Skip to content
View in the app

A better way to browse. Learn more.

HarpGamer

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

All Activity

This stream auto-updates

  1. Today

  2. As most regulars here know, on the 13th, President Trump issued a National Security Presidential Memorandum (NSPM), which was known in previous administrations as a National Security Memorandum. Most are aware of it because almost immediately there was much gnashing of teeth, rending of clothes, and general knee-bent running about concerning the future USS Doris Miller (CVN 81) having its EMALS replaced with steam and returning to hydraulics over a lot of the problematic electrical motors used in various elevators, etc. We’ll return to that in a bit—and it is but a small fraction of the story—but let’s make sure everyone understands what an NSPM is. It operates with the authority of the president, much like an Executive Order, but it is less formal, does not require publication in the Federal Register and do not always need a formal legal justification printed with it. That being said, they achieve the same practical management goals within the government as executive orders and stay active until a new president changes or cancels them. In line with some of the foolishness we’ve seen over the last week about our aircraft carriers that we discussed on Sunday’s Midrats Podcast, this has become hyper-politicized to the point that the bad-faith actors you always find in election years are drowning out serious people critiquing or supporting the substance of the memorandum. Some of the argle-bargle we’ve had to deal with is from those who are acting like everything—though mostly the EMALS issue (almost like they all parrot the same things from the same people)—was done on a whim by the President ungrounded by anything but vibes. No, that isn’t how this works. This was proposed to the President as a solution to a problem much greater than if EMALS and all-electric is the most effective way to get carriers displacing water faster and putting planes in the air or not—and the people involved have access to information that has yet to make it in open source. You may disagree with one part or another, but if all you have to discuss is EMALS, then frankly, I’m not all that interested in listening to you. Everyone should keep in mind that nothing in this memorandum will benefit the Trump Administration. You cannot build a fleet in a few months or a POM cycle. That isn’t how it works. Never forget that by the time New Years 1943 came around, we were almost out of aircraft carriers to fight the Imperial Japanese Navy. In the fall of 1942, we even had to borrow one from the Royal Navy. By mid-1943 however, the fleet that won the war left the shipyards in waves that swamped Japan for the next two years. The Essex Class carriers and all the support ships that came with them did not show up right away. No. The naval buildup began seven years earlier in 1936, followed by even more money injected into the maritime industrial base in 1938, 1940, and then, of course, with the war that finally came to our shores at the end of 1941. We have wasted so many years in vanity. The best time to have fixed the shortfalls in our shipbuilding industrial base was 20 years ago. The second best time is now. To keep doing the same thing and expecting better results is, of course, insanity. If this team is correct, then the benefit will be seen somewhere between 2030 and 2035, closer to 2035. It would be hard to do worse than we’ve done the last decade. The memo leads with this basic understanding. …President Donald J. Trump signed a National Security Presidential Memorandum to fix critical long-term issues in Navy shipbuilding and ship repair programs and restore capacity and competition to the maritime industrial base. No quick fix. No over-promise and under-deliver. No magic beans. You can argue the details if you wish, but try to get the big picture. Now that I’ve set the table, let’s look at the full thing. You can get the full memorandum at this link. Get it, print off a copy or put it in a tab next to this post, and let’s dive in. I’ll quote the first bullet everyone is focused on in a bit, but know what is going on in the background. What problems could there be? PCU John F. Kennedy was supposed to be handed over to the US Navy a year ago, but two systems held up the delivery. These were “the Advanced Arresting Gear that catch aircraft as they land on the carrier and the Advanced Weapons Elevators that shuttle munitions from ammo storage deep in the ship to the aircraft on the flight deck”—both of which required further testing, USNI News reported. Seven of