start of T-64 engine core production in support of the H-53E Engine Reliability Improvement Program. The deal funds the phase two assembly planning effort for the GE T64 is a turboshaft engine used in both fixed-wing aircraft and in helicopters, for which it was originally developed. It powers the CH-53E Super Stallion. The Super Stallion is a heavy-lift helicopter operated by the US Navy and Marine Corps as well as the Japanese Navy. Work will take place in Massachusetts, Vermont, North Carolina and Kentucky. Expected completion will be by December 2021. March 30/20: Advanced Acquisition Sikorsky Aircraft won a $125.4 million for a firm-fixed-price advanced acquisition contract to procure long lead items for low-rate initial production of the seven Lot 5 CH-53K heavy-lift aircraft. The CH-53K is designed to transport US Marines, heavy equipment and supplies from amphibious assaults to destinations ashore. Work will take place in Stratford, Connecticut. Expected completion will be by August 2021. March 19/20: Cargo Loading Tower The Haskell Co. won a $9.5 million contract for the construction of the P680 CH-53K cargo loading tower at the Marine Corps Air Station in New River, North Carolina. Work will provide a high-bay facility that will house an operations trainer to support CH-53K helicopter pilot and crew chief training program. Construction includes a deep pile foundation, grade beams and reinforced concrete slabs to provide the building’s base while reinforced concrete masonry unit exterior walls and a standing seam metal roof provide the building enclosure. This facility will provide a covered, all-weather training environment for the ground operations aircrew trainer, a fuselage trainer device, pallet storage, retrieval and build-out packages associated with troop deployment and mobility. The facility includes high-bay roll-up doors and concrete drive aprons to accommodate moving the aircraft frame in and out of the building. Work will take place in New River, North Carolina. Estimated completion date is April 2022. February 24/20: Electronic Counter Measure Systems Sikorsky won a $12 million contract modification, which provides non-recurring engineering to replace existing subsystems, such as the Data Transfer Unit, Defense Electronic Countermeasure System and ARC-210 radio, with the CH-53K production aircraft. This means Sikorsky is replacing Electronic Counter Measure Systems in the King Stallion. The CH-53K King Stallion is the US Marine Corps’ new-build, heavy-lift replacement for the CH-53E. The CH-53K evolves the CH-53E design to improve operational capability, reliability, maintainability, survivability, and cost of ownership. Work under the contract modification will take place in Iowa, Connecticut and Texas. Estimated completion will be in August 2021. February 21/20: Support The US Navy awarded Sikorsky a $40 million contract modification, which procures organic capability pilot repair material, technical publications, peculiar support equipment re-design and acquisition and logistical support in support of lot 2 CH-53K aircraft. The CH-53K helicopter is a new-build design variant and replacement for the current USMC heavy-lift aircraft, the CH-53E. The CH-53K evolves the CH-53E design to improve operational capability, reliability, maintainability, survivability, and cost of ownership. Work will take place in Connecticut, North Carolina and is expected to be finished by December 2024. January 10/20: Engine Issue Resolved Engineers have mitigated an ongoing engine integration issue for the CH-53K King Stallion, the new heavy-lift helicopter from Sikorsky for the United States Marine Corps. It took 8 months of study and testing. The helicopter is designed to conduct expeditionary heavy-lift transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations. The CH-53K is powered by three General Electric T-408 engines, but these engines created several integration issues in the aircraft, including exhaust gas re-ingestion (EGR). The King Stallion is an all-new heavy-lift helicopter that will expand the fleet’s ability to move more material more rapidly. October 17/19: Nacelles Production Kits For CH-53E Sikorsky won a $7.9 million firm-fixed-price delivery order that procures 36 improved nacelles production kits in support of the CH-53E in-service aircraft. The CH-53E Super Stallion is a heavy-lift helicopter. It was developed from the CH-53 Sea Stallion mainly by adding a third engine, adding a seventh blade to the main rotor and canting the tail rotor 20 degrees. A total of 172 Super Stallions have been delivered and 165 are in service with marine corps squadrons in the Pacific Fleet and in the Atlantic Fleet. King Stallion is currently being developed from the Super Stallion. It will be the largest and heaviest helicopter in the US Army. Work under the delivery order in support of the CH-53E will take place in Stratford, Connecticut and estimated completion will be in May 2022. September 6/19: T408-GE-400 General Electric Aviation won a $143.7 million contract modification for 24 low rate initial production Lot 3 T408-GE-400 turboshaft engines and three Lot 2 T408-GE-400 engines for the CH-53K helicopter. The deal also provides for associated engine and programmatic support, logistics support, peculiar support equipment and spares. T408 engines provide enough power to the aircraft to carry a 27,000lb external load over a mission radius of 110nm in the navy high / hot weather conditions. The three-stage power turbine is capable of generating 7,378-rated shaft horsepower. The Sikorsky CH-53K King Stallion is a large, heavy-lift cargo helicopter. General Electric will perform work under the modification in Lynn, Massachusetts, and estimated completion will be in December 2022. August 22/19: Spare Parts and Repair The Navy tapped Sikorsky with a $48.3 million firm-fixed-price order in support of the CH-53K King Stallion. The order is to procure spare parts to repair and maintain low-rate initial production Lot Three configuration aircraft. A couple of days ago Sikorsky won a one-year $107.3 million contract from the US Navy for the long-lead items needed to manufacture its fourth batch of six CH-53K helicopters for use by the US Marine Corps. In May, the company received a $1.1 billion contract to produce 12 CH-53Ks and provide aircraft system spares and logistics support services. The King Stallion is a heavy-lift cargo helicopter. Its design features three 7,500 shp engines, new composite rotor blades, and a wider aircraft cabin than previous CH-53 variants. Sikorsky will perform work under the newly received order in Canada as well as the UK and various parts in the US. Estimated completion date is in August 2024. July 25/19: Hydraulic Sikorsky won a $9.8 million delivery order for H-53 hydraulic fluid tanks. The firm-fixed-price delivery order is a one-year contract with no option periods. Sikorsky will perform work in Connecticut. Estimated completion date is September 30, 2020. The Defense Logistics Agency Aviation in Philadelphia, Pennsylvania is the contracting activity. H-53 is a family of heavy-lift transport helicopters built by Sikorsky. It includes the CH-53 Sea Stallion. The Stallion has mechanical flight controls which are backed by three independent hydraulic systems. July 4/19: Sikorsky tapped twice The US Navy awarded Sikorsky two contracts with a combined worth of $28.8 for production aircraft and non-recurring work to support low rate initial production of the CH-53K. One non-recurring contract is worth $21.7 million and the other $7.1 million. Each contract brings the CH-53 King Stallion closer to production. Developed for the US Marine Corps, the King Stallion is the only sea-based, long-range, heavy-lift helicopter. It can carry up to 27,000 lbs (12,200 kg) over 110 natural miles (204 km), more than tripling the load of Sikorsky’s CH-53E helicopter. Sikorsky promotes the CH-53K for expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations inland from a sea-based center of operations, as well as support for special operations forces, humanitarian missions and combat search-and-rescue. The delivery order worth 21.7 million includes a data transfer unit and a defensive electronic countermeasure system replacement program to replace existing subsystems within the CH-53K production aircraft. Tasks include investigation, systems engineering support, risk analysis, integration development, weight impact and publication updates. Work on the contract is expected to be completed in January 2021. The other contract supports low-rate initial production of the CH-53K, including non-recurring engineering, development, tooling, manufacturing, qualification, reporting and delivery of the nose, main, intermediate and tail gearbox gears. Work will take place in Stratford, Connecticut, and is expected to be completed in October 2020. May 31/19: Israel? Israel is looking at CH-53 King Stallion as a possible replacement for the CH-53 Yas’ur (Sea Stallion) helicopters that have been in Israeli service for more than 40 years. According to Jane’s, Israeli Air Force officials let Lockheed Martin know about their intention. Israel started looking for a replacement for its Sea Stallion last year. The CH-53 King Stallion, which is designed to transport dozens of fighters and heavy weaponry to operations on the front or deep inside enemy territory, can carry two heavy SUVs in its cabin. The CH-53K has three hooks for carrying cargo on ropes. The Yas’ur has only one. The King Stallion can be refueled mid-air and has cutting-edge autopilot and landing features, enabling its pilot to touch down almost without using his hands. May 21/19: Sikorsky to build 12 Ch-53Ks Sikorsky won $1.1 billion to build 12 CH-53K King Stallion helicopters. The contract with the Lockheed Martin subsidiary, issued by the Navy will include programmatic support, logistics support and peculiar support equipment. Under the terms of the contract, known as Low Rate Initial Production (LRIP) Lot 2 and 3, Sikorsky will begin deliveries of 12 CH-53K helicopters in 2022. According to Lockheed Martin, the advanced helicopters are part of the 200 program of record aircraft for the US Marine Corps. The King Stallion can carry up to 12,200 kg over 204 km, more than tripling the load of Sikorsky’s CH-53E helicopter. It is the only sea-based, long-range, heavy-lift helicopter in production. The helicopter was originally intended to be delivered in 2018, but it was delayed because of technical issues in the design that required a major restructuring of the program. Sikorsky is expected to finish work in December 2023. April 4/19: Program Management Service Sikorsky won a $7.3 million contract modification in support of CH-53K low-rate initial production. The CH-53K King Stallion helicopter will serve as a critical land and sea based logistics connector. In April 2006, the Marine Corps signed a contract for 156 CH-53K aircraft valued at $18.8 billion with deliveries to be completed by 2021. The Marine Corps now plans to receive 200 helicopters at a total cost of $25 billion. The modification includes production systems engineering and program management services for calendar year 2019 in support of CH-53K low-rate initial production. Work will take place in Stratford, Connecticut and is scheduled to be finished in February 2020. February 5/19: Rescheduling Due to Multiple design deficiencies the Sikorsky CH-53K King Stallion will miss its initial operating capability date of December 2019. The CH-53K program is working on a major schedule revision to solve structural problems found during operational testing an evaluation. The deficiencies include airspeed indication anomalies, low reliability of main rotor gearbox, hot gas impingement on aircraft structures, tail boom and tail rotor structural problems, overheating of main rotor dampers, fuel system anomalies, high temperatures in the Number 2 Engine Bay, and hot gas ingestion by the Number 2 engine, which could reduce available power. Operational Test and Evaluation will most likely start in early 2021. January 18/19: Maintenance The Navy tapped Sikorsky with a $7 million contract modification for maintenance of King Stallion CH-53K helicopters amid continued delays in its development. The deal provides for Automated Logistics Environment software maintenance operating systems and obsolescence avoidance in support of the low rate initial production CH-53K aircraft. The CH-53K helicopter was designed to serve as the US Marine’s critical land and sea based logistics connector. In May 2018 the Marine Corps took its first delivery of the King Stallion. The CH-53K program has a long history of delays due to technical issues with the latest problems emerging in December. Sikorsky is a an aircraft manufacturer and subsidiary of Lockheed Martin. The company expects work to be completed in October 2021. December 13/18: Provisioning The Naval Air Systems Command is ordering a provisioning parts database of technical information from Sikorsky. The cost-plus-fixed-fee delivery order is priced at $38 million and supports the initial operational capability of the Navy’s CH-53K King Stallion helicopter. The database will include 2D drawings that support all organizational, intermediate and depot levels in support of the helicopter. The provisioning database will determine the range and quantity of repair parts, and support and test equipment required to operate and maintain the King Stallion for its initial period of service. Provisioning is an integral part of supply chain management. The delivery order is partially funded ($8.6 million) through FY 2019 research, development, test and evaluation funds. Work will be performed at Sikorsky’s facility in Stratford, Connecticut and is scheduled for completion in November 2023. October 26/18: Maintenance Sikorsky Aircraft, a subsidiary of Lockheed Martin, is being contracted to help stem the maintenance burden of the Marine Corps’ CH-53 Super Stallion. The contract is priced at $717.4 million and covers logistics and repair support for 98 components of the CH-53 and MH-53 platforms. H-53 aircraft include the CH-53E Super Stallion medium-heavy transport helicopter that can transport up to 55 troops or 15 tons of cargo, as well as the MH-53E Sea Dragon minesweeper and the MH-53M Pave Low IV CSAR and SOF helicopter. The helicopters have on average a 44:1 maintenance : flying hours ratio. Work will be performed in Cherry Point, North Carolina and Stratford, Connecticut, and is expected to be completed by December 2022. August 27/18: Keep’em sweeping The Navy is contracting Technical Systems Integration for the provision of necessary overhaul and modification work on the USMC’s Mk-105 minesweeping system. The firm-fixed-price, indefinite-delivery/indefinite-quantity contract has a value of $10.5 million, but also includes options, which if exercises, would bring the face value to roughly $54 million. The Mk-105 Magnetic Influence Minesweeping System is a catamaran hydrofoil which is towed behind the MH-53E Sea Dragon helicopter. It is used to detect mines that use magnetic sensors to target the metallic hulls of ships before detonating. The twin magnetic tails, consisting of open-electrode magnetic sweeps, are towed behind the sled, detonating mines to clear the water for safe shipping. Work will be performed in Panama City, Florida, and is expected to be completed by August 2019. May 01/18: IOC delays Bloomberg reports that the Sikorsky CH-53K King Stallion helicopter program may be falling behind schedule, as Pentagon officials have found that a significant number of components require redesign and re-qualification. While a spokesperson from Sikorsky’s parent-company Lockheed Martin said that most of these items are already “fixed and proven or are in process,” initial operational capability—originally scheduled for December 2019—could be delayed by as much as eight months. According to a Pentagon review prepared in February, four helicopters currently in the flight test program were operating at 69 percent effectiveness as of late last year, “well below” the 75 percent to 90 percent benchmark needed. 200 King Stallions have been ordered by the US Marin Corps in a $31 billion heavy-lift program with Lockheed chasing exports to potential operators such as Germany. April 20/18: German Heavy-Lift-Industrialization plan Sikorsky, Lockheed Martin’s helicopter subsidiary, revealed on Wednesday its industrialization plan for competing in the German Air Force “Schwerer Transporthubschrauber” (STH) Program, or effort to buy new heavy-lift helicopters. Offering its CH-53K King Stallion, Sikorsky has already teamed up with German defense giant Rheinmetall Group—who will take care of in-service support if Berlin chooses the King Stallion—and the Sikorsky CH-53K team plans to host German companies in an industry chalet during the ILA Berlin Airshow April 25-29, where it will showcase plans for the long-term sustainment of the CH-53K by German aerospace industry. Companies expected alongside Rheinmetall include MTU, ZF Luftfahrttechnik GmbH, Autoflug, HYDRO Systems KG, Rockwell Collins Germany, Jenoptik, Hensoldt, Liebherr, and Rohde & Schwarz. Germany is looking to replace its legacy fleet of CH-53G, some of which have been in service since the mid-1960s, with a new capability. Facing off against the CH-53K is Boeing’s CH-47F Chinook. March 6/18: Potential Sales-Partnerships Sikorsky has selected German engine manufacturer MTU to be its engine maintenance partner as the US helicopter firm builds up local partners to help its bid to supply CH-53K heavy-lift helicopter to the German Air Force. The agreement tasks MTU with providing maintenance, repair and overhaul services for the helicopter’s GE Aviation T408-GE-400 engines should Berlin order the King Stallion as the replacement for its ageing fleet of CH-53G/GA/GS helicopters. At present, MTU already have an 18 percent share of the T408’s engine program, producing its power turbine, exhaust casing and output shaft. Also included on the team for Sikorsky’s German bid is Rheinmetall. February 16/18: Initial Production Orders The Pentagon awarded Tuesday, February 13, a $126.5 million US Navy contract modification to Sikorsky for initial production of CH-53K King Stallion helicopters. Under the terms of the deal, the Lockheed Martin subsidiary will secure “long lead items in support of the low rate initial production of seven Lot III CH-53K aircraft.” Work will take place at Stratford, Connecticut, with work running until January 2019. The US Marine Corps is scheduled to receive 200 King Stallions, replacing the service’s older E variants for its heavy-lift mission. The first units are expected to become operational by 2019. February 8/18: German Heavy Lift-Partnership Lockheed Martin subsidiary Sikorsky has signed a strategic teaming agreement with German defense giant Rheinmetall, to offer Sikorsky’s CH-53K King Stallion helicopter to Germany’s upcoming heavy-lift competition. A Lockheed Martin press release stated that further German teammates will be announced in the coming weeks and “will leverage and build upon the deep knowledge and expertise of the German defense industry.” The statement added that the King Stallion “provides the German Armed Forces with a proven heavy lift helicopter that can be entered into service seamlessly without need for upgrades for the next several decades.” Facing the Sikorsky-Rheinmetall team will be Boeing’s CH-47 Chinook, whose MG-47 variant is the only model thus far capable of Germany’s fleet-wide aerial refueling capability requirement. November 21/17: Contracts-Spares General Electric Aviation (GEA) has been awarded a $143.4 million US Navy contract to provide 22 low-rate initial production Lot 1 and 2 T408-GE-400 turboshaft engines for the CH-53K King Stallion helicopter. In additional to the engines, the sale will also include associated engine and programmatic support, logistics support, peculiar support equipment, and spares. Work will take place in Lynn, Massachusetts, and is expected to be completed in July 2021. November 17/17: Airshow Debut Lockheed Martin’s CH-53K Super Stallion will make its international debut at the Berlin Airshow next April, sources close to the program told Reuters. Built for the US Marine Corps by Lockheed subsidiary Sikorsky under the Heavy Lift Replacement (HLR) program, the heavy-lift helicopter is being touted as a possible solution to Germany’s CH-53G replacement program, which will see the King Stallion face off against the smaller Boeing CH-47F Chinook in a $4.7 billion competition for about 40 units. However, an official start to the program—along with a formal structure to the competition—is unlikely to be unveiled until Chancellor Angela Merkel’s conservatives manages to negotiate a ruling coalition with the pro-business Free Democrats and the Greens—horse-trading that could take until the end of the year. Israel is also reported to be interested in the King Stallion, adding a potential 20 units to Lockheed’s order book. September 04/17: Lockheed Martin subsidiary Sikorsky has been awarded a Low Rate Initial Production (LRIP) Lot 1 contract to deliver two CH-53K King Stallion heavy-lift helicopters to the US Marine Corps (USMC). Valued at $304 million, the firm will deliver the models by 2021 in addition to spares and support, with work to be carried out in Stratford, Connecticut. The US Department of Defense’s Program of Record remains at 200 CH-53K aircraft, with the USMC intending to stand up eight active duty squadrons, one training squadron, and one reserve squadron to support operational requirements. Designed to lift three times as much weight as its predecessor, the CH-53E Super Stallion, its increased payload capacity can internally load 463L cargo pallets, High Mobility Multipurpose Wheeled Vehicles (HMMWV) or a European Fenneck armored personnel carrier while still leaving the troop seats installed. July 11/17: With CH-53K King Stallion helicopters recently completing their first long-range flight test from West Palm Beach, Florida to NAS Patuxent River, Maryland, where it will continue flight testing, manufacturer Sikorsky has begun courting German industry in an effort to line up orders for the new heavy-lift helicopter from Berlin. The two day event, held in West Palm Beach, saw the delegates told that if the King Stallion is selected, German suppliers would be responsible for the majority of the work when it comes to platform sustainment. Germany is expected to issue a request for proposals for the replacement of its fleet of 81 CH-53GA/GS helicopters, originally delivered in the 1970s, in mid-2018, with deliveries to commence in 2023. Boeing is also likely to pitch its CH-47 Chinook as the “proven” helicopter. May 24/17: Sikorsky has been awarded a $55 million contract modification to a previously awarded contract for the long-lead support of low-rate production of four Lot II CH-53K King Stallion helicopters. An upgrade of the Sea Stallion heavy-lift helicopter, work on the King Stallion contract will be conducted at the Sikorsky plant in Stratford, Conn and is expected to be completed by March 2022. The helicopter is capable carrying up of 27,000 pounds of external sling load. It can carry artillery pieces and Humvee utility vehicles and it’s cabin is capable of carrying 463 pallets for cargo transportation. April 6/17: Lockheed Martin subsidiary Sikorsky will proceed with low-rate production of the CH-53K King Stallion since the helicopter has received a Milestone C status by a US Defense Acquisition Board review. A total of 200 CH-53Ks are to be acquired by the US Marine Corps. The first six aircraft are under contract and are expected to be delivered starting next year. Long-lead procurement of parts and materials for the first two low-rate initial production helicopters is underway. The King Stallion is capable of lifting three times as much as its predecessor, the CH-53E, and can carry as many as three external loads at the same time. March 29/17: The US Department of Defense is expected to award Lockheed Martin a multi-billion contract to start production of 200 new heavy cargo helicopters for the US Marines Corp by the end of the week. Colonel Hank Vanderborght, head of the Pentagon’s CH-53K King Stallion program, stated that each unit will cost $87 million on average and $105 million including spare parts and certain service contracts. The total value of the program is $27 billion. Developed by Lockheed’s helicopter subsidy Sikorsky, the CH-53K can lift 36,000 pounds and would replace the CH-53E Super Stallion, which has operated as the backbone of field logistics for the USMC since the mid-1980s. October 24/16: The CH-53K King Stallion helicopter has completed its initial operational testing. A two-week trial period, known as the OT-B1, took place at Sikorsky’s Development Flight Center in West Palm Beach, Florida. Requirements asked of the helicopter included multiple external lift scenarios of 27,000 lb. (12,200 kg), in-hover, and 12,000 lb. (5,422 kg) 110 nautical mile radius missions. June 29/16: Sikorsky has achieved a key USMC requirement with the CH-53K King Stallion by successfully flying 100ft above the ground with a 12,250kg (27,000lb) payload. Due to replace the CH-53E Super Stallion, the new helicopter promises better range and triple the E model’s payload in hot weather conditions, as well as flight-by-wire flight controls designed to reduce pilot workload in degraded visual environments. While successful testing has the CH-53K currently on track, it hasn’t always been plain sailing with gearbox trouble delaying its first flight for a year. May 18/16: Pricing and availability for the Sikorsky CH-53K King Stallion helicopters is being sought by Germany to meet its heavy vertical lift requirement. Other options include Boeing’s CH-47 Chinook, however the US Marine Corps is keen to take advantage of the better pricing that could be achieved by adding a sizable King Stallion order at the front-end of the production ramp. The latest K-model has twice the max gross take-off weight of the legacy CH-53G operated by the Luftwaffe at 40t (88,000lb) with external loads compared to 19t (42,000lb). April 22/16: A USMC test has seen a Sikorsky CH-53K complete its first external load flight test, lifting a 12,000 pound external load in a hover. The April 12 test will see further loads tried with external payloads of 12,000 pounds flown first in hover, then incrementally increasing speeds up to 120 knots, followed by 20,000 and 27,000 pound external payloads. The system features an electrical load release capability from the cockpit and cabin, and a mechanical load release capability at each of the pendant locations. An auto-jettison system is incorporated to protect the aircraft in the event of a load attachment point failure. March 17/16: The second prototype of the CH-53K helicopter made its maiden flight in January according to Lockheed company Sikorsky. In addition, the first aircraft into the test program has achieved flight envelope expansion to 120 knots for the USMC’s CH-53K King Stallion heavy lift helicopter program. The two are the most heavily instrumented of the Engineering Development Models (EDM) and will focus on structural flight loads and envelope expansion. Two more will join the flight line later this year and will focus on performance, propulsion, and avionics flight qualification. January 5/16: The USMC seems to have given the seal of approval to the latest CH-53 after the first marine pilot to test the helicopter commended its abilities. Lt. Col. Jonathan Morel tested the CH-53K King Stallion which is set to become the largest and heaviest helicopter in the US military. Two hundred of the rotorcraft will be procured by the USMC in a deal worth $25.5 billion. October 29/15: The Sikorsky CH-53K King Stallion helicopter has flown for the first time, eleven months behind schedule. The new helicopter is intended to replace the Marine Corps’ fleet of CH-53E Super Stallion heavy lift helicopters, with the new design boasting three times the lift capability of the older model. The first CH-53K, known as Engineering Development Model-1 (EMD-1) will be joined by an additional three aircraft to undergo 2,000 flight hours of testing. July 31/14: Engines. General Electric in Lynn, A receives a $68.6 million firm-fixed-price contract modification for 16 GE38-1B engines, closure kits, tooling, and associated systems engineering and program management in support of the CH-53K helicopter program’s Operational Evaluation phase. This is on top of the July 17/13 contract for “time critical parts”, and the $84.3 million total represents the first engine buy beyond the 20 covered by the System Development & Demonstration contract. $22.5 million in FY 2013 – 2014 US Navy RDT&E budgets are committed immediately. Note that each CH-53K is equipped with 3 engines. Work will be performed in Lynn, MA, and is expected to be complete in January 2017 (N00019-13-C-0132). See also GE, “U.S. Navy Awards GE38 Engine Production Contract”. June 9/14: Leadership. PMA-261 Program Manager U.S. Marine Corps Col. Robert Pridgen turns over command to Col. Henry Vanderborght, a long-time CH-53E pilot, former John Glenn Test Pilot of the Year, and former Light/Attack Helicopters (PMA-276) platform team lead for UH-1Y production and the UH-1N’s sundown. Vanderbought wasn’t actually a full Colonel until he was promoted on the morning of the change-of-command ceremony. Pridgen will become the program manager for the Presidential Helicopters Program (PMA-274) in July 2014. Sources: US NAVAIR, “Heavy-lift helicopters program welcomes new program manager”. May 5/14: Naming. Sikorsky officially unveils their CH-53K flight test helicopter EDM-2, and the USMC officially names the type “King Stallion”. One can see the natural extension from the CH53A/D Sea Stallion and CH-53E Super Stallion, but there comes a point where one can push the boundaries in unintended directions. Maybe they were thinking of the 1942 movie with Chief Thundercloud. In the modern era, people are more likely to think that somewhere, an adult entertainer wants his name back. Sources, Sikorsky, “Sikorsky Unveils CH-53K Helicopter; U.S. Marine Corps Reveals Aircraft Name” | South Florida Sun-Sentinel, “Sikorsky introduces new ‘King Stallion’ helicopter” | Stamford Advocate, “Sikorsky unveils its new King Stallion heavy lift helicopter”. “King Stallion” May 1/14: Testing. Sikorsky announces that full testing is finally moving ahead with the non-flying GTV, including powered “light-off” with all 7 main rotor blades and 4 tail rotor blades spinning, and powered by its three 7,500 horsepower class GE engines. This begins a rigorous 2-year test program of the rotor blades, transmission, engines, and all subsystems using the GTV. Sources: Sikorsky, “Sikorsky Begins Powered Ground Tests of CH-53K Helicopter with Rotor Blades”. March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. With respect to the CH-53K, their top concern is that the USMC is scheduled to begin ordering helicopters before testing is done. Beyond that concurrency worry: Nearly 9 years later the program’s two critical technologies – the main rotor blade and main gearbox – are approaching maturity. The program expects these technologies to be demonstrated in a realistic environment by its planned February 2016 production decision, a delay in 6 months over last year’s schedule. Program officials reported that they conducted a three-blade whirl test that produced results that exceeded required outcomes. Flight testing is expected to begin in late 2014. March 4-11/14: FY15 Budget. The US military slowly files its budget documents, detailing planned spending from FY 2014 – 2019. The current Navy plan will begin buying production CH-53Ks with an order for 2 in FY 2017, followed by 4 in FY 2018 and 7 in FY 2019. That means production has been pushed back by about a year, because: “Late delivery of components into qualification, and subsequent qualification challenges, have delayed Ground Test Vehicle (GTV) delivery, Flight Readiness Reviews (FRR – GTV & 1st Flight), Engineering Development Models (EDM) delivery and CH-53K 1st Flight, and have moved Milestone C (MSC) and other associated events to 3Q 2016. Budgetary constraints delayed start of the Aircraft Procurement (APN) program by one year. As such, Advanced Acquisition Contracts (AAC) and LRIP awards have been adjusted accordingly. In order to procure aircraft that effectively demonstrate manufacturing processes are both mature and under control, two (2) additional RDT&E,N-funded System Demonstration Test Articles (SDTAs) in FY15 with delivery in 4Q 2018 and 1Q 2019 were added to the program.” Sources: USN, PB15 Press Briefing [PDF] and detailed budget documents. Oct 31/13: Rotors. Sikorsky has completed initial tests of the CH-53Ks new rotor blades, including fatigue tests and whirl-tower balance tests. Additional blade qualification testing will continue for several years, in order to validate aspects like aerodynamic stability, tip deflection, and rotational twist. The next steps involve installation and testing on the stationary CH-53K GTV. There’s a lot to test, because the rotors are new technology. The 35 foot span, 7-bladed main rotor has blade of almost 3 foot chord width, with new airfoil designs, twist, and taper to handle the engines’ 71% power increase. The new blade tips are designed to improve hover performance, and a composite cuff attachment allows attachment of each blade to the elastomerically-articulated titanium rotor head, without tools or redundant fasteners. The rotor hub itself is almost 9 feet in diameter, and the blade radius will be 39.5 feet when assembled, with 12% more total surface area than the CH-35E. The 4-blade tail rotors are also new, with 10 foot blades and 15% more surface area compared to the CH-53E. Sikorsky says that the CH-53K tail rotor produce as much thrust as the main rotor blades on Sikorsky’s 5.5 ton S-76 medium helicopter, which is used in the offshore oil industry. Source: Sikorsky via PR Newswire, “Sikorsky Completes Initial Tests of First Rotor Blades for CH-53K Helicopter”. Oct 11/13: EVM penalty. Bloomberg News: “Sikorsky was notified Sept. 6 of three deficiencies on a contract for the Navy’s CH-53K heavy-lift helicopter related to guidelines for the recording of direct costs and material accounting, Navy Commander William Urban, a Pentagon spokesman, said in an e-mailed statement. A corrective action plan is expected from the company by Oct. 21, he said.” While Bloomberg doesn’t say so, the issue in question relates to a quantitative approach to project tracking called Earned Value Management. Until they’re satisfied, the Pentagon is withholding the maximum 5% on payments. Sikorsky responds that 2 of the 3 issues are already resolved, and they don’t expect this to affect the program. Sources: For Dummies.com, “Earned Value Management Terms and Formulas for Project Managers” | Bloomberg, “Pentagon Withholds Sikorsky Payments for Business System Flaws”. Oct 1/13: Sub-contractors. Kratos Defense & Security announces that an $8.5 million contract from Sikorsky to design and develop CH-53K maintenance trainers. The full-fidelity Maintenance Training Device Suite (MTDS) is meant to provide a true-to-life environment for maintenance training; as well as remove-and-replace training for avionics systems, electrical systems, hydraulic systems and many other mechanical subsystems. The Helicopter Emulation Maintenance Trainer (HEMT) uses a 3D virtual environment to support maintenance training scenarios: functional tests, fault isolation, troubleshooting, and remove and installation for 27 subsystems. Sources: Kratos Oct 1/13 release. FY 2013 SAR shows program cost increases; Ground Test Vehicle delivered; Flight test helicopters ordered. CH-53K GTV (click to view full) Sept 27/13: Sensors etc. Raytheon in El Segundo, CA receives a $20 million firm-fixed-price delivery order for: CH-53K, using FY 2013 USN RDT&E budget… 5 AAQ-29 day/night surveillance turrets 2 Memory Loader Verifier System cables Software update, system integration, and test support USAF HH-60 search & rescue helicopters, using FY 2011 procurement budget… 25 AAQ-29 day/night surveillance turrets 25 L2G multifunction control units and 35 L2G system control units 1 technical data package 1 repair of repairables analysis All funds are committed immediately, and $16.2 million expires on Sept 30/13. Work will be performed in McKinney, TX (92%) and El Segundo, CA, (8%), and is expected to be complete in September 2015. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-10-G-0018). Sept 23/13: IG OK. The Pentagon’s Inspector General submits a non-public report concerning the CH-53K program. Their public statement: the program has been managed appropriately, but it may not meet its February 2016 Milestone C decision date, or its revised costs. The Acquisition Program Baseline was updated on April 24/13, to address cost growth and schedule delays. Contractor manufacturing delays and component testing failures, hence the risk of not being ready in time for the low-rate production decision, and not meeting even its revised costs. The Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics is aware of these issues. Sources: OIG, “CH-53K Program Management Is Satisfactory, but Risks Remain (Project No. D2013-D000CD-0095.000)”. July 17/13: Engines. General Electric Co. in Lynn, MA receives a $15.7 million cost-plus-fixed-fee contract to buy “time critical parts” for incorporation into the CH-53K’s T408-GE-400 gas turbine engine. All funds are committed immediately by the US Navy. Work will be performed in Lynn, MA, and is expected to be complete in December 2016. This contract was not competitively procured pursuant to FAR 6.302-2-1(a)(1) by US Naval Air Systems Command in Patuxent River, MD (N00019-13-C-0132). June 27/13: Sub-contractors. Boeing spinoff Spirit Aerosystems announces a $60 million sub-contract, as a result of the #435 million order for 4 System Demonstration Test Article helicopters (q.v. May 30/13). Spirit makes the base cockpit and cabin, essentially the body of the helicopter. Spirit will begin work during 2013 at its Wichita, KS facility, with deliveries to Sikorsky’s CH-53K prototype assembly line in West Palm Beach, FL to begin in 2014. When the helicopters are finished, they’ll enter Operational Evaluation in 2017, to verify that their performance meets projections. The contract follows over $150 million in work on 7 structures, for the first 5 prototype test helicopters and the 2 ground test frames. Spirit recently announced work with Spintech Ventures, of Xenia, OH on a set of trademarked products called Inflexion/ Smart Tooling. The technology uses re-formable, reusable mandrels that can change states through the layup and cure phases. That helps form complex, highly integrated composite structures into large and/or unusual shapes and configurations – like full integration of skins, stringers, and frames or ribs in one step. Spirit | Wichita Eagle | Spirit re: Inflexion. May 31/13: Hostile IG Report. The Pentagon’s Inspector General issues a report under Audit Project No. D2012-D000CD-0037.000, telling the USMC that the CH-53K’s program increase to 200 helicopters isn’t justified. The Marines politely tell the IG to stick it where Chesty can’t find it. The Inspector General’s statement that “the Marine Corps risks spending $22.2 billion in procurement and operating and support funding for 44 additional aircraft” is a blatant error – that’s the entire 2011 program cost for 200, plus R&D. Beyond that, they complain that the USMC: did not follow the Joint Capabilities Integration and Development System Instruction and obtain Joint Requirements Oversight Council [DID: JROC] approval for the increase; did not have requirement studies prepared to determine a procurement quantity in consideration of program affordability; incorrectly relied on a 2008 memorandum from the Deputy Commandant for Aviation directing the increase of the procurement quantity to 200 aircraft, without support; incorrectly used the 2010-2011 Force Structure Review’s war-gaming scenarios as justification for the quantity increase; and did not justify or appropriately consider the impact of the Marine Corps personnel reductions effect on Heavy Lift quantity requirements. In response, the USMC Deputy Commandant says the existing analyses do justify it, and JROC approved the 200. Then the Milestone Decision Authority approves the Marine Corps’ request to rebaseline the program with a 54% procurement cost increase over the 2005 baseline (a jump from Dec 2011 figures, if true) and formally push the Milestone C decision from December 2012 to February 2016 (later than the current August 2015). The IG wants additional comments re: the re-baselining. Which is fine, as far as it goes, but the whole process seems like an ad for the Lexington Institute’s Daniel Goure, who argues that the Pentagon’s procurement processes are an out of control overhead burden. It’s all about paper, rather than the soundness of the conclusion. And you can’t use what you learn in war games to change procurement decisions? What idiot thinks that’s a good idea? Pentagon IG Report. May 30/13: Sikorsky Aircraft Corp. in Stratford, CT receives a $435.3 million cost-plus-incentive-fee contract modification, to buy 4 CH-53K System Demonstration Test Article helicopters. The April 5/06 System Development & Demonstration contract already included 4 test helicopters, and US NAVAIR and Sikorsky subsequently confirm that these 4 SDTA helicopters are a different set that the Marines will test during operational evaluation. The buy is structured as an additional line item under the 2006 contract, and initial funding will use $48.1 million in FY 2013 RDT&E budgets. Sikorsky CH-53K Program VP Dr. Michael Torok says the SDTA helos will be based on the configuration of the 4th and final flight test aircraft from the 2006 contract, which is currently being assembled on the prototype production line. To date, Sikorsky has delivered 2 non-flying SDD CH-53Ks: the Ground Test Vehicle and the Static Test Article. That leaves the 4 flight test prototypes, 1 stationary Fatigue Test CH-53K, and now the 4 SDTA helicopters. First flight of a CH-53K prototype is now expected in “late 2014” instead of Spring 2014, and this contract requires 1st SDTA delivery by September 2016. Final delivery is scheduled by the time OpEval begins in March 2017, with incentives for early delivery. Work will be performed in Stratford, CT (17%); West Palm Beach, FL (17%); Wichita, KS (15%); Salt Lake City, UT (10%); St. Louis, MO (4%); Bridgeport, WVA (3%); Windsor Locks, CT (3%); Ft. Walton Beach, FL (2%); Redmond, WA (2%); Forest, OH (2%); Jackson, MS (2%); Cudahy, WI (2%); Irvine, CA (2%); Kent, WA (1.2%); Bristol, United Kingdom (1%); Phoenix, AZ (1%); Chesterfield, MO (1%); Los Angeles, CA (1%); Rochester, United Kingdom (1%); Buckinhamshire, United Kingdom (1%); Longueil, Quebec, Canada (1%); Cedar Rapids, IA (0.8%); Twinsburg, OH (0.8%); St. Clair, PA (0.5%), and various other locations (8.7%) (N00019-06-C-0081). See also US NAVAIR | Sikorsky 4 flight test helos May 24/12: SAR. The Pentagon finally releases its Dec 31/12 Selected Acquisitions Report [PDF]. “CH-53K Heavy Lift Replacement Helicopter – Program costs increased $1,897.6 million (+7.1%) from $26,626.8 million to $28,524.4 million, due primarily to changing the cost estimating methodology from analogy-based to supplier bottom-up (+$1,796.6 million), use of commercial indices for materiel escalation costs (+$948.9 million), revised escalation indices (+$539.4 million), an increase in the production line shutdown estimate (+$120.7 million), and an increase in support equipment, repair of repairables, and spares costs (+$64.9 million). These increases were partially offset by decreases in other support costs (-$664.0 million), initial spares requirements (-$589.0 million), and the application of new inflation indices (-$385.3 million).” To put the estimating into English, the program had estimated costs based on similar programs, but now they’ve gone through the chosen suppliers and built an estimate using actual costs for components and materials, plus commercial figures for raw materials etc. The result adds almost $2.85 billion to the program, and other cost jumps bring the total increase to $3.47 billion. The downward revisions to spares and support, and to inflation, prevent costs from rising over 13%. Are the changes reasonable? We won’t know until flight testing is well underway and time has revealed real inflation costs, but there’s reason to be skeptical. It could be a case of “paper cuts now, then cost increases once production is underway and jobs in Congressional districts are committed.” We’ll have to talk to the program to even begin to judge. SAR: program cost increases – questionable cuts? May 17/13: General Electric in Lynn, MA receives a $7.6 million firm-fixed-price delivery order to buy critical hard tooling required to support the manufacture of the CH-53K’s GE38-1B engines. The current order involves GE38s for the CH-53K System Demonstration Test Article (SDTA) helicopters, and they’re the engine’s inaugural platform. Work will be performed in Lynn, MA (20%); Morristown, TN (20%); Groton, CT (20%); Hooksett, NH (10%); Fort Wayne, IN (10%); North Clarendon, VT (10%); and Albany, OR (10%); and is expected to be complete in November 2014. All funds are committed immediately, using FY 2013 RDT&E budgets (N00019-10-G-0007). March 28/13: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2012, plus time to compile and publish. Overall, expected costs have risen (q.v. March 30/12 entry), though the added cost per helicopter is only 5.6% above the baseline. The “ground test vehicle” non-flying model has been delivered, but issues with a test stand are delaying progress. GAO points out that the design is released, but not necessarily finished. The big break in the program remains the April 2011 shift from a cost-plus award fee to cost-plus incentive fee contract, tied to specific cost and schedule goals, and associated with a much-delayed schedule. The next big event will be the beginning of system-level prototype testing in 2013. Dec 4/12: Testing. Sikorsky delivers the 1st CH-53K Ground Test Vehicle (GTV) prototype. It won’t fly, just help test the performance of the rotor blades, transmission, and engines. The 4 follow-on flight test helicopters aren’t expected to fly until 2014-2015. Sikorsky. GTV delivered FY 2012 GAO report says development will need more $; Last CH-53D retired. CH-53E lifts M113 APC May 6/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $7.8 million cost-plus-award-fee contract modification to incorporate CH-53K live fire test and evaluation. This is exactly what it sounds like – the Navy will shoot lots of holes in test platforms, and assess damage resistance. Work will be performed at Naval Air Warfare Center Weapons Division, China Lake, CA (80%), and Stratford, CT (20%). Work is expected to be complete in December 2018 (N00019-06-C-0081). April 12/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $25.7 million cost-plus-incentive-fee contract modification, to provide detailed maintenance plans in support of the CH-53K helicopter program. Work will be performed in Stratford, CT, and is expected to be complete in December 2015 (N00019-06-C-0081). March 30/12: GAO report. The US GAO tables its “Assessments of Selected Weapon Programs” for 2012. With respect to the CH-53K: “Program officials reported that in July 2011, the contract’s estimated cost was increased by $724 million to $3.4 billion. According to Defense Contract Management Agency officials, the estimated contract costs increased because of several factors including the need for additional flight test hours and spare parts, increased material costs, and design complexity. The contract was also changed from cost-plus award fee to cost-plus incentive fee for the remaining period of performance. The incentive fees are tied to specific cost and schedule goals… According to Marine Corps officials, a force structure review has been conducted to assess the required quantity of aircraft and that review determined that the requirement for 200 aircraft is still valid despite the proposed manpower reduction.” Feb 28/12: Avionics. Northrop Grumman announces a $5.6 million Phase II contract from US NAVAIR to modify existing software for the CH-53K’s LN-251 embedded GPS/fiber-optic inertial navigation system (INS). Northrop Grumman’s Navigation Systems Division will provide updated software and engineering support for platform integration and flight tests, to both NAVAIR and Sikorsky Aircraft. Feb 24/12: Sikorsky Aircraft Corp. in Stratford, CT receives a $15.5 million cost-plus-incentive-fee CH-53K contract modification. The program needs a condition-based maintenance plus software toolset (almost certainly ISS – vid. Oct 26/11), to integrate the helicopter’s onboard prognostics and the Navy’s fleet common operating environment maintenance computers. The contract includes installation, operation, and recurring data analysis. Funds and work will be assigned if and as needed, and work will be performed in Lexington Park, MD (90%), and Stratford, CT (10%). The contract is expected to run until February 2018. US Naval Air Systems Command in Patuxent River, MD manages the contract (N00019-06-C-0081). Feb 10/12: USMC retires CH-53D. The USMC holds a “sundown ceremony” to retire its CH-53D Sea Stallion fleet, leaving only CH-53E Super Stallions. See also Aug 16/10 entry. US NAVAIR explains that the retirement isn’t immediate, but it is imminent: “The Sea Stallion’s last mission is currently underway with Marine Heavy Helicopter Squadron 363 supporting Operation Enduring Freedom in Afghanistan. The helicopter will be flown from Marine Corps Air Station Kaneohe Bay to its final destination at the Pacific Aviation Museum, where it will be displayed.” CH-53D retired Dec 19/11: Sub-contractors. Northrop Grumman announces a follow-on contract from US NAVAIR in Patuxent River, MD to define system requirements for the integration of its LN-251 embedded global positioning system (GPS)/fiber-optic inertial navigation system (INS) on the new CH-53K. The firm touts the LN-251 system as “the world’s smallest, lightest navigation-grade embedded GPS/INS unit in its class… [whose] modular, open architecture supports additional applications and evolving requirements.” Oct 26/11: Recognition. The CH-53K Helicopter Systems Engineering Team wins a Department of Defense Systems Engineering Top 5 Programs Award, at the annual NDIA Systems Engineering Conference Award Luncheon in San Diego, CA. US NAVAIR. Oct 26/11: ISS Patent. Sikorsky Aerospace Services’ Integrated Support System (ISS) aftermarket software suite has received a patent. ISS integrates onboard diagnostics (vid. Sept 26/08 HUMS entry) and usage data with ground-based troubleshooting and service information. This technology is part of Sikorsky’s efforts to move toward proactive diagnostics, and ISS platforms for the Sikorsky CH-53K and S70i are under development. Future plans include expansion to other aircraft types. Sikorsky. Oct 11/11: Sub-contractors. Thermoplastic composites firm Fiberforge announces the addition of Njord A. Rota as its CH-53K Program Manager. They explain that the Lockheed Martin veteran will lead all management aspects of Fiberforge’s work for DRS Technologies Inc. Their work includes the design, development and production of the carbon fiber composite components within the CH-53K’s Internal Cargo Handling System. Helihub. FY 2011 GE delivers 1st engine, sees GE38 civil and military market potential as $4+ billion; Sikorsky unveils virtual reality center, FAFO experimental assembly line. August 2011: Re-baselined. The CH-53K program undergoes a major time shift. Delivery dates for engineering development models are moved, 1st flight is pushed back to 2014, and Initial Operational Capability is moved from 2015 to 2018 (later 2019). Source: GAO. Contract rebaselined GE38 engine (click to view full) Aug 4/11: Engine. GE has delivered the 1st GE38 engine, for use on the Sikorsky CH-53K Ground Test Vehicle. After 2 years of testing, GE touts 57% more power and 18% lower specific fuel consumption than the CH-53E’s similarly-sized GE T64, while using 63% fewer parts. In addition to the CH-53K SDD program’s 20 flight engines, the GE38 testing program includes 5 factory-test engines that will accumulate more than 5,000 engine test hours by 2013. GE is pushing ahead on its engine despite CH-53K delays, and expects it to have applications in the fixed wing and naval markets, alongside its helicopter potential. They see a total civil and military market potential of $4+ billion. GE. June 21/11: Industrial. Sikorsky announces that they’ve begun assembly of the CH-53K Ground Test Vehicle (GTV), which is currently in position 4 on the line. It’s the 1st of 5 prototype CH-53Ks to be assembled at the Sikorsky Florida Assembly and Flight Operations (FAFO) facility in West Palm Beach, FL, which opened in March 2011. Another 2 GTVs will be assembled at Sikorsky’s main manufacturing plant in Stratford, CT, making 3 ground test and 4 flight test helicopters. CH-53K ground testing is scheduled to begin in early 2012, and flight testing during FY 2014. To give one a sense of the CH-53K, its rotor hub and transmission alone weigh 15,000 pounds – about the empty weight of a UH-60 Black Hawk. April 2011: Restructuring. The CH-53K program undergoes a major shift. The SDD contract is changed from a cost-plus award fee structure to cost-plus incentive fee contract, which is tied to specific cost and schedule goals. Source: GAO. Contract restructured March 22/11: Industrial. Sikorsky officially opens its new 60,000 square foot Florida Assembly and Flight Operations (FAFO) campus, establishing experimental assembly line operations for the new CH-53K heavy lift helicopter. The FAFO line introduces a set of new manufacturing technologies. It’s equipped with wireless data connections to all operator plasma data screens, uses digital operation sheets, and is outfitted with overhead power and air dropdowns, new aircraft work stands, and overhead cranes. Sikorsky, incl. video. Feb 16/11: Sub-contractors. Donaldson provides an update regarding its Engine Air Particle Protection System, which is a critical piece of equipment in desert or dusty environments. They received the contract in September 2007: “We built the first full-scale EAPPS in just three months following the CDR, [DID: which was August 2010]” said Sheila Peyraud, General Manager, Aerospace and Defense at Donaldson. “Developmental testing began in November 2010 to support testing of the helicopter’s GE38-1B engine in 2011. We are pleased that initial results in this phase of the program are exceeding expectations originally set during the conceptual design phase. Qualification testing will begin in May 2011.” Jan 14/11: Industrial. Sikorsky unveils a state-of-the-art virtual reality center for the CH-53K heavy lift helicopter program, attempting to help identify production and maintenance issues before the initial build takes place by using a 3-dimensional digital environment. Located within the engineering labs at Sikorsky’s main manufacturing facility in Stratford, CT, the virtual reality center uses sophisticated software, along with 12 cameras, a head-mounted display headset, gloves, and a gripping tool. All devices are linked to 3 computers, which comprise the “command center” for operating the system. Nov 19/10: Sub-contractors. ITT Corporation (formerly EDO) announces that after nearly 3 years of advanced design, development, testing and manufacturing, they’ve delivered the first pair of CH-53K sponsons to Sikorsky. Each sponson is 25 feet long by 4 feet wide and 5 feet high, and fits on the helicopter’s side to house landing gear, fuel, and other mechanical and electrical assemblies. ITT used composite materials instead of traditional sheet metal for the sponsons, and hopes they’ll provide benefits in weight, corrosion resistance, and in-flight stress tolerance. To make that work, ITT has to use advanced manufacturing technologies like electronic model control, laser-ply projection, 5-axis computer numerically controlled machining, automated trimming and drilling, and laser and ultrasonic inspection of all subassemblies. The CH-53K parts will be built at ITT’s Electronic Systems facility in Salt Lake City, UT. FY 2010 Why was the CH-53K program pushed back 2 years?; SAR raises plans to 200; Critical Design Review passed; AAQ-29 surveillance turrets for CH-53K; No more “boneyard” CH-53D/Es left. CH-53Ds in Hawaii (click for video) Sept 6/10: Sub-contractors. GKN Aerospace delivers the first major CH-53K structural assembly to Sikorsky – an aft transition fuselage section that measures approximately 20′ x 9′ x 9′, built of an advanced hybrid composite, aluminum and titanium structure covered with external composite skins. GKN Aerospace was accorded full design authority and manufacturing responsibility for the CH-53K helicopter aft transition fuselage section, cargo ramp, and overhead door structural assemblies in 2007. Structural design is carried out by the GKN Aerospace Engineering Development Center in Nashville, TN, and manufacturing of over 1,000 separate components takes place at the Company’s plant in St. Louis, MO. GKN Aerospace is employing manufacturing technologies including automated fibre placement (AFP), automated trim and drill, and digital inspection. GKN Aerospace. Aug 16/10: CH-35D plans. DoD Buzz looks at the shifting plans to replace the USMC’s 30 CH-53D Sea Stallions. The original plan was to replace them with MV-22s. At some point in 2007/08, the Marine Corps formally decided replace their aging CH-53Ds with CH-53Ks. But now USMC Lt. General Trautman is saying that he wants an east coast and a west coast MV-22 squadron to replace the CH-53Ds in Afghanistan, and “When I can do that, that’ll be the start of getting CH-53 Delta out of the way.” Exactly what “out of the way” means is ambiguous. If it means out of service, DoD Buzz correctly notes that this raises questions about the USMC’s support for the CH-53K, and would seem to be better news for the MV-22. If it means “shifted back to Hawaii while MV-22s serve in Afghanistan,” that would be something else. The exact meaning isn’t 100% clear in the article. Aug 3/10: CDR. Sikorsky announces a successful Critical Design Review for its CH-53K, following a week-long meeting in late July that included representatives from the military, Sikorsky, and 21 industrial partners. At the review, the CH-53K team had to demonstrate that their design meets NAVAIR’s system requirements. System-level performance projections indicate that all 7 Key Performance Parameters (KPPs) will be achieved with adequate risk mitigation margin built-in. Over 93% of the design has been released for manufacturing, and the final design definition concludes, the next step involves initial prototypes and testing. The overall program CDR follows previous efforts including a System Requirements Review (SRR), System Functional Review (SFR), System Preliminary Design Review (PDR), 77 supplier-level CDRs, 64 supplier and internal software reviews, and 16 sub-system CDRs. Sikorsky VP and CH-53K Chief Engineer Mike Torok offers an update of other preparations: “Parts are being made throughout the supply base and at our new Precision Component Technology Center; test facilities are being fabricated and prepped for installation in our recently opened ground test facility; the integrated simulation facility is marching toward a late 2010 opening, already having received the first increment of software for the aircraft; and the final assembly facility in West Palm Beach is being prepared to start building the ground and flight vehicles early next year. It’s time now to prove out our design and show that this helicopter system will indeed meet the war fighting requirements of the USMC…” CDR June 28/10: Sub-contractors. Raytheon Co. in El Segundo, CA received a $26.5 million firm-fixed-price delivery order for 50 forward looking infrared devices that will be fitted to CH-53E (42) and CH-53K (8) helicopters. Discussions with corporate representatives confirm that these will be AN/AAQ-29 turrets, using a 480 x 640 element, 3-5 micron wavelength indium antimonite infrared detector, and a 2 field of view telescope on a 12-inch diameter turret. This is a follow-on to a previous order. Work under this basic ordering agreement will be performed in El Segundo, CA, and is expected to be complete in June 2012. $530,000 will expire at the end of the current fiscal year, on Sept 30/10 (N00019-10-G-0018). June 4/10: No more CH-53D/Es. US NAVAIR announces that it has delivered the last available CH-53s from storage at AMARG in Tucson, AZ. The last H-53E to come out of desert retirement was delivered to Marine Helicopter Training Squadron 302 on May 7/10, while the last CH-53D was delivered April 16/10. Since the start of the program in August 2005, FRC East H-53 artisans have inducted and completed 10 of the heavy-lift helicopters. The team delivered 8 CH-53Es and 2 CH-53Ds, some of which had been idle for as many as 11 years, ahead of schedule and under budget. Each helicopter still took about 25,000 total work hours for all testing, modifications, and maintenance. Sikorsky ended CH-53 production in 1999, so AMARG was the last remaining source of airframes. Boneyard out of CH-53s May 10/10: Engine. Flight International reports that even though the CH-53E is delayed, GE remains committed to delivering the 7,500 shp class GE38-1 engine on schedule. The firm sees re-engining opportunities and related sales beyond the CH-53K, so they’ve begun delivering GE38s for ground tests years before airframes become available for flight test. As of Feb 15/10, GE had recorded 176 engine starts and 177 operating hours, with sustained power of 7,760 shp and peak power of 8,300 shp. April 2010 saw delivery of a 2nd engine for ground tests. The article is less positive about the CH-53K’s odds of winning the German/French heavy-lift helicopter program. Apparently, Germany wants a helicopter that will fit key vehicles internally, not underslung. Ultimately, the question will be whether Germany can afford to develop what it wants, can find it elsewhere, or is forced to remove some requirements. April 29/10: Why the delay? DefenseTech reports that the USMC has pushed back the initial flight date of the CH-53K by 2 years to FY 2013, and Initial Operational Capability by 3 years to FY 2018, “with little concrete justification beyond an ‘overly aggressive initial program schedule’ “, and while stressing that the program has not run into technical problems. Craig Hooper writes: “The CH-53K was an unsung showpiece for those preaching the virtues of incremental development, and, as a result, appetite for the platform has grown by about 30 percent, with the program of record expected to increase from 156 aircraft to 200. But, in the process, the CH-53K has become something of a MV-22-killer. Is this the problem?… In late 2009, the Marine Corps decided to go with the CH-53Ks to replace their 40-year old CH-53D fleet (MV-22 Ospreys were originally slated to replace the CH-53D). At about the same time, Israel decided to forego the Osprey for the CH-53K, killing the Osprey’s best hope of snaring an international buyer. And with the Osprey 65% availability and the MV-22s high operating costs of about $11,000 dollars an hour… worse, studies from the Pentagon demonstrated that a CH-53K-equipped big-deck amphib provided a lot more logistical support for embarked Marines than the MV-22… Slowing CH-53K development will… prevent real-data comparisons between platforms… [until] a second multi-year MV-22 contract gets signed in FY 2013. Even worse, slowing the CH-53K schedule raised the program price by at least $1.1 billion dollars, raising the per-unit price… Why slow a program that stands to be a high-demand showpiece with potential markets in Israel, Germany, France, Turkey, Singapore and Taiwan?” Asked for a response, US MARCORSYSCOM said that US NAVAIR was the only agency that could respond; NAVAIR did not respond to DID’s simultaneous inquiry. April 1/10: SAR – Program grows. The Pentagon releases its April 2010 Selected Acquisitions Report, covering major program changes up to December 2009. The CH-53K is included, because the Marines want more of them – but there’s a self-imposed catch: “CH-53K – Program costs increased $6,817.8 million (+36.4%) from $18,708.3 million to $25,526.1 million, due primarily to a quantity increase of 44 aircraft from 156 to 200 aircraft (+$3,108.9 million), and increases in other support costs (+$749.7 million) and initial spares (+$456.2 million) associated with the quantity increase. Costs also increased due to a three-year delay in the procurement profile shifting initial purchases from fiscal 2013 to fiscal 2016 (+$1,148.4 million), schedule growth attributable to funding constraints (+$669.6 million), and an increase in the cost estimate for the development contract (+$611.2 million).” Feb 22/10: Sub-contractors. Cobham announces [PDF] a sub-contract from Sikorsky to manufacture all leading and trailing edge details and precisely locate and bond the details onto the CH-53K’s main rotor blade spar. The work will be done by its Antenna Systems unit, which has consolidated all composites-related operations within the company. Depending on how many CH-53K helicopters are eventually built by Sikorsky for the US Marine Corps, the contract could be worth up to $25 million. Jan 22/10: Industrial. Sikorsky formally opens its new $20 million Precision Components Technology Center, as part of United Technologies Corp.’s $130 million investment the CH-53K program. The center currently employs 8 people, and was designed to allow the development of new product lines with “zero setup time” and quick changeover from one component to another. The center will produce major dynamic components of the CH-53K helicopter such as rotating and stationary swashplates, main and tail rotor hubs, and main rotor sleeves. The equipment in the center has the capability to produce any precision rotor and drive system dynamic component, including earlier-model configurations, and forgings machined there can be up to double the size of previous on-site limits. Sikorsky release. Jan 7/10: IDR. Sikorsky announces the wrap-up of its Integration Design Review for the CH-53K, in preparation for the Critical Design Review coming in 2010. The event included industrial team members , and personnel from US NAVAIR and the Office of the Secretary of Defense. Risk reduction initiatives on the critical split torque main gear box and the advanced main rotor blade are done, and 2010 will also hold a Technology Readiness Assessment. Initial Operational Capability is currently slated for early 2016. Established features of the CH-53K helicopter currently include a joint-interoperable glass (digital screens) cockpit; fly-by-wire flight controls; 4th generation rotor blades with anhedral tips; a low-maintenance elastomeric rotor head; upgraded engines; a locking cargo rail system; external cargo handling improvements; survivability enhancements; and design for reduced operation and support costs. Sikorsky release. FY 2009 CH-53s flying at 3x planned usage; 1st GE38 engine test; VELD removed from the design; Sub-contractors picked. CH-53E, Cobra Gold 2002 (click to view full) July 28/09: Engine. The GE38 team holds a ceremony at General Electric in Lynn, MA, celebrating the completion of the first full GE38 engine test. This first engine test, which began June 24/09, focused on basic engine checkout and risk reduction. All engine test parameters were within predicted values. SDD phase testing will include 5 ground-test engines that will accumulate more than 5,000 engine test hours, plus production of 20 flight-test engines for the CH-53K development helicopters (each helicopter carries 3 engines). NAVAIR release. May 7/09: Sub-contractors. Curtiss-Wright Corporation announces a contract from Sikorsky to develop and supply data concentrator units for the CH-53K. Curtiss-Wright’s system consists of 2 data concentrator units (DCUs) that will receive and provide various avionic and air vehicle discrete, digital and analog inputs for monitoring, processing data and controlling various CH-53K subsystem components. Curtiss-Wright’s Motion Control segment will develop and manufacture the DCU systems at its newly-opened City of Industry, CA, facility. The initial contract runs through 2011 with the production phase starting in 2013. The contract has a total potential value of $22 million when development and all aircraft production options and phases are completed. April 21/09: Sub-contractors. Curtiss-Wright Controls Inc., announces a contract from United Technologies subsidiary Claverham Ltd. (a Hamilton Sundstrand Flight Systems business unit) to provide multi-channel linear variable displacement transducers (LVDTs) for the fly-by-wire (FBW) systems controlling the main rotor and tail rotor on the Sikorsky UH-60M Upgrade and CH-53K helicopters. The LVDTs are special pressure sealed linear displacement transducers that are embedded in Claverham’s Primary Flight Control Actuators. The transducers provide electrical signals that are proportional to the position of the hydraulic actuator rod, and the actuators change pitch angles on the main and tail rotors in response to the pilot’s commands. These two programs have a potential contract value in excess of $20 million over a 15-year period, with shipments expected to begin in 2009. The company will supply these products from its Christchurch, UK operation. March 30/09: GAO. The US GAO audit office delivers its 7th annual “Defense Acquisitions: Assessments of Selected Weapon Programs report, which looks at 47 programs including the CH-53K HLR. The CH-53K stands out, as one of the few programs to show lower R&D projections (from $4.23 billion to $4.17 billion) and estimated delivery time (2 months early) since its 2005 baseline. The truth is, the Marines have little choice. The time crunch has already begun: “According to program officials, all available decommissioned CH-53E helicopters have been reclaimed… Currently deployed CH-53E aircraft are flying at three times the planned utilization rate… The program intends to manufacture up to 29 of the 156 total [CH-53K] helicopters (19 percent) during low-rate initial production at the same time that it is conducting initial operational testing. While concurrent testing and production may help to field the systems sooner, it could also result in greater retrofit cost…” That’s likely, since a number of requirements and systems have been shelved, in order to deliver the helicopter on time: “Both of the CH-53K’s current critical technologies, the main rotor blade and the main gearbox, are immature and are expected to be fully mature following the low-rate initial production decision in 2013. The program replaced a third technology, the viscoelastic lag damper, with a modified version of an existing [linear hydraulic damper] technology. During preparations for the preliminary design review, it was discovered that maturing system engineering tasks would potentially require additional cost and time. As a result, the program eliminated noncritical requirements to contain costs and delayed the preliminary and critical design reviews and low-rate initial production decision.” Feb 8/09: Sub-contractors. BAE Systems announces contracts from Sikorsky Aircraft for development and initial deliveries of CH-53K Cockpit Seats and Cabin Armor Systems, and for integration of the CH-53K’s fly-by-wire flight controls. BAE Systems efforts will include design, development, testing, qualification, and delivery of initial systems to support the flight test and ground test aircraft. Follow-on contracts would be placed for production orders and spares. The seats will be based on BAE Security & Survivability Systems S7000 armored, crashworthy seats, and first deliveries of both seats and cabin armor are scheduled for 2010. The total value of the programs is estimated at approximately $90 million through 2022, if 156 CH-53K aircraft are built. FY 2008 PDR successful; Sub-contractors picked. Iraq: CH-53E lifts UH-60 (click to view full) September 2008: PDR. The CH-53K program conducts a successful Preliminary Design Review. Source. PDR Sept 26/08: Sub-contractors – HUMS. Goodrich announces that it has been picked to supply its IVHMS Health Usage and Monitoring Systems (HUMS) for the CH-53K. HUMS are embedded sensors within the aircraft’s key components, like engines. They monitor these systems, and can often tell if things are beginning to wrong inside before something actually breaks. Avoiding breakdowns, and helping to pinpoint problems faster if something does break, saves money. Further savings can be had by using HUMS in conjunction with advanced maintenance and fleet management software. Once a baseline of good data is available, it becomes possible to switch from “do it just in case” maintenance and overhaul checklists, to “condition-based maintenance” that’s performed only when necessary, based on a combination of HUMS readings and predictive software. Goodrich has carved out a strong market position in this area, supplying HUMS systems of varying complexity for a number of US military helicopters. IVHMS will supposedly build on earlier IMDS systems implanted in the CH-53E, but will be broader in nature, monitoring “the CH-53K helicopter’s entire mechanical drive train from the engines to the rotor system, and hundreds of aircraft systems.” Sept 2/08: Sub-contractors. Breeze-Eastern Corporation announces that Sikorsky has picked them to provide the CH-53K’s Internal Cargo Winch System. The initial contract requires the delivery of 5 units for the System Design and Development phase. Breeze-Eastern has worked with Sikorsky in this area to supply the S-92, and to retrofit USMC CH-53Ds. Bloomberg. May 30/08: Camber Corp. in Huntsville, AL received an $8.6 million cost-plus-fixed-fee contract for program management, acquisition management, and engineering and technical services in support of the CH-53D, CH-53E, MH-53E, and CH-53K. Work will be performed in Patuxent River, MD and is expected to be complete in November 2008. This contract was not competitively procured by the Naval Air Warfare Center Aircraft Division, Patuxent River, MD (N000421-08-C-0044). Feb 18/08: Sub-contractors. Northrop Grumman Corporation announces that U.S. Naval Aviation Systems Command has picked their APR-39BvX radar warning receiver (RWR) integration program for the Navy’s CH-53K helicopter fleet. The APR-39 BvX upgrade, scheduled for completion and flight testing in late 2009 or early 2010, builds on the recently completed AvX program and includes new, faster processors and “massive” memory expansion. Under the terms of the $17 million phase Phase 2 contract, Northrop Grumman will incorporate all electronic warfare (EW) integration capabilities of the APR-39Av2 and APR-39Bv2 versions, which are variants of the same system tailored to the kind of aircraft computer and cockpit interfaces in Navy/USMC aircraft. The APR-39BvX program will create one interoperable version for the forthcoming CH-53K fleet. This phase 2 program will include electronic warfare controller and integration interfaces to multiple missile and laser warning sensors, and also tie the APR-39 into Northrop Grumman’s Directional Infrared Countermeasures (DIRCM) systems onboard each of the helicopters. The intended result is a system providing warning and protection against electro-optical, infrared, and radar guided missiles, and electronic warfare threats. NGC release. Nov 6/07: Sub-contractors. Sikorsky has selected fellow United Technologies Corporation subsidiary Eaton Corporation to design, develop and supply the CH-53K’s integrated fuel system. This is in addition to the contract for the helicopter’s hydraulic power generation system and fluid conveyance package awarded to Eaton in July 2007. During the development phase of the program, which runs through 2014, Eaton will provide the integrated fuel system support hardware for 5 helicopter shipsets in addition to a number of system development test sets. “Based on expected production of more than 156 helicopters for the U.S. Marine Corps, the contract value is approximately $96 million and, when combined with anticipated foreign military sales, is expected to exceed $160 million over the approximate 12-year life of the program.” Eaton release. FY 2007 Sub-contractors picked; Sikorsky opens CH-53K development center. CH-53E Super Stallions: 2 HMMWVs, to shore (click to view full) Sept 25/07: Sub-contractors. Donaldson Company announces that Sikorsky has picked them to provide the CH-53K’s engine air particle protection system (EAPPS), which helps keep blown sand and other contaminants from gumming up the helicopter’s engines. Sept 17/07: Sub-contractors. Fellow United Technologies’ subsidiary Hamilton Sundstrand announces that they’ve been selected to supply integrated secondary power systems for the CH-53K, consisting of the environmental control system, auxiliary power unit and main engine start system. The environmental control system (flight deck and avionics air conditioning, cabin ventilation and heating, engine bleed system, and supply air for the onboard inert gas generation system) and main engine start system will be built at Hamilton Sundstrand’s Windsor Locks, CT facility. The Auxiliary Power Unit will be built at the company’s San Diego, CA facility. The contract includes design, development and production work; design and development will begin immediately with first hardware deliveries scheduled for 2009. Hamilton Sundstrand says that this agreement has a potential value of more than $400 million. The firm already holds contracts to supply the CH-53K’s fly-by-wire flight control computers, and primary main and tail rotor actuators. Hamilton Sundstrand release. Sept 4/07: Sub-contractors. Sikorsky Aircraft Corporation has selected Goodrich Corporation to act as integrator for the CH-53K’s input and tail drive shaft system, as well as supplying the electrical power generation and distribution system (q.v. June 17/07). July 12/07: Sub-contractors. Sikorsky Selects fellow UTC subsidiary Eaton to supply the CH-53K’s Hydraulic Power Generation System and Fluid Conveyance Package. During the development phase of the program, which runs through 2014, Eaton will provide support hardware for 10 aircraft shipsets. Based on expected production of more than 156 aircraft for the U.S. Marine Corps, as well as anticipated foreign military sales, the potential value of the contract over the life of the program is expected to exceed $200 million. Eaton release. June 20/07: European HTL. France & Germany confirm their heavy-lift helicopter program, known as HTL in France and FHT in Germany. A full set of specifications have not been created yet, and the countries involved are still trying to decide whether to pay the price of a full R&D program to get exactly what they want, or base their helicopter on an existing design. Possible contenders include the CH-53K, Boeing’s CH-47F, and Rosvertol’s super-giant Mi-26T helicopter. June 18/07: Sub-contractors. Canadian aerospace manufacturer Heroux-Devtek Inc.’s Landing Gear Division received a contract from Sikorsky to design, develop, fabricate, assemble, test and deliver the CH-53K’s landing gears and tail bumper during the SDD phase, which includes the production of landing gears and tail bumper assemblies for 8 systems. Total revenue for the SDD and the Production Phase, which will be awarded in a separate contract, is expected to exceed C$ 95 million (about $89 million). Rotor News. June 17/07: Sub-contractors. Sikorsky Aircraft Corporation has selected Fortune 500 firm Goodrich Corporation to supply the electrical power generation and distribution system for the CH-53K program. Goodrich’s Pitstone Green, UK and Twinsburg, OH facilities will be involved in the development and delivery of a complete electrical power system for the aircraft, consisting of generators and controls; primary power distribution; AC/DC converters; battery; and external power controls. Goodrich currently supplies power generation for the Sikorsky S-92/H-92 Superhawk, and has recently been selected to supply the DC power generation for the Sikorsky’s upgraded S-76D civil helicopter. Rotor News | Goodrich press kit release incl. pictures May 9/07: Sub-contractors. Sikorsky Aircraft announces its selection of 4 subcontractors to design and fabricate the CH-53K’s major fuselage sections, “following an extensive solicitation and evaluation of multiple bids over a 12-month competition”: They include Aurora Flight Sciences in Manassas, VA; Bridgeport, WVA; and Columbus, MS; R&D in Cambridge, MA (main rotor pylon). EDO Corp. composites in Salt Lake City, UT; select resin transfer molding parts from Walpole, MA; and final assembly in North Amityville, NY (tail rotor pylon & side sponsons). GKN Aerospace in Nashville, TN & St. Louis, MO (aft transition). Spirit AeroSystems in Wichita, KS (cockpit and cabin). Design will be conducted in a collaborative environment between supplier sites and Sikorsky’s Heavy Lift Development Center using model management systems linked to Sikorsky IT and data systems. Composite and titanium materials are being employed extensively to provide superior fatigue and corrosion durability at minimum weight, and state-of-the-art manufacturing processes such as co-curing, automated part fabrication, super high speed machining, and determinant assembly are being pressed into service to keep costs down. Sikorsky release. Assemblies will initially be built for 7 test and certification aircraft (4 Engineering Development Models, 1 Ground Test Vehicle, 1 Static Test Article and 1 Fatigue Test Article.) The CH-53K SDD program schedule runs through the end of September 2015. ADDENDA: GKN Aerospace’s release says that they’re contracted to deliver their 7 development ship sets to Sikorsky between 2009 – 2012, and estimates that this deal could be worth up to $70 million to them. Aurora Flight Sciences’ release clarifies that the Main Rotor Pylon (MRP) is one of 6 major fuselage sections; it is mostly made of composite materials, and houses the CH-53K’s Main Rotor Head, the No. 2 engine and other aircraft subsystems. EDO Release [PDF] Feb 12/07: Manufacturing. Sikorsky Opens the CH-53K Development Center. The CH-53K program’s new Heavy Lift Development Center is a 106,000-square-foot office building in Stratford, CT, about 5 miles from Sikorsky’s main facility. It houses the CH-53K Program and Engineering staff, co-locating 500 team members consisting of Sikorsky, Naval Air Systems Command, Defense Contracting Management Agency personnel and subcontractors. These members work in Integrated Product Teams to design, develop, test and manufacture major systems and subsystems within the CH-53K. Dec 22/06: Engine picked. Sikorsky Aircraft has selected General Electric Aviation to provide the new CH-53K heavy lift helicopter’s main engines. The GE38-1B engine planned for the CH-53K is a derivative of the CFE738 commercial turbofan engine used in the Falcon 200 business jet; the CFE738 was in turn derived from the T407 turboprop intended to power the US Navy’s updated P-7 Orion (that program was canceled and a competition restarted that left the 737-derived P-8A MMA as the winner). See also GE’s Feb 7/07 release. According to this Flight International article, GE’s engine beat out Pratt & Whitney’s PW150 and a derivative of Rolls Royce’s AE1107 that powers the V-22 Osprey. Oct 30/06: Rotor. Sikorsky Aircraft has submitted test results for its 4th Generation(TM) rotor blade, which builds on the work done for the Growth Rotor Blade(TM) (GRB) currently used on their new UH-60M and S/H-92 helicopters, using anhedral tips. The CH-53K model wind tunnel testing performed late in the summer of 2006 has reportedly shown a significant improvement in forward flight efficiency over the GRB. Earlier in the year, similar model rotor hover testing indicated large gains in hover efficiency. Read Sikorsky’s release. FY 2004 – 2006 Program OK and $3 billion development contract; European HTL opportunity? CH-53D at work (click to view full) July 19/06: European HTL. Jane’s reports that EADS Eurocopter is seeking partners for a “super lift” helicopter to be fielded around 2020 with the French & German militaries, and confirms that talks have been held with Sikorsky regarding a modified CH-53K with European avionics and a larger cabin. The Germans apparently want to replace their CH-53Gs (actually modified CH-53Ds) around 2020, and will look for upgrade programs to bridge the gap. The French currently lack heavy-lift helicopters in the CH-53 or CH-47 class, though the supergiant Russian Mi-26 was evaluated recently. Eurocopter and Sikorsky recently partnered on the successful $3 billion LUH program, but the firm has said it is keeping all its options open and is making no commitments. UPDATE: Germany is updating their CH-53Gs, and the 2 countries are also going ahead with the heavy lift helicopter program. The CH-53K is still a competitor. Where does it stand? Read “The European Heavy Lift Helicopter Program?” April 5/06: SDD contract. Sikorsky Aircraft Corp. in Stratford, CT receives a $3.04 billion modification to a previously awarded cost-plus-award-fee contract (N00019-06-C-0081) for the System Development and Demonstration (SDD) of the CH-53K aircraft, to include 4 SDD aircraft, 1 ground test vehicle, and associated program management and test support. Work will be performed in Stratford, CT and is expected to be complete in December 2015. See also NAVAIR release. SDD contract Dec 22/05: Green light. A formal decision by the Honorable Kenneth R. Krieg, US Undersecretary of Defense for Acquisition, Technology and Logistics, gives the estimated $4.4 billion HLR program the green light to proceed to the System Definition and Development (SDD) phase. CH-53E Super Stallion (click to view full) August 25/05: Sikorsky Aircraft Corp. in Stratford, CT received a $43.3 million cost-plus-fixed-fee delivery order against a previous basic ordering agreement to perform requirements definition and engineering studies in support of the Marine Corps’ Heavy Lift Replacement (HLR) Program. Work on the requirements definition and engineering studies will be performed in Stratford, CT and is expected to be complete in April 2006. Jan 6/05: Sikorsky Aircraft Corp. in Stratford, CT received an $8.4 million cost-plus-fixed-fee contract for preliminary design work in support of HLR, as part of the initial system development and demonstration of the Marine Corps’ CH-53X Heavy Lift Replacement (HLR) program. Work on the preliminary design contract (N00019-06-C-0081) will be performed in Stratford, CT and is expected to be complete in January 2008 (N00019-03-G-0003). Dec 23/04: A $34 million time and materials delivery order, issued against basic ordering agreement N00019-03-G-0003, to perform requirements definition and engineering studies in support of the Marine Corps’ Heavy Lift Replacement Program. Work was performed in Stratford, CT, and was expected to be complete in May 2005. This contract number is not exclusive to the CH-53K. Other awards under this particular contract covered the Presidential Helicopter program (Sikorsky lost) and other helicopter engineering. Appendix A: Flying Between Scylla and Charbydis: Navigating the Political Shoals JHL: QTR Concept (click to view full) DID’s coverage of the HLR program has also included a report about HLR’s potential merger with the US Army’s futuristic JHL program. The Joint Heavy Lifter (JHL) is imagined as an aircraft with cargo capacity that approaches a C-130 Hercules transport (about 20 tons), but with the ability to take off and land like a helicopter. No current US military helicopter platform even comes close. JHL’s competitors are deploying some radical and different technologies in their attempt to achieve these goals – from quad tilt-rotors to coaxial skycranes and even compound helicopters. Marine Corps acquisition officials also weighed the option of participating in JHL. While Congress could always step in to force the issue – and may still do so – the Marine Corps note that this would be deeply unwise for a number of reasons: “The Army’s proposed heavy lift requirement to transport the Future Combat System greatly exceeds our requirement,” said program manager, Col. Paul Croisetiere. “The actual aircraft hasn’t been designed yet, but initial analysis suggests the joint heavy lifter will be too large to operate from current and programmed amphibious shipping. We may have a use for it, but in more of a logistical role as a possible KC-130J [air tanker] replacement – we still need the CH-53K for tactical heavy lift.” Joint Heavy Lifters may not be available any sooner than 2025, according to Croisetiere, which is more than 10 years after the Marine Corps will be forced to start retiring its current CH-53E fleet. Even if the Marines could use it, Croisetiere pointed out that as currently envisioned, JHL will be too big to operate from the Marines’ amphibious ships. V-22 Osprey This is a logical argument. However this rationale might sell better if the USMC hadn’t spent the last decade describing tilt-rotor technology as the necessary wave of the future that would make helicopters obsolete, in its quest to sell the $100 million per plane V-22 Osprey. When budgets are also being squeezed hard by multiple cost overruns on a wide swath of programs, programs that appear to be similar to each other will become big targets for Congressional cuts and pressure to merge. The US Marines have been the leading service advocates of tilt-rotor technology as a transformational necessity. Having invested so much of their prestige and credibility in the V-22, some people on Capitol Hill seem inclined to view the Marines’ rejection of a program that includes similar Quad Tilt Rotor and OSTR (Optimum Speed Tilt-Rotor) options as inconsistent, and hence mere territoriality. If this view spreads, it will not bode well for the HLR Program’s political survival. It certainly wouldn’t be the first time in US military procurement history that the promise of the shiny new thing has found itself in the way of fulfilling military necessities with cheaper, proven options. MH-53J Pave Low IV (click to view alt.) The natural response to such pressures would be twofold. One track would emphasize the comparatively speculative nature of the JHL Program’s technologies and their uncertain development timelines. The other track would tout the value of cheaper builds of proven helicopters, in order to meet immediate needs and an uncompromising timeline for fleet airframe life. This is exactly what Col. Paul Croisetiere has done. Making that argument, however, flies in the face of almost everything the USMC said when some in Congress pushed for immediately available conventional helicopter options to replace the Marines’ extremely aged Vietnam-era CH-46 Sea Knights. Options that would also have cost about half the price per aircraft. If the CH-46s could be patched together via life extension programs and extensive maintenance while the V-22s sorted out their difficulties and eventually reached production many years late, why not the CH-53Es? Especially if pursuing a similar tilt-rotor technology like the JHL’s QTR would reduce the V-22’s per-aircraft costs while increasing overall interoperability, and therefore easing long-term maintenance and logistics costs as well? These arguments may or may not be considered valid. Nevertheless, they should absolutely be expected as the Global War on Terror, unexpected future contingencies, and a looming demographic shift put increasing pressure on US defense budgets. The US Marine Corps has certainly prepared the ground well. The HLR program may have an eventful political journey ahead of it. Appendix B: Interesting Ideas: The CH-53X Skycrane Concept CH-53X Skycrane Concept (click for details) As a point of interest, this is one of the more innovative suggestions we’ve seen re: the next-generation CH-53X. It proposes turning the CH-53 into a “Skycrane” variant, and using it in conjunction with the trend toward “battle box” containerized forces, plus underslung light armor & vehicles. The idea is that this would improve both the CH-53E’s capabilities (via reducing aircraft weight but not power) and the USA’s transformational deployability (via faster and more versatile load and ship that would also improve tactical surprise). Additional Readings & Sources Sikorsky – CH-53K. GlobalSecurity.org – Heavy Lift Replacement [CH-53X]. SLD (Oct 16/10) – Adding a Core USMC Capability: The CH-53K As A Logistical Force Multiplier. An Interview with Major Jeff “Kingpin” Davis. Sikorsky Frontlines, via WayBack (Q3 2009) – CH-53K Update [PDF]. American Helicopter Society’s Vertifile Magazine, via WayBack (Spring 2002) – An Affordable Solution To Heavy Lift [PDF] by Lt. Col. James C. Garman, MH-53E pilot in HMH-772 and a Senior Preliminary Design Engineer in the New Product Definition Group, Sikorsky Aircraft Corporation. It describes the basic outlines of many low-risk CH-53X improvements. Naval Technology – CH-53E Super Stallion – Heavy-Lift Helicopter, USA. GE Aviation – GE38. CH-53K’s Engine, designated T408-GE-400 by the US Navy. MTU – GE38. The firms are partnering to develop it, with the German firm having an 18% stake; MTU will be licensed to offer it for any European FTH helicopter program. DID – Incoming & Hostile: The USN’s JATAS Aircraft Warning System. ATK picked, will be used on the CH-53K. News & Views Flight International, via WayBack (May 10/10) – CH-53K delay will not hold up GE38 engine programme. Its potential uses go beyond helicopters, to include things like hovercraft, and GE sees its market potential as $4+ billion. Flight International, via WayBack (June 25/08) – GE plots GE38 engine’s future in emerging heavylift market. Offers further details re: the CH-53K’s planned engine. US DoD DefenseLINK: Transformation, via WayBack (Jan 9/06) – New Heavy Lift Helicopter Starts Development. US Navy NAVAIR, via WayBack (April 5/06) – $3B CH-53K contract awarded to Sikorsky. Jane’s Defense Weekly, via WayBack (Feb 24/06) – US heavy-lift aircraft will stretch state of the art. Full subscriber’s article includes JHL Program coverage as well. DID (Jan 9/06) – CH-53X (HLR) Program Moves Into SDD, Preliminary Design. An $8.6 million preliminary design contract is issued to Sikorsky, beginning the SDD phase. The CH-53X program is also redesignated CH-53K. Has the HLR program dodged the bullet? DID (Sept 27/05) – CH-53X HLR & JHL: Future Heli Programs on Collision Course? The shiny new (expensive, uncertain) thing may become the enemy of the necessary, proven thing in the US military’s procurement culture. Again. DID (Sept 21/05) – CSAR-X: And Boeing Makes 3…. The HLR program may be affected by the choices Sikorsky makes in the CSAR-X competition. DID (Aug 29/05) – HLR (CH-53X) Helicopter Program Moves Toward Milestone B Approval. Aviation Today, via WayBack (July 1/05) – Future Heavy Lift for the Marine Corps. An interview with Col. Paul Croisetiere, program manager for the U.S. Naval Air Systems Command H-53 Heavy Lift Helicopters Program PMA 261. Hill News, via WayBack (June 1/05) – House language could create friction over chopper programs. USMC, Leatherneck Magazine, via WayBack (May/05) – Heavy Lift Replacement: A Vital Marine Corps Program. American Helicopter Society’s Vertifile Magazine, via WayBack (Spring 2002) – From The Past To The Future Of Heavy Lift Part Three: Heavy Lift Helicopters [PDF]. View the full article
  5. We have all seen this brief every decade or so for decades. You can almost use the same sales pitch as before, just move the clauses around. We know what is wanted - but it is hard. Instead of saying that, we try to trick everyone in to thinking there is a new idea out there. There isn't ... and every time "we" pretend there is, we lose more credibility. The latest example from the, “This is Why DOD Can’t Have Nice Things” is the superbly mockable “Joint All-Domain Command and Control" (JADC2) concept. It is almost insulting in that is seems to be written by people who either themselves don’t know what has been going on in this area for the last few decades, or they assume no one else has institutional memory either. Just bask in the opening; Joint All-Domain Command and Control (JADC2) is the Department of Defense’s (DOD’s) concept to connect sensors from all of the military services—Air Force, Army, Marine Corps, Navy, and Space Force—into a single network. For those with an Electronic Warfare background and an onion-paper thin understanding of what the Chinese and Russians are capable of today – or even what they did as far ago as the Vietnam War - just behold Figure 1. If you transmit, you will be tracked, identified, and attacked. Transmit all day long, even easier. You then have the intellectual hangover from a couple decades of colonial policing; JADC2 intends to enable commanders to make better decisions by collecting data from numerous sensors, processing the data using artificial intelligence algorithms to identify targets, then recommending the optimal weapon—both kinetic and nonkinetic (e.g., cyber or electronic weapons)—to engage the target. Do we assume the enemy can’t do the same? What is your backup? Some analysts take a more skeptical approach to JADC2. They raise questions about its technical maturity and affordability, and whether it is even possible to field a network that can securely and reliably connect sensors to shooters and support command and control in a lethal, electronic warfare-rich environment. Analysts also ask who would have decision making authority across domains, given that, traditionally, command authorities are delegated in each domain rather than from an overall campaign perspective. Some also question how much a human will be needed for JADC2 to make decisions in real time, and whether it is appropriate to reduce the amount of human involvement in military-related decisions. Oh, I don’t know … is there a reason to be skeptical? This diagram, or variations of same, is decades old. Jokes about it are older than those just putting on LCDR. This was always the promise that was never kept. Why would anyone use this diagram who wanted to be taken seriously? Unachievable at war. War isn't that clear or clinical. You simply will not have that level or reliable access in a peer conflict’s most important inflection points. The Joint All-Domain Operations concept, thus, provides commanders access to information to allow for simultaneous and sequential operations using surprise and the rapid and continuous integration of capabilities across all domains—to try to gain physical and psychological advantages and influence and control over the operational environment. Misuse of the word “concept” here and all over the place. I don’t know, maybe we can tell what you are proposing through all all the recycled CONOPS, opaque verbiage, and word salad acronyms. DOD is leading a Joint Cross-Functional Team to explore JADC2 as the concept evolves. Have you filled out your bingo card yet? Multiple bingo cards. The Army and Air Force have announced programs to implement JADC2; what are the Navy’s plans to implement this new command and control concept? Is that Deptula throwing shade there? Anyway, I don't know .. maybe we can tell what you are proposing this to be through all the recycled CONOPS, opaque verbiage, and word salad acronyms. What role would AI have in JADC2 development? None. How about that for an answer. It isn't ready - not even close - and those in industry know AI isn't ready for late night, much less prime time. That is before the JAG gets at it. How much human-in-the-loop is necessary if sensors are linked to shooters in real-time? A lot. As someone who used to work in this area, let me help you out. Ahem: “After decades of attempts, the Secretary of Defense will conduct a baseline reset of the ability for each service’s data links to communicate with each other in real time through peacetime and degraded wartime constraints. Systems shall also maintain the ability to function as stand-alone systems, partial functionality, or in an offline mode.” So much of this, again, is trying to sweep up as much money as possible for a program that promises perfect information and perfect knowledge. Both are impossible at war. Good communications links, both voice and data, are important – but history shows us that they can be as much of a danger as a help. When overused or over-relied on, they tip towards a Critical Vulnerability vice a Critical Capability. Better yet are efforts in instead invest in the ability of our commanders to understand themselves and their mission – and that of potential enemies. That should be the goal. A vain attempt to make the real world look like a game you play on your computer should not. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=I-lEKRBElOA:Hnd8yuseMaQ:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/I-lEKRBElOAView the full article
  6. Americas Four B-1B bombers left Texas this week, arriving in Guam for Bomber Task Force training missions with allied partners, the US Air Force announced. On the way, the bombers integrated with 16 F-15 and two F-2 planes of the Japan Air Self-Defense Force for training over the Sea of Japan, the Air Force said. They also conducted a training exercise with the amphibious assault ship USS America in the western Pacific Ocean. The visit to Guam comes after the Air Force adjusted its force employment model, enabling strategic bombers like to B-1B to be forward deployed in the Indo-Pacific region from a broader array of worldwide locations. The first AC-130W gunship to record a combat kill has been flown to its final home at Sheppard AFB, Texas whereby it will become a ground instructional trainer for ammo and armament students in the 363rd Training Squadron as well as crew chief student in the 362nd Training Squadron. The aircraft was received from the Lockheed-Martin factory Jun. 6, 1989, with the original nickname of ‘City of Hurricane.’ It recorded its first combat kill on February 9, 2011 and on December 2016, it became the first AC-130W to score a combat kill with the 105mm cannon. Middle East & Africa Turkish President Reccep Tayyip Erdogan confirmed the test-firing of the Russian-made S-400 air defense system, adding that US objections did not concern him. The truck-mounted S-400 system was tested in Turkey’s Sinop province on the Black Sea, where it was delivered earlier this month with British-made Banshee drones for use as targets. “It is true that tests have been carried out,” Erdogan said in televised remarks from Istanbul, Bloomberg reported. “What are we supposed to do, not test these capabilities? Obviously we’re not going to ask the US“. Europe US Chief of Naval Operations Admiral Mike Gilday conducted a bilateral Strategic Dialogue via video teleconference with the First Sea Lord this week. The leaders discussed the two navies’ alliance and areas for continued collaboration and cooperation around the globe. Additionally, the two leaders signed a Statement of Intent for ‘Future Integrated Warfighting’ that will set a “cooperative vision for inter-changeability between the two navies, synchronize pioneering capabilities, strengthen operating concepts, and focus our collective efforts to Deliver Combined Seapower, together”. The Swedish Air Force (SwAF) will retain a number of its Saab JAS 39 Gripen C/D fighters beyond their current planned 2026 retirement date, solidifying an earlier announced plan to make up an anticipated shortfall in Gripen E numbers. The plan, announced by the Swedish Defense Ministry in mid-October and confirmed by manufacturer Saab on October 23, is part of a wider increase in national defense spending by more than 40% between 2021 and 2025 that was revealed by Swedish defense minister Peter Hultqvist. Of the current six Gripen C/D squadrons fielded by the SwAF, four are set to transition to the Gripen E over the coming years. As revealed in Hultqvist’s latest announcement, the two outstanding squadrons will remain operational with their existing Gripen C/D aircraft. Asia-Pacific The US Marine Corps at Iwakuni, Japan, announced formation of a new attack squadron on Friday in anticipation of the arrival of F-35B fighter planes. Marine Aircraft Group 12 re-designated Marine All Weather Fighter Attack Squadron 242 to Marine Fighter Attack Squadron 242, or VMFA-242. The change is part of the Marine Corps’ ongoing transition process from F/A-18 Hornet fighter planes to the more-advanced F-35B. It will be the second overseas Marine squadron. Today’s Video Watch: DEFENSE UPDATES WEEKLY NEWS ROUND-UP 25th OCT – ARLEIGH BURKE DESTROYERS TO HAVE HYPERSONIC WEAPON ! View the full article
  7. South African JAS-39D (click to view full) As a neutral country with a long history of providing for its own defense against all comers, Sweden also has a long tradition of building excellent high-performance fighters with a distinctive look. From the long-serving Saab-35 Draken (“Dragon,” 1955-2005) to the Mach 2, canard-winged Saab-37 Viggen (“Thunderbolt,” 1971-2005), Swedish fighters have stressed short-field launch from dispersed/improvised air fields, world-class performance, and leading-edge design. This record of consistent project success is nothing short of amazing, especially for a country whose population over this period has ranged from 7-9 million people. This is DID’s FOCUS Article for background, news, and contract awards related to the JAS-39 Gripen (“Griffon”), a canard-winged successor to the Viggen and one of the world’s first 4+ generation fighters. Gripen remains the only lightweight 4+ generation fighter type in service, its performance and operational economics are both world-class, and it has become one of the most recognized fighter aircraft on the planet. Unfortunately for its builders, that recognition has come from its appearance in Saab and Volvo TV commercials, rather than from hoped-for levels of military export success. With its 4+ generation competitors clustered in the $60-120+ million range vs. the Gripen’s claimed $40-60 million, is there a light at the end of the tunnel for Sweden’s lightweight fighter? In 2013 a win in Brazil started to answer that question. JAS-39: The Gripen Program Saab’s JAS-39A-D Gripens “Could-have” weapons (click to view full) The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs[1] and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The “Cobra” HMD completes that capability, and became operational on SAAF Gripens as of September 2011. Power to weight ratio is good, its PS-05 radar mechanically scanned radar gets good reviews, some “radar profile shaping” techniques have been employed to reduce its own signature, and its small physical size can make it a tricky opponent for enemy pilots. Short Take-Off and Landing capability makes Gripen a difficult target on the ground as well. Sweden’s defense doctrines avoid dependence on easily-targeted bases, and its fighters are expected to fly from prepared sites next to automotive highways. Gripens can fly from a 9 x 600 meter/ 29.5 x 1,970 foot runway, and land in 600 meters or less – without using a launch catapult or an arrester hook. The Gripen has one other asset that is often overlooked: very attractive lifetime operational costs. To date, each new generation of modern fighters has proven to be more expensive than its predecessors to operate and maintain. Since operation and maintenance are over 65% of a fighter’s lifetime cost, this aspect of the defense procurement spiral forces much smaller aircraft orders with each new generation of equipment. The JAS-39 was designed from the outset to counter this trend, and lifetime operating costs were given a high priority when making design and equipment decisions. Many of the Gripen’s competitors have tried, but Saab appears to have succeeded. More exact cost figures were offered in July 2010 by Gripen technical director Eddy de la Motte, who quoted less than $3,000 per flight hour for Sweden’s Flygvapnet, and “for the export customers it will be less than $5,000, including maintenance, spare parts, fuel and manpower.” On its face, that’s stunning. By comparison, the USAF places the per-hour cost of an F-15 at $17,000 [PDF]. Even given a likely mismatch between direct flight costs, and figures that include allocated life cycle costs including depot maintenance, etc., that is a big difference. Switzerland is one customer where that difference appears to have been decisive. Swiss evaluations reportedly rated the Gripen at roughly half the O&M costs expected for its twin-engine Rafale and Eurofighter counterparts. Gripen: integrated equipment Hungarian JAS-39C/Ds (click to view full) The Gripen’s equipment commonality and choice are good. Its engine is a derivative of GE’s F404, in wide use on F/A-18 A-D Hornets and many other platforms. A wide variety of international equipment has successfully been tested and integrated with the aircraft, including equipment from American, Israeli, European, and even South African[2] suppliers. Some key slots like radar-killing missiles still need to be filled, but Raytheon’s GBU-49/EGBU-12 Enhanced Paveway GPS/laser guided bombs were added in 2009, and Gripen is serving as the MBDA Meteor long-range air-air missile’s test aircraft for flight trials. The end result is an effective lightweight fighter. As an example, the Hungarian Air Force described their experiences at Exercise Spring Flag 2007, held in May at Italy’s Decimomannu air base in Sardinia. Other participants included France (E-3 AWACS), Germany (F-4F ICE), Italy (AV-8B Harrier, F-16C, Tornado ECR and Eurofighter Typhoon), NATO (E-3 AWACS), and Turkey (F-16C), with tanker support from Italy, the UK and the US. The Gripen’s 100% sortie rate was impressive, and it also generated some interesting comments from Hungarian Air Force Colonel Nandor Kilian: “In Hungary we just don’t have large numbers of aircraft to train with, but in Spring Flag we faced COMAO (combined air operations) packages of 20, 25 or 30 aircraft. The training value for us was to work with that many aircraft on our radar – and even with our limited experience we could see that the Gripen radar is fantastic. We would see the others at long ranges, we could discriminate all the individual aircraft even in tight formations and using extended modes. The jamming had almost no effect on us – and that surprised a lot of people. Other aircraft couldn’t see us – not on radar, not visually[3] – and we had no jammers of our own with us. We got one Fox 2 kill[4] on a F-16 who turned in between our two jets but never saw the second guy and it was a perfect shot. Our weapons and tactics were limited by Red Force rules, and in an exercise like this the Red Force is always supposed to die, but even without our AMRAAMs and data links we got eight or 10 kills, including a Typhoon. Often we had no AWACS or radar support of any kind, just our regular onboard sensors – but flying like that, ‘free hunting,’ we got three kills in one afternoon. It was a pretty good experience for our first time out.” To keep the basic Gripen relevant, block upgrades occur about every 3 years. Block 19, in 2009, integrates IRIS-T SRAAM (Short-Range Air-to-Air Missile), NATO’s Link-16 as a supplement to Gripen’s own shared awareness datalink, and the Cobra helmet-mounted sight. Block 20 in 2012 is expected to include enhancements to the PS-05/A radar, and the ROVER close-air-support data link used with such success by American forces. Partnerships & Production JAS-39C The Industry Group JAS (IG JAS) is the joint venture partnership that develops the Gripen System for the Swedish Armed Forces. Partners included in IG JAS are Saab Volvo Aero Corporation and Ericsson Microwave Systems (now part of Saab Group). The development and production of the Gripen has been one of Sweden’s largest industry projects, consuming up to one-third of the Swedish defense budget in some years. Brazil’s 2014 purchase will give them a role in production, and made Embraer a design partner in the 2-seat JAS-39F. The first JAS-39s were delivered in 1993, and the last Swedish plane was due to be delivered in 2007. While exact figures are extremely difficult to come by, sources place the average flyaway cost of the JAS-39 at about $40 million[4] per plane, or about $50 million in current dollars. The whole Gripen production run for all customers, according to current orders, will reach 261 aircraft. This consists of: The multinational UK Empire Test Pilot’s School has bought Gripen flight hours from Saab since 1999. They switched from the JAS-39B to the JAS-39D in 2014. The lion in winter… (click to view full) On the marketing front, Saab now handles all international sales, and ties to its parent firms like Investor AB allow it to offer an attractive program of industrial offsets to potential owners. An initial Gripen International marketing partnership with BAE gave the Swedish aircraft wide global representation, but BAE had conflicts of interest, and a divestiture formally ended the partnership in March 2010. A limited international marketing agreement for the JAS-39E/F is being negotiated with Brazil’s Embraer, but that isn’t done yet. Unfortunately, the Gripen has lost out in or been absent from important export competitions in Austria (Eurofighter), Finland (F-18), Japan (DNP – F-35), India (Rafale, but not closed), the Netherlands (F-35), Norway (F-35), Poland (F-16), Qatar (DNP – TBD), South Korea (DNP – F-35), Switzerland (F-18, then a win but a lost referendum), and Singapore (F-15SG Strike Eagle to replace A-4 Skyhawks). Meanwhile, Sweden downsized its Gripen force to 100 JAS-39 C/D aircraft, flooding the market with second-hand models and choking new production opportunities. All in a market where overall export orders were already below Saab’s expectations. A number of factors could be cited as reasons for this situation: purchasing slowdowns across the industry, the inertia of existing relationships and equipment standardization, Sweden’s lack of geopolitical weight in contrast to countries like the USA, France or Russia. In Singapore’s case, its status as a single engine lightweight fighter with limited range also hurt it – as did its partner BAE’s greater interest in promoting its own Eurofighter. Still, the bottom line is that the Gripen was dependent on exports for profitability, as a result of the unprofitable contract Saab signed with the Swedish government. The government’s ability to assist with foreign export orders has proven to be very limited, and envisaged export orders have been more in line with skeptics’ predictions than with corporate hopes. Can the Gripen production line survive? Upgraded variants have given the fighters new traction in the global marketplace. JAS-39 Gripen: The Way Forward JAS-39NG: Evolution (click to view full) One way forward is through upgrades. Most JAS-39s offered in recent export competitions touted important improvements beyond the present C/D versions. The most important is next-generation AESA radar technology, which offers substantial improvements in detection, resolution, versatility, and maintenance costs. Other common upgrades include uprated engines and longer range. Eventually, they were formalized into 2 programs. The test and development program is called Gripen Demo. Production aircraft will be JAS-39E/Fs, though they’re also referred to as Gripen NG (“next generation”). Regardless of the exact upgrade sets offered, the hope remains the same: that appropriate upgrades would allow the Gripen to continue offering better performance and features than lightweight fighter peers like the F-16 and MiG-29, including new variants like Russia’s new thrust-vectoring MiG-35 and Lockheed’s AESA-equipped F-16 Block 60 “Desert Falcon” flown by the UAE. They’re also intended to allow the Gripen to compete on more even terms with more expensive fighters like the Rafale, F/A-18 Super Hornet, etc. In those competitions, Gripen would be positioned as a lower-budget option with “close enough” capabilities overall, and outright advantages in key areas. So far, that positioning has been right on the money in Brazil and Switzerland. Gripen NG click for video That competitiveness is essential. Like France’s Rafale, which also depends on exports to finance its ongoing development, the Gripen is finding itself dependent on home government handouts in order to remain technologically competitive. That’s less than ideal, but given the Gripen and Rafale’s status as the future backbones of their respective national air forces, non-competitiveness is hardly an option. Absent further foreign sales, therefore, the question for both aircraft is how badly future upgrade costs will eat into their home market’s fighter procurement and maintenance budgets. Which explains Saab’s eagerness to escape this trap. New weapons integration will continue, highlighted by the long-range Meteor air-to-air missile in 2014 – 2015. The sale to Brazil may be especially helpful in this regard, as it creates a customer with full source-code access who will be very interested in integrating their own weapons and systems. They’ll be building on a set of pre-planned upgrades, which form the core of the JAS-39E/F’s improvements. Sensors & C4 ES-05 Raven AESA (click to view full) The first set of chosen Gripen enhancements will improve the pilot’s situational awareness, and this set of enhancements is being designed with an eye to retrofit compatibility on existing JAS-39C/D Gripen fleets. The upgrade set includes: An AESA radar in place of the present PS-05 is an important future selling point, and has been promised in several of Saab’s recent foreign bid submissions. As of March 2009, Saab is partnered with Selex Galileo to design an ES-05 Raven AESA radar that builds on Selex’s experience with the Vixen 500 AESA, Ericsson’s PS-05 radar, and its Nora AESA experiments. The Raven incorporates an identification friend-or-foe (IFF) function that works in conjunction with the cheek-mounted active array SIT 426 IFF. In an unusual twist, the Raven AESA will be movable using a single-bearing system, increasing its total field of view by a factor of 2 to +/- 100 degrees, and improving “lock, fire, and leave” maneuvers. The cost is paid in reliability and maintenance, because the pivot mechanisms create a point of failure and maintenance, whereas fixed AESA radars are mostly maintenance-free. Saab is betting that the improved scan performance will justify the cost. The quality of Raven’s AESA transmit/receive modules, and their integration, will also play a large role in the radar’s final performance. Reaching this point wasn’t easy, and the developmental state of its radar has been a weakness for Saab in competitions like India’s M-MRCA. Saab bought Ericsson’s radar group, which also makes the Erieye AWACS radar, in March 2006. Later that year, they began the “Nora” AESA project, but by autumn 2007 they had changed their approach, and looked to leverage existing radar initiatives instead. That would have been fine in a normal marketplace, but underhanded anti-competitive behavior by Dassault and the US government left Saab without a viable partner, and cost them years of time on a critical market feature. Gripen Demo & JAS-39D (click to view full) Sensors & Datalinks. Beyond the Raven radar, a passive IRST (infra-red search and track) system will be added to improve the JAS-39NG’s aerial target detection, without running the risk that the Gripen will reveal itself by emitting detectable electro-magnetic energy. The JAS-39E/F’s Skyward-G system is air-cooled, which eliminates the weight and maintenance of cryogenic liquid cooling systems. IRST systems are useful against some ground targets, and all aerial targets. They especially enhance performance against opponents with “low observable” radar stealth enhancements. If medium-long range infrared guided missiles like MICA-IR or NCADE are integrated in Gripen at some future date, an IRST system can even provide missile guidance beyond visual range, without triggering the target’s radar warning receivers. Link 16 is a situational awareness upgrade, and retrofits are also available for earlier Gripen models. Gripens already had a proprietary datalink that allows them to see a common picture of the battlefield, but the NATO Link-16 standard is more widely used, and adds the ability to share with other types of aircraft, air defense radars, ships, etc. (see June 11/07 entry, below). EW/ECM. Electronic warfare enhancements are another component of situational awareness these days, and Swiss evaluations in 2008/2009 rated this as a platform strength. Upgrades are critical, in order to keep the platform current. The JAS-39 E/F will get them, and Elbit Systems’ PAWS-2 appears to be at least part of the upgrade. Structural/ Mechanical JAS-39NG CAP Concept (click to view full) Mechanical upgrades are in the works, too. Size & Payload. Early projections for the single-seat JAS-39NG showed a larger fighter, in order to carry more fuel, and more weapons on 2 extra stations (10 total). Subsequent reports regarding the JAS-39E/F confirm that the fighter will be longer and wider, but aims to have the same wing loading ratio as earlier models. Empty weight for the Gripen Demo technology development prototype was reported as 7,100 kg, which is up from the JAS-39C’s 6,800 kg, but still well below the 10,000 kg of the F-16E Block 60.[5] Maximum takeoff weight for Gripen Demo was a bigger jump from previous versions, rising to 16,000 kg from 14,000 kg. The derivative JAS-39E/F may end up being even heavier, at 16,500 kg or greater. Maximum payload only jumps from 5,000 kg up to 6,000 kg, however, because of… Fuel. One of the Gripen’s handicaps against competing fighters has been its range. A 38%+ jump in internal fuel capacity is meant help to offset the Gripen NG’s weight and power increases, while extending the aircraft’s combat air patrol radius to 1,300 km/ 812 miles, and boosting unrefueled range to 2,500 km/ 1,560 miles. The landing gear is repositioned to accommodate those extra fuel cells. A new underwing 1,700 liter (450 gallon) fuel tank has been flown, and tanks capable of supersonic drop will be tested in future. With the full set of drop tanks, the JAS-39E/F’s total flight range is expected to reach 4,075 km/ 2,810 miles. Engine. Hauling all of that around will require a more powerful engine than the current RM12 variant of GE’s popular F404. GE’s F414, produced in partnership with Volvo Aero and in use on the F/A-18E/F Super Hornet family, will be that engine. The base model offers a 25-35% power boost over its predecessor the F404, and the developmental F414 EPE could offer another 20% thrust increase on top of that, for a total boost of 50-62%. Key F414G alterations for the Gripen will include minor changes to the alternator for added aircraft power, and Full Authority Digital Electronic Control (FADEC) software that’s modified for single-engine operation, instead of the Super Hornet’s twin-engine configuration. Reports also indicate that Saab will look to add divertless supersonic intakes to the JAS-39E/F. This technology saves weight while offering similar or better engine performance, and can be found on the F-35, as well as on China’s JF-17, J-10, and J-20 fighters. Saab Group remains on track with the basic Gripen Demo program, which has also been referenced as the “Gripen MS21”. The next step will involve setting the final specifications for Sweden and for initial buyers, and finalizing the “JAS-39 E/F” design. Development is expected to be done by 2018-2020, with new JAS-39E/F fighters entering service in Sweden around 2023. The Next Gripens: Industrial Gripen Demo rollout (click to view full) In July 2006, Saab received a SEK 1 billion contract from the Swedish government (about $150 million) to improve the aircraft, and develop the Gripen Demo/NG. This was later followed by a NOK 150 million (about $25 million) agreement with Norway in April 2007, and a set of industrial partnerships with key suppliers. A welter of upgrade contracts, studies, and private investment initiatives have also worked to finance R&D of key components, including the avionics and radar. Saab’s approach to those Gripen Demo partnerships has been a departure from past practice. Instead of selecting key technologies and modifying them to become proprietary, as was the case for the F404-based Volvo RB12 engine, Gripen Demo is using far more “off the shelf” parts. As noted above, its new GE F414 engine will feature minimal changes, so the upgraded engine is expected to cost 20% less than the its RB12 predecessor. Suppliers like Honeywell and Rockwell were reportedly asked to just provide their products, and let Saab handle integration. There are even rumors that Saab may embrace the same HMDS pilot helmet used on the F-35, instead of Saab’s Cobra. At present, Saab is leading a team of Gripen Demo partners that include: A demonstrator for the new version was rolled out in April 2008, and has been in flight testing since. Current negotiations with the Swedish, Swiss, and Brazilian governments are aimed at freezing the configuration for the JAS-39E/F/BR, which will feed back into the final industrial team. As of April 2014, a much-modified JAS-39D (aircraft #39-7) is the primary component test bed, with upgraded avionics including a digital HUD, a production-standard ES-05 Raven AESA radar, and the SkyGuard IRST. Saab is currently assembling aircraft #39-8, a more representative test prototype of the JAS-39E/F that’s due to fly in 2015. Aircraft #39-9 is due to join the test fleet in 2016 as a primary system testbed, while aircraft #39-10 is due to fly in 2017 in the final JAS-39E configuration at the production-standard weight. Future Gripens? Sea Gripen Concept (click to view full) Other aircraft upgrades are not advertised at present, but have been the subject of industry rumor and conditional commitments. Some reports have touted the possibility of a thrust-vectoring engine in future Gripen upgrades, but this was not listed as a selling point in Saab’s submissions to Norway or Denmark, and has not been mentioned in any Gripen Demo descriptions. More probable rumors involve upgrading existing fighters to JAS-39 C+/D+, by adding the improved F414G engine. Other reports over the years have focused on a carrier-capable Sea Gripen, and Saab had indicated that it would spend up to half of Gripen NG’s development budget on this variant, if it found a partner. In May 2011, however, an announcement seemed to indicate that the firm was beginning to move forward on its own, with development centered in the UK. Carrier landing is usually a very difficult conversion, but Saab can take advantage of the aircraft’s natural Short Take-Off and Landing (STOL) design. The Sea Gripen would add new undercarriage and nose gear to cope with higher sink rate forces and catapult launches, strengthen the existing tail hook and some airframe sections, and improve anti-corrosion protection. Launch options would include both catapult (CATOBAR) and “ski jump” ramp short take-off (STOBAR) capabilities, with maximum launch weight about 1/3 lower for STOBAR launches. Carrier landing speed is already in the required range under 150 knots, but the current 15 feet per second sink rate needs to be able to reach 25 feet/sec. Sea Gripens have a possible future role in Brazil as a naval aircraft on Brazil’s NAe Sao Paolo or its successor. They also exist as a very unlikely backup to Britain’s F-35B Lightning IIs on the new CVF carriers, should absolute disaster strike. Export Opportunities Czech JAS-39C/Ds (click to view full) Time will tell whether the JAS-39 Gripen’s unique combination of performance, price, and life-cycle benefits will find enough buyers in the end, or if it will go down in history as the twilight of Sweden’s indigenous combat aircraft designs. Thus far, buyers have included Sweden (195 + 60 JAS-39E upgrade), Brazil (36), South Africa (28), the Czech Republic (14 lease/buy), Hungary (14 lease/buy), and Thailand (12). Meanwhile, Saab Defence & Security continues to pursue sales possibilities worldwide. The base list comes from a 2006 Bloomberg interview that outlined Saab CEO Ake Svensson’s thoughts about the aircraft’s potential export customers in the coming years. A report from Jane’s, based on that interview, added more specifics. Subsequent developments have closed off some opportunities, and added others. Still open Argentina: The country has been looking to replace its aged fighter fleet, and is discussing a deal for 24 JAS-39E/Fs, to be signed through Brazil’s Embraer. The catch? The USA and Britain both make critical parts. Baltics: There is an lease requirement for up to 12 aircraft in Estonia, Latvia & Lithuania, but no active pursuit yet. Belgium: interest formally notified in 2014. Bulgaria: Stated in 2004 that it has a requirement for 20 aircraft to replace 6 MiG-21s and 15 MiG-29s. Issued a Request for Information (RFI) to Saab in May 2006. A 2011 RFI cut that to 8 planes. No movement or decision, but Russian aggression seems to be adding to their sense of urgency. Croatia: Was looking for 8-12 aircraft, with an in-service date of 2011. A JAS-39C/D offer was presented, with Swedish JAS-39As to be loaned as an interim force. No action as of October 2014. Greece: In limbo. Was looking to purchase a second tranche of 30-40 advanced fighters, with the process expected to begin in 2006. That was delayed, then hope was held out, then the 2010 fiscal collapse happened. Still in limbo. Finland: Studying a EUR 6 billion program to replace their 62 remaining F/A-18C/D Hornets. Possible joint air defense cooperation with Sweden would help, but Gripen isn’t compatible with their stocks of AIM-9X and AIM-120C-7 air-to-air missiles. Buy decision expected after 2020, replacement to finish by 2030. Indonesia: Looking to replace about 16 F-5E/F fighters. Indonesia has been expanding its own SU-27/30 and F-16 fleets, but they seem to want a 3rd fighter. The shortlist is a confused mix of heavy Su-35s & F-15s, and light F-16s & JAS-39s. Malaysia: Limping along with MiG-29Ns until 2015, but not happy. Saab will offer 12-24 fighters and up to 2 Saab 340AEW AWACS aircraft for lease, competing against Boeing, Dassault & Eurofighter. Their AWACS offering, and unique experience with leasing, will help. So will neighboring Thailand’s happy experiences with the same mix. Philippines: They just bought 12 South Korean FA-50s as low-cost light fighters, but the government says they will also want more advanced fighters to counter ongoing Chinese pressure, and the Gripen has been mentioned. We’ll see. Slovakia: They need to replace their 8 serving MiG-29s, and want to cooperate with the Czech Republic, which is a Gripen customer. Believed to be looking at 6-8 JAS-39Cs, to the same standard as the CzAF. Slovenia: There have been incredible reports re: national aspirations to field 40 aircraft. It’s difficult to see how they could afford anything even close to that, and they don’t fly any fighters at present. Semi-closed Hungary: Customer. The country extended its existing Gripen lease to 2026, and is looking to phase out its fleet of MiG-29s. Saab once thought that another 6 aircraft were possible within the lease extension, but that would have to be a separate deal mow.Decided/ Closed Brazil: Win (36 – 26E, 8F). The canceled F-X program got underway again, as Swensson had hoped, and Gripen outfought the favored Dassault Rafale. Follow-on buys could expand Brazil’s orders to 60 – 104 fighters, including a potential carrier-based variant within 10-15 years. Brazil will be a Gripen NG development and export partner, with full responsibility for the JAS-39F. The Czech Republic: Extension. In July 2010, Saab officials said that they saw the potential for up to 10 more planes there, but the next 12-year cycle from 2015-2027 just extended the existing lease for 14 JAS-39C/Ds, while adding minor upgrades. On the other hand, continued Czech use makes a similar 6-plane lease/ buy the overwhelming favorite for Slovakia. Denmark: DNB. Offered about 48 JAS-39DKs for their F-16 replacement competition. The Danes cancelled that competition, and now expect to buy just 25-35 fighters (F-35A, F/A-18E/F, or Eurofighter), with a decision delayed until 2014-15. Denmark is an F-35 Tier 3 industrial partner, and Saab and FXM decided not to bid in round 2. Hungary: Extension. Renewed their 12-plane lease until 2026, and did not add any planes. Their ownership is one more reason that Slovakia is likely to fly Gripens. India: loss. India’s M-MRCA competition for 120-190 fighters. JAS-39IN is out, and France’s Rafale is the pick… if M-MRCA can finish without a restart. Escalating costs have the buy under pressure, but even if Rafale negotiations fail, Sweden’s offer has shifted from the Gripen to collaboration on India’s own Tejas Mk.2. The Netherlands: loss. A Tier 2 F-35 partner, but political pressure forced a competing bid, and Saab submitted one for 85 planes in 2008. The bid is essentially lost at this point, with the main Labour Party opposition apparently caving in to a similarly-expensive buy of just 35 or so F-35As. Norway: loss. Had a requirement for 44 fighter aircraft to replace its F-16s. EADS withdrew its Eurofighter, then the F-35A won against the JAS-39N, but it may never have been a real competition. F-35A purchases have begun. Romania: loss. Was looking for 40 new aircraft, but cut that down to 24 used F-16C/D Block 25s from Portugal. Switzerland: canceled (22 JAS-39E picked, but lost referendum). Was expected to start the process to replace 3 of its F-5 squadrons later in 2006, but starts and stops pushed a decision to 2011. Saab’s Gripen was picked against the Rafale and Eurofighter in 2013, and Parliament ratified the decision, but a lack of courage in defending their position cost the government the referendum in 2014. Thailand: Win (12). was looking to replace its aging F-5s, and Gripen won against more F-16s or Russian SU-30s. A follow on order brought their total to 12 JAS-39C/Ds, as part of a package that also included 2 S340 AEW planes. 2014 reports indicate that they may want another 6. JAS-39 Gripen: Major Events 2014 – 2020 Saab will build JAS-39Fs as well; Live opportunities in: Indonesia, Malaysia, Slovakia; Future opportunities in the Philippines? Thailand?; Government blows referendum in Switzerland, deal dead. CzAF JAS-39C, L-159As (click to view full) October 27/20: Extended! The Swedish Air Force (SwAF) will retain a number of its Saab JAS 39 Gripen C/D fighters beyond their current planned 2026 retirement date, solidifying an earlier announced plan to make up an anticipated shortfall in Gripen E numbers. The plan, announced by the Swedish Defense Ministry in mid-October and confirmed by manufacturer Saab on October 23, is part of a wider increase in national defense spending by more than 40% between 2021 and 2025 that was revealed by Swedish defense minister Peter Hultqvist. Of the current six Gripen C/D squadrons fielded by the SwAF, four are set to transition to the Gripen E over the coming years. As revealed in Hultqvist’s latest announcement, the two outstanding squadrons will remain operational with their existing Gripen C/D aircraft. September 10/20: Croatia Sweden has made a formal offer to Croatia to sell 12 Saab Gripen C/D fighters to satisfy the country’s requirement to replace its Yugoslav era MiG-21s. The government-to-government offer, announced by Saab on 9 September, is part of a wider package that, the manufacturer stated, includes “a tailored made strategic co-operation package” designed to boost Croatia’s defense industry and national security. Croatia had previously opted to acquire surplus Israeli Lockheed Martin F-16C/D ‘Barak’ Fighting Falcons, but this plan was cancelled in January 2019 following US government refusal to grant required third party transfer (TPT) permission over concerns related to bespoke equipment that had been installed on the aircraft by the Israeli Air Force. August 3/20: Offer for Canada Swedish company Saab submitted its proposal for the Future Fighter Capability Project (FFCP) to Canada. The proposal comprises 88 Gripen E fighter aircraft, with a comprehensive support and training package and an industrial and technological benefits program. The submission is a formal response to the Request for Proposal (RFP) issued by Public Services and Procurement Canada (PSPC) on July 23, 2019. Saab is committing to deliver an industrial program that has been designed to generate long-lasting, high-tech employment opportunities, and business opportunities across all regions of Canada. “Saab’s Gripen fighter is designed to operate in harsh environments and defeat the most advanced global threats. The system meets all of Canada’s specific defence requirements, offering exceptional performance and advanced technical capabilities. A unique element of the avionics design is that Gripen E’s system can be updated quickly, maintaining technological superiority against any adversary,” says Jonas Hjelm, Senior Vice President and head of Saab business area Aeronautics. Meanwhile, the deadline for Canada’s fighter competition has now closed and only three companies have submitted their bids. Boeing will enter the competition with its Super Hornet while Lockheed Martin will compete with the F-35. Europe’s only entrant in the competition is the Saab JAS-39. The winner will be decided in 2022, with the first aircraft delivery projected in 2025. The tender is worth approximately $14 billion. July 10/20: Brazil Brazil has officially begun manufacturing fighter jets with the start of production at a new facility that makes sections of the Saab Gripen, Swedish aerospace company Saab announced Tuesday. Saab Aeronáutica Montagens, a new manufacturing plant located near Sao Paulo, has begun producing Gripen E/F aerostructures, including the tail cone and front fuselage for the single-seat Gripen E version of the jet. It will eventually also make the brakes, rear fuselage, wing box and front fuselage for the two-seater “F” model, Saab stated. Those structures will then undergo final assembly at Embraer’s nearby plant in Sao Paulo and Saab’s main Gripen production hub in Linköping, Sweden. Saab won a contract with Brazil in 2014 for 36 Gripen E/F aircraft after a hard-fought competition that included Boeing’s F/A-18 Super Hornet, the Dassault Rafale and the Eurofighter Typhoon. Technology transfer was a major requirement for all proposals. March 27/20: Focus Shift According to Jane’s, Saab has shifted the focus of its Gripen E/F testing away from basic flight trials towards the aircraft’s tactical and sensor suites as the program ramps up ahead of the first upcoming deliveries to Sweden and Brazil. Speaking at Saab’s annual Gripen Seminar on March 26, the company’s head of the programme, Eddy de la Motte, said that, with flight-characteristic tests having proceeded to plan, the focus is now on validating the aircraft’s mission systems. The Gripen E/F is fitted with the Selex ES-05 Raven active electronically scanned array (AESA) radar and the Selex ES 60 Skyward G-IRST. The company also announced on March 26, that it has performed the first metal cut for the two-seater fighter aircraft Gripen F, marking an important milestone in the program. Gripen F is under development for the Brazilian Air Force (FAB) and shares the same advanced design and features as Gripen E, but with seat, displays and controls for a second crew member. February 21/20: Thailand The Royal Thai Air Force has published its new 10-year white paper and it was disclosed that the service will procure a JAS-39C/D fighter in 2023. The single airframe is expected to replace the JAS-39C that crashed during an airshow in January 2017. It was also announced in the same paper that all existing 11 Gripens will be upgraded to MS 20 software standard from next year. February 3/20: Evaluation For Finland Swedish company Saab officially launched the flight evaluation phase of its Gripen E/F fighter and GlobalEye airborne early warning and control (AEW&C) aircraft for Finland’s HX program. Gripen E test aircraft 39-10 arrived at Tampere-Pirkkala Airbase north of Helsinki the day prior to Saab’s media day to mark the commencement of its HX Challenge, although due to poor weather conditions it was decided not to fly until the following day. The single-seat 39-10 was joined by the twin-seat Gripen NG demonstrator 39-7 on January 31. A GlobalEye did fly from Saab’s facility in Linköping, Sweden, on January 30 with a Finnish Air Force delegation on board. This aircraft will continue to fly out of Linköping for the duration of the evaluation as that is where the company’s bespoke de-briefing and other specialist related equipment is located. The Gripen E 39-10, Gripen NG 39-7 and the GlobalEye will be evaluated through to February 6. January 17/20: Engine Stays in Sweden Sweden has decided not to sell its General Electric F414G engine that powers the Gripen E to the United States for scheduled servicing. It has now decided that the engines will be serviced at Trollhättan instead. All F404 engines for the Swedish Gripen C/Ds are currently maintain at Trollhättan. The Saab JAS 39 Gripen is a light single-engine multirole fighter aircraft manufactured by the Swedish aerospace company Saab. The Swedish Armed Forces commissioned the Swedish Defense Material Administration to establish technical support and maintenance for RM16 / F414 for Gripen E at GKN in Trollhättan. This means that technical support and maintenance down to component level will be co-located in the Trollhättan for the JAS 39 Gripens engines December 23/19: Philippines Philippine Secretary of National Defense Delfin Lorenzana confirmed on December 16 that the Philippine Air Force is evaluating two aircraft for its multirole fighter (MRF) program. “One of the aircraft being evaluated is from Sweden the Saab Gripen and the other is the American F-16V,” Lorenzana was quoted by the state-owned Philippine News Agency (PNA) as saying, without providing further details. During the Asian Defence and Security (ADAS) 2018 exhibition in Manila a senior PAF official told Jane’s that the PAF had budgeted $1.1 billion to procure a multirole combat aircraft over the following five years. December 9/19: DAM For Hungarian Gripen Saab announced that it has delivered the Deployable Maintenance Facility (DAM) to the Hungarian Air Force. DAM is a mobile solution that enables enhanced maintenance capacity for aircraft and other vehicles combined with superior protection. The delivery stems from a contract signed between Saab and the Hungarian Ministry of Defense in December 2018. DAM provides capability equivalent to stationary maintenance infrastructure. The official handover took place at a delivery ceremony at Pápa on December 5. The Hungarian Air Force is currently operating 14 Gripen C/D fighter aircraft on a lease-purchase agreement with the Swedish government. DAM will provide an increased level of flexibility and reduce their dependency on stationary infrastructure for maintenance and protection of their Gripen fleet, Saab said. September 12/19: Brazil Saab announced that it presented the first Gripen E to the Brazilian Air Force. However, the new fighter, part of an order for 36 units, will only move to Brazil at the end of 2020. Deliveries will actually start in 2021. Saab held a Gripen E fighter presentation ceremony for Brazil, which is expected to be the sixth country to use the Swedish aircraft from 2021. The first of 36 planes from the $4 billion order was completed weeks ago and made its maiden flight on August 26. It was this fighter that attended the event in Linköping this Tuesday with the presence of several authorities of the Brazilian Air Force as well as representatives of the companies involved in the project. „Gripen increases the operational capacity of the Brazilian Air Force and boosts a partnership that ensures transfer of technology to Brazil, fosters research and industrial development in both countries,” says Fernando Azevedo e Silva, Brazilian Minister for Defense. September 6/19: Czech Gripen in Balitc Air Policing Mission Jane’s reports that five Czech Air Force JAS 39C fighters began a four-month rotation of NATO’s Baltic air policing mission on September 1 in their first operation with their new Rafael Litening 4i laser targeting pods. The aircraft are reportedly armed with their usual cannons: the AIM-9 Sidewinder and AIM-120 Advanced Medium Range Air-to-Air Missiles (AMRAAMs). On 14 June 2004, it was announced that the Czech Republic was to lease 14 Gripen aircraft, modified to comply with NATO standards. In September 2013, the Defense and Security Export Agency announced that a follow-up agreement with the Czech Republic had been completed to extend the lease by 14 years, until 2029. September 4/19: Eurofighter Withdraws From Canada’s Fighter Acquisition, Gripen Still Running Airbus announced on August 30 that it along with the United Kingdom’s Ministry of Defense is withdrawing from Canada’s effort to acquire a new fighter aircraft. Airbus Defense and Space, which was pitching the Eurofighter Typhoon, notified the Liberal government Friday that it was not going to bid. The decision was made after a detailed review of the tender issued by the federal government in mid-July. The move leaves only three companies in the $19 billion contest: Lockheed Martin Canada with its F-35; Boeing with the Super Hornet; and Saab, which is offering an updated version of its Gripen fighter. August 2/19: F-16 Instead of Gripen for Slovakia Lockheed Martin won a $800 million firm-fixed-price incentive contract for the production and support of 14 Slovak Republic F-16 block 70 aircraft. Slovakia wants to replace its MiG-29 fighter jets with this purchase. The country had previously been in talks to purchase Saab Gripen multirole fighter jets from Sweden, but Defense Minister Peter Gajdoš stalled those discussions and invited other bidders, with the field eventually narrowing in February 2018 to a choice between F-16 Vipers and JAS-39 C/D Gripens. Among its nearest neighbors, Hungary and the Czech Republic operate Gripen jets, while Poland has fleet of F-16s. Lockheed will perform work in Greenville, South Carolina and estimated completion dare is January 21, 2024. July 23/19: Future UK Combat Air System? Saab announced in a news release that the company signed a Memorandum of Understanding regarding co-operation on future combat air systems. The British-led push to build a sixth-generation warplane has executives eyeing near-term improvements to the company’s Gripen E aircraft rather than the creation of a brand-new fighter in the more distant future. “The MoU is the starting point for the countries to analyze the conditions for deeper cooperation on the development of future combat aircraft capabilities, including future development of the JAS 39 Gripen,” Saab said. The Gripen E has an overall length of 15.2m, wingspan of 8.6m, and maximum takeoff weight of 16,500kg. The maximum speed of the aircraft is Mach 2 at high-altitude, while the speed at low -altitude is 1,400km/h. July 12/19: Continued Technical Support Saab has received an order from the Swedish Armed Forces and the Swedish Defense Material Administration (FMV) for continued technical support on weapons and external stores for Gripen. The order value amounts to $15.1 million. The order is a call-up of an option as part of a previous agreement with FMV for technical support and maintenance of Gripen’s existing weapons and external stores, which was signed in March 2015. Today’s order secures continued technical support for Gripen regarding weapons and external stores. June 17/19: Gripen+GlobaEye to Finland The offer by Saab to deliver its Gripen to Finland also entails two GlobalEye Airborne Early Warning and Control (AEW&C) aircraft, the Swedish company announced via a press release. Saab’s GlobalEye is a multi-role AEW&C solution that can detect and track airborne and surface targets on land as well as on sea. According to Saab, AEW&C capability would increase Finland’s situational awareness and provide increased pre-warning time, supporting the protection of the nation’s territorial integrity. AEW&C systems have shown to provide an efficient deterrent effect whilst enhancing and maximizing the combat effectiveness of a fighter fleet. Saab’s proposal comprises 64 Gripen aircraft, of which 52 are single-seat Gripen E and 12 are dual-seat Gripen F, as well as two GlobalEye AEW&C aircraft. Finland is planning a procurement decision in 2021. May 2/19: C/D Extension Sweden could approve an extension of operations with the Saab Gripen C/D beyond 2030. This would increase the size of Sweden’s fighter inventory beyond the 60 E-model examples currently on order for its Air Force. The Air Force holds an active fleet of 100 Gripen. Saab has been awarded to produce 60 new-generation E-model fighters for the service, with operations to commence early in the next decade. Gripen C/D is a new-generation, multi-role combat aircraft currently in operation with the Air Forces of Sweden, South Africa, Hungary, Czech Republic and Thailand. Stockholm could confirm the decision to extend Gripen C/D operations on May 14, when it publishes its next long-term defense bill. January 28/19: Offer for Switzerland Saab submitted its proposal to offer Gripen E for the Swiss New Fighter Aircraft procurement to armasuisse, the Swiss defense procurement agency. The proposal consists of options 30 and 40 new Gripen E fighter aircraft in response to the Request for Proposal (RFP) by armasuisse. Switzerland seeks to replace its fighter fleet of F/A-18 Hornet and F-5 E/F Tiger aircraft. The Gripen E or „Saab JAS 39 Gripen“ is a light single-engine multirole fighter aircraft powered by Volvo RM12. Five nations currently operate Gripen: Sweden, South Africa, the Czech Republic, Hungary and Thailand. Sweden and Brazil have ordered Gripen E. Additionally, the UK Empire Test Pilots’ School uses Gripen as platform for test pilot training. December 28/18: Sweden The Swedish Defense Materiel Administration (FMV) is allocating more funds for Gripen E combat aircraft production. The $48 million contract boost allows Saab to build the Gripen Es from new parts instead with parts from salvaged Gripen Cs. The Swedish Air Force currently has 60 Gripen Es on order and is expected to cost just short of $7 billion in total. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. November 14/18: Meteor Saab confirms that its Gripen E fighter jet successfully fired a Meteor Beyond Visual Range Air-to-Air Missile (BVRAAM) for the first time. MBDA’s Meteor missile was conceived as a longer-range competitor to popular weapons like the Russian R77/AA-12, and American AIM-120 AMRAAM. Its ramjet propulsion offers the missile a head-on closing range of 120 km, and full powered performance at Mach 4+ throughout its flight, instead of the standard “burn and coast” approach use by rocket-powered counterparts. Sweden’s JAS-39 Gripen is serving as the Meteor’s main test platform. “The aircraft continues to perform as smoothly as we have seen throughout the whole flight test phase flying with external stores. I’m really looking forward to the upcoming steps in the flight test program, taking us closer and closer to completing weapon integration. Meteor makes Gripen E extremely capable in the air dominance role”, says Robin Nordlander, Saab’s experimental test pilot. October 29/18: Test – Test Saab is one step closer to readying the Gripen E for operational use. One of the new JAS-39s successfully completed the first tests to verify the ability to release and launch external payloads earlier this month. During the test one of Saab’s pilots jettisoned one external fuel drop tank and fired an IRIS-T air-to-air missile. “As a pilot, flying with external stores such as drop tank and missiles is important to allow for evaluation of how the aircraft behaves with the stores attached. This test was also used to evaluate the effect on the aircraft when releasing and launching the stores. The highlight was of course to pull the trigger and watch the missile fire away. It also brings us closer to making the aircraft ready for its operational use”, says Marcus Wandt, Experimental Gripen Test Pilot at Saab. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. October 18/18: Philippine purchase The Philippine Department of National Defense (DND) is choosing Saab’s JAS-39 Gripen to be the country’s next supersonic jet fighter. The Philippine Air Force has been looking for new aircraft to replace its retired fleet of US-made F5 Interceptors for over a decade. Defense Secretary Delfin Lorenzana told the Philippine News Agency (PNA) that the country is opting for the Gripen due to it being cheaper and less expensive in maintenance cost than the also offered F-16. Furthermore the Gripen is a proven supersonic fighter aircraft that has been in service with several countries in Europe and the Middle East. The Philippine Air Force needs the new multi-role jetfighters to counter ongoing Chinese pressure. September 24/18: MS 20 for SAAF Saab is currently recommending that the South African Air Force (SAAF) adopts the latest software update for its JAS39C and JAS39D Gripen fighter jets. MS 20 is the latest step in Saab’s process of constant capability expansion. The MS 20 upgrade includes integration of the MBDA Meteor beyond-visual-range air-to-air missile and Boeing GBU-39 Small-Diameter Bomb, improved radar modes and a new laser designation pod (LDP) among other things. The new software will would also increase the performance of the Gripen’s radar and would allow the fitting of an automated Ground Collision Avoidance System. The Swedish Air Force was using MS 20 to improve the reconnaissance performance of its Gripens. August 23/18: Struck by a bird The Swedish Air Force needs a new fighter jet after one of its JAS 39 Gripen crashed yesterday, August 21. Shortly after take-off the aircraft collided with a bird and subsequently crashed in a forested area about five miles north of a military air base near the southern Swedish city of Ronneby. The Gripen multirole fighter aircraft, developed by Saab, was first flown in December 1988 and entered operational service with the Swedish Air Force in 1997. The JAS-39, is a canard-winged successor to the Viggen and one of the world’s first 4+ generation fighters. The Gripen remains the only lightweight 4+ generation fighter type in service, its performance and operational economics are both world-class, and it has become one of the most recognized fighter aircraft on the planet. July 11/18: Botswana can’t pay The government of Botswana is still undecided if it should acquire several Gripen C/D fighter aircraft. The African nation started negotiations about purchasing 8 to 12 aircraft with Sweden in 2016. However, the country is currently struggling to fund the $1.7 billion needed for the purchase. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The Gripens were meant to replace the Botswana Defence Force’s ageing fleet of US-made F-5 fighter jets acquired over two decades ago. The aircraft acquisition is part of a force modernization program that also includes the replacement of old troop carriers, transporters, tanks, armored vehicles, light weapons and aerial defense systems. May 21/18: Saab expects sale boost The Swedish defense contractor Saab is expecting more purchases of its Gripen fighter jet after the smooth progress with the Gripen E/F development program for Brazil has heightened interest in the Swedish-designed fighter among numerous other potential customer nations. The JAS-39 Gripen is an excellent lightweight fighter by all accounts, with attractive flyaway costs and performance. Its canard design allows for quick “slew and point” maneuvers, allowing it to take advantage of the modern trend toward helmet-mounted displays, and air-air missiles with much wider boresight targeting cones. The Gripen has one other asset that is often overlooked: very attractive lifetime operational costs. Swiss evaluations reportedly rated the Gripen at roughly half the O&M costs expected for its twin-engine Rafale and Eurofighter counterparts. Prospective buyers for the C/D-version include Botswana, which has shown interest in the type as a replacement for its Northrop F-5s. Despite a recent setback in Europe when Croatia opted to acquire secondhand Lockheed Martin F-16s refurbished in Israel, Bulgaria and Slovakia remain firm targets for Gripen deals via the Swedish government. Indonesia the Philippines are also seen as opportunities. The air forces of the Czech Republic, Hungary, South Africa, Sweden and Thailand currently operate the Gripen C/D, while Brazil and Sweden will introduce the E/F from late 2019. April 16/18: Israeli upgrades for Saffa Gripens Israeli defense firm Rafael has offered a series of upgrades to South Africa that would upgrade its JAS-39 Gripens to the 4.5 generation standard. Working in conjunction with the warplane’s manufacturer Saab, included are offers to swap the current Litening 3 targeting pod with the 4.1 version and install a IP Mobile Ad-hoc Network Software Defined Radio. Also included in the package are the provision of Python 5 and the I-Derby ER air-to-air missiles which offer a 100 km range. February 8/18: Offer to India Saab has responded to an Indian Navy request for proposals for carrier-borne fighter aircraft, offering a marine-variant of the Gripen NG. As a sweetener to the offer, the Swedish firm is also open to a technology transfer with New Delhi—a key requirement in any major Indian defense procurement under its ‘Make in India’ initiative—adding that the Sea Gripen will have all the capabilities of the Gripen E/F as well as a “small logistic footprint”. Other potential purchasers in the Asia-Pacific region being chased by Saab at this year’s Singapore airshow including Indonesia, Malaysia and the Philippines, however, Saab has caveated by saying it will have to wait and see if military budgets “match [their] ambitions”. January 29/18: Brazilian assurances The Brazilian Defense Ministry has assured Saab that any defense tie-up between local airframer Embraer and Boeing is not going to happen. Speaking to the Swedish firm’s CEO on January 25, Defense Minister Raul Jungmann said any such deal with Boeing was off the table, adding that they had also ruled out a spin-off or sale of Embraer’s defense or commercial units. Saab and Embraer are partners in the development of the Gripen NG fighter, and Saab had feared that a partnership between Embraer and Boeing could could result in the leak of sensitive data from the Gripen project. Jungmann has subsequently asked the Brazilian Air Force as well as the Defense and Finance Ministries to keep Saab executives informed of any progress in talks between the companies, adding that any deal would mean building safeguards for Saab with its input. January 25/18: Brazil deal in doubt? Brazilian daily Folha De San Paulo reports that CEO of Saab, Hakan Buskhe will warn Brazil’s Defense Minister Raul Jungmann on January 25, that the Swedish firm may cancel its $4.9 billion contract to supply 36 JAS-39 Gripen fighters to the Brazilian Air Force (BAF) if there is a partnership between Boeing and Embraer. News of a potential tie-up between Boeing and Embraer—the “golden share” owned by the Brazilian government—surfaced in December 2017, and the Brazilian airframer is considered by Boeing as a strategic part of its positioning against European giant Airbus, which purchased Canadian company Bombardier’s regional aircraft line last October. Saab’s opposition to the deal comes from promises made during the Gripen negotiations for the mandatory provision of technology transfer to the BAF and national companies such as Embraer, as well as the joint building of a portion of the ordered aircraft. The Swedish objection comes as it is worried that its technological secrets will be at risk if such a move occurs as Embraer is participating in the development of the Gripen F, however, this may result in only increasing Brazilian negotiating power in any such deal with Boeing—although any interruption of the contract already being delivered with Saab is highly unlikely. December 19/17: Contracts-Equipment Sweden’s procurement agency, the Defence and Material Administration (FMV), has signed a multi-million dollar order with Saab for equipment for existing and new E-model JAS-39 Gripen fighter aircraft. The contract is supplemental to an earlier 2013 agreement for the development and modernization of the Gripen and is worth more than $46.9 million. While specific equipment requested was not disclosed, Saab did say that the order is a first step in changing the structure of the Gripen E production for the Swedish air force. “Saab, FMV and the Swedish Armed Forces have agreed on the terms of the contract based on the relevant needs and deliveries,” says Jonas Hjelm, Senior Vice President and Head of Business Area Aeronautics. “This joint approach is intended to secure availability so that the Swedish Armed Forces can keep the Gripen C/D fleet in operational service while Gripen E is being delivered and put into operational service in the Swedish Air Force.” December 4/17: Contracts-Support Saab has received a contract through Armscor, South Africa’s procurement agency, for weapons support services on Republic of South Africa Air Force JAS-39 Gripen C/D fighter aircraft. Valued at $24.6 million, the contract will run until February 2020 and includes airworthiness management, engineering support, maintenance, repair and overhaul, spares replenishment and updates of technical publications. No further details on the contract were disclosed. October 31/17: Saab’s Gripen E smart fighter flew its first supersonic flight on October 18, the firm announced last Friday. During the flight, conducted over the Baltic Sea, the aircraft conducted maneuvers to demonstrate its aerodynamic design and powerful engine, and the data collected will go towards the ongoing flight trials for the fighter program. Saab said that the milestone had been preceded by over 20 flying hours since the jet’s first flight back on June 15, 2017. October 25/17: Bulgaria has pulled away from plans to procure eight JAS-39 Gripen fighter aircraft and will instead launch a new tender for new fighter aircraft. The Defense Ministry said it will request new offers from Portugal and Italy—who had previously offered second-hand F-16s and the Eurofighter Typhoon respectively—after the tender is officially filed in November. The decision to ditch the Gripen was made in early October following the release of a report from the special committee of the Bulgarian parliament, who called on the Cabinet to relaunch its MiG-29 fighter replacement tender despite the recommendation of a ministerial expert group that ranked the Gripen as the top choice. Approximately $899.8 million has been earmarked for the program. September 20/17: A new electronic warfare suite for the JAS-39 Gripen E/F fighter has been launched by Saab. The Arexis electronic warfare (EW) suite comprises of a radar warning receiver (RWR), enabling the equipped fighter with situational awareness of enemy radar tracking activity. It also includes Digital Radio Frequency Memory (DRFM)-based Electronic Countermeasures (EC) systems for jamming against enemy radars, be it onboard enemy aircraft or air-to-air missiles (AAM). For dedicated EA roles, the Arexis can be packaged into a pod, which Saab states, “provides high output power” for dedicated EW/EA roles. September 14/17: Saab has unveiled its Gripen Aggressor platform for the adversary air combat training market. Based on the proven Gripen C-series, the unarmed aircraft was debuted at this year’s Defence and Security Equipment International (DSEI) 2017 expo in London, and is being offered as a solution to the Royal Air Force’s (RAF) Air Support to Defence Operational Training (ASDOT) program. ASDOT is a 15-year program to provide ‘Red Air’ adversaries for RAF fighter training, and also ‘Blue Air’ platforms for the training of joint terminal attack controllers (JTACs) and fighter controllers. The requirement also includes electronic warfare and simulation elements. Saab also sees the Aggressor as a high-level aggressor option for the United States Air Force’s Adversary Air (ADAIR) program. September 1/17: Saab is planning to link up with India’s Adani Group to bid for a contract to make Jas-39 Gripen fighter aircraft in India. The pairing will face off against a team consisting of Lockheed Martin and local partner Tata Advanced System—offering the F-16—in a two-horse race to equip the Indian military with single-engine fighter jets to be produced locally under Prime Minister Narendra Modi’s “Make-in-India” initiative. New Delhi is expected to issue a formal request to both foreign firms over the next few days to provide information about their plans to design, develop and produce combat jets in the country. July 21/17: Saab’s JAS-39 Gripen has been pulled out of Belgium’s fighter competition, leaving Brussels with the choice of either the Dassault Rafale, Eurofighter Typhoon, or Lockheed Martin F-35. While Sweden’s FMV defence materiel administration had initially touted the Gripen as a cost-effective solution that can easily fill the operational requirements required by Belgium, the request included the requirement that the delivering nation also provides extensive operational support—something that would require a change in both Swedish foreign policy and political mandate. As a result, Sweden and the FMV choose not to submit an answer to the Belgian request. June 26/17: After almost a decade of deliberation, Bulgaria is to formally start talks with Sweden over the purchase of 8 Saab JAS-39 Gripen fighters to replace its Soviet-designed MiG-29s. The official go-ahead was given by Prime Minister Boyko Borissov, months after the deal was announced by the previous interim government, much to Borissov’s chagrin. However, Sofia is now looking to seal a deal by the end of the year to acquire the jets between 2018 and 2022 in order to improve its fighter fleet and improve its compliance with NATO standards. June 19/17: Saab’s latest Gripen E variant has successfully completed its maiden flight. The forty minute flight saw the fighter cover functions such as basic avionics and retracting and extending the landing gear, and is the first model of three pre-production planes authorized by the Swedish government. 60 models are currently on order with the Swedish military while Brazil has ordered 36 Gripen E and Gripen F two-seater aircraft, and Saab expects to export the aircraft to other countries. June 16/17: Saab is hoping to start negotiations to sell Gripen fighter to the Bulgarian government after this summer. While Sofia has yet to approach the firm over the acquisition, the plane was deemed by the previous caretaker government of Boiko Borissov as the best option out of three to replace its ageing Soviet-made MiG-29s, which continue to run up huge bills in overhaul and maintenance costs. Magnus Lewis-Olsson, Saab’s president for Market Area Europe, described the Gripen as the only modern fighter in the competition, adding that any expert would know that no other aircraft was more Nato-compatible than the Gripen. He added that Saab would be able to deliver four aircraft within 18 months from the signing of the contract. May 30/17: Saab hopes that its JAS-39 Gripen fighter stands a good chance in an upcoming Croatian fighter replacement competition, adding that the Balkan nation is closer to modernizing its fighter jet force than might have been previously expected and would look to take offers soon. Zagreb has already inspected the Gripen and is now in the process of researching information on other fighters as a possible replacement for its fleet of MiG-21s. Saab has been focusing on increasing Gripen sale and lease agreements in central and eastern Europe, with the Czech Republic and Slovakia recently signing a “Joint Sky” agreement to co-operate on maintaining a joint Gripen fleet, while a Bulgarian interim government selected the Gripen as the best option for a new fighter fleet. However, Bulgaria’s new Prime Minister, Boiko Borissov, recently indicated that its MiG-29s could keep flying for another eleven years so a quick sale to Sofia may not be on the cards just yet. May 12/17: Sweden’s Saab is looking to finalize a number of near-term sales of the C and D variants of its JAS-39 Gripen fighter. Upcoming competitions in Botswana, Slovakia, and Bulgaria, have all been targeted as potential clients for the C/D models, which if agreements are reached, will boost sales and ensure the continuation of the Gripen’s production line into the future. Of the three countries, Bulgaria is the closest to moving forward with a deal, after its government announced Saab as the preferred option for its MiG-29 replacement program. Slovakia have been in negotiations with Saab since 2015, while in Botswana, a Gripen package is facing off against an offering from Korea Aerospace Industries’ (KAI) FA-50—the fighter version of its T-50 trainer. April 27/17: Bulgaria’s interim government has selected Saab’s JAS-39 Gripen as the replacement for their aging fleet of MiG-29 fighters. The Swedish jet won out against an offering of second-hand F-16s from Portugal and an Italian offer for the Eurofighter Typhoon. Further discussions with Saab on contract details are scheduled to take place once the new government takes office next month, but it is expected that at least eight aircraft will be procured at a cost of $850 million. This new government will oversee a large military modernisation effort, with plans already approved to purchase new warships as well as a new collection of armored vehicles. April 9/17: A JAS-39 Gripen fighter operated by the Swedish Ministry of Defense has completed the first flight with a GKN RM12 engine completely powered by renewable biofuel. The fuel, named CHCJ-5, is interchangeable with normal jet fuel, so no changes to the engine are necessary for use. GKN Aerospace, who conducted the flight test with Saab, said the RM12 engine demonstrated good performance during the biofuel flight. GKN, Saab and FMV, Sweden’s defense procurement agency, will use the flight to show the potential of biofuel for military aerospace. April 5/17: Saab has announced that they are developing the first Gripen fighter for the Brazilian Air Force. The two-seat version of the Gripen NG is being developed in the Brazilian state of Säo Paulo in conjunction with 56 engineers and with participation from several local firms. Saab made the announcement during a recent discussion of the Gripen NG program at the recent LAAD International Defence & Security Exhibition. March 15/17: As Saab continues marketing the Saab C and D fighters, the company has announced that their latest E variant is on course to make its debut flight during the second quarter of this year. So far, the company has conducted low-speed taxi tests on the fighter and are now validating its app-type software architecture in preparation for the first flight. Deliveries of the new fighter are expected to be made to the Swedish Air Force in 2019 with an export order to Brazil set to follow. Further potential markets include sales to Belgium, Canada, Colombia, Finland, Indonesia, Malaysia and Switzerland. March 13/17: Saab has opened an office in the Philippines as the Swedish defense firm looks to sell its JAS-39 Gripen fighter to the archipelago nation. The office was opened by Swedish Ambassador Harald Fries who said that his embassy will invite Swedish companies who do good work in terms of social responsibility to have an exchange with both government agencies, labor unions, and Filipino companies. Alongside air defense, Saab is also looking to offer coastal surveillance equipment and even submarines to the Philippines in order to profit from Manila’s maritime modernization efforts. February 13/17: Saab has offered to build the world’s most modern fighter aircraft factory in India if New Delhi selects the JAS-39 Gripen E to fill an upcoming 200-250 unit fighter requirement. The company has already been in talks with nearly 100 aerospace and defense firms in India to provide components for the production of the plane which would lay the industrial base for India to design, develop and build future fighters. Rival competitor Lockheed Martin has offered to transfer the production line of their F-16 Block 70 fighter to India if selected, even though President Donald Trump’s protectionist administration may want to take a fresh look at such plans. December 20/16: Canadian-based firm Héroux-Devtek have been tapped by Saab to manufacture landing gear systems for the Gripen E fighter. Under the contract, the company will assemble and deliver landing gear equipment for 96 Gripen planes being developed for the Swedish and Brazilian air forces. Manufacture work will be conducted at the company’s UK facilities and deliveries will commence next year. November 29/16: The first flight of the Gripen E will have to wait until 2017 as manufacturer Saab self-imposes a delay of at least six months. It was initially expected that the latest Gripen model would fly before the end of the year, however Saab has chosen to fully qualify its distributed integrated modular avionics (DIMA) design to commercial standards prior to the first flight. Deliveries of orders to the Swedish and Brazilian air forces, slated for 2019, are not expected. July 22/16: Saab has sent a proposal to Indonesian authorities to sell Gripen C/D fighters to their air force (TNI-AU). If selected, the Gripens would replace a well-seasoned fleet of Northrop F-5E Tiger II fighters, in service since 1980. The government’s replacement program initially seeks to procure 16 aircraft at a cost of $1.5 billion, but this could be expected to increase if territorial disputes in the region require Indonesia to beef up its capabilities further. July 15/16: Saab is aiming to carve out a market in South America following their export coup to Brazil. Cash conscious governments from Colombia, Ecuador, Peru, and Argentina could all find a cost effective replacement for their aging fleets in the Gripen fighter. The company has brought a mock-up of its latest model to the Farnborough Air Show alongside an older model for nations that don’t need the kinds of capabilities the new jet brings to an air force. June 17/16: Botswana has confirmed that negotiations to purchase between eight and 12 JAS Gripen C/D from Sweden are underway. With an estimated cost of $1.7 billion, the fighters will replace the country’s F-5 fleet bought from Canada in the mid-1990s. Other procurements in Botswana’s sights include a $179 million deal to purchase 45 Piranha 3 8×8 armored wheeled vehicles from Swiss company General Dynamics European Land Systems-Mowag (GDELS-Mowag). June 16/16: JAS-39 Gripens operated by the Royal Swedish Air Force have been equipped with the latest MS20 software upgrade and showcased at the annual Tactics, Techniques and Procedures exercise. Materiel System 20 is an update of both equipment and software in the aircraft, and involves everything from upgrades in the presentation areas and linkages to new and enhanced abilities. New weapons on the aircraft include the METEOR missile and the GBU-39 Small Diameter Bomb (GDB). June 6/16: Slovakia’s Ministry of Defense has rejected an offer from the Swedish government on a lease agreement for Saab Gripen fighters. Under the provisions of the deal, Slovakia would have seen Stockholm lease six JAS 39Cs and two JAS 39Ds for an undisclosed price for a total of 1,200 flight hours per year. However, since elections in March saw a change of government including the Slovak National Party, the new prime minister Robert Fico has praised the capabilities of the MiG-29 aircraft. May 17/16: Botswana is to purchase eight Gripen C/D fighters after it was revealed by the Swedish Defence Materiel Administration (FMV). It is, however, also reported that the deal could be for up to sixteen, with the total cost of the deal ranging from between $1.45 to $1.63 billion. Whatever the exact number, Botswana’s government is ordering the fighter as part of a modernization that will replace its current fleet of Canadair CF-5s. May 16/16: The Swedish Embassy has denied that it is in discussions to sell four additional Gripen fighters to Thailand’s military government. Thailand’s Deputy Prime Minister and former Air Force chief Prajin Juntong told reporters that Bangkok is interested in getting four more Gripen fighters. Juntong made the comments after meeting Swedish ambassador Staffan Herrstrom. The claims where subsequently denied by the Swedish mission, who claimed that no such discussions had taken place. Thailand currently operates 12 Gripens. March 3/16: Rheinmetall has been contracted by Saab to supply 88 BK27 automatic cannons for the latest Gripen NGs. 36 of the jets fitted with the cannon will be destined for the Brazilian Air Force. The cost of the deal has been said to be in the mid-8 figure euro amount, and delivery will take place between 2017-2025. The latest cannons feature a newly developed linkless ammunition feeding system. A linked ammunition-feeding version of the cannon features as the standard weapon in the Eurofighter Typhoon. February 5/16: Finland’s former prime minister has given his backing to the Saab Gripen as the jet of choice to replace the Finnish Air Force’s F/A-18 Super Hornet fleet. Matti Vanhanen stated his support for the Swedish aircraft in a book published this week mentioning the deepening defense cooperation between the two countries. While the government has yet to state any preference between the Gripen, Dassault’s Rafale, Boeing’s Super Hornet, Lockheed Martin’s F-35 and the Eurofighter Typhoon, Vanhanen acts as a close advisor to current Prime Minister Juha Sipila. With a final decision not to be chosen until the 2020s, the Gripen looks to be gaining the early lead in a procurement that could range between $5-11 billion. While both Sweden and Finland are non-aligned nations, increased cooperation between them, Baltic, and other Nordic states are bringing them into closer cooperation with NATO. January 19/16: Increased Swedish-Finn defense ties may see the latter purchase Gripen fighters replacing the Air Force’s F/A-18 C/D Hornet aircraft, which are scheduled to be retired between 2025 and 2030. While both governments have remained tight lipped about any particular deal, the increase in bilateral ties may see Sweden’s Gripen gain an advantage as a potential choice for the Finish HX-program. Both nations follow neutrality clauses which prevent them from joining NATO, but they are looking build the basis for a stronger regional military-security alliance with NATO-neighbors Denmark, Norway, Estonia, Lithuania and Latvia. January 8/16: Looks like if you break, you buy. Hungary will restructure its lease agreement with the Swedish government over the leasing of Saab Gripen fighters after two of the jets crashed in 2015. The new decree states that the replacement of the lost jets will not exceed $33 million between the leasing period of 2017-2026. Prior to the crashes, Hungary had been leasing twelve of the aircraft since 2001. The leasing of Gripens is seemingly a common practice among central European governments looking for cost effective fighters. The Czech Republic also operates the aircraft and Slovakia is looking into signing a lease agreement for the plane. January 4/16: Slovakia is set to go ahead with leasing Saab’s Gripen jet fighter, although final contracts will not be signed until after elections due in March. The Gripens will replace the Mig-29 fighters currently on loan to the Slovak Air Force after the current lease ends this year. A more cost effective way of obtaining a fleet, leasing six to eight Gripens between now and 2029 is estimated to cost about $340 million. December 22/15: Saab has made another bid to sell its Gripen fighters to India, after it lost out a tender to Dassault’s Rafale in 2011. With a deal to buy 36 Rafale fighters just signed last month, Saab has claimed that India will require more fighters to maintain an at capacity fleet. The offer comes sweetened with a technology transfer, giving full system and software control and an offer to help develop India’s aerospace industry for the next 100 years. This deal would see Saab help in the development of India’s own indigenous Light Combat Aircraft Tejas and the Advanced Medium Combat Aircraft (AMCA). The promise of a Saab base in India and full technology transfer is a tempting one as it would mark a big success for President Modi’s “Make in India” program after tough negotiations with France and Dassault over the Rafale purchase. October 28/15: Sweden is offering Croatia the Saab JAS-39 Gripen fighter as a replacement for the country’s MiG-21s. The Swedish Defence and Security Export Agency has offered the fighter to Croatia, with the potential procurement likely covering between eight and twelve new aircraft. Croatia’s Defence Ministry is also thought to be looking at the F-16 Fighting Falcon alongside another Western design, with the country announcing its intention to replace its Soviet-era MiGs in April. July 30/15: Confirming reports from June indicating that Brazil was looking to refinance its procurement of 36 Saab Gripen NG fighters, Sweden has reportedly agreed to reduce the commercial interest rate applied by the Swedish Export Credit Corporation from 2.54% to 2.19%. Brazil cut the amount of funding it planned to take from Sweden in June, with the original sales contract announced in October 2014. The revised agreement will now be transferred to Brazil’s Federal Senate to be signed-off. Meanwhile, Brazilian prosecutors announced in April 2015 that they were planning to investigate the $5.4 billion Gripen deal. July 20/15: European defense giants Saab and BAE Systems may become embroiled in fresh corruption allegations, with Brazil’s Defense Minister announced on 15 July that the country will soon sign a final, refinanced $5.4 billion contract with Saab for 36 Gripens, approximately a year after the two sides struck an initial agreement on the sale. June 30/15: European defense giants Saab and BAE Systems may become embroiled in fresh corruption allegations, with the Swedish press reportedly unearthing fresh UK Serious Fraud Office documents relating to the sale of 26 Gripen fighters to South Africa in 1999, as well as a separate deal for Hawk trainers. The lucrative sale saw allegations up to and including the bribery of former South African