the future carrier’s 11 advanced elevators have been installed and are operational, and that is reportedly enough to enable the crew to access the weapon magazines and to continue with training and certification. It remains unclear if the remaining four AWEs will be operational when the carrier is delivered, but HII has another seven months to tackle the issues. The United States Navy had also sought to ensure that the future CVN-79 would not need to undergo the same level of post-delivery modifications that the USS Gerald R. Ford (CVN-78), the first ship in the class, required and still requires. The Ford still can’t accommodate the fifth-generation F-35C Lightning II. To head off the same problems aboard the Kennedy, Congress mandated that CVN-79 would be capable of embarking the Joint Strike Fighter on its maiden deployment. First in class issues are expected and should be fixed for follow-on classes of ships. FORD was commissioned on 22 JUL 2017. That was nine years ago, 3,313 days, to be exact. Of course, that means it is time to pull out my favorite measure of time: the time it took the U.S. to defeat Imperial Japan (and Nazi Germany) in WWII—1,364 days, AKA a “WorldWar”. CVN-78 was commissioned 2.42 WorldWars ago, and things are still not working. It still can’t handle our premier fighter, the F-35C (will it anytime soon?). Only some of the weapons elevators work…and I am sure there are more. This is why I am willing to give the benefit of the doubt for this, The Memorandum directs the Secretary of War to replace the Advanced Electromagnetic Aircraft Launch Systems and the Advanced Weapons Elevators with traditional steam and hydraulic systems during the construction of CVN-81. We have wasted the entire century at this point with failed programs that The Smartest People in the Room™ promised everyone would be transformational and bring the U.S. Navy to an unchallenged position of dominance, from LCS, DDG-1000, CG(X), FFG-62, and, of course, FORD. As a side note, this problem was predicted two decades ago. Give a listen to this Midrats Podcast with Tal Manvel from July of 2017. It is all there. We are years past running out of time. We need speed and timeliness in getting hulls in the water. The only detailed critique I have heard of the changes proposed for CVN-81 was giving up the launch rate. That is but one aspect of a larger system. I don’t think you can justify everything on that one figure. Does EMALS work? Sure, but it is worth it? If you are building a football team, are you bad if you don’t hire a wide receiver prospect who has the fastest 40 yard time you’ve ever seen? Everyone thinks you’re an idiot for not hiring the kid because…he has the fastest 40? What if he is 5’1 and 120 lbs? Pass on a 6’8” tight end? He happens to be missing one arm and is legally blind, but he’s 6’8”, right? I understand well the selling points of EMALS and going electric. It briefs well, but if we can’t make it work in 2.24 WorldWars and it is preventing us from getting functional carriers forward in a timely manner…then is the trade off worth it? It appears that a critical mass of people believe the trade off is not worth it and it is better to step back to something that works so aircraft carrier delivery doesn’t slide to the right too much. CVN-81 is going to take 15 years to be delivered. That isn’t acceptable. Aircraft carriers, like all ships, have a demographic problem. You cannot create fleets overnight, nor their airwings or support infrastructure. Ships are commissioned, get worn out, and have to be retired. If you want to grow a navy, you have to commission more ships than you decommission, just like if you want to grow your population, you have to have more births than deaths. CVN-71 through CVN-75 were all commissioned two to three years apart from 1986 to 1998. They reach the 50 year retirement point in 2036. If we are not commissioning a carrier every three years by that point, we will slip to 10 and probably 9. We already know that we are an “11” carrier navy in a 15 carrier world. Additionally, do you know how many carriers the People’s Liberation Army Navy plans to have by 2036? Conservatively, they are looking at nine, but plan to build six in 10 years. With their industrial base, I don’t doubt it. CVN-81 will be commissioned sometime after 2034. Can the engineering changes be done? I don’t know. We’ll find out. Our whole structure is creaking: Budget records state that “the delivery date of CVN-81 shifted from February 2032 to February 2034 due to shipyard construction capacity constraints, which limited its ability to fabricate the ship’s modules.” There are greater concerns here than how many point-nosed