President Jacob Zuma, just one of a set of BAE-related bribery allegations. The new documents reportedly show that the company paid out approximately $1.58 billion in bribes to secure the Gripen and Hawk deals, with Saab kept in the loop regarding the illicit payments. June 29/15: Brazil is reportedly looking to restructure its financing with Gripen-manufacturer Saab, a result of austerity-driven budget constraints and cuts to the amount of borrowed cash the country is taking from Sweden’s Export Credit Corporation to fund the fighter. Brazilian prosecutors announced their intention in April to investigate the $5.4 billion deal signed with Saab last year, after the Gripen beat out competitors Boeing and Dassault. June 17/15: The cause of the Hungarian Air Force JAS-39C Gripen crash last week is being attributed to software issues, according to the country’s defense minister. This is pre-empting the outcome of the official investigation, with defense minister Csaba Hende citing initial details of that investigation. Dec 15/14: Belgium. Sweden’s FMX defense export agency indicates that back in June it had received a request on joining a feasibility study for Belgium’s future combat aircraft procurement. FXM of course accepted and recently submitted a background document to the Belgian Ministry of Defence. The request applies to next generation Gripen Es. Belgium is going to upgrade its F-16s so they have ample time to make a decision. The F-35 is seen as a strong contender, if the Belgians can afford it. Nov 9/14: Argentina. Argentina may want to do a deal with Brazil (q.v. Oct 22/14), but Britain has now publicly said “no.” To be more precise, they reiterate the continued existence of a ban. A spokesperson for the UK Department of Business, Innovation and Skills: “We are determined to ensure that no British-licensable exports or trade have the potential to be used by Argentina to impose an economic blockade on the Falkland Islanders or inhibit their legitimate rights to develop their own economy…” About 30% of the JAS-39E/F will be British, from the ejection seats to the radar, landing gear, and a number of electronic systems. Embraer could try to downgrade and substitute, but Argentina lacks the money to finance such an ambitious effort. Now add the fact that a newly-Republican US Senate and House would block export’s of GE’s F414 engines. As knowledgeable observers expected, Argentina will have to look elsewhere. C4ISR & Networks, “Argentina Buying Gripens? Brits Say ‘No Way'”. Oct 22/14: Argentina. During the Embraer KC-390 medium jet transport’s rollout, Argentina and Brazil sign a formal “Alianca Estrategica em Industria Aeronautica.” Argentina is already making parts for the KC-390, and they need a larger partner for a number of other reasons. The FAB’s releases add that: “El Gobierno nacional decidio iniciar una negociacion con la administracion de Dilma Rousseff para la adquisicion de 24 aviones Saab Gripen dentro del programa denominado FX 2…” Regional export rights are also expected to be part of the $5+ billion deal, which is signed on Oct 24/14. That could get interesting, because the Gripen has systems from the USA and Britain in it. You might be able to replace electronics, but it’s expensive – and ejection seats and engines are a lot tougher. Sources: FAB NOTIMP, “Argentina quiere comprar 24 cazas supersonicos”. Oct 18/14: Finland. The Finnish government has commissioned a working group to investigate Finland’s future tactical and strategic air defense options, with the tactical level centered around an estimated EUR 6 billion project to replace the country’s 60+ F/A-18C/D Hornets. New fighters would be delivered by 2030, at which point the Hornet fleet would be retired; but The working group is also looking to see whether it’s possible to upgrade the existing Hornets, which beat the JAS-39A/B Gripen and 2 other contenders in 1992. MoD official Lauri Puranen puts it this way: “A 30-year old Formula 1 car can’t survive in this world, and we need to find out if a 30-year old fighter jet can…” The answer depends on what you want them for, and how much better newer alternatives like the F/A-18E/F Super Hornet, JAS-39E/F Gripen, F-35A/B etc. might be for the missions you need. An increasingly aggressive Russia, armed with SU-30SM, SU-34, and SU-35 fighters, is a significant threat – and its long-range S-400 anti-aircraft missiles can cover all of Finland. The Finns seem to understand this time, because the study will also look at options like joint air defense with Sweden, or joining the NATO alliance. A decision to pursue joint air defense with Sweden could give the JAS-39E/F Gripen a “second time lucky” edge, but Finland’s stocks of AIM-9X and AIM-120C-7 air-to-air missiles are currently incompatible, and Russian anti-aircraft missiles could force a need for stealth that pushes detection range outside of Finnish airspace. The missile-compatible and stealthy F-35 also has a constituency (q.v. April 22/14), and so does the less expensive F/A-18E/F, but the Super Hornet may not have a live production line by then. Sources: FDF (2010), “The Successor of the Hornet Needs to Be Decided Only in the Early Twenties” | YLE Uutiset, “Finnish Defence Forces to replace aging Hornet fighter fleet” | Corporal Frisk, “Replacing the ‘capabilities of the Hornet fighter aircraft'”. Sept 17/14: IHS Jane’s reports that: “Saab is offering “100% technology transfer” in its bid to supply the Indonesian Air Force (Tentara Nasional Indonesia Angkatan Udara – TNI-AU) with its JAS 39 Gripen combat aircraft, a company executive has told IHS Jane’s.” It’s a similar offer to the ones they made to India and to Brazil. Indonesia also has a native aviation industry, though PT Dirgantara has been focused on transport aircraft (CN-235, C-212) and helicopters (AS332). With that said, if Southeast Asia is an area of focus for Saab (q.v. Sept. 8/14), it makes sense to have a local partner who can build aerostructures and perform advanced maintenance. Sources: IHS Jane’s Defence Industry, “Saab offers “100% technology transfer” in bid to secure TNI Gripen deal”. Sept 8/14: Indonesia. Saab begins actively pitching the JAS-39 to Indonesia, which indicates some level of belief in a serious competition, and in Saab’s odds within that competition. To an outside observer, “F-16 capability at a lower ownership cost” seems to be the basic competitive positioning. The other driver at work may be the global market as a whole. An objective look for Saab sees the Middle East opting for the most expensive jets, while Asia’s biggest players have already made their picks. Africa doesn’t have much opportunity to offer beyond the South African win, and the coming deal with Brazil will cover any possibilities in Latin America. There are a number of small country opportunities in Europe, but those competitions are mostly in limbo. By process of elimination, Southeast Asia is a necessary focus for Saab right now, and Thailand has shown that even small wins lead to larger buys in time. A “max win” scenario in the region could add small but notable Gripen fleets in Malaysia and Indonesia, then follow-on possibilities in the Philippines (q.v. July 10/14), and perhaps even Vietnam over the medium-long term. Every regional win will make Saab more competitive within the region. Sources: Saab AB, “Gripen: Ideal for Indonesian Air Force”. Aug 30/14: Slovakia. The Czech Republic, Slovakia and Sweden have signed a Letter of Intent to co-operate on using the JAS-39 Gripen, “…for ett bilateralt samarbete kring en gemensam luftrumsovervakning av Slovakien och Tjeckien.” Which is to say, as a foundation for bilateral airspace overwatch co-operation between Slovakia and the Czech Republic. Note that past reports have gone as far as positing a common Gripen fighter squadron (q.v. April 3/14) if Slovakia also buys the aircraft, organized as a main base and a secondary forward base. Sources: Swedish FXM, “Idag har Sverige, Tjeckien och Slovakien undertecknat en avsiktsforklaring rorande samarbete kring Gripen” | Flightglobal, “Slovakia creeps closer to Gripen agreement”. July 21/14: Denmark. Confirmed media reports indicate that Saab declined to bid in the re-launched Danish fighter competition, believing that they faced a situation similar to Norway’s where Lockheed Martin’s F-35 had already been picked. Denmark is already a Tier 3 F-35 industrial partner. Boeing (F/A-18 Super Hornet) and Airbus (Eurofighter Typhoon) bid alongside Lockheed Martin and Saab, for an expected order of just 24-32 fighters. In contrast, the Norwegian experience appears to have triggered a more gimlet-eyed appraisal of opportunities by Saab, who also declined to participate in a recent Canadian RFI that was believed to be a political front. Each bid costs millions to prepare, so it’s a smart use of money – if one’s corporate intelligence is good enough to make consistently accurate assessments. Sources: Swedish FXM, “FXM not submitting tender for Gripen to Denmark” | Politiken, “Sverige opgiver at saelge kampfly til Danmark” | Reuters, “Saab will not bid for Denmark warplane order -newspaper” | Seeking Alpha, “Lockheed, Boeing, Airbus enter bids for Danish fighter jet tender”. No bid in Denmark July 15/14: Sea Gripen / Slovakia. Saab’s Lennart Sindahl tells a Swedish newspaper that the JAS-39E has become the base for a Sea Gripen design, following studies done in the UK. They don’t intend to move forward without a confirmed customer, however, and the 3 countries they cite (India, Thailand, Brazil) amount to 1 valid prospect. India has already picked the MiG-29K and Tejas Naval LCA for its carriers, and Air Force dependencies on similar planes means that neither choice will change. Thailand has a carrier that’s arguably too small for a STOBAR fighter like Gripen, but it doesn’t matter – they lost the ability to operate fixed wing aircraft from it several years ago. It’s now a helicopter carrier that isn’t used very much, because they can’t afford it. That leaves Brazil, a Gripen customer working to co-develop the JAS-39F, who will need aircraft to replace the Skyhawks on NAe Sao Paolo in about a decade. On a more optimistic note, he also says that Slovakia is getting closer to a deal for 6 JAS-39C Gripens, to give them interoperability with the Czech Republic and Hungary. Sources: SvD Naringsliv, “Saab tar kliv mot Gripen anpassad for hangarfartyg”. July 10/14: Philippines. The Philippines recently bought 12 FA-50 light fighters, but Defense Secretary Voltaire Gazmin is reportedly interested in more advanced aircraft as well. Saab’s Gripen is reportedly on their radar screen, given the type’s low maintenance costs for a modern fighter. Sources: Saab’s Gripen Blog, “Gripen Has Admirers In Philippines Too”. July 7/14: Weapons. MBDA announces that Saab and Sweden’s FMV have concluded missile integration firings with the JAS-39C/D Gripen and the Meteor BVRAAM (Beyond Visual-Range Air-to-Air Missile). The March 2014 launches completed the full integration program, which includes new MS20 operating software for the jet. Full Meteor capability will be delivered as part of Swedish Flygvapnet MS20 upgrades. Once that upgrade is cleared for service, the JAS-39 Gripen will be the 1st platform able to use the long-range Meteor, whose continuous ramjet propulsion also widens its no-escape zone. Gripen’s Eurofighter and Rafale competitors won’t even begin to catch up until 2017, and there’s no scheduled integration date for other fighters. Sources: MBDA, “Gripen Closes In On Operational Meteor Capability”. June 17/14: No Gripen for India. As negotiations to buy advanced Rafale fighters stall, and projected costs rise sharply, India’s Business Standard reveals that Saab had proposed to take a 51% share of a joint venture company, then leverage their expertise to help with HAL’s LCA Tejas Mk.2. It was an abandonment of Gripen in India, but for Saab, the JV would give them a major new niche in the global marketplace: a low-end fighter in a class below the Gripen and its Western competitors. DRDO chief Dr V K Saraswat was enthusiastic, with an RFI in 2012 and an RFP in 2013. The idea does indeed make great sense in terms of India’s needs. The catch? Incoming DRDO chief Dr Avinash Chander was more focused on developing the Mk.2 alone, and believed that any foreign partnership would require a global tender. In India, that would take years. If MMRCA negotiations for the Rafale fail, on the other hand, and DRDO continues to fail at fielding even the Tejas Mk.1, the new BJP government may decide to take a second look at all of its options. Sources: India’s Business Standard, “Rafale contract elusive, Eurofighter and Saab remain hopeful”. May 18/14: Switzerland. Unsurprisingly, a tepid and convictionless defense of the Gripen fighter deal results in a referendum loss, with projections showing about a 53.4% no vote. The only surprise is that the margin was this narrow, indicating a winnable vote. Compare and contrast with the September 2013 referendum, which resulted in the Swiss keeping conscription. Or the government’s success in the referendum that ratified their F/A-18 Hornet buy. While some governments in Europe will re-run referendums until they get the result they like, the Swiss aren’t like that. The TTE fighter buy, and the unrelated referendum proposal to implement a SFR 22 (about $25)/ hour minimum wage, are both history. Switzerland will need to depend on French and Italian jets for basic airspace protection, and Sweden is very likely to end up buying Brazilian Super Tucano trainers instead of Swiss PC-21s. Sources: Swissinfo, “Swiss Reject $3.5 Billion Gripen Purchase in Blow to Saab” | Deutsche Welle, “Swiss referendum turns down minimum wage and new fighter jets” | Reuters, “Swiss voters narrowly block deal to buy Saab fighter jets: projection”. Referendum kills Swiss buy April 24/14: Weapons. Sweden has decided that they need KEPD 350 cruise missiles on their Gripens, but their politicians are doing a poor job explaining why. The semi-stealthy Taurus KEPD 350 cruise missile uses a combination of GPS navigation and Imaging Infrared final targeting, with a range of around 500 km/ 310+ miles. They’re integrated on Gripen, but Sweden has never bought any, even though Taurus is a consortium between Airbus, MBDA, and Saab Bofors Dynamics. Now Defence Minister Karin Enstrom is pushing for a purchase, as part of the governing center-right coalition’s proposals to strengthen Sweden’s defenses post-Crimea (q.v. April 22/14). She touts their “wider reach and the ability to fight distant targets,” adding that “high-precision capacity can also have a deterring effect”. What she doesn’t explain is why that’s necessary, leading observers to conclude that it’s because Germany (KEPD 350) and Finland (AGM-158 JASSM) have been buying such weapons. Overall, it’s a terrible explanation to a country who sees its defense policy as defensive-only, especially after the government’s own foreign minister said in 2013 that cruise missiles would “never be relevant” for that very reason. It also misses a critical military need, in the face of new advanced air defense missiles with ranges beyond 160 km. In order for Sweden’s Gripens to even fly over defended territory safely, Gripens need to be able to destroy enemy surface-to-air missile platforms that may threaten them, without entering their killing range. The KEPD 350 can perform this role, but the Gripen’s other integrated weapons cannot. If advance thought had been given, and Sweden’s military had outlined a “deep strike” doctrine aimed at the gathering places and logistics of any attacking force, advance consensus on an argument to establish that policy could also have served as a springboard for buying these missiles. Firing a “bolt from the blue” works well if you’re shooting live KEPD 350s. If you’re a politician, however, it’s just poor preparation. Sources: The Local – Sweden, “Sweden wants cruise missiles ‘for defence'” | Radio Sweden, “Analyst: events sped up cruise missile decision”. April 22/14: Finland. The Finns are looking ahead to eventual replacement of their upgraded F/A-18C/D Hornet fighters, which beat Saab’s early-model Gripens to become Finland’s first post-Russian fighters. The new discussion involves the JAS-39E/F and F-35A, and will probably involve other machines as well, depending on what’s still in production. But the politics are going to make your head spin. Helsinki Times: “Carl Haglund (SFP), the Minister of Defence, has rejected the proposal by Eero Heinaluoma (SDP), the Speaker of the Parliament, to acquire JAS Gripen fighters from Sweden in a bid to promote Nordic co-operation…. “Although I advocate co-operation with Sweden, we should not acquire Swedish JAS fighters when we could acquire American F-35 stealth fighters for roughly the same price. Performance must take precedence in the investment,” emphasises Haglund…. “There may be fewer aircraft than at present, but the price tag will be a minimum of five billion euros. A special funding is required.” Let’s leave aside that the F-35 won’t be roughly the same price, creating fleet size issues, and avoid the military arguments for each plane in light of Finland’s geography. SFP is the Svenska folkpartiet i Finland – Swedish People’s Party of Finland. You read that right. Finland has a Swedish cultural minority, which has often been part of the balance of power in Parliament, and Swedish is a recognized 2nd language that is taught in Finnish schools. As one might imagine, there are also some tensions under the surface. So, the prominent Social Democratic Party (SDP) is suggesting Gripens, but the influential Swedish party is saying no. On the other hand, how would it look if they just smiled and agreed to something this big? Sources: Helsinki Times, “Haglund advises against JAS fighter acquisition”. April 22/14: 10 more in Sweden? Party representatives from all 4 parties in the current center-right governing coalition make a public statement, officially committing to more defense spending in light of Russia’s recent actions. The increase would be about $760 million per year (SEK 5 billion), and the main beneficiary will be the submarine fleet, which would add 3 newly-designed boats to the 2 in operation. The second beneficiary will be the JAS-39E fleet, which would grow to 70 planes. The 3rd new priority would be an improved air defense system. In declining order of party seats, the spokespeople were Fredrik Reinfeldt (Moderate), Jan Björklund (Liberal People’s), Annie Loof (Centre) and Goran Hagglund (Christian Democrats). This is a minority government, which currently has a majority because of the Sweden Democrats, a right-wing populist party that’s described as ultra-nationalist, but includes an influential contingent of Chaldean Christians who immigrated from the Middle East. The party is outside the formal governing coalition, but very disinclined to vote with the left-wing opposition parties. Sources: Dagens Nyheter, “Sa vill regeringen starka forsvaret” | The Local – Sweden, “Sweden to beef up air force to counter Russia”. April 18/14: Update. JAS-39E/F testing seems to be focused on components so far. A much-modified JAS-39D (aircraft #39-7) is the primary component test bed, with upgraded avionics including a digital HUD, a production-standard ES-05 Raven AESA radar, and the SkyGuard IRST. Saab is currently assembling aircraft #39-8, a more representative test prototype of the JAS-39E/F that’s due to fly in 2015. Aircraft #39-9 is due to join the test fleet in 2016 as a primary system testbed, while aircraft #39-10 is due to fly in 2017 in the final JAS-39E configuration with the production-standard weight. Sources: Selex ES, “Selex ES Advances Gripen Systems”. April 16/14: EW. Finmeccanica subsidiary Selex ES says that tests involving a fighter and ground radars have cleared the way for production of their BriteCloud decoys, which contain DRFM active jammers and are are shot out of a dispenser instead of being towed behind the aircraft. That dispensing method creates larger miss distances for missiles that home in on the decoy, which is very helpful against proximity fuse warheads. It also eliminates added drag on the fighter. The flip side is that you don’t get the decoy back, but cylindrical BriteCloud decoys are the same size and shape as a flare, and can be dispensed from a standard 55mm flare cartridge. That kind of capability is predictable given the advancing power of electronics, but realizing it is a big technological step forward. Britecloud will be part of the JAS-39E/F’s defensive systems, and is also available as an upgrade to existing JAS-39A-D fleets. Sources: Selex ES, “Selex ES successfully demonstrates BriteCloud Expendable Active Decoy technology”. April 4/14: Sensors. Saab announces the first flight with the new Selex ES SkyGuard long range Infra Red Search and Track sensor, which can pick up other aircraft using heat instead of radar. Now all they need is a beyond visual range air-to-air missile that can take full advantage, like the French MICA IR or Russian R-27T/ AA-10T. Sources: Saab, “Saab successfully completes flight test with IRST for Gripen E”. April 3/14: Slovakia. The Czech Republic’s Lidove Noviny writes that working groups are finalizing the details regarding major cross-cooperation with the Slovak Air Force, which currently flies 8 MiG-29s (2 trainer, 6 front-line) but is discussing a Gripen lease. Key goals include cross-border operations for in-process missions like air policing intercepts, and full cross-servicing of each other’s fighters. Obviously, that will become a lot easier if Slovakia leases the same planes. The newspaper adds that if Slovakia does lease Gripens for operations after the MiG-29s’ service agreement expires in 2016, a joint Czech and Slovakian fighter squadron would be formed, with one main and one minor air base. Sources: Prague Post, “LN: Czech, Slovaks to connect their fighter squadrons”. April 2/14: Espionage. Saab Switzerland spokesman Mike Helmy confirms that “Secret services have attempted to intercept our communications,” driven by unnamed states on behalf of their industries. Saab Switzerland is a very logical target. A new customer for an advanced weapon, busy sharing a lot of industrial data as they look to line up manufacturing partners, gives new meaning to the phrase “I’d tap that.” Sources: Swiss RTS, “Le groupe suedois Saab, constructeur du Gripen, se dit victime d’espionnage”. March 18/14: Malaysia. Reports suggest that just 3 manufacturers will submit leasing options in response to a Malaysian RFI. Saab will submit a bid of up to 24 fighters and 2 S340 AEW aircraft through Saab International Malaysia Sdn Bhd, addressing 2 Malaysian needs at once. Boeing (F/A-18F) and BAE (Eurofighter Typhoon) have reportedly submitted bids as well, but neither has Saab’s military leasing experience. Dassault has reportedly declined to participate with its Rafale, while Sukhoi’s status (RMAF flies SU-30MKMs) is unclear in the absence of a response. Malaysia will have to look at the bids, and decide if they’re willing to even lease new fighters as replacements for the RMAF’s dwindling MiG-29N fleet. In the wake of the mysterious Malaysian Airlines FLT 370 fiasco, however, Saab’s offer of AEW aircraft may give both the company and the program a higher profile in Malaysia. Sources: The Malaysian Reserve, “Three fighter jet makers to submit leasing bids” | TIME Magazine, “Another Lesson from MH370: Nobody is Watching Malaysian Airspace”. Feb 12/14: Thailand. Flight Global says they’re a happy customer, and may want to boost their fleet to 18: “Saab is in discussions with Thailand for six additional Gripen C/D fighters, the Swedish company says. In a press briefing, Saab Asia-Pacific president and chief executive Dan Endstedt said talks are ongoing. He did not give a timeframe for the possible acquisition, but says that he hopes the deal “happens soon”.” Sources: Flight Global, “SINGAPORE: Saab looks for additional Thai Gripen sale”. Feb 4/14: JAS-39F. IHS Janes reports that Brazil wants both single-seat and two-seat variants, unlike Sweden or Switzerland. Perhaps there will be a JAS-39F after all: “Saab has confirmed to IHS Jane’s that Brazil’s aerospace industry will be given the opportunity to develop a two-seater version of the Gripen NG as part of the USD4.5 million consignment of 36 fighter aircraft…. Out of the 36 fighter jets under the FAB F-X2 programme, eight of the aircraft will be twin-seat Gripen Fs and the rest [DID: 28] will be in the single-seat Gripen Es.” That would increase Brazil’s workshare, and give them a solid design role, but it also increases costs. Negotiations will be interesting. The other question involves weapons. The JAS-39D eliminates the 27mm cannon found in the JAS-39C, and it remains to be seen whether the JAS-39F will follow the same pattern. Sources: IHS Jane’s 360, “Saab confirms twin-seat Gripen F development for Brazil”. Jan 17/14: Swiss referendum. Switzerland’s Federal Council announces that the TTE program’s national public referendum will be held on May 18/14, as a yes/no vote re: the Swiss Gripen Fund Law approved by Parliament. The opposition still has to collect 50,000 signatures first, but an organized group is unlikely to fall short of that goal on a high-profile issue, while supported by sitting political parties, in a country of 8 million people. They make it. Subsequent developments show a pattern wherein the Swiss parties supporting the deal, Sweden, and Saab all abandon the political field under trumped-up pressure, effectively conceding the legitimacy of their argument. The government looks set to lose, even though the Swiss air force was off duty during an airline highjacking in the middle of the referendum. The hijacking had to be handled by Italian and French fighters. Read “Switzerland Replacing Old F-5 Fighters with New Gripen-E” for full coverage. Jan 8/14: Slovakia. Slovakia is reportedly leaning toward JAS-39 fighters as a replacement for its MiG-29s. They might be able to get second-hand F-16s or Kfirs for less, but the JAS-39’s low maintenance costs are very attractive, and they want to cooperate with the Czech Republic. Flying the same jets offers them the ability to share costs and services at a much deeper level. Slovakia currently fields 9 L-39 Albatros light attack planes, plus 3 in storage, and reportedly has 6-12 flyable MiG-29s. They’ve never bought fighters as an independent state – what they fly is what’s left of the fleet that was received in their “Velvet Divorce” with the Czech Republic. Sources: MINA, “Slovakia to replace Mig29s with Swedish JAS39”. Jan 7/14: Indonesia. Indonesia wants to replace its 11 remaining F-5E/F Tiger II light fighters with 16 modern aircraft. Defense Minister Purnomo Yusgiantoro confirmed that they “have received proposals from several jet fighter manufacturers,” and are evaluating them. Indonesian Military Commander General Moeldoko added that the TNI-AU has studied the SU-35, F-16, F-15, and JAS-39 Gripen. Moeldoko wants the requisition plan included in Indonesia’s Strategic Plan II for the 2015 – 2020, but the air force’s choice will also depend on available funds. The F-15 is significantly more expensive than other options, and if the air force wants 16 fighters, the state of Indonesia’s economy will influence what they can buy. Sources: Antara News, “Defense Ministry looking to replace aging F-5 tiger fighter aircraft”. Jan 2/14: Czech. The Czech government has negotiated its next lease period for their JAS-39C/D Gripens. The new deal will have a longer lease term (12 years + 2 year option), and annual payments about 31% lower. It would be interesting to know how the lease-to-buy program has been affected by these changes, and to have clarity regarding the terms of ongoing aircraft modernization. The catch is that October’s elections upended Czech politics, in the wake of scandals involving ex-PM Petr Necas and the PMO’s chief of staff that included an affair, using military intelligence to keep an eye on his estranged wife, and possible payments to legislators who resigned in advance of a critical non-confidence vote. The ODS party went from 2nd place to 5th, and its allied parties also lost ground. The new center-left government will be headed by the CSSD (Social Democrats), and includes the ANO protest party and the KDU-CSL Christian Democrats. The outgoing government could have signed the deal, but decided to leave it to the new government on the grounds that it’s a strategic decision. The new government approves the deal on March 12/14 – see “Contracts” section. Sources: Wikipedia, “Czech legislative election, 2013” | Czech Ministerstvo obrany, “Vlada schvalila prodej letounu L-159, prodlouzeni pronajmu gripenu prerusila”. 2013 Formal Swedish Gripen NG approval – with conditions; Swiss government approves Gripen NG; Gripen NG picked in Brazil; Denmark competition starts up again; Serious about Sea Gripen; Work begins to build the JAS-39E; No Gripen weapon school in South Africa. Gripen-F Demo (click to view full) Dec 18/13: Brazil. Earlier press reports that the competition was stalled for another 2 years are proven wrong by a somewhat unexpected announcement by the Ministerio da Defesa that Brazil has picked Saab’s Gripen-NG as their preferred bidder, and expects to buy 36 planes for $4.5 billion. That’s currently just an estimate, as negotiations need to sort themselves out. A final contract and financial arrangements are expected in December 2014, and deliveries are expected to begin 4 years later. That’s a challenge for Saab, as any schedule slippage in the development program would create a late delivery. Late fees can be expected to be a negotiating point, and Brazil’s MdD says that leasing JAS-39C/D Gripens as an interim force may be addressed in the negotiations as a 2nd contract. The Gripen NG contract figure tracks exactly with previous reports by Folha de Sao Paolo, which means an additional $1.5 billion contract can be expected for long-term maintenance and support. Saab was the cheapest of the reported offers, beating Boeing ($5.8 billion) and Dassault ($8.2 billion, reportedly reduced) by significant margins. Once Edward Snowden’s revelations of NSA spying on Brazil’s government killed Boeing’s chances, there was no middle ground. The Rafale’s reported $10.2 billion purchase + maintenance total made it 70% more expensive than Saab’s Gripen. Brazil’s economic slowdown, and the Rousseff government’s focus on entitlement spending, made that cost chasm a big factor. It wasn’t the only factor. The Gripen has Ministry statements indicate that industry’s long-standing preference for Saab’s industrial terms played a role, as Gripen-NG offers the prospect of participating in a new fighter’s design. So, too, did the unique prospect of full access to weapon integration source code, which the Ministry cited in its Q&A. That will allow Brazil to leverage its revived arms industry, and easily add weapons like Mectron’s MAR-1 radar-killer missile. Throw in the ability to participate in the future design of a carrier-based Sea Gripen variant to replace ancient A-4 Skyhawks on Brazil’s carrier, and Saab’s industrial combination overcame the Gripen’s reliance on an American engine and other equipment. The Brazilian Air Force has a dedicated website to explain its choice. Dassault issued a terse statement pointing out the presence of US parts on Gripens, and positioning the Rafale in a different league. Which may be true, but it’s also true that global fighter buys have historically been heavily weighted toward a less-expensive league. Sources: Brazil MdD, “FX-2: Amorim anuncia vencedor de programa para compra de novos cacas” | MdD, “Perguntas & Respostas sobre a definição do Programa F-X2” (Q&A) | Dassault, “FX2 contest – 2013/12/18” | Folha de Sao Paulo, “Dilma agradece Hollande por apoio contra espionagem dos EUA”. Brazil picks Gripen NG Dec 6/13: Not in T-X. Boeing and Saab AB sign a Joint Development Agreement (JDA) to jointly develop and build a new advanced, cost-efficient advanced jet training solution for the USA’s upcoming T-X competition to replace the U.S. Air Force’s aging supersonic T-38s. The JDA has Boeing as the prime contractor and Saab AB as primary partner. Its scope covers design, development, production, support, sales and marketing of “a completely new designed aircraft, built to meet the needs of the Air Force.” While Boeing’s predecessor companies did take Northrop’s YF-17 and develop it into the “new” F/A-18 Hornet, Boeing clarified to DID that their offering would not be derived from the JAS-39. Sources: Boeing, “Boeing and Saab Sign Joint Development Agreement on T-X Family of Systems Training Competition”. Nov 26/13: Qatar. La Tribune cites a number of French export opportunities in Qatar, where the JAS-39 Gripen reportedly wasn’t even invited to bid. That helps France’s Rafale, and so does the USA’s failure to approve export requests in time to respond to the fighter RFP. At least 1 bid from an American manufacturer is expected, but Qatar already uses French weapons on their existing fleet of 12 Mirage 2000-5s, and they are a strong French defense customer generally. If Qatar really does want a mixed fleet, per some reports, the Rafale’s competition narrows to only the Eurofighter. Sources: La Tribune, “La France au Moyen-Orient (3/5) : le Qatar premier client du Rafale?”. Sept 18/13: Switzerland. The Swiss upper house (Ständerat, or Council of States) votes 27 – 17 in favor of the Gripen fighter deal, following a 119 – 70 – 5 vote in the Swiss National Council. That completes elected political approval, but the deal is very likely to need approval in a countrywide referendum. If so, May 2014 is crunch time. Sources: SBC’s SwissInfo: “Gripen go-ahead: Fighter jets given parliamentary all-clear” | Saab Group, Sept 18/13 release. Sept 12/13: Czech Republic. After over a year of negotiations, the Czech Government has agreed on terms to lease its 14 Gripen aircraft (12 JAS-39C, 2 JAS-39D) for another 14 years, to 2029. The next step is for the contract to be detailed and then formalized in a signed agreement. The current 10-year, CZK 19.6 billion (about $1.033 billion) lease-to-buy arrangement lasts until 2015, so there’s no urgent rush. Still, it’s nice to settle the issue after a long period of proposed interim extensions (q.v. Feb 14/12), threats to end the lease (q.v. March 15/13), etc. The new Rusnok government appeared eager to settle the issue on a long term basis (q.v. July 15/13), and has successfully created a framework for doing so. Source: Swedish FXM export agency, Sept 12/13 | See also Saab, “Gripen for the Czech Republic”. Czechs agree to new 14-year lease terms Sept 11/13: T-X? Aviation Week reports that Boeing may abandon its push for a clean-sheet advanced jet trainer design, and hook up with Saab to offer a Gripen variant for the USA’s T-X. Subsequent comments from Saab EVP Lennart Sindahl that “We remain focused on the continued development of the Gripen E and the fighter will never be a trainer” make sense from a branding point of view, but Sindahl adds that Saab is open to new business opportunities, and using 2-seat JAS-39Ds as the base would offer an interesting recycling of Saab’s last-generation design. There’s no doubt that a JAS-39 Gripen, which is flown by Britain’s Empire Test Pilot School, can effectively simulate the most advanced jets. It comes built for supersonic speeds and high Gs, with a helmet-mounted sight, modern weapons, and proven low operating costs. Even with a lower-end radar than AESA-equipped front line variants, it would serve well as a swing-role entrant that could fly Air National Guard (ANG) roles for domestic emergencies. It could also function as an excellent aggressor aircraft, providing capabilities that equal or exceed existing F-16C aggressors at a lower operating cost. F-22s are already using much more primitive T-38s as opponents in order to keep operating costs down, so having Gripens on hand would be a notable upgrade. Those capabilities set Gripen apart from the General Dynamics/ Alenia M-346, but not from the Lockheed Martin/ KAI T-50, whose TA-50 and FA-50 variants can perform air policing and aggressor roles at a lesser but possibly adequate level. That’s why price is likely to be the key for Saab – and for Boeing. On the one hand, the notional T-X order of 300 planes would double total Gripen production since the fighter’s inception, creating some economies of scale for a JAS-39T. Boeing can already deliver the significantly larger, twin-engine Super Hornet for around $60 million; still, in order to beat competitors hovering around $30 million, they’ll need to do more than just use 1 GE F404 engine and a cheaper radar. Sources: Aviation Week, “Boeing And Saab To Propose Gripen For T-X”. Sept 4/13: Operating Costs. South Africa’s iOL News offers a snapshot of JAS-39C/D operational costs per flight hour (CPFH) for the South African Air Force. That’s a tricky area, for 3 reasons. The 1st is that there’s no standard formula, so different militaries can include different costs. The 2nd twist is that the SAAF fleet’s small size increases “dry” costs per flying hour, as fixed costs are amortized over fewer planes. The 3rd twist is unique to low-readiness countries like South Africa, who spend more per flight hour because they allocate few flight hours, but still have to maintain all of the jets. Even with all these caveats in mind, it’s still an interesting data point, especially alongside its comparison to a popular platform: “[SAAF Director of Combat Systems] General John Bayne… said the “dry costs” (without fuel) for a Gripen were R104 600 per flying hour and fuel cost R30 800, giving a total “wet cost” of R135 400. Hawks fly at a dry cost of R67 500, with fuel costs of R15 400 and a total cost of R82 900…. “To date the Hawks have flown over 10 000 major accident-free flying hours since 2005 and the Gripens 3 500 since 2008,” said Bayne.” At current exchange rates, that translates into JAS-39C/D flying-hour costs of about $10,465 dry and $13,350 wet; both are wildly higher than IHS Jane’s Aerospace and Defence Consulting’s 2012 estimate of $4,700 per flight hour. The same study’s figures for the F/A-18E/F Super Hornet help provide some perspective, however, with a base US Navy Super Hornet figure of $11,000 CPFH, but $24,400 listed for Australia. Fortunately, we have a 2nd set of SAAF data points from a more popular platform. Gen. Bayne’s figures for the sub-sonic Hawk Mk.120 trainer & light attack jets translate to $6,755 dry and $8,295 wet. One good way to normalize Gripen figures for prospective customers is probably to create a ratio involving in-service Hawk trainers under similar circumstances vs. SAAF costs, then adjust from there. Source: iOL, “SAAF jets aren’t in storage, says general” | StratPost, “Gripen operational cost lowest of all western fighters: Jane’s”. Operating Costs July 24/13: Netherlands. Financieel Dagblad reports that Saab’s final offer to the Dutch government included penalties for late delivery. A reasonable move, given that the F-35 is about as close to operational capability now as it was 5 years ago. To make things more interesting, Rekenkamer estimates are saying that the country’s EUR 4.5 billion acquisition budget is likely to buy just 33-35 F-35As, instead of the 85 fighters originally planned. Dutch News. July 18/13: South Africa. DefenceWeb quotes Saab South Africa President Magnus Lewis-Olsson, who tells them that the SAAF’s interim Gripen support contracts ended in April 2013. Saab was hoping to get a support contract in place within the next few months, but if it doesn’t, SAAF personnel can only provide front-line maintenance. Over time, their fleet will become unable to fly. defenceWeb | DID: “South Africa’s Sad Military: Why Maintenance Matters.” July 17/13: Weapon School. Saab South Africa President Magnus Lewis-Olsson tells defenceWeb that a planned global Gripen Fighter Weapon School in South Africa (q.v. July 10-18/12) represents a missed opportunity for the country. The 1,000 square meter training HQ would have been at AFB Overberg in the Western Cape, which Saab liked for its central location and available flight space. The course would have used a mix of Swedish and South African pilots, keeping those SAAF pilots current, and reimbursing the SAAF for the use of 4-6 Gripens that aren’t flying anyway due to budget cuts. Oddly, the South African National Defence Force (SANDF) didn’t move to support the initiative, and in fact seemed to campaign against it. Meanwhile, Saab has completed its syllabus and is ready to begin construction of the School and start training. Other countries have expressed interest, and Saab will be moving forward. defenceWeb. July 15/13: 1st JAS-39E. Saab announces that they’ve begun building pre-production test aircraft 39-8, the 1st complete pre-production version of the JAS-39E. They’re beginning with the front fuselage, as part of manufacturing and assembling of all parts of the fuselage. After the fuselage join comes the installation of cables, mount systems, the outer shell and other equipment. Other parts of the airplane are also being assembled during this process, and they will eventually be joined to or installed in the fuselage. Saab. July 12/13: Czech Republic. The new Rusnok government’s defence minister Vlastimil Picek says that he’ll submit a proposal for extending the Czech Republic’s JAS-39C/D Gripen lease after the Chamber of Deputies’ expected vote of confidence in early August 2013. Military deputy chief-of-staff Bohuslav Dvorak added that the next lease would be longer than the 10-year lease signed in 2004. The reality is that the Czech defense budget dropped 25.6% in absolute terms from 2005 – 2012, from CZK 58.44 billion to 43.47 billion and down to about 1.1% of GDP. The dueling imperative are that the Czech Air Force can’t realistically switch to another fighter, given the costs of new training, spare parts, etc. At the same time, they need to negotiate a deal they can afford within that small budget. Prague Daily Monitor | Defense News re: budget comparison. May 15/13: Sea Gripen. Saab remains serious about its “Sea Gripen NG,” and has been working on the idea since their May 2011 announcement. They’re targeting India, Italy and the UK alongside Brazil, but India has picked the MiG-29K, and is developing their own lower-tier naval LCA fighter. Italy and the UK both seem committed to the F-35B. The leaves Brazil, where a Sea Gripen may be necessary, in order to compete for F-X2. Brazil’s Navy is expected to buy its own fighters to equip a new aircraft carrier, which is expected to replace NAe Sao Paulo around 2025. They expect their 24 new fighters to be the same type as the FAB’s F-X-2 winner, which leaves Saab competing against 2 proven naval fighters in Boeing’s F/A-18 Super Hornets and Dassault’s Rafale-M. To help build their case, former Brazilian naval aviator Comte. Romulo “Leftover” Sobral is invited to flight test a JAS-39D, in order to verify the design’s basic suitability for naval conversion. Sobral liked the aircraft’s intuitive flight controls, ground handling, stability at low airspeeds, acceleration response, handling at the high angles of attack used in carrier landings, and good visibility. He even liked the flight suit. The plane landed in 800m, and Comte Sobral believes that the plane does have the basic requirements to become an effective naval fighter. The Sea Gripen’s lack of proven status, and absence of even a flying prototype, will still hurt the JAs-39. On the other hand, the time lag from F-X2 to a naval buy gives Brazilian industry a unique opportunity to participate in designing the Sea Gripen. Saab Gripen Blog | Full article at Defesa Aerea & Naval [in Portuguese]. April 10/13: Brazil. Saab executive Eddy de la Motta is quoted as saying that Brazilian JAS-39 Gripen NGs would use AEL’s avionics, creating a forked version under the wider development effort. This will help Saab meet industrial offset obligations, and also create commonality for Brazil’s fighter fleet, but integrating all of those components with the plane’s mission computers, OFP core software, weapons, etc. is not a trivial task. Elbit subsidiary AEL’s avionics are used in many Brazilian aircraft, with the exception of the Mirage 2000s that will retire as F-X2 fighters enter the FAB. A less comprehensive suite of AEL avionics will also be used in Boeing’s F/A-18 International, which offers AEL’s wide-screen display and some other components to all potential customers. Defense News. March 13/13: Denmark. The Danes pick up their fighter competition as promised, following their announced hiatus in April 2010. Invited bidders include the same set of Lockheed Martin (F-35A), Boeing (Super Hornet), and Saab (JAS-39E/F) – plus EADS (Eurofighter), who had withdrawn from the Danish competition in 2007. The goal of a 2014 F-16 replacement decision has been moved a bit farther back, and now involves a recommendation by the end of 2014, and a selection by June 2015. The Flyvevabnet are reported to have 30 operational F-16s, with 15 more in reserve, out of an original order of 58. Past statements indicate that they’re looking to buy around 25 fighters as replacements, but there are reports of a range from 24-32, depending on price. Danish Forsvarsministeriet [in Danish] | Eurofighter GmbH | Saab | JSF Nieuws. March 8/13: Brazil. Brazil has asked the 3 F-X2 finalists to extend their bids for another 6 months from the March 30/13 deadline, as the Brazilian commodity economy remains mired in a 2-year slump. The competitors had hoped for a decision by the time the LAAD 2013 expo opened in April. The length of the cumulative delays could create changes for the bids, and it effectively squashes any faint hopes that the new jets would be able to fly in time for the 2014 World Cup. Reuters. March 15/13: Czech Republic. Czech Prime Minister Petr Necas says that the latest Swedish contract extension offer doesn’t meet Czech “expectations,” and makes noises about a competition to choose different fighters. He’ll repeat that line in July, as negotiations continue. Ceske Noviny. March 13/13: South Africa. Opposition Democratic Alliance MP David Maynier forces the ANC government to acknowledge that 12 of its 26 delivered JAS-39/C/D fighters were in long term storage, and sums up the situation this way: “The sad facts of the Gripen system are as follows: 26 Gripen fighter jets were delivered; 10 or fewer are operational; 12 are in long-term storage; there are six qualified pilots; there are about 150 flying hours available to the entire squadron for 2013.” Read “South Africa’s Sad Military: Why Maintenance Matters” for full coverage. Jan 17/13: Sweden. The Swedish government gives formal approval to the planned purchase of 60 JAS-39E/F fighters, a bit more than a month after the Swedish Riksdagen voted 264-18-19 in favor. This isn’t an order, just approval to negotiate one – and there’s a big condition attached. If Switzerland backs out, and there are no orders from other countries, the Swedish deal will also die. The SEK 47.2 billion framework contract is announced on Feb 15/13, see contracts section for more. Saab’s Gripen blog | Sweden’s The Local | Aviation Week | UPI. Swedish approval – with conditions 2012 Sweden votes for JAS-39E/F; Czech extension; Swiss pick; South Korean opportunity declined. Sea or Land attack (click to view full) Dec 10-13/12: Testing. Swedish and Swiss pilots successfully test the Gripen-F Demo, and its new AESA radar, at Linkoping in Sweden. Swiss DDPS [in French] | Saab’s Gripen blog Dec 6/12: Swedish vote. Sweden’s Riksdagen votes 264 – 18, with 19 abstentions, to approve the JAS-39E/F Gripen Next-Generation program. The total estimated cost, including maintenance and operation, is estimated to SEK 90 billion up until 2042. Swedish FXM | Saab’s Gripen blog. Sept 23/12: Malaysia. RMAF chief Tan Sri Rodzali Daud tells The Sun Daily that Saab’s offer to lease 18 JAS-39 Gripens is under serious consideration, as a lower cost alternative to buying MiG-29N replacements. Other sources had told the paper that the Gripen and the RMAF’s existing SU-30MKM fighter had been eliminated in technical tests, but Daud stressed that all competing aircraft were still under consideration. He added that a special budget might be necessary to fund MRCA, and that operating and maintenance costs would play a big role in the RMAF’s choice. Indeed, O&M costs have been the main reason behind Malaysia’s desire to retire its MiGs. If those criteria turn out to be accurate, then the SU-30MKM’s installed maintenance base, and Gripen’s proven design for low operating costs, could give them an important advantage over the Eurofighter and Rafale in Malaysia. Boeing’s F/A-18E/F Super Hornet would fall somewhere in between. It’s more expensive to operate than the Gripen, and doesn’t have much commonality with Malaysia’s F/A-18D Hornets, but the joint base at Butterworth, Malaysia would offer Super Hornet interoperability with Australia. Just as the Gripen would offer interoperability with neighboring Thailand. Sept 21/12: Sweden. Sweden’s government presents its 2013 budget request to Parliament, which includes the planned SEK 300 million (about $46 million) to begin paying for Gripen E/F development. The challenge is that the agreed formula of SEK 300 million in 2013-14, and SEK 200 million thereafter, only gets them to SEK 2.3 billion by 2023. Unfortunately, the Swedish Forsvaret now says that the Gripen E/F program is expected to cost “cirka fem miljarder kronor” (about SEK 5 billion) above and beyond the current 10-year plan, and the plane is scheduled to enter service by 2023, 10 years after development funding begins. To us, that sounds like “half funded”; we’ve asked the Forsvaret to clarify. Swedish Forsvaret [in Swedish] | Swiss DDPS [in German]. July 10-18/12: Pilot school? Saab says that they’re moving to establish a new global Fighter Weapons School for Gripen pilots at the SAAF’s Overberg base, in the southern Cape area, along with the Swedish and South African air forces. The first class is said to be targeting an October 2013 opening. Aviation Week: “A former site for secret South African/Israeli missile tests, Overberg hosts the SAAF’s test squadron and was chosen because it offers access to maritime, desert and high-elevation training areas, live ordnance areas and instrumented ranges with land targets… The SAAF will provide the school with [4-6] JAS 39C/D Gripens, plus aggressors (opposition aircraft) and targets if necessary, and each student will fly 20 day and night sorties. Discussions with other Gripen operators have already started. Airborne early warning and control aircraft or tankers could be added later.” The South African National Defence Force (SANDF) follows with a sharp rebuke: “We would like to place on record that there has never been any discussion between SAAB and the SANDF. It is with dismay that we read such in the media when no interaction whatsoever with regard to the purported school. The Air Force Base Overberg is a sensitive security establishment of the SANDF and will remain solely in the hands of the SANDF. The suggestion therefore that such a school will be established is devoid of truth.” Saab tells defenceWeb that it remains 100% committed to the project, and says that the SAAF was onboard and supportive, “but final and formal approval with South African government bodies is still outstanding.” Saab | Aviation Week | defenceWeb. July 10/12: Weapons – Meteor schedule. The Gripen will be the 1st plane integrated with MBDA’s Meteor long-range air-to-air missile, and the plane’s role during the last 6 years of firing trials could allow an early finish in 2013, instead of the planned 2014 operational date. Subsequent revelations place the Eurofighter’s operational date with Meteor within 2017, and the Rafale’s in 2018. MBDA has undertaken 21 test firings to complete the development program, is about the deliver a final performance statement that it’s “fully compliant from a lethality and kinematic point of view”, and is building the first production missiles. Aviation Week. June 18/12: JAS-39E/F. Aviation Week’s Bill Sweetman reports from an aerospace conference at Sweden’s Malmen AB, where they’ve discussed details of the JAS-39E/F. They’re hoping that the first 2 development aircraft can fly in late 2013. The plane’s new sensor set, avionics, and mission computer will be designed so that they can also serve as JAS-39A-D upgrades. The airframe is another matter. Sweetman describes the airframe as “largely new” compared to the JAS-39C/D, with new mid and aft fuselage sections, and widened blended wing-body sections, based on the design and lessons from Gripen Demo. The overall description involves a longer and slightly wider fighter that maintains the same wing loading, despite a gross weight increase over the JAS-39C/D that has reached 5,000 pounds. It’s also supposed to supercruise with weapons, using divertless inlets. Even with a new engine for those inlets to feed, however, the extra weight will make armed supercruise a challenge. The F414 EPE, which adds more thrust, is reportedly under discussion, but configuring the EPE for more thrust will penalize range. Feb 29/12: JAS-39E/F. Sweden’s armed forces publish a report recommending that at least 60-80 JAS-39E/F Gripens be present in the future Swedish air force, with new aircraft beginning to arrive in 2020 and the entire effort lasting until 2030 or so. The military said its aim was to split the upgrade cost with “at least one other strategic partner country,” but did not reveal whom. It eventually becomes clear that the partner is Switzerland. This sort of arrangement would usually mean new-build planes, given the extent of the changes, but Saab itself talks about upgrades, and so have earlier reports (vid. Jan 26/12). Either way, Swedish acceptance would stabilize the future of its next-generation Gripen project. Swedish media talk about a SKR 30 billion (about $4.5 billion) project, though the military isn’t discussing any firm estimate yet. Saab | Sweden’s The Local. Feb 14/12: Czech mates. The Czech Republic’s government has reportedly decided to pursue a 5-year extension of the 10-year, CZK 19.6 billion (about $1.033 billion) lease-to-buy for its 14-plane JAS-39C/D fighter fleet, rather than opting for an immediate replacement tender. Czech defense minister Alexandr Vondra said that he didn’t expect Czech-Swedish negotiations to last longer than 4 months, but they have. The net effect is to freeze the Gripen as the country’s intermediate-term fighters, and make the Czechs’ long-term fighter fleet plan an issue for a follow-on government. Subsequent negotiations and a new government would later change the country’s plans. Ceske Noviny | Ottawa Citizen. Feb 13-14/12: Swiss 2009 evaluation leaked. The confidential 2008/2009 Swiss Air force evaluation results are publicly leaked. Its verdict that the Gripen didn’t meet minimum Swiss requirements for its future fighter directly contradicts earlier statements from Swiss military and political leadership that all 3 planes on offer had done so. This leaves the entire basis of the Swiss selection open to question, and pressure is building across the political spectrum. In response, the Swiss have stated that they’re still open to formal offers, essentially touching off another round of bidding. Officials have staunchly defended their pick in the meantime, saying that it met Swiss requirements by the time the final offer was evaluated. Saab’s public stance reinforces both tracks, saying that they are finalizing Switzerland’s JAS-39E/F configuration, while dropping strong hints that they will lower their price in response to Dassault’s maneuvers (vid. Jan 29/12). DID has confirmed that at least 2 key attributes did change between the report and the award: the Gripen’s ability to hit multiple targets in one pass, using newly-integrated GPS-guided weapons; and an operational helmet-mounted display. Read “Switzerland’s F-5 Fighter Replacement Competition” for full coverage, including report excerpts. Jan 31/12: India loss. Dassault’s Rafale is picked as the “L-1” lowest bidder for India’s 126-aircraft M-MRCA deal, even after the complex life-cycle cost and industrial calculations are thrown in. Next steps include the negotiation of a contract, in parallel with parliamentary approval and budgeting. Until a contract is actually signed, however, India’s procurement history reminds us that even a “close” deal is just 1 step above a vague intention. The contract may take a while. Even the French government sees a deal as only an 80% probability within 6-9 months. The budgeting is likely to be even trickier. The IAF’s exclusion of cost considerations in picking its finalists means that the only question now is: how far over the stated budget will a full Rafale buy go? Some reports place the deal’s cost at around $15 billion – an increase of up to 50% from previous estimates. If economic downturns or squeezed defense budgets make those outlays a big enough issue, early enough in the process, it could have the effect of re-opening the competition. British PM David Cameron has expressed an intent to change India’s mind, and both Saab and Boeing are still positioned within India, in order to be ready for a renewed opportunity. In a competition that’s re-opened for financial reasons, the Gripen would have much better odds. Read “India’s M-MRCA Fighter Competition” for full coverage. Jan 29/12: Switzerland. Dassault makes Switzerland a new final offer, after the competition: 18 Rafale fighters for SFR 2.7 billion (EUR 2.24 billion, $2.96 billion), instead of 22 Gripens for SFR 3.1 billion. On a per-plane basis, that’s 17.5% less than Dassault’s reported “final” RFP offer of SFR 4 billion for 22 Rafales. The offer is aimed at the Swiss parliament, but the way it was handled looks set to create plenty of enemies. Parliamentary discussions are expected to begin in mid-February. Jan 29/12: South Korea. The Korea Times quotes a DAPA spokesman, who confirms that Saab submitted an application to attend the F-X-3 fighter program’s mandatory explanatory session. They were joined by Boeing, Lockheed Martin, and EADS. The report adds that DAPA doesn’t see the Gripen as likely to meet its competition’s requirements. Then again, that’s what explanatory sessions are for. Saab itself told the newspaper that it hadn’t decided whether or not it would bid. When the bids are submitted, Saab isn’t among them. Jan 26/12: Swedish JAS-39E/Fs? Defense News reports that the Swedish government will soon begin examining a proposal from Swedish Air Force Command to upgrade 100 Gripens to next generation status: “Some 20 possible new configurations for a Gripen E/F version are being examined by Saab, the AFC and FMV… The AFC advocates that the Air Force’s stock of C/D version Gripens be upgraded on a phased basis to spread the total cost over a five- to 10-year budgetary period. The AFC views the impending government decision, which it anticipates will be made in March, as the most critical funding issue facing Swedish defense.” Jan 26/12: Switzerland. An anonymous letter from a “Groupe pour une armee credible et integree” alleges that Switzerland’s benchmark fighter tests had their results manipulated. The accusations are seen as being detailed and specific enough to prompt Switzerland’s parliamentary sub-committee for security policy to investigate further. 24 Heures [in French]. Jan 5/12: Czechmate? Financial Times Deutschland reports that Germany is looking to sell some of its used Eurofighters to Eastern European countries, at the cut-rate price of EUR 60-80 million each. The Czech Republic, Croatia, Slovakia and Romania are named. Even that price is likely to be rather steep for these countries, in comparison to alternatives like used F-16s, unless Germany can propose substantial savings on training and maintenance. Czech defense ministry spokesman Jan Pejsek says that: “I can completely exclude that talks have taken place, even a [informal] probing.” Meanwhile, allegations that the CSSD government’s original deal to buy 24 JAS-39 fighters may have been marred by corruption, is creating uncertainty around the possible 2015 renewal of the 12-year, CZK 20 billion (now around $1.04 billion), 14-plane Czech lease-to-buy deal. The current OSD government is reportedly very cool to the idea, and may be considering less-capable options like the American F-16. Czech Prime Minister Petr Necas said in June 2011 that it would be difficult to imagine renewing the contract until the corruption investigation was concluded, and recently added that the country’s deteriorating economic situation would have to be taken into account when making this choice. Czech Position. 2011 Swiss win; India elimination; Doing the Brazilian limbo; Competition in Croatia; RM12 engine upgrades; Cobra HMD operational; Thais operational; Sea Gripen started. Swiss takeoff (click to view full) Dec 1/11: Swiss win. Switzerland announces their choice – and it’s Saab’s JAS-39 Gripen. Swiss Defence Minister Ueli Maurer estimates the cost of the envisaged deal at up to CHF 3.1 billion (currently $3.5 billion, probably more by 2014), for 22 planes. The DDPS explicitly stated that Gripen also won because it offered lower maintenance costs that made it affordable over the medium and long term. The deal includes a provision for 100% value industrial offsets to Swiss firms. Dassault wasn’t very happy, though they did concede that the Gripen beat them on price. For various reasons, a secure contract isn’t expected until sometime in 2013. If the contract goes through, Switzerland will join Sweden, the Czech Republic, Hungary, South Africa, and Thailand as Gripen operators. Read “Switzerland Replacing its F-5s” for full coverage. Swiss pick Oct 14/11: Croatia. The Swedish Defence and Security Export Agency (FXM) publicly presents the Swedish JAS-39 Gripen offer, which has already been submitted to the Croatian government. It involves the sale of 8-12 JAS-39C/D fighters, rather than more advanced Gripen Demo/NG planes. Sweden would also loan Croatia some older JAS-39As as an interim force, to avoid a fighter gap as its aged MiG-21s are retired. The offer also support and training agreement for pilots and technicians, and an industrial co-operation package backed by Saab’s delivery record in the Czech Republic, Hungary and South Africa. The biggest competitor in Croatia is thought to be the Eurofighter. It’s more expensive than the Gripen, but German influence, and the potential for shared training and support, is expected to make it a competitive option. Vid. March 27/08 entry re: the RFI. Saab Group. Sept 20/11: Cobra HMD operational. South Africa’s air force becomes the 1st customer to declare the Gripen’s Cobra Helmet-Mounted Display operational, on 2 Squadron in Makhado. South Africa was the system’s first customer, but Sweden has since ordered its own Cobra HMDs. Like all helmet-mounted displays, the Cobra dramatically improves the effectiveness of the plane’s short-range air-to-air missiles, by allowing launches at targets within a much larger field of view. Saab Group. HMD operational Sept 14/11: Switzerland. The Swiss House of Representatives and Senate approve a SFR 5 billion per year armed forces budget, instead of SFR 4.4 billion. The difference is about $682 million per year, and some of that will reportedly be used to help fund Switzerland’s fighter purchase. Sept 12/11: RM12 engine upgrade. Volvo Aero discusses a 2-15% thrust increase for the JAS-39A-D model’s F404-derived engine, at the ISABE 2011 conference in Sweden. They also tout the engine’s record of over 150,000 flight hours without a single major engine mishap, which is indeed impressive. It helps to begin from a very stable, long-serving design like GE’s F404, but it also requires a design focus by Saab and Volvo Aero, extending into the maintenance system used by operating air forces. Project leader Torbjorn Salomonsson saw the RM12’s improvements coming from an improved FADEC controller, improved fan and blisks for better airflow, and a new high-temperature turbine adapted from GE advances in the F404 and F414. Volvo Aero head of research, Henrik Runnemalm, added that: “We have stated previously that it is possible to significantly increase the thrust of the existing RM12 engine at a very competitive cost. We will then have a more powerful and economical engine. It also means that we can upgrade the 220 engines that the Air Force already has whilst maintaining engine competence within country.” July 8/11: Thailand. In a ceremony at Wing 7’s air base in Surat Thani, The Royal Thai Air Force (RTAF) officially declares its new air defense system operational. That includes the 6 initial Gripens, the S340 AEW Erieye plane, and the ground command and control systems. The system was originally intended to reach this milestone in September, but they managed to be 2 months early. Saab. May 24/11: Sea Gripen starts development. A Saab Group release states that Saab AB will open a new UK headquarters and a new Saab Design Centre in London. The engineering center: “…will capitalise on the UK’s maritime jet engineering expertise and is scheduled to open in the late Summer. Initially staffed by approximately 10 British employees, its first project will be to design the carrier-based version of the Gripen new generation multi-role fighter aircraft based on studies completed by Saab in Sweden.” A 12-18 month concept design phase will follow. After that, Saab will need to decide whether or not to build a flight demonstrator. Sea Gripen was initially pushed for India (q.v. Dec 28/09 entry), but with Gripen out of M-MRCA unless something changes, the likely targets would appear to be Brazil’s suspended F-X2 program, or a Plan B for Britain if its F-35 plans go awry. As an example, imagine that catapult installations in the new CVF carriers prove unaffordable, ruling out F-35Cs, while the F-35B STOVL fails its probation and is canceled. With UK firms already providing 28% of the Gripen NG, Sea Gripen could tout itself as a legitimate British alternative to the more-expensive Eurofighter Naval concept. See also Flight International. Sea Gripen studies May 18/11: Brazil. Official opening of the Swedish – Brazilian centre of research and innovation (Centro de Inovacao e Pesquisa Sueco-Brasileiro, CISB) in Sao Bernardo de Campo, Brazil, which grew out of the Saab CEO’s September 2010 visit to Brazil. So far, the centre has attracted over 40 partners from academia and industry, who will be active partners in the specific projects. Areas of focus will be in Transport and Logistics, Defence and Security, and Urban development with a focus on energy and the environment. Saab President & CEO Hakan Buskhe cites a coastal surveillance radar project with Atmos and a datalink development project with ION as examples, and the firm sees many opportunities in Brazil beyond the Gripen project. Civil security will get special attention, as Brazil is hosting both the FIFA World Cup and Olympic Games within the next few years. Saab Group. April 27/11: Indian elimination. Saab confirms that the JAS-39IN Gripen has been eliminated from India’s M-MRCA competition, which has become a duel between Dassault’s Rafale and EADS/ BAE/ Finmeccanica’s Eurofighter Typhoon. Read “India’s M-MRCA Fighter Competition” for full coverage. India Feb 22/11: Thailand. The initial batch of 6 Gripen fighters arrives in Thailand. Bangkok Post. Thai delivery Feb 8/11: India. Saab announces the establishment of a Research and Development Centre in India, with an initial base of 100-300 Indian engineers. Areas of focus would include aerospace, defense, and urban innovation, including civil security. See also Saab’s “India – an important part of Saabs production flow“, which covers Saab Aerostructures’ industrial strategy more generally. To date, Saab is working with Tata Advance Material (small to medium sized composite parts), QuEST Engineering (sheet metal and machined parts), and CIM Tools (machining and sub-assemblies). Feb 4/11: Bulgaria. Bulgaria issues another fighter replacement RFI, soliciting information from Boeing (Super Hornet), Dassault (Rafale, Mirage 2000), EADS (Eurofighter), Lockheed Martin (F-16), and Saab (JAS-39 Gripen) re: 8 new and/or second-hand fighter jets, to replace its existing fleet of 12 MiG-21s. Bulgaria issued a similar RFI in 2006, for 20 jets, but the global economic crash, and Bulgaria’s own issues in trying to pay for past defense purchases, forced a hold. The Defense Ministry has taken pains to emphasize that this is just an exploratory request, and is not the start of a purchase tender. Nevertheless, November 2010 saw the formation of a National Steering Committee and an Integrated Project Team, to draft preliminary fighter replacement operational, technical, and tactical requirements. That followed October 2010 remarks by Bulgaria’s Defense Minister Anyu Angelov, who discussed spending BGN 1 billion (around $725 million) for the purchase of an uncertain number of new fighter jets to replace its MiG-21s, while modernizing its fleet of 16 MiG-29A air superiority jets. Sofia News Agency | Saab | SNA re: Saab visit. Jan 17/11: Brazilian limbo. President Rousseff leaves the entire F-X2 competition in limbo, in light of concerns about the financing of the purchase, how much to borrow for the initial fighter purchase, and inter-agency disagreements. The exact commitment is a decision later in 2011, but no contract until 2012. In practice, however, there is no firm timeline or deadline for a decision, the 2011 decision date is later revoked, and domestic spending priorities loom large in Rousseff’s agenda. Which makes this a de facto suspension. If it is a suspension, it leaves the situation of every contender in play. 2010 BAE divests, ends partnership; Swedish sims upgraded; Danish delay; DJRP Reco pod; SAAF just for show? Gripen Demo w. IRIS-Ts, Meteors, GBU-10s (click to view full) Sept 23/10: DJRP Reco pod. Thales announces that it has delivered its Digital Joint Reconnaissance Pod (DJRP) for installation and integration flight trials on South Africa’s JAS-39C/Ds. The electro-optic and infrared Thales DJRP completed its factory integration tests at Thales’s optronics facility in Glasgow, Scotland in June 2010. Handover of the reconnaissance pod to the South African Air Force (SAAF) will occur after the integration phase. Aug 7/10: India. India’s Times Now news show reports that the M-MRCA trials will leave only Dassault’s Rafale and EADS’ Eurofighter in the race. To be confirmed. Brahmand | Livefist. July 13/10: Sea Gripen, Exports. Flight International reports from Farnborough on JAS-39NG plans and testing, including plans to allocate development funds for a carrier-based “Sea Gripen” variant, as described above. Having said that: “The Sea Gripen will not be developed by Sweden alone… but potential partners could include Brazil and India, who have been offered to do work in their own countries. [Gripen technical director Eddy] De la Motte says the “cost of that programme will be a couple of billion Swedish crowns; more than one billion [DID: over $135 million]. It will be half of the Gripen NG’s development programme cost.” The big challenge is that India has already picked the MiG-29K as its carrier-borne fighter, and Brazil may well close its door by picking the carrier-capable Rafale. Other carrier-using countries have locked in their future fighter choices, with the exception of Thailand and Spain. This means the Gripen would need to win in Brazil, or depend on new countries joining the ranks of naval fighter operators, in order to make Sea Gripen viable. For now, the announcement adds to their existing bid in Brazil, and thanks to the stated need for a partner, it costs nothing up front. With respect to export opportunities overall: “Looking out to 2016, Saab-led Gripen International sees multiple export opportunities for almost 230 aircraft with Bulgaria (16), Croatia (12), the Czech Republic (10), Denmark (36), Hungary (six), Malaysia (12), the Netherlands (85), Romania (24), Switzerland (22) and Thailand (six).” Finally, Gripen technical director Eddy de la Motte gave JAS-39 figures of less than $3,000 per flight hour for Sweden’s Flygvapnet, and “for the export customers it will be less than $5,000, including maintenance, spare parts, fuel and manpower.” On its face, that’s stunning. By comparison, the USAF places the per-hour cost of an F-15 at $17,000 [PDF]. Gripen is engineered for significant savings, but there’s also a possible mismatch between direct flight costs, and figures that include allocated life cycle costs including depot maintenance, etc. Mid-May 2010: India. Gripen NG demo makes its international debut by taking part in the last phase of the Indian evaluation trials for the M-MRCA competition, following 135 test flights in Sweden. Testing includes high altitude trials at Leh airbase, 3,300m/ 10,826 feet above sea level, as well as testing under tropical conditions and comparative flight tests. Saab AB. April 21/10: Raven AESA. Finmeccanica subsidiary SELEX Galileo provides an update concerning its “Raven 1000P” prototype AESA radar. The radar is flying on the Gripen Demo, and has been demonstrated in air-air and air-ground modes, including long range synthetic aperture radar scans at medium and high resolution imagery. The company says simply that “expected performance has been achieved,” without providing clarifying details, and notes that development and new capabilities will continue. SELEX Galileo release [PDF]. April 15/10: Romania. Agence France Presse quotes Jerry Lindbergh, a Swedish government official in charge of defense exports, who says that Sweden could provide Romania with 24 new “fully NATO interoperable Gripen C/D fighters, including training, support, logistics and 100 percent offset for the amount of one billion euros ($1.3 billion),” paid off over 15 years with low interest rates. In essence, they’re offering newer and better fighters, for the same price as very-used F-16s. Alenia would later match this with an offer of its own for 24 used Italian Eurofighter Tranche 1s, which possess no precision ground attack capability. Read “Nothing But Netz: Romania’s New Fighters” for full coverage of Romania’s fighter buy. March 24/10: Danish delay. Denmark decides to delay its fighter decision to 2014, with no delivery until 2018. That gives the F-35 a chance to stabilize costs, and win an order it appeared to be losing to Boeing’s F/A-18 E/F Super Hornet. The Gripen remains a distant 3rd, but could recover. The US Navy plans to end Super Hornet production in FY 2015, barring exports to countries like India. Aviation Week Ares. March 23/10: Exports drive Swedish simulator upgrades. Saab Group announces that Swedish Air Force Wing F 7, based at Satenas, is upgrading from JAS-39 A/B to JAS-39 C/D aircraft and simulators. The Multi Mission Trainer is already converted, and will soon be followed by the Full Mission Simulator. What’s driving the conversion is the Thai order. The Gripen instructors at 1st OCTU are now preparing to train the first batch of Thai Gripen pilots, who recently arrived to Sweden. March 15/10: Denmark. Danish radio station DR Forside reports that the Tier 3 JSF partner Denmark will pick Boeing’s F/A-18 E/F Super Hornet as its future fighter, instead of the F-35A JSF or Saab’s JAS-39DK Gripen NG. According to the report, the ministry’s decision awaits an auditor’s review before being forwarded to the full government and to parliament. The formal contract and delivery date for new fighters are also expected to be delayed, with the F-16 fleet flying on and their replacements entering service in 2017-18. DR Forside [in Danish] | Aviation Week Ares. March 9/10: India. Sweden flies its Gripen fighters into Bangalore for MMRCA-related trials – but India’s Business Standard reports that they’ll be JAS-39D Gripens, not the new Gripen NG. That could get the platform disqualified, depending on the decisions made by the IAF and Indian MoD: “The Gripen NG… has always been one of the hottest contenders in the fray. Saab’s default on the MoD’s trial directive, which lays down that the fighter being offered must be the one that comes for trials [leaves it] vulnerable to disqualification… the Swedish Air Force, having opted to buy the Gripen NG, has ordered a series of improvements on the Gripen NG prototype. With those under way, Sweden’s flight certification agency, SMV, has ruled that the prototypes require additional flight-testing in Sweden before the aircraft can be sent to India… Sources close to the Gripen campaign say IAF pilots will be offered a chance to fly the Gripen NG during a visit to Sweden from April 6 to April 10. Gripen International will also ask for fresh dates for bringing the Gripen NG to India for trials.” March 5/10: BAE divests. BAE’s 11.2 million Class B shares in Saab Group are sold to Investor AB, the Wallenberg family’s publicly traded holding company, at SEK 95.50 per share. The 10.2% share is half of BAE’s remaining 20.5% stake in Saab. Following the sale, and some conversions of some Investors AB and all BAE stakes from Class A to Class B shares, Investor AB’s stake in Saab will change from 19.8% of the capital and 38% of the voting rights, to 30% of Saab and 39.5% of its voting rights. Investor AB Head of Corporate Communications, Oscar Stege Unger, reportedly had this to say: “[Cooperation between BAE and Saab has] in practice ceased, in as much as Saab manages the Gripen exports itself. There has also been a degree of overlapping between BAE and Saab in larger deals… Now BAE have decided that they do not see this as a strategic holding and want to pull out. We also think that it is good that we clarify the ownership structure.” The March 4/10 closing price for Saab amounted to SEK 106.00 per share, so Investor AB is presumably happy already. Investor AB | BAE Systems | Sweden’s The Local | UK’s Telegraph | Bloomberg | Defense News. BAE divests March 4/10: South Africa. South Africa’s News24 reports that the country’s Gripen jets, along with its MEKO-A frigates and Manthatisi Class U209/1400 submarines, are effectively present only for show, given their extremely low budgets for actual usage. The SAAF’s current fleet of 11 Gripens will spend 550 hours in flight in the current financial year, which compares to NATO standards of 20 hours per pilot per month (240 per plane per year). Most of that will take place during the 2010 World Cup. In the next 2 years, that meager total will shrink to a fleet total of 250 flight hours per year – or about 9.6 flight hours per plane, per year, with the full fleet of 26 planes. 2009 Raven AESA partnership; EGBU-12 GPS/laser guided bombs integrated; Brazilian dogfight; Dutch deal delineated; Dassault’s double-cross; JAS-39NG Supercruise. Gripen Demo (click to view full) Dec 28/09: Sea Gripen. Reports confirm that co-development of a carrier-capable “Sea Gripen” design was part of Saab’s response to India’s M-MRCA fighter competition RFI, adding that Brazil’s future fighter requirements were also targeted. Key changes are outlined, and Gripen VP of Operational Capabilities Peter Nilsson tells StratPost that the Sea Gripen is intended for both CATOBAR (Catapult Assisted Take Off But Arrested Recovery) as well as STOBAR (Short Take Off But Arrested Recovery – “ski jump”) operations: “There will obviously be differences in the MTOW (Maximum Take-Off Weight). In a CATOBAR concept, the Sea Gripen will have a MTOW of 16,500 kilograms and a maximum landing weight of 11,500 kilograms. In a STOBAR concept it depends on the physics of the carrier. Roughly, the payload of fuel and weapons in STOBAR operations will be one-third less than the payload in CATOBAR operations. There will be no differences in ‘bring-back’ capability,” he says.” Oct 22/09: Denmark downgrade. Danish Defence Minister Soren Gade says that Denmark plans to purchase just 25-35 jets to replace its 48 operational F-16s, instead of the 48 aircraft originally envisioned. Gade now believes the soonest an agreement can be reached on the purchase would be the start of 2010, and the Copenhagen Post reports that the military has estimated the purchase will eventually cost “at least 100 billion kroner” (at current rates, about $20 billion – presumably, this includes lifetime maintenance and full equipping costs). That cost estimate is creating pause, especially in light of a February 2009 report that says the current F-16 fleet still has many hours left in their airframes. The cost imperative to stretch the current fleet runs up against the potential Danish aerospace jobs and manufacturing technology improvements that will accompany any new fighter order. A Danish Defence Command committee was set up in 2007 to evaluate the competitors, which currently include the F-35A, Boeing’s F/A-18E/F Super Hornet, EADS’ Eurofighter Typhoon, and Sweden’s JAS-39NG Gripen. Defence minister Garde is quoted as saying that at this point, there is no preference among the competitors. Copenhagen Post | defense aerospace. Oct 4/09: Brazil. Brazil’s FAB confirms that revised bids are in from all 3 short-listed contenders, and Saab’s offer clearly has significant support from the Swedish government. Gripen International’s revised bid offers a wide range of elements, including: Full involvement in the Gripen NG development program; Complete technology transfer and national autonomy through joint development; Independence in choice of weapons and systems integration; Production in Brazil of up to 80% Gripen NG airframes, via a full Gripen NG assembly line; and Full maintenance capability in Brazil for the Gripen NG’s F414 engine. That last offer would largely remove the threat of future American interference, and it would be interesting to see how Gripen International proposes to achieve it. Gripen International touts “significantly lower acquisition, support and operating costs” for its plane, and all this would be backed by a firm proposal for full long-term financing from the government’s Swedish Export Credit Corporation. The additional offers are equally significant. Brazil will have the sales lead for Gripen NG in Latin America, with joint opportunities elsewhere. Saab would join the KC-390 program as a development and marketing partner, and Sweden will evaluate the KC-390 for its long term tactical air transport needs, as a future replacement for its recently-upgraded but aging C-130 Hercules aircraft. Saab also proposes to replace Sweden’s aged fleet of about 42 SK60/ Saab 105 jet trainers with Embraer’s Super Tucano, but it received a SEK 130 million ($18.8 million) deal in September 2009 to upgrade the planes’ cockpit systems, and current Swedish plans would see the SK60s continue in service until mid-2017. FAB release [in Portuguese] | Gripen International release. Sept 29/09: Brazil. Embraer release: “Regarding the article published in the Valor Econômico newspaper, dated September 28, 2009, Embraer clarifies that it is not directly participating in the selection process of the new F-X2 fighter for the Brazilian Air Force and, contrary to what was stated, it has no preference among the proposals presented. Embraer reaffirms its unconditional support of this process, always in close alignment with Brazil’s Aeronautics Command and the Ministry of Defense.” Sept 28/09: Brazil. Brazil’s leading aerospace firm Embraer drops a political bombshell. Embraer’s Deputy Chief Executive for the defense market, Orlando Jose Ferreira Neto, tells Valor Economico that the firm was asked to advise the Air Force re: industrial proposals, and concluded that participating in the JAS-39NG Gripen’s development offers Brazil’s aerospace industry the best long-term benefits. Embraer reportedly saw the JAS-39NG as offering the opportunity to participate in the design process, rather than just producing parts. The opinion is a shock, as France’s interest in buying Embraer’s KC-390 transports was expected to leave Brazil’s top aerospace firm solidly on-side for the Rafale bid. T-1 Holdings executives (see Sept 17/09 entry) were also quoted in the article. In response, Defence Minister Jobim fires back to say that the government will make these decisions, not Embraer. Dow Jones | Defense Aerospace translations (note: links will not last) | Valor Online, via Noticias Militares [in Portuguese] | Defesa Brazil [in Portuguese] | O Globo [in Portuguese]. Sept 17/09: Brazil. Saab announces that over 20 engineers from the Brazilian firms Akaer, Friuli, Imbra Aerospace, Minoica, and Winnstal are already working on the Gripen NG project in Linkoping, Sweden, with the Swedish government’s authorization. The 5 firms will participate as the T1 holding, and would be responsible for projecting and manufacturing the JAS-39BR’s central and rear fuselages and wings. If all goes well, Akaer predicts that as of 2010 a team of at least 150 engineers and technicians from the T1 holding will start working in Brazil, alongside 20 Swedish specialists. Beyond Gripen production, the holding’s goal is to form a new Brazilian aeronautical center in Brazil, and some technology transfer in the area of composite materials is reportedly underway already. Shaping the wing of a supersonic craft requires higher quality levels than civil applications, as well as manufacturing challenges owing to thicker and more resistant parts. Management and integration training within a holding structure of this type will also be required. Sept 7/09: Brazil. Brazil’s Ministerio Da Defesa announces that Dassault Aviation is now the F-X2 competition’s preferred bidder, and the country will order 36 Rafales subject to further negotiations. The announcement also says that Brazil has secured French cooperation to develop Embraer’s KC-390 medium transport, and possibly buy 10-12 of the aircraft when they’re introduced. This sale would be France’s 1st export order for its Rafale fighter, after numerous attempts spanning more than a decade. The twist in this story is that the air force has yet to request final bids, or deliver its evaluation and recommendations. Sept 7/09: Dutch deal described. The Dutch TV show KRO reporter does an expose, which claims that the Ministerie Van Defensie (MvD) has knowingly misled Parliament regarding its F-35 procurement plans. The report says that the Dutch Defence Materiel Organization head had told the MvD in 2005 that its plans for 85 F-35s was not sustainable at expected budget levels. But the MvD continued to use that number when describing its planned budget and plans to Parliament, and even signed off on that number in the 2006 production phase agreement. The MvD responds that it still intends to buy 85 aircraft, and that a budget increase to EUR 6.1 billion will take care of the gap. Which is true – if the pricing for the F-35As can be relied on. In contrast, KRO reveals that Gripen International has submitted a firm fixed-price bid for 85 in-service JAS-39NLs at EUR 4.7 – 4.8 billion. KRO reporter video [Flash] | Defense Aerospace KRO partial translation | MvD response [in Dutch]. June 16/09: South Africa. Swedish Chief Prosecutor Christer van der Kwast decides to close the preliminary investigation concerning alleged bribes in connection with the sale of Gripen fighters to South Africa. Saab SVP for Communications and Public Affairs Cecilia Schon Jansson, is unequivocal: “No illegal methods have been forthcoming from Saab, and this is strengthened by the fact that the Chief Prosecutor now decided to close the investigation.” See: Chief Prosecuror’s statement [in Swedish] | Saab Group release. March 24/09: ES-05 Raven AESA. Saab and SELEX Galileo sign an agreement to develop an Active Electronically Scanned Array (AESA) radar for the JAS-39NG. This is both a major milestone event and a contract, so it’s covered in full the “contracts” section, below. March 10/09: RBE-2 Dassault double-cross. Aviation Week’s “AESA Radars Are A Highlight of Aero-India” points to problems with the JAS-39’s AESA radar, which stems from Dassault’s acquisition of a large shareholding in Thales. Rather than produce an RBE2 AESA radar that’s available on 2 platforms, Dassault appears to be excluding other options. The hope appears to be that this will lead to more orders for Dassault’s Rafale, rather than just shrinking Thales’ installed base for AESA fighter radars. Aviation Week: “In 2007, Saab struck a deal with Thales to provide an AESA antenna for the Gripen Demo program, to be mated with the signal processor from the JAS 39C’s Saab PS-05 MSA radar… Thales will honor the Gripen Demo contract but its AESA will not be available for a production NG. Sweden has talked about [Raytheon’s] RACR, but would prefer the PS-05/A’s “back end” modules for ease of integration and to stay away from control issues associated with U.S. components. The answer may lie with Selex, which, first as Ferranti, then as GEC-Marconi and subsequently as BAE Systems, was Sweden’s partner on the original PS-05/A.” Selex was also Saab’s partner in the M-AESA R&D project. Selex Galileo’s Italian division has considerable experience with the Grifo family of mechanically scanned radars, while Selex S&AS UK division has already created the Vixen AESA radar for smaller fighters. Korea’s F/A-50 was recently barred from using the Vixen 500E, under an agreement with co-developer Lockheed Martin that did not allow the F/A-50’s capabilities to surpass the ROKAF’s F-16s. Feb 2/09: Brazil. Gripen International confirms a Brazilian F-X2 bid involving 36 JAS-39NG aircraft. Their release adds that Brazil will have “direct involvement in the development, production and maintenance of the platform but it will also generate transfer of key technology including access to Gripen source codes.” Boeing confirms that it has submitted a bid involving 36 F/A-18 Super Hornet Block IIs, with the APG-79 AESA radar. It is presumed that Dassault also submitted a 36-plane bid for its Rafale fighter. Boeing release | Gripen International release. Jan 21/09: “Supercruise.” A JAS-39NG “supercruises” over the Baltic Sea, flying at 28,000 feet above Mach 1.2, without using afterburners, until the pilot ran out of test area and had to head back to the Saab Test Flight Centre in Linkoping. Saab Group release. Very few aircraft can supercruise at all, and the fuel penalty means that most fighters’ time above Mach 1 during their entire service lives is measures in minutes, not hours. Supercruise cannot be operationally useful, however, unless it can be maintained with weapons mounted. The extra weight and drag created by externally-mounted weapons can make this a real challenge, which is why supercruise reports beyond America’s F-22A have been in “clean” configuration, with no weapons carried. Unless details are given to the contrary, the working assumption is that this was a “clean” configuration flight. 2009 Gripen Demo rollout; Norway loss. JAS-39D, Swiss arrival (click to view full) Dec 18/08: Dutch study. Tier 2 Joint Strike Fighter partner The Netherlands issues a comparative study of the F-16 Block 60+, JAS-39MG Gripen, and F-35A, which has been compiled in cooperation with several organization, and audited by 2 ministries and RAND Europe. It recommends the F-35 as the best combat aircraft. Surprisingly, it also concludes that the F-35 also has the lowest capital costs, and the lowest anticipated life-cycle costs. The issue will now go before Parliament. Read “Dutch MvD Report Urges F-35 over Gripen NG, F-16E Fighters” for full details and updates. Nov 20/08: Loss in Norway. The first domino falls. Norway chooses the F-35 over the JAS-39, though the way they chose to make that decision and announce it has created controversies, and had a negative effect on relations with Sweden. The decision itself is now controversial as well, after Sabb’s CEO took the very unusual step of holding a public presentation full of very specific criticisms regarding the accuracy and fairness of Norway’s process. Nov 6/08: Jane’s publishes “Analysis: Why 2009 could be the year of the Gripen.” It calls attention to the ongoing competitions in Brazil (36+), Croatia (12), Denmark (48), India (126+), the Netherlands (85), Norway (44), Romania (around 40) and Switzerland (36) make final selections, and estimates total sales of up to 523 aircraft worth around $35-40 billion at stake: “It will be a truly crucial period in shaping the future of the global fighter market. The common link between these eight contests is the presence of the Saab Gripen in the bidding process… Jane’s believes the Gripen team has reasons for optimism, however. First of all, in terms of the aircraft’s capability, Saab is offering its enhanced Gripen NG (Next Generation) variant for the Brazilian, Danish, Dutch, Indian and Norwegian requirements… According to Saab, further enhancements will be rolled out in three-year increments… Development and incorporation of specific customer-funded requirements is also envisaged as part of a 50-year programme plan… the Gripen NG programme would be accelerated in the event of a contract win and the aircraft would be available to enter service from 2014. With regard to cost, the Gripen NG is viewed by Jane’s as competitive in terms of both acquisition and through-life support costs when compared to its rivals. Bob Kemp, sales and marketing director for Gripen International, citing figures produced for the Dutch fighter contest, said Saab believes that the Gripen NG, as part of an 85-aircraft fleet, would cost EUR6 billion (USD7.6 billion) less than the F-35 in terms of life-cycle costs over a 30-year period…” Aug 25/08: Netherlands. Gripen International delivers its formal response to The Netherlands’ F-16 replacement program, which has been re-opened due to ongoing political controversies concerning the F-35’s eventual costs. Eurofighter GmbH and Dassault refused to participate in this exercise, citing unrealistic time limits and perceived favoritism, and Saab’s request for an extension was denied. Saab reportedly replied to 85% of the 250 questions that had to be answered by 25 August; some questions with respect to integration with American products were reportedly not answered, as American firms must receive clearance from the US government in order to even discuss that information with Saab. The F-35A is still heavily favored, but Saab’s offer is an all inclusive package comprising 85 next-generation “JAS-39NL” Gripen NG aircraft, plus a complete package of training, spares, simulators and support, and industrial co-operation to at least 100% of the total value of a possible contract. Other interesting elements include an option for final assembly in the Netherlands, and a ‘Repairables Exchange Service’ designed to lower costs and reduce their customers’ need for initial inventories of spare parts. Gripen International release | Gripen International Presentation [PDF, 3.2MB] | Gripen International Offer Summary [PDF, 3.2MB]. July 2/08: Switzerland. Gripen International delivers its initial bid to the Swiss government, and announces conditional industrial partnerships. See DID coverage. April 28/08: Gripen International delivers its MMRCA bid to India’s Ministry of Defence. The JAS-39IN is based on the Gripen NG/ Gripen Demo, and includes an AESA radar and an IRST (InfraRed Scan and Track) system, a Transfer of Technology (ToT) program, a life-time logistics support solution sourced from Indian suppliers with support from Saab and its partners, and full industrial offset cooperation. Gripen International release | Saab release. Eddy de la Motte, Gripen International’s India Campaign Director: “Gripen IN will provide India with a capability that offers complete independence of weapon supply… We will do this by transferring all necessary technologies to enable Indian industry and the Air Force to build, operate and modify Gripen to meet all indigenous requirements over time.” April 28/08: Norway. Gripen International delivers its bid to the Norwegian government. Dagbladet reported, and Gripen’s release confirmed, that Norway added a new wrinkle – a guarantee from Sweden that it would not be the only operator of this fighter type. That guarantee may have consequences for the size of Sweden’s Gripen force. Gripen Demo c. Gripen International (click to view full) April 23/08: Gripen Demo Rollout. A 2-seat version of the next-generation Gripen Demonstrator aircraft is ‘rolled out’ to the media and public at a ceremony in Linkoping, Sweden. Photos show it equipped with illustrative mock-ups of IRIS-T short range air-air missiles, Meteor long-range air-air missiles, and Paveway precision-guided bombs. Gripen International release | Saab release | Saab: Videos from the ceremony | Gripen: Saab CEO interview & rollout videos March 27/08: Croatia. Sweden’s FMV procurement agency announces that it has answered a Request For Information from Croatia, involving a potential lease to buy deal for 12 Saab-made Gripen fighter jets. No prices are quoted at this stage, but Reuters reports that the jets would be former Swedish Air Force planes. Other candidates for Croatia’s air force reportedly include the EADS Eurofighter, Lockheed Martin’s F-16, and Russia’s MiG-29. Sweden’s FMV adds that : “This invitation from the Croatian authorities follows the recent receipt of similar invitations from Norway, India, Denmark, Switzerland, Romania and Bulgaria…” Reuters report | Reuters Sidebar: “FACTBOX-Balkan candidates offer NATO leaner military muscle” March 3/08: India. With Gripen competing in India’s MMRCA contest, Saab hosts Indian TV journalist Vishnu Som from New Delhi Television for an episode of his new show, “The Jet Set.” See the full episode: Saab release | Full episode [Windows Media] Jan 17/08: Switzerland. The JAS-39 Gripen is one of 4 aircraft solicited in a competition to replace 3 of Switzerland’s 5 aging F-5 E/F squadrons. Other competitors are Boeing’s F/A-18 E/F Super Hornet, Dassault’s Rafale, and EADS’ Eurofighter. See “Switzerland Replacing its F-5s” for more. Jan 17/08: Norway. Gripen International announces that it has been formally invited to bid on the Norwegian F-16 replacement fighter contract. It will compete one-on-one with the F-35A lightning II. 2007 F414 for Gripen Demo; Brazil’s back; Link-16 added; Spring Flag 2007. Gripen w. “smokewinders” c. Gripen International (click to view full) Dec 21/07: Norway, Netherlands. EADS pulls its Eurofighter out of the Norwegian and Danish competitions, leaving both future fighter programs as a straight-up competition between the JAS-39 and the F-35. The rationales given are vague and make little sense, but many sources believe their key objection is official favoritism toward the F-35. The government-to-government nature of the F-35 deal, it seems, wouldn’t require the same industrial offsets, though the F-35 program has pledged significant production contracts with Denmark’s Terma and with Norwegian firms. The Motley Fool, on the other hand, wonders if the same dollar devaluation that’s hammering EADS in the passenger jet market is also creating a price chasm for the Eurofighter. At $100-120 million per aircraft vs. $50-70 million for its Gripen and Lightning II competitors, it was already a significantly more expensive aircraft before dollar devaluation. Bloomberg | Financial Times | Flight International | Motley Fool. Dec 13/07: Hungary. Hungary receives its last 3 Gripen fighters from its 14-aircraft lease/buy deal signed with the supplier and Sweden’s Defence Materiel Administration (FMV). Its fleet now consists of 12 JAS-39Cs and 2 JAS-39Ds. A Dec 10/07 announcement by Kaj Rosander of Gripen International added that “We have fulfilled our total export [read: industrial offsets] obligations to the Hungarian Ministry of Economy and Transport.” Flight International Dec 5/07: Denmark. Gripen International release: “In connection with a Gripen deal with Denmark, Saab is planning extensive co-operation with Danish industry. Saab has signed a large number of agreements for over 100 percent of the contractual value.” Denmark’s F-16 replacement order will cover up to 48 planes, and Saab Group’s DKK 10 billion ($1.9 billion) co-operation agreement with dominant Danish defence company Terma in the areas of aviation, space, defense and civil security includes non-military contracts. Saab’s automotive enterprise remains a significant asset when competitions turn on industrial offsets, and is a much wider focus than Terma’s F-35 related contracts; then again, it has to be, since far fewer Gripens are likely to be produced. The Saab-Terma agreement is spread over 10-15 years, and parts of it are dependent on Denmark selecting the Gripen NG for its air force. See full Gripen release. Nov 29/07: Denmark. The Gripen team submitted their formal proposal to Denmark in December 2005, in response to that country’s RFI(Request for Information), but supplementary information was also requested. The Gripen team’s response is formally handed-over, on time. Gripen International release. Nov 8/07: IRIS-T. A JAS-39 Gripen fires an IRIS-T short range air-air missile with an operational target seeker for the first time. It was a high g-load test firing using a fully operational missile without a warhead, and was successful at hitting the target over the Vidsel range in northern Sweden. The IRIS-T is a multinational (Germany, Greece, Italy, Norway, Spain, Sweden) 4th-5th generation SRAAM that is currently under development for several air forces. Gripen International’s Jan 16/08 release adds that: “The missile is being developed to combat targets at short range and is also designed to strike targets behind the firing aircraft. IRIS-T will enter service alongside the Cobra HMD (Helmet Mounted Display) System…” Nov 5/07: Brazil re-launch. Brazil’s F-X competition appears to be on again, with a $2.2 billion budget for 36 front line fighters. A 50% boost to defense spending in the FY 2008 budget accompanies the announcement. Looks like Brazil may be serious this time, and the Gripen is tagged as one of the contenders. Oct 2/07: Gripen International announces that a 10-ship flight of Swedish Air Force F21 Wing’s JAS-39C/D Gripens were hosted by the USAF 493rd Fighter Squadron “Grim Reapers” at Lakenheath, England for joint exercises. Electronic warfare systems were the focus of the exercise, the pilots performed Close Air Support missions and executed air-to-ground attacks against targets defended by simulated surface-to-air missile systems during the week-long exercise. They also flew air combat missions against the Grim Reapers’ F-15C Eagles; unfortunately, no results were given. Sept 28/07: South Africa. As is often the case, South Africa’s Gripen purchase involved industrial offsets. Given the nature of South Africa, those offsets involved special quotas for small and medium “black empowered enterprise” engineering firms. Saab discusses those efforts, with a focus on a 2006 R11 million ($2 million) contract between Saab and Aerosud under which local engineering firms secured sub-contracts for the supply of ground support equipment. South Africa’s Aerosud is responsible for the program, including managing and mentoring a select group of BEE companies which manufacture the various items, raising their quality standards so that they could become qualified suppliers to the aerospace industry. Items supplied include electrical test equipment, overhaul platforms and test rigs to tailored engine inlet covers, engine trolleys and cockpit access ladders. Companies supplying these items include Cape Town’s Quad Engineering, ContactServe of Olifantsfontein, and the Tshwane-based companies Vacuform and Hartell. Gripen International feature. Sept 12/07: Denmark. Danish Minister of Defence Soren Gade and the Swedish Minister of Defence Sten Tolgfors signed a Memorandum of Understanding (MoU) regarding Gripen at Saab in Linkoping, Sweden. Denmark is planning to replace its aging F-16 fleet of 48 aircraft within the next 10 – 15 years, and are conducting a comprehensive evaluation of different aircraft types. The MoU guarantees that all relevant Swedish information which is needed for the Danish evaluation of the Gripen fighter will be available; in practical terms, the JAS-39DK is now an official member of the fighter competition. Saab release. A Gripen International release adds that the Danish Air Force Chief, Major General Stig Ostergaard Nielsen flew in a JAS-39D during his August 2007 visit to Sweden. July 2/07: F414 picked. Saab announces that GE Aviation’s new F414G fighter engine will power its next-generation Gripen models. The F414G is derived from the popular 22,000+ pound/ 96 kN thrust F414-GE-400s that power the twin-engine F/A-18 E/F Super Hornet, and offers a 25-35% power boost over its predecessor the F404. Key F414G alterations will include minor changes to the alternator for added aircraft power, and modified Full Authority Digital Electronic Control (FADEC) software for enhanced single-engine operation. GE Aviation and Volvo Aero Corporation will be working together on the new F414G fighter engine. Although Volvo Aero has manufactured modified F404 engines under license for past Gripen fighters, GE will be supplying GE F414G engines directly to Saab for the Gripen Demo project, with Volvo as a major sub-contractor. GE is currently delivering 2 F414 Engines, with flight-tests and customer demonstration evaluations planned for 2008-2010. Gripen International. July 2/07: Gripen International continues to tout its aircraft for India’s MRCA fighter competition. India Defence reports that the firm has gone one step farther than the July 2006 promise to have all airframe production take place in India. The firm stresses that the aircraft would be next-generation “Gripen Demo” aircraft, and adds that they were “willing to provide all the know-how for India to carry out modifications according to its needs.” This is a very high level of technology transfer, and resembles the benchmark adopted by the partner nations in the F-35 Joint Strike Fighter consortium. India’s government finally issued the formal RFP for the MMRCA competition on Aug 28/07. June 11/07: Link-16 added. Saab announces that Link 16/ MIDS compatibility will become an option on the JAS-39, replacing or complementing the existing Swedish datalink. Full Link 16 certification is planned for 2008. The Link-16 program is part of the SEK 1 billion ($139 million) Version 19 systems upgrade – see July 3/06 entry in the contracts section, below. Finally, this tidbit was interesting: “By the late 1950s Sweden’s military thinkers and aircraft builders had recognized the game-changing effect that a linked flow of secure electronic combat data could have on tactics and operations. It is well known now – but was once a highly-classified national secret – that Saab’s J 35 Draken was fielded with one of the world’s first operational datalink systems. Since then, every generation of Saab combat aircraft from Draken to Viggen to Gripen has fielded more and more powerful datalink capabilities.” May 2007: Spring Flag 2007. In September 2007, Hungarian pilots described their experiences at Exercise Spring Flag 2007, held in May at Italy’s Decimomannu air base in Sardinia. It included combat assets from France (E-3 AWACS), Germany (F-4F Phantom ICE), Italy (AV-8B Harrier, F-16C, Tornado ECR and Eurofighter Typhoon), NATO (E-3), Turkey (F-16C), and Hungary (JAS-39C/D Gripen) with tanker support from Italy, the UK and the US. The Gripens were the only participating aircraft with a 100% sortie rate, and generated some interesting comments from Hungarian Air Force Colonel Nandor Kilian re: the Gripen’s radar capabilities and low visual cross-section (see above, or follow the link). If you’re curious about the view from inside these kinds of exercises, DID recommends former USAF Air Weapons Controller John S. Green’s “Command and Control” recounting of a 1980s exercise involving American F-15s in Germany. Feb 8/07: Norway. “F-35 Lightning II Faces Continued Dogfights in Norway.” Endre Lunde chronicles developments in Norway, including endorsement of the Gripen by one of the governing coalition’s political parties. 2006 and earlier Saab buys Ericsson Microwave; Saab layoffs; Red Flag EW; Terma MoU in Denmark; Terma MRP reco pod. JAS-39 landing c. Gripen International (click to view full) Nov 16/06: Red Flag Alaska – Gripen EW rules! Saab’s release discusses Gripen’s performance at Red Flag Alaska. During the 11-day exercise, the 4 aircraft each flew 2 sorties per day, accumulating 340 flight hours (150 ‘on mission’) with a staff of 12 pilots and 35 maintenance technicians. In the tactical realm, note the release’s confirmation that the JAS-39 has the ability to drop Laser Guided Bombs carried on one Gripen aircraft, using laser designator pods fitted to another Gripen aircraft. The aircraft’s warning and electronic warfare systems (EWS) also got high ratings: Lt. Col. Lindberg said that: “…it was almost impossible for the Red air force to get through our EW systems. We always knew where the air defense was, could avoid them and still do our work, even in very dynamic situations, with the threat getting more complex each day.” Nov 16/06: IRIS-T. Saab announces successful tests with the IRIS-T short-range air-air missile, in order to verify Gripen compatibility. IRIS-T is in production, and is a multinational project that includes Germany, Greece, Italy, Sweden, Norway and Spain. It was developed following German experience with the Russian R-73/AA-11 Archer on East German MiG-29s, which caused them to rethink the entire design philosophy behind ASRAAM and pull out of the multinational project. Nov 3/06: Terma MoU. Saab and Danish defence and aerospace company Terma announce a Memorandum of Understanding for a longer-term business relationship. As a first concrete step, Terma and Saab signed a Contract for production of DKK 10 million (about $1.7 million) worth of Gripen parts, to begin immediately at Terma’s facilities in Grenaa, Denmark. Gripen International Nov 1/06: Denmark. Danish Aerotech A/S and Saab AB conclude a conditional cooperation agreement worth up to DKK 200 million (about $34.3 million). If Denmark decides to purchase the Gripen fighter as a replacement for its current F-16 fighters, Danish Aerotech is expecting to supply Saab with mechanical, electrical and electronic components as part of the new cooperation agreement. Since its establishment in 1992, Danish Aerotech has been a Saab partner responsible for all maintenance on Danish Saab T-17 training aircraft. Gripen International. Aug 23/06: Bulgaria RFI. Gripen International announces its response to Bulgaria’s May 2006 RFI: 16 JAS-39 Gripen C/D aircraft (12 single and 4 two-seater) with full support and training provided in cooperation with the Swedish Armed Forces. Several financing options were outlined, and Saab/GI’s usual 100% offset promise was included. The first aircraft could be delivered within two years. July 19/06: India. Saab pledges to conduct all production in India if it wins the MRCA fighter competition, and cites its record of successfully meeting industrial offset provisions. June 26/06: Red Flag, ho. Flight International reports that 7 Swedish Air Force Gripens (5 JAS-39Cs and 2 two-seater JAS-39Ds), Two Tp84s (C-130H), and 12 pilots will be headed to Eilson AFB, Alaska under Lt. Col. Ken Lindberg for the latest Red Flag Alaska exercise. As a traditionally neutral country, Sweden has not participated in such exercises before. The Gripens will be deployed with LITENING III targeting pods, and will participate in both air-air and air-ground missions (4-6 aircraft each day, 2 missions per day), including leading mixed air groups from participating nations. They will take off from Ronneby AFB, Sweden on July 13, fly mostly overland without air-air refueling, and arrive on July 17, 2006. This Red Flag Alaska will run from July 24 – August 4, 2006, and is expected to involve 47 fighters and 6 support aircraft from participating countries. See Flight International article for more on the Gripen deployment, and a US Air Force Link article has more background re: the Red Flag Alaska exercises. June 20/06: Meteor. The JAS-39 Gripen successfully completes its first test set of MBDA Meteor missile firings. Further flight test campaigns will be performed with the Meteor on the Gripen combat aircraft during 2006 and beyond. June 12/06: Saab buys Ericsson Microwave. Saab Group acquires Ericsson Microwave Systems, who make the Gripen’s current PS05 radar – and probably its future AESA radar as well. EMS also makes the Erieye AESA radar that serves on Saab’s S-1000 and Embraer’s EMB-145 airborne early warning aircraft. See DID coverage. JAS-39N concept (c) Gripen International (click to view full) May 15-16/06: Denmark, Norway. Gripen International announces the tabling of offers to Denmark and Norway for JAS-39 Gripens to replace those nations’ aging F-16 fleets. The aircraft would have “longer range and greater payload” than existing JAS-39 C/D Gripens, but other than that no details of the offers themselves are released. For slightly more background, see also their Dec 9/05 release “Gripen for Denmark – Tailor-made to suit Danish needs!” April 25/06: Swedish cuts? The Swedish Armed Forces submit their 2007 budget proposal, which includes a plan for the reduction of Sweden’s Gripen force to just 100 aircraft. The remainder of the force will either be sold on the international market to approved buyers, or scrapped. March 24/06: eDefense Online publishes “Gripens in Hungary Spark EW Revival.” The archive no longer exists, but an excerpt follows: “The original decision to lease 14 Gripens from Sweden was made in September 2001 by the country’s previous conservative government. Although many, mostly economic reasons were given for this surprise move against the US offer of Lockheed Martin (Ft. Worth, TX) F-16s, insiders in Hungary say that as a kind of “side effect,” the HDF will have access to a more comprehensive electronic-warfare (EW) system that offers a more “independent” EW capability. While providing “indigenous” EW planning for the customer was included in the original December 2001 contract calling for the leasing of air-to-air-combat-oriented JAS 39A/B aircraft, when the current post-communist government altered the deal in March 2003, more capable hardware was ordered as well. The revised contract includes the lease-to-own of the unique JAS 39 EBS (Export Baseline Standard) HU (Hungary) version, which has a significantly improved EW system compared with its predecessor.” Dec 13/05: Meteor. Gripen is the first aircraft to flight-validate system integration with MBDA’s Meteor long-range air-air missile. Gripen International. June 8/05: Layoffs. Saab announced that it will lay off 350 workers in four business units, owing to a reduction of work for the JAS-39 Gripen. The 350 lay-offs involve workers at Saab Aerostructures, Saab Aerosystems, Saab Aircraft and Saab Support. Saab had already laid off 1,000 people in 2003 and 2004; and including this latest move, notice had now been given to 760 people in 2005. The company warns that it expects to lay off a further 1,000 – 1,500 people in 2005 and 2006. March 29/05: Terma MRP. Flight tests validate Terma’s new Modular Reconnaissance Pod (q.v. contract, Jan 7/02). Flight tests and evaluation will be ongoing at Saab in Linkoping for approximately a year, and introduction into Swedish service to replace the AJSF-37 Viggens will be in 2006. Saab Group’s release quotes Richard Ljungberg, Saab test pilot and former Swedish Air Force recce pilot: “Excellent handling qualities, the digital flight control system took care of everything; it just feels like flying a clean aircraft… We even tested camera functions in the pod together with maneuverability of the aircraft during the first flight.” JAS-39 Gripen: Contracts & Awards 2014 – 2017 Czechs extend lease to 2027; ETPS multi-year support to 2018 and new fighter; JAS-39F development MoU. Gripen for FAB (click to view full) March 30/17: Saab has been awarded a $42 million contract to perform operational and developmental support for Swedish Gripen fighters throughout 2017. The contract will include the operation of rigs and simulators, alongside work to test, verify and validate Gripen C/D and Gripen E fighter aircraft systems. Gripen C/D planes will also receive operational support. Work will be carried out in various cities in Sweden, including Linköping, Järfälla, Arboga and Gothenberg. Oct 27/14: Sweden. Sweden’s 2015 budget will need to make some changes, in the wake of the Swiss fighter referendum defeat: “In order to ensure the development and acquisition of the new JAS Gripen 39 E, we will take the responsibility for the completion of its upgrade and production. As a consequence of the incomplete JAS-deal with Switzerland, the allocation to defence equipment will be given an additional SEK 2 billion in 2014. This initiative will be funded in part by reducing the appropriation for international operations by SEK 500 million. The allocation for defence equipment will also receive a further SEK 900 million in 2015. The JAS-project will thereby receive a total of SEK 2.9 billion over the next two years. This is crucial in order to ensure that the lost revenues in the JAS-project do not have a negative impact on other planned equipment acquisitions.” SEK 2.9 billion is about $404 million at current exchange rates. Sources: Swedish MoD, “Budget reinforcement to the Swedish Armed Forces’ regimental- and air surveillance capabilities”. Oct 24/14: Brazil. Saab signs a SEK 39.3 billion / BRL 13.363 billion / $5.475 billion contract with Brazil’s COMAER for 28 JAS-39E and 8 JAS-39F fighters, alongside provisions for training, initial spares, and a 10-year Industrial Co-operation contract to transfer technologies to Brazilian industry. Embraer will have a leading role as Saab’s strategic partner, with a JAS-39F co-development role and full responsibility for production. This contract winds up having wider implications as well, by securing Sweden’s order for 60 JAS-39Es. As signed, it required at least 1 other customer, which was going to be Switzerland until a weak effort from that government destroyed the deal in a referendum. Brazil has now become that additional customer, and Saab expects that this commitment will keep the JAS-39 in service to 2050. What’s left? Brazil’s FAB confirms that the interim lease agreement for 10-12 JAS-39C/Ds will be a separate deal with the Swedish government. Meanwhile, the JAS-39NG contracts still require certain conditions before they become final, such as required export control-related authorizations from the USA et. al. All of these conditions are expected to be fulfilled during the first half of 2015, with deliveries to take place from 2019 – 2024. Sources: Saab, “Saab and Brazil sign contract for Gripen NG” | Brazil FAB, “Brasil assina contrato para aquisicao de 36 cacas Gripen NG”. Brazil: 36 Gripen NG July 12/14: ETPS. Saab signs a new agreement with QinetiQ’s Empire Test Pilots’ School from 2015 – 2018, continuing an association that has been in place since 1999. ETPS will continue to use the JAS-39D fighter they switched to earlier in 2014, after a long period using a JAS-39B for the most advanced portions of the curriculum. Hakan Buskhe, Saab’s President and CEO: “Since 1999 Gripen has trained more than 70 test pilots and provided more than 800 hours for the ETPS. Saab has a record of 100 per cent on-time delivery with a jet that is totally reliable. The relationship between Saab and the ETPS is something really unique.” ETPS buys Gripen flight hours from Saab, plus all required support, instead of owning the planes. Operations are conducted at Saab’s Flight Test Department in Linkoping, Sweden, with ETPS instructor pilots flying under Saab supervision. Saab provides supervisory pilots, the Gripen aircraft, logistics, ground support and facilities. Saab 105 jet trainer aircraft are also provided, to act as radar targets for training. Campaigns typically last for 1 week in May and 4-5 weeks in August and September. Sources: QinetiQ/ UK MoD LTPA, ETPS | ETPS, “The Saab Gripen” | Saab, “Saab and ETPS sign new multi-year agreement for continued Gripen training”. Empire Test Pilot School July 11/14: JAS-39F Brazil MoU. There’s no agreement yet for the Gripen lease, but Saab and Embraer have signed the expected Memorandum of Understanding around JAS-39E/F production. Embraer will be the Brazilian industrial lead, performing its own assigned work while managing all local sub-contractors in the program. They’ll also work with Saab on systems development, integration, flight tests, final assembly and deliveries, with full joint responsibility for the 2-seat JAS-39F Gripen NG. Sources: Embraer and Saab, “Embraer to partner with Saab in joint programme management for Brazil´s F-X2 Project”. March 3/14: Brazil. Brazil and Saab sign advance agreements on defense cooperation, which lay the foundation for the future Gripen contract. This includes a defense cooperation framework agreement, whose scope is already wider than just fighters, and a corollary agreement that commits to appropriate levels of secrecy and security procedures within that cooperation framework. The new agreements build on documents signed in 1997 and 2000, and both will be forwarded to Brazil’s National Congress for approval. The industrial goal is to be able to produce 80% of the plane in Brazil, which has future implications given that final Brazilian orders over time are estimated at 60 – 104 fighters. Equally significant, the accompanying security agreements include access to the Gripen’s source code. That will allow Brazil to add its own weapons to the new fighters, increasing the global attractiveness of both Saab’s Gripens and of Brazil’s weapons. A current wave of Latin American upgrades could create timing issues for wider regional sales, but export partnership arrangements are under discussion. They currently revolve around Latin America, and developing nations with close Brazilian ties (“das nacoes em desenvolvimento com as quais o Brasil possui estreita relacao bilateral”). Sources: Brazil FAB, “Brasil assina acordos de cooperacao e da prosseguimento a compra dos cacas suecos” | See also Defense News, “Fleet Modernization Drives Requirements Across South America”. Brazil: Defense cooperation agreements March 12/14: Czech Republic. The Czech cabinet approves a 12-year the extension of their Gripen fleet lease, with a 2-year option to 2029. Annual outlay will be CZK 1.7 billion, for a total of CZK 20.4 billion over the base period ($1.033 billion). That’s reportedly about a 31% drop. The official contract signing is expected later, but this decision was the key event. The deal includes the jets, training for 25 pilots and 90 maintenance technicians, depth logistics support, and upgrades to add Link-16 and night vision optics. Sources: Swedish FXM, “Czech Republic approves new Gripen agreement” | Ceske Noviny, “Czech govt approves extension of Swedish Gripen fighters lease” | Sweden’s The Local, “Czech renew lease on Jas Gripen jets”. New Czech lease March 4/14: Sub-contractors. Switzerland’s RUAG receives a CHF 68 million ($41.1 million) contract from Saab to develop and produce payload mountings for the JAS-39E’s hardpoints. The order reportedly includes 4 work packages, with CHF 15.5 million ($9.4 million) committed immediately for design, system development, and prototypes for 3 JAS-39E test planes. RUAG is already soliciting sub-contractors within Switzerland. An option for series production would make up the rest, but Saab can award it elsewhere if the Swiss referendum fails. As appears likely. Sources: RUAG, “RUAG wins contract for SAAB Gripen E payload mountings” | UPI, “RUAG making payload mountings for Gripen fighters” (their currency conversion is wrong) | Saab’s Gripen Blog, “Swiss Technology Group RUAG Collaborates With Saab”. Jan 30/14: Support. Saab announces a SEK 174 million (about $27 million) Swedish option to support and maintain Gripen fleets throughout 2014, placed under the June 29/12 multi-year contract. The contract still covers JAS-39 fleets in Sweden, the Czech Republic, Hungary, and Thailand. South Africa has its own independent support contract, after a long period of bungles and a near-crisis for its fleet (q.v. Dec 19/13). Work will take place at Saab’s facilities in Linkoping, Arboga, Jarfalla, Gothenburg… and Ostersund, which wasn’t mentioned in the 2012 contract. Saab’s June 2012 announcement placed the contract’s maximum option value at SEK 2 billion (about $283.6 million), but this release has revised that to SEK 1.36 billion (about $208 million), with SEK 795 million allocated so far. Sources: Saab, “FMV places order for Gripen support and maintenance”. 2012 – 2013 Sweden & Switzerland agree in principle to buy 82 JAS-39Es, followed by a framework contract and the development contract; Sweden issues 60-plane conversion contract; Hungary extends lease to 2026; South Africa gets a real support contract. JAS-39D & Swiss F/A-18 (click to view full) Dec 19/13: South Africa. South Africa has been relying on short-term interim support contracts that expired in April and endangered the fleet, but a SEK 180 million ($27.5 million) contract with Armscor creates a longer-term arrangement from 2013 – 2016 that should improve costs and predictability. The contract includes typical support services like engineering support, MRO (maintenance, repair, and overhaul), and spares replenishment, as well as technical publications amendments to keep them current with SAAF changes. Read “South Africa’s Sad Military: Why Maintenance Matters” for full coverage. South African support Dec 18/13: Sweden. Saab receives its Swedish Defence Materiel Administration (FMV) contract to convert 60 JAS-39Cs to JAS-39 Gripen Es. The SEK 16.4 billion (about $2.498 million) contract covers the next decade of work from 2013 – 2023, with initial deliveries scheduled in 2018. The contract is announced the same day that Brazil picks Gripen NG for an initial $4.5 billion buy of 36 planes. That may be simple coincidence, but the Feb 15/13 umbrella contract did have provisions that would allow Sweden to end the conversion contract if the Swiss referendum rejects a fighter buy, and no other customers had committed. While the final contract with Brazil isn’t expected until December 2014, their selection puts that doomsday scenario to rest. This contract was expected in the fall, and is larger than the math in the initial contract had suggested (SEK 12.962 billion, q.v. Feb 15/13). It follows SEK 13.2 billion in final development contracts (q.v. Feb 15/13, March 22/13), and represents Gripen NG’s 1st production order. Swedish Gripen E conversion contract Dec 18/13: Meteor. Saab announces an SEK 186 million (about $28.4 million) order from Sweden’s FMV procurement agency, to finish integration of the Meteor long range air-to-air missile on Gripen E. These funds are on top of the February 2013 contract to develop the JAS-39E Gripen NG. The order will play out over Gripen E’s 2013 – 2023 development, but Meteor is scheduled to become operational on JAS-39C/D models in 2014, and JAS-39E conversion shouldn’t take that long. The challenge will be bringing the new fighter itself up to an adequate readiness state for qualification trials, which creates a likely certification threshold of 2017 – 2019. Sources: Saab Group, “Saab Receives Order for Integration Support of Weapon System for Gripen E”. Dec 3/13: Sub-contractors. Israel’s Elbit Systems EW and SIGINT – Elisra announces a contract “for the integration and delivery” their PAWS-2 passive missile warning system “onboard the Gripen fighter.” They don’t say whether this is only for a particular country, as an available upgrade for any model, or targeted for the new JAS-39E/F. The latter option is most likely, as an improved Missile Approach Warning System was an explicit component of the Gripen-E’s upgrades. PAWS looks for the heat plume of incoming missiles, and calculates whether it’s a potential threat. If it is, PAWS triggers a pilot warning, and can fire automatic flare/ chaff countermeasures while cueing DIRCM direct laser countermeasures. If it isn’t a threat, the system doesn’t bother the pilot, and saves on-board resources until they’re needed. PAWS-2 already serves aboard Israel’s unique F-16i Soufa deep strike fleet, and Elisra says that it was picked for Gripen after in-depth evaluations that included a comparative live fire test. Sources: Elbit Systems, “Elbit Systems Selected to Provide Electronic Warfare Systems for the Gripen Fighter System”. April 2/13: Industrial. Saab announces that they’ve set Swiss workshare for all future JAS-39E fighters, but haven’t set their exact industrial partnerships yet. They’ve committed to the armasuisse policy of having 5% of their industrial benefits in Italian-speaking regions, 30% in French speaking regions, and 65% in German speaking regions. Swiss industry will become sole suppliers of the fighter’s rear fuselage, tail cone, air brakes, pylons, and external fuel drop tanks. March 22/13: Gripen E SDD. Saab receives its SEK 10.7 billion (about $1.65 billion) system design & development order for the JAS-39E, covering work over 2015-2023. It includes full definition and development work for the type, as well as adaptation of test and trial equipment, simulators and rigs. This brings total Gripen-E funding to date SEK 13.2 billion, on top of funding to create and test Gripen Demo over the last several years. Additional funds under the SEK 47.2 billion development and production framework agreement will be booked when each order is received, and are expected in 2013-2014. If Sweden’s FMV exercises a cancellation under the conditions of the framework agreement, they are liable to Saab for both costs incurred to date, and for cancellation fees. FMV [in Swedish] | Saab Group. JAS-39E development contract Gripen Demo (click to view full) Feb 15/13: Contract. About 2 months after an overwhelming Dec 6/12 parliamentary vote (q.v. Events section, above), Sweden’s FMV signs a SEK 2.5 billion development contract with Saab for 2013-2014 work on the JAS-39E Gripen Next-Generation. The contract also comes with a number of development and procurement options, which could raise the total to SEK 47.2 billion (currently $7.471 billion). Within another month or 2, Saab expects to sign a contract that funds the rest of Gripen E development, worth SEK 10.6 billion. This would bring the development and testing total to SEK 13.1 billion (about $2.075 billion) on top of Gripen Demo, far higher than initial estimates (vid. Sept 21/12 entry). By the end of 2013, Saab expects to sign a contract to convert 60 Swedish JAS-39C fighters to JAS-39Es. That will require a lot of work, because the fuselage is substantially different. Initial JAS-39E deliveries aren’t expected until 2018, and the type isn’t currently expected to gain its operational capability designation before 2023 or so. By the end of 2014, Saab expects to sign a tranche contract for JAS-39E specific equipment, support and maintenance. It would begin in 2018, alongside the first upgraded Swedish fighters. The umbrella contract adds provisions for 22 new Swiss JAS-39Es, plus initial support, training, etc. By 2014, Saab should know if the referendum on the purchase has passed. The Swiss contract will be CHF 3.126 billion, or SEK 21.138 billion / $3.384 billion at current rates. If Switzerland’s referendum fails to pass and no other customer has bought the JAS-39NG, however, the contract has provisions that would cancel the conversion deal with Sweden at agreed-upon terms. A bit of math leaves an interesting question. If the Swiss deal is included in the SEK 47.2 billion figure, then 47.2 billion – 13.1 billion development – 21.138 Swiss = just SEK 12.962 billion/ $2.04 billion. That has to cover major structural modifications on 60 Swedish fighters, add expensive new equipment including engines and radars, AND finance a support deal encompassing all of the JAS-39E’s unique new features and parts. $34 million per fighter is possible for the conversion, but conversion and maintenance is a stretch. The Riksdagen’s Gripen upgrade vote had approved SEK 90 billion to 2042, so the explanation may be that the JAS-39E support annex is very short term. [DID adds: the final conversion contract alone was SEK 16.4 billion] Swedish FMV | Saab. JAS-39E contract framework for Sweden, Swiss Aug 25/12: JAS-39E/F. Sweden’s government announces that they are committed to buying 40-60 next-generation JAS-39E/F fighters, as part of a joint effort with Switzerland who will buy 22 more. To fund this effort, they’ve agreed to commit another SEK 300 million to the defense budget in 2013 and 2014, and SEK 200 million per year after that. By the time the 1st planes are scheduled to enter service with the Flygvapnet, in 2023, that extra funding would amount to SEK 2.3 billion (currently almost $350 million), if subsequent governments maintain it. It’s hard to know if that’s enough, as negotiations are reported to be in progress for the system development contract, but if the aircraft includes everything it’s supposed to have, that would be a cheap price. Green Party MP Peter Radberg says that his party calculates the likely development cost at “a couple of billion kronor per year” instead. At the same time, the Swiss government issues a statement that there is an agreement in principle between armasuisse and Sweden, completing a Memorandum of Understanding signed on June 29/12. The countries will reportedly share support and upgrade costs under an umbrella model, and final details of specifications, delivery dates, prices, equipment and infrastructure have reportedly been settled, pending final approval from Swiss political authorities. That will include a national referendum – see “Switzerland Replacing Its F-5 Fighters” for full coverage of that buy. Swedish government Release [in Swedish] & Video | Swedish Armed Forces | Svenska Dagbladet – full statement from 4 party leaders [in Swedish] | Swiss government [in German] | Swedish-Swiss Framework Agreement [PDF, in French] | Saab Group || Sweden’s The Local | Expatica Switzerland | Agence France Presse | Aviation Week | Bloomberg | Reuters. JAS-39E/F commitment June 29/12: Support. A multi-year support deal with Sweden’s FMV replaces all of the existing Gripen support contracts with a single contract that includes performance-based support and maintenance, extra funding for the MS20 upgrade package, and studies and definition activities for further Gripen development. It covers Gripen fleets in Sweden, the Czech Republic, Hungary, and Thailand, but not South Africa. The initial order is SEK 3.6 billion ($510.5 million) plus a series of 1-year options totaling up to SEK 2 billion (currently $283.6 million) until December 2016. Performance-based activities include spare parts, maintenance of aircraft systems, and technical engineering support. there’s also an international angle, as Saab’s work maintains updated technical publications and logistics solutions for operation of the Gripen system in Sweden, the Czech Republic, Hungary and Thailand. Most of the work will take place at Saab’s facilities in Linkoping, Arboga, Jarfalla and Gothenburg. Sources: Saab, “Saab signs support and development agreement with FMV for Gripen”. Swedish support, 2012-2016 Jan 30/12: Hungarian extension. Hungary opts to extend its lease of 14 Gripens for another 10 years, to 2026, but doesn’t add any more planes just yet. Terms aren’t disclosed, but the Budapest Business Journal reports that: “Hungarian Defence Minister Csaba Hende said earlier that extending the lease until 2026 would save the state HUF 63bn [DID: about $290 million]… Government data show the Gripen lease costs the budget an annual HUF 30bn. Training programmes for the aircraft cost an additional HUF 2bn a year.” That would place the 10-year extension at about $1.1 to $1.4 billion equivalent, including training, based on straight-line extrapolation. In 2001 the Swedish and Hungarian governments entered into a lease-purchase agreement, with a further modification in 2003 that included 14 Gripen C/Ds (12 single-seater and 2 two-seater aircraft). All aircraft were delivered in 2006 and 2007, and all 14 aircraft were in operation with the Hungarian Air Force by the end of 2008. The current contract was due to expire in 2016. Saab | Budapest Business Journal. Hungarian extension 2010 – 2011 Thais orders another 6 JAS-39C/Ds, AEW plane, missiles; Meteror BVRAAM integration contract; Swedish orders to modernize and maintain the fleet, incl. new avionics system; Curtiss-Wright DSPs for new AESA; Swedish JAS-39 (click to view full) Sept 6/11: ES-05 Raven. Curtiss-Wright Corporation announces a $15 million contract from SELEX Galileo to supply rugged embedded digital signal processor modules from 2010 – 2014. The company’s Motion Control segment will develop the DSP modules at its Ashburn, VA facility. The firm has confirmed that their DSPs will provide the radar processing for the new ES-05 Raven AESA fire control radar system, and the contract could rise to $25 million over the lifetime of the program. July 1/11: Support. Sweden’s FMV issues SEK 1.034 billion (about $159 million) worth of contracts to Saab for a variety of Gripen-related services in 2011. First, Saab will undertake continual maintenance and updates for Sweden’s JAS-39C/D fighters, in compliance with the Swedish Armed Forces’ long-term planning. Second, related efforts will work to maintain the Swedish fleet’s operational capability, including technical support, product maintenance, flight testing, and flight simulator operation. finally, Saab will conduct studies regarding further JAS-39 development, and a resource baseline will be laid down for renewed Gripen testing and verification in the long-term. Saab. May 18/11: Avionics. Saab announces a SEK 152 million (about $24.1 million) order from the Swedish FMV for cockpit development work on the Gripen C/D fighter, upgrading the material system 39/ edition 19 configuration during 2011-2012. March 3/11: Support. Saab announces a SEK 120 million (about $19.1 million) order from the Swedish FMV Defence Material Administration, to provide technical support, product maintenance, flight test and simulators to ensure that Sweden’s Gripen fleet remains ready and operational. The work will be done during Q2 2011, mainly at Saab facilities in Linköping, Arboga, Gothenburg and Järfälla. Jan 25/11: Upgrades. Saab announces a SEK 127 million (about $18.2 million) order from the Swedish FMV to modify undeclared sub-systems of Sweden’s JAS-39 edition 19 fighters – the 2009 upgrade baseline. Work will be carried out in 2011 and 2012. Nov 23/10: Thai Order #2. Saab receives a SEK 2.2 billion (currently $316.6 million) order from Sweden’s FMV to provide Thailand’s 2nd tranche of fighters (6 JAS-39C Gripens) and equip the 2nd S340 AEW&C aircraft being sold to Thailand. There’s also a 3rd component to the overall deal – Saab’s RBS-15F air-launched anti-ship missiles. Precise designations matter here. The FMV specified RBS-15Fs, which are radar-guided Mk.I missiles, without the land attack capabilities of the longer-range, GPS/radar guided Mk.III variants. The RBS-15Fs can be carried on the Gripens to hit ships over 70 km away, using a 200 kg warhead delivered by a stealthy, wave-hugging approach that includes programming for indirect attack vectors, and evasive maneuvers. The agreement is reportedly signed by RTAF commander in chief Air Chief Marshal Itthaporn Subhawong and FMV Director General Gunnar Holmgren, and FMV’s announcement would not disclose the full value of the government-to-government contract. Swedish FMV | Gripen International | Saab Group | Bloomberg | Engineering News, South Africa | Flight International | ScandAsia | China’s Xinhua. Thailand Nov 16/10: Training. Saab announces an order from the Swedish FMV procurement agency, to deliver 3-dimensional (3D) models to the Swedish Gripen simulators, to be generated from aerial images using Saab’s new Rapid 3D Mapping(TM) system. Sept 8/10: Meteor. Sweden’s FMV military procurement agency gives Saab a 4-year, SEK 312 million (about $42.75 million) contract to integrate MBDA’s Meteor long-range air-to-air missile with their JAS-39 fleet’s radar, displays, and support and maintenance systems like simulators and planning computers. The order includes test flights and test firing, as well as a 2-way datalink for communication with the missile and even “hand-off” targeting after it has been fired. The JAS-39 has a head start in this area. It has been the Meteor missile’s test platform since 2006, and has already conducted several Meteor test firings. Work will mostly be performed in Linkoping, Sweden, with some involvement from the Gothenburg facilities. Sweden is now the 3rd country to sign Meteor production orders, after Britain and Spain, but the other 2 countries will mount them on the Eurofighter Typhoon. Saab Group | Gripen International | Defense News. Meteor integration June 1/10: Support. Saab announces a SEK 230 million (currently $29.4 million) support contract from the Swedish Defence Material Administration. It covers product maintenance, technical support, and basic operations such as test flying, rigs and simulators, in order to ensure that the Svenska Flygvapnet’s Gripens remain operational. Work will be undertaken during the second half of 2010, at Saab’s Swedish plants in Linkoping, Arboga, Goteborg, and Stockholm. Saab AB. May 25/10: Upgrades. Saab AB announces a 2-year, SEK 450 million (currently $57.25 million) contract from Sweden’s FMV procurement agency, in order to develop a next-generation set of Gripen avionics upgrades. Saab VP and head of the Aeronautics business area, Lennart Sindahl, explains part of the problem, which is common to all modern combat aircraft: “Computers with the best performance possible today will be viewed as inadequate for the tasks facing Gripen in ten years, when the aircraft must remain modern for a further twenty years. Few high-tech products have a service life as long as Gripen.” In response, Saab will develop a completely new avionics system that includes new displays, back-end computing, and features like sensor fusion, the ability to sort and selectively display information with different security classifications, and changes to the electronic system architecture. The challenge is doing these things without breaking existing capabilities, of course, and the new package isn’t scheduled to enter service with Sweden until about 2020. Saab AB. March 31/10: Upgrades. Sweden’s FMV procurement agency issues a 4-year, SEK 400 million (about $42.3 million) contract to Saab Group to improve the reconnaissance pod’s user interface, and give it night-time capability. The Gripen can also carry the LITENING-III surveillance and targeting pod, which has full night-time capability, and its ReeceLite relative. This order, however, almost certainly involves Terma’s Modular Reconnaissance Pod (MRP 39, q.v. Jan 7/02 entry below). March 30/10: Support. Saab announces a SEK 600 million (about $82.6 million) support contract for 2010-2011: “The contract represents a part of continual system maintenance and updating tasks for the Gripen and complies with the Swedish Armed Forces’ long-term planning for the Gripen… as well as maintaining the material prerequisites for conducting coordinated testing of the flight system. The material prerequisites include renewal of test equipment and test aircraft for testing of the Gripen system on the long term.” March 10/10: Upgrades. Saab announces a 5-year, SEK 2 billion (currently about $280 million) contract from Sweden’s FMV procurement agency, aimed at upgrading the existing fleet of JAS-39 C/D Gripen fighters. On the capability front, upgrades will include improved communications systems, and ECM (Electronic Counter-Measures) defensive systems, upgrades to the existing PS05 radar that will increase its range and add new functions, and integration of additional weapons. On the operational front, Saab will be making some changes to reduce operating costs, based on the fleet’s 130,000 hours of flight experience to date. Interestingly, there’s also a project to “reduce the noise and emissions from test runs during engine maintenance.” Work will mainly take place at Saab’s Swedish plants in Linkoping, Gothenburg, Jarfalla, Kista and Arboga. Saab release. Feb 16/10: IRST. Saab picks SELEX Galileo’s Skyward-G Infrared Search and Track (IRST) to equip Gripen NG. Saab Gripen blog. 2008 – 2009 Swedish government support & upgrade contracts, incl. EW & IFF, IRIS-T SRAAM integration; Sweden orders Cobra HMDs; MRP 39 reece pod development; ETPS support agreement; ES-05 Raven AESA radar development contract with SELEX, after Thales sabotages RBE2-AA AESA collaboration; F414 picked for Gripen NG; improvements. RTAF Gripens (click to view full) May 9/09: Thailand. The Thai Democrat Party government cancels its 15 billion baht follow-on option for 6 Gripens. Faced with a drop in government revenues, it slashes the coming defense budget from 171 billion to 151 billion baht. Subsequent comments indicate that the purchase may end up being delayed, rather than canceled. That is what happened, in the end. March 24/09: ES-05 Raven AESA. Saab and SELEX Galileo sign an agreement to develop a mechanically-pivoted Active Electronically Scanned Array (AESA) radar for the JAS-39NG. Terms are not disclosed. The Raven’s base technology comes from SELEX Galileo’s proven Vixen family of AESA radars, but it has evolved while incorporating technologies and experiences from other radars, including the existing PS-05. Part of that evolution is an innovative combination of AESA focus and low signal “leakage” beyond its focus area, with the potentially wider field of regard that mechanically-pivoted radars can possess. The result will be a far more capable radar than previous Vixen offerings. The new joint radar is now known as the ES-05 Raven, and the addition of mechanical rotation to traditional AESA strengths is an interesting design choice that will give the Raven a unique set of strengths (wider scan; lock, fire and leave tactics) and weaknesses (reliability, maintenance). The end quality of its AESA transmit/receive modules, and their integration, will also play a large role in the radar’s final performance. The arrangement is initially aimed at Brazil’s F-X2 fighter competition, where it leverages Selex Galileo’s strong pedigree equipping Brazil’s F-5BR fighters (Grifo-F radar) and AMX light attack jets (Scipio radar). Once integrated and proven, of course, the AESA upgrade would be available to any Gripen customer. Saab | Gripen International. Raven AESA partnership Feb 10/09: Sub-contractors. Saab and TATA Consultancy Services (TCS) partnered Aeronaoutical Design and Development Centre (ADDC) has been awarded its first contract by Saab to participate in the aerostructural design and development for Gripen NG. Gripen International. Feb 9/09: Studies. Saab announces an SEK 400 million (about $49.7 million) order from the Swedish Defence Materiel Administration (FMV) for 2009 studies regarding future Gripen capabilities. Until significant export sales are made, Sweden remains the home market and financier of the ongoing upgrades required to keep Gripen current. This order is a continuation of a project that started last year, and will form the base for the Swedish Armed Forces decisions regarding what capabilities and technologies to incorporate in subsequent versions. Jan 8/09: Support. Saab announces a SEK 550 million (about $70 million) order from the Swedish FMV procurement agency, to support the Swedish Air Force. Covered activities during 2009 will include program management, product maintenance, support, flight testing, pilot equipment and simulators. Gripen Demo rollout (click to view full) July 9/08: EW. Saab announces a pair of orders from the Swedish FMV procurement agency worth SEK 574 million (about $95.5 million). A SEK 324 million order for Electronic Warfare Systems (EWS) will equip Sweden’s aircraft with up to date antennae, transmitters and appropriate electronics, and deliveries will be made during 2008-2009. The second contract is a SEK 250 million contract for weapons pylons that will enable the Gripens to use GPS-equipped weapons systems like JDAM bombs; most likely this involves pylons with MIL-STD 1760 circuitry. Deliveries will take place between 2009-2011. April 23/08: Thales AESA. Saab announces a contract with France’s Thales to develop a new advanced radar based on AESA technology. Peter Andersson, product manager at Saab Microwave Systems: “At present Thales is developing an AESA within a French radar programme and, like Saab Microwave Systems, is one of the world leaders within the radar field. Together we can quickly develop a demo-product that can show the markets the advantages of AESA technology. The collaboration over the antenna is also cost effective and is in line with Saab’s overall strategy of finding industrial partners for Gripen… Our collaboration is for the Gripen demo. We will have to see what happens in the future.” The collaboration is good for Thales, which have been building the RBE2 AESA radar for France’s Rafale fighter. With other future fighter markets locked up, a Gripen deal offers them their best hope of leveraging that technology into wider sales. Both Thales and Saab have experience with AESA radars, but the global fighter market pits them against established competitors in the USA’s Northrop Grumman and Raytheon, and prospective competitors in Russia’s Phazotron and Euroradar (EADS, Finmeccanica’s SELEX SAS and Galileo Avionica, and INDRA). Saab Microwave Systems is responsible for the overall radar system and its capability, Thales contributes with the antenna, and Saab Aerosystems is responsible for integrating the final product into the JAS-39. Collaboration surrounding the AESA radar actually started in autumn 2007; integration of the complete radar system will continue during 2008, and is expected to be completed in the spring of 2009. The first test flights are planned for summer 2009, and Saab intends to follow that with customer demonstrations. RBE-2 AESA Jan 8/08: IFF. Saab has awarded the Thales Group a contract to supply new IFF (Identification, Friend or Foe) Combined Interrogator-Transponders (CITs) for existing and future JAS-39 Gripen fighters. Price was not disclosed. The contract covers a total of 143 aircraft. 68 Swedish Gripens will receive NATO Mode 4 CITs, and another 75 Gripens (47 Swedish, 14 Hungarian, 14 Czech) will be upgraded to Mode 4 CITs with Mode S capability that gives each aircraft its own “squawk” and can tell aircraft apart in a crowded sky. The aircraft will be ready for the transition to the new NATO Mode 5 secure IFF capability, but this will not be part of the current upgrades. [Source Epicos report link now broken.] 2007 and Earlier Thailand orders 6; Note that this section is not complete. See the Gripen Program Timeline, above, for key milestones and buys involving Sweden, South Africa, Hungary, and the Czech Republic. Gripen & S-1000 (click to view full) Oct 17/07: Thailand. The Thai government announces a $1.1 billion deal for 12 JAS-39 Gripens and 2 S-1000 Erieye AWACS aircraft. Phase 1 will feature 6 Gripens and 1 AWACS for $600 million, with a $500 million Phase 2 option for another 6 Gripens and the 2nd AWACS. Thailand’s current political situation did much to clinch the deal – but it also risked unraveling it. Read: “Thailand Buying JAS-39 Gripens, AWACS” for full coverage. Thailand Oct 17/07: Gripen Demo – Go! SEK 3.9 billion ($600 million) contract with the Swedish Defence Material Administration (FMV) to upgrade 31 Swedish Air Force JAS-39 A/B Gripens to the very latest JAS-39 C/D standard. The FMV has also given the go ahead for the next-generation ‘Gripen Demo’ variant. Gripen Demo Oct 3/07: Cobra HMD for Sweden. A SEK 345 million ($54 million) deal between Sweden’s FMV and Saab promises to equip Swedish Gripens with the Cobra Helmet-Mounted Display. South Africa has already ordered it for their Gripens, and an HMD can really add to a fighter’s air-air capabilities. July 2/07: F414 picked. Saab announces that GE Aviation’s new F414G fighter engine will power its next-generation Gripen models. The F414G is derived from the popular 22,000+ pound/ 96 kN thrust F414-GE-400s that power the twin-engine F/A-18 E/F Super Hornet, and offers a 25-35% power boost over its predecessor the F404. Key F414G alterations will include minor changes to the alternator for added aircraft power, and modified Full Authority Digital Electronic Control (FADEC) software for enhanced single-engine operation. GE Aviation and Volvo Aero Corporation (now part of GKN) will be working together on the new F414G fighter engine. Although Volvo Aero has manufactured modified F404 engines under license for past Gripen fighters, GE will be supplying GE F414G engines directly to Saab for the Gripen Demo project, with Volvo as a major sub-contractor. GE is currently delivering 2 F414 Engines, with flight-tests and customer demonstration evaluations planned for 2008-2010. Gripen International release. F414G for Gripen Demo April 26/07: Norway. Norway and Sweden sign a Memorandum of Understanding on co-operation in development work on future versions of of the JAS-39, worth NOK 150 million (currently about $25 million) over 2 years, plus the option to further extend the agreement. There was also a Letter of Agreement (LoA) signed between Norway and Saab subsidiary Gripen International that will enable Norwegian companies to undertake advanced development work in a range of high technology areas, such as composites, communication systems, studies and integration work for Norwegian weapon systems, ammunition, logistics and data systems connected to Next-Gen Gripen development. July 17/06: UK ETPS. Trainee test pilots at Britain’s world-class ETPS (Empire Test Pilots’ School), which is operated by QinetiQ in partnership with the UK MOD, have signed a new agreement that increases their use of the JAS-39 Gripen. In 2005 all syllabus requirements were met, zero flights were lost due to unserviceability, and where all teaching goals in all areas were exceeded. The new 2006 deal will see a 30% increase in student numbers, a 20% increase in flights per student, the training of a third ETPS Instructor Pilot (IP) and the inclusion of Flight Test Engineer students within a refined syllabus. The 2006 program goes very well, with 56 sorties in just 10 flying days, and no downtime due to mechanical issues. The 2006 test pilot students will be drawn from the French Air Force, the United States Navy, the Royal Australian Air Force and Britain’s Royal Air Force. See Saab release for more details.TEXT UK ETPS MRP-39 on Gripen (click to view larger) July 3/06: Upgrades. Saab received a SEK 1 billion ($150 million equivalent as of 05/07) order from the Swedish Defence Material Administration, covering continued development of the Gripen System. The order reportedly covers various software upgrades, as well as other development activities supporting the long term development of the Gripen system. Work will be performed at Saab Aerosystems and Saab Aerotech in Linkoping, Sweden as well as at Saab Avitronics in Jarfalla and Kista, Sweden. See release. March 23/06: Drop tanks. Saab Aerosystems appoints Swiss firm RUAG as single source supplier for drop tanks to the Gripen. At the same time, an initial EUR 4 million order for more than 60 export drop-tanks was announced, with first deliveries scheduled for August 2007. Note that entries before 2006 are incomplete at this point. Dec 29/05: IRIS-T. Saab receives a SEK 150 million ($18.9 million) contract for integration of the IRIS-T 4th generation short-range air-air missile on the Gripen. Saab is planning to fire the first shot with IRIS-T in 2007, but the integration process will continue to 2009. IRIS-T Jan 7/02: Terma MRP. Terma A/S announces a sub-contract from Saab Avionics AB to make Modular Reconnaissance Pods for the Swedish JAS-39 Gripen fleet, in order to meet the Swedish FMV’s request for a new reconnaissance system. Terma bid jointly with Saab on that contract as the partner responsible for the pod system. AerotechTelub is responsible for Integrated Logistic Support, Recon Optical for the CA270 sensor, and L3 Communication for the digital mass memory. Terma is contracted to develop, qualify and supply the Modular Reconnaissance Pod (MRP 39), including the Environmental Control System, Electrical System, Ground Support System, and part of the Reconnaissance Management System (RMS). The MRP 39 is conceptually based on Terma’s successful F-16 MRP, but it employs a circular cross-section on the lower area of the pod, and an advanced rotating window section. The rotating window is attached directly to the MRP 39 strongback and can be positioned at various positions along the length of the pod mid-section, giving the system more flexibility to add different sensors with different weight and balance restraints. The window section’s 360 degree rotation is electronically synchronized to the sensor aiming, except for take-off and landing where it is rotated up to a safe position. The upper part of the MRP 39 has a square cross-section providing room for the strongback, ducts for the environmental control system, cabling, etc. The idea is to offer more internal pod space, and provide separation that helps eliminate or limit buffeting and dynamic vibrations on the sensitive equipment. The Environmental Control Unit (ECU) will be a new, hybrid structure providing both air and liquid coolers and heaters, plus two symmetrical, multi-speed fans. The ECU will be installed in the aft cone of the MRP 39 and it will be handled as a single, line replaceable unit for ease of maintenance. Saab re: partners. Terma MRP 39 Reco Pod End notes fn1. Defense-Aerospace.com’s July 2006 report attempting to estimate the true cost of western fighters placed the JAS-39C Gripen at over $68.9 million per plane based on the offer to Poland, and estimated the plane’s program cost (R&D amortized) at $78.7 million. To give the reader a quick idea of how that benchmarks, costs for the F/A-18 E/F Super Hornet were estimated at $ 78.4/ 95.3 million, the Eurofighter at $ 100-120/ 120-145 million, and the F-35 Lightning II at $ 115 LRIP / 112.5 million. Read the full report here. The report also noted Saab’s official response of $35-40 million per plane flyaway costs, however, and acknowledged the problems involved in calculating per-plane figures based on foreign orders due to other costs and terms. [Return to story] fn2. Saab clarified that they had not integrated and qualified all of the weapons shown in the “could-have weapons” illustration. Rather, it was intended to display a full range of options that Saab could integrate, in response to customer requests and funding. DID is working on a current list. [Return to story] fn3. The Gripen’s “visual stealth” may surprise some people, but it shouldn’t. A lightweight fighter with a small frontal cross-section always has this edge in air-air combat. An especial disparity occurs when fighters like that confront bigger aircraft; American F-4 Phantoms had some nasty experiences along these lines in Vietnam, flying against much older MiG-17s and MiG-19s. A trip to the Pima Air Museum in Tucson, AZ, where a MiG and Phantom are positioned right across from one another, makes the difference clear. Now throw in the Gripen’s high maneuverability, and the widened ‘threat cone’ for modern short-range infrared missiles. An enemy pilot must now scan for threats in a much larger area – when seconds are all he has, he risks missing an oncoming Gripen in a quick scan, or looking in the wrong place. In exchange for these advantages, lightweight fighters have traditionally given up the powerful radars that could guide medium-range missiles. Moore’s Law of rising silicon chip power has removed this trade-off, and turned it into a difference of degree rather than an absolute difference in capability. [Return to story] fn4. “Fox 2 kill” means an infrared missile shot. Many current Gripens are equipped with Sidewinders, but the plane has also been integrated with the European multinational IRIS-T, and the South African/ Brazilian A-Darter. [Return to story] fn5. Many thanks to reader Dave Dogman, who took the time to read the Saab presentation to Norway and noted the typo – it isn’t 8,100 kg empty weight for Gripen NG, but 7,100 (up from 6,800). DID is grateful to him for pointing this out. [Return to story] Additional Readings & Sources DID thanks Saab and the Swedish FMV for their assistance with this article. Any mistakes are our own. Readers with corrections, comments, or information to contribute are encouraged to contact DID’s Founding Editor, Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so. JAS-39 Gripen: The Platform Gripen Official Site. Was the URL for the Gripen International collaboration with BAE, now redirects back to Saab. See also their old PDF brochure “Gripen: Seeing is Believing“. Saab – The official Gripen multi-role fighter blog. Swedish FMV Procurement Agency – JAS-39 Gripen. Air Force Technology – Gripen Multi-Role Fighter Aircraft, Sweden. JAS-39 Gripen: Ancillary Equipment Saab – PS 05/A Fighter Radar. Used to be an Ericsson Microwave product, until Saab bought them. GE Aviation – F414. Engine installed on JAS-39E/F. GE Aviation – F404. Engine installed on JAS-39A-D. GKN Aerospace – Engines. GKN bought Volvo Aero. Deagel – NORA. Ericsson’s initial AESA radar project involving the Gripen. Defense Update – RBE2 – AESA for the RAFALE. Thales’ current offering in the field. Thales – Active Electronically Scanned Array (AESA) RBE2 radar. UK Parliament, Select Committee on Defence (April 2012) – Written evidence from Saab. Mentions that “up to 36%” of the Gripen is made in the UK, including the new AESA radar, landing gear, etc. Peer Competitors DID FOCUS Article – Eurofighter’s Future: Tranche 3, and Beyond. DID – Top Falcons: The UAE’s F-16 Block 60/61 Fighters. The world’s most advanced F-16s. Vipers have been competitors in several countries, and recent F-16V upgrades offer a slightly less advanced configuration for existing and potential F-16 buyers. DID FOCUS Article – Super Hornet Fighter Family MYP-III. The F/A-18E/F, Advanced Super Hornet, and EA-18G. DID FOCUS Article – EA-18G Program: The USA’s Electronic Growler. A very specialized Super Hornet variant that performs high-power jamming and air defense suppression. Gripen’s integrated weapon set has important limitations in that role, but so do all of its European competitors. DID FOCUS article – Lightning Rod: F-35 Fighter Family Capabilities and Controversies. RAC MiG – MiG-35/MiG-35D. Russian MiG-29 upgrade with an AESA radar and thrust vectoring. DID – France’s Rafale Fighters. Export Competitions: Highlights Norwegian Ministry of Defence, via Wayback Machine – Industripakkane i sokelyset. Unfortunately, the downloadable Gripen International presentation, which is in English and included many details regarding plans for future Gripen versions, isn’t reachable this way. Saab – Official India campaign pages. See also their Gripen India Calendar, a clever marketing campaign. IDSA (Sept 28/12) – Swedish Investments in the Indian Defence Industry: Prospects and challenges. Gripen India (Dec 29/09) – Sea Gripen for Indian Carriers [link dead]. News & Views DID – nEUROn UCAV Project Rolling Down the Runway. Saab is a major player in this stealth attack UAV. Part of the deal included offsetting Swedish government financing in order to keep the JAS-39 Gripen current. Veja Magazine, translated by Saab (February 2014) – Sweden is a model: Interview with Hakan Bushke, CEO of Saab. Talks about Brazil’s F-X2 competition, which Saab won. Flight International (July 13/10) – FARNBOROUGH: Saab plots bright future for Gripen programme. Including a carrier version. Defpro, via Wayback Machine (April 14/09) – Interview with Ake Svensson, President and CEO of Saab AB Saab (July 3/06) – Saab receives 1 Billion SEK order for Continued Development of the Gripen System. Flight International (June 27/06) – New Gripen Variants Studied by Saab. Flight International (June 27/06) – Red Flag Alaska exercise to test Sweden’s Gripens. DID (June 13/06) – Saab Acquires Ericsson Microwave Systems. Once the acquisition is complete, Saab will own all of JAS. DID (May 11/06) – Norway Remains in F-35’s SDD Program But Evaluates Other Aircraft. The Gripen faces off vs. the 5th generation F-35, and the 4th generation Rafale and Eurofighter. DID (May 4/06) – 2007 Budget Proposal Cuts Swedish Gripen Force, Looks to Buy Strategic Lift. The target number put forward is 100 Gripens, down from 204. DID (March 8/06) – Mirage 2000s Withdrawn As India’s MRCA Fighter Competition Changes. Technically, the Gripen is still a possibility for India. Realistically, it’s a long, long shot. edefense Online (July 14/05) – Gripen Settles In. This excellent article covers the Gripen’s evolution and technical capabilities very thoroughly. Dead link, though there’s a partial WayBack version. DID (June 16/05) – Dassault Discusses Global Fighter Market to 2015. Some interesting insights regarding the overall market and replacement timelines. DID (June 13/06) – Gripen Offsets Set – But Drooping Sales Leave Workers Gripin’. BreakingNews.ie (June 8/05): Swedish defence firm Saab lays off 350 [dead link]. DID (May 27/05) – Meteor Missile Will Make Changes to Accommodate F-35. No integration date set, and will be at least 2023. Meanwhile, operational integration of the long range air-to-air missile on Gripen is scheduled for 2015. View the full article
  8. It is one thing to talk about a "Pacific Pivot" or the importance of the Indo-Pacific theater ... but you signal you are serious by your actions. I think Australia has put down a marker ... and they are making the correct move. They see the Long Game. A three-decades-long Australian naval presence in the Middle East will come to an abrupt end this year as the Federal Government grapples with an increasingly uncertain strategic environment closer to home. Defence Minister Linda Reynolds has announced Australia will no longer send a Royal Australian Navy ship to the Middle East every year. ... The shift was flagged in the Government's recent Defence Strategic Update, which declared that deteriorating strategic circumstances would force the military to focus more sharply on the Indo-Pacific and Australia's immediate region. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=xkNyOQguIx0:sdlf3USAAS4:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/xkNyOQguIx0View the full article
  9. Americas Honeywell International won a $15.8 million delivery order for V-22 spare parts. The V-22 Osprey is a joint-service, medium-lift, multimission tilt-rotor aircraft developed by Boeing and Bell Helicopters. Boeing is responsible for the fuselage, landing gear, avionics, electrical and hydraulic systems, performance and flying qualities. The delivery order was a sole-source acquisition using justification 10 US Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. Work will take place in Arizona. Estimated completion date is October 31, 2021. L3 Technologies von a $23.8 million contract to perform survivable super high frequency (SSHF) upgrades to the E-4B platform. The SSHF upgrade seeks to build new capabilities that form the foundation for maintaining the E-4B as an effective nuclear command, control and communications platform. The E-4B is a militarized version of the 747-200 commercial airliner and acts as the United States’ principle airborne command and control operations center during times of war. Originally designed to carry the Secretary of Defense and the Joint Chiefs of Staff during a nuclear attack, the aircraft provides a highly survivable, command, control and communications center to direct US forces, execute emergency war orders and coordinate actions by civil authorities. Work will take place in Utah and Nebraska. Expected completion will be by April, 2022. Middle East & Africa Bombardier Recreational Products (BRP) says it will no longer export its Rotax engines to Turkey after the company become aware that the power plants were installed on the latter’s Bayraktar TB2 unmanned aerial vehicles (UAVs). “We have recently been made aware that some Rotax engines are currently used in military UAVs, and have started a thorough investigation immediately,” Martin Langelier, BPR’s senior vice president and the company’s spokesperson, told Radio Canada International in an email statement. He added that those engines are produced in Austria exclusively for civilian purposes and are certified for civilian use only. An Azerbaijan Bayraktar TB2 was shot down by Armenia last week and components from the wreckage showed that they were made by Canadian companies. Europe The US State Department announced that the Trump administration intends to give two decommissioned F-16 fighters to Bulgaria. The donation was announced during Assistant Secretary for Political and Military Affairs R. Clarke Cooper’s visit to the country. The transfer is subjected to approval by the US Congress. The jets will be used as training aids and general familiarization tools for Bulgarian Air Force personnel. Asia-Pacific A US Air Force C-17 had to make an emergency landing with its nose gear up on October 18 in Afghanistan. US Forces in Afghanistan spokesman Army Col. Sonny Leggett confirmed the incident. A video, taken from a car driving by the runway, shows the C-17 landing on its rear landing gear and then easing its nose down as it slows to a stop, with sparks streaking from its fuselage. Pictures of the C-17 on the ground after the emergency landing show the markings of the 62nd and 446th airlift wings at Joint Base Lewis-McChord in Washington. VT-ALW, the second Boeing 777 airliner modified as the VVIP aircraft for the Indian government has arrived home on October 24. The first aircraft, VT-ALV, was delivered to India on October 1.The B777 is fitted with the state of the art defense systems, including missiles and jamming mechanisms. The plane has a state of the art missile defense system called as the Large Aircraft Infrared Countermeasures (LAIRCM) and Self-Protection Suites (SPS). Today’s Video Watch: US NAVY’S JOHN S.MCCAIN, JMSDF’S JS KIRISAME & AUSTRALIAN ROYAL NAVY’S HMAS ARUNTA JOIN HANDS ! View the full article
  10. E-4B NAOC (click to view full) In December 2005, the U.S. Air Force awarded Boeing a contract as Product Support Integrator (PSI) for the USAF’s E-4 National Airborne Operations Center fleet. These 4 modified 747-200s were introduced in 1974, and serve as complete flying command posts for national and military authorities. As one might imagine, they are hardened to resist the side-effects of nuclear attack, such as electro-magnetic pulse effects. The 2005 contract was a 5-year, indefinite delivery/indefinite quantity contract vehicle, with one 5-year option and a $2 billion cost cap. That’s a lot of money for a small fleet, but the E-4’s plays a military and civil role that gives the program enough leverage to justify it. A long history of support from Boeing includes a number of modernizations, and those continue for various systems within the fleet. DID looks at the aircraft, the program, and ongoing awards. The E-4B and Its Update Team The USAF operates 4 of these 747-200 aircraft variants, assigned to the 55th Wing at Offutt Air Force Base, NE. They’re big planes, for a set of big missions. The E-4B is designed for full national command, including the President of the United States and/or successors, Secretary of Defense, and/or Joint Chiefs of Staff. These command functions extend to nuclear forces if necessary. It also has a civil role in the event of natural disasters. As of 1994, the E-4 fleet will also ferry Federal Emergency Management Agency crews to natural disaster sites and serving as a temporary command post on the ground until facilities can be built on site. E-4B support can cut timelines from days to hours. E-4B overview click for video So, how does this relate to other command planes in the USAF’s inventory? The VC-25 Air Force One is the President’s transport plane, with a much nicer interior and secondary command functions. An E-4B is kept on full alert at all times, and 1 remains relatively close to Air Force One so that the American President can get into an E-4B quickly from anywhere in the world. The smaller 707-based E-6B Mercury/TACAMO has a simpler primary mission: it mirrors the command systems of the military’s STRATCOM authority for nuclear missiles, including VLF communications with American nuclear ballistic missile submarines. Its “Looking Glass” theater command post role offers helpful redundancy, but it would never be the primary option if a choice is available. Inside tour click for video The E-4A debuted in late 1974, and the first E-4B conversion was delivered in 1980. By 1985, all E-4s were E-4Bs. As one might imagine, the E-4B has always had electromagnetic pulse protection, an electrical system designed to support advanced electronics, and communications equipment that’s as new as the requirements for hardened systems can offer. A spool within the aircraft can extend a long antenna up to 5 miles behind the plane, for VLF transmissions. E-4B improvements include newer nuclear and thermal effects shielding, acoustic control, an improved technical control facility, and an upgraded air-conditioning system for cooling all those electrical components. An advanced satellite communications system improves worldwide communications. The main deck is divided into 6 functional areas: a command work area, conference room, briefing room, an operations team work area, and communications and rest areas. An E-4B crew may include up to 112 people, including a joint-service operations team, an ACC flight crew, on-board maintenance and security personnel, a communications team and “selected augmentees.” The goal of the 2005 PSI contract is to provide increased readiness for the fleet, and integrate multiple contracts (Contractor Logistics Support, Engineering Support Services, Message Processing System, and Block I upgrades) into a single best-value contract. USAF Air Combat Command (ACC) is the single-resource manager for the E-4B, and provides aircrew, maintenance, security and communications support. The Joint Chiefs of Staff actually control E-4B operations, and provide personnel for the airborne operations center. Boeing remains the lead system integrator for the E-4 fleet, and leads a team that also includes L3 Communications, Rockwell Collins, and Greenpoint Technology Inc. Contracts & Key Events FY 2012 – Today E-4B (click for full photo) October 26/20: SSHF L3 Technologies von a $23.8 million contract to perform survivable super high frequency (SSHF) upgrades to the E-4B platform. The SSHF upgrade seeks to build new capabilities that form the foundation for maintaining the E-4B as an effective nuclear command, control and communications platform. The E-4B is a militarized version of the 747-200 commercial airliner and acts as the United States’ principle airborne command and control operations center during times of war. Originally designed to carry the Secretary of Defense and the Joint Chiefs of Staff during a nuclear attack, the aircraft provides a highly survivable, command, control and communications center to direct US forces, execute emergency war orders and coordinate actions by civil authorities. Work will take place in Utah and Nebraska. Expected completion will be by April, 2022. Sept 30/14: Boeing Aerospace Operations in OK City, OK receives a $9.8 million contract modification to design and develop a modern “E-4B low frequency transmit system,” through to the stage of system requirements review and finalized system requirements. $4.7 million is committed immediately, and this is just the 1st stage of a FY14$ 92 million effort to replace onboard LF/VLF systems that are considered obsolete. Initial Operational Capability for the new system is planned for FY 2019. Low frequency is also known as the kilometer band, and is useful for long-range transmission because it can be bounced off of the ionosphere and diffract over obstacles. A small subset in the 30-50 kHz range can even communicate with submarines that aren’t too far underwater. Surer sub-surface communication can be had below this range through ELF and VLF sites, but those methods require structures whose size is measured in square miles. The USA decommissioned its fixed ELF sites in 2004, but continues to maintain several VLF locations. Work will be performed at OK City, OK, and is expected to be complete by April 30, 2015. The USAF Life Cycle Management Center in Tinker AFB, OK, manages the contract (FA8106-07-C-0001, PO 0204). See also Briefing slide [PDF]. Sept 26/14: Boeing in Wichita, KS receives a sole-source $26.6 million task order for E-4B programmed depot maintenance and modifications. All funds are committed immediately, using USAF FY 2014 O&M and aircraft budgets. Work will be performed at San Antonio, TX, and is expected to be complete by May 15/15. This award is the result of a sole-source acquisition. The USAF Life Cycle Management Center at Tinker AFB, OK manages the contract (FA8106-06-D-0001, 0047). June 2/14: FAB-T terminals. Raytheon in Marlborough, MA receives a $298 million firm-fixed-price and cost-plus-fixed-fee contract modification for 84 FAB-T Command Post Terminals (CPT), which will allow broadband-speed reception from the USAF’s hardened, secure new AEHF satellites. FAB-T CPTs will equip E-4B NAOC and E-6B Mercury Block II command post aircraft, as well as some ground and mobile locations. After FAB-T reaches Milestone C, Phase 2 production contract options for Low-Rate Initial Production and beyond will open up for Raytheon, expanding the contract considerably. It’s a sharp blow to prior incumbent Boeing, but not entirely unexpected. Buying FAB-T terminals for USAF B-2 and B-52 bombers, RC-135 SIGINT/ELINT aircraft, or other planes, would require another procurement process. Work will be performed in Marlborough, MA and Largo, FL, with the Florida location serving as the assembly point. USAF FY 2013 through 2019 budgets will fund FAB-T buys over time, with just $31,274 committed immediately. Two bids were solicited and two received. The USAF Life Cycle Management Center/HNSK at Hanscom AFB, MA, solicited 2 bids, and received 2 (FA8705-13-C-0005, PO 0002). Sources: Pentagon DefenseLINK | Raytheon, “Raytheon awarded $298 million for US Air Force FAB-T satellite terminal program” | Defense News, “Space Fence, FAB-T Awards Show an Emboldened DoD”. Dec 3/13: Support. Boeing in Wichita, KS receives a $75.7 million firm-fixed-price contract modification, attached to the $1 billion E-4B “Product Service Integrator” deal (q.v. Dec 8/05). They’ll provide support and spares, programmed depot maintenance, modifications, and related activities. $24.5 million in FY 2014 operations and maintenance funds are committed immediately. The Pentagon said that work would be performed in Wichita, KS and is expected to be complete by Nov 30/14. That’s half-right. Wichita has traditionally been the E-4’s base of support, but Boeing announced their intent to close the plant in January 2012, and it’s still on schedule for closure in March 2014. E-4 work has been moved to Oklahoma City, OK and San Antonio, TX. The USAF Life Cycle Management Center/WLKLC at Tinker AFB, OK manages the contract (FA8106-06-D-0001, PO 0030). See also Wichita Eagle, “Boeing: Work from Defense contract won’t be done in Wichita”. July 1/13: Broadband SATCOM. Raytheon Network Centric Systems in Marlborough, MA receives a $34 million contract modification to continued development and testing of air (E-4, E-6) and ground fixed and transportable command post terminals with presidential and national voice conferencing. The systems are a parallel project award under the Family of Advanced Beyond line-of-sight Terminals (FAB-T) program, which leverages new AEHF hardened broadband satellites. The goal is a production-ready system by September 2014. Work will be performed at Marlborough, MA, and is expected to be complete by by October 2013. Fiscal 2012 Research and Development funds are being obligated at time of award. Air Force Life Cycle Management Center/HNSK, Hanscom Air Force Base, MA manages the contract (FA8307-12-C-0013, PO 0013). Sept 10/12: Broadband SATCOM. The Raytheon Co. Network Centric Systems in Marlborough, MA, is being awarded a $70 million firm fixed price contract for development, testing and production of FAB-T engineering development models of air (E-4B, E-6B TACAMO), ground fixed and transportable Command Post Terminals with Presidential and National Voice Conferencing (PNVC). FAB-T terminals are designed to work with the US military’s new AEHF hardened broadband satellites. The location of the performance is Marlborough, MA. Work is to be complete by July 2013. The AFLCMC/HSNK at Hanscom AFB, MA manages the contract (FA8307-12-C-0013). Feb 24/12: Raytheon in Largo, FL receives an $8.9 million cost-plus-fixed-fee price contract for 1 installation lot of E-4B Mod Block 1 audio infrastructure obsolescence upgrades. Work will be performed in Largo, FL and is expected to be complete by Feb 28/13. The OC-ALC/GKSKH at Tinker Air Force Base, OK manages the contract (FA8106-12-C-0003). FY 2005 – 2011 E-4B mission click for video Sept 19/11: Delivery. Boeing returns another E-4B to Offut AFB, NE after its programmed depot maintenance (PDM). Boeing’s E-4B program manager, Glenn Winkler, referred to “over and above” surprise issues uncovered during the maintenance, but the maintenance and modifications were completed, and the plane flew on to Offut AFB, NE after a new paint job by Boeing partner L-3 in Greenville, TX. Boeing. June 7/11: CNS/ATM upgrade. Boeing announces an unspecified USAF award for the E-4B Communications Navigation Surveillance/Air Traffic Management (CNS/ATM) upgrade, Phase 1. The CNS/ATM upgrade will bring the fleet in line with new Federal Aviation Administration requirements for flight in civilian and international airspace, and will also allow the E-4Bs to operate more efficiently at airports and in crowded airspace. Their solution will be derived from current Boeing 737 cockpits, and the 4 E-4Bs will be upgraded in 3 phases. Phase 1 includes next-generation flight-management hardware and software, as well as a multimode receiver radio that combines several aircraft systems into a single component. Boeing Global Transport & Executive Systems (GTES) will incorporate the Phase 1 upgrades during the E-4Bs’ regularly scheduled maintenance cycle at Boeing’s Wichita, KS facility. The initial E-4B CNS/ATM Phase 1 aircraft is expected to enter flight test in Q4 2012. Aug 20/10: Accident. A USAF Air Combat Command Accident Investigation Board rules that a May 12/10 accident at Offut AFB, NE was caused by pilot error. The E-4B’s tail hit the runway between 2-3 feet past the centerline, causing about $3.1 million worth of damage. The aircraft was quickly brought to a stop, with no injuries or further property damage. According to the report, the board ruled that major factors included misperception of the operational conditions in altitude, glide path and descent rate on the aircraft’s short final; breakdown in visual scan during a night landing; overcontrolling the input to the yoke of the aircraft; and procedural error recovery technique that resulted in too much pitch. USAF. Sept 21/07: Delivery. Boeing announces the delivery of a refurbished E-4B National Airborne Operations Center to the U.S. Air Force Strategic Command after completing programmed depot maintenance (PDM) at its modification center in Wichita, KS. Dec 8/05: Support. Boeing in Wichita, KS receives a maximum $1 billion indefinite delivery/ indefinite quantity contract fee to be the E-4B’s Product Support Integrator (PSI): a sole source, performance based effort to take care of logistics, maintenance, modernization, and engineering work, combining a number of separate contracts (CLS, ESS, MPS, & Block I) into one contract. Boeing has supported the E-4 fleet of 4 modified Boeing 747 aircraft for 25 years now, offering contractor logistics support, engineering services and technical order support. Solicitation began August 2005, and negotiations were complete December 2005. The indefinite delivery/ indefinite quantity contract will have a 5-year basic period, plus 1 more 5-year option period, which would extend it to FY 2016. The Oklahoma City ALC at Tinker AFB, OK (FA8106-06-D-0001, announcement Feb 13/06). Boeing’s corporate release pegs the total value at up to $2 billion. $1 billion performance-based support deal Additional Readings USAF – E-4B. Boeing – E-4B Advanced Airborne Command Post. TIME Battleland (April 2/13) – Costly Flight Hours. If the C-5C is removed as a massive outlier (even compared to other C-5s), The E-4B is the most expensive plane per flight hour, just ahead of Air Force One. Both cost over $160,000 by AFCAP figures, which include aircraft modifications as a cost. Defense Media Network (April 23/11) – E-4B Emergency Command Post Doubles as SECDEF’s Ride. Other C2 Aircraft DID – Boeing Contracted to Support Air Force One VC-25s. DID – The USA’s E-6 Fleet: TAke Charge, And Move Out!. View the full article