things you can launch in a day. Let’s look at the rest of the memo. The Memorandum directs the Department of War to pursue more direct investments in the American shipbuilding industrial base based off of the successful “Finland model,” which was first employed with the Coast Guard’s medium icebreaker program. As foreign shipbuilders make substantial and durable investments into America’s shipyards and train an all-American workforce for the jobs they create, they will be temporarily permitted to build up to two ships in their parent shipyards that will be delivered to bridge gaps on a quick turnaround, while additional ships will be built in revitalized American shipyards. If you are looking to get hulls in the water faster—sustainably in the long run—this is the way to do it. The way to avoid this was to not allow our maritime industrial base to degrade to the state it is in this century. In our arrogance, vanity, and sense of entitlement, we have used up all the time left for an “all American” solution. I think well-meaning people can argue the case, but unless you have a way to match this speed of delivery, I think it is too late to make the sell. Why is no one talking about this? The Memorandum directs the Secretary of War to establish a fifth Naval shipyard, the first in over 80 years, to increase the Nation’s submarine and aircraft carrier repair capacity. It has been knowv, again, for decades we do not have the ability to properly maintain our submarines and aircraft carriers…but all we did was study with no action. This takes action. The next part is, for me, the foundation for real change and success. For two decades we have discussed the absolute requirement for root-and-branch reform of NAVSEA. We will not build the fleet we need if we rely on the same processes, programs, people, and institutions that allowed us to sleepwalk into this state. BEHOLD!The Memorandum directs the Secretary of War to undertake a full review, reform, and reorganization of Naval Sea Systems Command to address chronic challenges in American naval shipbuilding. Yep, I’m going to be watching that closely. There is also some clear, direct, and firm fact delivery. The U.S. Navy has experienced several shipbuilding setbacks stemming from overly complex designs and iterative design change procedures, which have resulted in cost growth, delays, and cancellations. A lack of capacity and competition has resulted in large backlogs of orders across six major Navy shipbuilding programs and a commercial shipbuilding sector that is not globally competitive. An atrophied shipbuilding industrial base, coupled with diminished adjacent supplier bases, has expanded delays and increased costs. How could I not approve a memo that reinforces critiques we have been pounding for all these years? Yes, follow through and action is required, but to have this from the CINC matters. We have been suffering the secondary effects from Perry’s Last Supper and the warping effects of two decades of spending on imperial policing action ashore in Central and Southwest Asia. We are by nature and comparative advantage a maritime and aerospace power—not a continental land power. Let’s be clear, this memo should not be a shock. During the March 2025 joint address to Congress, President Trump promised to “resurrect the American shipbuilding industry, including commercial shipbuilding and military shipbuilding.” We’ve been waiting 17 months for follow through. Here’s the capstone of what has been building since that March: President Trump established a new Office of Maritime and Industrial Capacity at the National Security Council in the White House to prioritize American Maritime Dominance. In April 2025, President Trump signed a historic Executive Order to restore American Maritime Dominance, strengthening the nation’s economic and national security. President Trump’s Working Families Tax Cuts included nearly $9 billion to build a series of heavy, medium, and light arctic security cutters (ASCs). In October 2025, President Trump signed a Presidential Memorandum to authorize the construction of up to four ASCs abroad to address urgent national security needs in the Arctic region. In February 2026, the White House released its Maritime Action Plan, which expands the Maritime Industrial Base to include investment and expansion of commercial and defense shipbuilding capabilities, component supply chains, ship repair and marine transportation capabilities, port infrastructure, and the adjacent workforce. And there’s the NSPM. Short and to the point. Again, people will argue small points, and I hope preliminary work on how to convert to steam and hydraulics are already