  11. We don't do politics here ... but we do touch on how politics can impact national security issues ... so here we go! Why has national security almost been a non-issue this election? What to expect if Trump gets a second term. What and who will come to the front if Biden is elected. What will drive the challenge regardless of who gets elected? Come join us for the full hour this Sunday from 5-6pm Eastern as we discuss this and more with an open chat room and open phones if you want to join in. It will be an open topic, open phones free for all ... so if you think our topics are bogus, bring your own! If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=7WbNVXfrsus:pF6JXKpjd4M:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/7WbNVXfrsusView the full article
  12. http://1.bp.blogspot.com/-RcvUrMT2jmg/Vbr0UnCZ3GI/AAAAAAAAKFw/D6h-Gx0SfkQ/s320/horace-greasley-confronting-heinrich-himmler-like-a-boss.jpg I look at what some men did so young, and I look at pity at what little I have done, and am perplexed about all the complaining from others. That photograph on the right? That is Horace Greasley looking down at Himler. As Peter outlines, He admitted to not know who the man was, only that he was a high ranking Nazi. He is shirtless because he was showing Himmler how skinny he was and was requesting more rations for the prisoner. Because that is what you do when you are carrying on a secret love affair with a Jewish girl that could get you killed, you stand up to the head of the SS and the guy most responsible for the Holocaust. He was maybe 25 when that was happened. What else did he do? Via TheTelegraph; The reason for the frequency with which Greasley put his life in danger, he admitted with engaging good humour and frankness, was simple: he had embarked on a romance with a local German girl. Rosa Rauchbach was, if anything, running even greater risks than Greasley. A translator at the camp where he was imprisoned, she had concealed her Jewish roots from the Nazis. Discovery of their affair would almost certainly have meant doom for them both. Greasley recounted the almost incredible details of his wartime romance in the book Do The Birds Still Sing In Hell? (2008), which he had been "thinking about and threatening to write" for almost 70 years. But while the book is described as an "autobiographical novel", the story was largely confirmed at his debriefing by MI9 intelligence officers shortly after the war. ... He was 20 and working as a young hairdresser when Hitler invaded Czechoslovakia, ... But his war proved a short one. After seven weeks' training with the 2nd/5th Battalion Leicestershire Regiment, he landed in France at the end of the "Phoney War" as one of the British Expeditionary Force; on May 25 1940, during the retreat to Dunkirk, he was taken prisoner at Carvin, south of Lille. There followed a 10-week forced march across France and Belgium to Holland and a three-day train journey to prison camps in Polish Silesia, then annexed as part of Germany. Many died on the way, and Greasley reckoned himself lucky to have survived. In the second PoW camp to which he was assigned, near Lamsdorf, he encountered the 17-year-old daughter of the director of the marble quarry to which the camp was attached. She was working as an interpreter for the Germans, and, emaciated as he was, there was, Greasley said, an undeniable and instant mutual attraction. Within a few weeks Greasley and Rosa were conducting their affair in broad daylight and virtually under the noses of the German guards – snatching meetings for trysts in the camp workshops and wherever else they could find. But at the end of a year, just as he was realising how much he cared for Rosa, Greasley was transferred to Freiwaldau, an annex of Auschwitz, some 40 miles away. The only way to carry on the love affair was to break out of his camp. ... Sometimes, Greasley reckoned, he made the return journey three or more times a week, depending on whether Rosa's duties among various camps brought her to his vicinity. His persistence in their love affair was not the only testimony to his daring. A wartime photograph shows Heinrich Himmler, head of the SS, inspecting a prison camp and a shirtless skinny PoW close to the fence confronting him. ... Rosa repaid his attentions, he said, by providing small food parcels and pieces of equipment for him to take back into the camp, eventually including radio parts which enabled 3,000 prisoners to keep up with the news by listening to the BBC. Greasley was held prisoner, working for the Germans in quarries and factories, for five years less one day, and was finally liberated on May 24 1945. He still received letters from Rosa after the war's end, and was able to vouch for her when she applied to work as an interpreter for the Americans. Not long after Greasley got back to Britain, however, he received news that Rosa had died in childbirth, with the infant perishing too. Horace Greasley said he never knew for certain whether or not the child was his. After demobilisation he returned to Leicestershire, swearing that he would never take orders from anyone again. He ran a hairdressers', a taxi firm and a haulage company in Coalville, where he met his wife, Brenda, at a fancy dress party in 1970. They married in 1975, retiring to the Costa Blanca in Spain in 1988. Greasley was delighted with the publication of his book and was to have undertaken a return visit to Silesia for a television company this spring, having, he said, been promised the company of "a very attractive 21-year-old female nurse for the entire journey". He died in his sleep before the offer could be made good. Horace Greasley is survived by his wife and by their son and daughter. First posted in July 2015. http://feeds.feedburner.com/~ff/blogspot/FAFV?d=yIl2AUoC8zA http://feeds.feedburner.com/~ff/blogspot/FAFV?d=qj6IDK7rITs http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:gIN9vFwOqvQ http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:-BTjWOF_DHI http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:V_sGLiPBpWU http://feeds.feedburner.com/~ff/blogspot/FAFV?i=vq87-FkMnqs:mokeXZg16ZY:F7zBnMyn0Lo http://feeds.feedburner.com/~r/blogspot/FAFV/~4/vq87-FkMnqsView the full article
  13. Americas The US Air Force has started a search to find a supplier for its Global Precision Attack Weapon, a small, lightweight bomb that fits in the weapons bays of the B-21 and F-35. The weapon is to have “high loadout” and digitally engineered, Air Force magazine reports. „High load“ means many can be carried on a single platform, suggesting a small size—and digitally engineered, with open-systems architecture. It should enable “maximum flexibility to integrate a suite of technologies,” including position, navigation, and timing and guidance, navigation, control; as well as “cockpit-selectable warhead effect,” fuzing, sensors, propulsion, “signature optimization” or stealthiness, “maritime apps, multimode seeker, affordable mass, and autonomy/sensing.” GPAW will have to operate “within the joint, all-domain functional environment against near-peer competitors.” It was suggested the weapon should be able to collaborate autonomously. The announcement modified a previous announcement published by the Air Force and Special Operations Command in the spring. This year’s Trident Warrior 20 exercise saw the US Marine Corps deploy four oceanographic sensors from its MV-22Bs for the first time. Dropped into the Pacific Ocean by VMM-163, these sensors were previously deployed from the back of C-130s or directly by ships. The data collected would provide the Marines with the best environmental awareness possible prior to conducting amphibious operations. Trident Warrior is an annual large-scale field experiment in operational naval environments. Middle East & Africa The United States contracted the sale to Jordan of one Sikorsky UH-60 Black Hawk helicopter for royal duties. The Department of Defense announced that Sikorsky had been awarded $13.7 million for a single UH-60M to be delivered by November 30. Fiscal 2010 Foreign Military Sales (Jordan) funds for the full amount were obligated at the time of the award. “The UH-60M will supplement Jordan’s existing Royal Squadron fleet of Black Hawk helicopters and be used to facilitate the movement of the Jordanian royal family in a safe and efficient manner,” the DSCA notification said. Europe Leonardo successfully demonstrated unique integrated capabilities between a manned aircraft and an unmanned aerial vehicle (UAV). This took place in the UK during Manned-Unmanned Teaming (MUMT) trials between a Leonardo AW159 Wildcat helicopter and a semi-autonomous UAV from Callen-Lenz Associates. The demonstration was part of the British Army’s MUMT themed Army Warfighting Experiment (AWE) 19, and was planned and executed by Dstl and took place on Salisbury Plain in September. Asia-Pacific A notice released Wednesday says the State Department has approved the sales to the Taipei Economic and Cultural Representative Office in the United States of 135 Standoff Land Attack Missile Expanded Response (SLAM-ER) missiles and related equipment estimated for more than $1 billion, 11 High Mobility Artillery Rocket Systems (HIMARS) M142 Launchers and related equipment for an estimated $436.1 million and six MS-110 Recce Pods and related equipment for an estimated $367.2 million. “This proposed sale serves U.S. national, economic, and security interests by supporting the recipient’s continuing efforts to modernize its armed forces and to maintain a credible defensive capability,” the Defense Security Cooperation Agency announcement said. Today’s Video Watch: Why America’s V-22 Osprey Just Keeps Getting Better – Able to Fly Across the Pacific Ocean View the full article
  14. Americas Lockheed Martin won a $138.8 contract modification, which adds scope to continue the development of pilot training device software to align the F-35 air system with continued capability development. Additionally, this modification provides for testing and continuous re-certification activities for dual capable F-35 aircraft as Block 4 capabilities are developed, matured and fielded in support of the Navy, Marine Corps, Air Force and non-Department of Defense (DOD) participants. The Lockheed Martin F-35 Lightning II is an American family of single-seat, single-engine, all-weather stealth multirole combat aircraft. Just recently it was reported, that by the end of 2020, F-35 fighter jets from Lockheed Martins production will be equipped with a modified lightning protection system that will fix problems discovered earlier this year, the company’s head of production said. Work under the current modification will take place in Texas. Expected completion date will be in June 2024. The first live fire test of the MK 57 Vertical Launching System on the first-in-class USS Zumwalt, using a Standard Missile-2, was executed successfully on the Naval Air Weapons Center Weapons Division Sea Test Range, Point Mugu, earlier this month. The Zumwalt, delivered to the Navy in April, successfully showed off its ability to detect, track and engage an anti-ship cruise missile with an SM-2, the US Navy announced this week. The test also assessed the ship’s ability to hold up against the shock and vibration of weapon firing, along with any hazards and degradations resulting from the live firing, the Navy said. At 610 feet long and 80 feet wide, which is 100 feet longer and 13 feet wider than the Arleigh Burke Class destroyer, Zumwalt has the space to conduct a wide array of surface, undersea and aviation missions, the Navy has said. Middle East & Africa The UN’s Libya envoy said she was “quite optimistic” about the prospects of a ceasefire emerging from talks underway in Geneva between the two warring factions in the troubled north African country. After two days of face-to-face discussions at the United Nations, which are scheduled to last until Saturday, the two sides have agreed to open internal land and air routes. They also agreed to maintain the current calm on the frontlines and to avoid military escalation, and on moves which should ensure the increase of oil production. “The two sides have reached agreement on several important issues which directly impact the lives and welfare of the Libyan people,” Stephanie Williams, the head of the UN Support Mission in Libya (UNSMIL), told a press conference. “I’m quite optimistic… there is an air of seriousness and commitment,” she said on the prospect of a ceasefire. Europe Eurofighter formally submitted to Spain its offer to provide a further 20 Typhoon aircraft under the country’s Project ‘Halcon’ (Falcon). Delivery of the offer, which was disclosed by the consortium on 19 October, came three months after Spain announced that it was seeking to augment its existing Typhoons and to begin the process of replacing its Boeing EF-18 Hornet fleet. “Eurofighter has submitted proposals for the replacement of the Spanish Air Force’s EF-18s which are based on the Canary Islands. Spain is looking to secure 20 new Eurofighter Typhoon aircraft to boost its existing fleet under what is called Project Halcon,” the consortium said. Asia-Pacific Bucking the trend, the Republic of Korea Air Force (RoKAF) will not be assigning a local nickname for the RQ-4. Instead, the unmanned air vehicle will still be called Global Hawk. The service had given the nickname “Freedom Knight” to the F-35A last year. Separately, Korea Herald reports that the Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) system for the RQ-4 is expected to be delivered to the country next month. The “due to prolonged negotiations between the US government and its manufacturer, along with the COVID-19 situation,” the Defense Acquisition Program Administration (DAPA) mentioned in a report to the National Assembly. The US government made requests in July and August this year to Indonesia for its P-8A to land and refuel in the South East Asian country but those requests were rejected. Indonesia’s President Joko Widodo personally rejected those requests, Reuters reports. Representatives for Indonesia’s president and defense minister, the US State Department press office and the US embassy in Jakarta did not respond to requests for comment. Representatives for the US Department of Defence and Indonesia’s foreign minister Retno Marsudi declined to comment. The proposition, which came as the US and China escalated their contest for influence in Southeast Asia, surprised Indonesia’s government, the officials said, because Indonesia has a long-standing policy of foreign policy neutrality. The country has never allowed foreign militaries to operate there. Today’s Video Watch: STAND-OFF ANTI-TANK (SANT) MISSILE TESTED SUCCESSFULLY | CHINESE TANKS ON CROSSHAIR! View the full article
  15. Italian Eurofighters (click to view full) The multi-national Eurofighter Typhoon has been described as the aerodynamic apotheosis of lessons learned from the twin engine “teen series” fighters that began with the F-14 and F-15, continued with the emergence of the F/A-18 Hornet, and extended through to the most recent F/A-18 Super Hornet variants. Aerodynamically, it’s a half generation ahead of all of these examples, and planned evolutions will place the Eurofighter near or beyond parity in electronic systems and weapons. The 1998 production agreement among its 4 member countries involved 620 aircraft, built with progressively improved capabilities over 3 contract “tranches”. By the end of Tranche 2, however, welfare state programs and debt burdens had made it difficult to afford the 236 fighters remaining in the 4-nation Eurofighter agreement. A 2009 compromise was found in the EUR 9 billion “Tranche 3A” buy, and the program has renewed its efforts to secure serious export sales. Their success will affect the platform’s production line in the near term, and its modernization plans beyond that. Eurofighter: Design & Evolution Eurofighter, Spain (click to view full) The Eurofighter program emerged out of a long and conflicting set of multinational efforts to design a new European fighter. By 1983, Britain, France, Germany, Italy and Spain had coalesced around the Future European Fighter Aircraft (FEFA) program. That partnership lasted only until 1985, as differences with France over carrier compatibility, weight limits, and French insistence on the lead industrial role, ended their partnership. Britain, Germany, Italy and Spain established Eurofighter Jagdflugzeug GmbH in 1986 to manage the Eurofighter project, while France went its own way and developed their Rafale fighter. Both projects went on to develop clipped delta, canard-equipped twin-engine fighters, whose “radar shaping” designs significantly lowered their radar signature compared to earlier fighters like the Mirage F1, Tornado, or F/A-18A-D Hornet. Even so, it would be a misnomer to call these European jets stealth aircraft. The standard term is a “4+ generation” fighter, distinguishing them from “5th generation” aircraft like the American F-22A Raptor and Indo-Russian PAK-FA. While the Rafale’s development emphasized weapon load and multi-role capabilities, squeezed budgets and ample fleets of strike aircraft led Eurofighter’s partner nations to focus on the air superiority role. An excellent aerodynamic design, very good thrust-to-weight ratio, and fast slew-and-point capability was fused with a very integrated set of electronic sensor and defensive systems, including a pilot-friendly cockpit design that offered the first use of voice commands in a fighter. This made Eurofighter’s Typhoon very capable in its chosen aerial role, able to compete with or best serving opponents short of the American F-22A. Typhoons even proved capable of armed supercruise during 2011 Libyan operations, but this was only possible with low-drag “4 + 2” air-to-air missile configurations, at high altitudes, to Mach 1.2. PIRATE IRST: B-2, ICU (click to view full) For air-to-air combat, the Eurofighter currently relies on long range detection using its mechanically-scanned, phased array ECR-90 CAPTOR radar and PIRATE IRST(Infra-Red Search & Track) system, coupled with a good array of advanced air-to-air weapons. Non-British Eurofighters will also have a 27mm Mauser cannon on board, considered by many observers to be the best fighter cannon on the market. On defense, the Typhoon’s Praetorian (formerly EuroDASS) self-protection suite is designed for 360 degree coverage, with high automation. The Defensive Aids Computer (DAC) controls a package that includes Towed Radar Decoys, a Missile Approach Warner (MAW), wingtip ECM pods, and a Countermeasures Dispensing System (CMDS). They are integrated with each other, and with the Eurofighter’s radar and IRST. Unfortunately for the consortium, this aerial combat strength ended up being the flip side of their biggest weakness. Initial “Tranche 1” machines were severely hobbled on the export market by their poor ground attack capabilities, a serious weakness in a world of multi-role fighters. When combined with the plane’s $100+ million cost, the result has been a slew of lost export competitions. Dassault’s Rafale, which had gaps of its own, could not capitalize on that failing, and is still looking for its first export win. Embarrassingly, the Eurofighter has usually lost to modernized, multi-role versions of the very F-16s and F-15s it was meant to supplant. That, in turn, has affected both prices and the pace of upgrades. A list of current weapons may help snap the plane’s evolution into clearer focus: As the list above notes, the Tranche 2 fighters that began delivery to member countries in 2008 have added precision ground attack capabilities under programs like P1E, but still fall well short of the full capabilities and weapon arrays offered by competitors like the American F/A-18E/F Super Hornet and F-15E Strike Eagle. Their lack of a helmet-mounted display (HMD) compounded this issue, preventing the Typhoon from taking full advantage of its new air-to-air missiles, and detracting from their ground attack capabilities. A BAE “Striker” HMSS Helmet-Mounted Display is in low-rate production now, but it didn’t become operational until 2011. Tranche 3 Eurofighters will reportedly be based on the Tranche 2 standard, with provisions for dorsal conformal fuel tanks (CFTs) that can extend range while creating minimal drag. The other big change involves upgraded power systems and electronics that can more easily support future growth and upgrades. The weapon bus can handle fiber optic cabling, onboard computing is upgraded, and a high speed data network improves sharing with weapons or other platforms. The most important upgrade remains a CAPTOR “E-Scan” Active Electronically Scanned Array (AESA) radar to replace the ECR-90. Industry is developing it for a 2015 delivery date, but there doesn’t seem to be a contract framework in place. The lack of an AESA radar leaves the Eurofighter a generation behind its American counterparts in radar technology, and until it catches up, it’s likely to suffer in export competitions. F-35A Lightning II (click to view full) Even as these upgrades are being discussed, however, the Eurofighter’s export window as a leading-edge fighter choice is closing. The F-35 Joint Strike Fighter is aerodynamically inferior, but it offers a stealth fighter with a tested AESA radar, a wider array of sensors, and sensor fusion at an even higher level. By the end of this decade, 5th generation projects like the Russo-Indian PAK-FA will also become viable choices for some export targets. Successful upgrades can keep the Eurofighter Typhoon competitive, even in that environment, if its production line lasts long enough. The key word will be “competitive.” As an example, see this comparison of the Eurofighter vs. Saab’s single-engine contemporary, the 4+ generation JAS-39 Gripen. Saab already has a development contract for an ES-05 Raven AESA radar, and is significantly ahead in weapons integration: Eurofighter: What’s Next? A Weak Core Eurofighter 2020 (click to view full) Tranche 3 aircraft are expected to deliver a few important new capabilities, including an AESA radar and Conformal Fuel Tanks. At present, however, only Tranche 3 Eurofighters are designed to add CFTs. The biggest question at present is whether Tranche 3A aircraft will be the only CFT-capable Typhoons. The status of core countries’ Tranche 3B orders is very unclear, but Britain and Germany have already firmly ruled out further buys, and it appears likely that Tranche 3A will be the last production order from the original member countries. In 2011, Eurofighter’s CEO placed the end of production at 2015, barring a major export win like India or Japan, or a Tranche 3B purchase from the consortium partners. By 2014, that date had been revised to 2017/18, but 2015 still marks the point that parts of the supply chain will begin to stop. This will leave core countries with smaller fleets, for 2 reasons. One is limited orders. The other is Typhoon fleets that won’t serve in parallel. UK Air Chief Marshal Sir Glenn Torpy has said that he expects the RAF to operate on the basis of a Typhoon fleet of 120 aircraft. By the time the last jets of the 3A tranche come into service, between 2015 and 2020, the first batch of Tranche 1 Typhoons would be approaching the end of their life. This is likely to be true in other partner countries as well. A 2009 Der Spiegel article illustrates some of the issues in Germany, for instance: “The German air force didn’t get the first jets until July 2006. It now has 38 Eurofighters. But 14 of them have been sent back for repairs. Some of them still suffer instrument failure during flights. Of the six single-seat aircraft at the Neuburg air base only four are fit for service on average. That’s just enough to provide day and night cover for Germany’s airspace. The defense ministry recently admitted to budget committee members that the approved sum of [EUR] 14.7 billion would only be enough to pay for 143 Eurofighters. Parliament would have to approve an additional [EUR] 3 billion if the air force was to get the planned 180 aircraft…” Upgrade Lifeline? IPA7 tests KEPD-350s (click to view full) At the same time, remaining aircraft in these existing fleets offer strong opportunities for piecemeal upgrades, from moves to give Tranche 1 planes precision ground attack capabilities, to helmet-mounted sights, AESA radar retrofits, and even thrust-vectoring engines to create super-maneuverability. Conformal fuel tanks (CFTs) could also become possible, if Eurofighter devises an appropriate upgrade process. It would be logical to make that part of a life-extension structural refit, which would help existing customers keep expensive investments in service for longer. Key export order competitors like the F/A-18E/F Super Hornet, F-15 Strike Eagle, F-35 Lightning II, JAS-39 Gripen, Rafale, and Russian SU-30MKx/SU-35 already field every one of these capabilities – but none currently field all of them. Weapon upgrades are absolutely expected. Expansion of the Typhoon’s ground attack weapon choices is an ongoing process. MBDA’s medium-range stealthy Storm Shadow cruise missile is in testing for full integration by 2015, reportedly thanks to Saudi Arabia and Oman. Taurus’ similar KEPD 350 will undergo partial testing at the same time. Saudi Arabia also reportedly wants to add the French Damocles surveillance and targeting pod, which makes sense because the Israeli LITENING-III runs up against their boycott. Storm Shadow (click to view full) In the air, 2017 is expected to mark full integration of the long-range Meteor air-to-air missile. Over the medium term, planned weapons reportedly include Diehl’s medium-range PILUM and HOSBO glide bombs, short-range MBDA Brimstone light strike missiles, and possibly their longer-range SPEAR-3 successors. Raytheon’s AGM-88 HARM anti-radar missiles have been discussed, and they would fix a critical deficiency for an important mission. So, too, would anti-ship missiles, which all of its competitors already carry. None of these items come with a schedule, however. National budgets will play a role in the pace of these upgrades, as they have throughout the Eurofighter’s history. The question, for current and future customers, is timing. Until integration is done, the absence of key capabilities like long-range precision strike and anti-radar missiles will continue to hobble the Typhoon’s positioning as a fully multi-role aircraft. What has changed now is the consortium’s seriousness about winning exports, along with a dawning understanding that most of these upgrades are now basic requirements for serious players. The question is whether this understanding came too late. Exports Required Eurofighter Display click for video Export wins will be necessary in order to finance the full range of timely improvements, and keep the line open past 2017/18. An August 30/09 Financial Mail article reported that Eurofighter GmbH was hoping for sales of 300 Eurofighter Typhoon to 10 export countries by 2020, but that will be very challenging. The Eurofighter’s cost of $100-140 million each is already creating tough sledding against F-35 stealth fighters whose production quantities will eventually create prices in the $100 million range, and F/A-18 Super Hornets or JAS-39E/F Gripens that can be sold for around $60-70 million. With existing operators interested in selling some of their aircraft, even an export win or 2 may not change the Eurofighter’s overall production numbers. The Tranche 3A release from Eurofighter cited active export campaigns in Switzerland, India, Japan, Romania, Greece, and Turkey, while “exploring possible opportunities” in South Korea, Bulgaria, Croatia, et. al. Romania (F-16s) and Turkey (F-35A) never went ahead with a real competition. Subsequent losses in Brazil (JAS-39E/F Gripen), India (Rafale, unfinalized), Japan (F-35A), South Korea (F-35A), Switzerland (JAS-39E Gripen, canceled by referendum), and the UAE (TBD, q.v. Dec 19/13 entry) have hurt. Greece, which canceled an order for 30-60 Eurofighters in 2005, and bought F-16s instead, still had plans for an additional next-generation fighter buy to counter Turkey’s planned purchase of 100 F-35As. With Greek finances in tatters, however, don’t hold your breath. After that, Eurofighter’s options narrow sharply. On the bright side, the Gulf states of Bahrain, Kuwait, and Qatar all have fighter competitions in progress, and successful sales to Saudi Arabia and Oman help the Typhoon’s chances within the Gulf Cooperation Council. With Japan and South Korea out, the once-promising Asian market has few options left for Eurofighter. A MiG-29N replacement competition in Malaysia has run into trouble due to finances, and they are exploring leasing deals. That will be a tough win for Eurofighter. In Europe, Eastern European countries like Bulgaria and Croatia would normally be problematic sales due to the Eurofighter’s costs, but Germany is pushing hard, and offering umbrella maintenance agreements and training packages. Even if they succeed, however, the end result is just a handful of sales. Typhoon at Sea? Naval variant, cutaway (click to view full) India was pitched with very explicit offers to have their needs and investments drive the Typhoon’s future enhancements, and significant roles for Indian industry. At Aero India 2011, Eurofighter and BAE even unveiled an initial internally-funded design for a navalized Eurofighter than can operate from aircraft carriers. In a direct nod to potential Indian sales, they touted the plane as being able to take off from “ski jump” carriers without catapults – a design that describes all of India’s current and planned carriers, as well as the initial design for Britain’s own Queen Elizabeth Class. Eurofighter GmbH describes the goal as 95% commonality with land-based aircraft, and required changes as “limited… include a new, stronger landing gear, a modified arrestor hook and localised strengthening on some fuselage sections near the landing gear, as well as updates the EJ200 engines,” which could include thrust-vectoring as well as structural reinforcement. It didn’t help. India picked the French Rafale, which already has a carrier-capable version, as their future M-MRCA medium fighter. The Indian Navy is currently flying MiG-29Ks as its naval fighters, and plans to add Indian-designed LCA Naval light jets. Britain could have been a long-shot backup option, but they’re planning to use the F-35B from future carriers, which won’t be fitted with steam catapults and arrester wires after all. Brazil might have been a future option, on the assumption that they will replace their aircraft carrier at some point. Unfortunately for Eurofighter, Brazil picked Saab’s JAS-39E/F Gripen as their future air force fighter, and Saab also has plans for a naval variant. That leaves a carrier-capable Eurofighter variant without a plausible future customer. Eurofighter: Industrial Structure & Orders IPA7 over Manching (click to view full) Technically, the NATO Eurofighter and Tornado Management Agency (NETMA) is the customer for the Eurofighter project. Eurofighter GmbH is the contractor, with joint ownership by all of the key industrial partners: BAE Systems, EADS, and Finmeccanica. Overall, Eurofighter GmbH cites a total of 100,000 supported jobs in 400 companies across Europe. Aircraft production work shares were designed to correspond to the number of aircraft ordered under the 1998 Umbrella Contract: 37.5% UK (232). BAE Systems: Front fuselage including foreplanes, canopy, dorsal spine, tail fin, inboard flaperons, rear fuselage section. 30.0% Germany (180) EADS Deutschland: Main center fuselage. Airbus spinout Premium AEROTEC is the main sub-contractor. 19.5% Italy (121). Alenia Aeronautica: Left wing, outboard flaperons, rear fuselage sections 13.0% Spain (87). EADS CASA: Right wing, leading edge slats The Eurofighter’s 2 EJ200 turbofans deliver 20,000 pounds thrust each in reheat mode, and are manufactured by the EUROJET partnership of Avio (Italy), ITP (Spain), MTU Aero Engines (Germany) and Rolls-Royce (UK). The Euroradar consortium supplies the ECR-90 CAPTOR radar, and is developing the “E-Scan” AESA successor for introduction by 2015. It is led by Finmeccanica subsidiary SELEX Sensors and Airborne Systems in Edinburgh, UK (formerly BAE Systems Avionics), and also includes EADS and Spain’s Indra. The Eurofighter contract was designed to protect the fairness of each participants’ agreed manufacturing work shares, by making it very expensive to back out of committed orders. On the other hand, European defense spending continues to decline due to pressure from welfare state commitments and debt burdens, even as European military operational deployments and their costs have increased. Hence the fractious contract negotiations around Tranche 3, and also the investigation of foreign sell-offs by the member countries. In June 2009, the partners took a diplomatic way out, splitting Tranche 3 into 2 parts. At the end of July 2009, the 4 partner nations placed a EUR 9 billion Tranche 3A order, which will keep production going for several more years. The table below summarizes the Eurofighter’s evolving production plans, from the original 1985 plan to the 1998 agreement, and then planned and actual orders for each production tranche. Note that 24 of Britain’s Tranche 2 aircraft have been diverted to Saudi Arabia, in order to satisfy Saudi demands for early delivery. In response, Britain ordered 24 more Tranche 3 aircraft as replacements. In practice, this means that Britain has ordered only 16 of its originally planned 88 Tranche 3 Eurofighters – and high-level statements indicate that Tranche 3A agreement absolves Britain of the need to place any further Eurofighter orders. Other reports explain the gap by claiming that the other 48 British Tranche 3 aircraft will go to Saudi Arabia, meaning that all of Saudi Arabia’s 72 planes will have been siphoned off from British orders. Maintenance contracts to keep the fleets in service involve a small core of multi-national contracts for key systems and general service, followed by a number of national umbrella contracts to address other areas, and then a set of national maintenance agreements that are less comprehensive. See the chart below for tracking of the main support contracts currently underway: Contracts & Key Events New dawn, or twilight? (click to view full) DID coverage focuses on purchases related to consortium aircraft buys under Tranche 3, platform improvement efforts, international opportunities, and sales. See the “Additional Readings” section for coverage of the comprehensive support contracts for the various countries, and of the Saudi and Austrian export deals. 2014 – 2020 Germany confirms no Tranche 3B, but how much will they have to pay?; German maintenance costs an issue; Eurofighter needs new orders, soon. with Brimstones October 22/20: Spain Eurofighter formally submitted to Spain its offer to provide a further 20 Typhoon aircraft under the country’s Project ‘Halcon’ (Falcon). Delivery of the offer, which was disclosed by the consortium on 19 October, came three months after Spain announced that it was seeking to augment its existing Typhoons and to begin the process of replacing its Boeing EF-18 Hornet fleet. “Eurofighter has submitted proposals for the replacement of the Spanish Air Force’s EF-18s which are based on the Canary Islands. Spain is looking to secure 20 new Eurofighter Typhoon aircraft to boost its existing fleet under what is called Project Halcon,” the consortium said. September 2/20: Air Policing Mission On August 31, the German Air Force Eurofighter detachment took over the augmenting role of NATO’s Baltic Air Policing mission from the French Air Force at Ämari Air Base, Estonia. The French Air Force Mirage 2000-5 detachment, deployed at Ämari since last May, handed over its augmenting role in NATO’s Baltic Air Policing to a German Air Force Eurofighter detachment during a ceremony today. The second Air Policing detachment at Ämari takes place under NATO’s assurance measures introduced in 2014 as the Alliance’s response to Russian interventions in Ukraine and is aimed at reassuring eastern Allies and demonstrating NATO’s commitment and resolve. August 6/20: Lithuania The first ever Luftwaffe Eurofighter training detachment while embedded with a Royal Air Force (RAF) contingent that is deployed to Lithuania as part of the NATO Baltic Air Policing Mission has concluded. Pilots from RAF Lossiemouth-based 6 Sqn RAF flew with pilots from the German Tactical Fighter Wing 71 Richthofen to practice air intercepts and basic fighter maneuvers together as a pair. Both sides will reverse roles in September when the British will embed with a German detachment in Amari, Estonia. June 22/20: Upgraded AESA in Germany The German Bundestag approved funding to develop, build, and integrate a new active electronically scanned array (AESA) radar system for the Luftwaffe’s Eurofighter combat aircraft fleet. The approval by the Bundestag’s Budget Committee will see national sensor-house Hensoldt lead the effort to equip the Luftwaffe’s 79 Tranche 2 and 31 Tranche 3A Eurofighters with an updated AESA (also known as electronically scanned [E-Scan]) radar system. The Eurofighter consortium that comprises Germany, Italy, Spain, and the UK is already developing an AESA/E-Scan radar through the Euroradar consortium. This effort, led by Leonardo UK, builds on the aircraft’s existing Captor mechanically scanned (M-Scan) radar, and is known as Captor E-Scan and/or Captor AESA (CAESAR). June 4/20: E-SCAN Italian defense firm Leonardo announced that a flight test campaign dedicated to the configuration chosen by Kuwait is proceeding at pace. According to the company, Leonardo ISPA 6 (Instrumented Series Production Aircraft) is the most advanced Eurofighter Typhoon test aircraft with E-SCAN radar and it recently joined the other Typhoon test aircraft after the successful completion of an important lay-up in November last year. ISPA6 has completed the overall P3Eb Flight Test campaign, which represents a significant step forward to allow the delivery of the Eurofighter to the Kuwait Air Force. ISPA 6 is one of the three EF Typhoon test aircraft equipped with the Electronic Scan Radar made by the EuroRadar Consortium, led by Leonardo UK in Edinburgh, and it’s currently allocated to the EF/NETMA P3Eb (Eurofighter Consortium/NATO Eurofighter and Tornado Management Agency – Phase 3 Enhancements Package b) development programme to perform E-SCAN Entry Into Service flight tests and provide final clearance to the Kuwait customer. May 21/20: JTAC Training Lithuanian, German and Norwegian Joint Terminal Attack Controllers (JTAC) carried out training with Royal Air Force Eurofighters and Spanish F/A-18s at Kazl? R?da training ground on May 11. The German and Norwegian JTACs are part of NATO’s enhanced Forward Presence Battlegroup in Lithuania. The British and Spanish air force contingents operate from Šiauliai Air Base and help guard the skies over the Baltic region as part of NATO’s Air Policing mission. NATO’s battlegroup in Lithuania is composed of around 1,200 personnel from Germany, Belgium, Croatia, Czech Republic, Iceland, Luxembourg, Netherlands and Norway. The battlegroup is part of the biggest reinforcement of the Alliance’s collective defense in a generation. March 20/20: Production Plans During COVID-19 Pandemic According to Jane’s, the Eurofighter consortium has a strategy in place to ensure that work across its four national production lines continues amidst the worsening coronavirus crisis. The deliveries to the four partner nations of Germany, Italy, Spain, and the UK are all recently completed. The pan-European consortium has now introduced plans to protect the delivery of its outstanding orders for Kuwait and Qatar. The program-of-record (PoR) for the Eurofighter partner nations of 160 aircraft for the UK, 143 for Germany, 96 for Italy, and 73 for Spain was concluded in January. The export orders of 15 aircraft for Austria, 12 for Oman, and 72 for Saudi Arabia, had already been delivered, leaving an outstanding backlog of 28 aircraft for Kuwait and 24 for Qatar. To satisfy these Kuwaiti and Qatari orders, all four national production lines will manufacture parts, with final assembly to take place at Caselle and Warton respectively. The delivery of these two orders, expected from late 2020 to 2023 for Kuwait and from 2022 to an unspecified date in the mid-2020s for Qatar, will conclude the 623-aircraft PoR for the partner nations and export customers. January 15/20: Kuwait The first Eurofighter combat aircraft configured for Kuwait made its maiden flight towards the end of 2019, the company announced. Instrumented Series Production Aircraft (ISPA 6), equipped with the Kuwait Air Force configuration, departed the Flight Test Centre of Leonardo Aircraft Division in Turin-Caselle on December 23, 2019. As written by Eurofighter, ISPA 6 is the most advanced iteration of the aircraft to date, and while other elements have previously been flight tested, this is the first time that all of the enhancements have been brought together. ISPA 6 is the first to fly the Captor E-Scan Radar with Phase Enhancement 3 b (P3Eb), for which Kuwait is to be the launch customer. Other enhancements for Kuwait include the Lockheed Martin Sniper advanced targeting pod, the introduction of the DRS-Cubic ACMI P5 combat training pod and an enhanced Very High Frequency (VHF) Omni-Directional Range navigation aid. December 31/19: Kuwait The first Instrumented Series Production Aircraft (ISPA 6) configured for the Kuwaiti Air Force has successfully completed its first flight. The aircraft is the first to fly the Captor E-Scan Radar with Phase Enhancement P3Eb, and is a key milestone for the entry into service of Eurofighter with the State of Kuwait. ISPA 6 is the first Eurofighter in the planned export configuration for the Kuwait Air Force, with the second iteration of the Phase 3 Enhancement software (P3EB) and fitted with the new Captor E-Scan radar (known as Radar One Plus, or Captor E Mk0), an active electronically scanned array (AESA) derivative of Typhoon’s highly regarded Captor radar. The capability package for Kuwait includes the integration of Storm Shadow and Brimstone and other air-to-surface weapons. November 15/19: UK Deploys To Iceland The United Kingdom has sent fighter aircraft to Iceland for the first time since a diplomatic spat between the two countries over the Nordic nation’s banking crisis scuppered a previous planned deployment in 2008. An undisclosed number of Royal Air Force Eurofighter Typhoon FGR4s from 1 (Fighter) Squadron and 100 personnel were deployed from their home station of RAF Lossiemouth in Scotland to Keflavik Air Base on November 13. According to the UK Ministry of Defense, the aircraft will spend the next month protecting the airspace as the UK’s contribution to NATO’s Icelandic Air Policing Mission, returning to Scotland in mid-December. The RAF deployment to Iceland was announced by the then-Defense Secretary Gavin Williamson in June 2018, at which time he said four Typhoon aircraft would be sent to the island. The announcement came a decade after the last scheduled deployment was called off after Iceland’s banking system collapsed owing billions of pounds to UK savers. In 2016, the UK Treasury announced that it had received the final compensation payment from Iceland, resetting the relationship between the two countries. November 8/19: Germany Airbus Defence and Space disclosed a plan for a Electronic Combat Reconnaissance (ECR)/Suppression of Enemy Air Defenses (SEAD) variant of the Eurofighter for Germany. Germany plans to replace its Tornado fighter, 40 of them are the ECR variant. Airbus wants to put escort jammer pods on the underwing stations while moving the 1,000 liter tanks to another station that has to be modified to carry fuel tanks. Speaking at the company’s Manching facility in southern Germany on November 5, Kurt Rossner, head of Air Combat, provided the first insight into Airbus DS plans for an Electronic Combat Reconnaissance (ECR)/Suppression of Enemy Air Defenses (SEAD) version of the Eurofighter to replace the Luftwaffe’s Tornado ECR aircraft. This Tornado ECR replacement covers 40 aircraft as part of the wider Tornado IDR/ECR replacement program for 85 aircraft. October 22/19: Next-Generation EW Suite The four-country EuroDASS consortium, which consists of UK’s Leonardo, Italy’s Elettronica, Germany’s Hensoldt, and Spain’s Indra, has outlined its vision of a next-generation electronic warfare (EW) suite for the Eurofighter Typhoon combat aircraft. Global Flight reports, that the industry partners launched plans for a so-called Praetorian Evolution, or “Evo” package of capabilities. Known as Praetorian Evolution, the future Defensive Aids Subsystem (DASS) builds on the Typhoon’s existing Praetorian DASS but introduces a new all-digital architecture and expands electronic warfare functionality beyond platform self-protection. EuroDASS has developed its roadmap independent of the Praetorian Long Term Evolution (LTE) study activity awarded earlier this year, although Praetorian Evolution work is expected to inform LTE outputs. October 3/19: UK BAE Systems delivered an advanced Typhoon to the UK Royal Air Force, the company announced in a press release. The delivery of the final Tranche 3 aircraft brings a production run of 160 Typhoons for the RAF to an end that began in 2003. The RAF fields eight Typhoon units with 1 (Fighter), 2 (Army Cooperation), 6, and 9 (Bomber) squadrons based at RAF Lossiemouth in Scotland; and 3 (Fighter), 11 (Fighter), and 12 (Bomber) squadrons based at RAF Coningsby in England. There is also a permanent detachment located on the Falkland Islands. A ceremony was held at BAE Systems’ final assembly facility at Warton to mark the latest milestone delivery. September 5/19: Headed East British Royal Air Force Typhoons based at Coningsby have left for a four-month tour of the Middle East and the Far East to participate in exercises. The first stop for the multi-role Typhoon jets will be Oman, the Royal Air Force announced in a statement. There, pilots from both nations will test their skills in a two week ‘live’ weapons exercise in the desert. The Royal Air Foce of Oman also operates the Typhoons and has a long history in training with the UK. The exercises prepare personnel performing support functions to become familiar with operating in tough conditions away from home. The jets will then be flying on to a multi-national exercise in Malaysia at the end of September. Meanwhile Typhoons, which have been deployed to Estonia under Operation Azotize have returned to the UK. August 15/19: Spectre For UK Typhoons BAE Systems announced in a news release that their ‘revolutionary’ new mission planning software will be rolled out to the Royal Air Force by November 2020. The software, named Sceptre, will be used throughout a mission, from the initial plan, to the execution of it, to the debrief. BAE says it’ll allow users on the ground to “make better, more informed decisions” to support the flight crew. The RAF plans to initially use it primarily to support its Typhoons. BAE Systems developed and funded Spectre internally. The value of the contract with the Ministry of Defense is yet to be released. August 13/19: RAF Tranche 3 Makes Second Flight Craig Hoyle from Flight Global reports that the final Eurofighter Tranche 3 for the UK Royal Air Force has made its second flight and will be delivered to the customer by end of the year. The Royal Air Force has an active fleet of 116 Typhoons, the oldest of which are 14 years old. Under current plans, the type should remain in UK service until 2040, operating alongside its short take-off and vertical landing Lockheed Martin F-35Bs. The same news report also said that Qatar has requested to accelerate the delivery of its own Eurofighters. The jets will start arriving in 2022 and most of the 24 jets on order will be delivered in 2023. The final aircraft will reach home in 2024. August 7/19: EJ200 The UK and Rolls-Royce signed a contract to provide maintenance for the engines of Typhoon fighter jets. The deal is valued at $425.9 million. The contract will provide support for the Eurojet EJ200 jet engine until 2024, Reuters reports. The company will also be required to provide modules, spares and accessories to support the Typhoon fleet. “Not only will this contract help to maintain our world-class jets, it secures 175 jobs across the UK and boosts the skills base our world-leading defense industry relies upon,” junior defense minister Anne-Marie Trevelyan was quoted by the news agency. June 26/19: Largest Export Credit Deal Qatar’s $6.4 billion deal with the UK in 2018 to supply Qatar with 24 Typhoon fighter jets was the largest UK export credit deal ever, the recent UK Export Finance report shows. In the UKEF report, it says: „As well as being its centenary, this has also been a record year for UKEF, with the largest amount of business underwritten in a single year for decades. This included support for the biggest transaction in its history, worth nearly £5 billion for the export of defence equipment to Qatar. As well as supporting BAE Systems, MBDA UK and their thousands of UK employees and suppliers, this contract will strengthen our own defence capabilities and those of an important strategic ally“. According to Jane’s the provision of credit to Qatar continues the UKEF’s trend in recent years to engage primarily with the defense materiel requirements of countries from the Middle East and Asia Pacific. June 25/19: Crash in Germany Two German Eurofighter Typhoons collided and subsequently crashed in the northeast of Germany, reportedly killing one of the pilots. According to the German Air Force, the aircraft were taking part in an air combat exercise when they collided and crashed near Laage Air Base. The German newspaper „Die Welt“ called the incident „the worst crash in the history of the Eurofighter“. It is yet unknown, what caused the collision. The accident comes in the midst of the Luftwaffe’s plans to procure more Eurofighters. The old models of the German Eurofighters are to be replaced by modernized variants. The cost for one Eurofighter is roughly valued at $148 million. June 18/19: Scrambling Russian Fighters British Typhoons in Estonia have yet again been busy intercepting Russian fighters. The British Ministry of Defense said that Typhoon jets launched during the evening of Friday the 14th of June to intercept a Russian SU-30 fighter aircraft that was flying to the north of Estonia. Royal Air Force crews made a second scramble on Saturday June 15 to intercept a Russian SU-30 Flanker fighter and an Ilyushin IL-76 Candid transport aircraft transiting north from Kaliningrad towards Estonian and Finnish airspace. The RAF Typhoons are deployed at Ämari Air Base in Estonia in support of NATO Baltic Air Policing. This was already the eight time the British aircraft intercepted Russian fighters since taking over the Baltic Air Policing mission on May 3, 2019. During both intercepts, pilots reportedly flew the aircraft at a safe distance and operated in a professional manner throughout. May 27/19: RAF tests BriteCloud The British Royal Air Force started testing the latest version of the BriteCloud missile decoy on its Typhoon fighter aircraft. Leonardo will support a series of trials in which the ‘BriteCloud 55’ Expendable Active Decoy is being trialled for operations with the Royal Air Force (RAF)’s fleet of Eurofighter Typhoon Aircraft. Designed and built by Leonardo Aerospace in Luton, Bedfordshire, BriteCloud is a line of expendable anti-missile decoys. With mission programmable electronics packages, the small canisters come in a number of variants to fit different aircraft. Each canister has spring-loaded airfoils and contains a miniaturized radio-frequency jamming module. In recent tests, the RAF dispensed 33 BriteCloud rounds from Typhoon fighters against a series of simulated battlefield threats. The trials were not only to demonstrate the effectiveness of the decoy, but also that the canisters can be launched safely from the Typhoon. May 17/19: Interception British Typhoons were launched twice in two days after taking over the NATO Baltic Air Policing mission in Estonia. On Wednesday, the aircraft intercepted two SU-27 fighters and an IL-22 and escorted the formation towards Russia. On Tuesday, British Typhoon fighters scrambled out of Ämari Air Base in Estonia in response to two Russian SU-27 fighter aircraft and one IL-22 aircraft that were flying along the Baltic coast heading towards Kaliningrad. Britain took over the NATO Baltic Air Policing mission from the German Air Force last month. May 7/19: Air Policing Mission British Typhoons officially started their NATO Baltic Air Policing mission from Amari Air Base in Estonia on May 3. The aircraft from XI(F) Squadron normally based at RAF Coningsby in Lincolnshire already arrived on April 24 and the crew has been working with the German Luftwaffe and their Eurofighters to prepare themselves for the NATO mission of providing a Quick Reaction Alert capability off the Baltic Sea area around Estonia. The Handover Ceremony marked the replacement of the German aircraft with the British Typhoons and their crew. April 19/19: Italian Eurofighters on a Mission to Montenegro According to local reports, NATO for the first time launched Italian Air Force Eurofighters based at Gioia del Colle Air Base on April 9. The mission was to intercept a civilian airliner that lost communications with civilian air traffic control over Croatia and was heading south towards Montenegro and Albania. It was established that the loss of communications was related to a misunderstanding between civilian air traffic control and the airliner crew. After resuming regular contact with the civilian controllers, the airliner continued to proceed to its destination to Hurghada, Egypt. On December 16, 2005, the F-2000 Typhoon reached initial operational capability with the Italian Air Force. The Italian Air Force uses the Eurofighter Typhoon as the main nation’s asset for air defense and coalition missions. March 19/19: RAF in Estonia The British Royal Air Force (RAF) sent vehicles and supplies from Southhampton to Estonia to mark the start of a new deployment in the region. The RAF will join the already deployed British Army Battlegroup that formed part of the NATO Enhanced Forward Presence mission. The Enhanced Forward Presence is an allied, forward deployed defense and deterrence military posture in Eastern Europe to reassure the countries of their security. British Defense Minister Gavin Williamson announced the RAF Mission already last year. As part of the mission the Air Force will deploy four Coningsby based Typhoon jets to the Amari Air Base in Estonia. March 5/19: Spain Airbus delivered the first upgraded Tranche 1 Eurofighter to Spain. The company performed the upgrade at its facilities in Getafe near Madrid, Spain. The enhancements included the introduction of hardware modifications, which support the Operational Flight Program 02 (OFP-02) developed by Spain’s Armament and Experimental Logistics Centre (CLAEX). The company also integrated Tranche 2 and Tranche 3 equipment on the aircraft, including a computer symbol generator, digital video and voice recorder, laser designator pod and maintenance data panel. CLAEX will use this first single-seat Eurofighter, to be followed by a second two-seat aircraft currently undergoing the upgrade, as a test aircraft for the qualification of these new capabilities that will be implemented on the Air Force’s fleet of 15 Tranche 1 Eurofighters. The Eurofighter Typhoon is a project with four European nations, the UK, Germany, Italy and Spain as founding members. December 12/18: UK Typhoons armed with MBDA Meteor Jane’s reports that the Royal Air Force is arming its Eurofighter Typhoon combat aircraft with MBDA’s Meteor missile. This is the first time the French-made beyond visual range air-to-air missiles are deployed on the British Typhoons. The Meteor was conceived as a longer-range competitor to popular weapons like the American AIM-120 AMRAAM. Its ramjet propulsion is intended to offer the missile a head-on closing range of 120 km, with a 2-way datalink and full powered performance at Mach 4+ throughout its flight, instead of the standard “burn and coast” approach use by rocket-powered counterparts. The intent is to give the Meteor both longer reach, and a wider “no escape” profile. The Meteor program partners include France, Germany, Italy, Spain, Sweden, and the UK. September 20/18: Qatari milestone Qatar is marking another milestone in its Eurofighter Typhoon acquisition program. The country made its first payment to BAE Systems on Tuesday, and thus finalises the $6 billion purchase of 24 Eurofighter jets and 9 Hawk trainers. This deal is the first major defense contract between the Emirate and the UK. In October 2017 the deal was hailed by former UK Defence Secretary Sir Michael Fallon as “an important moment in our defence relationship and the basis for even closer defence co-operation between our two countries.” The contract also provides for the training of Qatari pilots, facilitated by the British Royal Air Force’s (RAF) No. 12 squadron. This joint UK-Qatari operational squadron will also help to police the skies during he Gulf state’s hosting of World Cup 2022. Deliveries of the fighter aircraft are expected to commence in 2022. September 13/18: Kuwait orders Kuwait’s budget for the current fiscal year suggests that the country will buy several additional Eurofighter Typhoon aircraft. The Ministry of Defense plans to spend $1.1 billion on the Typhoons and another $1.1 billion on machinery and air transport equipment. Kuwait purchased an initial 28 Eurofighter aircraft equipped with the Captor-E active electronically scanned array (AESA) radar back in 2016. First deliveries of which are expected to commence in 2019. August 9/18: Oops! A Spanish Eurofighter accidently launched an AIM-120 AMRAAM in Estonia. The fighter aircraft was flying near defenses near Pangod in the vicinity of Otepää when the incident occurred. It is yet unclear if the AIM-120D’s built in self-destruct mechanism terminated the flight or if the missile landed at an unspecified location. The Estonian Defense Forces have sent helicopters to search for the missile. The Spanish Eurofighter is part of NATO’s Air Policing Mission that support member states that do not have the necessary air capabilities to independently protect their airspace. The Spanish air force currently deploys six Typhoons as part of this mission. An investigation has been initiated to clarify the circumstances. July 11/18: Project Centurion upgrade Jane’s reports that, the UK Royal Air Force (RAF) can now fly the first of its Eurofighter Typhoon combat aircraft upgraded with the Project Centurion weapons fit. The multi-national Eurofighter Typhoon has been described as the aerodynamic apotheosis of lessons learned from the twin engine “teen series” fighters that began with the F-14 and F-15, continued with the emergence of the F/A-18 Hornet. The Project Centurion configuration is intended to combine the already-delivered Raytheon Paveway IV precision-guided bomb, and the Storm Shadow, Meteor beyond-visual range air-to-air missile (BVRAAM), and Brimstone on the Typhoon FGR4 in time for the retirement of the Tornado in April 2019. May 04/18: Small parts cause big problems The magazine Der Spiegel reports that the German Luftwaffe is currently facing problems keeping the ground readiness of its Eurofighter Typhoon fleet. According to the magazine the majority of the Luftwaffe’s 128 fighter planes is currently not cleared for conducting missions. Engineers are concerned about faulty wing-pods that could seriously impede the functionality of the plane’s self-protection system. Without this system the planes are not ready for conducting missions as part of its NATO obligations. The technicians managed to fix some issues with the pods but are unable to fix an issue with leaking cooling-fluid. The component issue, centers on a so-called “grease nipple” that is part of the system that cools the wingtip pods that house elements of the self-protection system, which was designed by BAE Systems. Supplies of the component have been restricted while the primary supplier, a U.S.-based company, is recertified after a change in its ownership. “We hope to get this problem under control in several weeks or months,” the Defense Ministry spokesman Colonel Holger Neumann told a regular German government news conference. He declined to give any details about how many of Germany’s Eurofighters were affected by the spare parts logjam. March 29/18: Leonardo targets Poland The Italian airframe manufacturer Leonardo prepares to promote the Eurofighter Typhoon to the Polish government which should launch its “Harpia” fighter tender to replace its remaining RAC MiG-29s and Sukhoi Su-22s within the next few weeks. The company is willing to negotiate the relating integration of weapons used by the Polish air force. This would involve the Eurofighter consortium clearing the type to operate with Lockheed Martin’s AGM-158 JASSM air-to-surface cruise missile. Warsaw is a strategic costumer for the company as it has previously bought Leonardo’s Aermacchi M-346 advanced jet trainers. Eurofighter Typhoons can be either assembled in Italy, Germany, Spain or the UK. The companies that took part in the analysis and market survey phase are Boeing, Leonardo, Lockheed Martin and Saab. March 12/18: Saudi MoU The three-day visit of Saudi Arabia’s Crown Prince Mohammed Bin Salman to the UK has seen the kingdom’s heir sign a memorandum of intent for the purchase of 48 Eurofighter Typhoon fighter jets. While the accord stops short of committing to an order, manufacturer BAE Systems sees the sale as a “positive step towards agreeing a contract for our valued partner.” Before offsets are included, the sale could be worth as much as £8 billion. The visit, which included meetings with the British cabinet and the Queen, was marred by protests by human rights and anti-war campaigners critical of the kingdom’s ongoing war in Yemen, backed by British weaponry. February 14/18: Austria Corruption Probe-Defense Ministry Statement The Austrian Defense Ministry has announced that the government has handed over its findings on suspect money flows related to its 2003 purchase of Eurofighter jets to international bodies including the US Department of Justice. “Foreign authorities were informed about the results of the defense ministry’s investigation in the context of the international fight against corruption. The Department of Justice has also been informed,” it said, adding that the documents were handed over two months ago. The sale is being investigated by Austrian prosecutors over allegations of fraud against Airbus and the Eurofighter consortium based on earlier complaints from the defense ministry. Austria is seeking up to 1.1 billion euros ($1.4 billion) in compensation, while the consortium dismiss any wrongdoing, calling the accusations politically motivated. Another investigation into the sale by German prosecutors, was closed after Airbus agreed to pay fines nearing $99 million. February 14/18: Potential Sale-Malaysia BAE Systems has offered the Malaysian government a UK government-sanctioned financing deal, if Kuala Lumpur selects the Eurofighter Typhoon as its new fighter jet. “We have an offer on the table…It’s competitively priced and we have offered UK government financing so the Malaysian government can spread the payment over a longer period,” Alan Garwood, the Group Business Development Director for BAE Systems, said from the Malaysian capital. “We can offer training, local partnership and lots of jobs,” he added. Malaysia could buy as many as 18 fighters in a $2 billion program to replace its MiG-29 fighters, with Dassault’s Rafale also in the running for selection. However, a decision on the acquisition has been delayed until after elections, which much be held by August. February 12/18: Austria Corruption Probe Airbus will pay $99 million in fines in order to settle one of two investigations into alleged corruption surrounding the sale of Eurofighter combat jets to Austria in 2003. The settlement was reached with German prosecutors based in Munich and includes an administrative fine of 250,000 euros and “disgorgement”—which legal experts broadly define as the recovery of ill-gotten gains—of 81 million euros. In a statement, prosecutors said they had not found evidence of bribery but that Airbus had been unable to account for over 100 million euros in payments to two shell companies. Airbus said in a statement the penalty, which it had agreed to pay, related to the “negligent breach of supervisory duties” by unidentified members of Airbus Defence and Space’s former management. February 9/18: Project Centurion Britain’s Royal Air Force (RAF) has hailed 2018 the “Year of the Typhoon” as modernization work to the multi-role fighter’s continues to pass tests. Upgrades to systems and weapons under Project Centurion—an effort to improve the capabilities of Eurofighter Typhoons in the RAF fleet as it replaces the Tornado as the force’s main fighter—have been undergoing testing by 41(R) Squadron, a Test and Evaluation Squadron based at RAF Coningsby, Lincolnshire. The head of Project Centurion, Gp Capt John Cunningham, said that by the end of the year “no other aircraft in the world will have all of the Typhoon’s capabilities.” He added: “It will have the long-range air-to-air Meteor missile, Brimstone and Storm Shadow which can hit moving targets and underground structures, Paveway IV laser guided bombs, the Litening III targeting pod and ASRAAM air-to-air missiles. All this will come together by December 2018 making the next year the biggest game changer ever in the development of this aircraft.” January 31/18: Fleet Retirement-Reduce To Produce The British Royal Air Force (RAF) plans to retire 16 two-seat Eurofighter Typhoons, as the service looks to trim $1.13 billion in operating costs. Following their retirement, the aircraft will then be cannibalized for spare parts under the Reduce to Produce (RTP) project, which aims to generate over $70 million worth of parts from each airframe “back into the supply chain”, according to RAF Air Command at High Wycombe, in Buckinghamshire, UK, in response to a Freedom of Information (FOI) Act request submitted by Jane’s. News of the cost-saving measures comes less than a week after chief of the general staff, General Sir Nicholas Carter, told the Royal United Services Institute (RUSI) that an increase in defense spending was required to fill a $28 billion funding shortfall to stave off cuts to key capabilities and personnel numbers. January 22/18: Qatar-Support A joint Qatari-UK operational squadron will be formed to help police the skies during the Gulf state’s hosting of World Cup 2022. The announcement was made by Qatar’s Deputy Prime Minister and Defense Minister Dr Khalid bin Mohamed al-Attiyah during his speech at the Royal United Services Institute (RUSI) in London last week, with the agreement made last month as part of the UK’s support and training package within Qatar’s Eurofighter procurement program. Qatar’s World Cup bid and preparations have been shrouded in criticism, which have been made worse by its neighbors enforcing a blockade and cutting off ties which included earlier offers of providing hotels and training facilities—Iran is now believed to be in talks to fill this void—while some allege that governing body FIFA, received bribes from the Qataris to help bring the competition to a state with little soccer culture. January 16/18: Settlement-Probe Germany’s Sueddeutsche Zeitung newspaper has reported that Airbus has offered to pay between €70 million and 80 million settlement ($85 million to $98 million) in order to stop an investigation by German prosecutors into its 2003 sale of 15 Eurofighter Typhoon fighters to Austria. While the firm refused to comment on the reported figure, the settlement would end one probe into the sale, while the Austrian government still investigates fraud allegations in relation to offsets attached to the agreement that never materialised. The newspaper report followed an Airbus statement on Saturday in which the company said it was talking to Munich prosecutors about “the potential termination of the investigation”. January 3/18: Training-Qatar The British Royal Air Force’s (RAF) No. 12 squadron will stand again in order to help Qatari air and ground crews be trained to operate the Eurofighter Typhoon combat aircraft. Previously based at RAF Marham, the unit will relocate to RAF Coningsby in Lincolnshire, where Qatari Air Force personnel will be temporarily integrated with the squadron ahead of the delivery of Typhoons to the Gulf. The British Ministry of Defense (MoD) said the arrangement will provide Qatar with valuable joint frontline experience on an RAF Typhoon Squadron and speed up their preparation for when their own jets are delivered. December 15/17: Potential second-hand sale According to a story originally reported in the Spanish-language news website, Defensa, the Colombian Air Force is currently evaluating a series of options that will boost its fighter-interceptor fleet capabilities. The main option involves procuring about a fighter wing’s worth of second-hand, Trance 2 standard Eurofighter Typhoons from Spain, equipped with the advanced Meteor missile. If the deal was to go ahead, Colombia would become the first operator of the Typhoon in the region, and the aircraft itself would be one of the most advanced fighters in South America, comparable only to the future Brazilian Saab JAS-39E/F fleet. Other (mostly second-hand) options being considered by Bogota include both Dassault Aviation’s Mirage 2000 and Rafale fighter, the American Lockheed-Martin F-16 and Boeing F/A-18, the Swedish Saab JAS-39 Gripen, and even the Russian Sukhoi Su-30. December 15/17: Program update-Kuwait Eurofighter partner companies are on track to start Typhoon fleet deliveries to Kuwait from 2019. According to the consortium, “Production activities have begun in order to comply with the contract and the Customer expectations,” adding that “activities to establish infrastructures in Kuwait to operate the aircraft are also proceeding according to the plans.” Italy’s Leonardo is lead partner in the sale, which calls for 28 Eurofighters, including six two-seat trainers, with all aircraft equipped with the consortium’s Captor-E active electronically scanned array radar, Lockheed Martin Sniper targeting pod, plus precision-guided weapons including MBDA’s Brimstone air-to-surface missile and Storm Shadow cruise missile. Detailing of the program’s status comes during the annual Gulf Defence & Aerospace exhibition in Kuwait, which ran from December 12-14. December 13/17: Potential FMS The German Defense Ministry has come out in favor of the Eurofighter Typhoon combat aircraft as the replacement for its fleet of 85 Panavia Tornado jets. However, the decision contradicts an announcement by the Luftwaffe last month that hailed Lockheed Martin’s F-35 Joint Strike Fighter as the best option to meet the service’s requirements of stealth and long-distance operational capabilities. News of the ministry’s preference came to light in a letter sent to a Greens lawmaker who had inquired about the deliberations, with the ministry listing the F-35, alongside Boeing’s F-15 and F-18 fighters as secondary options. Built by the Eurofighter consortium consisting of Britain’s BAE Systems, France’s Airbus, and Italy’s Leonardo, a Typhoon purchase by Berlin may come as a precursor to eventual Franco-German cooperation on a new European fighter effort, intentions on which were announced earlier this year. A decision on the Tornado’s replacement needs to be approved by parliament within the next two years and a contract signed by 2020 or 2021to ensure deliveries by 2025. However, no final decision is likely to be made before a new government is formed, which has remained undecided since elections in September left no party with a majority or workable coalition. December 11/17: Contract Signing BAE Systems and Qatar finalized Sunday a $6.7 billion deal to deliver 24 Eurofighter Typhoon combat jets to the Gulf nation. Delivery is expected in late 2022 and the contract is subject “to financing conditions and receipt by the company of first payment” that is “expected to be fulfilled no later than mid-2018”. The deal was signed during a ceremony in Doha under the auspices of the UK Defence Secretary Gavin Williamson and Qatari Minister of State for Defence Affairs Khalid bin Mohammed al Attiyah. Williamson hailed the sale as a “massive vote of confidence, supporting thousands of British jobs and injecting billions into our economy”. November 30/17: Foreign Sales In what may be some kind of record, a senior BAE Systems official has told the UK Parliament’s Defence Select Committee that a deal to sell Eurofighter Typhoon fighters and Hawk jet trainers to Qatar is complete—just six weeks after the signing of a statement of intent. Chris Boardman, the managing director of BAE Systems’ military air and information business, said all that is needed to be decided is an appropriate date to sign contracts, but would not speculate on what that date would be. Boardman also urged the British government to provide clarity on its vision for combat air requirements in a post-Typhoon era. Qatar’s purchase of 24 Eurofighter Typhoons is the first major arms contract to be signed between the UK and the Gulf state, and is the first Typhoon sale by the British since the Ministry of Defence took over responsibility for leading the government’s Typhoon export sales effort from the Defence and Security Organisation, the department responsible for most overseas sales in the sector. November 06/17: BAE Systems has completed firing tests of the Brimstone precision strike missile from a Eurofighter Typhoon aircraft, paving the way for evaluation by the British Royal Air Force (RAF) in 2018. A total of nine firings and nine jettisons were conducted from the aircraft as part of the firm’s Phase 3 Enhancement (P3E) package, which aims to transfer capabilities from the Tornado GR4 onto the Eurofighter before the former is taken out of service in 2019. The flight trails, which commenced in July, covered a range of specific release scenarios, testing at various heights, speeds, levels of G-force and in different positions on the aircraft wing and in the launcher. It was also used to perform data analysis and models of the weapon’s performance, and was completed with support from the UK Ministry of Defence, MBDA, QinetiQ, Eurofighter GmbH and the Eurofighter Partner Companies, Airbus and Leonardo. October 11/17: BAE Systems confirmed Tuesday that it is to cut nearly 2,000 jobs from its UK operations in what is being deemed a “significant blow” to the country’s manufacturing industry. Approximately 1,400 jobs are expected to go at its military aerospace business over the next three years, along with a further 375 in maritime services and 150 at its cyber-intelligence business. The brunt of the cuts will take place at BAE’s aerospace bases at Warton and Samlesbury in Lancashire, where the Eurofighter Typhoon combat jet is assembled, with 750 losses, while another 400 posts will go at its other aerospace base in Brough, east Yorkshire. 340 posts will go in Portsmouth, 245 at the RAF bases Marham in Norfolk and Leeming in North Yorkshire, and 150 in London, Guildford and at other cyber-intelligence sites. A further 30 job losses will take place at other UK locations. The firm’s new CEO, Charles Woodburn, said the “organisational changes we are announcing today accelerate our evolution to a more streamlined, de-layered organisation, with a sharper competitive edge and a renewed focus on technology.” Citing the timing of future Typhoon orders, BAE said the cuts were necessary “to ensure production continuity and competitive costs between the completion of current contracts and anticipated new orders, we now plan to reduce Typhoon final assembly and Hawk production rates.” It also blamed the British government’s decision to take the RAF Tornado fleet out of service in 2019, which will affect Marham and Leeming, although BAE will continue to work on the F-35 fighter jet at Marham. BAE employs more than 83,000 people worldwide, including 34,600 in the UK. October 10/17: BAE Systems is expected to announce this week, redundancies that are likely to result in the loss of over 1,000 jobs. The cuts are believed to take place primarily at the firm’s Warton plant in Preston, England, but “trimming” could also take place at other locations as well. While sources said that Brexit—the UK’s exit from the European Union—was “not a factor” in BAE’s decision, the cuts are being largely attributed to the continued slowdown in production of the Eurofighter Typhoon fighter aircraft, with ongoing uncertainty about the timing of a potentially large order from Saudi Arabia. Last month, BAE announced that Qatar made its first major defense deal with the UK, ordering 24 Typhoon aircraft in a sale that was hailed by Defence Secretary Sir Michael Fallon as “an important moment in our defence relationship and the basis for even closer defence co-operation between our two countries.” October 05/17: The Eurofighter consortium has pitched its Typhoon fighter to Poland at the recent MSPO defence exhibition. Raffael Klaschka, head of marketing at Eurofighter GmbH said that by being part of the Eurofighter program, Poland would experience “new and additional opportunities…both from a military and economic perspective, with a number of possible options in scope, from assembly and manufacturing to support and maintenance.” She added, “Poland would play a role in the definition of any future development of the aircraft, which will continue to be in service well beyond 2050.” Finishing her pitch, Klaschka told the audience that industrial collaboration was an inherent part of the Typhoon program, promising an attractive and cost-effective solution for Warsaw. September 19/17: Airbus has refuted claims levelled at it by Austrian prosecutors that it carried out fraud and willful deception during a $2 billion Eurofighter Typhoon deal. The aerospace giant went on to threaten legal action at Austria’s Defence Minister Hans Peter Doskozil, accusing the minister of disregarding the presumption of innocence in the case and therefore violated the firm’s rights. A final report of a parliamentary inquiry into the 2003 jet purchase, how side deals were awarded and whether bribes were paid, is expected on Tuesday. September 18/17: Qatar has signed a Statement of Intent with the British government for the purchase of 24 Eurofighter Typhoons from BAE Systems. Speaking on the deal, British Defence Secretary Sir Michael Fallon, who is on a visit to the Gulf State, said this will be the first major defence contract between both countries, and will run into the billions of dollars. Human rights and anti-war organisations are likely to protest the sale, which comes as the UK’s $16 billion defence industry is facing intense scrutiny over exports to Saudi Arabia and other states accused of major human rights violations.The UK has exported more than $6 billion in arms to authoritarian states since the summer’s general election, with a huge increase in arms exports to Saudi Arabia and exports worth $160 million to Qatar, where political opposition is banned. August 1/31: BAE Systems, in conjunction with the British Royal Air Force (RAF), are testing a new package of advanced weapons, software and avionics enhancements for the Eurofighter Typhoon as part of its Project Centurion program. Upgrades already tested during the program—which looks to provide a seamless transition between use of the GR4 Tornado and Typhoon—have included the successful live firing of the Brimstone air-to-surface missile. The ongoing operational testing and evaluation of the upgrades, known as the Project Centurion Phase 1 capability package, includes trials of MBDA’s Meteor ‘beyond visual range’ air-to-air and Storm Shadow deep attack air-to-surface missile software systems. July 21/17: The British Royal Air Force (RAF) is to drive funds into Eurofighter Typhoon fleet enhancement from savings made through a new in-service support model. Known as the Typhoon total availability enterprise (Tytan), the 10-year arrangement between the RAF and industry partners BAE Systems and Leonardo is expected to reduce the Typhoon’s per-hour operating cost by 30-40%, generating savings of at least $712 million over the agreement’s lifetime. These funds will then be generated back into upgrading the aircraft. UK-specific initiatives already introduced via the Tytan contract include increasing the intervals between scheduled major maintenance activities, which will increase aircraft availability and reduce repair bills. Deep maintenance initially scheduled after every 400 flight hours has previously been extended to a 500h interval, and is expected to be stretched further to 750h. July 18/17: Following a series of flight trails earlier this year, a British Eurofighter Typhoon has test-fired a Brimstone air-to-surface missile for the first time. The missile’s integration is part of Phase 3 Enhancements developed for the jet in a wider a program known as Project Centurion, which aims to deliver a series of upgrades that will improve the strike abilities of RAF-operated Tornado GR4s and Typhoons. The missile is expected to enter service in 2018. July 14/17: UK Defence Secretary Michael Fallon has announced that Whitehall will spend $52 million on upgrading the anti-missile defense system of its Eurofighter Typhoon fighter jets. The Eurofighter consortium member Leonardo will undertake the work on the jets’ Defensive Aids Sub System (DASS), and the government said it would help the aircraft in missions against Islamic State in Iraq and Syria. The work will sustain approximately 65 jobs at Leonardo’s site in Luton, 30 miles north of London, as well as a further 41 jobs at fellow consortium member BAE Systems’ site in Warton, northwest England. June 26/17: Oman have received delivery of the first of 12 Typhoon fighters ordered from the Eurofighter consortium. The aircraft’s arrival to the sultanate was marked by a ceremony at Adam AFB, with Commander of the Royal Air Force Air Vice-Marshal Mattar bin Ali bin Mattar Al Obaidani in attendance. Ordered in 2012 to beef up its fighter fleet, the squadron of Typhoons along with eight Hawk aircraft will join Muscat’s current fleet of F-16 and Hawk aircraft. June 21/17: The Eurofighter consortium has announced a record year in operations of its Typhoon fighters, with further sales on the horizon. Operators of Eurofighter fleets have exceeded a combined 400,000 flight hours, including operations by RAF aircraft in Syria and supporting Baltic Air Policing commitments for NATO. The consortium also announced that its fighter will soon commence the first live firings of missile manufacturer MBDA’s Brimstone air-to-surface missile. June 13/17: The head of Airbus has called on the French government to join German and Spanish efforts on a proposed new fighter to succeed the Eurofighter Typhoon. “I really hope that France will be involved,” says Fernando Alonso, speaking to reporters on 9 June at the company’s media day. “We have to do this in Europe. There’s no place to do two or three different systems.” While Paris had initially stayed out of the Eurofighter program—instead favoring to work with Dassault on the Rafale—there has been much talk of further integrated European defense research and procurement among EU members, and with the UK gearing up to leave the EU, France is being seen as a potential replacement partner in such joint programs. Last year, Germany and Spain partnered to draw up requirements for the New Generation Weapon System (NGWS), a proposed new fighter that would be developed under the Future Combat Air System effort, which includes other elements of air warfare technology, including unmanned air vehicles (UAV) and space-based capabilities. May 16/17: BAE Systems has rolled out the lead example of its Eurofighter Typhoons destined for delivery to Oman later this year. Muscat’s Typhoon order, signed in December 2012, is for nine single-seat aircraft and three two-seat examples to support training activities. A ceremony to mark the occasion was hosted at the firm’s final assembly in Lancashire, UK, with the Typhoon joined by Oman’s first new-generation Hawk advanced jet trainer, of which eight Mk 166 examples are on order by the Gulf sultanate. April 13/17: Italian manufacturer Leonardo has handed over its 500th operational Eurofighter Typhoon to the Italian Air Force. Marking the occasion was a ceremony at the firm’s Turin facility and saw attendance from various military and security industry representatives, including leaders from Leonardo, NETMA, and Eurofighter Jagdflugzeug. Speaking at the event, Eurofighter Jagdflugzeug CEO Volker Paltzo stated that the “500-strong Eurofighter Typhoon fleet represents one of the largest and most capable fighter fleets in the western hemisphere, and will be the backbone of European airpower for decades to come.” European armed forces have been operating the Typhoon since 2003, when the first completed jet was delivered to Britain’s Royal Air Force. The service received their 100th plane in September 2006 while Germany’s air force accepted the delivery of the 400th jet in 2013. March 15/17: The British Royal Air Forces and BAE Systems have completed a series of trials as part of the Phase 3 Enhancement package that the company is developing for the Eurofighter Typhoon aircraft under the Centurian program. RAF pilots in conjunction with support from BAE’s engineers flew over 40 flights with the aircraft which set out to test its high precision MBDA Brimstone air-to-surface weapon. Each flight carried two launchers; each containing three Brimstone missiles alongside four AMRAAM, two ASRAAM, and two Paveway IV laser-guided bombs. The Centurian program aims to upgrade the Typhoon to sufficient multi-role standards in order to effectively replace the Tornado GR4 currently in service, by 2018. March 5/17: Opposition parties in the Austrian parliament have agreed to the setting up of an inquiry into the 2003 purchase of Eurofighter jets. The parliamentary inquiry formally announced on Friday by the Greens and far-right Freedom Party (FPO) comes just a week after Austrian prosecutors opened a criminal investigation into allegations of fraud against Airbus and the Eurofighter consortium, based on a complaint by the defense ministry. This is the second parliamentary inquiry in relation to the deal. The first, in 2006, sought to find reasons to cancel the contract but only resulted in the order being scaled back while the new investigation will examine the terms of that settlement and seek to claim back any monies it finds to have been wrongly paid out. February 20/17: Northrop Grumman and the British RAF have successfully demonstrated communication system interoperability between an F-35 and Eurofighter Typhoon jets. The test was carried out during an MoD-funded two week trial, called Babel Fish III, and saw a Lockheed Martin F-35B communicate with a Typhoon fighter by translating its Multifunction Advanced Data Link messages into a Link 16 format. It was the first time a non-U.S. 5th- and 4th-generation aircraft shared MADL-delivered data. Northrop claimed that the test integrated its Freedom 550 technology into the F-35’s Airborne Gateway, which translates information from various sources to enhance situational awareness and interoperability. February 17/17: After four years of investigation, Austria has filed a lawsuit against Airbus and the Eurofighter consortium over alleged deception and fraud linked to the 2003 purchase of Eurofighter jets. The investigation into the $2.1 billion deal by the Defense Ministry found that the defense groups gave misleading information on the purchase price, deliverability, and equipment of the jets, and are seeking damages that could amount to $1.17 billion. Vienna’s purchase of 15 fighters has faced scrutiny since the outset of the deal, with allegations that money was pocketed by politicians, civil servants, and others via brokers for side deals accompanying the purchase. January 18/17: Eurofighter will provide a five-year support deal for four NATO countries operating the Typhoon fighter. Two contracts were signed between NETMA, the NATO Eurofighter & Tornado Management Organization on behalf of core Eurofighter nations, and Eurofighter Jagdflugzeug GmbH on behalf of aircraft makers Airbus Defense and Space, BAE Systems and Leonardo. The deals cover the sustainment of engineering capabilities and program management, and for logistics, repairs, and the provision of spare parts for the Eurofighter fleet. October 24/16: Eurofighter Typhoons recently ordered by Kuwait will be fitted with Lockheed Martin’s Sniper advanced targeting pods. Under a contract with the Aircraft division of Leonardo-Finmeccanica, a member of the Eurofighter consortium, Lockheed Martin will supply 18 pods for Kuwaiti Typhoons, plus integration and logistics support. Deliveries are expected to begin in 2017. October 10/16: Efforts to market the Eurofighter Typhoon to Belgium will be lead by BAE Systems, as Brussels shops for its aging F-16 fleet’s replacement. As part of the bid, BAE has spoken to more than 100 Belgian companies in the defense, aerospace, and space sectors. Other fighters included in the mix are Lockheed Martin’s F-35, Boeing’s F/A-18, Dassault’s Rafale, and Saab’s Gripen. October 6/16: A lack of orders alongside a complex production process has seen production of the Eurofighter Typhoon suspended and potentially removed from the German market, at least until 2018. A joint European offering, the Typhoon receives components manufactured at four plants in Germany, Britain, Italy and Spain, which makes the production very complicated and expensive. It’s believed that Spain may soon follow in suspending production but production lines are likely to remain open in Italy and the UK. This is due to orders arranged between Italy and Kuwait as well as UK ambitions to shift Eurofighters to Saudi Arabia. July 15/16: A UK operated Eurofighter Typhoon has commenced flight testing of the E-scan radar following successful ground trials on the aircraft. The trials are designed to ensure the radar and weapons system reach the required capability in time for first deliveries to the Kuwait Air Force, which became the aircraft’s eighth customer earlier this year. Development of the new radar underpins the Typhoon’s current and future capability evolution. July 7/16: A Spanish Eurofighter Typhoon has dropped the GBU-48 dual-mode GPS and laser guided bomb for the first time. Testing took place in the Gulf of Cadiz in support of the Air Force´s Arms and Experimentation Logistical Centre (CLAEX) between June 20-24. According to the service, the event marks a significant increase for the C-16’s air-to-ground capabilities allowing the fighters to carry out simultaneous offensives against several ground targets. June 23/16: Eurofighter is to target fresh export sales of the Typhoon fighter as the consortium announced deliveries of 47 of the multi-role aircraft in the 12 months running up to May. A backlog of 106 deliveries now remain, with orders from Germany, Italy, Kuwait, Oman, Saudi Arabia, Spain and the UK. Targets for the fighter include campaigns with Indonesia and Malaysia, several European nations and a watchful eye is being kept on the ongoing situation in Canada. May 10/16: With the company currently rolling out its Leonardo re-brand, Finmeccanica has reported a strong financial first quarter thanks to its recent $9.1 billion Eurofighter deal with Kuwait. However, a drop in helicopter sales is negatively affecting the company. Helicopter orders dropped a massive €964 million in the first quarter from €1.35 billion last year to €384 million, which managers are attributing to turmoil in the oil and gas sector, resulting in companies buying fewer helicopters to access oil rigs. April 8/16: Kuwait is to become the launch customer of the Eurofighter Typhoon’s Captor-E active electronically scanned array (AESA) radar. The country will be the first to flight test the new technology upon delivery of its long awaited order for 28 of the multi-role fighters. Finmeccanica, who has taken the lead on the Kuwait sale has said that the Typhoons that will be delivered to Kuwait will be the most advanced configuration of the type, and will include the company’s Praetorian defensive aids suite and Pirate infrared search and track system. April 6/16: Kuwait’s delayed Eurofighter deal was eventually signed on Tuesday. The 28 jets making their way to the Gulf state will be the largest order of the jet for Italian Eurofighter partner Finmeccanica, who spearheaded the deal. The fighters will also come with a new electronically scanned radar designed by the European EuroRADAR consortium and specifically developed for the Eurofighter. Kuwait will be the first to have such radars installed on their jets as the four Eurofighter launch partners, Germany, Spain, Italy, and UK have yet to adopt the radar. March 3/16: Finmeccanica can breath a sign of relief as Kuwait’s parliament approved a draft law to allow for a $500 million down payment on its future Eurofighter deal. The purchase of 28 jets at a total cost of $8.7 billion had been hanging in the balance since a memorandum of understanding was signed in September. A final was expected to be signed in January, but issues over final cost and training requirements had been put under scrutiny. The delay had stoked fears that the deal could be cancelled, causing a 6 percent tumble in the Italian manufacturers’ shares in early February. February 23/16: Oman’s ordered Eurofighter Typhoon’s move one step closer to delivery according to Eurofighter partner BAE Systems. Final assembly has begun at BAE’s Warton site in Lancashire, UK with 12 to be delivered to the Royal Oman Air Force in 2017. The sale will also include eight Hawk 166 advanced jet trainers. Exports of the joint European Typhoon have been on the increase, with Italian partner Alenia Aermacchi and the Italian government leading the charge for the sale of 28 of the fighters to Kuwait. February 15/16: Following the delays in finalizing Kuwait’s Eurofighter fighter deal, Kuwaiti Deputy Premier and Defense Minister Sheikh Khaled Jarrah Al-Sabah has said that contracts will be signed this week. Italian Defense Minister Roberta Pinotti will visit Kuwait after both ministers discussed issues surrounding the deal during wider NATO talks over tackling the Islamic State in Brussels. With the deal originally planned to be finalized by the end of January, procedural delays over cost and training had put in doubt a deal being concluded any time soon. February 3/16: Last weekend’s expected signing of a deal for Kuwait to purchase twenty-eight Eurofighter jets has been put off. Italian Ministry of Defense officials cited “procedural” delays on Kuwait’s behalf, and that no clear date had been set. It had been expected that the deal would close quickly after some initial delays over pilot training had pushed an agreement into 2016. News of the deal came as Kuwait’s initial plan to purchase F-18 Super Hornets from Boeing was scrapped after their frustration over congressional delays in gaining approval for the sale. The loss of the sale to the Eurofighter has put into question the security of some jobs at Boeing’s St. Louis plant. The plant specializes in the manufacture of the Super Hornet, and were set to start production of the $3 billion deal before the change. January 28/16: After delays in gaining approval from the US to buy new F-18 Super Hornets, Kuwait instead looks set to sign contracts for twenty-eight Eurofighter Typhoon jets to replace their older F-18s. An official in the Italian Ministry of Defense said minister Roberta Pinotti would visit Kuwait on Sunday to sign papers finalizing the deal estimated to be worth $8.7 billion. Talks had been ongoing since November with issues over pilot training delaying the deal, but should be completed within eighteen months. The switch in allegiance will no doubt annoy manufacturer Boeing, and may see renewed frustrations over the lengthy congressional approval process for foreign military sales. December 14/15: Kuwait’s purchase of 28 Eurofighter jets from Finmeccanica is set to experience further delays, as contracts may not be signed until 2016. The CEO of Finmeccanica expressed concerns last week, saying that he did not expect a sale to be agreed upon before December 25. The $9 billion purchase has been delayed repeatedly since a memorandum of agreement was signed in September. Reasons for the delay have apparently arisen due to disagreements over pilot training and the dispatching of specialized personnel. On December 1, the Kuwaiti government requested parliament to release a supplementary budget of $20.4 billion to fund military weapon purchases over the next ten years. November 30/15: A $9 billion Eurofighter sale to Kuwait has been delayed. Italian defense company Finmeccanica announced that problems with pilot training and the dispatching of specialized personnel has resulted in the deal being postponed until mid-December. An initial memorandum of agreement for 28 fighters was signed in September and it was hoped contracts would have been signed by November. Kuwait is one of several Gulf nations currently driving to acquire high-tech aircraft and weaponry to protect themselves from neighbouring Iran as well as internal threats in the region. November 13/15: BAE Systems is slowing Eurofighter production in order to sustain production lines out past 2018, in addition to cutting jobs on the fighter’s UK production line. The decision reflects the company’s orderbook, covering production orders which conclude in 2018 and an expected uptick in production as a result of an order for 28 Eurofighters by Kuwait, following an agreement between the Italian and Kuwaiti governments earlier this year; however a finalized deal has yet to materialize. October 19/15: In further bad news for the German Eurofighter program, a malfunction with the aircraft’s external fuel tank grounded [German] the fleet from flying with the additional fuel pod attached, reducing the ability of the fighters to operate at longer distances. One of the German contingent of Eurofighters deployed to the Baltic region saw one of its fuel tanks fall off last week, leading to the grounding. This follows news earlier this week that the German government has temporarily suspended deliveries of new Eurofighters, citing manufacturing defects. German press also reports [German] that the EUR1 billion ($1.27 billion) contract to develop the CAPTOR-E radar system for the fighter, signed in November 2014, is now delayed by five months, as well as being above budget. October 14/15: Germany’s Defence Ministry has halted deliveries of Eurofighter Typhoon fighters following the discovery of a technical fault with the Airbus-manufactured jets. The technical problem is thought centered around the connection between the aircraft’s vertical stabiliser and the fuselage. This is the second time quality control measures for the European fighter have caused problems, with manufacturing defects in September 2014 [German] also leading to a suspension of deliveries. In both cases BAE Systems was the consortium member responsible for manufacture of the defective parts; however this latest problem is not thought to pose any immediate flight safety issues for operators of the aircraft. September 14/15: Kuwait is buying 28 Eurofighters through the Italian government, following an order for a dozen of the aircraft in December 2012. The order is the first in three years for the multinational Eurofighter, with the Eurofighter consortium’s partner company Alenia Aermacchi reportedly having led the marketing campaign in the Gulf state. Oman similarly ordered twelve of the multi-role fighters in December 2012, with the aircraft already in operation with six national air forces. Dec 12/14: Weapons. BAE announces that the 1st Brimstone trial onto a Typhoon was completed, following a June 19/14 award to study integration between the missile and the aircraft. The firm says that “6 Brimstone missiles were fitted to the aircraft, each wing carrying a launcher with three missiles. Training missiles were used for the purposes of the trial and demonstrated that the weapon can be fitted to the aircraft.” Of course that’s not the toughest part in such an endeavor, and full integration is not expected before 2018. November 2014: Weapons. The 1st release of a Storm Shadow cruise missile was performed successfully by the Italian IPA2 test aircraft, following initial tests in August. Now that inert drop tests and store release trials were performed, Phase 3 will involve environmental data gathering, followed by additional flights to assess handling qualities. BAE Systems was also able to test the installation of a Storm Shadow onto a RAF Typhoon. Source: Eurofighter. Captor-E concept (click to view full) Nov 19/14: Sensors. NATO’s Eurofighter and Tornado Management Agency (NETMA) finally signs a EUR 1 billion/ GBP 800 million / $1.273 billion contract with Eurofighter Jadgflugzeug GmbH to finish and integrate Euroradar’s Captor E-Scan movable AESA radar (q.v. March 22/12, July 30/12, Nov 15/13, Oct 17/14), whose absence is currently a big disadvantage compared to every other top-tier fighter on the market. This deal was supposed to be done by the end of 2012, and the delay has been costly, but better late than never. Captor-E is touted as having an unspecified “very large” antenna size that’s expected to be comparable to F-15s (APG-82v1) and F-22As (APG-77). That means more raw power for performance, and more T/R modules available for specialized functions; though materials, build quality, and the number of the T/R modules will all modify final performance statistics. Instead of using a fixed mounting like American fighters and the French Rafale, Eurofighter’s Captor-E will be mounted on a movable plate for an extremely Wide Field of Regard (WFoR). The current contract release appears to have expanded the touted FoR from about 120 to 200 degrees, thanks to the combination of mechanical movement and electronic beam steering. Eurofighter sees that capability as very useful for fire-and-evade dogfighting maneuvers that use the Eurofighter’s speed and maneuverability to their fullest, without breaking the launching fighter’s radar lock. The tradeoff is paid in poorer reliability and higher maintenance costs, compared to a fixed AESA array. The contract value for Finmeccanica alone will be EUR 400 million, as the leader of the Euroradar consortium. Finmeccanica-Selex ES will produce the new radar at its facilities in Edinburgh, UK and Nerviano (Milan), Italy while Finmeccanica-Alenia Aermacchi’s Turin, Italy site will be responsible for the navigation systems during the integration phase. Airbus DS in Germany, and Spain’s Indra, round out the consortium. Sources: Eurofighter GmbH, “Eurofighter And NETMA Sign One Billion Euro Radar Contract” | UK MoD, “€1 billion contract to develop cutting-edge radar for Typhoon” | Airbus Group, “New radar ensures superiority of the Eurofighter” | Finmeccanica Selex ES, “€1 billion contract signed between the Eurofighter consortium and the inter-governmental agency NETMA” | Defense News, “Action Pending on AESA Radar for Typhoon”. CAPTOR-E AESA Radar Flying low… (click to view full) Oct 17/14: P1E. BAE Systems announces that deliveries of Eurofighter Typhoon Phase 1 Enhancement upgrades have created 17 P1Eb standard aircraft in service with the RAF. A further 18 are to be delivered by April 1/15, under a EUR 1.2 billion program that will eventually convert all 67 Tranche 2 Typhoons in RAF service; BAE offers a useful summary of key features. Now that the UK has completed testing and undertaken initial fielding, the upgrade package will also become a proven installation option for other Eurofighter Tranche 2 customers, beginning in 2015. Meanwhile, future P2E and P3E upgrades are being planned, but the biggest wild card and competitive disadvantage remains: “Eurofighter is still waiting for the partner nations to sign a production contract for the introduction of the Captor-E [AESA radar]…. A program source confirmed that the signing of the deal had slipped to the end of 2014, and “the staffing process within some partner nations is taking more time than originally planned.” “Germany is still sorting out some details,” a second source said.” Sources: BAE Systems, “Royal Air force now flying their most advanced fighter jets ever” | Defense News, “British RAF Now Flying Improved Typhoon Aircraft”. Sept 30/14: Defects. Germany suspends their remaining 32 Eurofighter deliveries, pending resolution of a manufacturing defect and negotiations re: what to do about it. They also sharply cut the estimated number of safe flying hours in each of their 108 delivered Eurofighters to just 1,500, and Austria and Britain are apparently taking similar measures. The timing is terrible, coming on the heels of revelations that budget cuts have forced the German armed forces into deep disrepair, with most of its key equipment unready for war. BAE Systems and Britain’s RAF reportedly discovered that some of the rivet holes in the rear fuselage of the jet were drilled in ways that could introduce splinters and cracks into the rear fuselage, giving it less ability to resist wear and tear. That section is built by BAE, and tests are underway to get a more precise estimate of the effect on the fighter’s safe lifespan. Meanwhile, the problem isn’t an immediate safety issue, and the Luftwaffe won’t hit even this low hours limit until 2018, so the planes aren’t grounded. Exports to Oman and Saudi Arabia are expected to continue. Note that 1,500 flight hours is a ridiculously short life span, even for fighter jets whose forecasts in a capable military amount to just 150-300 hours per plane per year. Base figures of 5,000 – 8,000 are expected, with deep repair and refurbishment extending some airframes to around 10,000. The original official limit of 3,000 hours was itself just half of the Eurofighter Typhoon’s 6,000 hour design life, with the expectation that hard flight data would extend the official limit as experience offered greater certainty. It’s a very German approach, but the introduction of a big uncertainty is pushing estimates the other way for now. Sources: German Bundeswehr, “Eurofighter: Flugbetrieb der Luftwaffe aktuell nicht von industrieller Flugstundenreduzierung betroffen” | Der Spiegel, “Desolate Bundeswehr-Ausrustung: Hersteller warnt vor Mangeln am “Eurofighter” | Defense-Aerospace, “Eurofighter: Air Force Flight Operations Currently Not Affected By Flight Hours Reduction” | Agence France Presse, “Germany ‘erring on side of safety’ regarding Eurofighter defect” | Reuters, “UPDATE 2-Manufacturing flaw halts some Eurofighter deliveries” | Reuters, “Austria says Eurofighter has part problem” | SwissInfo, “Austria says Eurofighter has part problem, some deliveries halted” | Russia Today, “Eurofighter hull hitch: Germany halves fighter flying hours” || Der Spiegel, “Marodes Material: Bundeswehr erfullt Nato-Anforderungen derzeit nicht” (re: massive disrepair in armed forces) | Deutsche Welle, “Bundeswehr struggles with faulty defense equipment”. Manufacturing defect could shrink fighter lifespan Aug 5/14: Weapons. Italy’s Alenia Aermacchi has confirmed that the 1st phase of tests for Storm Shadow long-range cruise missile integration (q.v. July 26/13, Nov 20/13) is complete. They add that the fighter will be able to carry 2 Storm Shadows and up to 8 air-to-air missiles. That’s a good load for fighting your way in and out, which is useful to customers like Saudi Arabia and Oman who are paying for the work. The ability to add drop-tanks would be another valuable load-out, extending the Storm Shadow’s reach. Countries like Britain would find that exceedingly useful, but weight and aerodynamics make this combination a more challenging load-out. Perhaps Tranche 3 upgrades and Conformal Fuel Tanks (q.v. May 13/14) can offer this capability in a more elegant way. Sources: Eurofighter GmbH, “Success For Italian Eurofighter Storm Shadow Trials”. July 16/14: HMD. BAE unveils its Striker II Helmet-Mounted Display (HMD), which builds on the original Striker system flying with Eurofighter and Gripen fleets. The new system removes the need for night vision goggles, integrating a center-mounted ISIE-11 sensor based on Intevac Photonics’ patented electron bombarded active pixel sensor (EBAPS) advanced imaging sensor technology. The result is brighter and lighter than standard HMD/NVG combinations. the system is fully digital, and new hybrid opto-inertial technology is designed to reduce jitter and other syncing issues as the HMD tries to stay aligned with the pilot’s head movement and display its symbology. Sources: BAE Systems, “BAE Systems Unveils Digital Striker II Helmet-Mounted Display System with Superior Tracking, Night Vision Capabilities”. June 19/14: Weapons. BAE announces an initial GBP 5 million study contract from the British Ministry of Defence, to conduct initial integration studies for the dual-mode radar/laser guided Brimstone 2 short-range light strike missile. Brimstone is already operational on Britain’s Tornado GR4 strike fighters, and this is an expected development that will improve the Typhoon’s capabilities for close air support against land targets and swarming motorboats. Initial wind tunnel tests are already underway at Warton, Lancashire, and the study also intends to explore a common launcher for future derivatives like the 75+ km SPEAR 3 light strike missile. The target date for Brimstone 2 integration is 2018. Sources: BAE, “UK Study Contract Awarded to integrate Brimstone 2 onto Typhoon”. June 10/14: Crash. A Spanish Eurofighter Typhoon crashed just before landing at Moron de la Frontera AB, killing the pilot. The pilot was an experienced flyer with 600 flight hours in the type, and the cause is under investigation. It’s the first Spanish Air Force plane to go down, though a consortium prototype and a Saudi Eurofighter have crashed in Spain within the last decade. Sources: The Local – Spain, “Eurofighter jet exploded shortly after 2pm shortly after take-off for a routine practice mission” | Reuters, “UPDATE 2-Eurofighter jet crashes at Spanish base, killing pilot” | UK Daily Mail, “Eurofighter jet crashes just short of southern Spain airbase runway killing pilot”. Spanish crash June 9/14: Weapons. The Eurofighter’s weak weapons array has come back to bite it again, this time in Malaysia and Qatar. In “response” to this demand for “maritime attack capabilities,” which all of its competitors already possess in full: “Peter Maute, the head of combat aircraft sales at Airbus Defence, said the Boeing Harpoon and MBDA’s Marte and Sea Brimstone missiles were being considered as possibilities…. work on the weapons was done by Eurofighter in its development simulator but that full integration would have to await a customer. Qatar and Malaysia are known to have stipulated a maritime-strike capability for their next purchase of combat jets.” One hears “discussion,” study” and “plan” a lot, with respect to key Typhoon capabilities. In a competitive market, that doesn’t substitute for action. If you await a customer, you’ll be watching them buy something else: F-16s with Penguin Mk3s, F-15s with SLAM-ERs, JAS-39 Gripens with RBS-15s, Rafales with Exocets, Russian jets with Kh-31/ Kh-35s, or Super Hornets with Harpoon and SLAM-ER anti-ship and land strike missiles. It’s also doubtful that most customers would consider the short-range Brimstone missiles to be a “maritime attack capability,” unless one confines potential targets to small boats. Sources: Defense News, “Eurofighter Studying Missiles To Give Typhoon Maritime Attack Capability”. May 21/14: P1Eb. Eurofighter GmbH formally unveils the Phase 1 Enhancements B package in Berlin at the ILA 2014 airshow. It’s essentially the EP2 capabilities (q.v. Oct 30/13) of enhancements to the existing radar for Meteor missile compatibility, DASS defensive system improvements, MIDS/Link-16 interoperability updates, as well as Flight Control System (FCS) and the Utility Control System (UCS) improvements. Plus Storm Shadow cruise missiles, which weren’t announced in EP2 because payments are coming from outside the core group. Storm Shadows should be integrated by 2015, but full Meteor long-range air-to-air missile integration isn’t scheduled until 2017. The FCS/UCS upgrades will inprove compatibility with future civil airspace requirements, and also allow the pilot to switch seamlessly between air-to-air and air-to-ground modes. Overall, there’s less here than meets the eye. The Eurofighter’s aerial performance is very good, and they have a reputation for implementing very good pilot interfaces. With the exception of Meteor, however, comparable or better capabilities are already fielded in competitive aircraft like the F-15. This is more of a partial catch-up than a paradigm shift in anything. Sources: Eurofighter GmbH, “Eurofighter Unveils ‘Paradigm Shift’ In Capability At Berlin Air Show”. May 13/14: CFTs. BAE Systems has begun wind tunnel tests for conformal fuel tank designs, based on a “geometrically perfect 1/12th scale model” of the Tranche 3. The CFTs are created using additive manufacturing, then attached and removed for the tests. CFTs are one of the big changes inherent in the Tranche 3 aircraft, which will form a small portion of the core partners’ Typhoon fleets. Removing drag-creating fuel tanks from underwing hardpoints is a big plus, but a great deal depends on good design. Boeing and Northrop Grumman managed to craft CFTs that added 3,500 pounds of fuel to the F/A-18E/F Super Hornet, while creating nearly zero drag at sub-sonic speeds. Even those CFTs impose a trans-sonic penalty, which will be an issue for Super Hornets, but the Eurofighter has such a good power to weight ratio that a minor trans-sonic penalty won’t matter. Sources: BAE, “British Engineers test new configuration of fighter jets in high speed wind tunnel”. April 30/14: Germany – Costs. Germany’s Bundesrechnunghof (Federal Court of Auditors) publishes a supplementary annex to its 2013 report, and the Eurofighter is one of their subjects. The press release goes over known ground by saying that the EUR 11.5 billion budget will buy just 140 planes, instead of 180. What’s new is an acknowledgement that Eurofighter maintenance costs continue to increase, driven by added need for support and spares, and that life-cycle costs are expected to be roughly double the 1997 estimate of EUR 30 billion. 2011 and 2012 reportedly had the Eurofighter fleet consuming about 1/3 of the air force’s maintenance budgets, even though the fleet was smaller than planned and didn’t reach its maximum flight hours. By 2020, the fleet is expected to rise from 86 to 140, and flight hours would roughly triple to 28,400 per year. A comparative graph in the full report shows the rising operating & maintenance costs from the F-4F Phantom, to the Tornado fleet, to the Eurofighter fleet. The United States has seen similar trends as it fielded each new generation of fighters, but the Tornado is known to be a maintenance problem, and the Eurofighter still graphs significantly above it. The Bundesrechnunghof adds that even Germany’s Ministry of Defence doesn’t seem to know the full cost, and explains the Ministry’s rationalizations for not knowing. Other countries seem to manage such things, somehow. Perhaps the Germans could visit those countries and find out. Sources: German FCA, 2014 Pressemitteilung 04 – Bemerkungen 2013, weitere Prüfungsergebnisse [Press release] | “2013 Bemerkungen – Weitere Prufungsergebnisse – Nr. 09 “Kostentransparenz beim EUROFIGHTER herstellen” [Eurofighter summary, incl. link to full report] | Langfassung der Bemerkung Nr. 09 [Full report, PDF]. German costs Feb 27/14: Pessimism, or Realism? Airbus CEO Tom Enders doesn’t sound very sunny about Eurofighter’s future: “Enders said he’s also “not very optimistic” about securing further deals for the Eurofighter combat jet…. “We do hope we can still score one or two other successes in exports,” he said. “But we also have to prepare for a scenario — due to lack of export orders plus cancellations from others — that we’ll have to ramp down production of this otherwise very impressive aircraft sooner rather than later.” Sooner would be an end of production in 2017, which means that preparations within the supply chain would begin sometime in 2015. Sources: Bloomberg BusinessWeek, “Airbus CEO Says Turkish Delay in Taking A400M Threatens Ramp-Up”. Feb 25/14: Germany. The Handelsblatt business daily says that Airbus is demanding EUR 800 – 900 million in compensation for Germany’s Tranche 3B cancellation. Britain finessed its absence from Tranche 3B by substituting Saudi jets, which were bought under a direct government-to-government deal with Britain, but the other partners aren’t able to do that. That’s a steep price. Negotiations are expected, but even if Germany ends up paying in full per their original contract, it will still be a small percentage of what they would have paid to buy 37 new Typhoons. Obvious options involve some shifting of payments into R&D or upgrade work, or a refundable “export loan” whose repayment depends on reaching a certain number of fighter exports. The larger question for Eurofighter GmbH is whether financially fragile Italy and Spain take the same approach as Germany, or stand by their Tranche 3B orders. Sources: Sky News Australia, “Airbus ‘wants money’ for scrapped jets” | Frankfurter Allgemeine Wirtschaft, “Airbus will Entschadigung fur abbestellte Eurofighter”. Feb 20/14: Germany. German Defense Minister Ursula von der Leyen removes 2 senior procurement officials: Stephane Beemelmans and Detlef Selhausen. Part of the issue involves Eurofighters, specifically, a EUR 55 million euro (~$75 million) settlement to Germany’s MTU in lieu of EUR 340 million for Eurofighter Tranche 3B engine work. Not bad, but Bundestag budget committee approval is required for contracts over EUR 25 million, and the payment was authorized without that. Relationships with these individuals were already tense, so that was the end of the road. Sources: Defense News, “Germany Plans Procurement Overhaul After Program Missteps” | Der Spiegel, “Rustungsprojekt “Eurofighter”: Verteidigungsministerium gab Millionensumme ohne Bundestagsvotum frei” | Frankfurter Allgemeine Zeitung, “Wie von der Leyen aufräumen will”. Feb 19/14: Saudi Arabia. Saudi Arabia finalizes their contract for 72 fighters, agreeing on price escalation terms to upgrade the fighters bought under the Salaam program toward Tranche 3 standard (q.v. Feb 21/13, Aug 1/13, Dec 19/13). BAE was very involved in the process, but because the underlying agreement is actually with the British government, the amendment must also be negotiated between the governments involved. BAE had continued Eurofighter deliveries during the long negotiations, which meant rising amounts of cash committed without booking any profits. Clearing this issue up frees BAE to deploy its cash reserves more freely, while also removing a source of uncertainty for potential Gulf Cooperation Council customers. The firm describes the settlement as “broadly consistent with the Group’s prior trading outlook for 2013.” That outlook (q.v. Dec 19/13) estimated a 6-7 pence earnings per share drop without any agreement, or about GBP 250 million (~ $410 million) maximum, based on total shares revealed in a recent transaction. That’s on top of the original GBP 4.43 billion pounds/ $7.4 billion. Sources: BAE Systems, “Agreement on Salam Price Escalation” and “Feb 20/14 Transaction in Own Shares” | Reuters, “UPDATE 2-BAE Systems agrees pricing on Saudi Eurofighter deal”. Saudi finalization Feb 19/14: Germany. News reports are describing a German decision to cancel 37 Eurofighters, based on Deputy Defense Minister Stephane Beemelmans’ testimony before their the parliamentary defense committee. That isn’t quite true. What it means is that Germany doesn’t intend to pay for a Tranche 3B, which would have included 37 fighters to finish their agreed purchases. A Tranche 3B offer was reportedly extended to the core countries by Eurofighter on June 9/10, but Europe’s financial woes have left the core partners uninterested. Indeed, Germany ended their plans for a Tranche 3B order back in 2011 (q.v. Oct 21/11). 2014 was supposed to be a year of decision for the core countries, but with Germany and Britain on the sidelines, Spain or Italy become that much more difficult to convince. The wording of the July 31/09 Tranche 3A agreement, and of the broader Eurofighter partnership agreements, determine how much the decision costs Germany in cancellation fees. Britain found a way to disclaim any Tranche 3B buy the moment the Tranche 3A contract was signed, but they appear to have done so by shifting Saudi exports under their own account, which avoids any penalties. Unless Eurofighter GmbH finds additional orders somewhere, the production line will begin shifting toward upgrades and maintenance only in 2015 (q.v. Jan 25/11). Sources: Reuters, “Germany cancels delivery of last 37 Eurofighter jets: source” | Handelsblatt, “Deutschland bestellt 37 Eurofighter wieder ab”. Feb 9/14: Italy. The center-left Democratic Party is reportedly preparing a policy document that would cut F-35 buys from the current reduced plan for 90 F-35A/Bs to around 45 planes, while trying to make Italy invest in Eurofighter’s Tranche 3B buy. Significant reductions in planned buys by Italy, Denmark, the Netherlands, etc. will all hit Italy’s own F-35 Final Assembly and Check-Out plant. Part of the party’s push despite this incentive is ideological, reflecting a bias that’s in favor of European defense programs and less friendly toward the USA. Part of it reflects a level of general uneasiness with F-35 costs, capabilities, and delivery dates. Sources: Defense News, “Italian Lawmakers Consider New Cuts to JSF Purchase”. Jan 15/14: Testing. Test flights with the KEPD 350 cruise missile begin from at Manching Military Air Systems Center, north of Munich. They’re technically part of the Storm Shadow integration program, thought the KPED 350 won’t be fully integrated, and will include flutter tests, air data system large store interference assessment and aerodynamic data gathering. Sources: Eurofighter, “Eurofighter Typhoon: Flight tests with Taurus KEPD 350 missile started”. 2013 Saudis abandon local assembly; Competitions in Denmark, South Korea; Problems in Germany?; Testing begins for Storm Shadow & KEPD 350 missiles; Tranche 3 flies; 400th delivered; New CEO has a big job ahead. Saudi Eurofighters (click to view full) Dec 19/13: Low Rents of Arabia. A BAE investors release suggests that the UAE “have advised that they have elected not to proceed with [Eurofighter] proposals at this time,” and adds that negotiations with the Saudis over Tranche 3 upgrades to their Al-Yamamah buy of 72 planes may be deadlocked. The UAE’s decision is a very big blow to the Eurofighter’s future in the Gulf. A UAE buy offered the prospect of sustaining production for several years beyond 2018 by making Eurofighter the GCC’s de facto standard fighter, just as key competitions in Bahrain, Kuwait, and Qatar were coming up. If the UAE goes back to the Rafale instead, their fellow Mirage 2000 operator Qatar becomes a much harder target for Eurofighter, and the standardization momentum that was bringing unlikely customers like Bahrain to the table evaporates. The British government tried to use diplomacy on Eurofighter’s behalf, but they may have done more damage than good. None of the Gulf Cooperation Council were pleased with Britain’s failure to support the Syrian rebels. They were even less pleased when Britain’s government pushed hard for an Iranian nuclear deal that most of them regard as both catastrophically stupid and directly threatening. In contrast, France has played a leading role in pushing the Syrian issue, and was a very public dissenter regarding the Iranian deal. Sources: BAE, “BAE Systems – Status of prospective business in the UAE and Salam pricing discussions” | The Telegraph, “Blow for Britain and BAE Systems as UAE rules out Eurofighter deal” | The Telegraph, “David Cameron’s Typhoon debacle a sign of Britain’s declining Arabian influence”. UAE loss Dec 9/13: Tranche 3. British Single Seat aircraft #116 conducts the 1st Eurofighter Tranche 3 flight, with pilot Nat Makepeace at the controls. The biggest differences from earlier versions include a structure that can mount dorsal conformal fuel tanks; and a modified nose with a new internal structure, power, cooling and electronics for the future E-Scan AESA radar. Another development aircraft has been modified to take an E-Scan development radar for testing purposes. It’s currently being prepared at Warton, UK, ahead of its coming 1st flight. Eurofighter GmbH, “Eurofighter Typhoon Tranche 3 Takes to the Skies” | BAE Systems, “Eurofighter Typhoon Tranche 3 Takes to the Skies”. 1st Tranche 3 flight Dec 4/13: #400. The 400th Eurofighter Typhoon has been delivered. The single-seat fighter in question was handed over to the German Air Force at Cassidian’s Military Air Systems Center, located in Manching, Southern Germany. Sources: Eurofighter GmbH, “Eurofighter Typhoon Marks Delivery of 400th Aircraft”. #400 Nov 27/13: Testing. Flight tests of the Storm Shadow missile (q.v. Nov 20/13) begin from Alenia Aermacchi’s Flight Test Centre at Decimomannu Air Base, in Sardinia, Italy. Sources: Eurofighter, “Eurofighter Typhoon: Flight tests with Storm Shadow missile started”. Nov 22/13: Industrial. BAE and Finmeccanica’s Selex ES announce a teaming agreement to provide Electronic Warfare Operational Support (EWOS) for future Eurofighter Typhoon customers, “and the Eurofighter Typhoon core programme where appropriate.” Electronic warfare is often a pretty “black box”, as-is affair, but its importance makes it something that customers want to be able to modify for local threats and local needs. Technology has made that ideal easier, as software-defined digital systems are fielded. The flip side is that full export customer access to key items like threat libraries and operational modes creates a greater attack surface area for the core countries’ enemies to steal secrets. Under this agreement, the partners pledge to provide willing customers with a “sovereign” EWOS capability. That word is usually associated with full ability to maintain and modify a system, but absent further details, use of the word alone isn’t something to rely on. Selex ES SVP Electronic Warfare, Chris Bushell, adds that the partners have “agreed to also look at non-Typhoon EW support solutions where there is mutual benefit to doing so.” Sources: BAE, “Boosting Eurofighter Typhoon Electronic Warfare Support”. Nov 20/13: Weapons. At the Dubai Air Show, Eurofighter GmbH commits to full integration of the stealthy, medium range GPS/IIR guided Storm Shadow cruise missile by 2015. Storm Shadows are already used by Eurofighter customers in Britain, Italy, and Saudi Arabia (q.v. July 26/13). Ground tests are complete, and flight tests will begin using the IPA2 test aircraft upgraded to the P1E equipment standard. The similar KEPD 350 missile in service with Germany and Spain won’t be fully qualified, but it will be flight tested at the same time on the IPA7 test aircraft. That will cut time and costs if a customer decides to spend the money and pay for full integration. Sources: Eurofighter, “Flight tests for Storm Shadow and Taurus stand-off precision missiles announced”. Nov 15/13: CAPTOR-E AESA. The Eurofighter’s new AESA radar has finished its 4-nation program review at Cassidian’s site in Ulm, Germany, with antenna, repositioner, and Antenna Power Supply and Control Unit results that meet the theoretical design. Next, the antenna sub-system will go to Selex Edinburgh for integration and test with receiver and processor. Final integration of the Captor-E radar into Eurofighter test plane IPA5 is planned in springtime 2014. Source: EADS Cassidian, Nov 15/13 release. Nov 12/13: Bahrain. Flight International quotes Col. Salah Al-Mansoor from the Royal Bahraini Air Force’s planning headquarters, who says that Bahrain will be upgrading its 21-plane F-16 fleet to roughly F-16V status from 2014-2018, under a deal whose initial outline is already agreed with Lockheed Martin. Bahrain would represent the 3rd such F-16 upgrade, after Taiwan and South Korea. Major upgrades under the Common Capability Integration Program will reportedly include an AESA radar (NGC APG-80 or SABR, or Raytheon RACR), new cockpit displays, the Link-16/MIDS datalink, software upgrades, and Lockheed’s AN/AAQ-33 Sniper surveillance and targeting pod. Al-Mansoor also mentions GPS-guided JDAMs, an upgrade to AIM-9X short range air-to-air missiles, and “the D-model version of Raytheon’s AIM-120 AMRAAM”. That last is unlikely; the AIM-120D isn’t approved for export, and is still working toward Initial Operational Capability in the USA. Col. Al-Mansoor says that the kingdom is considering a follow-on order of new F-16s, adding that “We must analyse and determine the cost of the future force structure.” The RBAF’s 16 F-5E/F fighters need replacement, and a winner is expected to be announced in January 2014 at the Bahrain international air show. BAE’s Eurofighter remains the front-runner, but the same outlay that would buy just 12 Eurofighters would net Bahrain around 20-22 F-16E/F Block 60s or similar F-16V equivalents, with all of these upgrades already baked in. Questions remain. Can Bahrain buy new F-16s and Eurofighters, given the need to aid countries like Egypt and pacify its own restive population? Is the F-16 CCIP + Eurofighters their best Plan B, or could they decide to operate an all-F-16 future fleet of upgraded and new fighters, offering lower short and long-term force structure costs, and commonalities with the nearby UAE? Finally, what about Gulf monarchs’ growing wariness concerning US intentions and support? How will that play into Bahrain’s decisions? Flight International, “Bahrain to launch F-16 upgrade in 2014”. Nov 4/13: Tranche 3. The 1st Tranche 3 Typhoon (BS116), has successfully completed engine ground runs at Warton, UK, from green screen checks through Stage C checks of the engine’s integration with all onboard systems. 1st flight is expected to take place before the end of 2013 – and does, in December. Sources: Eurofighter GmbH, Nov 4/13 release. Oct 30/13: EP2. The NATO Eurofighter and Tornado Management Agency (NETMA) signs a development contract with Eurofighter Jagdflugzeug GmbH for Evolution Package 2. It includes enhancements to the existing radar, DASS defensive system, and MIDS/Link-16 system, as well as Flight Control System (FCS) and the Utility Control System (UCS) improvements to inprove compatibility with future civil airspace requirements. MBDA’s Storm Shadow cruise missile isn’t mentioned (q.v. July 26/13). Development is supposed to be done by the end of 2015. Earlier reports (q.v. July 30/12) suggested that the radar enhancements may involve a new AESA system, but current sources indicate that EP2 this just adds Meteor missile capability to the existing Captor-M radar (q.v. June 18/13). Sources: Eurofighter GmbH, Oct 30/13 | AIN, “Eurofighter Signs New Contract, Describes AESA Radar Status”. EP2 development Oct 28/13: P1E. The Eurofighter Typhoon Phase 1 Enhancements (P1E) program has finished flight testing in Manching, Germany and Getafe, Spain, and will be ready for installation and retrofit on existing Tranche 2 aircraft by the end of 2013. P1E implements full Air-to-Surface capability, with full integration of a Laser Designator Pod (RAFAEL LITENING III), full smart bomb integration (Paveway laser-guided, and dual-mode Paveway IV/ EGBU-16 GPS and laser), Helmet Mounted Sight System upgrades for ground attack use, Mode 5 Identification Friend or Foe, improved Radios and Direct Voice Input, Digital integration of Short Range Air-to-Air Missiles (full IRIS-T integration with HMSS for high off-boresight shots, and allowing future AIM-9X integration), and an updated MIDS/Link-16 Datalink for wider interoperability. All of these enhancements will come factory-installed in Tranche 3 aircraft. Sources: Eurofighter GmbH, Oct 28/13 | Aviation Week, “Partners Chart Course For Eurofighter Typhoon Enhancements”. Tranche 2 P1E upgrades approved Aug 19-20/13: South Korea. Conflicting messaging from DAPA and contractors give a somewhat muddled picture, but the upshot is that Eurofighter was disqualified on a questionable technicality, and the F-35 for budgetary reasons, apparently leaving the F-15SE as the de facto winner. That was reversed in late September, when South Korea’s government decided to cancel the competition and start over. In effect, they’ve signaled that it isn’t really a competition, they want the F-35. Which is confirmed in November, when the F-35 is picked as a sole-source winner. Read “South Korea’s Reboots F-X Multi-Role Fighter Buy, Wants 5th Gen” for full coverage. Loss in Korea Aug 7/13: Bahrain. BAE Systems says that Bahrain “has expressed an interest in Typhoon and the British government are leading very early discussions”. That’s new, and the motivation is interesting. Bahrain’s King Hamad al-Khalifa reportedly told British Prime Minister David Cameron that they were interested in buying Eurofighter jets to “create a cohesive defence system between the Gulf Cooperation Council (GCC)” nations. Saudi Arabia is the linchpin of the GCC, and Oman is a respected member. This is a clear dividend from their purchases, and the king’s comment may also be good news for prospective sales in the UAE (40-60 jets), Kuwait, and Qatar. At the same time, every one of these sales is expected to be hotly contested, with competition in place or expected from Boeing’s F/A-18E/F Super Hornet, Dassault’s Rafale, Lockheed Martin’s F-16E/F, and Saab’s JAS-39E/F Gripen. Reuters. Aug 1/13: Saudi Arabia. BAE’s 2013 Half-Year Results says that deliveries have resumed, with the Saudi fleet up to 28 fighters, construction beginning on new facilities, and pilot training in-country progressing: “Four Typhoon aircraft were delivered in the first half, adding to the initial phase of 24 Typhoon aircraft deliveries between 2009 and the end of 2011…. A [GBP] 0.3bn contract was signed in March for the construction of airfield facilities at King Fahd Air Base in Saudi Arabia. Discussions on the provision of maintenance and upgrade facilities in-Kingdom, and further capability enhancement of the Typhoon aircraft remain ongoing. Under an order received at the end of 2012 to deliver training to the RSAF, the first graduation ceremony of cadets from the King Faisal Air Academy was held in May [2013].” With respect to finalizing terms for Tranche 3 upgrades, BAE’s accompanying presentation cites “good progress,” and says “Significant trading bias to second half anticipated.” Translation: we expect a deal before the end of the year. That will need to be taken care of before BAE can talk about further sales, though they do cite a “KSA B2” opportunity as one of their top prospects. Half-Year Results statement [PDF] and presentation [PDF] | Daily Mail. July 26/13: Storm Shadow. AIN reports that key Tornado upgrades may end up being funded by Saudi Arabia and Oman. RAF assistant chief of the air staff AVM Ed Stringer says that “Storm Shadow will be on the Typhoon sooner than you think.” From “Middle East Customers Funding Eurofighter Upgrades”: “…further indication that some key upgrades to the combat jet are being funded by Saudi Arabia and possibly Oman. The four original partner nations have proved reluctant to collectively fund in the near term enhancements… such as integration of the MBDA Storm Shadow cruise missile. The four partners have also so far failed to approve full development of the Captor-E AESA radar by the Euroradar consortium…. “Other Typhoon customers are involved [in providing] funding profile,” [RAF Air Vice Marshal Ed Stringer] added…. During a briefing at the IDEX show in Abu Dhabi earlier this year, a BAE Systems official said that the Storm Shadow would enter flight-test on the Typhoon this year because this is a requirement of the Royal Saudi Air Force.” The RSAF already uses Storm Shadow missiles on their Tornado strike fighters. July 7/13: Germany. Der Spiegel takes a strafing run at the Eurofighter program in Germany, pointing out both its budget overruns, and citing recent documents that discuss safety and quality issues with the planes. Germany and the other Eurofighter partners are expected to make their Tranche 3B decisions sometime in 2014, so the articles feed into a live political debate as an election approaches. On the budgetary front, the Bundestag approved EUR 14.7 billion for 180 fighters, but Der Spiegel says that EUR 14.5 billion has already been spent on just 108 machines. The current Bundeswehr estimate is reportedly EUR 16.8 billion for 143 fighters (Tranche 1 through 3A) by 2018. That would average out to EUR 117.5 million/ $157 million per plane. The 2nd issue involves quality control problems. On Oct 1/08, the military did not extend the Manching, Bavaria plant’s license to remain a Bundeswehr aviation site. Aircraft were still accepted after more detailed inspections, but that could leave the government liable in the event of a crash on German soil. Later, on April 18/13, an auditor from the Bundesamt fur Ausrustung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw) in Koblenz cited the ejection seats as a fleet-wide problem area. Der Spiegel alleges that German quality control and inspections have suffered as a result of austerity measures and military “reforms,” but it isn’t the first time this has been publicly cited as an issue. In August 2010, an RSAF Lt. Col. and member of the Saudi Royal family was killed in a 2-seat Typhoon crash near Moron, Spain, when his parachute separated from the harness. His Spanish counterpart ejected safely. The accident led the RAF to modify its fleet’s ejection seat harnesses. Der Spiegel re: budgets [in German] | Der Spiegel re: reliability [in German] | Reuters. Program problems July 5/13: South Korea. DAPA suspends bidding on its fighter competition, after none of the entries (Eurofighter, F-15SE, F-35A) could meet South Korea’s industrial demands, and performance specifications, and budget limits. Something clearly has to be rethought, if South Korea wants those fighters. If they don’t drop the number bought, then either the budget must be increased, or cost-adding elements like industrial offsets need to be revised, or the performance specifications need to be relaxed and new competitors contemplated. Yonhap | Yonhap follow-on. July 2/13: P1E Weapons. BAE announces that they have finished initial Paveway IV GPS/laser guided bomb trials with a Eurofighter, as part of the Phase 1 Enhancement Programme that will give Eurofighter Typhoon Tranche 2 planes independent precision strike capabilities. Other elements of the program include the LITENING laser designation & surveillance pod, and EGBU-16 Enhanced Paveway laser/GPS guided bomb. BAE Systems. June 20/13: Qatar. AFP says that the Middle Eastern Emirate intends to launch its RFP for 24-36 fighters “soon.” They own a fleet of Mirage 2000-5s, which recently flew to enforce the no-fly zone over Libya. French President Hollande will visit Doha for high-level economic talks on June 22, and France has close ties with the Emirate, but the Qataris aren’t waiting around. They reportedly spent time in May 2013 evaluating the Eurofighter Tornado with the RAF, and will soon host a Eurofighter team in-country for flight trials. Boeing also remains in the mix. Agence France Presse. June 19/13: Industrial. New Eurofighter GmbH CEO and former Airbus Military head Alberto Gutierrez seems to understand what his firm needs to do. Now, can he do it? He tells Reuters: “In this market, where we are, there is competition and we have to keep on going, finding out whatever improvement is available to catch up, to make the product cheaper and a way of getting into decisions leaner and faster…” All true. The problem is, he has just admitted that his plane is behind competitors in key areas, too expensive, and hobbled by an industrial structure that doesn’t foster either lean costs or fast action. Fixing even 1 of those problems is a serious challenge. Fixing all 3 in time to land new orders, before the plane goes out of production, while keeping governments from derailing improvement plans, starts edging toward “Mission: Impossible” territory. June 18/13: Weapons. Eurofighter Jagdflugzeug GmbH signs a full weapon system integration contract with the NATO Eurofighter and Tornado Management Agency (NETMA) for MBDA’s Meteor long-range air-to-air missile. This will reportedly include 2-way datalink integration, which will offer parity with the JAS-39 Gripen and an advantage over the Dassault Rafale. Germany became the last of the 6 core Meteor partners (Britain, France, Germany, Italy, Spain, Sweden) to sign a contract for missile stocks, on May 31/13. The NETMA contract completes the other coverage loop, and means that MBDA now has contracts to integrate its missile onto all 3 originally-envisaged platforms: the Dassault Rafale, Eurofighter Typhoon, and Saab’s JAS-39 Gripen. BAE had done some preliminary work (q.v. June 20/11, July 11/12) in Britain, which led to an unguided test firing (Dec 6/12). That was an excellent set of 1st steps to cut integration time for everyone, but that isn’t the same as full integration. Further design and test work on the missile system will continue at Alenia Aermacchi, BAE Systems, and EADS Cassidian… which doesn’t seem like a very efficient way to conduct things. What the releases don’t say is when integration will be complete. Eurofighter GmbH has now confirmed the date as 2017. That’s about 3 years later than Saab’s JAS-39 Gripen (2014), and later than original Eurofighter forecasts of mid-2015, and but a year earlier than the French Rafale (2018). Eurofighter | MBDA | UK MoD | Aviation Week. Full Meteor air-air missile integration contract June 7/13: Engine. EUROJET Turbo GmbH celebrates the delivery of its 1000th EJ200 production engine, of over 1,500 orders places so far. This one was assembled at ITP for Spain, and the firm touts 789 engines in service so far on operational Eurofighter Typhoons. To date, the engines have accumulated over 390,000 flying hours. Eurojet [MS Word] | Eurofighter. 1,000th EJ200 May 23/13: South Korea. EADS Cassidian reportedly announces that they would invest $2 billion in the K-FX fighter development project, and help market the plane internationally, if the Eurofighter is chosen for F-X-3. Investments would include a maintenance repair and overhaul (MRO) facility that could extend to the KF-X, and an aerospace software center. It isn’t a bad idea for EADS. Barring multiple orders from new sources, it’s very unlikely that the Eurofighter will still be in production by 2022. Upgrades and maintenance will continue for some time, but the C-203 KF-X design could offer EADS a new option to sell, with a fundamental design that can improve toward stealth fighter status. The question is whether South Korea wants to go forward. Yonhap News. April 5/13: South Korea. An un-named military official tells the government’s Yonhap News Agency that after 2 years of discussions and negotiations with DAPA, EADS has changed its industrial offer. Instead of having the first 10 made in Europe, the next 24 made using Korean components, and the last 26 assembled in Korea, EADS has offered to build just 12 in Europe, with the other 48 Tranche 3 planes at KAI in South Korea. The news report is imprecise, leaving the question of structural manufacturing vs. kit assembly unaddressed. It also fails to address how EADS can promote the idea of 20,000 South Korean aerospace jobs for a 5-year period, when the company also says that building the Typhoon for the much larger orders of the core country participants created just 10,000 jobs in Europe. On its face, the statement seems less than plausible, but it does point to the likelihood of significant structural manufacturing in Korea. Yonhap. April 4/13: South Korea. The ROKAF has picked Taurus’ KEPD 350 long range cruise missile for their future fighter force. They’ll have to pay extra to integrate it with their F-16s and F-15Ks. The proposed F-15SE Silent Eagle is different enough that it will probably require added testing, so Eurofighter may garner a slight advantage from German & Spanish plans to add the KEPD 350 to Eurofighter by 2015. Read “Korea’s F-X Multi-Role Fighter Buys: Phases 2 & 3” for full coverage. March 26/13: Tranche 3. The Tranche 3 Instrumented Production Aircraft 8 test plane has joined all major structural pieces, and moves on to the next production station on the final assembly line in Manching. Work is now focused on hydraulics, defensive aids, test flight instrumentation, and electrical systems with over 110 km of complex special cabling. IPA8 will play an important role testing and integrating new features like the AESA radar, new weapons, etc. EADS Cassidian. March 13/13: Denmark. The Danes pick up their fighter competition as promised, following their announced hiatus in April 2010. Invited bidders include the same set of Lockheed Martin (F-35A), Boeing (Super Hornet), and Saab (JAS-39E/F) – plus EADS (Eurofighter), who had withdrawn from the Danish competition in 2007. The goal of a 2014 F-16 replacement decision has been moved a bit farther back, and now involves a recommendation by the end of 2014, and a selection by June 2015. The Flyvevabnet are reported to have 30 operational F-16s, with 15 more in reserve, out of an original order of 58. Past statements indicate that they’re looking to buy around 25 fighters as replacements, but there are reports of a range from 24-32, depending on price. Danish Forsvarsministeriet [in Danish] | Eurofighter GmbH | Saab | JSF Nieuws. Feb 21/13: Saudi Arabia. BAE’s end of year investor presentation [PDF] discusses changes in Saudi Arabia, including a contract amendment that formally abandons Saudi plans for a final assembly line in-country. That insistence had been holding up deliveries, and the remaining 48 aircraft will begin arriving in 2013. Meanwhile, work to “expand the multi-role capabilities” of Saudi Typhoons continues, as do negotiations to continue expanding those capabilities toward Tranche 3 levels. Pricing remains an issue several years after the contract, and the next stage of support contracts is also in long negotiations: “Under the Saudi British Defence Co-operation Programme (SBDCP), orders totalling £3.4bn were awarded for support through to 2016, including the provision of manpower, logistics and training to the RSAF…. The initial three-year Typhoon support contract finished at the end of June and two subsequent six-month extensions have been secured. Discussions continue with the customer on the next five years of support. Discussions on Typhoon price escalation with the Saudi Arabian government remain ongoing. Negotiations are also ongoing for the provision of maintenance and upgrade facilities in-Kingdom, and further capability enhancement of the aircraft.” Feb 11/13: DACT distilled. A veteran Eurofighter test pilot doesn’t see the logic behind Lockheed Martin test pilot Bill Flynn’s recent claim that an F-35 will beat any 4+ generation aircraft, including the Eurofighter Typhoon: “The F-35 thrust to weight ratio is way lower [than Eurofighter] and its energy-manoeuvrability diagrams match those of the F/A-18…. starting from medium altitude and above, there is no story with a similarly loaded Typhoon…. [F-35] Transonic acceleration is… better than in an F/A-18 or F-16, but mainly due to its low drag characteristics than to its powerplant. That means that immediately after the transonic regime, the F-35 would stop accelerating and struggle forever to reach a non operationally suitable Mach 1.6…. The Typhoon will continue to accelerate supersonic with an impressive steady pull, giving more range to its BVR (Beyond Visual Range) armament…. Angle-of-attack is remarkably high in the F-35, as it is for all the twin tailed aircraft, but of course it can not be exploited in the supersonic regime, where the limiting load factor is achieved at low values…. Excessive energy bleeding rates would operationally limit the F-35 well before its ultimate AoA is reached.” Both Britain and Italy will eventually find out for sure, as they will soon have both types in service. Italy will be the best test, as its F-35As are more capable dogfighters than Britain’s F-35Bs. About 2 months earlier, the Aviationist had canvassed Italian pilots, who fly both the F-16 and the Eurofighter, for their opinion concerning those 2 platforms: “During more or less a decade of service with the Italian Air Force, the F-16 has been extensively used to train Typhoon pilots in WVR engagements. According to the Italian pilots, the F-16 matches the F-2000 under 10,000 feet. But above FL100 the Typhoon becomes quite difficult to beat since its superior aerodynamics give the Eurofighter can out maneuver the Viper at every engagement.” Sources: The Aviationist, “No way an F-35 will ever match a Typhoon fighter jet in aerial combat” Eurofighter test pilot says” | and “How does the F-16 perform against its adversaries in dogfight?” vs. F-35 & F-16 2012 EUR 2 billion support deal; Oman buys 12; India loss. Eurofighter & Paveways (click to view full) Dec 21/12: Oman. It isn’t Christmas over there, but the RAFO is getting a present anyway. The Sultanate signs a GBP 2.5 billion (about $4.057 billion) deal with Britain for 12 Eurofighters, and 8 Hawk LIFT advanced trainers. This makes them the Eurofighter Typhoon’s 3rd export customer, a status they share with their neighbor Saudi Arabia. The deal includes in-service support, and deliveries are expected to begin in 2017. See “Oman’s Air Force Upgrades: From Jaguars to F-16s & Eurofighters” for full coverage. Oman buys 12 Dec 6/12: Weapons. 1st firing of MBDA’s Meteor long range air-air missile from a Eurofighter Typhoon. It’s part of Britain’s Future Enhancements Flight Test Programme, and builds on BAE’s unpowered trials to verify safe separation. The flight trials were conducted with integrated support from QinetiQ and MBDA. BAE | Eurofighter. Nov 29/12: UK Updates. BAE Systems has finished upgrading 43 RAF Eurofighters under the Retrofit 2 program, which began as its own effort but was subsumed into the wider Typhoon Availability Service (TAS) contract. Their Tranche 1 Block 5 standard installs the PIRATE forward looking infra-red (FLIR) system, improves air-to-air capability; and adds precision strike by using a combination of Paveway II family laser-guided bombs, and RAFAEL’s LITENING-III surveillance and laser designator pod. Eurofighter GmbH. Nov 6/12: UAE. British Prime Minister David Cameron issues a joint communique with the UAE. The 2 countries will improve their defense ties, with specific commitments that include: “Deepen our defence ties by; continuing the development of our joint plans for the security of the UAE and wider Gulf region; increasing our joint exercises and training; and by investing in the British military presence in the UAE. Establish a defence industrial partnership that involves close collaboration around Typhoon and a number of new technologies.” The Eurofighter is competing with France’s Rafale for a 60-plane buy, and these sorts of agreements are normal under the circumstances. It’s also normal for specific defense deals to depend on the customer’s final choice, though the joint communique includes economic relations beyond defense. UK PM | Reuters. Nov 6/12: Flight costs. From Britain’s House of Commons: Mr Ellwood: To ask the Secretary of State for Defence what the average hourly cost was of flying the Typhoon fighter (a) with and (b) without fuel costs. [126215] Mr Dunne [holding answer 1 November 2012]: The standard marginal flying hour cost for a Typhoon is £3,875, including the cost of fuel. Excluding fuel costs the figure reduces to approximately £2,670.” Even GBP 3,875 (about $6,200) is considerably cheaper than published American fighter costs per flight hour. The comparable F-15 Eagle family is generally quoted as being in the $17,000 – $30,500 range. The difference has less to do with the respective machines, and more to do with differing approaches to calculating those costs, especially in one’s choice of what to include. A standard calculation method would be informative, but it doesn’t exist. RAF flight costs HEA click for video Oct 16/12: HMD. Eurofighter GmbH touts the new “Head Equipment Assembly (HEA), developed by BAE Systems’ Electronic Systems, [which] comprises the aircrew helmet and all the sub-system elements needed to display a real world overlaid picture on the helmet visor.” The accompanying video has a Typhoon pilot explaining why this is so powerful, and expressing his belief that it’s impossible to beat an enemy if they have a system like this and you don’t. “Once you’ve had this helmet on, you don’t ever want to be without it.” All well and good, but American fighters have had these capabilities for almost a decade now. A fact that they have used to their advantage in international competitions against the Typhoon, and against other fighters like the French Rafale that lack an accompanying HMD. Why HMDs matter July 2012: Japan. The Japanese Ministry of Defense releases its “Defense of Japan 2012” White Paper. Among other things, it explains exactly why the F-35 won. All 3 contenders fulfilled all mandatory requirements, but the F-35 was rated as the overall winner based on the 2nd stage evaluation of capability, industrial participation, cost, and support. Part of the problem is that Japan simply accepted Lockheed Martin’s paper performance and cost promises at face value, in the absence of data. Even then, the Typhoon was seen as the most fuel-efficient plane, and its bid had the best industrial benefits for Japan. On the other hand, EADS and BAE had trouble meeting Japan’s purchase cost targets while giving Japanese firms all of that work, and picking EADS/BAE would have meant deviating from Japan’s strongly American industrial links and equipment infrastructure. The Eurofighter Typhoon also had a compatibility problem with the JASDF’s KC-767 aerial tankers, who don’t carry hose-and-drogue refueling pods. KC-767 retrofits would have been required, driving up the program’s expense. Read “Japan’s Next Fighters, From F-X Competition to F-35 Buys” for full coverage. Luftwaffen (click to view full) July 30/12: Eurofighter vs. F-22. Combat Aircraft leaks some results from the 2012 Red Flag exercises. WIRED Danger Room: “In mid-June… [8] Typhoons arrived at Eielson Air Force Base in Alaska for an American-led Red Flag exercise involving more than 100 aircraft from Germany, the U.S. Air Force and Army, NATO, Japan, Australia and Poland. Eight times during the two-week war game, individual German Typhoons flew against single F-22s… The results were a surprise to the Germans and presumably the Americans, too. “We were evenly matched,” Maj. Marc Gruene told Combat Aircraft’s Jamie Hunter. The key, Gruene said, is to get as close as possible to the F-22 … and stay there. “As soon as you get to the [close-in] merge … the Typhoon doesn’t necessarily have to fear the F-22,” Gruene said.” That’s interesting, and an impressive testament to the Eurofighter’s design and ergonomics. On the other hand, let’s acknowledge that it isn’t exactly easy to “get to the merge” against an opponent who is invisible to your radar at range, moving up to 50% faster than you are, and able to see you just fine on their own radar. vs. F-22 July 30/12: AESA. NETMA(NATO Eurofighter and Tornado Management Agency) has reportedly issued an RFP to Eurofighter GmbH for the development of an E-Scan Active Electronically Scanned Array Radar. Eurofighter CEO, Enzo Casolini says the 2015 target remains, per announcements in June 2011: “The timescale is to answer the RFP by October this year and to have an agreement with the nations by the end of the year. The target is to have a contract by the middle of next year and to have an E-Scan entering into service by 2015.” See: Arabian Aerospace. July 11/12: Weapons. BAE describes cockpit assessment trials for the long-range Meteor air-to-air missile. They took pilots from “each of the Eurofighter nations,” and put them through a range of scenarios in a modified simulator. That led to a series of recommendations for the final cockpit design. On the one hand, getting the user interface really right pays big dividends in combat. On the other hand, the fact they’re doing these exercises a good indication of how early they are in the process. It also points to how much more is involved in this sort of thing, beyond just hanging a new missile on a pylon. BAE Systems. July 10/12: Gulf opportunities. Reports from Farnborough shed some light on potential Eurofighter Typhoon sales to Oman, Qatar, and the UAE. Dassault has been sounding quite confident about the Rafale’s ultimate prospects in the UAE, but BAE Systems’ business development director Alan Garwood told Reuters that he believed the UAE’s interest is “real and genuine,” adding that they “could tell by the questions they were asking us that they were serious.” BAE is still working with the British government to put together a package for 60 planes. With the loss in India, and the near-certain demise of Tranche 3B, the UAE represents the fighter’s largest near-term opportunity. Oman is a higher-odds opportunity, and Garwood said that: “We’ll start formal negotiations [for 12 jets] with Oman towards the end of August [2012] I would imagine. The two governments have targeted it for completion this year and we want it done this year as well… I see no reason why we shouldn’t be able to do that.” With respect to Qatar, he would say only that: “We are talking to the Qataris quite a bit.” That’s normal in a competition like this, which is reported to include Boeing’s F/A-18E/F Super Hornet, Dassault’s Rafale, Lockheed’s F-35A Lightning II, and Saab’s JAS-39E/F Gripen. Reuters | WSJ’s The Source blog. July 9/12: Upgrades at last? At the opening of the Farnborough defense exhibition, British Prime Minister David Cameron discusses the Eurofighter’s future: “Typhoon’s growth potential is huge and the four partner nations, Italy, Germany, Spain and the UK have agreed the next steps required to further exploit this. The integration of the METEOR missile, an Electronically Scanned Radar, enhancements of the Defensive Aids System, further development of the air-to-air and air-to-ground capabilities and integration of new weapons.” With Tranche 3B fading away, and India out as a big export win, upgrades like these are the only way to keep part of the manufacturing base going for much longer, and are also its best hope for landing significant export orders. The question is when some of these upgrade “agreements” will become signed contracts with actual dollars behind them. Read “Eurofighter’s Upgrades: Enough? In Time?” for more. March 30/12: “Contract 1”. Eurofighter Jagdflugzeug GmbH signs a major 5-year contract with NATO’s Eurofighter and Tornado Management Agency (NETMA), to support the fleet of Typhoon jets across the 4 Eurofighter core nations: Germany, Italy, Spain and the UK. The overall contract total is not disclosed, but is estimated to be around EUR 2 billion (currently $2.66 billion). BAE estimates its share of the total at GBP 446 million (about EUR 533 million). Finmeccanica estimates its share of the total at “more than EUR 500 million.” EADS declined to give figures. “Contract 1” replaces previous Integrated Logistics Support (PC1-11) contracts and a number of sustainment contracts, covering items like day-to-day support, studies, and customer queries and investigations. It also includes continued development, testing, and upgrade work on the fighters’ systems. Replaced contracts will morph into Contract 1 over a period of time, but they will not include any of the major support contracts announced by various member countries in 2009. Eurofighter GmbH | BAE | Finmeccanica | Defense News. “Contract 1” for support March 30/12: #321. A Finmeccanica release notes that so far, the consortium has delivered 321 Eurofighter Typhoons to customer nations. March 22/12: AESA – just a sim. EADS Cassidian touts the benefits of an “E-Scan” AESA radar for the Eurofighter, and touts its operation of the largest assembly line in Europe for the individual transmit/ receive modules that make up those radars. The German BWB’s 2-year study, using IABG GmbH’s MILSIM (man-in-the-loop simulator), is nice enough. What it isn’t, is a development and production contract. American F-15 Strike Eagles, F-16s, and F/A-18E/F Super Hornets are offered with AESA radars right now. France’s Dassault just received the 1st RBE2-AA AESA radar for its Rafale production line. Saab is well underway developing its own ES-05 Raven AESA radar for the JAS-39E/F Gripen NG, which will join the Eurofighter’s notional AESA design in using a pivoting plate approach. They’re doing so in conjunction with Finmeccanica’s SELEX Galileo, the current leader of the Euroradar consortium. Unless the Eurofighter consortium and its governments get moving soon, their fighter will begin to find itself at a severe disadvantage in international competitions. Jan 31/12: India loss. Dassault’s Rafale is picked as the “L-1” lowest bidder for India’s 126-aircraft M-MRCA deal, even after the complex life-cycle cost and industrial calculations are thrown in. Some reports place its cost as $5 million lower per plane. Next steps include the negotiation of a contract, in parallel with parliamentary approval and budgeting. Until a contract is actually signed, however, India’s procurement history reminds us that even a “close” deal is just 1 step above a vague intention. The contract may take a while. Even the French government sees a deal as only an 80% probability within 6-9 months. The budgeting is likely to be even trickier. The IAF’s exclusion of cost considerations in picking its finalists means that the only question now is: how far over the stated budget will a full Rafale buy go? Some reports place the deal’s cost at around $15 billion – an increase of up to 50% from previous estimates. If economic downturns or squeezed defense budgets make those outlays a big enough issue, early enough in the process, it could have the effect of re-opening the competition. British PM David Cameron has expressed an intent to change India’s mind, and both Saab and Boeing are still positioned within India, in order to be ready for a renewed opportunity. Eurofighter’s problem is that it’s hard to see how it might succeed in a competition that was re-opened for financial reasons. Dassault | President Sarkozy [in French] | Economic Times of India, see also their timeline | Indian Express | Rediff (thanks for using our descriptions, sans attribution) | Times of India || Aviation Week | BBC | UK’s The Guardian | Reuters report and expert roundup. India loss 2011 HMD at last; Tranche 3 sub-system contracts; German cuts to 3B plans; Competitions in Bulgaria, India, Japan (loss), South Korea, UAE; Opportunities in Indonesia & Turkey?; AESA by 2015?; Paveway IV and EGBU-16 bomb tests; PILUM glide bomb; Naval Eurofighter; Negative British NAO report; 100,000 flying hours. Eurofighter over Dubai (click to view full) Dec 20/11: Japan loss. Japan’s Ministry of Defense announces that Lockheed Martin’s F-35 Lightning II has won the F-X competitive bid process for 42 planes, beating the Eurofighter and Boeing’s F/A-18 Super Hornet International. As F-4 replacements, the F-35As will have an air defense role, but Japan does have a large cadre of dedicated F-15Js to perform that mission. Conclusion? Their undeclared role is as strike fighters. Note that there’s still an F-XX program in the future, aimed at replacing Japan’s F-15Js. Numbers as high as 100+ planes have been floated, but that will depend on both economic straits, and local geopolitical threats. Read “Japan’s Next Fighters, From F-X Competition to F-35 Buys” for full coverage. Japan loss Nov 16/11: UAE. The UAE is either engaged in the mother of all hardball negotiations, or the potential Rafale sale is crashing. Critical comments at the highest levels are accompanying the invite to Eurofighter, strengthening the belief that the Typhoon is more than just a stalking horse to lower the French bid. The question is, how big is the opportunity? Reports have surfaced that the UAE may be about to cut its planned new jet order, regardless of its choice, and buy more of its unique F-16E/F Block 60s. Read “Derailed Denouement in Dubai: What’s Up With the UAE’s Fighter Deal?” for a snapshot. Nov 13/11: UAE. Flight International reports that the UAE must have liked their October briefings re: Eurofighter’s capabilities, because they’ve asked Eurofighter GmbH for an RFP bid to replace their current fleet of Mirage 2000-9s. The UAE has been in negotiations to buy Rafale planes for several years now, but hasn’t been able to clinch a deal. It’s hard to tell if the UAE is just looking to add pressure and get a better price from Dassault, or if their interest is serious. One sign that they might be serious is the fact that they’ve also received classified technical briefings regarding the F-15E Strike Eagle and F/A-18 Super Hornet, but haven’t asked for RFP bids from the Americans. Flight International believes that this may be a prelude to consideration of the stealth-enhanced F-15SE Silent Eagle or F/A-18 Super Hornet International for the UAE’s planned 2018-2025 fighter modernization. The obvious 3rd contender there is Lockheed Martin’s F-35. Nov 12/11: Eurofighter GmbH touts their Dubai flying display, complete with a graphic showing their impressive flight plan. They also tout a range of technologies that they hadn’t advertised much before, including thrust-vectoring engine nozzles, an AESA radar, and MBDA’s Marte anti-ship missile. The release appears to blur the line between concepts/plans, and field-ready equipment. Oct 21/11: Germany & Tranche 3B. Germany announces further defense cuts, which include a proviso that their Eurofighter orders will end at Tranche 3A, instead of adding another 37 planes in a Tranche 3B. With Britain also saying that Tranche 3Ais the end, and the governments of Spain and Italy under severe financial strain, it appears less and less likely that there will be a Tranche 3B. The question is how to escape termination costs. Negotiations can be expected, but one option is to count future exports as re-sales of scheduled orders from existing partner countries. Aviation Week. Aug 18/11: Sub-contractors. Finmeccanica’s SELEX Galileo contracts with BAE Systems Manufacturing at Hillend in Fife, in GBP 20+ million procurement and electronic manufacturing services contract related to Tranche 3A’s Captor radars. Work at the Hillend facility will run from 2011-2013. BAE’s release adds that the facility has won over GBP 165 million in Captor and Typhoon DASS orders, over the last 12 years. July 20/11: South Korea. As South Korea’s DAPA eases the criteria to try and foster more competition, DAPA’s Col. Wi Jong-seong says that “Russian aircraft manufacturer Sukhoi expressed its intent to compete in the fighter jet procurement project early this year.” The report quotes him as saying that Sukhoi’s T-50 PAK-FA will be up against Boeing’s stealth-enhanced F-15SE Silent Eagle, Lockheed Martin’s F-35 Lightning II, and the Eurofighter Typhoon. Assuming we don’t have an FX-II competition repeat, where all competitors but one drop out. At this point, FX-III is being touted as a 60 jet buy of high-end fighters, with a budget of 8.29 trillion won ($7.86 billion). Eurofighter reportedly offered a better deal than the F-15K in F-X-2, but lost. The firm recently proposed to phase in Korean assembly for Phase III, with the 1st 10 made in Europe, the next 24 using Korean components, and the last 26 assembled in Korea. Korea Times. June 27/11: Weapons. Diehl BGT and Israel’s RAFAEL unveil a new weapon for Eurofighter at the 2011 Paris Air Show. The PILUM long-range glide bomb concept has a range variously reported as 100-160 km/ 62 – 99.5 miles, but it’s a developmental weapon, so exact figures remain to be proven. PILUM uses RAFAEL Spice’s combination of GPS/INS and imaging infrared guidance, within Diehl’s HOSBO modular glide bomb system. HOSBO is a steamlined glide bomb that can carry a modular payload, including warheads of various sizes and types, even warheads designed to disrupt electronics. This JSOW Block III competitor will be able to attack defended targets, vehicles, ships, or even smaller targets. It will be integrated on Germany’s Tornado and Eurofighter aircraft. Will the Saudis, who fly both types, want any? Diehl BGT release | Jerusalem Post. June 24/11: HMD. A Reuters report offers an update on progress with the Eurofighter’s BAE “Striker”/ HMSS helmet-mounted displays. HMDs are now considered a standard feature for fighter jets, as they’re required in order to take full advantage of new short range air-to-air missiles, and boost ground attack capabilities. British RAF pilots tested the first helmets in summer 2010. So far, about 50 total helmets have been delivered to Italy, Germany, Spain and UK, at a delivery rate of about 8 per month, but none are being used over Libya. They’re expected to become operational in the RAF by the end of 2011. June 22/11: AESA. After a year of preliminary industry funding, Eurofighter GmbH and Euroradar agree to continue development, and announce 2015 as the target date for entry into service of a Typhoon with the new “E-Scan” AESA radar. A later date wasn’t really feasible, given the delivery schedules involved in critical competitions like India’s M-MRCA. Indeed, even a 2015 date could be a disadvantage as the Eurofighter competes with France’s Rafale, which has begun testing its own RBE2-AA. The firm does say that: “The new AESA array, larger than the ones available to our competitors thanks to the Typhoon’s voluminous radome, will be fitted on a repositioner that will provide a wider field of regard when compared to those installed or scheduled for introduction on other fighters. The new radar will offer customers the freedom to retrofit their existing Typhoons when required.” E-Scan AESA date announced June 20/11: Weapons. Eurofighter IPA1 has completed the first of a series of Meteor missile trials, beginning with safe separation across the flight envelope on the Aberporth range in Britain. Eurofighter GmbH. May 17/11: Leadership. EADS Cassidian Spain has appointed 56 year old Luis Hernández Vozmediano as their new Head of the Eurofighter program. He has spent virtually his entire professional career at EADS, and has been heavily involved in Britain’s A330 Future Strategic Tanker Aircraft (FSTA), and the related American KC-X pursuit. Eurofighter GmbH. May 11/11: Turkey. Eurofighter has courted Turkey for a long time, despite Turkey’s political & industrial commitment to the F-35 program. Hurriyet reports growing interest in a fighter split-buy, to reduce dependence on the USA. Naturally, Italy’s government is pushing Turkey to solve that problem by joining the Eurofighter consortium. Turkey might also pick a hi-low approach, and join South Korea and Indonesia in KF-X instead. The real wild card? Turkey’s current account deficit is hitting levels that worry some observers. High levels have been predictors of Turkish economic crises in the past. April 27/11: India. Fulfilling long-standing rumors that it had gained a leading position in India’s M-MRCA future fighter competition, Eurofighter is confirmed as one of 2 finalists, alongside Dassault’s Rafale. Read “India’s M-MRCA Fighter Competition” for full coverage. April 2011: Weapons. EADS Cassidian Spain achieves the first 1,000 pound EGBU-16 Enhanced Paveway II precision guided munition release. The EGBU-16 is the selected dual mode bomb for Germany, Spain and Italy, whereas the locally-developed Paveway IV is the dual mode choice for the UK. Eurofighter GmbH. March 7/11: Weapons. The first ever Eurofighter release of a Paveway IV dual guidance bomb takes place from development aircraft IPA6, in an hour long test flight over the Aberporth Range in Wales. BAE Systems | Eurofighter GmbH, incl photo. March 10/11: Indonesia? The Times reports that more of Britain’s fighters could be leaving the force, if Indonesia’s interest in up to 24 Typhoons pans out. That could be politically challenging, though. Britain has led the way into attacks on Libya for bombing its civilians, but Indonesia has used its BAE Hawk light attack jets against its own insurgencies, and in East Timor. That triggered a defense export ban 12 years ago. Indonesia continues to operate a large fleet of Hawk jets, but it has since filled its high end air superiority slot with a handful of Sukhoi’s SU-27/30 Flanker family fighters – a cheaper choice with similar capabilities. The UK MoD says it has “no current plans” to export Typhoons to Indonesia, but that means little to nothing when the statement is carefully parsed. If Indonesia really is interested in adding Typhoons, one option might be to re-export 24 RAF Tranche 1 aircraft that haven’t been given precision ground attack modifications. The Times [subscription-only] | Agence France Presse | The Guardian | UPI. March 2/11: Britain’s reluctance to invest in additional Typhoon fighters is partly explained by the findings of an NAO report, which notes that: “The cost of the Typhoon project has risen substantially. Despite the MOD’s now buying 72 fewer aircraft (down from 232 to 160, a reduction of 30 per cent), the forecast development and production cost has risen by 20 per cent to [GBP] 20.2 billion. This is a 75 per cent increase in the unit cost of each aircraft. The cost of supporting each aircraft has also risen by a third above that originally expected. The MOD now estimates that, by the time the aircraft leaves service, some [GBP] 37 billion will have been spent.” There are concerns that the report might affect the jet’s chances in India. Meanwhile, a report in The Register highlights the importance of paying attention to Tranche buy totals, in an atmosphere of declining budgets. Note that the retirement of the RAF’s Tranche 1 jets will happen long before they reach their service life design limits, raising the possibility of resale: “Probably the most dismal figure we are given is that the RAF will actually put into service just 107 Typhoons. At the moment it has received 70: the last of the 160 planes ordered by the UK will be delivered in 2015. But, we are told, “by 2019” all the Tranche 1 jets (which were still being delivered to the RAF at the start of 2008) will be “retired” – that is, thrown away. We’ll pay for 160 jets (actually we’ll pay for 232), but we’ll only ever get a fleet of 107.” UK NAO report March 2/11: During high level visits, British officials continue to press the case for the Eurofighter as Japan’s future F-X fighter, over offerings from Boeing (F/A-18E/F Super Hornet or F-15SE Silent Eagle) or Lockheed Martin (F-35A/B/C). One interesting wrinkle is that reconnaissance capabilities could become an important requirement, a move that would give the F-35 family an edge. BAE et. al. are fighting an uphill fight, but they’re not alone: in January 2011, the European Business Council in Japan launched a defense and security committee to promote defense-related business cooperation. Asahi Shimbun | Japan Times | L.A. Times. Naval concept (click to view full) Feb 21/11: Aero India 2011 sees Eurofighter and BAE unveil an interesting wrinkle: an initial design for a navalized Eurofighter than can operate from aircraft carriers, based on an internally-funded set of studies and simulations. In a direct nod to potential Indian sales, they tout the plane as being able to take off from “ski jump” carriers without catapults – a design that describes all of India’s current and planned carriers, as well as the initial design for Britain’s own Queen Elizabeth Class. Eurofighter GmbH describes the goal as 95% commonality with land-based aircraft, and required changes as “limited… include a new, stronger landing gear, a modified arrestor hook and localised strengthening on some fuselage sections near the landing gear, as well as updates the EJ200 engines,” which could include thrust-vectoring in flight. India is currently planning to use MiG-29Ks as its naval fighters, but it’s currently the type’s only customer, and the Typhoon is seen as a leading contender in its M-MRCA competition for land based aircraft. Britain is planning to use the F-35C from its future carrier, but further cost increases or delays for the multinational program could open an opportunity for a jet type that the RAF already flies. Eurofighter GmbH. Naval concept unveiled Feb 4/11: Bulgaria RFI. Bulgaria issues another fighter replacement RFI, soliciting information from Boeing (F/A-18E/F), Dassault (Rafale, Mirage 2000), EADS (Eurofighter), Lockheed Martin (F-16), and Saab (JAS-39 Gripen) re: 8 new and/or second-hand fighter jets, to replace its existing fleet of 12 MiG-21s. Bulgaria issued a similar RFI in 2006, for 20 jets, but the global economic crash, and Bulgaria’s own issues in trying to pay for past defense purchases, forced a hold. The Defense Ministry has taken pains to emphasize that this is just an exploratory request, and is not the start of a purchase tender. Nevertheless, November 2010 saw the formation of a National Steering Committee and an Integrated Project Team, to draft preliminary fighter replacement operational, technical, and tactical requirements. That followed October 2010 remarks by Bulgaria’s Defense Minister Anyu Angelov, who discussed spending BGN 1 billion (around $725 million) for the purchase of an uncertain number of new fighter jets to replace its MiG-21s, while modernizing its fleet of 16 MiG-29A air superiority jets. Sofia News Agency. Feb 3/11: Upgrades. The first Spanish single-seat instrumented production aircraft version 4 (IPA4) completes 500 hours of flight at the EADS Cassidian Spain facility at Getafe, near Madrid. After a functional upgrade from its original Tranche 1 air superiority standard to Tranche 2, this aircraft is testing new technology including a Link-16 MIDS system, as well as integration trials and the launching of precision air-to-ground weapons. The UK has already upgraded a number of its Eurofighters along similar lines, and added advanced LITENING targeting pods. Eurofighter GmbH believes that this Spanish IPA4 platform may serve as a model for the possible upgrade of the Tranche 1 fleets currently in service with Eurofighter customer nations. That’s the good news. The bad news is that an upgrade program of this type may also be seen as an alternative to ordering the final Tranche 3B set of Eurofighters. Eurofighter GmbH. Jan 28/11: Sub-contractors. Premium AEROTEC’s Varel, Germany plant has successfully started assembling structural components for the Eurofighter. EADS Cassidian announces that Varel’s first 3/2b Eurofighter fuselage section, a 3m section that mates with the wings, has been delivered to the Augsburg plant, where the entire fuselage center section will be assembled. Premium AEROTEC is a spin-off of the former Airbus sites in Nordenham and Varel and the former EADS site in Augsburg. It began operations on Jan 1/09, and in addition to various Airbus passenger aircraft components, it manufactures the fuselage center section for all Eurofighter aircraft, including the 4 program partners (United Kingdom, Spain, Italy and Germany) and export customers Austria and Saudi Arabia. This makes Premium AEROTEC GmbH, with over 6,000 employees and 2009 revenues of EUR 1.1 billion, the largest supplier of structures for the Eurofighter. The company has production plants in Augsburg, Bremen, Nordenham and Varel in Germany; and in Ghimbav, Brasov County, Romania. Premium AEROTEC | EADS Cassidian. Jan 25/11: Eurofighter GmbH’s CEO sees 2011 as a pivotal year, in order to avoid the end of production in 2015. India’s M-MRCA competition, and hopes of a Tranche 3B from its consortium countries, are the key underpinnings. Britain has been very clear that there will be no Tranche 3B buy there, and the austerity programs underway (voluntarily or otherwise) in Germany, Italy, and Spain make a Tranche 3B buy extremely unlikely. 100k milestone @ Moron (click to view full) Jan 25/11: Eurofighter GmbH announces that the multinational operational fleet of Eurofighter Typhoons in service since the second half of 2003 achieved 100,000 flying hours in January 2011. As aircraft are delivered and air forces declared their Typhoons to be operational, usage has accelerated. The first 5,000 flying hours was achieved by November 2005, and 10,000 hours was reached in August 2006. May 2007 included the 20,000 hour milestone, and by August 2008 the Typhoon had surpassed 50,000 hours. According to the firm, global operational fleets currently have more than 260 aircraft in service, with 6 squadrons in the UK (4 in Coningsby, 1 in Leuchars and 1 in Mount Pleasant, Falkland Islands); 4 squadrons in Italy (2 in Grosseto and 2 in Gioia del Colle); 3 squadrons in Germany (Laage, Neuburg and Nörvenich), as well as 1 each in Spain, Austria and in the Kingdom of Saudi Arabia. At present, all 148 Tranche 1 aircraft have been delivered, and Tranche 2 production is in full swing. 100,000 fleet flight hours Jan 4/11: HMD. BAE announces that its “Helmet Mounted Symbology System” (HMSS) is scheduled to enter service with the RAF in 2011, giving Britain’s Eurofighters the same helmet mounted sighting capability already enjoyed by pilots of competing aircraft, via systems like the Israeli/American JHMCS. The HMSS does add some advanced wrinkles. A Eurofighter pilot can now look at multiple targets, lock-on to them, and prioritize them by voice-command. This will work even for targets over the shoulder, or targets picked up by the radar but located underneath the aircraft. HMD at last 2009 – 2010 EUR 9 billion Tranche 3A deal; Tranche 3A sub-system contracts; Tranche 3B offer on table; Private work toward a “CAPTOR-E” AESA radar. CAPTOR-E (click to view full) Oct 5/10: Sub-contractors. Finmeccanica subsidiary SELEX Galileo announces a EUR 242 million (about $333.5 million) contract for 88 Captor-M mechanically scanned phased array radars, as part of the Eurofighter Typhoon Tranche 3A buy. Deliveries would begin in 2012. The CAPTOR-M is the Eurofighter’ standard radar. Contracts are in progress to develop and field new CAPTOR-E Active Electronically Scanned Array radars for future buys or retrofits, vid. the July 20/10 entry. SELEX Galileo [PDF] | Defense News. Sept 7/10: Sub-contractors. Finmeccanica subsidiary SELEX Galileo announces [PDF] a EUR 400 million sub-contract from BAE Systems, to supply Tranche 3A fighters with the Praetorian Defensive Aids Sub System (DASS), delivered to the same standard as the Tranche 2 fighters. SELEX Galileo leads the EuroDASS Consortium of Elettronica, Indra Sistemas, EADS and SELEX Galileo, which shares the production of more than 20 major Line Replaceable Items (LRIs) that make up the system. First deliveries are expected in mid-2012. The Praetorian DASS includes Electronic Support Measures (ESM) to find hostile radars, active Electronic Counter Measures (ECM) to confuse them, and Missile Approach Warning (MAW) systems, tied into an array of defensive subsystems that include chaff, flares, and towed decoy options. Aug 19/10: Sub-contractors. Northrop Grumman announces a contract from EADS Military Air Systems business unit to deliver 88 inertial measurement units (IMU) for Tranche 3A of the Eurofighter Typhoon. The IMU system is the sole sensor which measures the motion of the aircraft and continuously provides motion data to the flight control computer. In a secondary function, the IMU provides backup navigation data. The IMUs, which provide motion data for the aircraft, will be built by the company’s German navigation systems subsidiary, Northrop Grumman LITEF, which also provided IMUs for Tranche 1 and Tranche 2 of the aircraft. More than 400 Northrop Grumman LITEF IMUs have been delivered and are already in service on Eurofighters in Germany, Spain, Italy, United Kingdom, Austria and Saudi Arabia July 20/10: AESA. Eurofighter GmbH and Euroradar announce that they have begun full scale development of an Active Electronically Scanned Array (AESA) radar to serve in the Eurofighter, with a target in-service date of 2015. The Eurofighter/Euroradar groups have been conducting preliminary AESA development and flight testing since 2007, and Selex Galileo is already working towards integrating an AESA array with the UK’s Eurofighter (vid. Feb 19/10 entry). Full-scale development of a CAPTOR AESA successor is a new step that could become a factor in Tranche 3B discussions, or later 3A upgrades. Still, SELEX Galileo CEO Steve Mogford says move represents a standalone offer, and is not linked to the proposed Tranche 3B production phase. The Euroradar consortium has reportedly proposed retaining as much “back-end” CAPTOR equipment as possible, as part of delivering the proposed E-Captor AESA system. The consortium also plans to make CAPTOR-E a mechanically scanned AESA radar, rather than mounting it in a fixed position as American fighters have done. This will expand the AESA radar’s slightly narrower cone, and also make it easier for the aircraft to use “launch and break away” tactics against aerial opponents that are beyond visual range. Eurofighter GmbH | Flight International | Microwave Journal. June 9/10: Tranche 3B offer. At the ILA Air Show in Berlin, Germany, Reuters relays word from a Eurofighter GmbH spokesman that it has submitted a Tranche 3B offer to the partner nations for 124 more Eurofighters, finishing the planned Tranche 3. Defense industry sources at the Berlin Air Show said the offer was around EUR 10 billion. To date, Britain, Germany, Italy and Spain have so far taken delivery of a combined 222 Eurofighter Typhoons, out of 473 ordered. Eurofighter says a production decision is needed within a year, in order to avoid the beginning of a supplier shutdown and a production gap. The member countries will face a choice between declining defense budgets, versus the likely need to pay some cancellation costs if there is no Tranche 3B. Feb 19/10: Finmeccanica subsidiary SELEX Galileo announces [PDF] a GBP 19 million contract from Britain’s defense ministry to install a first of type, multi-function, wide field of regard AESA radar on a British Eurofighter as a technology demonstration program. The AESA TDP will focus on Day/Night All Weather targeting, high resolution Synthetic Aperture Radar (SAR), air to air targeting, and communications. It’s designed to raise the technology readiness levels of the enabling hardware, de-risk the capability and demonstrate maturity of concept. Following ground and antenna range testing, the radar is planned to fly on a Royal Air Force Typhoon around 2013. Future weapons array? (click to view full) July 31/09: NETMA (NATO Eurofighter and Tornado Management Agency), Eurofighter Jagdflugzeug GmbH and EUROJET Turbo GmbH signed the Tranche 3A contract, a EUR 9 billion (about $12.96 billion) order for 112 aircraft and 241 EJ200 engines (224 engines to equip 112 planes, plus 17 spares). This new contract also sets the baseline for subsequent support contracts. BAE cites a work value of GBP 2 billion (EUR 2.35 billion), Finmeccanica cites EUR 3 billion worth of work from Tranche 3A, divided between subsidiaries in Italy (EUR 1.6 billion) and the UK (EUR 1.4 billion). Rolls Royce values its 37% share in the EUROJET order at GBP 300 million (EUR 352 million). The EJ200 includes advanced integrated Health Monitoring, and is already supported by availability-based contracting terms. Eurofighter GmbH | UK MoD | BAE Systems | EADS | Finmeccanica | Rolls Royce | BBC | Deutsche Welle | Financial Times | Hamburg Local | Reuters says last buy for Britain | London Telegraph | Times Online | UPI Asia. Tranche 3A Additional Readings Readers with corrections or information to contribute are encouraged to contact editor Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so. Eurofighter GmbH. Official site. Eurojet Turbo GmbH. SELEX Galileo – CAPTOR-M radar [PDF]. Eurofighter GmbH – Eurofighter Typhoon Helmet. Includes Quicktime video. Official Reports German Bundesrechnunghof (April 30/14) – Press release [in German] | Eurofighter summary, incl. link to full report: 2013 Bemerkungen – Weitere Prufungsergebnisse – Nr. 09 “Kostentransparenz beim EUROFIGHTER herstellen [in German] | Full Report: Langfassung der Bemerkung Nr. 09 [PDF, in German]. UK National Audit Office (March 2/11) – Management of the Typhoon Project. See also The Register. News & Views The Aviationist (Feb 11/13) – No way an F-35 will ever match a Typhoon fighter jet in aerial combat. The Aviationist (Dec 10/12) – How does the F-16 perform against its adversaries in dogfight? “….above FL100 the Typhoon becomes quite difficult to beat since its superior aerodynamics give the Eurofighter can out maneuver the Viper at every engagement.” Smithsonian Air & Space (May 21/12) – Under the Eurofighter’s Hood: Europe’s frontline fighter is a marvel of technology. Aviation Week Ares (March 1/10) – JSF – Mid Year Check. Includes a detailed anecdote covering serious aerodynamic issues with the Typhoon, which delayed its entry into service until 2005, when its automatic low-speed recovery system was qualified. Defense et Securite Internationale (May 2006) – Rafale et Typhoon: Les Europeens auraient-ils tort d’avoir… raison? [PDF, in French]. Other Eurofighter Contracts DID – The 2006 Saudi Shopping Spree: Eurofighter Flies Off With Saudi Contract. DID – Eurofighter’s Rough Ride in Austria. DID – UK’s Eurofighters Fly To Availability-Based Contracting . DID – Spain’s Moron Maintenance: EUR 150M to EADS for Typhoons. DID – Eurofighter GmbH Signs EUR 600M+, 5-year Support Contract for Italy. DID – BAE Wins Big PBL Support Contracts for European & Saudi Eurofighters. DID (July 5/05) – $1.5B for Eurofighter Electronic Warfare Suite. Part of Tranche 2 production. tag: typhoonfocus, eurofighterfocus View the full article