underway. I am naturally suspicious, but there are people involved in this decision who will be around for years. They are in the arena. They have access to levers of power. They want to be successful, not just for their reputation, but for their Navy and the nation it serves, so I’m willing to step back and let them run. If I could offer some unsolicited advice here? I would release the data on the performance shortfalls and other concerns that drove the decision to make the changes for CVN-81. It is hard to find discussions of issues, and what you do get—like linked above—is full of generalities and corporate rope-a-dope. In theory, EMALS and the electric motors will be operating on CVN-78, 79, and 80. If the problems are sorted out by the time 81 is commissioned…well…it won’t be a good look. There simply is not enough information out there to argue the point one way or another…but in a way, the point is moot. The memo is in force. Let’s cut steel. Leave a comment Share This Substack is reader-supported. To receive new posts and support my work, consider becoming a free or paid subscriber. View the full article
  3. Yesterday

  4. What a great weekend for a good old fashioned Midrats Podcast Maritime Melee! Petty domestic political posturing has decided to broach a whole series of our favorite subjects for the last 17 years: carrier shortages, neglect of our auxiliaries in our Combat Logistics Force, leadership at sea, ships adrift…enough for a whole series of shows, but Mark and I promise to keep today’s show to an hour. Join us LIVE from 5--6 PM this Sunday at this link. Jump in the live show chat and share your observations or direct a question to us. DON’T MISS IT! If you’re reading this after the show, check back on the Substack page late Sunday or right before your Monday commute, and we’ll have all the podcast links up so you can catch the fun. No spin. No silly political posturing. Just clear-eyed discussion of the issues, decades in the making…if they’re really issues at all. Leave a comment Share This Substack is reader-supported. To receive new posts and support my work, consider becoming a free or paid subscriber. View the full article
  5. The U.S. Coast Guard is seeking companies capable of converting new C-130J transport aircraft into HC-130J surveillance planes, part of a program that will eventually cover 28 Coast Guard aircraft and 12 more for Customs and Border Protection. The Coast Guard’s Office of Aviation Acquisition posted a request for information on August 14, asking industry […]View the full article
  6. The U.S. Air Force is buying Chinese-made DJI drones for a Wyoming nuclear missile base, using the foreign aircraft as stand-ins for the kind of drones security forces there are training to detect and shoot down. The 90th Contracting Squadron posted a combined synopsis and solicitation on August 14 seeking a small business vendor to […]View the full article
  7. The U.S. Army has opened a Sources Sought notice for production of the T901-GE-900 turboshaft engine, the next-generation powerplant set to replace the T700 series across the service’s Black Hawk and Apache helicopter fleets. The notice, posted August 14 by the Army’s Aviation Turbine Engines Project Office, asks industry to identify companies capable of executing […]View the full article
  8. Andreas Rupprecht, a researcher who tracks Chinese military aviation, published a photograph he says shows what is likely the first clear image of a J-10CE fighter jet belonging to the Uzbekistan Air Force. “Likely the first clear(er) image of an Uzbekistan Air Force J-10CE,” Rupprecht wrote. Uzbekistan has reportedly agreed to purchase 24 J-10CE fighters […]View the full article
  9. A Spanish F-18 fighter jet flying NATO air policing duty shot down a drone that crossed into Romanian airspace early Sunday, marking the fourth drone Romania has shot down this year, the country’s Ministry of National Defence said. Romanian radar systems detected the aircraft entering national airspace at 4:44 a.m. local time, arriving from neighboring […]View the full article
  10. Russia’s A-50U airborne early warning aircraft function as “flying quarterbacks” for its air defense network, and Moscow has no near-term way to replace the ones it has lost, defense researcher Michael Bohnert wrote in a recent analysis of the fleet. Bohnert said the aircraft’s value comes down to line of sight and the curvature of […]View the full article
  11. OM Defence Systems demonstrates X7 counter-drone interceptor across NATO trials, shifting engagements from FPV pilots to operator-supervised autonomy. UK-based OM Defence Systems is demonstrating the X7 drone interceptor to NATO and British military users and using each event to capture customer requirements, as it moves the counter-drone engagement out of the hands of FPV pilots […]View the full article