  16. In the last couple of years, as the phrase "Great Power Competition" has grown in use, more often than not people use it to mean "China and Russia" not together, but to imply that - at least at sea - they are both growing to challenge the USN. I'm sorry, but if the future is what you are building today, Russia does not fit that bill. That is my take over at USNIBlog. Come on by and give it a ponder with me. View the full article
  17. Americas Alabama Shipyard won a $17.9 million deal for a 76-calendar day shipyard availability for the regular overhaul and dry-docking of USNS Washington Chambers (T-AKE 11). The T-AKE 11 is a Lewis and Clark Class Dry Cargo Ship. The ship delivers ammunition, provisions, spare parts, potable water and petroleum products to US Navy and other navy ships at sea, allowing them to remain underway and combat ready for extended periods of time. The contract includes options which, if exercised, would bring the total contract value to $19,278,302. Work will take place in Mobile, Alabama, and is expected to be completed by March 20, 2021. The Wake Island Airfield, regarded as among the most isolated installations in the US military, is undergoing an $87 million upgrade, the Air Force said. The infrastructure modernizations include improvements to the deteriorating runway, new lighting, and grounding and pavement markings to support mission readiness and global air mobility, the Air Force Civil Engineering Center at Joint Base San Antonio-Lackland, Texas, announced. California-based contractor AECOM won the contract for the improvements in 2019, and is expected to complete the project in early 2021. “The remote location of the Wake atoll required extensive logistics planning to ship construction equipment, material, parts and supplies which we successfully accomplished in November 2019,” Capt. David Leonard, AFCEC project manager, said in a press release. Middle East & Africa A decade-long UN arms embargo on Iran that barred it from purchasing foreign weapons like tanks and fighter jets expired on October 18, despite objections from the United States, which insists the ban remains in place. While Iran says it plans no “buying spree,” it can now in theory purchase weapons to upgrade military armaments dating back to before its 1979 Islamic Revolution and sell its own locally produced gear abroad. In practice, however, Iran’s economy remains crippled by broad-reaching US sanctions, and other nations may avoid arms deals with Tehran for fear of American financial retaliation. The Trump administration has warned that any sales of weapons to Iran or exports from Iran will be penalized. Europe British defense firm BAE Systems unveiled a next-generation cyber-threat detection and mitigation solution for military platforms. The Fox Shield cyber resilience system was developed to provide military platforms with better detection capabilities, attack warning, and mitigation. “Cyber protection was not necessarily a mission-critical capability when some of these platforms were first developed. That’s why we designed the Fox Shield cyber resilience system to be easily integrated into new and legacy platforms,” said Michael Weber, technical manager for FAST Labs’ Cyber Technology group at BAE Systems. According to the company, Fox Shield is the result of a multi-year effort from BAE Systems’ FAST Labs research and development team. It was developed with ongoing internal investment and builds upon baseline technology that has proven effective on other platforms as previously announced. Asia-Pacific Philippine Navy chief Vice Admiral Giovanni Carlo Bacordo said in a virtual presser that his service will only make the call to buy more AW-159 naval helicopters when the plan to acquire two additional corvettes are finalized. The two corvettes with anti-submarine warfare (ASW) capabilities are scheduled for the procurement of Horizon 2 of the Armed Forces of the Philippines Modernization Program. The Myanmar Navy publicly displayed its lone submarine at its ongoing Fleet Exercise 2020, dubbed Bandoola, which kicked off on October 15. The highlight of the exercise, which featured at least 12 naval vessels, was the Project 877 EKM submarine UMS Minye Theinkhathu, which was formerly the Indian submarine INS Sindhuvir. As imagery of the submarine was released by the Tatmadaw, the Indian Ministry of External Affairs (MEA) made an official announcement regarding the submarine transfer. Today’s Video Watch: TURKEY TESTS RUSSIAN SUPPLIED S-400 AIR DEFENSE SYSTEM | PUTS U.S & NATO IN MAJOR PROBLEM ! View the full article
  18. USNS Sacagawea (click to view full) Warships get a lot of attention, but without resupply, an impressive-looking fleet becomes a hollow force. The US Navy’s supply and support fleet has been aging, and needed new vessels. T-AKE is part of that effort, and the ships have also found themselves performing “naval diplomacy” roles. The entire T-AKE dry cargo/ ammunition ship program could have a total value of as much as $6.2 billion, and a size of 14 ships, as the US looks to modernize its supply fleet. How do T-AKE ships fit into US naval operations? What ships do they replace? What’s the tie-in to US civilian industrial capacity? How were environmental standards built into their design? And what contracts have been issued for T-AKE ships to date? T-AKE Ships: Mission & Capabilities How it works (click to view full) T-AKE multi-product fleet replenishment ships will provide logistics lift to station ships and other ships operating with naval forces from supply sources such as friendly ports, and at sea from merchant vessels. In other words, their primary mission is to provide a steady stream of ammunition, spare parts and provisions (dry, refrigerated and frozen) to naval forces at sea in their role as a shuttle ship. As a secondary mission, they may operate in concert with a T-AO oiler as a semi-substitute for one AOE-1 Sacramento Class, or with AOE-6 Supply Class fast combat logistics support ships if the situation so dictates. Given the T-AKE’s fuel capacity, it would certainly require at least a T-AO oiler as well in order to service any Carrier or Amphibious strike group. The AOEs are also referred to as “station ships.” They offer a form of one-stop shopping by carrying dry stores (food, consumables, spare parts), ammunition (bombs, missiles) and fuel (oil, jet fuel), and are able to transfer them all simultaneously. Often, shuttle ships simply resupply the AOE station ship. T-AKE 1 in Crete (click to view full) Lewis and Clark Class T-AKE dry cargo/ammunition ships are 210 meters (689 feet) in length and 32.2 meters (105.6 feet) in beam, with a design draft of 9.12 meters (29.9 feet). They displace 41,000 tons, and the ships can carry almost 7,000 metric tons of dry cargo and ammunition and 23,500 barrels of marine diesel fuel. The specifications demanded that the transfer rates for ammunition and stores must be at least equal to those of the AOE-6 Class. Maximum speed is slower, however, at around 20 knots of burst speed. The T-AKEs will provide a 2-product (ammunition; and combat stores – including dry stores, frozen and chilled products, spare parts, and consumables that may include drinkable water) shuttle ship replacement for US Military Sealift Command’s aging Combat Store (T-AFS 1 Mars Class) and Ammunition (T-AE 26 Kilauea Class) shuttle ships. They are designed to be fully inter-operable with all US Navy and North Atlantic Treaty organization ships capable of underway replenishment, using standard US Navy Underway Replenishment (UNREP) equipment, or improved systems developed by industry. ASRS test (click to view full) As one example, the US Navy is testing the Automated Storage and Retrieval System (ASRS), an automatic shipboard storeroom system that can be configured to store Navy-standard pallets, Joint Modular Intermodal Containers, or any other packaging container, offering faster performance, less work, and fully selective offloading. ASRS is intended to be a low-maintenance system that can operate in Sea State 5 (waves up to 7 feet, just under Small Craft Advisory), and survive to Sea Sate 9 (hurricane force winds and/or waves well over 14m/45 feet, “hey isn’t that Laird Hamilton out there?” conditions). With their single propulsion screw (mariners do not call them “propellers”) and single rudder, however, mechanical problems can become disabling more quickly than is the case for multiple screw or multiple rudder designs. T-AKE ships are the US Navy’s first full-size all-electric ships, with diesel-electric generation that can be used for propulsion or for internal systems. The use of electric drive creates more internal redundancy in the event of damage. It also eliminates the need for drive shaft and reduction gears, which brings benefits to the ship’s internal space and makes for a quieter ship that’s harder to find using sonar. The ship class’ 4 Fairbanks Morse/MAN B&W 9L and 8L 48/60 diesel generators can generate up to 35.7 MW of power for use around the ship, compared to just 7.5 MW of power generated by the DDG-51 AEGIS destroyers to run internal machinery and combat systems. SA330 from T-AKE 1 (click to view full) T-AKE ships have a crew of 124 CIVMARs – civilian mariners who function under Secretary of the Navy instructions, and are Excepted Service employees of the US government. Military Sealift Command’s Naval Fleet Auxiliary Force serves as their program manager, but the ships are assigned to Fleet Forces Command. As such, these ships are given the USNS (name) designation and “placed in service,” unlike Navy warships which are given the USS (name) designation and commissioned. The T-AKE’s military detachment is 11 Navy sailors, who provide operational support and supply coordination. Another effect of this CIVMAR difference can be seen in the ship’s air assets. T-AKE ships are capable of landing, fueling and maintaining up to 2 utility helicopters like the CH-46D Sea Knight or MH-60S Knight Hawk, with hangar space for 2 machines. In practice, however, they do not carry US Navy helicopters. Instead, they carry contracted Eurocopter SA330 Puma medium helicopters, which are used to help transfer personnel and cargo in VERTREP (Vertical Replenishment) operations. Other Navy helicopters may land on T-AKE ships and assist, of course, but they are not part of the T-AKE ship’s native complement. The T-AKE Program USS George Washington & USNS Carl Brashear (click to view full) As noted below, the initial October 2001 contract called for the design and construction of the lead ship and the 1st follow ship, with additional follow-on ships included as contract options. At the time, the total cost if all options were exercised and 11 ships were built was projected at $3.75 billion (presumably in FY 2001 dollars). In April 2007, the Pentagon’s Selected Acquisition Report placed total actual and estimated program costs at $5.715 billion, based on 12 ships, with inflation rates included over the project’s entire lifetime. Thanks to a multi-year agreement hammered out in August 2007, the T-AKE program now has the potential to produce a total of 14 ships to be awarded through 2011, with a total value of $6.2 billion. Named USNS ships of the T-AKE Lewis and Clark Class all have a strong exploration bent; named ships to date include: T-AKE 1 USNS Lewis & Clark T-AKE 2 USNS Sacagawea T-AKE 3 USNS Alan Sheppard T-AKE 4 USNS Richard E Byrd T-AKE 5 USNS Robert E. Peary. No disrespect, but this should have been USNS Dave Brubeck. T-AKE 6 USNS Amelia Earhart T-AKE 7 USNS Carl Brashear T-AKE 8 USNS Wally Schirra T-AKE 9 USNS Matthew Perry T-AKE 10 USNS Charles Drew T-AKE 11 USNS Washington Chambers T-AKE 12 USNS William McLean T-AKE 13 USNS Medgar Evers T-AKE 14 USNS Cesar Chavez Of these 14, 12 will serve in the classic logistics lift role. Another 2 T-AKE ships will go into the Maritime Prepositioning Service with a different cargo loadout, to support the US Marine Corps. The BOLD ALLIGATOR exercise’s February 2012 landing of an MV-22 Osprey aboard USNS Robert E. Peary is connected with that role. It means the Marines can lift ammunition directly from a T-AKE ship to shore, rather than using further transfer to other ships. Turning this test into an operational capability will take more work and testing. Having 2 T-AKE ships in the MPS should provide plenty of opportunity. T-AKE Ships: The Civilian Industry Angle T-AKE Drawing (click to view full) As a deliberate design decision, T-AKE ships have been built to commercial standards to the extent that this was practical. The commercial standards approach removes the potential bottlenecks of military standards, and removes the need for commercial shipbuilders to follow a whole different set of procedures and requirements. This minimizes costs, allows the USA to take advantage of industry innovations and commercial best practices (which can reduce life cycle cost and improve efficiencies), and allows the shipbuilders to build up their civilian industrial capacity. That last item was especially important to the T-AKE program. In recent decades, the US Merchant Marine has declined, most civilian shipbuilding has migrated away from the United States to nations like South Korea, and ship ownership has migrated strongly toward direct and indirect ownership by Chinese firms. This has obvious implications for the overall sustainability of the US shipbuilding industry, and raises national security self-sufficiency concerns for the world’s pre-eminent naval power. GlobalSecurity.org notes that the ADC (X) program (which eventually became T-AKE) was seen as especially critical to demonstrate America’s ability to produce affordable and flexible container-type ships without going overseas. The idea was that ships would contribute to America’s overall shipbuilding infrastructure because their design would be a common hull having tremendous application to the civilian shipbuilding industry. So T-AKE’s goal was really two-fold: re-capitalization of the Navy’s sealift needs, and implementing a program that would impact America’s ability to competitively build ships on the civilian market. NASSCO’s Jan 31/06 release noted that the exercise of the option for the 9th T-AKE ship brought NASSCO’s backlog to 10 ships, including the 9 T-AKEs and the 4th of 4 double-hull oil tankers being built for BP Shipping Company of Alaska. The question is what will happen when T-AKE construction ends, which is due to happen soon. Building the USA’s Mobile Landing Platform ships will take up some of that slack, but it’s a small class. T-AKE Ships and the Environment (click to feel better) The existing T-AO Kaiser Class Fleet Oilers are not all double-hulled like the T-AKE – only the last 3 T-AOs are double-hulled. The Kaiser Class will need to be updated to meet international oil pollution conventions, and to address the wear being placed on them by the current high operational tempo. Given the inevitable reductions in active T-AO ships during the refit period, T-AKE vessels will be particularly welcome in the fleet. For several reasons. GlobalSecurity.org notes that this new class of T-AKE ships was envisaged as the first Navy Environmentally Sound Ship of the 21st century built with protection of the marine environment as a design objective. Performance requirements were crafted in the T-AKE ships’ System Specification that would ensure compliance with environmental regulations projected for the next 20 years. Central themes are compliance with international and national regulations, adaptation of pollution prevention measures though elimination of pollutants at the source (design them out at the onset), establishment of a hazardous material prohibition list, and a second list of materials that may only be used with government concurrence. USNS Lewis and Clark is the first Navy ship designed to be Ozone Depleting Substance free. It is also capable of performing mid-ocean ballast water exchange to minimize introduction of invasive species, and incorporates a combined sewage/graywater treatment system, and a double hull around cargo fuel areas to afford port access. Analysis of total pollutant loading between the T-AFS and T-AE ships and the T-ADC (X)/ T-AKE design showed a drop of 95% in total pollutants being introduced into the marine environment. Management of the Environmental Protection Program rests with the Assistant Project Manager, and the government/ industry team is responsible for ensuring environmental performance through the Environmental Protection Working Group. The T-AKE program received a Secretary of Defense Environmental Award on May 1/02. T-AKE Ships: Contracts & Key Events UNREP: USS Essex & USNS Alan Sheppard (click to view full) Thanks to a multi-year agreement hammered out in August 2007, the T-AKE program is now slated to produce a total of 14 ships, with a total value of up to $6.2 billion. Unless otherwise specified, US Naval Sea Systems Command in Washington, DC issued these contracts and modifications to General Dynamics subsidiary National Steel and Shipbuilding Co. (GD NASSCO) in San Diego, CA. FY 2020 T-AKE 10 & DDG-92 (click to view full) October 21/20: Shipyard Availability Alabama Shipyard won a $17.9 million deal for a 76-calendar day shipyard availability for the regular overhaul and dry-docking of USNS Washington Chambers (T-AKE 11). The T-AKE 11 is a Lewis and Clark Class Dry Cargo Ship. The ship delivers ammunition, provisions, spare parts, potable water and petroleum products to US Navy and other navy ships at sea, allowing them to remain underway and combat ready for extended periods of time. The contract includes options which, if exercised, would bring the total contract value to $19,278,302. Work will take place in Mobile, Alabama, and is expected to be completed by March 20, 2021. January 27/20: Calendar-Day Shipyard Availability Vigor Marine won a 15.3 million contract or a 75 calendar-day shipyard availability for the regular overhaul and dry-docking of USNS Charles Drew (T-AKE 10). Vigor Marine is a commercial repair and modernization subsidiary of Vigor Industrial. The shipyard offers eight drydocks, more than 15,000 feet of pier space and tens of thousands of square feet of superior indoor facilities to serve vessels of nearly any size. The USNS Charles Drew is a Lewis and Clark Class dry cargo ship of the United States Navy, built in 2009. The Navy vessel was delivered to Military Sealift Command on 14 July 2010 and began conducting missions for MSC in spring 2011, mainly operating in the Pacific Ocean. Work will take place in Portland, Oregon. Expected completion will be by May 9, 2020. FY 2019 November 20/19: Overhaul And Dry-Docking Vigor Marine LLC won a $20 million contract for a 75-calendar day shipyard availability for the regular overhaul and dry-docking of USNS Matthew Perry (T-AKE 9). T-AKE 9 is a Lewis and Clark Class dry cargo ship. The USNS Lewis and Clark is the first-of-class T-AKE dry cargo and ammunition ship and is part of the more than 40 ships within the US Naval Fleet Auxiliary Force. The ships, which are not armed and are classified as non-combatant ships, are capable of operating independently for extended periods at sea while providing underway replenishment services and contribute to the US Navy’s ability to maintain a forward presence. The deal includes options, which, if exercised, would bring the total contract value to $20,217,869. Work will take place in Portland, Oregon and is scheduled to be complete by March 16, 2020. September 27/19: Maintenance And Repair EMS Development Corp. won a $10.3 million deal for supplies relating to the maintenance and repair of the Advanced Degaussing Systems onboard T-AKE Lewis and Clark Class vessels. The ships, which are not armed and are classified as non-combatant ships, are capable of operating independently for extended periods at sea while providing underway replenishment services and contribute to the US Navy’s ability to maintain a forward presence. The ships provide services with logistic lift from sources of supply in port or at sea and the transfer of cargo including ammunition, food, fuel, spares, potable water and expendable supplies and materiel to battle groups, station ships, shuttle ships and other naval ships at sea. Work under the contract will take place in Yapbank, New York and is expected to be complete by September 2024. April 25/19: Overhaul and Drydocking of T-AKE 8 Vigor Marine won a $14.3 million contract in support of the USNS Wally Schirra or T-AKE 8. The Lewis and Clark Class cargo ship has a length of 689 feet and was launched on March 8, 2009. The mission of Lewis and Clark Class ships is to deliver ammunition, provisions, stores, spare parts, potable water and petroleum products to carrier battle groups and other naval forces, serving as a shuttle ship or station ship. The deal provides for regular overhaul and dry docking. Work will take place in Portland, Oregon and the estimated completion date is August 25, 2019. February 15/19: T-AKE 12 The US Navy’s Military Sealift Command contracted Detyens Shipyards $10.5 million for a 50-calendar day shipyard availability for the regular overhaul and dry docking of USNS William McLean (T-AKE 12). Detyens Shipyards operates a commercial shipyard on the East Coast of the US. It provides ship repair and conversion services. The USNS William McLean is a Lewis and Clark-class dry cargo ship. The Lewis and Clark class of dry cargo ship is a class of 14 Combat Logistics Force underway replenishment vessels. Work under the contract includes clean and gas-free tanks, voids, cofferdams and spaces, main engine and electric motor maintenance, 10-year crane maintenance and recertification, dry-docking and undocking, propeller shaft and stern tube inspect, freshwater (closed loop) stern tube lubrication, underwater hull cleaning and painting, 2.5-year bow thruster maintenance and tunnel grating modification, renew flight deck nonskid, and auxiliary pre-stage area refrigeration installation. Work will take place in North Charleston, South Carolina, and is expected to be finished by July 16 this year. February 12/19: T-AKE7 overhaul and dry-docking The US Navy’s Military Sealift Command (MSC) awarded a $17 million contract to Vigor Marin Inc. for a 75-calendar day shipyard availability for the regular overhaul and dry docking of USNS Carl Brashear (T-AKE 7). USNS Carl Brashear is a Lewis and Clark-class dry cargo ship delivered to the Navy by General Dynamics on March 4, 2009. Lewis and Clark Class T-AKE dry cargo/ammunition ships are 210 meters in length and 32.2 meters in beam, with a design draft of 9.12 meters. Vigor Marine provides vessel construction and repair services including dry-docking, structural repair, welding, machinery repair, diesel engine repair, shaft seal replacement, tube renewal among others. Work for this contract, which will take place in Portland, Oregon will entail clean and gas-free tanks, voids, cofferdams and spaces, propulsion motor and cooler, main generator maintenance and cleaning, high voltage switchboard and emergency switchboard cleaning, five-year main engine flex hose replacement, dry-docking and undocking, propeller shaft and stern tube inspect, freshwater stern tube lubrication, underwater hull cleaning and painting, freeboard cleaning and painting, sea valve replacements, renew flight deck nonskid, and reverse osmosis unit sea-chest installation. Work is scheduled to be completed by May 15 this year. FY 2013 July 5/13: T-AKE 7 drydocking. BAE Systems San Francisco Ship Repair in San Francisco, CA receives a $10.8 million firm-fixed-price contract for a 56-calendar day regular overhaul and dry docking of USNS Carl Brashear. All funds are committed immediately, but the contract includes options which could bring its total value to $12.3 million. Work will include inspection of the propeller shaft and stern tube, cleaning and painting of the hull, inspection and polish of the bow thruster propeller, installation of the cloropac unit and overhaul of the seal valves. Work will be performed in San Francisco, CA, and is expected to be complete by Sept 25/13. This contract was competitively procured, with proposals solicited via FBO.gov, and 1 offer received. US Military Sealift Command Norfolk in Norfolk, VA manages the contract (N32205-13-C-3015). Feb 5/13: TAKE-5 drydocking. Detyens Shipyards Inc. in North Charleston, SC receives an $8.5 million firm-fixed-price contract for a 55-calendar day regular overhaul and dry docking of USNS Robert E. Peary. Improvements will include installing a reverse-osmosis system to produce fresh water; inspecting the propeller shaft and stern tube; overhauling sea valves; installing a chlorpac unit; and cleaning and painting of the underwater hull. It’s not quite the same as T-AKE 4’s list, which explains why the price is so different. The contract includes options which could bring the total value to $9.9 million. Work will be performed in North Charleston, SC, and is expected to be complete by May 2013. All contract funds are committed in FY 2013, and will expire at the end of the current fiscal year of Sept 30/13. This contract was competitively procured via FBO.gov, but just 1 offer was received by Military Sealift Command Norfolk in Norfolk, VA (N32205-13-C-3010). Jan 17/13: DOT&E testing. The Pentagon releases the FY 2012 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). T-AKE is included, and most of the type’s previous deficiencies now list as corrected. One deficiency that popped up is potential vulnerability to hackers. Category I vulnerabilities were found during an Information Assurance audit, and a subsequent Red Team effort gained system access. The other 2 are related to T-KAE’s protection measures again chemical, biological or radiation attacks. Corrosion in the Countermeasure Water Wash Down’s (CMWWD) mild carbon steel piping system is still a problem, and the new IPDS-LR alert system doesn’t automatically activate the ship’s general or chemical alarm. The crew must manually activate this alarm, unlike US Navy ships. IPDS-LR still works, and isn’t formally on the “fix it” list, but it is worth noting. Nov 21/12: TAKE-4 drydocking. BAE Systems San Francisco Ship Repair in San Francisco, CA receives $13.4 million firm-fixed-price contract for a 53-calendar day regular overhaul and dry-docking of T-AKE 4, the USNS Richard E. Byrd. Improvements will include freeze chill decking structure support and repairs; installing a reverse-osmosis system to produce fresh water; inspecting the propeller shaft and stern tube; cleaning and painting of the underwater hull; and replacing the flight deck foam sprinkler piping. The contract includes options which would bring the total to $15.1 million. Work will be performed in San Francisco, CA, and is expected to be complete by Jan 17/13. Contract funds will expire at the end of the current fiscal year, on Sept 30/13. This contract was competitively procured via FBO.gov, with 1 offer received (N32205-13-C-3012). Oct 24/12: T-AKE 14 delivered. Military Sealift Command accepts delivery of its newest and last T-AKE ship, USNS Cesar Chavez, during a short ceremony at the General Dynamics NASSCO Ship Yard San Diego, CA. US MSC Final T-AKE FY 2012 Osprey lands; T-AKE 13 launched with greatly reduced labor hours, then delivered; T-AKE 3 drydock. UNREP: T-AKE 11 to CG 52 (click to view full) Sept 28/12: T-AKE 14 trial. The future USNS Cesar Chavez completed its Integrated Acceptance Trial which should lead to delivery later this (civil) year. NAVSEA. April 24/12: T-AKE 13 delivered. US Military Sealift Command accepted delivery of T-AKE 13 as USNS Medgar Evers, during a short ceremony at General Dynamics NASSCO in San Diego. US MSC | US Navy | GD NASSCO. March 16/12: T-AKE 3 drydock. BAE Systems San Francisco Ship Repair in San Francisco, CA receives a $12.3 million firm-fixed-price contract for a 55-calendar day regular overhaul and dry-docking of the USNS Alan Shepard [T-AKE-3]. Some of the major work items include dry-docking and undocking the ship, repairing interior decks, structural repairs, overhauling the main diesel generators, and inspecting and refurbishing the propeller shaft and stern tube. This contract includes options, which could raise it to $14.3 million. Work will be performed in San Francisco, CA, and is expected to be complete by May 28/12. Contract funds will expire at the end of the current fiscal year, on Sept 30/12. This contract was competitively procured, with 1 offer received by US Military Sealift Fleet Support Command in Norfolk, VA (N40442-12-C-3011). Feb 9/12: Osprey landing. A USMC MV-22 Osprey tilt-rotor aircraft from VMM-266 makes the 1st landing aboard a T-AKE ship, on USNS Robert E. Peary [T-AKE 5]. The Osprey landed aboard Robert E. Peary while conducting an experimental resupply of Marines during exercise Bold Alligator 2012. US Navy photo release. Nov 12/11: T-AKE 13 launched. USNS Medgar Evers [T-AKE 13] is christened at NASSCO’s San Diego, CA shipyard. She is named in honor of the African American civil rights leader from Mississippi, who was assassinated on June 12/63 in the front yard of his Mississippi home, by Ku Klux Klan member Byron De La Beckwith. Evers had tried to end segregation at the University of Mississippi in the 1950s, and was appointed Mississippi’s first NAACP field officer in 1954. He held the position until his assassination, working for economic boycotts and peaceful protests against “Jim Crow” segregation laws. His widow, Myrlie Evers-Williams, christened the ship. NASSCO says that its culture of continuous improvement has as reduced the labor hours required to build T-AKE 13 by 67%, compared to T-AKE-1. The ship is due for delivery to the US Navy in Q2 2012, after at-sea testing. US MSC | GD NASSCO. FY 2011 Cam Ranh return; T-AKE 11 delivered; T-AKE 12 launch & delivery; T-AKE 13 keel laid; T-AKE 14 named & keel laid; T-AKE 1 drydock. Building T-AKE 13 (click to view full) Sept 28/11: T-AKE 12 delivered. General Dynamics NASSCO delivers USNS William McLean to the U.S. Navy, during a signing ceremony at its San Diego, CA shipyard. US MSC | GD NASSCO. Aug 23/11: Cam Ranh Bay. USNS Robert E. Byrd [T-AKE-4] leaves Cam Ranh Bay, after becoming the 1st US Navy vessel to visit the southern Vietnamese port in over 30 years. She spent 7 days at Cam Ranh Shipyard for routine maintenance and repairs that included underwater hull cleaning, polishing of the ship’s propeller, repairing shipboard piping, and overhaul of the salt water cooling system. MSC Ship Support Unit Singapore routinely contracts shipyards throughout Southeast Asia to conduct maintenance and repairs, reducing transit times and hence the amount of time these ships are off-mission. US MSC. May 19/11: T-AKE 14 named. Secretary of the Navy Ray Mabus announces that T-AKE 14 will be named USNS Cesar Chavez. Chavez served in the Navy from 1944-1946, then became a leader in the American labor movement, and a civil rights activist who co-founded the National Farm Workers Association union. The choice ends up focusing unfriendly attention on Mabus’ politicization of ship names. US MSC. May 10/11: T-AKE 14 keel. General Dynamics NASSCO hosts a keel laying ceremony for T-AKE 14 at its San Diego, CA shipyard. Construction began in October 2010, and the ship is scheduled to be delivered to the U.S. Navy in Q4 2012. GD NASSCO also touts shipbuilding progress to date: “During the course of the decade-long T-AKE Program, General Dynamics NASSCO has implemented more than 20,000 ideas to drive down costs and improve quality as part of its continuing commitment to the efficient production of world-class ships for the U.S. Navy. These enhancements are the result of ongoing process improvement initiatives, Lean Six Sigma projects, facility investments of more than $300 million since 2000 and capturing and rigorously applying lessons learned… In just five years, NASSCO has reduced the labor hours required to build a T-AKE by more than 60 percent, while completing construction in half the scheduled time required to build the first T-AKE ship…” April 17/11: T-AKE 12 launched. GD NASSCO launches the USNS William McLean [T-AKE 12] dry cargo/ammunition supply ship at its San Diego shipyard. William Burdette McLean was a Navy physicist who conceived and developed the heat-seeking Sidewinder missile. NASSCO began building the USNS William McLean in September 2009. Following its at-sea testing phase, the ship will be delivered to the Navy in the 3rd quarter of 2011. GD NASSCO | US Navy pic. March 25/11: T-AKE 1 drydocking. Detyens Shipyards, Inc. in North Charleston, SC wins a $7.3 million firm-fixed-price contract for a 55-calendar-day regular overhaul of USNS Lewis and Clark [T-AKE 1], including options which would bring the cumulative value to $8.8 million. This regular overhaul will include dry-docking and undocking the ship; underwater hull painting; main engine overhaul; propeller shaft inspection; cleaning and gas freeing tanks, voids and cofferdams; tank structural surveying and testing; and non-skid renewal. Work will be performed in Charleston, S.C., and is expected to be completed by June 2011. Contract funds will expire at the end of the fiscal year, on Sept 30/11. This contract was competitively procured and posted to the Federal Business Opportunities Web page, with 3 offers received. The U.S. Navy’s Military Sealift Fleet Support Command manages the contract (N40442-11-C-3049). Feb 23/11: T-AKE 11 delivered. US Military Sealift Command accepts delivery of its newest T-AKE dry cargo/ammunition ship, the USNS Washington Chambers [T-AKE 11], following successful sea trials. US MSC | GD NASSCO re: trials. Jan 26/11: T-AKE 11 trials. GD NASSCO begins contractor sea trials for the Washington Chambers [T-AKE 11], before a scheduled return to the shipyard on Feb 3/11 for additional work. NASSCO spokesman Jim Gill told Sign-On San Diego that the ship: “…goes out 20-plus miles… They test all the systems, including drop anchor and hauling it back up. This is usually done just off Coronado Roads (Silver Strand). Take the engine through all its configurations. Test the cranes, test the replenishment equipment (cabling, winches), run the fluids through the lines. Test the radar, fire fighting systems, top side sprinkling systems.” Oct 26/10: T-AKE 13 keel. General Dynamics NASSCO lays the keel for T-AKE 13, the Medgar Evers. The ship is named in honor of the African American civil rights activist whose 1963 murder prompted President John F. Kennedy to ask Congress for a comprehensive civil rights bill. NASSCO also cites a number of improvements since launching T-AKE 1, aimed at driving down costs and improving quality. These improvements involved facility investments, workforce training and capturing and applying lessons learned. For example, design enhancements feature an electronic sensor-triggered fire extinguishing system that eliminates a mechanical arrangement. This results in fewer parts, and hopefully higher reliability and lower costs. Oct 21/10: T-AKE 14 begun. General Dynamics NASSCO begins construction of the 14th T-AKE ship, which is scheduled to be delivered to the U.S. Navy in Q4 2012. Source. FY 2010 T-AKE 9 delivered; T-AKE 10 launched & delivered; T-AKE 11 launched; T-AKE 13 & 14 ordered; T-AKE 13 named. USNS Amelia Earhart (click to view full) Sept 11/10: T-AKE 11 launch. General Dynamics NASSCO launches the USNS Washington Chambers [T-AKE 11], during a christening ceremony at the shipyard, on San Diego’s working waterfront. NASSCO. July 14/10: T-AKE 10 delivered. General Dynamics NASSCO delivers USNS Charles Drew [T-AKE 10] to the U.S. Navy, formally completing construction work that began in October 2008. Like other T-AKE ships, she is crewed by 124 civil service mariners, and 10 U.S. Navy sailors. The ship is named in honor of Dr. Charles R. Drew (1904-1950), the African American surgeon and hematologist who pioneered the procedures for the safe storage and transfusion of blood. US MSC | GD NASSCO. May 14/10: Small business qualifier Pacific Ship Repair & Fabrication in San Diego, CA will handle post-shakedown availability contracts for USNS Matthew Perry [T-AKE 9] and USNS Charles Drew [T-AKE 10]. The multi-ship solicitation contracts include options which would bring the total contract value to $18.9 million, if exercised. Post-shakedown availability is a normal process for ships, in order to fix and tune problems found on the initial shakedown cruise. This one will include work on the lube-oil-tank, second-deck-cargo and galley modifications; cargo hold overhead insulation; and deck air compressor and radar installation. Work will be performed in San Diego, CA, and is expected to be complete within 75 calendar days, once work begins for each ship. This contract was competitively procured on a set-aside for small business basis, and posted to the Military Sealift Command, Navy Electronic Commerce Online and Federal Business Opportunities Web sites. A total of 4 offers were received by US Navy Military Sealift Fleet Support Command in Norfolk, VA, and they issued the contracts using funds from US NAVSEA PMS 325 (N40442-10-C-3020 for the USNS Matthew Perry; N40442-11-C-3000 for the USNS Charles Drew). March 26/10: T-AKE 12 keel. General Dynamics NASSCO lays the keel for T-AKE 12, the William McLean. It’s named for the research scientists whose accomplishments include the iconic AIM-9 sidewinder short-range air-air missile. NASSCO. Feb 27/10: T-AKE 10 launch. General Dynamics NASSCO launches USNS Charles Drew [T-AKE 10] at its San Diego shipyard. Dr. Charles Drew researched and developed methods of blood collection, plasma processing and storage. US Navy | General Dynamics release. Feb 26/10: T-AKE 13 & 14 ordered. A $824.6 million modification to a previously awarded contract (N00024-02-C-2300) for construction of T-AKE 13 and T-AKE 14; the contract modification also includes design and construction, technical manuals, special studies, analyses and reviews, engineering and industrial services, and data. Work will be performed in San Diego, CA and is expected to be complete by December 2013 for T-AKE 13 and November 2014 for T-AKE 14. See also Dec 12/08 long-lead items buy, GD NASSCO release. Feb 24/10: T-AKE 9 delivered. General Dynamics NASSCO delivers USNS Matthew Perry [T-AKE 9]. GD release. Oct 9/09: T-AKE 13 named. Secretary of the Navy Ray Mabus, a former governor of Mississippi from 1988-1992, announces that the Navy will name a dry cargo ammunition ship after the civil rights leader Medgar Evers. The Mississippi native’s 1963 murder, and the subsequent deadlock of 2 all white juries, prompted President John F. Kennedy to ask Congress for a comprehensive civil rights bill. Evers’ murderer, Byron De La Beckwith, was finally convicted in 1994 based on new evidence. US Navy. FY 2009 T-AKEing an expanded role; T-AKE 6 delivered; T-AKE 7 delivered; T-AKE 8 launched; T-AKE 9-12 named; T-AKE 9 launched; T-AKE 10 keel laid; T-AKE 11 & 12 ordered; T-AKE 11 begun. T-AKE-1, Crete (click to view full) Sept 16/09: Expanded role. USNS Richard E. Byrd [T-AKE 4] has to make some changes, in order to serve as the lead Pacific Partnership 2009 vessel instead of the Austin class amphibious assault vessel USS Dubuque [LPD 8]. Dubuque’s crew had begun to come down with flu symptoms, raising concerns about H1N1 transmission. The US Navy describes the shifts on board the Byrd, including substitution of outside personnel for some crew, bringing in Army cots, adding a reverse osmosis water purifier on deck, carrying full fuel and 3 months worth of provisions for the ship’s own use, adding cargo for medical needs, adding and deploying 4 small 7m RHIB boats, etc. Aug 17/09: T-AKE 9 launched. The US Navy christens T-AKE 9 Matthew Perry, named after the famed South Pole explorer. GD release | US MSC release. May 6/09: US MSC announces that USNS Lewis and Clark [T-AKE 1] foils a pirate attack off the coast of Somalia. Once shipboard lookouts spotted the 2 suspected pirate skiffs, the ship conducted evasive maneuvers and increased speed to elude the pirates. The pirates fired small arms weapons from approximately 2 nautical miles toward Lewis and Clark, which fell 1 nautical mile short of the ship’s stern. Lewis and Clark continued to increase speed and the skiffs ceased their pursuit. March 19/09: T-AKE 11 begun. GD NASSCO begins construction of the future USNS Washington Chambers [T-AKE 11]. The Washington Chambers is scheduled to be delivered to the Navy in the first quarter of 2011. Source. March 17/09: T-AKE 10 keel. GD NASSCO lays the keel for the future USNS Charles Drew [T-AKE 10]. Construction of the Charles Drew began in October 2008, and the ship is scheduled to be delivered to the Navy in the 3rd quarter of 2010. General Dynamics release. March 8/09: T-AKE 8 launched. The US Navy christens T-AKE 8 Wally Schirra, named after the American astronaut and command pilot of Apollo 7, the first manned flight in the Apollo program. US MSC | San Diego Tribune | San Diego Navy Compass | General Dynamics release. March 4/09: T-AKE 7 delivered. US Military Sealift Command accepts delivery of USNS Carl Brashear, after a series of tests and trials prior to delivery. MSC release | General Dynamics release. Feb 8/09: Gannett’s Navy Times offers a profile of life aboard the USNS Robert E. Peary [T-AKE 5]. The ships do have some limitations compared to their predecessors, and their electronics can be a source of adjustment and extra work, as well as improved performance: “He remembered serving aboard an Arctic-class ammunition ship, powered by gas turbines, and being able to keep pace with a carrier strike group at 30 knots or more. The Peary and its siblings can make a top speed of 20 knots, but not for very long. Where earlier ships had twin screws and twin rudders, affording better reliability, the Peary has a single screw and a single rudder, rendering it all-the-more vulnerable to engineering problems. When the Peary needed to get underway for a week’s worth of qualification trials in late January, the ship’s engine systems were acting up. Just as computer users have done for years, the Peary’s engineers shut down the engine system and re-started it, temporarily solving the problem. But the touchy plant forced Karavalos to cancel a day’s worth of practice unreps so his technicians could locate problems in the propulsion system.” DID would add that despite the article’s description of pleasant quarters and dispensed formalities compared with Navy ships is partly reflective of the fact that MSC mariners are away from home over 70-80% of the time. The ships are home, and the lack of duty seamen to do trivial work means that everyone must pitch in. Jan 27/09: Cascade General in Portland, OR won a $13.9 million firm-fixed-price contract for post-shipyard work on USNS Amelia Earhart [T-AKE 6] and USNS Carl Brashear [T-AKE 7]. Work involves ship alterations, including the lube-oil-tank, second-deck-cargo and galley modifications; cargo hold overhead insulation; and deck air compressor and radar installation. Naval Sea Systems Command (NAVSEA PMS 325) provides the funding for post-shipyard work, and this contract includes options which, if exercised, would bring the total contract value to $17.9 million. Work will be performed in Portland, OR and is expected to be complete within 75 calendar days. Contract funds will expire at the end of the fiscal year. This contract was competitively procured, with 2 offers received by U.S. Navy’s Military Sealift Fleet Support Command, a field activity of Military Sealift Command (N40442-09-C-3009). Dec 12/08: T-AKE 11 & 12 ordered. A $940.3 million modification to a previously awarded contract (N00024-02-C-2300), exercising 2 construction options for T-AKE 11 Washington Chambers and T-AKE 12 William McLean. Earlier this year, NASSCO received a total of $200 million to purchase long lead time materials for these ships. These funds also cover $200 million for engines and other long lead time materials and components for T-AKE 13 and T-AKE 14. GD NASSCO expects a contract that fully funds both ships by February 2010. Work will be performed in San Diego, CA and is expected to be complete by February 2012 for T-AKE 11, January 2013 for T-AKE 12, December 2013 for T-AKE 13 and November 2014 for T-AKE 14. Se also GD NASSCO release. Dec 2/08: T-AKE 9-12 named. Secretary of the Navy Donald Winter announces the names for the next 4 Lewis and Clark class T-AKE ships. All still have exploration theme, but some of these namings involve different kinds of pioneering and exploration. NAVAIR will be especially pleased by 2 of the names. T-AKE 9 honors Navy Commodore Matthew C. Perry (1794-1858), who is most famous for sailing a naval squadron to Japan and opening it to trade. Ford, Chrysler, and General Motors executives are probably wishing that he had stayed home. T-AKE 10 honors Dr. Charles R. Drew (1904-1950), a physician and medical researcher whose pioneering work in the late 1930s and early 1940s led to the life-saving discovery that blood could be separated into plasma. Dr. Drew was African-American, and has a medical university named after him in south Los Angeles. T-AKE 11 honors Navy Capt. Washington Irving Chambers (1856-1934), who arranged the world’s first airplane flight from a warship on Nov 14, 1910, when Eugene Ely flew from the light cruiser the USS Birmingham [CL-2]. T-AKE 12 honors William Burdette McLean (1914-1976), who conceived and developed the iconic Sidewinder short-range, heat-seeking air-to-air missile while serving as a physicist for the Navy. As NAVAIR’s release notes, he also pioneered the testing facility at China Lake, CA. Nov 24/08: NAVFAC Marianas announces the 2nd increment of an $83 million firm-fixed price contract to the IBC/TOA Corporation Joint Venture based in Barrigada, Guam. The $43 million increment will be used to complete expansion of U.S. Naval Base Guam’s Kilo Wharf, used for ammunition. Cmdr. Matthew Suess, executive officer for NAVFAC Marianas: “The extension is to accommodate the new T-AKE class of ammunition vessels, meet current seismic standards, and provide for containerized cargo operations with the installation of new crane rails.” The project is scheduled for completion in 2010. US Navy release. Oct 30/08: T-AKE 6 delivered. The USA’s Military Sealift Command accepts delivery of the USNS Amelia Earhart [T-AKE 6] in San Diego. In early December 2008, the ship will go on a short “shakedown cruise” where the ship’s crew will test a range of shipboard operations. Earhart will operate mainly in the Pacific Ocean out of Guam, and is anticipated to begin conducting missions for MSC in summer 2009. US MSC | GD NASSCO. FY 2008 Revised program SAR (to 12 ships); T-AKE 4 delivered; T-AKE 5 delivered; T-AKE 6 launch; T-AKE 7 named & launched; TAKE 8 named; T-AKE 10 ordered; T-AKE 12 long-lead. T-AKE 7 construction Ken Wright, GD NASSCO (click to view full) Sept 18/08: T-AKE 7 launched. USNS Carl Brashear [T-AKE 7] is christened and launched during a morning ceremony at the General Dynamics NASSCO shipyard in San Diego, CA. After a series of tests and sea trials, the ship will be delivered to the Navy’s Military Sealift Command for operations in 2009. The ship honors Master Chief Petty Officer Carl Brashear, who joined the U.S. Navy in 1948. See March 3/08 entry for more on Carl Brashear. MSC release. Sept 10/08: Detyens Shipyards, Inc. in Charleston, SC won a $7.4 million firm-fixed-price contract for a post-shipyard availability of Military Sealift Fleet Support Command dry cargo/ammunition ship USNS Robert E. Peary [T-AKE 5]. This shipyard availability is primarily for ship alterations, including lube-oil-tank, second-deck-cargo and galley modifications; cargo hold overhead insulation; and deck air compressor and radar installation. The contract includes options which, if exercised, would bring the total contract value to $9.1 million. Work will be performed in Charleston, SC and is expected to be complete within 75 calendar days. Contract funds will expire at the end of the fiscal year. This contract was competitively procured via Military Sealift Command, Navy Electronic Commerce Online and Federal Business Opportunities websites, with 2 offers received by the U.S. Navy’s Military Sealift Fleet Support Command (N40442-08-C-3011). June 10/08: T-AKE 12 long-lead. A $100 million modification to previously awarded contract (N00024-02-C-2300) to exercise an option for long lead time material for T-AKE 12. Long-lead material includes items like engines et. al. These items take time to make, but must be delivered early or else construction will be delayed. Work will be performed in San Diego, CA and is expected to be complete by January 2013. See also GD release. June 5/08: T-AKE 5 delivered. USNS Robert E. Peary [T-AKE 5] is officially accepted by the U.S. Navy. At the end of July 2008, the ship will go a short ‘shakedown cruise’ where the ship’s crew will test a range of shipboard operations. By the end of the summer, Peary will depart for her homeport in Norfolk, and soon deploy on its first operational mission. Navy release | GD release. April 7/08: SAR. The Pentagon releases its Selected Acquisition Reports for the period up to December 2007. T-AKE is included due to cost increases: “Program costs increased by $1,086.4 million (+23.5 percent) from $4,628.8 million to $5,715.2 million, due primarily to the addition of one ship from 11 to 12 ships (+$471.0 million), associated outfitting and post delivery costs (+$84.5 million), and cost growth on previous ships (+$520.6 million).” April 6/08: T-AKE 6 launch. USNS Amelia Earhart [T-AKE-6] is launched and christened at the General Dynamics NASSCO shipyard in San Diego. See also May 28/07 entry. US Navy release. March 14/08: At a House Armed Services Seapower subcommittee hearing, chairman Rep. Gene Taylor [D-MS] says: “Although I put the T-AKE in the list of programs which are healthy, I would like our witnesses to address why the T-AKE [ship] that was requested and funded in fiscal year 2008 is not being put on contract. The subcommittee understands that the money that was requested to purchase a ship was instead used to re-negotiate contract terms. I understand the Navy thinks they can do this because the money is in a working capital fund called the National Defense Sealift Fund or NDSF. I assure you that it is not the intent of the Congress that money authorized and appropriated for a specific purpose, in this case the procurement of a ship, would be used for any other purpose without further authorization or reprogramming.” Read “US Navy’s 313-Ship Plan Under Fire in Congress” for more. March 7/08: Pacific Ship Repair & Fabrication in San Diego, CA won an $11 million firm-fixed-price contract for a post shipyard availability of the USNS Richard E. Byrd (T-AKE 4). This contract is designed to take care of post-construction alterations, including conversions to the bakery, galley and scullery, as well as modifications to the 2nd deck cargo hold and bow thruster chilled-water piping system. The ship is expected to deploy on its first operational mission this summer, and the contract includes options that could bring the total contract value to $12.7 million. Work will be performed by Pacific Ship Repair & Fabrication at the General Dynamics NASSCO shipyard in San Diego, CaA and is expected to be completed by June 2008. Contract funds will expire at the end of the fiscal year. This contract was competitively procured, with 3 offers received by the U.S. Navy’s Military Sealift Fleet Support Command (N40442-08-C-3004). March 3/08: T-AKE 7 & 8 named. Secretary of the Navy Dr. Donald C. Winter announced the naming of the 7th and 8th Military Sealift Command ships of the Lewis and Clark-class Auxiliary Dry Cargo ships (T-AKE) as Carl Brashear and Wally Schirra. Master Chief Boatswain’s Mate (Master Diver) Carl M. Brashear joined the United States Navy in 1948, and became its first black deep-sea diver, first black Master Diver, and the first U.S. Navy diver to be restored to full active duty as an amputee, almost 2 difficult years after a salvage operation went awry. Brashear was the subject of the 2000 movie “Men of Honor,” starring Cuba Gooding Jr. Wally Schirra was of the original 7 Mercury astronauts profiled in the movie “The Right Stuff,” and holds the distinction of being the only astronaut to fly in each of the Mercury, Gemini and Apollo programs. USN PEO ships release. Jan 31/08: T-AKE 10 ordered. General Dynamics, National Steel and Shipbuilding Co. (NASSCO) in San Diego, CA received a $459.8 million modification to previously awarded contract (N00024-02-C-2300), exercising an option for construction of T-AKE 10. See the July 20/07 entry, which involved $100 million in long-lead time items for T-AKE 10. This $459.8 million contract also includes technical manuals and data, special studies, analyses and reviews, engineering and industrial services, and an unspecified value of long lead time material for T-AKE 11 like engines et. al. Work will be performed in San Diego, CA and construction of T-AKE 10 is scheduled to begin in January 2009, with delivery to the Navy’s Military Sealift Command (MSC) in Q4 2010. Construction of T-AKE 11 is scheduled to begin in the Q1 2010, with delivery in Q4 2011. GD release. T-AKE 2 Sacagawea and CG-53 Mobile Bay (click to expand) Dec 19/07: Cascade General Portland Shipyard in Portland, OR won a $9.1 million firm-fixed-price contract for a 70-day post shipyard availability (PSA) of Military Sealift Fleet Support Command’s dry cargo/ammunition ship USNS Alan Shepard [T-AKE 3] “to undergo a number of modifications that could not be economically accomplished under the ship construction contract.” NAVSEA PMS-325 provided funding for the alterations to be completed during the PSA, and the contract includes options which, if exercised, would bring the cumulative value of this contract to $10.8 million. Work will be performed in Portland, OR and is expected to be complete by Apr. 2008. Contract funds in the amount of $10.8 million will expire at the end of the current fiscal year. This contract was competitively procured, with 3 offers received by the U.S. Navy’s Military Sealift Fleet Support Command, a field activity of Military Sealift Command in Washington, DC (N40442-08-C-3003). Nov 14/07: T-AKE 4 delivered. General Dynamics NASSCO delivers USNS Richard E. Byrd [T-AKE 4] to the U.S. Navy. See May 15/07 entry for information about the ship’s namesake. In 2007, NASSCO delivered T-AKE 2 USNS Sacagawea in February, T-AKE 3 USNS Alan Shepard in June, and now USNS Richard E. Byrd. T-AKE 1 USNS Lewis and Clark was delivered in June 2006, and the 5th-8th ships of the class are currently under construction for deliveries through the third quarter of 2009. General Dynamics NASSCO employs more than 4,600 people and is the only major ship construction yard on the West Coast of the United States. In addition to the T-AKE program, the San Diego shipyard is building the first of 9 commercial product carriers for U.S. Shipping Partners LP. GD release. FY 2007 Multi-Year deal could order 9-14; T-AKE 2 delivered; T-AKE 3 launched & delivered; T-AKE 6 named & keel laid; T-AKE 10 long-lead. Aug 23/07: Multi-Year Deal for #9-14. GD NASSCO announces a multi-year agreement with the U.S. Navy for options to build up to 5 additional T-AKE dry cargo ammunition ships. Contracts for the ships, valued at approximately $2.5 billion if all options are exercised, and are expected to be awarded over the next 4 years. Including the 9 ships previously under contract, this agreement means the San Diego shipyard would build a total of 14 T-AKE ships for the Navy. GD release. July 27/07: T-AKE 3 delivered. Military Sealift Command accepts delivery of dry cargo/ammunition ship USNS Alan Shepard [T-AKE 3] in San Diego, CA. MSC release. July 24/07: “The US Navy (USN) and General Dynamics’ subsidiary National Steel and Shipbuilding Company (NASSCO) are “very close in negotiations” to restructuring its T-AKE combat and logisitics support ships contract to buy two additional vessels, USN Deputy Assistant Secretary Allison Stiller told Jane’s…” July 20/07: T-AKE 10 long-lead. A $100 million fixed-price-incentive modification under previously awarded contract (N00024-02-C-2300), exercising an option for long lead time material and associated labor for the 10th ship of the T-AKE Class (T-AKE 10). The contractor will perform material sourcing, material ordering, vendor interface, and material quality assurance for the ship’s engines and other components that have significant manufacturing lead times. Work will be performed in San Diego, CA and is expected to be complete by September 2009. A contract that funds full construction of the 10th T-AKE ship is expected to be awarded by January 2008. Construction of T-AKE 10 is expected to begin in the first quarter of 2009, with delivery scheduled for the first quarter of 2011. GD NASSCO release. May 30/07: T-AKE 6 keel. General Dynamics NASSCO holds a keel-laying ceremony for T-AKE 6. A keel-laying ceremony is a shipbuilding tradition that signifies important milestone as full-scale production begins. In recognition of that milestone, event honoree, Darlene Costello, deputy director for Naval Warfare in the office of under secretary of defense for Acquisition, Technology and Logistics, welded her initials into the keel. The Amelia Earhart is scheduled to be delivered to the US Military Sealift Command (MSC) in the fall of 2008. GD release. May 28/07: T-AKE 6 named. The US Navy declares that T-AKE 6 will be named USNS Amelia Earhart. Amelia Earhart became a household name in 1932 when she became the 1st woman – and 2nd person – to fly solo across the Atlantic, flying from Harbor Grace, Newfoundland, to Londonderry, Ireland. That year, she received the Distinguished Flying Cross from the U.S. Congress, the Cross of Knight of the Legion of Honor from the French government, and the Gold Medal of the National Geographic Society from President Herbert Hoover. In January 1935, Earhart became the first person to fly solo “across” the Pacific Ocean from Honolulu to Oakland, CA. Later that year she soloed from Los Angeles to Mexico City and back to Newark, NJ. In a tragedy that cemented her legend, Earhart and her Lockheed 10E “Electra” vanished utterly in 1937, during an attempt at an around-the-world flight. USNS Amelia Earhart will operate out of Guam when she is put into service. Hopefully, modern GPS technology will prevent her from joining her namesake in the South Pacific. US Navy Newsstand. May 15/07: T-AKE 4 launched. The US Navy christens the USNS Richard E. Byrd. The launching ceremony was held at the General Dynamics National Steel and Shipbuilding Company in San Diego, CA. Mrs. Bolling Byrd Clarke, Byrd’s oldest daughter and the ship’s sponsor, christened the ship by breaking the traditional bottle of champagne against its bow. GD release | a US Navy release describes the accomplishments of the ship’s namesake. May 11/07: Infrastructure. Healy Tibbitts Builders, Inc. in Aiea, HI received a $12.6 million firm-fixed price Task Order 0016 under previously awarded indefinite-delivery/ indefinite-quantity multiple award construction contract (N62742-04-D-1300) to dredge West Loch Channel at Naval Magazine, Pearl Harbor, so it will accommodate a T-AKE vessel. Construction dredging in the West Loch Channel will provide access and berthing facilities at Wharves W1, W2, and W3 for the T-AKE vessel. The project will also undertake horizontal directional drilling construction of a water line under West Loch channel, and bank stabilization along the dredged/excavated shoreline along Baltimore Point by slope control. Work will be performed in Pearl Harbor, HI and is expected to be complete by October 2008. Contract funds will not expire at the end of the current fiscal year. The Naval Facilities Engineering Command, Pacific in Pearl Harbor, Hawaii received 3 proposals for this task order. May 10/07: House Armed Services Committee Chairman Ike Skelton (D-MO) has announced that H.R. 1585, the National Defense Authorization Act for FY 2008, has been reported favorably by the committee on a vote of 58-0. The proposed bill includes $456 million for a second T-AKE ship in FY 2008, bringing the fleet to 12 – though this figure would not cover all of the internal systems etc. that must be added to make it operational. MarineLog report. Feb 27/07: T-AKE 2 delivered. After completing sea trials off the southern California coast, dry cargo/ ammunition ship USNS Sacagawea [T-AKE 2] was delivered to the U.S. Navy’s Military Sealift Command. See Navy release. T-AKE 3 launch Ken Wright, GD NASSCO (click to view full) Dec 15-16/06: USNS Lewis and Clark [T-AKE 1] conducted its first-ever underway replenishment as part of Operation Evaluation Event No. 1 alongside the Nimitz-class aircraft carrier USS Theodore Roosevelt [CVN 71]. The successful UNREP training evolution completed the first of 14 phases of training for Lewis and Clark, assessing the ship’s ability to conduct a ship-ship UNREP and MH-60S helicopter-based vertical replenishment (VERTREP) simultaneously. See Navy release. Dec 7/06: Detyens Shipyards Inc. in North Charleston, SC received a $6.45 million firm-fixed-price contract for a 90-calendar-day Post Shipyard Availability of Military Sealift Command’s dry cargo ammunition ship USNS Lewis & Clark [T-AKE 1]. The contract includes options which, if exercised, would bring the total contract value to $8.4 million. Work will be performed in North Charleston, SC, and is expected to be completed within 90 calendar days from the commencement of the contract in February 2007. This contract was competitively procured with 2 offers received by US Navy Military Sealift Fleet Support Command, a field activity of US Military Sealift Command (N40442-07-C-3000). Dec 6/06: T-AKE 3 launched. The USNS Alan Shepard [T-AKE 3] is christened during a launching at General Dynamics National Steel and Shipbuilding Company (NASSCO) in San Diego, CA. Meanwhile, DID reader Lee R. Wahler wonders “whether the ship’s proper name is [USNS] Alan B. Shepard, Jr or the shortened version [USNS Alan Shepard] which the media types use?” For those unfamiliar with the distinction, the proper name is what ends up on the Certificate of Ownership. FY 2001 – 2006 T-AKE 1 to 9 ordered; T-AKE 1 to 5 named; T-AKE 1 delivery; T-AKE 2 launch. USNS Lewis and Clark (click to expand) June 24/06: T-AKE 2 launched. The USNS Sacagawea [T-AKE 2] is christened and launched during a twilight ceremony at General Dynamics NASSCO shipyard in San Diego, CA. The ship is named for a Native American from the Lemhi Shoshone tribe; she served as guide and interpreter for the Lewis and Clark expedition. July 28/06: T-AKE 4 and 5 named. The US Department of the Navy announces the naming of USNS Richard E. Byrd [T-AKE 4] for the famed Antarctic explorer. As an interesting sidenote, Byrd also led the first expedition to fly over the North Pole. USNS Robert E. Peary [T-AKE 5] is named for the famed Arctic explorer, who is credited as the first person to reach the geographic North Pole. US Navy. June 20/06: T-AKE 1 delivered. The USNS Lewis and Clark, the first T-AKE ship, is delivered to the U.S. Navy’s Military Sealift Command. Jan 30/06: T-AKE 9 ordered. A $317.1 million fixed-price-incentive modification for design and construction of the 9th T-AKE Dry Cargo/Ammunition Ship (of 12). Work will be performed in San Diego, CA, and is expected to be complete by May 2009 (N00024-02-C-2300). GD NASSCO release. Jan 11/05: T-AKE 7 & 8 ordered. A $586.3 million fixed-price-incentive option provides full funding of the detailed design and construction of the 7th and 8th T-AKE Dry Cargo/Ammunition Ships ($293.1 million per ship). Work will be performed in San Diego, CA, and is expected to be completed by May 1, 2008 for the 7th ship and July 31, 2008 for the 8th ship (N00024-02-C-2300). Jan 27/04: T-AKE 5 & 6 ordered. A $578.2 million fixed-price-incentive modification provides full funding of the detailed design and construction of the 5th and 6th T-AKE Dry Cargo/Ammunition Ships ($289.1 million per ship). Work will be performed in San Diego, CA, and is expected to be complete by July 2007 (N00024-02-C-2300). July 18/03: T-AKE 4 ordered. A $287.6 million fixed-price-incentive modification exercises an option for design and construction of the 4th T-AKE Dry Cargo/Ammunition Ship. This contract will provide for the full funding of the detail design and construction of the fourth ship of the T-AKE Class. Work will be performed in San Diego, CA, and is expected to be complete by December 2006 (N00024-02-C-2300). July 16/02: T-AKE 3 ordered. A $289.9 million fixed-price-incentive modification exercises an option for design and construction of the 3rd T-AKE Dry Cargo and Ammunition Ship. Work will be performed in San Diego and is to be complete by May 2006. NASSCO would later note that construction on the third T-AKE, to be named the USNS Alan Shepard in honor of the first American in space, began in September 2005. Oct 18/01: T-AKE 1 & 2 ordered. A $406.9 million fixed-price-incentive (firm targets) contract for the detailed design and construction of the lead ship of the auxiliary cargo and ammunition ship class. T-AKE 1 would later be christened the USNS Lewis and Clark on May 21/05. The contract also provides for spare and repair parts, special studies and analyses, engineering and industrial services and technical data. This original contract (N00024-02-C-2300) has 10 remaining options for follow-on ships, which would bring the total cumulative contract value to $3.75 billion. Concurrent with this contract award, the US Navy exercises the 1st $301.6 million option for the detailed design and construction of the first follow-on ship: T-AKE 2 would be named USNS Sacagewea. Work will be performed in San Diego, CA (75.7%); Iron Mountain, MI (9.3%); Waynesboro, VA (3.9%); Philadelphia, PA (3.5%); Beloit, WI. (3%); Belle Chasse, LA (1.8%); Kingsford, MI (1.8%); Scarborough, ME (0.5%); and Willis, TX (0.5%), and is expected to be complete by September 2005. This contract was competitively procured and advertised via the Commerce Business Daily and posted to the Naval Sea Systems Command web site. There were three offers received by the Naval Sea Systems Command in Washington, DC. Additional Readings & Sources (DID thanks reader Lee Wahler for sharing his USNS expertise, and assisting with research for this article.) US Military Sealift Command Ship Inventory – USNS LEWIS AND CLARK (T-AKE 1) Dry Cargo/Ammunition Ship General Dynamics NASSCO – T-AKE Program. See also the Lewis and Clark (T-AKE) Class Dry Cargo/Ammunition Ship T-AKE Fact Sheet. Includes a helpful quick list of the ship’s capabilities. US Navy Fact File – Advanced Auxiliary Dry Cargo Ships – T-AKE GlobalSecurity.org – Combat Logistics Force. Includes a helpful quick reference table with capacities for the various US ships that operate in this role. GlobalSecurity.org – T-AKE-1 Lewis and Clark. Shuttle ships/ swing ships. GlobalSecurity.org – T-AFS 1 Mars. Dry goods and refrigerated shuttle ships. GlobalSecurity.org – T-AE-26 Kilauea. Ammunition shuttle ships. GlobalSecurity.org – T-AO-187 Henry Kaiser. Oiler ship, can work with T-AKE to replace an AOE ship in a pinch. GlobalSecurity.org – AOE-1 Sacramento. Station ships. GlobalSecurity.org – T-AOE-6 Supply. Station ships. See all DefenseLINK contract announcements related to N00024-02-C-2300. Professional Mariner (Dec-Jan 2008) – Diesel-electric propulsion pushes ahead. Explains the benefits and characteristics of the diesel-electric propulsion system used on T-AKE ships. “All electric” ships are a larger naval trend. US Department of Defense (May 19/05) – Navy to Christen New Dry Cargo/Ammunition Ship USNS Lewis and Clark. Ship’s class names are derived from the first ship in their class, so this is now the T-AKE-1 Lewis and Clark Class. US Department of Defense (May 1/02) – DOD Presents Environmental Awards View the full article