  12. Last week

  13. The U.S. Air Force has awarded Boeing a $75 million modification to buy initial spare parts for two VC-25B aircraft, the in-development replacement for the current Air Force One fleet. The modification brings the cumulative value of the underlying contract to $4.49 billion, up from $4.42 billion. The modification, listed as P00187 to contract FA8625-16-C-6599, […]View the full article
  14. Boeing has been awarded a $636.1 million modification to its ongoing contract to repair and supply components for the U.S. Army’s AH-64 Apache helicopter fleet, according to a Department of War contract announcement. The modification pushes the cumulative value of the underlying contract past $1.1 billion. The modification, listed as PZ0022 to contract W58RGZ-24-C-0028, covers […]View the full article
  15. The U.S. Army has awarded a $10 billion contract with a potential 26-year term to overhaul how it trains new helicopter pilots, shifting initial flight instruction at Fort Rucker, Alabama, to a contractor-owned, contractor-operated model. M1 Support Services L.P., based in Denton, Texas, won the firm-fixed-price, indefinite-delivery/indefinite-quantity contract, beating out 10 other bidders after the […]View the full article
  16. AM General has been awarded a new indefinite-delivery, indefinite-quantity contract to build High Mobility Multipurpose Wheeled Vehicles for the Army, with this initial action valued at $82.2 million against a cumulative ceiling of up to $754.6 million, the Department of War announced Aug. 13. Work locations and funding will be determined with each individual order […]View the full article
  17. Airbus Helicopters Inc. has been awarded a $115.4 million contract to build up to 12 more UH-72B Lakota helicopters for the U.S. Army, the Department of War announced Aug. 14. The contract covers the helicopters themselves, designated the MBB-BK 117 D3, along with jettisonable cockpit doors, air conditioning system installation, engine inlet barrier filters and […]View the full article
  18. Researchers at Monash University have published a capacity maturity model for assessing how prepared a country is to defend itself against disinformation campaigns, backed by a 103-page white paper that lays out the reasoning behind it in far more depth than the university’s public summary of the project disclosed. The model and white paper were […]View the full article
  19. Thermopylae Aerospace, a California-based interceptor drone startup launched in June 2025 by a young Ukrainian engineer, said it completed a successful end-to-end demonstration of its SPART interceptor at Edwards Air Force Base, briefing senior Air Force Test Center leadership on the system during the “Game of Drones 26-2” event in mid-July. “At 412th Test Wing, […]View the full article
  20. UFORCE, the London-headquartered maker of Ukraine’s Magura naval drones, is touting a series of Ukrainian strikes on Russian air defenses in Crimea as evidence for its pitch to the Pentagon, days before the deadline for a Defense Innovation Unit prize challenge seeking naval drones that can launch their own aircraft. Ukraine’s Defense Intelligence agency, GUR, […]View the full article
  21. Ukrainian long-range strikes hit an industrial site in Samara, Russia, overnight into Aug. 15, triggering a regional air raid alert and a series of explosions residents reported hearing across the city, according to Russian officials and Ukrainian open-source monitoring of the aftermath. Samara region governor Vyacheslav Fedorishchev confirmed that a missile struck an industrial enterprise […]View the full article
  22. A drone found washed up on a UK beach turned out to be a Skyhammer interceptor built by Cambridge Aerospace, the British startup that closed a $300 million funding round at a $3.4 billion valuation earlier this month, according to a Reddit thread and a subsequent technical breakdown posted on social media by UAV engineer […]View the full article
  23. U.S. defense giant Northrop Grumman unveiled Raid Hunter on Aug. 11, a 50mm gun-based air defense system built to counter cruise missiles and drone swarms at short range around military bases and other critical sites. The system pairs the company’s XM913 Bushmaster III chain gun with newly developed precision-guided 50mm ammunition and a networked system […]View the full article