  19. Future Lynx naval (click to view full) In 2006, Finmeccanica subsidiary AgustaWestland received a GBP 1 billion (about $1.9 billion at 02/07 rates) contract from the UK Ministry of Defence (MoD) for 70 Future Lynx helicopters, and began a new chapter in a long-running success story. The Lynx is an extremely fast helicopter that entered service in the 1970s, and quickly carved out a niche for itself in the global land and naval markets. The base design has evolved into a number of upgrades and versions, which have been been widely exported around the world. In Britain, Lynx helicopters are used in a number of British Army (AH7 & AH9) and Fleet Air Arm (Mk 8) roles: reconnaissance, attack, casualty evacuation & troop transport, ferrying supplies, anti-submarine operations, and even command post functions. The Future Lynx program reflects that, and British government and industry are both hoping that its versatility will help it keep or improve the Lynx family’s global market share. This is DID’s FOCUS Article for the AW159 Lynx Wildcat Program, describing its technical and industrial features, schedules, related contracts, and exports. The AW159 Wildcats Mk8: everyone retires… (click to view full) Britain originally referred to the 2 variants as Future Lynx Battlefield Reconnaissance Helicopters (BRH, now AW159 Wildcat Mk.1) for the British Army, and Future Lynx Surface Combatant Maritime Rotorcraft (SCMR, now AW159 Wildcat HMA Mk.2) for the Navy. Both AW159 versions will share a common fully-marinized airframe, with provisions for a range of mission and role-based equipment but an estimated 90% commonality. The new helicopter features a range of improvements, including human factors design improvements to the airframe, a new British Experimental Rotor Programme (BERP) main rotor for improved performance, a new 4-blade tail rotor to give improved yaw control at high weights, plus crashworthiness improvements, armoring improvements, and built-in infrared signature suppression to maximize survivability. Communications equipment will be compatible with the new BOWMAN systems used by British ground forces, but can be changed for export orders. The cockpit includes a fully integrated display system of 4 primary 10″x8″ inch displays. Sensors include a nose mounted Wescam MX-15Di surveillance turret with IR/TV imaging and laser ranging/targeting, and the naval variant will also carry the 360-degree Selex Galileo 7400E active array radar. Britain decided to confine dipping sonars to its larger AW101 Merlin naval helicopters, but Wildcat export models have the option of using the long-range detection capabilities of Thales’ Compact FLASH. Defensive protection is provided by a comprehensive integrated defensive aids suite from Selex Galileo that includes missile warning, radar warning, and countermeasures dispensing systems. Spike-NLOS AW159 helicopters will be able to carry rockets and gun pods, and the naval version adds BAE’s Sting Ray light torpedoes. Beyond that, integration of Thales’ beam-riding LMM missile (FASGW-L program) is underway, and Wildcat is the initial platform for Sea Skua’s small anti-ship missile successor (FASGW-H/ ANL). Given Britain’s cramped defense budgets, expansion beyond that weapon set depend on the stated requirements and desires of export customers. If local reports are correct, South Korea is adding the Spike-NLOS missile and its 25km range. That missile would out-range short-range air defense systems, and give the helicopters a very long reach against enemy hovercraft, speedboats, or coastal artillery. The AW159’s projected Maximum All-Up Mass (MAUM) is 5,790 kg, but can grow to 6,250 kg if necessary during its service life. New nose and tail structures, and an up-rated undercarriage ensure that the helicopter can handle these weights. A pair of LHTEC CTS800-4N engines rated at 1015 kW (1,361 shp) add extra power, and their 36% power increase over previous GEM engines will help maintain the Lynx’s reputation as a speedster. Despite the added mass, therefore, these changes translate into greatly improved hot and high performance, load-carrying ability, and single engine performance overall. All without significantly increasing fuel consumption. Other enhancements to Future Lynx include a new 12,000-hour fatigue life airframe. The original goal was a 30% parts reduction, but a successful design-to-cost process managed to reduce the number of airframe parts by 80%, using improved design techniques and machined monolithic components. Future Lynx: The Program Lynx BRH & Longbows (click to view full) The Future Lynx program aims to replace both British Army’s 100 or so AH7s & AH9s, and Fleet Air Arm’s set of about 60 Lynx Mk 8 helicopters. The original goal was 40 Battlefield Reconnaissance Helicopters (BRH) for the British Army, and 30 Surface Combatant Maritime Rotorcraft (SCMR) for the Royal Navy, with an option for another 10 helicopters that could be split in any way desired. At present, contracts have been issued for 34 AW159 BRH/ Mk.1 Army helicopters, and 28 naval AW159 SCMR/ HMA Mk.2s. Barring future expansion, that will constitute the entire program. By 2013, there was some question regarding whether the AW159 Mk.1 helicopters would be armed. The Royal Navy’s AW159 HMA Mk.2s will be armed, carrying Sting Ray torpedoes, FASGW-L LMM direct fire missiles, and FASGW-H anti-ship missiles. What they won’t carry is sonar capabilities, though a full ASW version with a SONICS/FLASH Compact dipping sonar system is being delivered for export. Program & Industrial Structure In April 2005, the UK Government announced the selection of Future Lynx for the British Army’s and Royal Navy’s requirements, with detailed technical and commercial discussions subsequently taking place that led to a contract award in June 2006. Both EADS’ Eurocopter Unit and Boeing had wanted to compete for the helicopter contract, but the MoD declined to put the contract out for competition. Instead, Future Lynx was the launch program for a new Strategic Partnering Arrangement between the MoD and AgustaWestland. The UK MoD hailed it as “a major milestone in the implementation of the new Defence Industrial Strategy (DIS),” helping them to meet the objective of sustaining critical helicopter design and engineering skills in the UK by supporting over 800 high technology jobs across the UK. The public-private partnering arrangements are enshrined within a formal Business Transformation Incentivisation Agreement, and a formal Strategic Partnering Arrangement. The MoD adds that partnering is already delivering significant improvements in spares delivery and technical support for Sea King and EH101 Merlin helicopters operated by the MoD. An integral requirement of the SPA has been the back to back signature by AgustaWestland of the Future Lynx Contract and Partnering Charters with the 6 major suppliers to the Future Lynx Program. Major industrial partners include: GKN Aerospace (helicopter airframes) LHTEC partnership between Rolls-Royce and Honeywell (engines) Finmeccanica’s Selex Galileo (defensive suite, SCMR Seaspray 7400E radar) GE Aviation General Dynamics UK Thales UK (avionics, COMPACT FLASH dipping sonar and SONICS processing system for SCMR exports) Other suppliers of note include: L-3 Wescam (MX-15Di surveillance & targeting turret)So far, the timeline looks like this: Future Lynx: Contracts & Key Events 2015 – 2020 Bringing her in (click to view full) October 21/20: Philippines Philippine Navy chief Vice Admiral Giovanni Carlo Bacordo said in a virtual presser that his service will only make the call to buy more AW-159 naval helicopters when the plan to acquire two additional corvettes are finalized. The two corvettes with anti-submarine warfare (ASW) capabilities are scheduled for the procurement of Horizon 2 of the Armed Forces of the Philippines Modernization Program. September 9/20: No more Lynx in French Navy The French Navy has formally retired its last Lynx Mk 4 helicopters, bringing the type’s 42-year Aeronavale service career to a close. A last embarkation at sea was completed from 18 to 23 July 2020, when the frigate Latouche-Tréville , the last remaining F70 Georges Leygues Class frigate in Marine Nationale service, sailed with a detachment of two Lynx helicopters for an operational/training mission off Brittany. Forty Lynx helicopters were purchased by the French Navy from the UK as part of a multinational agreement that also involved Puma and the Gazelle helicopters. Entering service in 1978, the Lynx has fulfilled a wide range of missions including anti-submarine warfare (ASW), maritime surveillance, over-the-horizon targeting, search-and-rescue, vertical replenishment, maritime counter terrorism, special forces operations, and disaster relief. In June 2019, it was announced that the retirement of the Lynx Mk 4(FN) would be brought forward from 2022 to 2020 to save money. May 27/20: Martlet Test-Firing The UK Royal Navy completed a series of live firing trials of the new Martlet lightweight precision strike missile from a Wildcat HMA2 helicopter. Undertaken at the UK Ministry of Defense Aberporth Range on the west coast of Wales, the firings, which were conducted as part of the UK’s Future Anti-Surface Guided Weapon program, demonstrated the integration of the Martlet system onto the Wildcat platform ahead of service entry. The system is due to enter service with the RN in January 2021, according to the Defense Equipment Plan 2019 financial summary released in February 2020. April 3/20: Covid-19 Mission in Britain A pair of British Army Wildcat helicopters have been shuttling in and out of Derby on March 31. An army spokesperson confirmed that the helicopters were on “Covid-19 related tasking.” Derby Telegraph says the operation is given the code name Rescript. Aircraft from the Army Air Corps based at RNAS Yeovilton will provide assistance to the government where needed across the southeast and southwest UK. Additional helicopters from RAF Odiham and RAF Benson will also be mobilized. The twin-engine AW159 multirole helicopter has logged over 50,000 flight hours, with more than 70 being operated by the British Army, RN, South Korean Navy and Philippine Navy. March 10/20: Weapon Wing System Leonardo has unveiled its weapon wing system that is to equip UK AW159 Wildcat HMA2 maritime helicopters during the Royal Navy’s Carrier Strike Group 2021 (CSG21) deployment. The UK-arm of the Italian company displayed one of the first production wings during the UK Naval Engineering Science & Technology (UKNEST) engagement activity aboard the second Queen Elizabeth Class aircraft carrier HMS Prince of Wales on March 2 as part of its week-long visit to Liverpool. The aluminium alloy and carbon fibre composite weapon wings enable a mix of weapons to be carried for a variety of force protection scenarios. This includes a full load of 20 Thales Martlet air-to-surface and up to four MBDA Sea Venom anti-ship missiles, or a mix of two Sea Venoms and 10 Martlets. July 8/19: Retirement in France The French Navy will retire its remaining Westland Lynx Mk 4(FN) helicopters in 2020. The retirement comes two years earlier than initially expected. The Lynx Mk 4(FN) had been planned to retire in 2022, but with support costs rising the decision has now been made to bring forward the type’s out of service date by two years as a savings measure. The Westland Lynx is a multi-purpose military helicopter. The British Lynx went into operational usage in 1977 and was later adopted by the Armed Forces of over a dozen nations. Early retirement of the Lynx will leave a capability gap as the type, equipped with the DUAV-4 active dipping sonar, constitutes the primary anti-submarine rotorcraft on board the French Navy’s last two F70 Class frigates, La Motte-Picquet (D645) and Latouche-Tréville (D646). June 20/19: Lynx in the Philippines The Philippine Navy commissioned two Leonardo AW159 Lynx Wildcat helicopters and four Korean Amphibious Assault Vehicles in a ceremony on June 17 at the Naval Base Heracleo Alano in Cavite City. The AW159 are part of a $101 million deal signed with Leonardo in 2016. They feature anti-submarine warfare capabilities and will serve with the Naval Air Wing’s Squadron MH-40 at the Danilo Atienza Air Base. The helicopters will be deployed from the José Rizal Class frigates, the first of which was launched on May 23 at the Ulsan facility of South Korean shipbuilder Hyundai Heavy Industries. The four Korean Amphibious Assault Vehicles were ordered in April 2016 from South Korean defense company Hanwha Techwin. April 16/19: Pre-delivery Inspection The Philippine Navy inspected the country’s first two anti-submarine choppers in the UK. According to reports, the test and pre-delivery inspection of the AW-159 Wildcat was going smoothly. In 2016, the country contracted AugustaWestland with a $114 million contract to manufacture the helicopters at the manufacturer’s Yeovil, UK site. The deal also includes training and support. The Wildcat is in service with the UK’s Royal Navy and Army Air Corps. The AW159 Wildcat features a ferry range of 963 kilometers and has an endurance of one-and-a-half hours, or four-and-a-half hours when provided with auxiliary fuel. It has a range of 777 kilometers and is capable of travelling at speeds of 291 kilometers per hour. The two AW159s will join Manilla’s modest naval rotorcraft fleet, which consists of five AgustaWestland AW109Es. November 8/18: PN tests The Philippine Navy (PN) is currently testing its first AW-159 helicopter in the UK. “As confirmed by the Commander Naval Air Group (CNAG), the AW159 has just started initial test flight as part of the manufacturer’s trial. It is still scheduled for a series of test flights before scheduling its handover to the Philippines. According as well to CNAG, the flight signals the completion of the first unit,” defense department spokesperson Arsenio Andolong, said in a text message to the Philippine News Agency (PNA) on Tuesday. The PN ordered two AW159 Lynx Wildcat naval helicopters for $114 million in March 2016. The helicopters will give the PN a long sought after anti-submarine warfare (ASW) capability, carrying active dipping sonar (ADS), sonobuoys, and torpedoes, while for the anti-surface warfare role it can be armed with anti-ship missiles, rockets, and guns. July 27/18: PN delivery The Philippine Navy (PN) is set to take delivery of its first two AW-159 ‘Wildcat’ helicopters in March 2019. The ‘Wildcat’ comes in an Army and Navy version. Both AW159 versions will share a common fully-marinized airframe, with provisions for a range of mission and role-based equipment with an estimated 90% commonality. The PN has opted for an anti-submarine warfare package to protect its frigates currently being constructed by Hyundai Heavy Industries. The AW159 helicopters will be able to carry rockets and gun pods, and the naval version adds BAE’s Sting Ray light torpedoes. The helicopter is capable flying at a speed of 291 km/h and has a range of 777 km. The contract for the two anti-submarine helicopters is worth over $101 million and includes munition, mission essential equipment, and integrated logistic support. March 13/18: First Deployment Four new AW159 Wildcat helicopters will be deployed by the British Army to Estonia in what will be the its first operational deployment. The mission will last for four months from April and is part of NATO’s enhanced Forward Presence (eFP) in Eastern Europe. During their deployment the Wildcats will be supporting Estonian troops and British ground troops in training, as well as participating in NATO’s Exercise ‘Sabre Strike’, which is to span all three Baltic states and involve the armed forces of about 20 nations. January 17/18: Lynx Retirement Great Britain’s Army has officially retired its last Westland Lynx helicopters from service after 40 years in operation. Leaving RAF Odiham in Hampshire at 9:00 GMT on Tuesday 16, the four remaining Lynx went on one last aerial tour taking in military bases and locations associated with the helicopter and culminated with a V-shaped “air procession” along the River Thames in central London. A similar event took place in March 2017 with Royal Navy Mark 8 Lynx before the aircraft were decommissioned. The Lynx are being replaced with the AgustaWestland AW-159 Wildcat. January 4/18: Philippines The beefing up of the Philippine Navy’s capabilities are set to get a boost this year, with deliveries of Rafael Spike E-R (Extended Range) missiles—for use on Manilla’s brand-new multi-purpose assault craft (MPAC)—scheduled for very early in the first quarter of this year. Adding to the missiles, the first delivery of two AgustaWestland AW-159 Wildcat anti-submarine helicopters will be completed by the end of 2018, with the second model coming in early 2018. A government spokesperson said the Wildcats will be based on two frigates ordered from South Korea’s Hyundai Heavy Industries, without giving any further information. July 27/17: The British MoD has insisted that fabrication of the AW159 Wildcat helicopter will remain within the UK. Leonardo, the helicopter’s manufacturer, had been considering moving from its facility where the Wildcat is fabricated in Yeovil, UK, however, the government announced that work will remain there for the life cycle of the Wildcat program. The helicopter is in use with the British Royal Navy and British Army, with 62 of the models currently in service. January 12/17: Leonardo helicopters has been commissioned to provide support for UK AW159 Wildcat helicopters. The five-year Wildcat Integrated Support and Training contract, worth $333 million, will see Leonardo provide a range of support and training services for Wildcat variants operated by the Royal Navy and Army and will preserve some 500 jobs at its UK facilities. Navy Wildcats act as the core of the service’s aviation capability, tackling ASW roles, force protection, transport and information, surveillance, target acquisition, and reconnaissance, while the Army variant performs reconnaissance, command and control, force protection, and transport missions. January 11/17: Production of a Laser Directed Energy Weapon demonstrator has been ordered by the UK government, with MBDA and industry partners from the UK Dragonfire consortium winning a $36 million contract to carry out the work. It is hoped that the weapon will be demonstrated by 2019, eventually entering service by the mid-2020s. London also signed a $303 million Integrated Support and Training contract with Leonardo Helicopters in a five year deal for the provision of support work of Royal Navy AW159 Wildcat ASW helicopters. March 25/16: Jane’s has reported that the Philippines have decided on the purchase of two AW159 Lynx Wildcat naval helicopters for their navy. At $114 million, the helicopters will give the Philippine Navy a long sought after anti-submarine warfare (ASW) capability, carrying active dipping sonar (ADS), sonobuoys, and torpedoes, while for the anti-surface warfare role it can be armed with anti-ship missiles, rockets, and guns. Manilla had been searching for a helicopter to fill an ASW hole since 2014, with Augusta Westland beating off offers from Airbus, Bell, Sikorsky and NHIndustries. September 21/15: The Royal Navy’s AW159 Wildcat helicopter has completed heat trials in the Middle East, with these taking place aboard Type 45 destroyer HMS Duncan, following dispatch of the helicopter to Bahrain. 2013 – 2014 South Korea buys; From 1st HMA Mark 2 flight to standup of 825 NAS training squadron. Oct 10/14: Re-commissioning. 825 Naval Air “Channel Dash” Squadron is formally re-commissioned into the Royal Navy with its AW159s, and receives the “Falkland Islands 1982” battle honors that were denied it when the squadron was disbanded after that conflict. The squadron gets its name from Operation Fuller, which attempted to halt the breakout of 66 German ships from Best, France through the English Channel, and back to their German home ports. A sortie of 6 825 Sqn. Swordfish biplanes from RAF Manston near Kent attacked with torpedoes in broad daylight, with only 10 Spitfires for air cover against a vastly larger Luftwaffe force, plus the guns of the German ships. All of the planes were shot down, with only 5 of 18 survivors, and a posthumous Victoria Cross was awarded to Lt. Cdr. Esmonde. All 66 German ships made it. Operation Fuller failed dismally – but 825 Squadron did not. Sources: Royal Navy Fleet Air Arm Museum, “The Channel Dash – Operation Fuller” | Royal Navy, “New Navy Wildcat Helicopter Squadron commissions at RNAS Yeovilton”. July 30/14: De-commissioning. 700W Naval Air Squadron at Royal Naval Air Station (RNAS) Yeovilton is decommissioned, after 4 years of work bringing the AW159 into the fleet and a flyby ceremony with all 7-helicopters. The Wildcat HMA2s will stand up again on Aug 1/14 as 825 NAS, which will train both aircrew and maintenance engineers, and get the first deployable Wildcat flights ready to go. Sources: UK Royal Navy, “Wildcat pride as they take to the sky”. 700W NAS disbands, 825 NAS begins July 17/14: Weapons. AgustaWestland signs a EUR 113 million (about GBP 89.3M / $153.1M) contract with the UK Ministry of Defence (MoD) to integrate, test, and install ANL anti-ship missile and LMM light strike missile system compatibility onto 28 Royal Navy AW159 Wildcat HMA2 helicopters. Note that the UK MoD has also signed a EUR 60.2 million contract with LMM missile maker Thales regarding broader integration of their missile onto the Wildcat fleet. Sources: Finmeccanica, “Finmeccanica – AgustaWestland signed a contract worth EUR 113 million with the UK Ministry of Defence”. June 17/14: Exercises. The AW159’s 700W Naval Air Squadron dropped in on the former aircraft carrier HMS Illustrious during the big Deep Blue Anti-Submarine exercise off of the Cornish coast. It didn’t perform any anti-submarine work, however, just dropped off some supplies while the ship’s 9 Merlin Mk.2 naval helicopters hunted a Dutch Walrus Class SSK and a British SSN. The Wildcat will continue training and trials with 700W until the end of July 2014, before disbanding. It will be replaced by the operational 825 Naval Air Sqn, which will be the parent unit for training all air and ground crew working on the AW159 HMA Mk.2. Sources: Royal Navy, “New Wildcat debuts aboard Illustrious”. June 16/14: Weapons. The Ministry of Defence awards Thales a GBP 48 million (EUR 60.2 M / $81.5 M) contract, covering the Light Modular Missile’s final development, qualification and integration on AW159 Wildcat helicopters, plus deployable test equipment. The chosen configuration involves a 5-missile launcher on each hardpoint, rather than the 7-missile sets shown in previous mock-ups. Read “Direct Sting: Thales’ Small LMM / FASGW-L Missiles” for full coverage. Jan 6/14: Weapons. South Korea will be adding RAFAEL’s Spike-NLOS missile to its AW159s, giving them a 25+ km reach: “…the new lot will be mounted on Wildcat maritime choppers to be purchased over the next two years, an official with the Defense Acquisition Program Administration said Friday. “We’ve recently struck a deal with the Israeli manufacturer of the missile…. The missiles cost about W300 million (US$1=W1,056) each, approximately 100 times the price of a shell for the K-9 self-propelled howitzer.” Well, yes, but K9 armored vehicles can’t fly, K9 shells aren’t guided, and they can’t hit moving targets. Other than that, it’s a great comparison. South Korea already operates land-based versions of the Spike-NLOS light strike missile, whose primary mission from land-based platforms is to kill North Korean artillery. A naval helicopter that became the first aircraft to mount it would add speedboats and hovercraft to the target list, and gain a much longer reach than the 15 km Hellfire missiles aboard AH-64E attack helicopters and US Navy MH-60Rs. In fact, it would be long enough to out-range short-range air defense systems. The Hellfire-range Spike-LR is more commonly mounted on helicopters, but subsequent reports indicate that this isn’t a reporting mistake – they’ve really picked the NLOS variant. Sources: Chosun Ilbo, “Korean Choppers to Be Armed with Israeli Missiles” | Defense Update, “Seoul to Equip its New Maritime Helicopters with Israeli SPIKE Missiles”. Feb 6/13: Sonar. AgustaWestland picks the compact version of Thales FLASH dipping sonar as their standard offering for naval Lynx exports. The FLASH Compact sonar features an optimized, lightweight architecture, as well as a fully electric reeling machine so that smaller helicopters can deploy it. Thales’ SONICS system will act as an on-board real-time data processing system, with a VHF receiver to pick up sonobuoy data. This equipment has been offered with their Super Lynx 300s before, so the announcement seems to be directly targeted at the AW159. Note that Britain’s AW159 Wildcat HMA Mark 2 helicopters don’t have a dipping sonar on board, but South Korea has said that their AW159s will. This appears to nail down the type. They’ll be in good company. FLASH platforms include America and Australia’s MH-60R Seahawks; Britain’s AW101 Merlins; NH90 helicopters ordered by France, Norway & Sweden; and the UAE’s EC525 Cougars. All of these other machines are medium helicopters or larger. Thales. Jan 28/13: HMA Mk.2. The Royal Navy refers to its “Wildcat HMA Mark 2”, as they discuss their 1st delivered helicopter’s inaugural flight at Yeovil in Somerset. HMA stands for Helicopter Maritime Attack, and is part of the operational designation. SCMR is the Future Lynx program’s reference, which is a separate thing. British Army helicopters will be Wildcat Mark 1s, and the first 2 were officially handed over on July 11/12. MoD | Royal Navy | Defense Update. 1st Naval AW159 delivered Jan 16/13: ROK on. South Korea’s DAPA spokesperson Baek Yun-hyung announces that the naval AW159 is South Korea’s preferred choice for its MH-X competition, with a planned initial buy of 8 helicopters. Finkeccanica’s Jan 17/12 release places the overall contract value at EUR 560 million (about $744 million), with AgustaWestland’s share at EUR 270 million. It’s the new helicopter type’s 1st export order, with deliveries planned from 2015-2016. DAPA’s Baek: “The Wildcat was deemed superior in three of four fields: cost, operational suitability, and contractual arrangements…. The overall consensus is that the Wildcat is the better option…. In joint operations the US model is superior but both models meet our performance requirements.” The ROKN’s AW159s will have the full complement of dipping sonar, radar, surveillance & targeting turret, rescue hoist, provision for anti-ship missiles and torpedoes, door gun, etc. Media descriptions involve using the helicopters with the ROKN’s 2,200t Ulsan Class light frigates, which are designed to serve as high-end coastal patrol vessels with a mix of anti-ship and anti-submarine capabilities, plus low-end air defense. A smaller helicopter will serve them better (“operational suitability”), but the class doesn’t have much service time left. The ROKN’s new 2,300t FFX Incheon Class light frigates will also need helicopters, and the ROK’s 24 Super Lynx 300s and 8 AW159s should give them good options. AgustaWestland | Finmeccanica | Hankoryeh. South Korea orders AW159 Jan 13/13: NAO Report. Britain’s NAO releases its 2012 Major Projects Report. The overall Future Lynx program remains GBP 140 million under its original GBP 1.803 billion approval estimate, in part because it has reduced to number of helicopters from 80 (at GBP 23.1 million each) to the current order set of 62 (at GBP 26.8 million each). The program is 7 months behind schedule, which will push the Army’s AW159 BRH in-service date from January to July 2014, but won’t affect the naval SCMR’s January 215 schedule. Meanwhile, bureaucracy is getting in the way. “Significant unanticipated activity has been undertaken to satisfy the emerging Regulatory Instructions issued by the recently formed Military Aviation Authority (MAA).” 2012 1st delivery. Support contract. Denmark loss. AW159 BRH (click to view full) Nov 21/12: Denmark. Denmark’s Forsvarsministeriet announces that it has picked the MH-60R for a 9-helicopter buy, to replace their existing fleet of 7 AgustaWestland Lynx 90B machines. Danish MH-60Rs will be missing their sonobuoy launchers and ALFS FLASH dipping sonar, which will increase their available internal cabin space for transport missions. The DKR 4 billion (about $686 million) choice must next be approved by the Finance Ministry, and then passed in a budget by Parliament. That’s expected to happen, and it would be followed by deliveries from 2016 – 2018. Danish Forsvarsministeriet [in Danish] | Sikorsky | Flight International | Jane’s . Denmark loss to MH-60R Lite July 11/12: Support. At Farnborough, the MoD takes the opportunity to announce that their GBP 250 million Wildcat in-service support and training contract is up and running with AgustaWestland, who will outfit a specialist training centre at RNAS Yeovilton. This deal builds on the earlier GBP 76 million March 8/11 contract, and will include flight simulators and a wide range of other equipment to train pilots, ground crew and engineers. The initial period of the availability-based Wildcat Integrated Support and Training (WIST) contract will run to March 2017, but the framework as a whole stretches to the Wildcat’s planned out of service date in 2044. It builds on the contracting-for-availability approach pioneered with the firm’s Sea King (SKIOS), Apache, and AW101 Merlin helicopter fleets, where money is paid for levels of fleet availability rather than parts and hours worked. Regular price and value for money reviews are designed to ensure performance targets are being met, and help to price successive WIST phases. WIST includes aircrew, maintainer and ground crew training as well, and it actually started in early 2012 so the April delivery could go smoothly. AgustaWestland and its suppliers are now delivering a complete spares provisioning service, enhanced technical support services including aircraft safety management and full systems integration rig support, and simulator and ground based training for both aircrew and maintainers. The contract will sustain over 300 industry jobs, mainly in the South West of England at Royal Naval Air Station Yeovilton. Its Wildcat Training Centre will include 2 Full Mission Simulators, a Flight Training Device, and a Cockpit Procedures Trainer. AgustaWestland will be responsible for delivering over 60 different training courses for ab-initio Army aircrew, ground crew and maintainers starting in July 2013, as well as for Royal Navy ab-initio aircrew and maintainers starting in January 2014. Once the helicopters are in service, operational currency and continuation training will also be supported at RNAS Yeovilton. UK MoD | AgustaWestland. 1st SCMR delivered, WIST through-life support contract July 11/12: Official delivery. The first 2 of 62 AW159 Wildcat helicopters are officially unveiled and delivered by AgustaWestland at the Farnborough International Airshow. Both are Army BRH variants, which will come into service in 2014. Royal Navy AW159 SCMR Wildcats are due to be delivered for training later in 2012. Technically, AgustaWestland says the 1st AW159 was accepted in April 2012, ensuring on-schedule and on-budget delivery. To date, a total of 5 production Wildcat helicopters have been finished. UK MoD | AgustaWestland. BRH Delivery Feb 17/12: Testing. The UK MoD announces that an AW159 SCMR prototype has completed 2 sets of 10-day sea trials aboard the Type 23 frigate HMS Iron Duke. The helicopter landed on the ship’s deck nearly 400 times by day and night, in “various weather conditions” off the coasts of southern England and northern Scotland, and in the Irish Sea. It sounds miserable this time of year, and probably was, but that’s what it takes in order to write the new machine’s “ship-helicopter operating limits” manual. Prototype ZZ402 also tested its mission systems, night-vision cockpit and navigation systems. The Navy will continue toward the type’s 2015 fielding goal by performing future tests of its radar, electro-optics, navigational kit, and compatible missiles. UK MoD. Jan 23/12: Denmark. AgustaWestland signs a Heads of Agreement (HoA) with Denmark’s Systematic A/S to jointly explore business opportunities worldwide, including integration of the SitaWare range of systems with AgustaWestland’s helicopters They’ll also cooperate on the Danish Maritime Helicopter Programme. AgustaWestland is proposing the AW159 helicopter to replace Denmark’s earlier-generation Lynxes, but they will face competition from Sikorsky’s MH-60R, and probably from the European NH90-NFH. Both competitors are larger helicopters. AgustaWestland. 2011 Testing; training. LMMs/FASGW-L on AW159 SCMR, Apache (click to view full) Nov 7/11: Testing. The AW159’s first at-sea landing on a ship begins 4 weeks of ‘operating limit trials.’that will include ground scenarios, as well as RFA Argus. UK MoD. June 21/11: Denmark. AgustaWestland signs a cooperation agreement with Denmark’s Terma A/S to jointly explore business opportunities in the fields of aircraft survivability equipment, 3D-Audio, advanced aero structures and other equipment. The two companies already have cooperated successfully on the AW101 helicopter, which Denmark has bought. They’re hoping that the Danish Maritime Helicopter Programme will also buy the AW159 Wildcat, to replace earlier generation Lynx maritime helicopters. AgustaWestland. June 20/11: The AW159 Lynx Wildcat flies at the Paris Air Show, and the firm offers a progress report. The 3 test helicopters have completed over 250 of 600 flying hours. Wildcat #1 will start hot and high trials in the USA in June 2011, and Wildcat #3 will undertake Shipborne Helicopter Operating Limit (SHOL) trials in October 2011. Wildcat #2 recently completed chaff and flare firing trials, and is focused on integration of the avionics and mission sensors. A production helicopter has begun flying, and 6 more are undergoing final assembly. AgustaWestland is currently negotiating with the UK MoD on a comprehensive IOS through-life support contract. AgustaWestland. April 20/11: Testing. The 1st production AW159 performs its maiden flight at AgustaWestland’s Yeovil facility. Source. April 5/11: FASGW-L. Thales receives a contract for 1,000 Lightweight Multi-role Missiles (LMM), to equip the UK’s AW159 helicopters as their “Future Anti-Surface Guided Weapon – Light” (FASGW-L). The parties offer no details regarding contract costs, as they’re re-routing funding from an existing project, in order to finalize LMM development and produce the initial set of weapons. The casualty is believed to be Thales’ laser beam-riding, Mach 3.5 Starstreak portable anti-aircraft missile, which reportedly had some of its technology re-used in the less costly LMM. March 8/11: Training. AgustaWestland announces a GBP 76 million ($122.2 million) contract with the UK Ministry of Defence to design and develop an integrated Lynx Wildcat training solution, including building and equipping a new modern training center at RNAS Yeovilton in South West England, where both Royal Navy and British Army AW159 squadrons will train. The facility will provide training courses for Army aircrew and maintainers starting in January 2013, with training for Royal Navy aircrew and maintainers starting January 2014. The Wildcat Training Centre will be equipped with a suite of briefing rooms, integrated electronic classrooms and a learning management system, a Full Mission Simulator (FMS), Flight Training Device (FTD) and Cockpit Procedures Trainer (CPT) simulators, any of which will be capable of delivering Army or Royal Navy conversion and mission training. Each of the Full Mission Simulators has 6 degrees of freedom to provide acceleration sensations, and a visual system that complies with JAR-FSTD-H Level D standard. Other synthetic training devices will cover mechanical, avionic and weapon systems. Key suppliers include Indra (Full Motion Simulators and other aircrew training equipment), and Pennant Training Systems (suite of maintenance training aids). The contract for construction of the facility will be awarded later in 2011, but all other work will start immediately. 2009 – 2010 Maiden flight. Export promotion. Maiden flight (click to play video) Nov 19/10: Testing. TI3, the 3rd and final AW159 test helicopter, successfully completes its maiden flight at AgustaWestland’s Yeovil facility in the UK. TI3’s main tasks include load survey trials and naval development, including ship helicopter operating limit trials. AgustaWestland. Nov 19/10: Exports. Shephard’s Rotorhub reports that Britain is already promoting the AW159 Wildcat on the international market: “Sheehan said the main targets for the aircraft were existing operators of earlier Lynx variants, identifying six in Europe and seven across the rest of the world. In addition, the DSO has been in discussion with the Royal New Zealand Navy (RNZN) about the capabilities of the Wildcat naval variant and Sheehan is meeting with RNZN representatives in early 2011. New Zealand is considering whether to proceed with an upgrade of its SH-2G Super Seasprite helicopters when they are due for one in 2015 or replace the aircraft outright. …Any export aircraft could mirror the Royal Navy’s equipment package and be fitted with the Selex Galileo Seaspray 7000E active electronically scanned array (AESA) radar, L3 Wescam MX-15D EO/IR imaging system MBDA Sea Skua missiles and Thales LMM missiles. The aircraft could also be fitted with the Thales FLASH (Folding Light Acoustic System for Helicopters) dipping sonar if required. Sheehan was also bullish about the Wildcat having seemingly emerged unscathed from the [SDSR], suggesting the requirement may even increase from the current order of 62 once the wider effects of the SDSR are digested by the MoD.” Oct 14/10: Testing. TI2, the 2nd AW159 test helicopter successfully completed its maiden flight at AgustaWestland’s Yeovil, UK facility. TI1 continues to perform air vehicle and flight envelope testing, while TI2 will undertake the flight testing of the aircraft’s core avionics and mission systems, following testing on AgustaWestland’s Full Systems Integration Rig (FSIR). AgustaWestland has now also established a new AW159 production facility at its Yeovil plant that introduces a pulse line production system. They hope to make big efficiency improvements in the final assembly process. AgustaWestland. Nov 11/09: Testing. The 1st AW159 successfully completes its maiden flight at AgustaWestland’s Yeovil facility, with AgustaWestland Chief Test Pilot Donald Maclaine at the controls. Another 2 test aircraft will join this machine in 2010, in order to complete the AW159 and mission equipment flight testing. To date, AgustaWestland says the program has remained on time and on budget for all of its major milestones. The first operational aircraft is still scheduled for delivery in 2011, and the Lynx Wildcat is still slated to reach full operational capability with the Army in 2014 and the Royal Navy in 2015. AgustaWestland release. Maiden flight April 24/09: Renamed – and Reduced. During a ceremony at AgustaWestland’s Yeovil facility, the Future Lynx is officially renamed the AW159 Lynx Wildcat. UK MoD | The AgustaWestland release states that: “62 AW159s will be initially procured by the UK MoD, 34 for the British Army and 28 for the Royal Navy… continues to be on time and on budget and was the first major project to be awarded under the Strategic Partnering Arrangement signed by the UK Ministry of Defence and AgustaWestland in June 2006. AgustaWestland has also signed partnering agreements with a number of key supplier on the Future Lynx programme including Selex Galileo, a Finmeccanica company; GKN Aerospace, LHTEC – a partnership between Rolls-Royce and Honeywell, General Dynamics UK, Thales UK and GE Aviation. The first flight of the aircraft is on schedule to take place in November 2009 with the first airframe having entered final assembly in November 2008, ahead of schedule. AW159 deliveries will commence in 2011 and it will enter operational service with the British Army in 2014 and the Royal Navy in 2015.” “AW159 Wildcat” 2007 – 2008 Subcontractors. BRH concept (click to view full) Dec 14/08: The unofficial British Navy Matters site offers its year in review for 2008. It highlights a number of negative trends, and has this to say about the Future Lynx program: “The Future Lynx helicopter project finally seems to secure, but the order announced in 2006 of 30 helicopters plus 5 options for the Royal Navy has been reduced to 28 aircraft. Back in 2001 the RN was hoping for 60 new helicopters.” Nov 13/08: Sub-contractors. GKN Aerospace delivers the first complete Future Lynx Airframe to AgustaWestland on schedule. The firm reports that it has achieved challenging an 80% reduction in parts count when compared with the existing Super Lynx airframe. GKN release. July 14/08: Sub-contractors. GE Aviation announces a contract from AgustaWestland to provide the Integrated Cockpit Display System on 70 Future Lynx and 30 Merlin Capability Sustainment Plus (MCSP) helicopters for the UK Ministry of Defence. The contact is valued at more than $55 million over the next 10 years, with production deliveries commencing in early 2009. The integrated cockpit display system includes a smart 10″ x 8″ Integrated Display Unit (IDU), flexible & adaptable Remote Interface Unit (RIU) and 2nd Generation Integrated Standby Instrument System (ISIS). May 21/08: Sub-contractors. GKN Aerospace announces that they have commenced Super Lynx airframe assembly on schedule at the Company’s Yeovil, UK facility, following a design-to-cost program. In order to meet these goals, the new design makes extensive use of monolithic machined components instead of a traditional fabricated detail structure; overall, the airframe’s parts count has been reduced by 80%, instead of the originally forecast 30%. During production, digital assembly instructions developed by GKN Aerospace directly from CATIA v5 will be presented to each individual on a stand alone wireless IT workstation, while state-of-the-art assembly tooling improves production mechanics. Nov 1/07: Sub-contractors. BAE Mobility & Protection Systems announces a contract from AgustaWestland to design, develop, and provide 140 S5000 crew seats, plus 340 S3000 troop seats and interface frames, for use on the UK’s Future Lynx helicopters. Deliveries are slated tp run from 2011-2016. The crashworthy Armor Holdings S5000 crew seat has mission adaptive armor for the seat pan and backrest, and incorporates a state-of-the-art 5-point harness with a dual action rotary buckle, armrest, headrest, adjustable thigh and lumbar support, and a folding armored wing panel to increase the lateral protective area. The S5000 crew seat features field installation of less than one hour and provides maximum ballistic protection. The S3000 rear cabin troop seats include state-of-the-art 4-point lightweight restraints with a rotary buckle. The modular seat frame system features quick installation and removal of interface fittings from frames through the use of 4 quick release pins. The cabin seat can be installed in aft, forward, and side facing locations, allowing flexibility for different cabin layouts. BAE Systems release. Oct 30/07: Sub-contractors. AgustaWestland announces that the first monolithic machined panel for the first Future Lynx (a BRH Army variant) was manufactured last week at Oldland CNC’s facility in Bristol, United Kingdom. The manufacture of the first component, a lower fuselage bulkhead, was witnessed by representatives from the UK Ministry of Defence Integrated Project Team and AgustaWestland. Oldland CNC is manufacturing 83 of the 147 Future Lynx primary structure monolithic machined components and supplying them to GKN Aerospace for incorporation into the airframe prior to delivery to AgustaWestland. The first Army variant remains on target to fly late 2009. Feb 19/07: SCMR radar. Finmeccanica subsidiary Selex Sensors and Airborne Systems (Selex S&AS) received a contract from AgustaWestland to provide the multi-mode e-scan surveillance radar for the Royal Navy’s variant of the Future Lynx helicopter. The GBP 20 million (currently about $39 million) contract will see the Selex S&AS Seaspray 7000E AESA (Active Electronically Scanned Array) radar installed as the scan and targeting radar for the Navy’s Surface Combatant Maritime Rotorcraft (SCMR) as it monitors the sea lanes, launches missiles, et. al. The Seaspray 7000E combines a state of the art active electronically scanned array with a commercial off the shelf processor, and covers both air-to-air and air-to-surface scanning. AESA radars feature improved range and capabilities, while requiring less maintenance. See SELEX release | Seaspray 7000E datasheet [PDF]. 2005 – 2006 Future Lynx contract. Subcontractors. SCMR concept (click to view full) July 27/06: Sub-contractors. GKN Aerospace will supply the complete, assembled airframe for all 70 Future Lynx helicopters. They will be responsible for managing the entire supply chain for this work and will assemble the airframe at Yeovil, prior to delivery to AgustaWestland. This contract is valued at approximately GBP 50 million (roughly $80 million) through to 2016. GKN Aerospace has been supplying assemblies for the Lynx airframe for over 20 years, and for the last 5 years it has supplied all Lynx airframes to AgustaWestland. The new Super Lynx airframe will continue to be manufactured in aluminum, but will incorporate monolithic machined components to reduce the component count by some 30%. See release. July 17/06: Sub-contractors. AgustaWestland awards Thales a 10-year, GBP 60 million contract for Future Lynx avionics. Thales UK will provide core elements of the avionics management, communications, and navigation systems, as well as taking responsibility for the integration of some of the Commercial Off The Shelf equipment within the Navigation and Communications sub-systems. The Thales Secure Communications Control System (SCCS), which is at the heart of the communications system, is from the family of TopSIS products. It is already selected and fitted on a number of aircraft including the UK’s Chinook Mk2/2A helicopters and ASTOR Sentinel R1 reconnaissance aircraft, as well as the Australian MRH-90 transport and Tiger reconnaissance/ attack helicopters, and its Airbus 330-derivative Multi-Role Transport and Tanker aircraft. See release. July 17/06: Sub-contractors. AgustaWestland has awarded Smiths Aerospace a contract to supply the new SDS-5000 large area cockpit display system for the new Future Lynx helicopter. The Smiths Aerospace 10″ x 8″/ 25 cm x 20 cm liquid crystal displays provide more than 70% additional display area compared to the existing Smiths’ SDS-4000 display system which it replaces. Design and development has commenced, manufacture will take place in Cheltenham, UK, and deliveries to AgustaWestland will begin in 2008. The contract value was not announced in the release. July 5/06: Sub-contractors. Smiths Aerospace has been awarded a $21 million contract for the development and supply of its comprehensive HUMS technology for the Future Lynx. The contract involves the implementation of the Smiths combined Health & Usage Monitoring System and Cockpit Voice & Flight Data Recorder (HUMS/CVFDR) capability on all 70 of Britain’s Future Lynx aircraft. Development is due to commence this year at Smiths’ facilities in Southampton, UK and in Michigan, USA, with deliveries scheduled to commence in 2011. The Future Lynx HUMS will continuously monitor the fleet wide health and performance of safety-critical components, providing advance warning of potential equipment failures and collecting valuable data for routine maintenance of each aircraft. HUMS sensors monitor the health and usage of the engines, transmission, drive-train system, rotor system and airframe by detecting and diagnosing potential failures, recording usage, automating test procedures and providing alerts for potential maintenance actions. The HUMS also provides continuous Rotor Track and Balance (RTB) capability, negating the requirement for the installation of carry aboard equipment and the overhead for dedicated RTB check flights. This feature will be operational in advance of the UK’s operational use of the aircraft, in time for the Super Lynx flight trials phase. June 22/06: Sub-contractors. General Dynamics UK Limited announces a GBP 24 million (about $44 million) contract from AgustaWestland for the design, development and manufacture of an Advanced Tactical Processor for the UK’s Future Lynx Programme. The Tactical Processor will be based on GDUK’s combat proven family of open systems computers, and will host software applications that interface to the hardware using an Allied Standard Avionics Architecture Council (ASAAC) standard based 3-layer software stack. It will also provide a sophisticated video processing and distribution function, embedded mission recording and playback and a digital map capability that is common to the UK’s Merlin Mk3 support helicopter. The new helicopters ATP will also feature 2-way data communication with the GD designed BOWMAN network. June 22/06: Strategic Partnering Arrangement for Future Lynx Program signed between the UK MoD and AgustaWestland. This solidifies the GBP 1 billion order for 70 helicopters, which is worth $1.9 billion at the time. June 13/06: Business Transformation Incentivisation Agreement signed between the UK MoD and AgustaWestland. AgustaWestland release. Future Lynx contract March 24/05: Future Lynx selected as the preferred option for UK land and sea helicopter requirements. See DID coverage. Additional Readings Background: Helicopter AgustaWestland – AW159. Army Technology – Future Lynx Battlefield Reconnaissance Helicopter, United Kingdom. NavalTechnology – AW159 Future Lynx / Lynx Wildcat – Maritime Surveillance and Attack Helicopter, United Kingdom. British Army – Wildcat Mk1. Royal Navy – Wildcat. Their designation is Wildcat HMA Mk2, where “HMA” stands for “Helicopter Maritime Attack”. Naval Technology – Super Lynx – Combat Helicopter, United Kingdom. The Super Lynx 300 fits between the Lynx Mk8 and the AW159 Future Lynx; see also AgustaWestland page. Army Technology – Lynx Mk7 / Mk9 Multirole Helicopter, United Kingdom. Background: Ancillaries DID – Light Naval Strike: MBDA’s FASGW-H / ANL Missile. BAE Systems – Sting Ray Mod 1 Lightweight Torpedo. Official Reports UK NAO (HC 684-i, 2012-13) – 2012 Major Projects Report.News & Views UK Armed Forces Commentary (Nov 18/13) – The evolving budget situation: helicopters – UPDATE. Explains that Army AW159s may lose their attack capability, and shows a number of internal configuration layouts. Defence Review Asia (June 2009) – Evolution Of The Species: AgustaWestland Eyes Regional Opportunities For AW159 [PDF]. Times Online (March 25/05) – Westland GBP 1bn helicopter deal angers rivals. “Privately, [EADS] is thought to be furious that its offer to allow its helicopters to be built under licence at Yeovil by an AgustaWestland workforce trained by EADS had been overlooked…”. Associated Press (March 24/05) – Finmeccania Gets Helicopter Contract. BBC (March 24/05) – Helicopter Firm to Get GBP 1bn Boost. View the full article
  20. So, I guess we need to talk about the STOUT. This is a regular topic here, so let's see what the navy has to say. The Arleigh-Burke class guided missile destroyer USS Stout (DDG 55) returned to Naval Station Norfolk today, marking the end of a nine month deployment to U.S. 2nd, 5th, and 6th Fleet areas of operation. In mid- January Stout’s crew departed Norfolk and operated under U.S. 2nd Fleet, taking part in the USS Dwight D. Eisenhower (CVN 69) Carrier Strike Group’s (CSG) Composite Training Unit Exercise (COMPTUEX), the final certification exercise prior to deployment. Upon successful completion and certification, Stout and the rest of the IKECSG immediately crossed the Atlantic to execute missions as assigned. While in U.S. 6th Fleet Stout conducted two port visits in Rota, Spain, bookending their record-breaking 215 days at sea. Both port visits in Spain enabled the ship to take on fuel and fulfill other logistical requirements before continuing their mission at sea. As COVID-19 made frequent port visits unsafe, Stout competed the first modern Mid-Deployment Voyage Repair (MDVR) period at sea, spending a week executing scheduled maintenance and preservation to maintain mission readiness while deployed. Throughout deployment, Stout’s technicians executed depot level repairs on vital engineering and combat systems equipment. During that period the ship conducted morale events, like swim calls and steel beach picnics. Stout conducted nearly 40 replenishments-at-sea enabling their continuous support to the mission. To allow the crew time to relax and reenergize, they had a "rest & reset" period at sea. Of course, one has to give a great nod of respect to the crew of the STOUT. As our Sailors have from even before the founding of our nation, they answered the bell - that is not the issue. I have the three big pictures above for the simple reason that it saves me 1,000 words about how appearance matters for a Navy whose primary peacetime mission is presence. Our warships represent our nation - and looks matter. Yes to all in the above pullquote ... but that is an excuse, not a reason. The reason is that someone decided that - best told by them - it was best to keep the ship and its Sailors at sea, because? ...and don't blame COVID-19. I'm sorry - but none of the missions outline justify what is clearly abuse of our Sailors' service. If we don't have enough ships to do the missions we tell ourselves we "need" to do ... then leave those mission gapped. Deploy for 180 days as is standard for peace. If the powers that be want more, then they can buy us more ships - but we cannot have a navy ready for war if we are wearing them out at peace. Yes, STOUT will look better after a lot of money and time ... but what a waste. I note that we have already forgotten the lessons of 2017. There is nothing to be institutionally proud of a ship having to do depot level maintenance. BZ to the crew, but raspberries to those who forced them to do it ... at peace. How does the reality vibe with this? "... Vice Adm. Andrew Lewis, commander U.S. 2nd Fleet. “Sailors are our Navy’s asymmetric advantage..." Cringe. The Skipper is spot on, however; “I don’t have the words to describe how immensely proud I am of this crew,” said Rich Eytel, commanding officer, USS Stout. “This crew defined what it means to be self-sufficient and resilient. We’ve gone for significant lengths of time without new parts, stretched our food and fuel limits, and they continued to give 110% every day. They faced our challenges head on, which allowed us to continue to meet all operational tasking.” Those words do not cause cringe. Those words ring true ... but they are also words that speak to unnecessary sacrifice and abuse. It speaks to a poorly run and utilized Navy. You can spin all you want. You can spit at me for saying it ... but you know it to be true. I don't know what it will take for our navy to stand up for itself, but right now we are in an abusive relationship with our COCOMs and those who should be standing up for it are not. View the full article
  21. Americas General Dynamics won a $25.1 million contract modification for additional fiscal 2021 development studies and design efforts for Virginia Class submarines. The Virginia Class new attack submarine is an advanced stealth multimission nuclear-powered submarine for deep ocean anti-submarine warfare and littoral (shallow water) operations. The Virginia-Class submarines are being built by a partnership between Huntington Ingalls Industries’ Newport News Shipbuilding division and General Dynamics Electric Boat. General Dynamics Electric Boat built the first of the class,Virginia (SSN 774), and Northrop Grumman Newport News the second,Texas (SSN 775). Work will take place in North Carolina. Estimated completion will be in September 2021. The Brazilian Air Force (FAB) has taken delivery of its final F-5M fighter from Embraer. FAB 4810 was handed over to the customer at Embraer’s Gavião Peixoto plant last week. A total of 49 aircraft underwent the modernization program. The aircraft delivery on October 14 marked the completion of a 15-year program that saw the company overhaul a total of 49 Northrop Grumman-built light fighters. Embraer was responsible for fitting the aging aircraft with Italian Grifo F multimode radars, electronic countermeasures and the capability to employ a range of modern missiles and laser-guided bombs. The overhaul will allow the aircraft to remain in service into the 2030s. Brazil started operating the aircraft in 1975 after ordering the first 42 units a year before. In 1988, the country bought additional aircraft in the form of used F-5s from the US Air Force and subsequently from Jordan. Northrop Grumman built well over a thousand of F-5 fighters that saw service with close to twenty countries. Middle East & Africa Turkey’s military exports to its ally Azerbaijan have risen six-fold before fighting broke out over the Nagorno-Karabakh region, according to figures by the Turkish Exporters’ Assembly. The figures show Azerbaijan bought $123 million in defense and aviation equipment from Turkey this year. Most of the purchases arrived were after July. The data shows that sales jumped from $278,880 in the month of July to $36 million in the month of August, and $77.1 million in just September. Military sales to Azerbaijan in the first nine months of 2019 totalled $20.7 million. Armenia and Azerbaijan were part of the Soviet Union and have been involved in a territorial conflict since gaining independence within the 1990s. The main issue is the disputed Nagorno-Karabakh region, internationally recognized as part of Azerbaijan but controlled by ethnic Armenians. The fighting over Nagorno-Karabakh began on September 27. Each side has accused the other of targeting civilians. Both sides have rejected talks and ignored growing international calls for a ceasefire. Europe The Netherlands is to retire its aging fleet of Lockheed Martin C-130 Hercules airlifters earlier than planned. The country’s Ministry of Defense (MoD) announced on October 13 that the four C-130H aircraft operated by the Royal Netherlands Air Force (RNLAF), the oldest of which date back to 1978, are to be replaced as their readiness rates have become so poor as to hinder simultaneous operations. The RNLAF received two new ‘stretched’ C-130H-30 Hercules in 1992 and two surplus ‘standard’ C-130H Hercules in 2005. The MoD had planned to modernize these aircraft, although it has now decided that such a programme would reduce the already poor availability of the fleet further and so an immediate replacement is the best option. British engineers have revealed some of the latest concepts under development for the Royal Air Force’s (RAF) next generation combat air system.The pioneering technology is being delivered by Team Tempest, a UK technology and defense partnership formed by BAE Systems, Leonardo, MBDA, Rolls-Royce and the RAF, and involving hundreds of high-tech companies, SMEs and academia across the UK. Tempest is one of the UK’s most ambitious technological endeavors and designed to deliver a highly advanced, adaptable combat air system to come into service from the mid-2030s. This next generation combat aircraft, which forms part of a wider combat air system, will exploit new technologies as they evolve to respond to the changing nature of the battlespace, addressing increasingly high-tech and complex threats and conflict. Asia-Pacific Japan’s Mitsubishi Heavy Industries has launched the first of a new class of diesel-electric attack submarines (SSKs) for the Japan Maritime Self-Defense Force (JMSDF) equipped with lithium-ion batteries. The new 3,000-tonne submarine, which has been named Taigei (with pennant number SS 513), entered the water on October 14 in a ceremony held at MHI’s facilities in Kobe City. According to the JMSDF, the new boat has a crew complement of about 70, an overall length of 84 m, a beam of 9.1 m, a draught of 10.4 m, and a standard displacement of about 3,000 tonnes, meaning that it is almost the same size as the Soryu Class SSKs, which are 84 m long, 9.1 m wide, 10.3 m depth, and have a standard displacement of 2,950 tonnes. Today’s Video Watch: The Most Dangerous Fighter Jets In The World View the full article
  22. Virginia Block I-II (click for SuperSize) “GDEB Receives $148M as Virginia Class Lead Yard” described changes to the Virginia Class submarine’s design that are expected to reach 20% of the $200 million savings goal by the time orders for the versatile sea attack/ land attack/ special forces submarines rise to 2 per year, in 2012. The bow changes cover the FY 2009-2013 ships, referred to as Block III. SSN 774 Virginia – SSN 777 North Carolina are Block I, and SSNs 778-783 will be Block II. Block III begins with the 11th ship of class, SSN 784. Long lead time component orders began May 22/08, and the submarine is expected to be ready for delivery around 2015. A fuller explanation of Block III’s extensive bow changes, and an accompanying graphic, may be found below – along with contract updates that include additional improvements and sonar development. The Virginia Class Program: “2 for 4 in 12” SSN 777 costruction (click to view full) The SSN-774 Virginia Class submarine was introduced in the 1990s as a Clinton-era reform that was intended to take some of the SSN-21 Seawolf Class’ key design and technology advances, and place them in a smaller, less heavily-armed, and less expensive platform. The resulting submarine would have learned some of the Seawolf program’s negative procurement lessons, while performing capably in land attack, naval attack, special forces, and shallow water roles. In the end, the Seawolf Class became a technology demonstrator program that was canceled at 3 ships, and the Virginia Class became the naval successor to America’s famed SSN-688 Los Angeles Class. The Virginia Class program was supposed to reach 2 submarines per year by 2002, removing it from the unusual joint construction approach between General Dynamics Electric Boat and Northrop Grumman Shipbuilding – but that goal has been pushed back to 2012 in progressive planning budgets. In FY 2005 dollars, SSN-21 submarines cost between $3.1-3.5 billion each. According to Congressional Research Service report #RL32418, and the Navy is working toward a goal of shaving FY05$ 400 million from the cost of each Virginia Class boat, and buying 2 boats in FY2012 for combined cost of $4.0 billion in FY 2005 dollars – a goal referred to as “2 for 4 in 12”. In real dollars subject to inflation, that means about $2.6 billion per sub in 2012, and $2.7 billion in 2013. The Navy believes that moving from the current joint construction arrangement will shave FY05$ 200 million from the cost of each submarine, leaving another FY05$ 200 million (about $220 million) to be saved through ship design and related changes. Block III: The Changes Block III bow mods (click to view full) The most obvious change is the switch from 12 vertical launch tubes, to 12 missiles in 2 tubes that use technology from the Ohio Class special forces/ strike SSGN program. The Virginia’s hull has a smaller cross-section than the converted ballistic missile SSGNs, so the “6-shooters” will be shorter and a bit wider. Nevertheless, they will share a great deal of common technology, allowing innovations on either platform to be incorporated into the other submarine class during major maintenance milestones. Net savings are about $8 million to program baseline costs. The other big change you can see in the above diagram is switching from an air-backed sonar sphere to a water-backed Large Aperture Bow (LAB) array. Eliminating the hundreds of SUBSAFE penetrations that help maintain required pressure in the air-backed sonar sphere will save approximately $11 million per hull, and begins with the FY 2012 boats (SSNs 787-788). The LAB Array has 2 primary components: the passive array, which will provide improved performance, and a medium-frequency active array. It utilizes transducers from the SSN-21 Seawolf Class that are that are designed to last the life of the hull. This is rather par for the course, as the Virginia Class’ was created in the 1990s to incorporate key elements of the $4 billion Seawolf Class submarine technologies into a cheaper boat. The SUBSAFE eliminations, plus the life-of-the-hull transducers, will help to reduce the submarines’ life cycle costs as well by removing moving parts that require maintenance, eliminating possible points of failure and repair, and removing the need for transducer replacements in drydock. The bow redesign is not limited to these changes, however, and includes 25 associated redesign efforts. These are estimated to reduce construction costs by another $20 million per hull beginning with the FY 2012 submarine. With the $19 million ($11 + 8) from the LAB array and Vertical Payload, and the $20 million from the associated changes, General Dynamics is $39 million toward the $200 million baseline costs goal of “2 for 4 in 12”. While the changes themselves will begin with the FY 2009 ship, the savings are targeted at FY 2012 because of the learning curve required as part of the switch. Recent discussions concerning an earlier shift to 2 submarines per year would result in faster production of the Block III submarines, but would be unlikely to make a huge difference to that learning curve. Contracts and Key Events Tomahawk launched October 20/20: Design Efforts General Dynamics won a $25.1 million contract modification for additional fiscal 2021 development studies and design efforts for Virginia Class submarines. The Virginia Class new attack submarine is an advanced stealth multimission nuclear-powered submarine for deep ocean anti-submarine warfare and littoral (shallow water) operations. The Virginia-Class submarines are being built by a partnership between Huntington Ingalls Industries’ Newport News Shipbuilding division and General Dynamics Electric Boat. General Dynamics Electric Boat built the first of the class,Virginia (SSN 774), and Northrop Grumman Newport News the second,Texas (SSN 775). Work will take place in North Carolina. Estimated completion will be in September 2021. April 21/20: Vermont General Dynamics Electric Boat announced that it has delivered the nuclear-powered attack submarine Vermont to the Navy. The Vermont is the 19th submarine of the Virginia Class, which displace 7,835 tons, with a hull length of 377 feet and a diameter of 34 feet, and can carry eight masts, including a snorkel mast and high-data-rate satellite communication masts as well as a radar mast. The submarine is valued at $3 billion. “I am pleased to report that the Vermont has received some of the highest quality ratings in the history of the Virginia program. We wish Vermont and her crew a long and distinguished career in defense of our nation“, said Kevin Graney, President, General Dynamics Electric Boat, in a press release. Back in December the Navy awarded Electric Boat $22.2 billion for delivery of nine Virginia-class subs, and in January Lockheed Martin received $19.3 million to deliver masts for the boats. March 18/20: Design Efforts General Dynamics Electric won a $13.1 million deal for additional fiscal 2020 development studies and design efforts for Virginia Class Submarines. The Virginia Class new attack submarine is an advanced stealth multimission nuclear-powered submarine for deep ocean anti-submarine warfare and littoral (shallow water) operations. The Electric Boat division of General Dynamics, Connecticut, is the lead design authority for the Virginia Class. General Dynamics Electric Boat has built the first of the class – Virginia (SSN 774), and Northrop Grumman Newport News the second – Texas (SSN 775). Work will take place in McLeansville, North Carolina and will be complete by September 2020. February 10/20: Phase III Electric Boat Corp. won a $7.6 million contract action to perform Phase III of the Virginia Class Main Propulsion Machinery control systems effort. The Virginia Class is a nuclear-powered fast-attack submarine built for anti-sub and anti-surface operations. It is armed with torpedoes, Tomahawk Cruise missiles and is capable of mine-laying operations. It can also deliver special forces teams as it has the ability to operate in shallow or littoral waters. It is the US Navy’s newest undersea warfare platform and incorporates the latest in stealth, intelligence gathering and weapons systems technology. Work will take place in Sunnyvale, California and is scheduled to be finished by March 2021. January 17/20: Block V Lockheed Martin won a $19.4 million contract modification to exercise options for the procurement of eight multi-function modular masts for new-construction Virginia Class submarine Block V hulls. Virginia Class subs are designed for a broad spectrum of open-ocean and littoral missions, including anti-submarine warfare and intelligence gathering operations. The Block V submarines include some significant upgrades and changes when compared to the Virginia-class submarines already built. Work will take place in New Hampshire and New York. Estimated completion date is in September 2023. December 27/19: USS Arizona And USS Oklahoma The US Navy announced that the next two Virginia Class submarines, which are also the first two of Block V of the class will be named for the sailors who during the Pearl Harbor attack. The USS Arizona and USS Oklahoma, currently referred to as SSN-802 and SSN-803, will be named for the USS Arizona and USS Oklahoma that were sunk in the December 7, 1941, attack and the roughly 1,600 sailors who died on them, the Navy said on Tuesday. The decision brings the names back into active-duty service more than 75 years after the two vessels were in use. The new Arizona and Oklahoma will be the first two in Block V of the Virginia-class submarine program, which have been named about a month after the Navy awarded a $22.2 billion contract to General Dynamics Electric Boat for first nine vessels of the block. December 4/19: Block V General Dynamics won a $22.2 modification for construction of nine Virginia Class submarines, eight with Virginia Payload Module (VPM), from fiscal 2019 to fiscal 2023. The contract modification includes spare material and an option for one additional submarine with VPM. The deal is for the construction of the fifth block of Virginia Class submarines by General Dynamics Electric Boat and major subcontractor Huntington Ingalls Industries’ Newport News Shipbuilding division, inclusive of design support and all efforts necessary to test and deliver each submarine. The Block V submarines built from 2019 onward will have an additional Virginia Payload Module. mid-body section, increasing their overall length. The VPM will add four more VPTs of the same diameter and greater height, located on the centerline, carrying up to seven Tomahawk missiles apiece, that would replace some of the capabilities lost when the SSGN conversion Ohio Class subs are retired from the fleet. Work under the modification will take place in Virginia, Rhode Island, Connecticut, California, Pennsylvania and Maryland. Work is scheduled to be complete by August 2029. November 7/19: New Deal Ahead The US Navy is reportedly preparing to sign a contract for nine Virginia Class Attack submarines. Eight of them will include an 84-foot section that boosts the boat’s strike missile capacity. Bloomberg reports that the Navy has reached an agreement with General Dynamics. The contract will also include an option for a 10th boat if needed. The news comes after the Virginia Class program has seen creeping delays and slipping profits in recent years caused by labor issues and a strained submarine industrial supply base. “We have reached a multiyear” agreement “and are working to announce a contract” by December 31, Navy spokesman Captain Danny Hernandez said in a statement. It “will achieve significant savings, will include important lethality enhancements,” and “provide critical stability to the industrial base. Further information will be available upon contract award,” he said. October 31/19: USS Delaware Huntington Ingalls Industries announced that it delivered the fast-attack submarine, the ninth Virginia Class vessel it has built, to the US Navy ahead of its commissioning next year. The nuclear-powered vessel completed sea trials earlier this month, and is the Navy’s 18th Virginia Class submarine, the company announced. The commissioning of the USS Delaware is scheduled for April 4, 2020, in Wilmington, Del. Delivery to the Navy was made on Friday. The submarine will be the seventh Navy vessel to carry the state’s name. The purchase of at 20 more Virginia Class vessels, replacing the Los Angeles Class, is planned through 2043. They are designed for open-ocean and littoral missions, anti-submarine warfare, anti-surface ship warfare, strike warfare, special operation forces support, intelligence, surveillance, and reconnaissance, irregular warfare and mine warfare missions. October 14/19: Lead Yard Support Electric Boat Corp. won a 434.4 million deal for lead yard support and development studies and design efforts regarding the Virginia Class submarines. The Virginia Class replaces Los Angeles Class submarines as they retire. The Virginia Class has several innovations that significantly enhance its warfighting capabilities, including in littoral operations. Virginia Class SSNs have a fly-by-wire ship control system that provides improved shallow-water ship handling. The class has special features to support SOF, including a reconfigurable torpedo room which can accommodate a large number of SOF and all their equipment for prolonged deployments and future off-board payloads. The class also has a large lock-in/lock-out chamber for divers. In Virginia Class SSNs, traditional periscopes have been supplanted by two photonics masts that host visible and infrared digital cameras atop telescoping arms. Work under the contract will take place in Connecticut, Virginia and Rhode Island. Estimated completion will be by September 2020. The contract provides lead yard support for Virginia class submarines that will maintain, update and support the Virginia class design and related drawings and data for each Virginia class submarine, including technology insertion, throughout its construction and post-shakedown availability period. The contractor will also provide all engineering and related lead yard support necessary for direct maintenance and support of Virginia class ship specifications. August 12/19: Planning, Material Procurement and Repair General Dynamics won a $15.2 million delivery order for the Virginia Class USS Washington or SSN 787. The order includes planning, material procurement and repair work. The nuclear-powered fast attack submarine is built by Huntington Ingalls and General Dynamic’s Electric Boat Division. Virginia Class submarines operate in the world’s littoral and deep waters while conducting anti-submarine warfare, anti-surface ship warfare, strike warfare, special operation forces support, and intelligence, surveillance and reconnaissance. General Dynamics will perform work in Groton, Connecticut. Work is estimated to be finished by December this year. August 9/19: Special Support Oceaneering International won a $34.3 million firm-fixed-price contract for the Virginia Class submarine sail racetracks, payload tube loading platforms and multiple all-up-round canister special support equipment ladder kits with shipping crates. The Virginia Class new attack submarine is an advanced stealth multimission nuclear-powered submarine for deep ocean anti-submarine warfare and littoral (shallow water) operations. The lead ship, Virginia was laid down in September 1999, launched in August 2003 and commissioned in October 2004. It underwent a three-year operational evaluation before operational deployment. Oceaneering will perform work under the support contract in Chesapeake, Virginia. Estimated completion date is in August 2024. June 25/19: Modular Mast for Block V The Navy tapped Lockheed Martin to build elements of the Virginia Class submarines. The firm-fixed-price, cost contract is valued at $16.3 million and has the company build multifunction modular masts for the submarines’ Block V hull, which can be extended by sections, depending on the requirements of the vessels’ strike capabilities. The Virginia Class of nuclear powered fast attack submarines is the US Navy’s latest undersea warfare platform. Block V subs incorporate the Virginia Payload Module (VPM), an added section of the ship, which will extend the hull by 84 feet and boost its strike capabilities. Virginia Class submarines with Block V armaments are capable of carrying Tomahawk cruise missiles. The VPM will increase the number of torpedoes and Tomahawk missiles the Virginia class can carry. 70 percent of the work will take place in Nashua, new Hampshire, and 30 percent in Syracuse, New York. Scheduled completion date is in June next year. April 11/19: ETCU The Navy awarded $33.4 million to Raytheon to supply the Naval Warfare Center in Philadelphia with up to 28 electronic throttle control units (ETCU) and auxiliary components in support of the Virginia Class program. The deal has Raytheon provide replacement ETCU hardware, which is currently obsolete and can no longer be efficiently supported. The Virginia Class are attack submarines. The Navy’s newest undersea warfare platform is designed to seek and destroy enemy subs as well as surface ships. Virginia Class boats can carry up to 24 torpedoes and Tomahawk cruise missiles. They can be deployed for a wide range of operations including anti-submarine warfare, anti-surface ship warfare, strike warfare, special operations forces support, intelligence, surveillance and reconnaissance, irregular warfare, and mine warfare missions. According to the DoD, the proposed contract includes the hardware fabrication for new construction platforms and all back-fit systems to mitigate parts obsolescence, update and maintain the ETCU technical data package, and design verification testing on limited production units for quality assurance. Work is scheduled to be completed by April 2024. March 20/19: Long Lead Time Material The US Navy awarded General Dynamics a $2 billion contract modification to provide additional materials required to build the Virginia Class submarines from fiscal 2019 through fiscal 2023. The deal includes additional Long Lead Time Material and Economic Ordering Quantity items for SSN-802 to SSN-811 underwater vessels. The SSNs 802 -811 Virginia Class submarine hull numbers have not been named yet. The Virginia Class is the Navy’s newest undersea warfare platform. Attack submarines are designed to seek and destroy enemy submarines and surface ships, project power ashore with Tomahawk cruise missiles and Special Operation Forces, carry out Intelligence, Surveillance, and Reconnaissance (ISR) missions, support battle group operations, and engage in mine warfare. The modification falls under a previously awarded sole-source contract. General Dynamics is the lead contractor of the Virginia Class submarine program. In February 2017, General Dynamics won an initial $126.5 million contract by the US Navy for long lead time material for the first two Block V Virginia Class submarines, SSN-802 and SSN-803. The Block V submarines built from 2019 onward will have an additional Virginia Payload Module (VPM) mid-body section, increasing their overall length. Work under the contract modification will take place within the USA. February 27/19: Universal Modular Mast The US Navy awarded L-3 KEO a $19.3 million contract modification for the production of the Universal Modular Mast, which serves as a lifting mechanism for the Virginia class mast payloads. The Universal Modular Mast is standard equipment for above-water sensors on U.S. and international submarines. It is a non-hull penetrating mast for Navy Virginia-class fast-attack submarines and Ohio-class guided missile submarines that can host five different sensor configurations: the photonics mast, the multi-function mast, the integrated electronic mast, the high-data-rate-mast, and the photonics mast variant. The Virginia class or SSN-774 class are nuclear powered fast attack submarines. The submarines form the Navy’s new undersea warfare platform designed to seek and destroy enemy submarines and surface ships as well as project power ashore. Work under the contract will take place in Italy as well as Massachusetts and is scheduled to be finished by August 2021. April 02/18: Post-delivery work General Dynamics Electric Boat Corp, is being contracted for the provision of post-delivery work on the USS Colorado (SSN 788). The awarded contract is valued at over $14 million. The USS Colorado is the 15th Virginia Class submarine delivered to the US Navy. She was delivered on September 21, 2017 and was commissioned on March 17, 2018. The SSN 788 is part of a 5-year, $17 billion deal to strengthen the USA’s nuclear submarine fleet. The SSN 788 belongs to Block III submarines that took a big step forward by replacing the 12 vertical launch tubes with a more flexible “6-shooter” approach, and swapping a water-backed, horseshoe-shaped LAB sonar array for the existing air-backed spherical array. Electric Boat Corp. will perform planning and execution efforts, including long lead time material procurement, in preparation to accomplish the maintenance, repair, alterations, testing, and other work on USS Colorado. Work will be performed in Groton, Connecticut and is expected to be completed by September 2018. Jan 5/09: Goodrich in Charlotte, NC received a $49 million contract from Northrop Grumman Shipbuilding to provide composite components for the next 8 Virginia Class nuclear fast attack submarines referred to as Block III. Goodrich’s Engineered Polymer Products team in Jacksonville, FL is building components to support the construction of 1 ship per year in 2009 and 2010, rising to 2 ships per year from 2011 through 2013. The components include the bow dome, and sonar and weapons equipment. Dec 22/08: The US Navy signals its a href=”/Early-Xmas-Big-Virginia-Contracts-for-GDEB-NGC-05218/”>approval of the Virginia Class’ progress, and of the new Block III design, with a $14.011 billion contract to fund 8 Virginia Class block III submarines. Work on these boats will run until 2019. Dec 12/08: General Dynamics Electric Boat Corp. in Groton, CT received a $16.8 million cost-plus-fixed-fee material order to fund the Block III Common Weapon Launcher (CWL) design, and includes the total scope associated with the vendor portion of the inboard electronics design as well as the scope required for in-house (Electric Boat) tasks. The CWL will sit in the Block III bow’s “six shooter” holes, and is so named because that space can be used to launch a wide variety of items besides UGM-109 Tomahawk cruise missiles; aerial UAVs and underwater UUVs are the most obvious. GDEB services will include engineering support, Engineering Development Model (EDM) hardware, continued development of the CWL for use with SSN 784 VPT, development of interface documents, and defining changes to support interfaces to the Weapon Control and Payload Tube Control Panels. Work will be performed in Manassas, VA, and is expected to be complete by 2013. This contract was not competitively procured by the supervisor of Shipbuilding Conversion and Repair in Groton CT (N00024-09-C-2101). Dec 12/08: Lockheed Martin Maritime Systems and Sensors in Manassas, VA received a $38.3 million modification to previously awarded contract (N00024-04-C-6207) for engineering services in support of the Acoustic – Rapid Commercial off The Shelf (A-RCI) program. The 550,000 additional engineering services hours will be used on TacLAN tasking related to Special Operations support, and to complete the new “BSY-2 Wrap Around Antenna (WAA),” which is listed as being a Virginia Class sonar. DID requested clarification, and got it. BSY-2 is a Seawolf class system only. WAA is the Wide Aperture Array, and on the SSN-774 Virginia Class it evolved to the L-WAA (Lightweight Wide Aperture Array). The Virginia Class Block III bow has been redesigned to save money beginning with SSN 784; it will use the Large Aperture Bow (LAB) Array. It turns out that the DefenseLINK release should read “technology insertions for the USS Jimmy Carter’s [SSN 23 Seawolf Class] BSY-2 WAA, and USS North Carolina [SSN 777 Virginia Class] LWAA TI-08 integration.” The exact work involved is technology insertion, integration, and modernization on USS Jimmy Carter and USS North Carolina, as well as the completion of the existing TI-08 effort and the Virginia Class Block III TI-10 Large Aperture Bow (LAB) Array effort for SSN 784. Work will be performed in Manassas, VA (90%) and Syracuse, NY (10%) and is expected to be complete by June 2009. This contract was not competitively procured by US Naval Sea Systems Command. Nov 5/08: The Virginia Class nuclear fast attack submarine Program Office Virginia Class Sub Program Wins Acquisition Awardreceives the 2008 David Packard Excellence in Acquisition Award during a ceremony at Fort Belvoir, VA. This marks the third time (1996, 1998, 2008) that the Virginia Class Program Office has earned the award. The Virginia Class Program was recognized for excelling in 4 specific areas: reducing life-cycle costs; making the acquisition system more efficient, responsive, and timely; integrating defense with the commercial base and practices; and promoting continuous improvement of the acquisition process. View the full article
  23. Another chapter in Islam's slow war on France. You need to take time today to read a critically important article by John Lichfield. Below I will pull extensively from it, but you need to read the whole thing. On October 6, Mr Paty, 47, a much-liked history and geography teacher in a dull Paris suburb, produced for his middle school civics class a pair of the cartoons of the Prophet Mohammed which provoked the attack on Charlie Hebdo magazine five years ago. Cartoons. History. A significance moment in their nation’s history. That is the job of a teacher. A secular teacher in a secular republic. What happens when that republic allows, and indeed encourages, the growth of an imported culture that is contrary to those same values? How can publishing such cartoons be justified, he asked the teenagers, if they offend people of the Islamic faith? Where does the freedom of expression end and respect for others’ feelings begin? These questions are not easy, Mr Paty explained. That is why fundamental principles exist in democratic states such as France to help people of different faiths and opinions to get along without murdering one another (as they have in not-so-distant parts of French history). The complexities are the lesson. But this lesson cost Mr Paty his life. Ten days later he was dead – decapitated by a 19-year-old Chechen refugee to France as he walked home from school. One of the pupils, a 13-year-old Muslim girl, had given her father a misleadingly lurid account of the lesson – from which she was absent. The father, with the help of a radical imam, started a campaign on the internet to have the teacher sacked. The lesson – or a false and inflammatory account of the lesson – became a cause celèbre on radical Islamic sites on Facebook, Instagram and Twitter. Parents at the school received as many as 10 messages day, some from Algeria and other Islamic countries, calling Mr Paty a “criminal”, a “thug” and a “paedophile” and demanding that he should be sacked. The murderer, Abdullakh Anzorov, was a Chechen Muslim, born in Moscow 19 years ago. He did not know Mr Paty or the school. He lived in Evreux in Normandy, 60 miles away. It is likely — but not certain — that he acted alone, enraged by the lies that he had read on the web. Anzorov followed Mr Paty as he left the Collège du Bois d’Aulne in Conflans-Sainte-Honorine, north west of Paris last Friday evening. He attacked him with a 12-inch butcher’s knife, stabbing him in the arms and abdomen and then beheading him. Anzorov was shot dead by police a few minutes later. Twelve people have been arrested, including his father, grandfather and brother and the parent and imam (apparently unknown to Anzorov) who started the hysterical hue and cry online. France once again starts to protest … but besides talk, what does their ruling class do? In the grim litany of islamist terror attacks in France in recent years, the killing of one teacher may seem relatively unimportant. It will soon be the five-year anniversary of the Bataclan and associated attacks in Paris on 13 November 2015 which killed 130 people. Nine months earlier, in February 2015, 17 people died in the attacks on Charlie Hebdo and the Hypercacher supermarket – for which 12 alleged associates of the terrorists are currently on trial. But forget the numbers. Mr Paty’s lone murder has struck a raw and angry nerve in France – and not just because of the appalling manner of his death. Tens of thousands of people turned out to mourn and honour the teacher in demonstrations in Paris and other French cities on Sunday. If this sounds familiar, it should. The French ruling class and its people spoke this after every attack … and yet, what happens? Secularism is France’s state religion, the soil in which French democracy grows. The state guarantees a freedom to believe, and a freedom not to believe. It must otherwise be neutral on all religious questions. Teachers in state schools, though poorly paid and often criticised, are regarded as a front-line infantry, or secular priesthood, which passes on these Republican values of tolerance, freedom of expression and secularism to new generations. The fact that Mr Paty was brutally murdered precisely for trying to explain these principles has made him into a kind of Republican martyr. There is talk of him being buried in the Panthéon, the secular cathedral on the Paris left bank which is the last resting place of great French men and women. This is the challenge. Mr Paty, though, was not the only target of last Friday’s attack. Anzorov also left a garbled message for the President, posted moments after the murder: “To Macron, leader of the infidels, I have executed one of your dogs of hell…Calm down others like him or we will inflict on you a severe punishment.” Is freedom of speech worth it? That is the wrong question. To even ask it is to advertise you don’t understand the challenge. Freedom of speech is the fundamental liberty that allows all the others to freely exist. It is a concept not just worth civil war, but general war on a global scale. Embedded deep in the West, and not just France, are those who have other plans than enjoying the fruits of The Enlightenment. They see the game in full. Don’t forget, modern day Turkey, Lebanon, Syria, Jordan, Israel, much of Iraq, Egypt, Libya, Tunisia, Algeria and Morocco were once Christian areas. There is a history here. Know it as they do. Act on it as they do. Spain was once part of an Islamic empire and wars were fought to hold off further invasion deep in to France and modern Austria. As I am wont to say; history is sticky. Back to today’s challenge. The policies of previous decades have not been successful, and things have gotten worse. To continue to do the same but expect a different result is just folly. Fixing the problem will be more challenging now than earlier, but the French Republic must stand up firm to the challenge of its own creation. This was obviously influenced by the furious response in parts of the Islamic world to a speech Macron had given in Les Mureaux two weeks ago. Les Mureaux is a more troubled, multi-racial, outer suburb of Paris in the Seine valley 20 kilometres west of Conflans. In the speech, the President proposed new action to prevent French Muslims from becoming a separate community who give their allegiance wholly to the Koran rather than French laws or values. He promised a law on “secularity and liberty” to combat extremist Islamist indoctrination by forbidding the teaching of children at home after the age of three and by ending the “importation” of foreign-financed imams. Mosques will be placed under greater surveillance. State funding will be available to mosques which sign a charter on secularism and democracy. Does anyone here think this will fix anything? Does this point you down the narrow path, or simply delay the inevitable off ramp to a deeper and more dangerous abyss? Islam is not structured like Christianity and Judaism. To pretend it is only plays in to the ignorance that got you here. There are some Islamic sects that are not a threat to a free republic, but the sects that are driving the violence in France are on the rise and are not of that confession. Sad it is here, but this is the natural result of decades of clearly self-destructive policies of mass immigration without assimilation from cultures that are now fully embedded and well pass the critical mass to be self-sustaining. Again, just look at what started this latest skirmish. One of the pupils, a 13-year-old Muslim girl, had given her father a misleadingly lurid account of the lesson – from which she was absent. The father, with the help of a radical imam, started a campaign on the internet to have the teacher sacked. The lesson – or a false and inflammatory account of the lesson – became a cause celèbre on radical Islamic sites on Facebook, Instagram and Twitter. Parents at the school received as many as 10 messages day, some from Algeria and other Islamic countries, calling Mr Paty a “criminal”, a “thug” and a “paedophile” and demanding that he should be sacked. That is home grown. The present situation is not sustainable and yet, as the murderer of the teacher shows, the present policies are doing nothing to stop it from getting worse. France has, proportionally, the largest Muslim population in Europe – between five and six million, or just under tenth of its people. Many – probably as many as a half – are non-practising. The great majority are law-abiding and accept the primacy of national laws. But there has been a shift in the last 20 years, even among moderate muslims, towards a more overt expression of their faith and sense of Islamic identity. I’ll repeat myself to emphasize the critical points; this was all known for decades. The path to today was well marked out and visible, but the ruling class pretended they did not see it. I have been warning in this venue for a decade and a half – but it has been obvious since the last few decades of the 20th Century that this crisis was coming. As previous generations of the ruling class failed to do their job, it is up to the present-day leaders and citizenship to fix the problem. As we are well past critical mass, the best path is now a narrow one – surrounded on one side by a gapping maw of the destruction of their nations as founded, and on the other being forced to become something they don’t want to be to defend it. If the ruling classes won’t fix it, then the people will rise up – that is stepping through a door in to a dark room no well meaning person would like to see, but that is where it is heading. Macron’s speech, clumsily worded in places, offered no snap solution. It offered a long-term strategy to create a barrier between the majority of the French Muslim population and a minority of extremists. This approach has been attacked, in the wake of Paty’s murder, by the Right and Far Right in France as a feeble response to the Islamist threat. Marine Le Pen of Rassemblement National called for a “real war against the poison of radical Islam…a real war to eradicate it finally”. Bruno Retailleau of the centre right Les Républicains said that “Islamism” must be “thrown out of the country by force”. These are largely meaningless words. What sort of force exactly? What kind of real war? Most of France’s muslims are French and French born. They are not going anywhere. Any violent attempt to isolate an extremist but often submerged minority could prove disastrous. ... But simple-sounding responses and explanations, whether offered by French politicians or by radical Muslim intellectuals, are not the solution. They are part of the problem. We should heed Mr Paty’s lecture to the 13 and 14-year-olds of Collège du Bois d’Aulne at Conflans-Saint Honorine.We should cling to the principles of tolerance and freedom which western societies have evolved from their own dark centuries of intolerance and violence. The principles are often muddled and confusing. But that is the lesson. Complexity is the lesson. Exactly. What the ruling class needs to do is, as we say in NASCARistan, turn in to the skid. - Macron should publicly display the cartoons the teacher died for. - All schools should do the same and while they are at it, pick a few scenes from “Life of Brian” that equally poke fun at Christianity and Judaism. - Every newspaper should publish the cartoons. - Saturate the intellectual marketplace to make a point. You will be called names – but isn’t Paris worth a few idiots calling you names? Muslims and Islam can live just fine in the West, but not the kind that is causing the trouble in France. Cowardice in the face of name calling and extremism brought on this crisis. If the French Republic, and the West for that matter, is a culture worth defending – then defend it. Do that or lose it and accept what replaces it. What are you afraid of - being called names? Knives and Kalashnikovs may kill you, but words will never hurt you. Stand or submit. Those are your options, and because of the errors of previous generations, you/we are running out of time to do it the easy way. View the full article
  24. Americas Raytheon Missiles Won a $239.1 million contract modification for StormBreaker (SDBII, GBU-53/B) production Lot 6. Designed to address critical troop needs, the StormBreaker can detect, track, and destroy stationary or moving targets with high-precision and stand-off range during the day and at night in all-weather conditions. The GBU-53/B, originally known as the Small Diameter Bomb II (SDB II), has a tri-mode guidance system able to find targets using imaging infrared or millimeter-wave radar, or using semi-active laser homing to hit a designated aimpoint. Depending on the altitude of the launching aircraft, the weapon can also glide up to 69 miles on its own using a GPS-assisted inertial navigation system, after which could strike a specific coordinate or begin searching for a target. Just recently it was announced that the Air Force approved the bomb for use on the F-15. This means that the service will now be able to send the weapons downrange for use by F-15E squadrons Work under the modification will take place in Tucson, Arizona. Estimated completion date is November 28, 2023. AAR Aircraft Services won a $67.3 million modification, which exercises options to procure P-8A Poseidon aircraft depot scheduled and unscheduled maintenance, fulfillment of depot in-service repair/planner and estimator requirements, technical directive incorporation, airframe modifications, aircraft on ground support and removal and replacement of engines in support of the Navy, the government of Australia, and Foreign Military Sales customers. The P-8A Poseidon,the US Navy’s maritime patrol aircraft, is capable of broad-area, maritime and littoral operations, and is also successful at search and rescue. Operating with a smaller crew, yet delivering an extended global reach, greater payload capacity, higher operating altitude, open-systems architecture and significant growth potential, the P-8A provides more combat capability. Work will take place in Indianapolis, Indiana and is expected to be finished by October 2021. Middle East & Africa Aegis Defense Services won a $16 million deal to provide US Forces Afghanistan with private security service protection. Bids were solicited via the internet with seven received. Aegis Defense Services provides management services on a contract or fee basis. Work will take place in Mazar-e, Afghanistan. Estimated completion date is October 29, 2023. Israel and the US Air Force carried out their third joint exercise involving their F-35A fighters on October 12. The press release said the exercise involves the 421st Expeditionary Fighter Squadron and Israel’s 116th Squadron. F-16Is from 115th Squadron played the aggressor role. The IAF’s 116th Squadron, which operates the “Adir” F-35I fighter jet, trained alongside the 380th Air Expeditionary Wing’s 421st Expeditionary Fighter Squadron and 908th Expeditionary Air Refueling Squadron. The 340th EARS assigned to Al Udeid Air Base, Qatar, participated as well. The 421 EFS operates the F-35A Lightning II, while the 908th EARS and 340th EARS provided aerial refueling support with a KC-10 Extender and KC-135 Stratotanker. Europe The US State Department approved the potential sale of Naval Strike Missile Coastal Defense Systems to Romania, in a deal that could be worth about $300 million. The Naval Strike Missile is a sea-skimming, over-the-horizon anti-ship missile that has limited, built-in target recognition capabilities. Romania wants to buy two of the systems, according to an announcement on the website of the Defense Security Cooperation Agency. Romania will use this long-range, precision strike weapon to enhance mission effectiveness, survivability, and NATO interoperability in current and future missions and operations. Included in the proposed package are up to 10 Link 16 Multifunctional Information Distribution System-Joint Tactical Radio Systems, two Coastal Defense System Fire Distribution Centers, four Mobile Launch Vehicles, Transport Loading Vehicles and the missiles themselves, as well as other equipment. Asia-Pacific Seven K-8W jet trainers were delivered from China to Bangladesk on October 15. The jets landed at Zahurul Haq base. The aircraft was flown by Bangladesh Air Force pilots, with Group Captain AKM Abdur Razzak leading the mission. They departed from Dehong Magshi airport and landed on BAF Base Zahurul Haque, Chattogram. Following the tradition, the aircraft received a water cannon salute after landing. The aircraft also made a flypast over the airbase in the presence of Bangladesh Air Chief Marshal Masihuzzaman Serniabat. The government-to-government deal was signed in 2018 under Forces Goal 2030 plan. It is an extension of the first order placed in 2014 in which 8 trainers were purchased. The 2018 contract was signed The Bangladesh Air Force and China National Aero-Technology Import & Export Corporation (CATIC), and it comprises of total 23 units, but the expenditure is yet to be revealed. Today’s Video Watch: JAPAN LAUNCHES FIRST OF TAIGEI – BIG WHALE CLASS SUBMARINE – GETS READY TO CONFRONT CHINA ! View the full article
  25. In a very rough year, there were sprinkles of renewed optimism about the Middle East as Israel established relations with a few of the Gulf Arab nations, but the Middle East is, and has been, always about more than Arab-Israeli relations. From North Africa across the Mediterranean coast to Syria and across the Arabian Peninsula to Yemen, what is the state of play in the Middle East as a whole, and where are the trends taking the region? Our guest this Sunday, October 18th for the full hour to discuss this and more will be Steven A. Cook. Steven is Eni Enrico Mattei senior fellow for Middle East and Africa studies at the Council on Foreign Relations (CFR). He is an expert on Arab and Turkish politics as well as U.S.-Middle East policy. Cook is the author of False Dawn: Protest, Democracy, and Violence in the New Middle East; The Struggle for Egypt: From Nasser to Tahrir Square, which won the Washington Institute for Near East Policy’s gold medal in 2012; and Ruling But Not Governing: The Military and Political Development in Egypt, Algeria, and Turkey. He is a columnist at Foreign Policy magazine. He has also published widely in international affairs journals, opinion magazines, and newspapers, and he is a frequent commentator on radio and television. His work can be found on CFR.org. Prior to joining CFR, Cook was a research fellow at the Brookings Institution (2001–2002) and a Soref research fellow at the Washington Institute for Near East Policy (1995–1996). Cook holds a BA in international studies from Vassar College, an MA in international relations from Johns Hopkins University’s School of Advanced International Studies, and both an MA and a PhD in political science from the University of Pennsylvania. He speaks Arabic and Turkish and reads French. If you use iTunes, you can add Midrats to your podcast list simply by clicking the iTunes button at the main showpage - or you can just click here. View the full article

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.