  24. Quit? That is what other people do. I wonder how well he is known in his own nation. It really doesn’t matter, I think. Anyone who has worn the uniform should be able to look to this officer and simply say, “stud.” Naval aviator and all.. Via TheDailyMail; Japan declared war on Germany and (Oberleutnant Gunther) Pluschow flew in a single-seat Rumpler Taube plane to neutral China while under heavy fire from the Royal Navy. He obtained a false passport in the name of E.F McGarvin and boarded the SS Mongolia which left Shanghai to San Francisco on December 5, 1914. He travelled across neutral America and obtained another false passport that proclaimed him to be Swiss national Ernst Smith. In February 1915 he sailed from New York to British controlled Gibraltar on an Italian passenger steamer. He talked his way past a Royal Naval officer but was caught out by the suspicious interpreter. Along with other captured Germans, Pluschow was shipped to Plymouth and then on to the PoW camp at Donington Hall, where he arrived in May 1915. On July 4 he and fellow prisoner Oskar Trefftz broke out by climbing over two 9ft barbed wire fences, before changing clothes and walking 15 miles to Derby where they caught a train to London. By the next morning the men’s escape was featured in the Daily Sketch newspaper with both names and descriptions of the pair. They went their separate ways but Trefftz was recaptured at Millwall Docks. Realising he had to alter his appearance, Pluschow removed his smart tie and handed his coat in at the cloakroom at Blackfriars station. As he handed the garment over the attendant asked him ‘What name is it?’ Without thinking Pluschow replied in German ‘meinen’ (mine). Luckily, the attendant wasn’t paying attention and wrote ‘Mr Mine’ on the receipt. The German then used scraped-up coal dust, boot polish and Vaseline to change his fair hair to greasy black and covered himself in soot to make him appear as a dock worker. He wandered around the docks and on July 7 he overheard a conversation about a Dutch ship due in at Tilbury. He caught a train to the Essex port ... He later swum into the Thames in a bid to reach a rowing boat to take him out to the moored ship but the current was too strong and he was washed ashore exhausted. He then spent four more days and nights making several attempts to row to the vessel before he was able to climb up a thick mooring rope and stow away in a lifeboat. When the vessel, the Prinses Juliana, docked at Flushing in Holland, he melted into the crowd of passengers before sneaking out through a door marked private. He was challenged by a Dutch policeman on the train from Flushing to Germany and, fortuitously, was allowed to carry on his journey despite having no identity papers. The only German POW from WWI to escape and make it home. He died in 1931 at age 44 while exploring in Chile. Of note, he wrote a book of his adventures: The Adventures of the Aviator from Tsingtao: My Experiences on Three Continents Leave a comment Share This Substack is reader-supported. To receive new posts and support my work, consider becoming a free or paid subscriber. View the full article
  25. Ukraine’s Security Service (SBU) says its Alfa special operations unit is running what the agency calls a unique operation to isolate an entire stretch of front-line territory, using a category of strike drones it calls “middle-strike” to cut Russian supply routes. Over the past month, SBU special operations fighters destroyed or damaged nearly 2,400 Russian […]View the full article
  26. German ARX Robotics and its Ukrainian manufacturing partner Roboneers have delivered 30 unmanned ground vehicles to Ukraine’s Defense Forces, equipping a single regiment to run logistics, casualty evacuation and ammunition resupply missions with unmanned systems at the same time, the German company said. The regiment is now operating the vehicles across multiple mission types simultaneously, […]View the full article
  27. Avidrone Aerospace said this week it will develop a new version of Katana, the single-rotor helicopter drone that won the top prize at DARPA’s Lift Challenge earlier this month in Dayton, Ohio. Katana carried a 51-kilogram (112.4-pound) payload aboard a 13.3-kilogram (29.3-pound) airframe, producing an official payload-to-aircraft-weight ratio of 3.84 to 1, Avidrone said. The […]View the full article
  28. Oshkosh Defense and the Marine Corps’ Marine Depot Maintenance Command manufactured an identical, approved replacement part for a Marine Corps heavy truck at two separate production sites, one in Japan and one in Georgia, using the same secure digital blueprint during Exercise Valiant Shield 2026, the company said in a release. Oshkosh Defense, an Oshkosh […]View the full article

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.